SANCHEZ FER NANDA SANC HEZ ARCHITECTURE AND URBAN DESIGN PORTFOLIO
TOURISM AND CONSERVATION URBAN PROPOSAL
DESIGN RESEARCH AND MAPPING GALAPAGOS ISLANDS, ECUADOR.
MILLEDGEVILLE MASTER PLAN
REACTIVATION OF THE CENTRAL STATE HOSPITAL CAMPUS (CSH) FACTOR’S WALK - SAVANNAH, GA.
SAVANNAH URBAN TYPOLOGIES
DESIGN RESEARCH SAVANNAH, GA.
SAVANNAH HISTORIC EVOLUTION AND URBAN LAYERS
DESIGN RESEARCH SAVANNAH, GA.
URBAN FRAGMENT
URBAN INTERVENTION AND INFILL PROPOSAL FACTOR’S WALK - SAVANNAH, GA.
SAVANNAH HISTORIC EVOLUTION AND URBAN LAYERS
DESIGN RESEARCH SAVANNAH, GA.
MIX USE_HOUSING PROJECT BACHELOR DEGREE THESIS LIMA, PERU.
PROFESSIONAL WORK OTHER WORK
GAL APAGO S ISL AND S TOURISM AND CONSERVATION
Mapping the Galapagos extends design research into the real of geography and critical cartography. Maps and the act of mapmaking are understood as spatial representations of geo-spacial conccerns as well as an exercise in design as an extra large scale enterprise. The maps that were created describe aspects of the galapagos pertinent to tourism and conservation. The studio project address interventions and proposals at differing territorial scales, which include the entire territory of the Galapagos Islands and surrounding marine environment. The Galapagos Islands possess an extraordinary range of ecological, environmental, geological, oceanographic, social, and infrastructural elements that were expressed visually through maps.
AGRICU LTU RE A ND CO NS E RVAT I O N
SANTA C R UZ C RO P T Y P E
CROP TYPE
ISLA SANTIAGO
CLIMATE
MICONIA
VERY HUMID
PISONIA
HUMID
PASPALUM CONJUGATUM
DRY
PANICUM MAXIMUM
VERY DRY
PALO SANTO, CHAMOMILE
ARID
SCALECIA PEDUNCULATA
BUFFER
GUAVA, BANANA, CITRUS, YUCA COFFEE HERBACEA
ISLA FERNANDINA ISLA RABIDA ISLA BARTRA
ISLA SANTA CRUZ ISLA PINZON
ISLA ISABELA
PUERTO AYORA
ISLA SANTIAGO
ISLA SANTIAGO
ISLA SANTA FE ISLA DE SAN CRISTOBAL
PUERTO BAQUERIZO MORENO
ISLA FERNANDINA
ROCKY OUTCROPS
ROCKY OUTCROPS WATER
ISLA RABIDA
ISLA FERNANDINA
ISLA RABIDA
WATER
ISLA BARTRA
ISLA BARTRA
BUSHY PLANTS
BUSHY PLANTS
ARBOREAL PLANTS
ARBOREAL PLANTS
CULTIVATED LAND
CULTIVATED LAND
INVASIVE ESPECIES
PUERTO VILLAMIL ISLA SANTA CRUZ
INVASIVE ESPECIES
ISLA PINZON
ISLA SANTA CRUZ
HERBACEOUS PLANTS ISLA PINZON
INFRASTRUCTURE
ISLA ISABELA
HERBACEOUS PLANTS MANGROVES
INFRASTRUCTURE
ISLA ISABELA
PIONEER PLANTS
MANGROVES
PUERTO AYORA
UNTREATED LAND
PIONEER PLANTS
CONSERVATION AND RESTAURATION AREA
UNTREATED LAND
ABSOLUTE PROTECTION
ISLA SANTA FE
PUERTO AYORA
BUFFER CONSERVATION AND RESTAURATION AREA
ISLA DE SAN CRISTOBAL
ISLA SANTA FE
AGRICULTURAL AREA
PUERTO BAQUERIZO MORENO
ISLA DE SAN CRISTOBAL
ABSOLUTE PROTECTION BUFFER
URBAN AREA
PUERTO PUERTO ISLA FLOREANA VELAZCO VILLAMIL IBARRA
AGRICULTURAL AREA URBAN AREA
1 0
PUERTO BAQUERIZO MORENO
PUERTO VILLAMIL
10 5
20
MILES
CLIMATE
PUERTO VELAZCO IBARRA
10
5
20
ISLA FLOREANA
LOC A L KN OW L E D G E AND P RAC T I C ES I N IS L AN D FA R MI NG ISLA SANTIAGO
ISLA FERNANDINA
ROCKY OUTCROPS
MANGROVES
WATER
PIONEER PLANTS
BUSHY PLANTS
UNTREATED LAND
ARBOREAL PLANTS
CONSERVATION AND RESTAURATION AREA
CULTIVATED LAND
ABSOLUTE PROTECTION
INVASIVE ESPECIES
BUFFER
HERBACEOUS PLANTS
AGRICULTURAL AREA
INFRASTRUCTURE
URBAN AREA
BUFFER AND AGRICULTURAL AREA
INTER ISLAND TRANSPORT SYSTEM
ISLA RABIDA ISLA BARTRA
BALTRA AIRPORT
ISLA SANTA CRUZ ISLA PINZON
ISLA ISABELA
PUERTO AYORA
LAS BACHAS
SANTA CRUZ FERRY TERMINAL 1
0
ISLA SANTA FE ISLA DE SAN CRISTOBAL
10
5
20 PUERTO BAQUERIZO MORENO
MILES
PUERTO VILLAMIL
PUERTO VELAZCO IBARRA
CERRO DRAGON
ISLA FLOREANA
SANTA CRUZ HWY
LEGEND
LEGENDURBAN AREA BUFFER
URBAN AREA
NATURAL VEGETATION
BUFFER
SECONDARY BUFFER / REACREATION AREA
NATURAL VEGETATION SECONDARY BUFFER / REACREATION AREA
SECONDARY BUFFER / REACREATION AREA
ROADS
SECONDARY BUFFER / REACREATION AREA ROADS
1 SANTA CRUZ HWY
1 0 MILES
5
BELLAVISTA TOWN
EL GARRAPATERO 1 0 MILES
Source: GIS Data + Google Earth
PUERTO AYORA
PLAYA PENINSULA
5
0 MILES
5
SANTA CRUZ HWY
LEGEND
FARMERS MARKET
BELLAVISTA TOWN SANTA CRUZ HWY
ROTATING STEER AND COW PASTURE
MAIN ROADS
ADOBE AQUACULTURE
AGRICULTURAL TRAIL (CYCLING, HIKING, RECREATION) GREEN STACKING
SECONDARY BUFFER AGRICULTURAL AREA (POLITICAL BOUNDARY) BARN AND RECREATION AREA
GOAT AND SHEEP PASTRURE GOAT AND SHEEP PEN
PERMACULTURE FARMER’S MARKET LAYOUT
HOUSE
VEGETABLE GARDEN ESPALIER AND CORDONING
CHICKEN PASTURE
BEES
FRUIT TREES
FRUIT TREES
CHICKEN COOP
HOUSE
SHED
PERMACULTURE
POTATOES
PATCHES - WOODED AREA (LANDSCAPE DESIGN ECOLOGY) DETAIL
BELLAVISTA TOWN
CORRIDOR (LANDSCAPE ECOLOGY)
ROTATING STEER AND COW PASTURE
LEGEND
SECONDARY BUFFER AND RECREATION AREA ADOBE GREEN HOUSE
STACKING
MAIN ROADS
COFFEE PERMACULTURE AREA
AQUACULTURE
BELLAVISTA TOWN SECONDARY BUFFER AND RECREATION AREA
BANANA FARMERS MARKET
NATURAL VEGETATION
CROP TYPE BARN
VEGETABLE GARDEN ESPALIER
BEES AND AGRICULTURAL TRAIL (CYCLING, HIKING, RECREATION) GOAT AND CHICKEN SHEEP
PASTURE
CORDONING
PASTRURE GOAT PISONIA AND AGRICULTURAL AREA (POLITICAL BOUNDARY) SHEEP PEN
FRUIT TREES
FRUIT TREES
FIFTH SOIL ZONE
PISONIA
FOURTH SOIL ZONE
CHICKEN PERMACULTURE HOUSE COOP PASPALUM CONJUGATUM
SHED
THIRD SOIL ZONE SECOND SOIL ZONE
+/- 700 m
FIRST SOIL ZONE
PASPALUM CONJUGATUM
PAMPA
PERMACULTURE
BUFFER
PANICUM MAXIMUM FARMER’S MARKET LAYOUT DESIGN DETAIL
VERY HUMID
500 m
HUMID
PANICUM MAXIMUM
DRY
400 m
AGRICULTURAL AREA
300 m
PALO SANTO, CHAMOMILE 180 m
PATCHES - WOODED AREA (LANDSCAPE ECOLOGY) SCALECIA PEDUNCULATA
CORRIDOR (LANDSCAPE ECOLOGY)
0m
GUAVA, BANANA, CITRUS, YUCA BELLAVISTA TOWN
MAIN ROADS
COFFEE
BANANA
GUAVA, BANANA, CITRUS, YUCA
SCALECIA PEDUNCULATA
LEGEND
100 m
POTATOES
PALO SANTO, CHAMOMILE
NATURAL VEGETATION
COFFEE
SECONDARY BUFFER AND RECREATION AREA
COFFEE
HERBACEA
AGRICULTURAL TRAIL (CYCLING, HIKING, RECREATION) +/- 700 m
FIFTH SOIL ZONE
AGRICULTURALHERBACEA AREA (POLITICAL BOUNDARY) 500 m
400 m
PERMACULTURE AREA 300 m
FARMERS MARKET
THIRD SOIL ZONE
FARMER’S MARKET LAYOUT
POTATOES SECOND SOIL ZONE
180 m
ROTATING STEER AND COW PASTURE
AQUACULTURE
SECONDARY BUFFER AND RECREATION AREA
STACKING BARN GOAT AND SHEEP PASTRURE GOAT AND SHEEP PEN
CHICKEN PASTURE
PAMPA
VEGETABLE GARDEN ESPALIER AND CORDONING
NATURAL VEGETATION
BEES
FRUIT TREES
CHICKEN COOP
+/- 700 m
FIRST SOIL ZONE
0m
CORRIDOR (LANDSCAPE ECOLOGY)
GREEN HOUSE
SECONDARY BUFFER AND RECREATION AREA NATURAL VEGETATION
SHED
FIFTH SOIL ZONE
THIRD SOIL ZONE
PERMACULTURE DESIGN DETAIL
SECOND SOIL ZONE
+/- 700 m
BUFFER
HUMID
PASTURE
COFFEE
DRY
PAMPA
+/- 700 m
CROP TYPE
400 m
300 m 500 m 180 m
500 m
100 m
300 m
PISONIA
DRY
PISONIA
PASPALUM CONJUGATUM
AGRICULTURAL AREA
PASPALUM CONJUGATUM
PANICUM MAXIMUM
PANICUM MAXIMUM
PALO SANTO, CHAMOMILE
PALO SANTO, CHAMOMILE
SCALECIA PEDUNCULATA
SCALECIA PEDUNCULATA
GUAVA, BANANA, CITRUS, YUCA
GUAVA, BANANA, CITRUS, YUCA
COFFEE
COFFEE
HERBACEA
AGRICULTURAL AREA
HUMID
HERBACEA
0m
BELLAVISTA TOWN MAIN ROADS
COTTON
FIRST SOIL ZONE
VERY HUMID
400 m
BANANA
VERY HUMID
FOURTH SOIL ZONE
HOUSE
500 m
LEGEND
CORN
100 m PATCHES - WOODED AREA (LANDSCAPE ECOLOGY)
PERMACULTURE AREA
ADOBE
TOMATOES
FRUIT TREES FOURTH SOIL ZONE
PERMACULTURE
PERMACULTURE METHODOLOGY
180 m 100 m
400 m AGRICULTURAL TRAIL (CYCLING, HIKING, RECREATION)
0m
AGRICULTURAL AREA (POLITICAL BOUNDARY) PERMACULTURE
+/- 700 m
300 m
FRUIT TREES
FIFTH SOIL ZONE
500 m
400 m
400 m
THIRD SOIL ZONE
FARMER’S MARKET LAYOUT
PEOPLECARE
PATCHES - WOODED AREA (LANDSCAPE ECOLOGY)
180 m
SECOND SOIL ZONE
CORN
BANANA
VERY HUMID
100 m
COTTON
DRY 5
100 MILES
100 m
2.5
0
COFFEE
AGRICULTURAL AREA
PASTURE
PISONIA PISONIA
PASPALUM CONJUGATUM
PASPALUM CONJUGATUM
PANICUM MAXIMUM
PANICUM MAXIMUM
PALO SANTO, CHAMOMILE
PALO SANTO, CHAMOMILE
SCALECIA PEDUNCULATA
SCALECIA PEDUNCULATA
GUAVA, BANANA, CITRUS, YUCA
GUAVA, BANANA, CITRUS, YUCA
COFFEE
COFFEE
HERBACEA
HERBACEA
0m
300 m
180 m 100 m
0m
HUMID
NATURAL VEGETATION
Using the earth’s limited resources in ways that are equitable and wise
180 m
FIRST SOIL ZONE PAMPA
CORRIDOR (LANDSCAPE ECOLOGY)
FAIRSHARES
Helping each other and ourselves to live sustainably
300 m
POTATOES
SECONDARY BUFFER AND RECREATION AREA
+/- 700 m
500 m
FOURTH SOIL ZONE
0m
EARTHCARE Respecting The Earth, Gaia, as the source of all life
TOMATOES
0m
M IL L E D GE VIL L E
REACTIVATION OF THE CENTRAL STATE HOSPITAL Analysis of the former Central State Hospital in Milledgeville, Georgia. Design a plan that will re-activate and re-connect the site to the town center of Milledgeville. Assess the potential for the site based on historic and current survey information. Historic resources used- Sanborn maps, images and information from a site visit. To understand the potential for the site, a diachronic survey was undertaken. This gave an understanding of the development of the city of Milledgeville and the subject site. The master plan focuses on reinvigorating the southern, former hospital campus, section of Milledgeville and aims to provide a resilient part of the city that can connect to the historic downtown: a focus on a new educational/college facility, a mixture of single dwelling housing and multi-family blocks, adaptive preservation of some of the historic buildings within the campus to integrate in to the new educational facilities, and newly constructed road to connect to highways running to the east and west of Milledgeville.
- Milledgeville is a city located 30 miles to the northeast of Macon. - Formerly the Capital of Georgia (1804-1868) until after the American Civil War. - The new planned town, modeled after Savannah and Washington, D.C., stood on the edge of the frontier, where the Upper Coastal Plain gives rise to the foothills and plateau of the Piedmont.
GEORGIA
BALDWIN COUNTY
75 - N/S Chatanooga - Atlanta - Macon -Lake City
MILLEDGEVILLE CITY
441 - N/S Madison - Dublin
441 - N/S Madison - Dublin
441 - N/S Athens - Milledgeville - Lake City 20 - E/w Atlanta - Augusta
ATLANTA
AUGUSTA
MILLEDGEVILLE MACON
DOWNTOWN MILLEDGEVILLE
STUDY AREA
SAVANNAH
16 - E/W Macon - Savannah
540 - E/S Macon - Augusta
540 - E/S Macon - Augusta
RESEARCH AND ANALYSIS DIACHRONIC SURVEY
The diachronic survey focused on the development of the town of Milledgeville from its inception in 1804 with the four public spaces, and how these are used currently. This understanding of how the urban pattern developed is important in understanding how the subject site developed alongside the town.
BUILDING FOOTPRINTS AND GREEN SPACE
FIGURE GROUND
TRAFFIC
LANDUSE
1804 - 08
LEGEND
LEGEND
LEGEND
Study area
Study area
Study area
Green space
Built area
Built area
LEGEND Study area Main roads Secondary roads Water Traffic - Primary Water Traffic - Secondary
1804 - 08 RESEARCH AND ANALYSIS DIACHRONIC SURVEY
The development of the town grid and subsequent road network in Milledgeville was considered important as it illustrated a disconnect, both intentional and unintentional where a creek divided the town to the north and the south. Analysis of historic maps with Illustrator allows a hierarchy of transport and roads to be displayed,LEGEND which can then be integrated in to the proposal for the site. LEGEND LEGEND Study area
Study area
Study area
Green space
Built area
Built area
LEGEND Study area Main roads Secondary roads Water Traffic - Primary Water Traffic - Secondary
1840 - 65
LEGEND
LEGEND
LEGEND
Study area
Study area
Study area
Undeveloped area Green space
Built area
Institutional Religious Residential Mix use Commercial Green space Industrial
LEGEND Study area Main roads Secondary roads Water Traffic - Primary Water Traffic - Secondary Railroad Landmarks
1840 - 65 RESEARCH AND ANALYSIS DIACHRONIC SURVEY
The surveys outlined the establishment of green space within Milledgeville within the town center, and within the Central State Hospital Campus. Analysis of historic maps including Sanborn maps allowed the illustration of a historical traffic hierarchy in Milledgeville. LEGEND
LEGEND
LEGEND
Study area
Study area
Study area
Undeveloped area Green space
Built area
Institutional Religious Residential Mix use Commercial Green space Industrial
LEGEND Study area Main roads Secondary roads Water Traffic - Primary Water Traffic - Secondary Railroad Landmarks
1927
LEGEND
LEGEND
LEGEND
Study area
Study area
Study area
Undeveloped area Green space
Built area
Institutional Religious Residential Mix use Commercial Green space Industrial
LEGEND Study area Main roads Secondary roads Water Traffic - Primary Water Traffic - Secondary Railroad Landmarks
ct
ds Primary Secondary
RESEARCH AND ANALYSIS DIACHRONIC SURVEY
The Synchronic survey documented five aspects of Milledgeville: - Through analysis of Google maps, GIS data and plans from a field trip to Milledgeville the existing building footprints and green spaces were detailed. - A traffic hierarchy is represented, including the road network, railroads and water traffic. - Existing land uses were illustrated to outline the current pattern of land uses in the town. - A figure ground diagram was developed to understand the density across the town center and the subject site at the CSH. - Following a meeting with the town planning department a zoning diagram was produced.
2017 LANDUSE BUILDING FOOTPRINTS AND GREEN SPACE TRAFFIC
LEGEND LEGEND Historic District Institutional Main roads Religious Secondary roads Water Traffic - Primary Residential Water Traffic - Secondary Mix use Railroad Commercial Landmarks
FIGURE LANDUSE GROUND TRAFFIC
ZONINGLANDUSE FIGURE GROUND
LEGEND LEGENDLEGEND Historic District Study area Institutional
Built area Main roads Religious Secondary roads Water Traffic - Primary Residential Water Traffic - Secondary Mix use Railroad Commercial Landmarks
ZONING FIGU
LEGEND
LEGEND LEGEND
Agricultural Residential Heavy Industrial Office Institutional Commercial Multi-Family Residential
Study area Institutional Built area Religious Residential Mix use Commercial
Green space
Green space
Central Business Commercial
Green space
Industrial
Industrial
Single Family Residential
Industrial
0
0
MASTER PLAN
MASTER PLAN 2050
SCALE: 1/5000
SCALE: 1/5000
STREET STREET SECTIONS SECTIONS STREET SECTIONS SPINE SECTION SPINE SECTION SPINE SECTION Residential
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Residential
Residential bike
Commercial Commercial
Residential
private property 5m set property back for commerce private
parallel parking parallel
sidewalk
parking
sidewalk
one way road one onelane way road
private property 5m set back for commerce
medium medium
one lane
sidewalk bike bike
bike
5m set back for commerce
Commercial
bike
parallel parking
sidewalk
one way road one lane
one way road oneroad lane one way one lane
medium
bike
one way road one lane
sidewalk parallel parking parallel parking
parallel parking
private property 5m set back for commerce private property
Residential
5m set back for commerce Commercial
sidewalk private property 5m set back for commerce
Commercial
Commercial
SCALE: 1/100 SCALE: 1/100 SCALE: 1/100
CONNECTOR SECTION CONNECTOR SECTION CONNECTOR SECTION
green buffer green buffer
SCALE: 1/100 SCALE: 1/100 SCALE: 1/100
RESIDENTIAL STREET SECTION RESIDENTIAL STREET SECTION RESIDENTIAL STREET SECTION
SCALE: 1/100 SCALE: 1/100 SCALE: 1/100
green buffer
SAVANNAH
HISTORIC EVOLUTION AND URBAN FORM This studio introduces to urban design concepts, strategies and representational tools through design research, documentation, analysis and projects based in the city of Savannah. Commencing with research and analysis to the historic district and its present situation in the 21st century, the project engaged with a range of issues central to the study and practice of urban design. The project will address the physical structure of Savannah’s historic district and its immediate surrounds, as well as human and experiential factors that are not easily understood using conventional maps and plans. In addition, it explores the city’s continuing ability to accommodate and adapt to a diverse mix of buildings, uses, public spaces, and infrastructures while considering the related concept of “urban design by adaptive reuse.” The project also focus attention at the street level to gain an understanding of how these essential urban elements effect the everyday world.
SAVANNAH HISTORIC EVOLUTION AND URBAN LAYERS SAVANNAH, GA
Portions of Savannah’s urban fabric have undergone radical, seemingly irreversible transformations during the twentieth century, and, as in all built environments, the continuity of change is inevitable, sometimes slow and subtle but often cataclysmic and dramatic. Nonetheless, the essential urban structure (the streets and open spaces) of the historic district remains intact. the structure has proven resilent and adaptable over the course of nearly three centuries, as buildings come and go, new
1916
1884
1733
DECKER WARD
DARBY WARD
REYNOLDS WARD
Source: Sanborn maps,Georgia Historical Socitey
DECKER WARD
DARBY WARD
REYNOLDS WARD
Source: Sanborn maps,Georgia Historical Socitey
1954
DARBY WARD
REYNOLDS WARD
DARBY WARD
REYNOLDS WARD
DECKER WARD
DARBY WARD
REYNOLDS WARD
2015
DECKER WARD
Source: Sanborn maps,Georgia Historical Socitey
DECKER WARD
Source: Sanborn maps,Georgia Historical Socitey
1973
DECKER WARD
Source: Sanborn maps,Georgia Historical Socitey
districts and uses emerge, and popular uses of public spaces shift and evolve. The historic development and transformation of the city, from 1733 through the present, was analized and representerd through maps, plans and views of the city. The goal was to capture and visualiza essential information about the city’s form and structure. Various levels of abstraction and reduction are to be used to achieve drawings that speak to the complexity of the urban fabric.
DARBY WARD
REYNOLDS WARD
Source: Sanborn maps,Georgia Historical Socitey
VACANT BUILDINGS
VACANT LOTS
BUS ROUTES
HISTORIC BUILDINGS
HISTORIC BUILDINGS
This map represents buildings classified as historic in the historic district. Historic buildings are considered all those that are protected by the government.
T OF SAVANNAH
TO BLACK SHEAR/PINE GARDENS/GORDONSTON/LIBERTY TERMINALS
LE/BEAVER VANNAH/WODVILLE BARSAVANNAH
TO GORDONSTON/VICTORY HEIGHTS
LEGEND
LEGEND Historic buildings
Bus routes Bus stops Dot Bus routes
TO HUNTER ARMY FIELDS
TO CLOVERDALE/BEAVER POND/CSX-SAVANNAH
TO VICTORY HEIGHTS
TO HUNTER ARMY FIELDS
Source: Chatam Metropolitan Planning Comission Vacant buildings
URBAN PATTERNS
BIKE ROUTES
URBAN PATTERNS
BRYAN STREET ST JULIAN STREET
ST JULIAN STREET
CONGRESS STREET
Savannah river BROAD STREET
BROUGHTON STREET PRICE STREET
HABERSHAM STREET
LINCOLN STREET
ABERCON STREET
DRAYTON STREET
WHITAKER STREET
BARNARD STREET
JEFFERSON STREET
MONTGOMERY STREET
MLK JR BLVD
This map represents the hydrology analysis of Savannah. How the water bodies affect the natural disaster on the low lying area.
BAY STREET
BAY STREET
BRYAN STREET
CONGRESS STREET
BROUGHTON STREET
HIDROLOGY
HYDROLOGY
This map represents the urban patterns present in the historic district according to the organization of plazas, blocks, lots and public spaces.
STATE STREET
STATE STREET
PRESIDENT STREET
PRESIDENT STREET
YORK STREET
YORK STREET
OGLETHORE AVE
OGLETHORE AVE
HULL STREET
HULL STREET
MC DONOUGH STREET
MC DONOUGH STREET
PERRY STREET
PERRY STREET
LIBERTY STREET
LIBERTY STREET
HARRIS STREET
HARRIS STREET
After math of Hurricane Matthew
MACON STREET
MACON STREET
CHARLTON STREET
CHARLTON STREET
JONES STREET
JONES STREET
LEGEND
LEGEND
Blocks and Squares
TAYLOR STREET
TAYLOR STREET
Bike routes
WAYNE STREET
WAYNE STREET
GORDON STREET
GORDON STREET
Zero Line Historic District Set back Historic District River front
GASTON STREET
GASTON STREET
Set back Victorian District Multifamily Housing
HARTRIDGE STREET
Others
Flood in Indian street
GWINNETT STREET
NICOLL STREET
Source: Google Maps, Google Earth
GWINNETT STREET
BROAD STREET
PRICE STREET
HABERSHAM STREET
LINCOLN STREET
ABERCON STREET
DRAYTON STREET
WHITAKER STREET
BARNARD STREET
TATTNALL STREET
JEFFERSON STREET
MONTGOMERY STREET
MLK JR BLVD
HUNTINGDON STREET
LEGEND Flood level 10m Hurricane cat 3 Hurricane cat 5 Water bodies Conduit lines
SAVANNAH URBAN TYPOLOGIES STREETS & SQUARES, BUILDINGS & BLOCKS SAVANNAH, GA JASPER WARD - MADISON SQUARE This assigment focuses on visual interpretation of essential urban elements - the streets and squares, buildings and blocks which could be considered irreducible parts of the city. students are asked to explore an Oglothorpe ward in comprenhensive detail and describe its built environment. In our understanding of how streets and squares together establish the public realm of the ward, of how buildings and blocks create the architectural fabric, what can be observe about about the relationships between these elements? Are there additional urban elements that bring architecture, infraestructure and open spaces into an interrelated whole?
LEGEND ROADS
LEGEND
LEGEND
VEHICULAR CIRCULATION
ROADS
STREETS
STREETS
SQUARE
SQUARE
LEGEND
LEGEND LEGEND LEGEND VEHICULAR CIRCULATION ROADS SERVICE STREET - T 1
LEGEND
LEGEND
VEHICULAR CIRCULATION
ROADS
STREETS SERVICE STREET - T 2 SQUARE BOULEVARD
STREETS
IN BETWEEEN ST - 1
SQUARE
IN BETWEEEN ST - 2 IN BETWEEEN ST - 3
SERVICE STREET - T 1 SERVICE STREET - T 2 BOULEVARD IN BETWEEEN ST - 1 IN BETWEEEN ST - 2 IN BETWEEEN ST - 3
LEGEND ROADS STREETS SQUARE
BUILDING TYPE ST JOHN’S EPISCOPAL CHURCH
DESOTO SAVANNAH HOTEL
SCAD’S POETTER HALL
SITE
SCALE
SITE
SCALE
SITE
ARCHITECTURAL ELEMENTS
MASSING
ARCHITECTURAL ELEMENTS
MASSING
ARCHITECTURAL ELEMENTS
LANDSCAPE
LANDSCAPE
LANDSCAPE
SCALE
MASSING
SECTIONS
SECTIONS
SECTIONS SECTIONS
HEM A PUBLIC SPACE CONCEPT
S A PLAZA
1: FACTOR’S WALK EXTENSION
SAVANNAH URBAN FRAGMENT - PEDESTRIAN CIRCULATION SHOULD BE CONTINUOS -FACTOR’S WALK EXTENSION WOUL CONNECT BOTH SIDES OF THE IN BETWEEN SPACE
CONTEXT PLAN
CITY FORM BETWEEN RIVER AND BLUFF: SECTION, INFRASTRUCTURE, TYPE - FLUID CIRCULATION
SAVANNAH, GA The site consists of the linear condition between Bay St and the buildings along River St from Bull St and City Hall to East CONCEPT 2: Broad St, with anPLAZA emphasis on the renovation/refinement of Factor´s Walk, emmet Park, and the northern edge of Bay MULTIFUNCTIONAL EXTENSION St, with a FOR key infill project BRIDGES NOT ONLY CIRCULATION - - - MAKE THEMlocated A PUBLIC SPACEat the east end of River St, at the juncture of Factor’s Walk and E Broad St ramp. The project formally addressed infrastructure and typological transformation. FACTOR’S WALK EXTENSION AS A PLAZA
CONCEPT 1: CONCEPTWALK 1: EXTENSION FACTOR’S
BAY ST LEVEL
FACTOR’S WALK EXTENSION
- PEDESTRIAN CIRCULATION BE CONTINUOS SERVICE ENTRANCESHOULD LEVEL
- PEDESTRIAN CIRCULATION SHOULD BE CONTINUOS
POSIBLE USE -FACTOR’S WALK EXTENSION WOUL CONNECT BOTH SERVICE LANE LEVEL SIDES OF THE IN BETWEEN SPACE
-FACTOR’S WALK EXTENSION - SITTINGWOUL PLACECONNECT BOTH
THE IN BETWEEN SPACE -SIDES FLUIDOF CIRCULATION FACTOR’S WALK EXTENSION AS A PLAZA
- COMMERCIAL EXTENSION - FLUID CIRCULATION - PUBLIC PLAZA
BAY ST LEVEL
-RESTING AREA
CONCEPT 2: SERVICE ENTRANCE LEVEL MULTIFUNCTIONAL PLAZA EXTENSION
CONCEPT 2: MULTIFUNCTIONAL PLAZA EXTENSION SERVICE LANE LEVEL
BRIDGES NOT ONLY FOR CIRCULATION - - - MAKE THEM A PUBLIC SPACE FACTOR’S WALK EXTENSION AS A PLAZA
BRIDGES NOT ONLY FOR CIRCULATION - - - MAKE THEM A PUBLIC SPACE FACTOR’S WALK EXTENSION AS A PLAZA BAY ST LEVEL
POSIBLE USE
SERVICE ENTRANCE LEVEL
BAY ST LEVEL
ERVICE CIRCULATION
SERVICE LANE LEVEL
- SITTING PLACE
SERVICE ENTRANCE LEVEL FACTOR’S WALK EXTENSION AS A PLAZA
- COMMERCIAL EXTENSION
SERVICE LANE LEVEL
- PUBLIC PLAZA FACTOR’S WALK EXTENSION AS A PLAZA BAY ST LEVEL
-RESTING AREA
SERVICE ENTRANCE LEVEL
BAY ST LEVEL
SERVICE LANE LEVEL
SERVICE ENTRANCE LEVEL
SERVICE LANE LEVEL
CONCEPT 3: NEW ACTIVIES PROPOSAL POSIBLE USE SERVICE ENTRANCE LEVEL
POSIBLE USE
- SITTING PLACE - SITTING PLACE SERVICE LANE NOT ONLY FOR VEHICULAR AND SERVICE CIRCULATION - COMMERCIAL EXTENSION - COMMERCIAL EXTENSION POSIBLE USE - MAKE THEM AN OUTDOOR PUBLIC SPACE - PUBLIC PLAZA - PUBLIC PLAZA - SITTING PLACE -RESTING AREA -RESTING AREA - COMMERCIAL EXTENSION BAY ST LEVEL
- PUBLIC PLAZA SERVICE LANE LEVEL
-RESTING AREA
CONCEPT 3: NEW ACTIVIES PROPOSAL CONCEPT 4: SERVICE ENTRANCE LEVEL
TERRACED PLAZA UNDER BRIDGE
SERVICE LANE NOT ONLY FOR VEHICULAR AND SERVICE CIRCULATION
CONCEPT 3: NEW ACTIVIES PROPOSAL SERVICE ENTRANCE LEVEL
- MAKE THEM AN OUTDOOR PUBLIC SPACE
BAY ST LEVEL LANE NOT ONLY FOR VEHICULAR AND SERVICE CIRCULATION SERVICE SERVICE LANE LEVEL - MAKE THEM AN OUTDOOR PUBLIC SPACE
BAY ST LEVEL
POSIBLE USE - SITTING PLACE - COMMERCIAL EXTENSION - PUBLIC PLAZA -RESTING AREA
SITE
OPOSAL WORKS LIKE A PARK - BUILDING – VIEWPOINT OF THE WEEN RIVER STREET AND FACTOR'S WALK
INFILL PROPOSAL - HYBRID PROJECT TYPOLOGY THAT USES THE SITE’S TOPOGRAPHY AS THE MAIN CONCEPT TO PLACE THE BUILDING BUILDING VIEWPOINT + PARK EXTENSION
B
OVER THE BUILDING’S ROOF MAKES THE EXPERIENCE BE MORE - THE BUILDING PROPOSAL WORKS LIKE A PARK - BUILDING – VIEWPOINT OF THE ONTANEOUS WHILE THE USERS MAKE USE OF IT
A
A
- Hybrid typology that uses the site’s topography as theFACTOR'S main concept to place the building. LINEAR CIRCUIT BETWEEN RIVER STREET AND WALK
B
- THE CIRCULATION OVERlike THE BUILDING’S ROOF MAKES EXPERIENCE BE MORE - The building proposal works a park - bilding - viewpoint of theTHE linear circuit between River St and Factor’s Walk.
A
NATURAL AND EXPONTANEOUS WHILE THE USERS MAKE USE OF IT
- The circulation over the building’s roof makes the experience be more natural and expontaneous while the users make use of it. B PROGRAM SECTIONS ARCHITECTURAL SECTIONS CAFE
ARCHITECTURAL SECTIONS
PROGRAM SECTIONS
MEETING ROOMS
CAFE
PARKINGMEETING ROOMS GALLERY/MULTIPLE USE TURIST SERVICES/FOOD GALLERY/MULTIPLE USE COURT
PARKING
TURIST SERVICES/FOOD COURT
SECTION A SECTION A
SECTION SECTION A
MEETING ROOMS
MEETING ROOMS
PARKING PARKING
GALLERY/MULTIPLE USEUSE GALLERY/MULTIPLE TURIST SERVICES/FOOD COURT COURT TURIST SERVICES/FOOD
SECTION B
B
A
A B
SECTION B
SECTION B
SECTION B
M IX USE _HO USING BACHELOR´S DEGREE THESIS PROJECT
In response to the lack of order, chaos and informality, which is born spontaneously a high density metropolitan area of commerce such as the Gamarra area in the district of La Victoria (Lima, Peru), is that this thesis seeks to support the development of an architectural project of Housing- Workshop and services, in order to strengthen the relationships that currently exist in the place between its inhabitants and the dynamics that occur in the place. The main objective of the project is to satisfy and improve the living conditions of those living in the workplace, as is the case of the vast majority of emerging merchants of Gamarra. In this way, the architectural project seeks to be a complement to what already happens in the place, satisfying infrastructure needs and lack of local equipment dedicated to cultural, commercial, and diffusion activities at the metropolitan level.
Exterior view_Public plaza, multipurpose gallery and housing complex main entrance.
GSPublisherEngine 0.0.100.100
A
NIV. +54.50
B
C
D
E
F
G
H
I
J
K
L
M
N
—
O
P
Q
R
S
T
U
3.00 NIV. +51.50
NIV. +48.50
6.00
NIV. +45.50
NIV. +42.50
NIV. +39.50
NIV. +36.50
NIV. +33.50
27.00 NIV. +30.50
NIV. +27.50
54.50
NIV. +24.50
NIV. +21.50
NIV. +18.50
TALLER DE CONFECCI”N NIV. +15.50
9.00 TALLER DE CONFECCI”N NIV. +12.50
TALLER DE CONFECCI”N
NIV. +9.50
4.75
NIVEL COMERCIAL comercio complementario
NIVEL COMERCIAL comercio complementario
NIVEL COMERCIAL comercio complementario
NIVEL COMERCIAL comercio complementario
PASARELA PUBLICA nivel comercial
NIV. +4.75
4.03 NIV. +0.72 NIV. 0.00
0.72
PLAZA P⁄BLICA EXTERIOR
PASARELA PUBLICA nivel comercial
PLAZA P⁄BLICA INTERIOR
PLAZA P⁄BLICA INTERIOR
3.25 PLAZA P⁄BLICA INTERIOR nivel de equipamiento y servicios
NIV. -3.25
COMERCIO comercio complementario
PLAZA P⁄BLICA INTERIOR nivel de equipamiento y servicios
PLAZA P⁄BLICA INTERIOR nivel de equipamiento y servicios
11.254.75
NIV. -8.00
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
3.25 NIV. -11.25
0
CORTE E - E'
5
UPC
SERVICES FLOOR PLAN
UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS
FACULTAD DE ARQUITECTURA DECANO Arq. Miguel Cruchaga Belaunde
DIRECTOR DE CARRERA Mario Segami Salazar
4.25
D
3.05
E
2.30
F
2.65
G
H
8.00
I
8.00
8.00
J
K
D
8.00
L
8.01
M 131.81 8.27
8.28
C
N
8.00
—
7.99
O
P
B
8.00
A
8.00
Q
8.00
R
4.15
S
6.30
T
6.30
PROYECTO PARA LA OBTENCI”N DEL TÕTULO PROFESIONAL
U
4.81
5.60
1
COMERCIO ZONAL npt: -3.50 hbt: 3.25
COMERCIO ZONAL npt: -3.50 hbt: 3.25
SSHH H npt: -3.50 hbt: 3.25
AULA TEORICA npt: -3.50 hbt: 3.25
COMERCIO ZONAL npt: -3.50 hbt: 3.25
AULA PRACTICA npt: -3.50 hbt: 3.25
AULA PRACTICA npt: -3.50 hbt: 3.25
LABORATORIO npt: -3.50 hbt: 3.25
2
AREA DE LOCKERS SALA DE PROFESORES npt: -3.50 hbt: 3.25
SSHH npt: -3.50 hbt: 3.25
SSHH M npt: -3.50 hbt: 3.25
DIRECCION npt: -3.50 hbt: 3.25
8.00
COMERCIO ZONAL npt: -3.50 hbt: 3.25
HALL npt: -3.50 hbt: 3.25
INFORMES npt: -3.50 hbt: 3.25 vestuarios
3 3.75
AREA COMERCIAL npt: -3.25 hbt: 3.00
vestuarios
4 CIRCULACION VERTICAL PUBLICA
CIRCULACION VERTICAL DE EMERGENCIA
CIRCULACION VERTICAL DE EMERGENCIA
CIRCULACION VERTICAL PARA VIVIENDA
CIRCULACION VERTICAL PARA VIVIENDA
VACIO
VACIO
H
CIRCULACION VERTICAL PARA ABASTECIMIENTO DE TALLERES
CIRCULACION VERTICAL PARA ABASTECIMIENTO DE TALLERES
SOTANO 1 npt: -3.25 hbt: 3.00
5 SOTANO 1 npt: -3.25 hbt: 3.00
PLAZA PUBLICA - COMERCIO npt: -3.25
AULA TEORICA npt: -3.50 hbt: 3.25
SSHH H npt: -3.50 hbt: 3.25
SSHH M npt: -3.50 hbt: 3.25
8.20
PLAZA PUBLICA - COMERCIO npt: -3.25
8.00
PABELLON DE EXPOSICIONES area multiusos npt: -3.25 hbt: 3.00 enchape de madera
OFICINA
CONTROL AUDIOVISUAL
CIRCULACION VERTICAL PUBLICA
PLAZA PUBLICA - CITE npt: -3.25
COMERCIO ZONAL npt: -3.50 hbt: 3.25
6 PLAZA PUBLICA - CITE npt: -3.25
E
5.60
COMERCIO ZONAL npt: -3.50 hbt: 3.25
CUARTO DE TABLEROS
MANTENIMIENTO npt: -3.50 hbt: 3.25
TALLER ANCIANOS npt: -3.50 hbt: 3.25
8.48
MANTENIMIENTO npt: -3.50 hbt: 3.25
CUARTO DE BOMBAS COMERCIO ZONAL npt: -3.50 hbt: 3.25
AULA PRACTICA npt: -3.50 hbt: 3.25
AULA PRACTICA npt: -3.50 hbt: 3.25
85.64
7 CASA DE FUERZA
AULA PRACTICA npt: -3.50 hbt: 3.25
8 COMERCIO ZONAL npt: -3.50 hbt: 3.25
DEPOSITO npt: -3.50 hbt: 3.25
5.23
COMERCIO ZONAL npt: -3.50 hbt: 3.25
CISTERNA CONSUMO
9 COMERCIO ZONAL npt: -3.50 hbt: 3.25 TALLER ANCIANOS npt: -3.50 hbt: 3.25
AULA PRACTICA npt: -3.50 hbt: 3.25
SOTANO 1 npt: -3.25 hbt: 3.00
8.20
COMERCIO ZONAL npt: -3.50 hbt: 3.25
SOTANO 1 npt: -3.25 hbt: 3.00
10
CIRCULACION VERTICAL PARA ABASTECIMIENTO DE TALLERES
CIRCULACION VERTICAL PARA ABASTECIMIENTO DE TALLERES
PLAZA PUBLICA - TALLERES npt: -3.25
TALLER ANCIANOS npt: -3.50 hbt: 3.25
CIRCULACION VERTICAL PUBLICA
AULA PRACTICA npt: -3.50 hbt: 3.25
8.00
PLAZA PUBLICA - TALLERES npt: -3.25
CIRCULACION VERTICAL PUBLICA
CIRCULACION VERTICAL DE EMERGENCIA
CIRCULACION VERTICAL DE EMERGENCIA
CIRCULACION VERTICAL PARA VIVIENDA
PLAZA PUBLICA - ESCUELA INICIAL npt: -3.25
11 ESPACIO MULTIUSOS npt: -3.50 hbt: 3.25
SALA DE PROFESORES npt: -3.50 hbt: 3.25 DIRECCION npt: -3.50 hbt: 3.25
TALLER ANCIANOS npt: -3.50 hbt: 3.25
INFORMES npt: -3.50 hbt: 3.25
COMERCIO ZONAL npt: -3.50 hbt: 3.25
COMERCIO ZONAL npt: -3.50 hbt: 3.25
COMERCIO ZONAL npt: -3.50 hbt: 3.25
COMERCIO ZONAL npt: -3.50 hbt: 3.25
SSHH M npt: -3.50 hbt: 3.25
SSHH H npt: -3.50 hbt: 3.25
NI—OS npt: -3.50 hbt: 3.25
NI—OS npt: -3.50 hbt: 3.25
Fernanda Pierina Sanchez kong
ASESOR MANTENIMIENTO npt: -3.50 hbt: 3.25
SSHH npt: -3.50 hbt: 3.25 NI—OS npt: -3.50 hbt: 3.25
ALUMNA
12
AREA DE SERVICIO npt: -3.50 hbt: 3.25
Arq. Jorge Burga Bartra
8.00
TOPICO npt: -3.50 hbt: 3.25
MANTENIMIENTO npt: -3.50 hbt: 3.25
TOPICO npt: -3.50 hbt: 3.25
F
3.73
COMERCIO ZONAL npt: -3.50 hbt: 3.25
CIRCULACION VERTICAL PARA VIVIENDA
OBSERVACIONES
G
FECHA
SSHH NI—OS npt: -3.50 hbt: 3.25 AREA DE LOCKERS
13
Agosto 2016
ORIENTACION
4.86
CISTERNA ACI
LA VICTORIA - DEPARTAMENTO DE LIMA
1.46
C
VIVIENDA TALLER Y SERVICIOS PARA EL EMPORIO COMERCIAL GAMARRA
A B
14 1.46
4.25
3.05
2.30
2.65
8.00
8.00
8.00
8.00
8.01
8.28
8.27
8.00
7.99
8.00
8.00
8.00
4.15
6.30
6.30
N
4.81
131.81
A B
C
D
E
F
G
H
I
J
D
K
L
M
C
N
—
O
B
P
A
SECTORES Y UBICACI”N
Q
R
S
T
U
TÕTULO
SOTANO 1 ESCALA
#1/250
LAMINA
A.03
1
2
3
4
5
6
7
8
9
10
11
12
13
14
NIV. +54.50
3.00 NIV. +51.50
NIV. +48.50
vivienda tipo b
espacio comun vivienda
NIV. +45.50
vivienda tipo b
NIV. +42.50
vivienda tipo a
espacio comun vivienda
NIV. +39.50
espacio comun vivienda
espacio comun vivienda
NIV. +36.50
33.00
vivienda tipo a
vivienda tipo a
NIV. +33.50
NIV. +30.50
espacio comun vivienda NIV. +27.50
vivienda tipo a
vivienda tipo b
vivienda tipo b
54.50
NIV. +24.50
vivienda tipo a NIV. +21.50
espacio comun vivienda
espacio comun vivienda
NIV. +18.50
vivienda tipo a
espacio comun vivienda
vivienda tipo a
NIV. +15.50
9.00
espacio comun vivienda
NIV. +9.5
vivienda tipo a
vivienda tipo b
vivienda tipo b
4.75
NIV. +4.75
NIVEL COMERCIAL comercio complementario
NIVEL COMERCIAL comercio complementario
NIVEL COMERCIAL comercio complementario
NIVEL COMERCIAL comercio complementario
4.03 NIV. +0.72 NIV. 0.00
0.72
3.25 HALL DE ESPERA - CITE equipamiento
NIV. -3.25
PLAZA P⁄BLICA INTERIOR nivel de equipamiento y servicios
AULA - ESCUELA INICIAL equipamiento
PLAZA P⁄BLICA INTERIOR nivel de equipamiento y servicios
SSHH equipamiento
11.254.75
NIV. -8.00
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
ESTACIONAMIENTO segundo sotano
3.25 NIV. -11.25
0
CORTE A - A'
5
UPC
PLUBLIC SPACE FLOOR PLAN
UNIVERSIDAD PERUANA DE CIENCIAS APLICADAS
FACULTAD DE ARQUITECTURA DECANO Arq. Miguel Cruchaga Belaunde
DIRECTOR DE CARRERA Mario Segami Salazar
A B
C
D
E
F
G
H
I
J
D
K
L
M
N
C
—
O
P
B
A
Q
R
S
T
PROYECTO PARA LA OBTENCI”N DEL TÕTULO PROFESIONAL
U
131.81 3.05
2.30
2.65
8.00
8.00
8.00
8.00
8.01
8.28
8.27
8.00
7.99
8.00
8.00
8.00
4.15
6.30
6.30
4.81
5.60
5.60
1
2
2 COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
8.00
SSHH h npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
SSHH M npt: +0.72 hbt: 4.50
8.00
COMERCIO ZONAL npt: +0.72 hbt: 4.50
3
3 ZONA COMERCIAL npt: +0.72 hbt: variable
3.75
3.75
ZONA COMERCIAL npt: +0.72 hbt: variable
4
4 CIRCULACION VERTICAL PUBLICA
PABELLON DE EXPOSICIONES area multiusos npt: -3.25 hbt: 3.00 porcelanato 60 x 60
CIRCULACION VERTICAL PUBLICA
CIRCULACION VERTICAL DE EMERGENCIA
CIRCULACION VERTICAL PARA VIVIENDA
CIRCULACION VERTICAL DE EMERGENCIA
8.00
CIRCULACION VERTICAL PARA VIVIENDA
8.00
H
3.00
ESTRUCTURA DE CONCRETO ARMADO
CIRCULACION VERTICAL PARA ABASTECIMIENTO DE TALLERES
5
H
3.00 7.00
CIRCULACION VERTICAL PARA ABASTECIMIENTO DE TALLERES
5
8.20
8.20
PROYECCION DE COPA DE ARBOL
ZONA DE JUEGOS npt: +0.00 cemento piedra natural
6
6
E
5.60
FERIA ITINERANTE npt: +0.00 cemento piedra natural
5.60
E
PLAZA PUBLICA INTERIOR npt: +0.72 hbt: variable
proyecciÛn de copa de arbol
7
7 85.64
8.48
PLAZA PUBLICA INTERIOR npt: +0.72 hbt: variable
ZONA DE DESCANSO npt: +0.00 cemento piedra natural
8.48
85.64
ZONA DE DESCANSO npt: +0.00 cemento piedra natural
PLAZA PUBLICA INTERIOR npt: +0.72 hbt: variable
8
8 ZONA DE DESCANSO npt: +0.00 cemento piedra natural
ZONA DE JUEGOS npt: +0.00 cemento piedra natural
5.23
5.23
PLAZA PUBLICA INTERIOR npt: +0.72 hbt: variable
9
COMERCIO ZONAL npt: +0.72 hbt: 4.50
ZONA DE JUEGOS npt: +0.00 cemento piedra natural
0
COMERCIO ZONAL npt: +0.72 hbt: 4.50
npt: +0.00 hbt: variable cemento estampado natural con bruÒas c/ 90cm
CIRCULACION VERTICAL PUBLICA
CIRCULACION VERTICAL PUBLICA CIRCULACION VERTICAL DE EMERGENCIA
CIRCULACION VERTICAL PARA VIVIENDA
F
CIRCULACION VERTICAL DE EMERGENCIA
CIRCULACION VERTICAL PARA VIVIENDA
ZONA COMERCIAL npt: +0.72 hbt: variable
3.73
8.00
8.00
F
ZONA DE DESCANSO npt: +0.00 cemento piedra natural
PLAZA PUBLICA EXTERIOR
1
OBSERVACIONES
G 10
CIRCULACION VERTICAL PARA ABASTECIMIENTO DE TALLERES
CIRCULACION VERTICAL PARA ABASTECIMIENTO DE TALLERES
8.20
ZONA DE DESCANSO npt: +0.00 cemento piedra natural
11 ZONA COMERCIAL npt: +0.72 hbt: variable
3.73
G
8.20
9
LA VICTORIA - DEPARTAMENTO DE LIMA
4.25
VIVIENDA TALLER Y SERVICIOS PARA EL EMPORIO COMERCIAL GAMARRA
1.46
1
2
ALUMNA
12
Fernanda Pierina Sanchez kong
COMERCIO ZONAL npt: +0.72 hbt: 4.50
SSHH M npt: +0.72 hbt: 4.50 COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
COMERCIO ZONAL npt: +0.72 hbt: 4.50
Arq. Jorge Burga Bartra
8.00
8.00
ASESOR SSHH h npt: +0.72 hbt: 4.50
FECHA
13
4
Agosto 2016
ORIENTACION
4.86
4.86
3
14 1.46
4.25
3.05
2.30
2.65
8.00
8.00
8.00
8.00
8.01
8.28
8.27
8.00
7.99
8.00
8.00
8.00
4.15
6.30
6.30
N
4.81
131.81
A B
C
D
E
F
G
H
I
J
D
K
L
M
C
N
—
O
B
P
A
SECTORES Y UBICACI”N
Q
R
S
T
U
TÕTULO
NIVEL 1 ESCALA
#1/250
LAMINA
A.04
HOUSING MODULES A
14
13
12
4
0.25
0.25
5
6
7
0.80 - dintel proyeccion
P 03
2.70
0.80
-
tablero terrazo pulido negro h= 0.90
P 05
2.70
0.75
-
11
10
16
9
15
14
13
12
11
10
-
2.70
0.80
-
piso laminado 12 cm x largo variable
proyeccion ventana alta
proyeccion dintel
0.80
0.30 2.20
proyeccion ventana alta
0.30 2.20
0.80
V 02
ducha pendiente 3 %
8.00
7.40
8.00
-
COMEDOR
tablero de granito con estructura metalica e:12 cm
1.64
1.10
1.10
1.64
1.10
2.70
0.90
-
0.60
0.60
0.60
0.60
V 02
2.70
0.90
-
0.80
0.30 2.20
V 02 0.80
tablero cuarz 0.90
0.30 2.20
BA—O TALLER piso porcelanato gris 30 x 60
proyeccion ventana alta
1.00
proyeccion mueble alto
0.60
2.25
0.60
2.84 proyeccion dintel
tablero de granito con estructura metalica e:12 cm
COMEDOR
closet con puertas de MDF pintado con poliuretano
clos p
COMEDOR
piso laminado 12 cm x largo variable
DORMITORIO 1 piso laminado 12 cm x largo variable
TALLER
piso PORCELANATO GRIS 60 X 60
piso PORCELANATO GRIS 60 X 60
cristal templado incoloro
piso laminado 12 cm x largo variable
1.10
1.64
proyeccion doble altura
proyeccion doble altura
proyeccion mueble alto con repisas para almacenar prendas
closet con puertas de MDF pintado con poliuretano
3.15
CL 1
cristal templado incoloro
M 02 2.70 -
TALLER CL 1
M 02 2.70 3.15
-
3.40
TALLER
proyeccion mueble alto con repisas para almacenar prendas
3.85
SALA
SALA
piso laminado 12 cm x largo variable
piso laminado 12 cm x largo variable
proyeccion almacena
BALCON DORMITORIO 1
BALCON DORMITORIO 1
piso cemento pulido sol
piso cemento pulido sol
1.50
proyeccion mueble alto con repisas para almacenar prendas
3.73
3.73
0.60
0.60
2
0.60
0.60
2 2
0.60
0.60
2
0.60
0.60
2
0.60
22
0.60
2
cristal templado incoloro
-
0.60
M 01 2.70
cristal templado incoloro
-
0.60
M 01 2.70
M 01 2.70 3.73
parapeto h=0.90
M 01 2.70
cristal templado incoloro
-
3.73
2
cristal templado incoloro
-
22
2
parapeto h=0.90
parapeto h=0.90
BALCON AREA SOCIAL
piso cemento pulido sol
piso cemento pulido sol
BALCON AREA SOCIAL
BALCON AREA SOCIAL
piso cemento pulido sol
piso cemento pulido sol
2.00
BALCON AREA SOCIAL
2.00
parapeto h=0.90
P 04
2.25
4.30
4.30
SALA piso laminado 12 cm x largo variable
0.60
0.60
1.50
piso cemento pulido sol
2
0.60
0.60
2
3.85
BALCON DORMITORIO 1
piso cemento pulido sol
proyeccion espejo suspendido
proyeccion ventana alta
proyeccion dintel proyeccion mueble alto
tablero de granito con estructura metalica e:12 cm
3.85
SALA piso laminado 12 cm x largo variable
0.60
3.85
BALCON DORMITORIO 1
-
1.00 proyeccion dintel
2.10
DORMITORIO 1
proyeccion mueble alto con repisas para almacenar prendas
3.40
-
0.60
3.15
2.70
0.80
piso PORCELANATO GRIS
CL 1
M 02 2.70
0.60
CL 1
0.60
-
proyeccion de campana
1.50
3.15
closet con puertas de MDF pintado con poliuretano
cristal templado incoloro
M 02 2.70
proyeccion segunda tramo escalera
4.30
proyeccion mueble alto con repisas para almacenar prendas
4.30
4.30
4.30
proyeccion doble altura
4.30
4.30
1.40
4.30
4.30
cristal templado incoloro
P 03
porcelanato blanco mate 30x60
closet con puertas de MDF pintado con poliuretano closet con puertas de MDF pintado con poliuretano
piso porcelanato gris 30 x 60
P 02b 2.70 0.80 - dintel proyeccion
P 04
repisas de melam ancho y alto vari
repisas de melamine blanco ancho y alto variable
piso laminado 12 cm x largo variable
1.40
DUPLEX
proyeccion doble altura
-
proyección de mueble bajo
piso laminado 12 cm x largo variable
DORMITORIO 1 piso laminado 12 cm x largo variable
2.70
0.80
1
COCINA
COMEDOR
piso laminado 12 cm x largo variable
1.10
DORMITORIO 1 piso laminado 12 cm x largo variable
P 03
closet con puertas de MDF pintado con poliuretano
1.40
tablero de granito con estructura metalica e:12 cm
2.10
pared de drywall
proyeccion de campana
BA—O 1
proyeccion ventana porcelanato blanco mate 30x60 alta
proyección de mueble bajo
0.15
1.00 CL 3
7.40
7.40
8.00
7.40
2.84
piso porcelanato gris 30 x 60
P 02b 2.70 0.80
BA—Opendiente 1ducha3 %
2.10 2.10
-
piso laminado piso laminado 12 cmtablero x largo variable 12 cm x largo variable cuarzo blanco h= 0.90 V 02 0.30 cristal templado con lamina de tablero de cuarzo cristal templado con lamina de tablero de cuarzo color color 0.80 2.20 h= 90 cm h= 90 cm
tablero cuarzo blanco h= 0.90
0.30 2.20
11
8
8.00
1.00 CL 3
closet con puertas de MDF pintado con poliuretano
0.80
proyeccion ventana alta
0.15
0.60
proyeccion dintel
7.40
-
2.70
0.75
proyeccion segunda tramo proyeccion espejo suspendido escalera
0.15
V 02 V 02
8.00
2.70
0.90
P 02
-
rejilla acero inox
proyeccion espejo suspendido
7
DEPOSITO TALLER
COCINA
ESTAR piso laminado 12 cm x largo variable V 02 0.30 0.80 2.20
0.15
2.25
2.84 P 04
6
piso porcelanato gris 60 x 60
pared de drywall
1.40
0.90
ESTAR
0.90
P 03
0.25
5
proyeccion dintel
2.70
0.75
rejilla acero inox
1.40
2.70
0.80
proyeccion ventana alta
0.15
0.60
0.15
1.00
0.15
2.25
proyeccion dintel
8.00
-
7.40
2.70
0.90
8.00
P 04
7.40
7.40
8.00
1.00
proyección de mueble bajo
0.60
P 02
9
0.15 P 03
CL 2
LAVANDERIA piso porcelanato gris 60 x 60 proyeccion dintel
proyeccion dintel
1.40
1.40
1.40
BA—O TALLER piso porcelanato gris 30 x 60 proyeccion dintel
proyeccion ventana alta
8.00
0.15
0.15 7.40
8.00
proyección de mueble bajo
tablero terrazo pulido CL 2 negro h= 0.90
LAVANDERIA piso porcelanato gris 60 x 60
0.15
porcelanato blanco mate 30x60
proyeccion mueble alto
2.20
0.80
0.25
4
4.30
piso porcelanato gris 30 x 60
P 02b 2.70
BA—O TALLER piso porcelanato gris 30 x 60
3
0.60
-
0.80
proyeccion ventana alta
0.60
0.60
0.60
8
proyeccion dintel
tablero cuarzo blanco h= 0.90
2
0.55
3
0.25
1
escalones de tablones de madera
1
0.60
2.70
0.80
0.80
tablero cuarzo blanco h= 0.90 V 02 0.30
0.30 2.20
8
0.60
P 03
proyeccion ventana porcelanato blanco mate 30x60 alta
proyeccion ventana alta proyeccion dintel proyeccion mueble alto
V 02
7
0.10
2
proyeccion espejo suspendido
0.95
BA—O 1
0.30 2.20
6
0.60
-
0.80
V 02
cristal templado con lamina de color
0.25
escalones de tablones de madera
5
0.55
1
0.50
0.80
0.30 2.20
0.25
-
4
0.10
8
0.50
piso porcelanato gris 30 x 60
P 02b 2.70 proyeccion ventana alta
BA—Opendiente 1ducha3 %
V 02
1.40
0.80
piso laminado 12 cm x largo variable
cristal templado con lamina de tablero de cuarzo color h= 90 cm
tablero de cuarzo h= 90 cm
0.60
ducha pendiente 3 %
proyeccion espejo suspendido
COCINA
piso laminado 12 cmtablero x largo variable cuarzo blanco h= 0.90
tablero cuarzo blanco h= 0.90
0.30 2.20
0.60
0.80
V 02
1.40
1.40
0.30 2.20
0.95
COCINA V 02
3
8.00
15
2.70
2.70
1.00
2
8.00
16 P 02
P 01
1
0.75
-
proyeccion0.75 dintel -
0.30 2.20
0.15
2.70
0.75
1.50
1.40
P 05
C2
0.40
0.15
repisas de melamine blanco ancho y alto variable proyeccion dintel
V 01
-
7.40
-
2.70
1.00
8.00
2.70
7
0.15
proyeccion de campana
P 01
0.75
repisas de melamine blanco ancho y alto variable
0.15
proyeccion segunda tramo escalera
0.15
proyeccion de campana
0.15
proyeccion segunda tramo proyeccion espejo suspendido escalera
rejilla acero inox
proyeccion espejo suspendido
1.40
0.15
0.15
rejilla acero inox
0.30 2.20
0.60
deposito taller piso porcelanato gris 60 x 60
0.75
0.60
0.60
0.60
0.60
0.60
0.60
0.60
deposito taller piso porcelanato gris 60 x 60
P 02
6
repisas de melamine blanco ancho y alto variable
0.15
0.60
pared de drywall
5
1.50
0.15
-
0.25
V 01
0.95
2.70
0.75
4
0.25
1
1.40
P 02 pared de drywall
3
0.25
1 1
4.30
-
2
1
escalones de tablones de madera
0.60
proyeccion dintel
2.70
0.75
1 repisas de melamine blanco ancho y alto variable
C2
2.73
1.50
P 02
8
A
0.40
0.40
1.40
proyeccion dintel
7
A
0.40
C2
2.70
1.00 escalones de tablones de madera
0.15
6
0.40
7.40
5
B 0.40
0.40 3.43
8.00
4
C1
0.30
0.60
3
0.15 3.43
0.95
0.25
C1
7.61
3.73 0.30
0.60
2
0.25
P 01
B 0.40
8.00
7.61 0.15
1.40
1
-
3.73 0.40
0.15
8
2.70
1.00
A 0.40
0.40
1.40
7
C2
C1
P 01
A 0.40
0.15
6
3.73 0.15
7.40
5
1
1.00
1.40
4
0.15
C1
11
1.40
3
1
B 0.40 0.40
8.00
7.61
1.00 2.58 0.15
escalones de tablones de madera
B 0.40 0.40 3.73
8.00
7.61 0.15
0.40
C2
escalones de tablones de madera
1.40
0.25
-
0.55
2
0.25
0.40 3.43
C2
2.70
1.00
piso porcelanato gris 60 x 60
1.40
1.40
piso porcelanato gris 60 x 60
1
CL 2
LAVANDERIA
0.30
P 01
0.10
tablero terrazo pulido CL 2 negro h= 0.90
LAVANDERIA
0.15 3.43
C1
0.30 2.20
0.75
1.50
0.60
V 01
-
0.60
2.70
1.00
0.55
3.73 0.30
P 01
0.10
tablero terrazo pulido negro h= 0.90
0.15
C1
0.30 2.20
1.50
0.75
V 01
0.40 0.40
2.58
0.60
A 0.40 0.40
0.60
B 0.40
0.60
0.60
0.60
0.60
3.73 0.40
1
0.60
0.40
1
8.00 7.61
1.40
B 0.40
8.00 8.00 7.61
0.60
A 0.40
1.40
A 0.40
cristal templado incoloro
0.40
A
A
3.88
4
0.25
0.25
5
6
tablero cuarzo blanco h= 0.90
0.80
-
0.30 2.20
V 02
0.30 2.20
0.80
0.80
0.30 2.20
V 02 0.80
C1 3.88
1.40
P 02
-
0.75
repisas de melamine blanco P 05 2.70 P 05 2.70 32 ancho y alto variable 0.75 0.75 P 02 - 2.70 2.70 proyeccion dintel proyeccion dintel 0.75 proyeccion dintel proyeccion dintel
0.15
V 02 0.80
BA—O TALLER BA—O TALLER
0.80
piso porcelanato pisogris porcelanato gris 30 x 60 30 x 60 P 03 2.70 0.80 -
18 20
19 21
20 22
21 23
22 24
23
24
17
18
19
C2
20
21
22
0.40
1
23
24
26
25
1
0.60
1
0.60
0.60
0.60
0.60
2.79
escalones de tablones de madera
0.25 0.25 0.25 0.25
0.25
0.25
0.25
0.25
31
32 30
31 29
30 28
29 27
28 26
P 05 2.70 27 25 26 0.75
proyeccion dintel
25
32
31
0.30 2.20
V 02
30
tablero cuarzo blanco h= 0.90
piso porcelanato 30 x 60 2.70 proyeccion dintel proyeccion dintel -
0.80
28
27
1.90
V 02
BA—O TALLER
2.20
P 03
29
-
proyeccion dintel
1.90
0.80
0.80
gris P 03
2.70
0.80
-
0.30 2.20
V 02
proyeccion ventana proyeccion ventana alta alta
proyeccion dintel
0.80
0.30 2.20
proyeccion ventana alta
proyeccion ventana alta
7.40
8.00
mesa de coser
8.00
mesa de coser mesa de coser
7.40
mesa de coser
8.00
mesa de coser mesa de coser
7.40
0.75
0.75
8.00
0.75
0.15
ESTAR piso laminado 12 cm x largo variable proyeccion dintel
0.15
ESTAR
piso laminado piso laminado 12 cm x largo variable 12 cm x largo variable 0.80 P 03 2.70
0.15
ESTAR
17 19
proyeccion espejo suspendido
tablero cuarzo blanco tableroh= cuarzo blanco h= 0.90 0.90 V 02 0.30
0.30 2.20
7.40
proyeccion dintel -proyeccion dintel 2.70
CL 3
0.80
1.16
1.16
2.00
1.84
1.84
1.16
4.45
1.84
3.20
3.20
TALLER
piso PORCELANATO GRIS 60deXmaquinaria 60 ubicacion ubicacion de maquinaria
ubicacion de maquinaria
0.80
0.80
3.20
4.30
0.80
1.00
4.45
2.00
4.45
2.00
TALLER TALLER PORCELANATO piso PORCELANATO GRIS 60 X 60 GRIS 60 X 60 ubicacion de piso maquinaria
0.80
piso laminado 12 cm x largo variable
1.84
0.80
1.00
0.80
1.00
4.30
4.30
4.30 piso laminado piso laminado 12 cm x largo variable 12 cm x largo variable
1.84
0.80
0.80 1.00
1.84
ubicacion de maquinaria ubicacion de maquinaria
DORMITORIO 2
0.65
DORMITORIO DORMITORIO 2 2
piso cemento pulido sol
C2 3.73
C2
3.73
7.61
7.61
8.00
8.00
A
-
3.72
-
BALCON DORMITORIO 2
piso cemento pulido piso cemento sol pulido sol
piso cemento pulido sol
C1
C1
C2
C2
0.40
0.40
0.40
0.40
7.61
7.61
7.61
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
7.61
7.61
7.61
0.40
0.40
0.40
8.00
8.00
8.00
B
A
A
A
B
B
B
0.40
A
0.40
A
C1
C2
7.61
7.61
7.61
8.00
8.00
8.00
C2
A
DV03DV03 DV03 DETALLE DETALLE DE MODULO DE MODULO DE VIVIENDA DETALLE DE VIVIENDA -DE MODULO MODULO - MODULO B DEBVIVIENDA - MODULO B
DV03DV03 DV03 DETALLE DETALLE DE MODULO DE MODULO DE VIVIENDA DETALLE DE VIVIENDA -DE MODULO MODULO - MODULO B DEBVIVIENDA - MODULO B
DV03DV03 DV03 DETALLE DETALLE DE MODULO DE MODULO DE VIVIENDA DETALLE DE VIVIENDA -DE MODULO MODULO - MODULO B DEBVIVIENDA - MODULO B
PLANTA PLANTA H1 H1
PLANTA H1
PLANTA PLANTA H2 H2
PLANTA H2
PLANTA PLANTA H3 H3
PLANTA H3
esc. 1/25 esc. 1/25
esc. 1/25
esc. 1/25 esc. 1/25
esc. 1/25
esc. 1/25 esc. 1/25
esc. 1/25
2
C2 0.40
0.40
0.40
B
B
B
0.60
2
0.60
0.60
0.60
cristal templado incoloro
0.60
0.80 0.80
0.80
0.80 0.80
0.80
C1
0.40
0.60
0.60
0.60
0.60
cristal templadocristal templado incoloro incoloro
C1
0.40 3.73
0.40
B
2
C2
0.40
B
2 2
0.60
2
0.60
2
0.60
2
0.60
0.60
0.60
cristal templado incoloro
BALCON DORMITORIO BALCON DORMITORIO 2 2
C1
C2
M 04 2.70
0.60
M 04 templado 2.70 cristal cristal templado incoloro 3.72 incoloro -
0.60
M 04 2.70
0.91
2
0.60
2
0.60
2
0.60
0.91
1.00
1.00
1.00
0.91
2
2.00
BALCON AREA SOCIAL
piso cemento pulido piso cemento sol pulido sol
8.00
2
3.72
BALCON AREA BALCON SOCIAL AREA SOCIAL
7.61
2
-
2.00
3.73
0.60
M 01 2.70
-
0.60
3.73
-
0.60
M 01 2.70
3.73
0.60
M 01 2.70
C1
0.40 3.88 0.40
2.70
0.75
proyeccion ventana proyeccion ventana alta alta
8.00
0.80 P 03
CL 3
18
piso porcelanato gris 60 x 60
P 02
proyeccion espejo proyeccion espejo suspendido suspendido
0.30 2.20
0.40
escalonesescalones de de tablones de tablones maderade madera
DEPOSITO TALLER
piso porcelanato pisogris porcelanato 60 x 60 gris 60 x 60
1.40
1.40
1.40 V 02
0.40
0.60 17
proyeccion ventana alta
B
0.40
repisas de melamine blanco ancho y alto variable
0.25
proyeccion ventana proyeccion ventana alta dintel alta proyeccion
B
0.40
0.60
7
1.90
V 02
2.70
0.80
0.19
B
0.40
1.40
3
0.25
7.40
2.70
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
2
1.00
P 03
C2
esc.
0.15
-
2.79 1.90 C2 2.79
0.15
PLA
esc. 1/25
1.40
2.70
0.75
0.19 C1
0.19
PLANTA H2
1.40
1
repisas de melamine repisas blanco de melamine blanco ancho y alto variable ancho y alto variable P 02
1.902.58 1.90
repisas de melamine repisas blanco de melamine blanco ancho y alto variable ancho y alto variable
1.00 0.50
0.15
0.60
7.40
0.80
0.15
8.00 7.61
1.40
7
BA—O 1
P 03
0.15 C1
8.00 7.61
0.15
6
proyeccion dintel
-
DUCHA
0.40 C1
2.58
8.00
0.15
57
0.25
1.40
proyeccion dintel proyeccion dintel repisas de melamine blanco ancho y alto variable 2.70
DV02 DV DETALLE DE MODULO DE DE
1.40
0.25 0.25 0.25 0.25
piso porcelanato pisogris porcelanato gris piso porcelanato gris pendiente 3 % 30 x 60 30 x 60 30 x 60 P 03 2.70 P 03 2.70 0.80 -proyeccion dintel 0.80 proyeccion dintel proyeccion ventana porcelanato blanco alta mate 30x60
CL 3
A
1.40
46
2.58
1
DEPOSITODEPOSITO TALLER TALLER
tablero cuarzo blanco tableroh= cuarzo blanco h= 0.90 0.90 0.30
2.20 BA—O 0.80 1 BA—O 1
A
0.74
0.74
8.00 0.74 1.00
1.00
0.65
0.40
0.40
35
1 1
piso entablado de madera 12 cm x largo variable
2.00
0.60
piso cemento pulido sol
SALA
piso entabladopiso de madera entablado de madera 12 cm x largo variable 12 cm x largo variable
3.85
BALCON DORMITORIO 1
SALA
0.60
3.85
piso cemento pulido piso cemento sol pulido sol
C1 0.40
24
1
1.40
0.75
B
7.61
7.40
P 02
-
0.40
B
-
0.60
3.15
BALCON DORMITORIO BALCON DORMITORIO 1 1
0.60
0.60
2
0.60
2
0.60
2
13
1
0.15
2.70
0.75
3.73 0.40
0.40
CL 1
M 02 2.70
0.60
CL 1
SALA 3.85
DUCHA
0.40
0.40
1
closet con puertas de MDF pintado con poliuretano
CL 1
-
0.60
3.15
-
V 02
DUCHA
pendiente 3 % pendiente 3 %
4.30
proyeccion doble altura
0.60
M 02 2.70
3.15
0.30 2.20
7.40
7.40
8.00
8.00
8.00
7.40
COMEDOR piso laminado 12 cm x largo variable
0.60
M 02 2.70
0.80
0.65
tablero de granito con estructura metalica e:12 cm
COMEDORCOMEDOR
piso laminado piso laminado 12 cm x largo variable 12 cm x largo variable
proyeccion doble proyeccion altura doble altura
closet con puertas closet de MDF con puertas pintadode con MDF pintado con poliuretano poliuretano
V 02
0.40
C2
1.40
0.30 2.20
1.40
1.40
1.40
1.40
0.60
0.15
2.25
0.15
0.60
0.60
4.30
piso laminado 12 cm x largo variable
0.15
0.15
0.15
0.15
0.15
0.15 0.95
1.40
1.40
0.80
0.40 3.73
proyeccion ventana proyeccion ventana porcelanato blanco porcelanato blanco alta alta mate 30x60 mate 30x60
0.15
0.60
V 02
0.30 2.20
0.40
0.60 P 02
0.40
0.40
2.86
escalones de tablones de madera
rejilla acero inox
proyeccion dintel
tablero de granito tablero con estructura de granitometalica con estructura metalica e:12 cm e:12 cm
DORMITORIO 1
1.00
0.80
0.60
-
V 02
proyeccion ventana alta proyeccion mueble alto
0.60
2.70
0.90
cristal templado con lamina de color
0.15
2.25
P 04
0.30 2.20
0.15
2.25
-
V 02
4.30
1.40
1.00
2.70 proyeccion dintel proyeccion dintel
0.30
8.00
0.90
piso laminado 12 cm x largo variable V 02
0.80de 2.20 tablero cuarzo 0.80 h= 90 cm proyeccion ventana proyeccion ventana alta alta proyeccion dintel proyeccion mueble alto
7.40
P 04
-
proyeccion mueble alto
7.40
2.70
0.90
2.70
0.80
8.00
P 04
0.95
0.95
1.00
proyección de mueble bajo
rejilla acero inoxrejilla acero inox
A
0.40
repisas de melamine blanco ancho y alto variable
COCINA
P 03
porcelanato blanco mate 30x60
4.30
4.30
COCINA
0.80 -proyeccion dintel proyeccion dintel
4.30
8.00
2.70
0.80
proyeccion de campana
4.30
0.15
0.15 7.40
7.40
8.00
8.00
COCINA
-
2.10
DORMITORIO DORMITORIO 1 1
4.30
0.80
2.10
piso laminado piso laminado 12 cm x largo variable 12 cm x largo variable
GSPublisherEngine 0.0.100.100
0.60
GSPublisherEngine 0.0.100.100
-
tablero de cuarzo tablero BA—O 1 de cuarzo h= 90 cm h= 90 cm piso porcelanato gris P 02b 2.70 30 x 60
DUCHA
0.80 ventana proyeccion alta porcelanato blanco porcelanato mate 30x60 blanco mate 30x60
proyección de mueble proyección bajo de mueble bajo
2.10
TRIPLEX
0.80
piso laminado piso laminado 12 cm x largo variable 12tablero cm x largo cuarzovariable blanco cristal templadocristal templado h= 0.90 con lamina de color con lamina de color
tablero cuarzo blanco tablero cuarzo blanco h= 0.90 h= 0.90 0.30
2.20 BA—O 0.80 1 BA—O 1
piso porcelanato pisogris porcelanato gris pendiente 3 % x 60 2.70 30 x 60 P 02b P 02b 2.70 30 P 03 2.70 P 03
0.60
DUCHA
0.60
V 02
DUCHA
pendiente 3 % pendiente 3 %
proyeccion segunda tramo proyeccion de proyeccion de escalera campana campana
2
0.25
DEPOSITO 1 piso entablado de madera 12 cm x largo variable
repisas de melamine repisas blanco de melamine blanco ancho y alto variable ancho y alto variable
1.40
0.30 2.20
proyeccion ventana proyeccion ventana alta alta
1.40
0.80
1.40
V 02
0.15
0.30 2.20
7.40
0.80
0.15
0.15
0.15 1.40
1.40
V 02
proyeccion segunda proyeccion tramo segunda tramo escaleraespejo escalera proyeccion suspendido
rejilla acero inox
proyeccion espejo proyeccion espejo suspendido suspendido
A
0.40
1.40
0.60
0.60
0.60
0.60
1 repisas de melamine repisas blanco de melamine blanco ancho y alto variable ancho y alto variable
DEPOSITODEPOSITO 1 1 piso entabladopiso de madera entablado de madera 12 cm x largo variable 12 cm x largo variable
1.00 rejilla acero inoxrejilla acero inox
A
0.40
0.15
0.60
pared de drywall
B
1.10
-
0.40
0.40
0.40
H1
0.40
7.40
2.70
0.75
8
0.10
proyeccion dintel
P 02 pared de drywallpared de drywall
C2
PLANTA esc. 1/25 esc. 1/25
8.00
-
7
8.00
3.35
2.70
0.75
6
0.15 3.73 C2
3.73
H1
8.00
P 02
-
5
8.00
B
3.35
2.70
0.75
C1
0.15 3.73
escalones de tablones escalones de madera de tablones de madera
0.25
0.10
1.40
piso porcelanato gris 60 x 60 proyeccion dintel proyeccion dintel
P 02
4
0.25
C2
2.86 7.61
0.40
0.15
3
0.25
C2
4.75 7.61
B
0.15
2
A
C1
4.75
0.40
1.40
1
8.00 7.61
0.15
A
1.10
8
C1
8.00 7.61
7.40
7
3.73 0.40 C1
3.73
1
0.40
3.35
68
1
8.00
0.50
57
0.25
1
0.40
0.40
1.85
46
0.40
1
0.40
PLANTA esc. 1/25 esc. 1/25
1.10
35
B
7.61
1.40
24
0.25 0.25 0.25 0.25
0.40
0.40
1
1
1.40
13
0.40
DV01 DV01 DV02 DV02 DETALLE DE MODULO DE DETALLE VIVIENDA DE -MODULO MODULODEA VIVIENDA - MODULO A DETALLE DE MODULO DE DETALLE VIVIENDA DE -MODULO MODULODEA VIVIENDA - MODULO A PLANTA H1 PLANTA H1
escalones de tablones de madera
1.40
2 CL 2 0.25
LAVANDERIA
piso porcelanato pisogris porcelanato gris 60 x 60 60 x 60
1.40
1.40
tablero terrazo pulido CL negro 2 h= 0.90
CL 2
LAVANDERIA LAVANDERIA
0.403.43
escalones de tablones escalones de madera de tablones de madera
0.55
1 tablero terrazo pulido tablero terrazo pulido negro h= 0.90 negro h= 0.90
0.40
2.70
1.00
0.60
P 01
A
0.40
0.60
3.43 0.153.43 0.30
0.30 2.20
A
0.40
0.55
- 1.50
A
0.40
0.10
2.70V 01
1.00
B
0.40
0.75
0.30 0.15 3.730.30
0.60
P 01
-
0.60
2.70
1.00
0.30 2.20
0.60
P 01
1.50
C2
0.60
0.15
V 01
B
0.40
0.55
3.73 0.40
0.30 2.20
B
0.40
0.75
1.50
8.00 7.61
0.60
0.60
V 01
0.60
3.73
1
C2 C2
8.00 7.61
0.75
0.40
C1 8.00 7.61
0.60
0.40
0.60
A C1 C1 0.40
8.00
0.40
0.40
1.40
PLANTA H2 esc. 1/25
0.60
0.60
0.60
1
PLANTA H2 esc. 1/25
A
8.00
0.40
DV01 DV01 DETALLE DE MODULO DE DETALLE VIVIENDA DE -MODULO MODULODEA VIVIENDA - MODULO A
PLANTA H1 esc. 1/25
0.40
4.78 7.61
B
PLANTA H1
A
4.78
7.61
A
esc. 1/25
0.40
C2
C2
2.82
0.40
A
DV01 DV01 DETALLE DE MODULO DE DETALLE VIVIENDA DE -MODULO MODULODEA VIVIENDA - MODULO A
1
0.40
0.15
B
B
2.82
8.00
A
A
0.40
0.40
1.40
0.40
0.40
7.40
8.00
0.40
8.00
7.61
8.00
C1 C1
C1
2.86
0.50
7.61
0.40
1.85
0.40
cristal templado incoloro
C2
2.86
1.85
4.75
0.60
0.40
C2
C1
4.75
0.60
0.40
1.40
cristal templado incoloro
C1 0.40
2
PROFFESIONAL WORK
L APA HO USE LIMA - PERU CONSTRUCTION MANAGEMENT
The Project´s basic idea was to have minimum impact in the natural setting. Having this in mind we planed the house to be felt smaller tan what it really is. In proportion it is 15% smaller tan the average existing projects in the club prioritizing the relation between the architecture and its natural setting. The rocky tract of land was cut before the project was designed. The proposal was created having it in mind and adapting itself to the space and lightly embedding it to the setting. At this level is the main platform, here we set the entrance and service areas and on top of it sits the main areas of the house (the white box) which in itself has several different levels and is oriented in a way that allows us to always be able to contemplate the ocean.
CO NST RUC TI O N PRO C ES S A. Main beam construction process B. Interior brick walls
A.
C. Concrete walls structure D. Stairs’ main structure
A.
B.
C.
M HO USE LIMA - PERU
DESIGN AND CONSTRUCTION MANAGEMENT
The building standards for the small semi isolated lot of 15x8 meters in the middle of an artificial oasis, only allowed the construction of single storey house plus a roof terrace to ensure the enjoyment of the "essential joys": sun, space, vegetation and the view over the desert landscape between the Isle of Asia and the coastal foothills of the Andes. The recreational use of the house by owners and guests during the summer weekends contrasts with minimal use during the rest of the year, so the program stratification should facilitate the opposed nature of the project: External during summer and private during winter. Thus, the proportion of public places are distributed hierarchically in the expanded mode from the roof terrace to the basement, with the first floor as intermediate level housing a minimum bedroom area for its proper operation in a compact mode. The location of the lot, far from the beach and surrounded by a grove, gives some natural privacy to its occupants, which allowed us to project greater transparency in its enclosures, more consistent with the open character of its owners and the need to have a passive thermal management system that runs through sunlight and ventilation control of the concrete mass.
A.
B.
CO NST RUC TI O N PRO C ES S A. Pumping water and foundations construction B. Concrete structure walls and metallic roof construction C. Wood panels details and metallic roof construction
C.
D.
E.
STA IRS CO NSTR UC T I O N PRO C ES S D. Stairs’ wooden formwork detail - steps E. Stairs’ wooden formwork detail - parapet F. Concrete steps and parapet before the cement layer
F.
SE TA HO USE LIMA - PERU DESIGN COLLABORATION AND CONSTRUCTION MANAGEMENT
The architecture project was an exploration of the mass, working with two blocks and the void generated between them. The house was conceived as a white box which was excavated to generate habitable spaces inside. The constructive challenge of this project was to keep the corner free of any structural support to integrate the internal and external social area of ​​the property. It was suggested that the structure of the main flown beam be connected with two lateral plates and a foundation slab behaving as a single element anchored on the horizontal axis as the vertical.
STRUCTURAL DIAGRAMS
CO NST RUC TI O N PRO C ES S Interior brick walls
Interior concrete walls - Wooden formwork details
DIGITAL VISUALIZATION
INTERIOR EV= 10.75 | WP= 8000k | 12/21/2017 | 9:00 AM
B
104
104
104
3000
door Dining Outdoor Dining Outdoor Dining
DN
DN
C
C
Room Legend RoomRoom Legend Legend Bath
Bath
Bath
46
Hall
Hall
Hall
46
Laundry Laundry
Living
Living
Mech.
Mech. Mech.
Living
C
D
D
D
46
46
46
46
46
46
46
46
46
46
46
46
46
46
46
46
46
46
3
1
1
A103
A103
106A
1
E
A103
106A 106B 106A
Deck
46 3
3
A105
F
E
F
EXTERIOR LIGHT STUDY 3Ds MAX
106B
Deck
G
A105
46
E
106B
Deck
A105
46
F
L 1 FLOOR LEVELPLAN 1LEVEL FLOOR 1 FLOOR PLAN PLAN
C
46
Kitchen & Dining Kitchen & Kitchen Dining& Dining Laundry
DN
G
MORNING MORNING MORNING EV=8000k 12.5EV= | WP= 12.5 8000k | WP= | 12/21/2017 | 12/21/2017 | 8:00 AM| 8:00 AM EV= 12.5 | WP= | 12/21/2017 |8000k 8:00 AM
G
REVIT MODEL IMPORT
DAYTIME DAYTIMEDAYTIME EV= 13| WP= EV= 13| 6500k WP= | 12/21/2017 6500k | 12:00 PM EV= 13| WP= 6500k | 12/21/2017 | 12:00| 12/21/2017 PM | 12:00 PM
INTERIOR INTERIORI EV= 10.75EV= | WP= 8000k | 12/21/2017 | 9:00| AM 10.75 EV= | WP= 10.75 8000k | WP= | 12/21/2017 8000k 12/21/2017 | 9:00 AM
EVENING EVENINGE 12.25 EV= | WP= 12.25 7000k | WP= | 3/21/2017 7000k | 3/21/2017 | 5:00 PM| EV= 12.25EV= | WP= 7000k | 3/21/2017 | 5:00 PM
EV= 3.5 | WP= 9000k | 12/21/2017 | 12:30 AM
3 3
DN
DN DN
CC
RoomRoom Legend Room Legend Legend Bath
Bath Bath
Hall
Hall Hall
46
46 46
46
46 46
Living
Living Living
46 46
CC
D
DD
46
46 46
46
E
Kitchen & Dining&& Dining Kitchen Kitchen Dining LaundryLaundry Laundry
C
46 46 46 46
46 46
EE
46
46 46
46
46 46
Mech. Mech. Mech. F 106A
106A 106A
Deck
106B
FF
106B 106B
Deck Deck
G
LEVEL 1LEVEL FLOOR PLAN PLAN LEVEL 11FLOOR FLOOR PLAN
INTERIOR LIGHT STUDY 3Ds MAX
G G
REVIT MODEL IMPORT
EV= 10.5 10.5 ||WP= WP= 9000k 9000k||12/21/2017 12/21/2017 9:30AM EV= 10.5EV= | WP= 9000k | 12/21/2017 | 9:30AM||9:30AM
EV= EV= 10.0 10.09000k ||WP= WP=|9000k 9000k ||12/21/2017 12/21/2017 |11:30 11:30PM PM EV= 10.0 | WP= 12/21/2017 | 11:30 |PM
EV= 3.5 | WP= | 12/21/2017 | 12:30||12:30 AM EV= EV= 3.5 3.5|9000k |WP= WP=9000k 9000k ||12/21/2017 12/21/2017 12:30AM AM
EV= EV= 3.5 3.5|9000k |WP= WP=9000k 9000k ||12/21/2017 12/21/2017 12:30AM AM EV= 3.5 | WP= | 12/21/2017 | 12:30||12:30 AM
954.297.3803 pierinasanchezkong@hotmail.com fsanch20@student.scad.edu