Phuong Anh - Portfolio 2017

Page 1

PORTFOLIO


NAME BIRTHDAY CONTACT

Pham Thi Phuong Anh 15/5/1994 phuonganhpham001@gmail.com +841633899761 18 Truong Hoang Thanh street, 12 ward, Tan Binh district, Ho Chi Minh city.


EDUCATION

Bachelor’s degree in architecture, Architecture University of Ho Chi Minh city 2012 – 2017

ACTIVITIES and ACHIEVEMENTS

2017 Graduation project with best lighting design prize - 2nd prize ( by ASA Lighting Design studio )

Participated the collaborative design workshop with student from Huddersfiled University – Manchester city 2016 Participated in Holcim Viet Nam prize – consolation prize EXPERIENCES

10/2017 - 4/2018 Working as a freelancer 4/2018 - 8/2018 Internship architect at Vn Art Arc (Vn-a) 2016 Intership student at MODE Haysom Architects company. ( Making 3D film and architecture model )

SKILLS

Good knowledge of Autocad, Sketchup, Adobe Photoshop, Indesign. Basic knowledge of Vray for sketchup, Revit, Lumion, Adobe Illustrator. Model making, hand sketching, graphic layout.



CONTENT

01 House with the art wall 02 Up - Future house competition 03 Buffer space between the old buildings Bim competition

04 Tay Nguyen Museum of Nature_Part of landscape - Graduation project


Installation view of the 1967 exhibition, “Jackson Pollock,” The Museum of Modern Art, New York. Photographic Archive (inexhibit.com)


HOUSE WITH ART WALL Unbuilt

Nowaday, house is not only meet the accommodation but also spirit demand and show the personality of the owner. It is really interesting because my first client is a special person. He has a paiting collection and he want to have a exhibition space for them. This make me a question how to combination living space and exhibition space in a reasonable way ?


The site on an alley of Nguyen Xi street, Ho Chi Minh city. It has 2 sides contact with road. Exhibition space

Exhibition space

Living space

Exhibition space

Living space

Exhibition space

Living space

Living space


The wall that the painting hang on is extended along the length of house. Minimum the color, furniture and the wall between spaces, to highlight the painting.



1

3

6

4 2

5

Ground floor

1 2 3 4 5 6 0

1st floor

Garage Laundry Living room Kitchen Toilet Bedroom 1

2

4

8m

2nd floor


‘ Xom Nuoc Den ‘ slumdog on high view ( vietnamplus.vn )


UP Future House competition

Housing is one of urgent problems in developing city. In Ho Chi Minh, the problem to be solved is not only the quantity but also the quality of housing. So the idea for future house competition offers opporturnities for architecture student propose new and effective ideas to improve the urban life.


Green density m2/person

URBANIZATION PROBLEM IN A DEVOLOPING COUNTRY At the end of XX and the begining of XXI century, we have witnessed the hasty emergence and devolopment of urban in Viet Nam such as Ho Chi Minh, Da Nang,... This causes the climate change, invironmental pollution, decrease of tree density and public space in the city. Instead of greenery space is many high-rises appearence. It is hard to ensure the green density reaches international standard. Why the high-rises especially high-rise apartments are reason for lack of tree in urban? According to the Ministry of Construction, green density for building is 40%. It only serves ground floor. When the 5 - 30 floors apartment building, the number of people increase 5 - 30 times. Green density is not enough for citizen.

Urban

7-9

6-7.5

5-7

4-6 1.2

special

I - II

III-IV

V

HCM



The proposed site is on a side of the channel which is main branch of city channel system. Until now, it is a slumhouse with crammed rickety ones. For decades, it is not improved and life quality of citizen is seriously affected especially in rain season. In the other side, it also has bad effect on urban and channel side landscape. Which must be used as park and place of activities for citizen.



View is limited

The slum with no more than 2 foors houses Green desity is low

The houses are on the site in the normal way

The houses is raised to release the ground and become apartment system

The released ground become riverside park

Traffic axises are created for pedestrian can conect with riverside

No ventilation and no conection


UP

When the blocks are deflected, the outside space is increased

...

The apartments raised gradually. All of them have riverview and ventilation.

Raising the ground to create the public space for commercial and cultural activities

The combination of raising the apartments and ground

Raising the ground to create the public function without impact on surrounding landscape




4

3

1

2

5

4

Direction to river view Direction to city view Ventilation Access to appartmet

The arrangement of the apartment

Circulation

Structural system

Green space






BUFFER SPACE BETWEEN THE OLD BUILDINGS BIM competition

The selected area is located in Thanh Da condominium which was built before 1975 with the long and seperated blocks. Life of each person who is living their own apartment is really boring and lack of connection. The ground floors of the apartment are just used as place for business although the other activities are also very important.


Buffer space is not used as the spaces that have main functions. But they support and increase the value of them. We want to create the buffer spaces between these blocks by adding the connected briges and lightweight structure roofs by fabric or policacbonat ...


PROPOSAL FUNCTIONS

Flea market

Park

Playground

Library





TAY NGUYEN MUSEUM OF NATURE _ PART OF LANDSCAPE Granduation project_2017

Take care, find right measure and envision the placement of the proposed building in the landscape over and over again to see whether the landscape accepts it. [...] Through inner appreciation, not through theoretical argumentation. Peter Zumthor


SITE LOCATION


LOCATION Project area is nearly in the center of Ea Kao lake, Buon Ma Thuot - the capital of Dak Lak. From the site, we can overlook 2/3 of total lake. The area has three sides adjacent the lake and the other side adjacent the park of the oldgrowth forest. Advantage : The area has the main features of Tay Nguyen nature. So it is really suitable to build a museum of nature on. Disadvanture : Far from the city center ( 12 km)

The road to reach the area

Boundary of the area

Animal house

Forest park of Ea Kao lake

Old-growth forest


Section 11’

Section 22’

Section throught the site


The different of landscape between tow season in a year, the dry and rain season


Existing landscape

Retaining most existing greenery, arranged function spaces along the terrain and minimum intervention existing landscape

Landscape axises link the functions. The main axis begins from the old-growth forest and ends at the lake

The auxiliary axis links inside and outside exhibition space - the end of sightseeing process


located in center with large volume, in the nomal structure the it will overwhelm surounding nature.

Decrease the volume above the ground

Sloping roof is gradually lower from old-growth forest to river bank


1 Square 2 Ramp to the basement 3 Footpath 4 Service path for animal area 1 Rest area 5 Square Ramp theanimal basement 2 area 6 Storagetofor Footpath 3 7 High footpath path for animal area 4 Observatory 8 Service 5 Fencearea 9 Rest 6 Storage for animal area 7 High footpath Boundary 8 Observatory 9 Fence Boundary

Site plan


2

Public area entrance

1

Main entrance

9

5

3

4 8 6 7


0

5 10

20

Plan cote -14.000

40


0

5 10

20

Plan cote -9.000

40


0

5 10

20

Plan cote -4.000

40


0

5 10

20

40

Plan cote +0.000

0

5 10

20

Plan cote +5.000

40


Section AA

Section BB









INTERIOR DESIGN

Plan

Section 11’

Section 22’

Concrete

Concrete

bronze

gravel

Material







Study model




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.