Project References - Fabrication

Page 1

Job References Project References Fabrication Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Vigdis NE Fast Track Project Statoil, North Sea 2011/2012 350 t Fabrication and delivery of integrated template structure and manifold

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Stjerne Fast Track Project Statoil, North Sea 2011/2012 350 t Fabrication and delivery of integrated template structure and manifold

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Hyme Fast Track Project Statoil 2011/2012 350 t Fabrication and delivery of integrated template structure and manifold

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Visund Sør Fast Track Project Statoil, North Sea 2010/2011 350 t Fabrication and delivery of integrated template structure and manifold

Project References - Fabrication

Page: 1 of 21


Job References Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Kirinskoye Gasprom, Russia 2011 410 t Fabrication and delivery of foundation base structure, manifold and two off protection structures

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Girri Project Total, Angola 2011 100 t Fabrication and delivery of one off manifold, prefab items for Angolan fabricator and 5 off well jumpers

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Gullfaks PS Statoil, North Sea 2011 100 t EPC – 1 off protection structure

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Marulk Statoil, North Sea 2010 340 t Fabrication and delivery of integrated template structure and manifold

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies OKONO Eni, Nigeria 2010 50 t Fabrication and delivery of 4 off UTA

Project References - Fabrication

Page: 2 of 21


Job References Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies GERM BP Angola 2010 15 t Fabrication and delivery of pig launcher and pig receiver.

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Pazflor Separation Unit (SSU) Total Angola 2010 2400 t Delivery of 3 off world’s first gas subsea separation systems each consisting of : 1 off Intermediate Frame 1 off Separator Module 1 off Manifold Module 1 off Inlet Module 2 off Pump Modules

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Pazflor Distribution Units Total Angola 2010 550 t 1 off SIV Module 3 off UDM modules 2 off UCM Modules 6 off UTP Modules

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Troll B Gas Injection Statoil 2010 450 t 2 off Flow Modules 2 off Integrated Satellite Structures

Project References - Fabrication

Page: 3 of 21


Job References Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Norne M Statoil 2009 450 t 2 off Host Systems 2 off Integrated Satellite Structures

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Pluto Project, Australia Woodside 2009 750 t 1 off Production Manifold Module 1 off Pigging Module 2 off Manifold Support Structures 2 off Closed Caisson Foundations 7 off Utility Termination Assemblies 3 off MEG PLETS 2 off Field Termination Assemblies 6 off 8” Multibore spool kits 2 off 14” Single bore spool kits 2 off 20 “ Single Bore Spools

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Enfield II Project, Australia Woodside 2008-2009 150 t 1 off Production Manifold Module 1 off Manifold Support Structure

Project References - Fabrication

Page: 4 of 21


Job References Customer: Project: Operator: Delivery: Weight: Description:

Technip Norway GJテ連 Riser Bases StatoilHydro 2009 650 t 1 Gas Export Riser Base (incl pig receiver) 1 Gas Export Plem Flags (incl pig launcher) 1 Gas Export Future Tie-in Valve Structure 1 Oil Export Riser Base 1 Gas Infield Riser Base 1 Oil Infield Riser Base 1 Vega Riser Base

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Ekofisk Project ConocoPhillips 2009 (sail away date) 350 t 2 off Manifold Modules 2 off HOST Systems 1 off Protection Structure Site Integration Testing and Load Out

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Vega Project StatoilHydro 2009 (sail away date) 1750 t 3 off Manifold Modules 3 off Integrated Template Systems 4 off Flow Module Site Integration Testing and Load Out

Customer: Project: Operator: Contr. Value: Delivery: Weight: Overall size: Description:

FMC Technologies Ormen Lange Subsea Phase II StatoilHydro 130 MNOK 2009 1500 t 44 x 32 x 14 m (L x W x H) 1 off Manifold System 1 off Template Systems 4 off PLEM units 2 off MEG PLET units Site Integration Testing and Load Out

Project References - Fabrication

Page: 5 of 21


Job References Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Troll O2 Project StatoilHydro 2009 500 t Customer: FMC Technologies 1 off Integrated Template System 1off Manifold Module 1 off Pig Loop Module Site Integration Testing and Load Out

Customer: Project: Operator: Contr. Value: Delivery: Weight: Description:

FMC Technologies GJØA Project StatoilHydro 130 MNOK 2008 2000 t 4 off Manifold Modules 4 off Integrated Template Systems 1 off Flowbase 1 off Integrated Satellite System Site Integration Testing and Load Out

Customer: Project:

M-I Epcon EPCON skids (4 off – various projects ) EPC contracts 2006-2008 (sail away date) 100 t Produced Water Treatment System

Contract: Delivery: Weight: Description:

Customer: Project: Operator: Contr. Value: Delivery: Weight: Description:

FMC Technologies Tyrihans Project StatoilHydro 130 MNOK 2008 2000 t 5 off Integrated Template Systems 5 off Manifold Modules Site Integration Testing and Load Out

Customer: Project: Operator: Delivery: Weight: Description:

Aker Kvaerner Subsea Tyrihans SRSWI Project StatoilHydro 2008 150 t 1 off Pump, Trafo and Manifold Module Site Integration Testing and Load Out

Project References - Fabrication

Page: 6 of 21


Job References Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Yttergryta Project StatoilHydro 2008 370 t 1 off Flow Base 1 off PLEM 1 off Satellite Structure

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Sigrid Project StatoilHydro 2008 40 t 1 off Flow Base

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Alve Project, Norway Statoil 2007 100 t 1 off Fixed HOST

Customer: Project: Operator: Delivery: Description:

FMC Technologies Moho Well Jumpers, Angola Total 2007 10 off Multibore Well Jumper Kits EPC of Lifting Arrangement

Customer: Project: Operator: Delivery: Weight: Description:

Aker Kvaerner Subsea BP King Pump Project BP 2007 150 t 2 off Manifolds 3 off Pump Structures

Project References - Fabrication

Page: 7 of 21


Job References Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Tordis Separation Project Statoil 2007 1700 t World’s first Subsea Separation System 1 off Foundation Base Structure 1 off Manifold Module 1 off Separation Module 2 off Desanding Modules 1 off Waterflow Module 3 off Multiphase Flow Modules 1 off Pipeline / Inline Module

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Vincent Project, Australia Woodside 2007 250 t 2 off Manifold Modules 2 off Templates Site Integration Testing and Load Out

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Vigdis Extension II Project Statoil 2007 400 t 1 off Integrated Template Structure 1 off Manifold Site Integration Testing and Load Out

Project References - Fabrication

Page: 8 of 21


Job References Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Ormen Lange Spools Hydro / Saipem 2007 100 t Spools

Customer: Project: Delivery: Weight: Description:

APL Puffin Loading Buoy 2007 110 t Refurbishment of 1 off Loading Buoy

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Oseberg Delta Project Norsk Hydro 2006 400 t 1 off Integrated Template Structure 1 off Manifold Module 1 off Pig Loop Module 1 off Drill Cut Injection Module

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Norne K Project Statoil 2006 50 t 1 off Manifold Module

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Ă…sgard Project Statoil 2006 50 t 1 off Manifold Module

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Heidrun Project Statoil 2006 240 t 1 off Satellite Structure and Flowbas

Project References - Fabrication

Page: 9 of 21


Job References Customer: Project: Delivery: Weight: Description:

APL Alvheim Loading Buoy 2006 520 t 1 off Loading Buoy

Customer: Project: Delivery: Weight: Description:

APL KMZ Loading Buoy 2006 500 t 1 off Loading Buoy

Customer: Project: Operator: Delivery: Description:

Aker Kvaerner Subsea Dalia Project I + II, Angola TotalFinaElf E&P Angola 2005-2007 Machining and welding of 72 flow loops

Customer: Project: Contr. Value: Delivery: Weight: Description:

Sevan Marine Hummingbird Flare Boom 8 MNOK 2006 90 t Flare boom (60 m long)

Customer: Project: Operator: Delivery: Total weight: Description:

FMC Technologies Ormen Lange Project Hydro 2005 2600 t 2 off manifolds each 450 tonnes 2 template systems each 700 tonnes 1 PLET bottom structure 300 tonnes System testing

Project References - Fabrication

Page: 10 of 21


Job References Customer: Project: Operator: Delivery: Total weight: Description:

FMC Technologies Skinfaks-Rimfaks, Norway Statoil 2005-2006 500 t 1 off manifold/template system (EPC) 1 off tie-in manifold/template system (EPC) 1 off Satellite/Flowbase system 2 off Protection Structures (EPC)

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Enfield, Australia Woodside 2005 120 t 3 off manifolds, E-FAT

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Chinguetti, Mauritania, West Africa Woodside 2004-2005 400 t 3 off template/manifold systems 1 off protection structure (EPC) System testing

Customer: Project: Operator: Delivery: Description:

Aker Kvaerner Subsea Dalia Project, Angola TotalFinaElf E&P Angola 2004-2005 Machining and welding of 42 Guide Base Connectors

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Heidrun Nordflanken Satellite Statoil 2005-2006 200 t 1 off Satellite Structure/Flowbase system

Project References - Fabrication

Page: 11 of 21


Job References Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Rosa project, Angola, West Africa Total 2005 200 t 4 off manifolds 2 off Pig Loop Module Shallow water test

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Bouri project Agip 2005 25 t 1 off protection structure (EPC)

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Norne project, Norway Statoil 2005 150 t 3 off manifolds, system testing

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Norne project, Norway Statoil 2004 1000 t 3 off integrated template systems

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Baobab, Côte d’Ivoire, Africa Canadian National Resources (CNR) 2004 320 t 4 off Manifold Modules, System testing 5 off SDU/UTA

Project References - Fabrication

Page: 12 of 21


Job References Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Oseberg Vestflanken Norsk Hydro 2004 200 t 1 off Manifold/Template System

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Oseberg J, Norway Norsk Hydro 2004 200 t 1 off manifold/template system, system testing

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies SVAN (Sleipner Vest Alpha Nord), Norway Statoil 2003 300 t Integrated Template manifold

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Vigdis Field Development, Norway Statoil 2003 300 t 2 off Satellite Structures

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Vigdis Field Development, Norway Statoil 2003 230 t each Testing, SIT, Template Manifold Systems

Project References - Fabrication

Page: 13 of 21


Job References Customer: Project: Contr. Value: Delivery: Weight: Description:

Esso Norge AS Ringhorne Jurassic Separation Module (EPC) 200 MNOK 2003 350 t Separation module (15 x 5 x 15 m)

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Megi/Zafiro, Equatorial Guinea ExxonMobil 2003 270 t Testing Manifolds and Pig Loop Modules 6 systems

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Host System Terra Nova Alliance/ Statoil 1996-2003 1400 t (40 t each) 35 off Host Template Manifold Systems

Customer: Project: Operator: Delivery: Description:

FMC Technologies Girassol/ Jasmim, Angola TotalFinaElf 1999-2003 14 off Manifolds, final assembly

Customer: Project: Operator: Delivery: Description:

FMC Technologies Girassol/ Jasmim, Angola TotalFinaElf 1999-2003 PGBs ready for delivery 40 off

Project References - Fabrication

Page: 14 of 21


Job References Customer: Project: Delivery: Weight: Description:

APL, Arendal Panyu Field, China 2003 320 t Loading Buoy

Customer: Project: Contr. Value: Delivery: Weight:

Statoil Kvitebjørn Drilling Facilities (EPC) 1000 MNOK March 2003 (sail away date) Drilling righ incl. derrick: 2700 t Mud module: 1300 t Drilling rig and mud module. Overall size drilling rig excl. derrick: 22.5 x 18 x 16.5 m (L x W x H). Overall size mud module: 39.5 x 11.5 x 19 m.

Description:

Customer: Project: Delivery: Weight: Description:

Minox Technology, Notodden Heidrun Field, Norway 2003 45 t Deoxygenation Package

Customer: Project:

APL, Arendal Bohai SEA, China CFD 11/BE 25 2003 2 SYS Yoke Systems

Delivery: Description:

Project References - Fabrication

Page: 15 of 21


Job References Customer: Project: Contr. Value: Delivery: Weight: Description:

Customer: Project: Contr. Value: Delivery: Weight: Description:

BP Amoco Norge Valhall Flank Development (EPCI) 555 MNOK July 2003 (sail away date) Topside: 2100 t Jacket + piles: 4100 t Wellhead platform to the north flank. Overall size topside: 32 x 32 x 21.5 m (L x W x H).

BP Amoco Norge Valhall Flank Development (EPCI) 655 MNOK Sept. 2002 (sail away date) Topside: 2100 t Jacket + piles: 4100 t Wellhead platform to the south flank. Overall size topside: 32 x 32 x 21.5 m (L x W x H).

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Fram Vest, Norway Norsk Hydro 2002 230 t each 2 off Fixed Templates

Customer: Project: Delivery: Weight: Description:

Hydralift, Kristiansand Santa Fe, Singapore 2002-2003 40 t each BOP - Trolleys

Customer: Project: Delivery: Weight: Description:

Hydralift, Kristiansand Santa Fe, Singapore 2002-2003 120 t each BOP - Elevators

Project References - Fabrication

Page: 16 of 21


Job References Customer: Project: Delivery: Weight: Description:

Hydralift, Kristiansand Santa Fe, Singapore 2002-2003 120 t each BOP - Cranes

Customer: Project: Contr. Value: Load out date: Delivery: Weight:

Esso Norge Ringhorne Wellhead Platform (EPCI) 3300 MNOK November 2001 (topside)

Description:

August 2002 (sail away date) Topside incl. module: 12 500 t Jacket + piles: 7000 t + 2500 t Drilling facilities: 5000 t Overall size: topside incl. module: 100 x 50 x 40 m (L x W xH)

Customer: Project: Delivery: Weight: Description:

APL, Arendal Bayu-Undan Field, East Timor 2002 300 t Turret and buoy assembly

Customer: Project: Operator: Delivery: Description:

FMC Technologies Girassol/ Jasmim, Angola TotalFinaElf 1999-2002 14 off CCF

Customer: Project: Operator: Delivery: Weight: Description:

FMC Technologies Girassol/ Jasmim, Angola TotalFinaElf 1999-2002 350 t 14 off Manifold Support Structures

Project References - Fabrication

Page: 17 of 21


Job References Customer: Project: Delivery: Weight: Description:

Minox Technology, Notodden Valhall Field, Norway 2001 25 t Deoxygenation Package

Customer: Project: Operator: Delivery: Description:

FMC Technologies Otter Field, Ireland ExxonMobil 2000 Testing, template manifold system

Customer: Project: Contr. Value: Date of order: Delivery: Weight:

Norsk Hydro Heimdal 2000 Riser Platform (EPC) 960 MNOK September 1998 April 2000 (sail away date) Topsides: 3000 t Jacket: 5360 t Bridge: 500 t Overall size: Topsides: 30 x 30 x 18 m (L x W x H) Jacket: 40 x 40 x 144 m Bridge: 80 m

Description:

Customer: Project: Operator: Delivery: Weight: Description:

Statoil Ă…sgard Statoil 2000 330 t 11 off Riser Bases

Project References - Fabrication

Page: 18 of 21


Job References Customer: Project: Delivery: Weight: Description:

ABB Miljø AS Åsgard Field, Norway 1999 45 t Acid Gas Incinerator and Seawater Absorbers Module

Customer: Project: Delivery: Weight: Description:

APL, Arendal Åsgard Field 1999 300 t Loading Buoy

Customer: Project: Contr. Value: Operator: Delivery: Weight: Description:

Kværner Oil & Gas, Egersund Åsgard B Pipe Spools (C) 12 MNOK Statoil February 1999 (last shipment) 800 t Pipe spools Materials: 230, 6Mo, Duplex, Carbon Dimensions: 0.5” – 30”

Customer: Project: Contr. Value: Date of order: Load out date: Delivery: Weight:

Esso Norge Jotun Wellhead Platform (EPCIC) 1800 MNOK March 1997 August 1998 (Topside)

Description:

Customer: Project: Contr. Value: Date of order: Load out date: Weight: Description:

October 1998 (sail away date) Topsides incl. modules: 8500 t Jacket + piles: 6500 t + 3500 t Overall size (L x W x H): Topsides incl. modules: 58 x 42 x 30 m Jacket (subcontracted): 43 x 43 x 120 m Amoco Norway Oil Company Valhall WP Equipment Module (EPCI) 70 MNOK February 1997 May 1998 600 t Overall size: 20 x 14 x 9 m (L x W x H) Project References - Fabrication

Page: 19 of 21


Job References Customer: Project: Contr. Value: Date of order: Load out date: Weight: Description:

Customer: Project: Contr. Value: Date of order: Load out date: Weight: Description:

Customer: Project: Contr. Value: Date of order: Load out date: Weight:

Description:

Customer: Project: Operator: Contr. Value: Date of order: Load out date: Weight: Description:

Customer: Project: Operator: Contr. Value: Date of order: Load out date: Weight: Description:

Amoco Norway Oil Company Valhall WP Equipment Module (EPCI) 70 MNOK February 1997 May 1998 600 t Overall size: 20 x 14 x 9 m (L x W x H)

BP Norge Ula Wag Module (CI) 48 MNOK August 1996 April 1997 380 t Overall size: 16 x 6 x 14 m (L x W x H)

Amoco Norway Oil Company Valhall WP Project (EPCIC) 350 MNOK June 1995 April 1996 (Topside + bridge) Topside: 1200 t Bridge: 150 t Jacket: 2400 t (subcontracted to HHB) Topside, bridge and jacket Overall size (L x W x H): Topside: 31 x 34 x 12 m Bridge: 51 x 3.5 x 5 m Jacket: 23 x 23 x 95 m

Kongsberg Offshore AS Norne Templates and Manifold Systems (EPC) Statoil 170 MNOK July 1994 April 1996 2050 t (5 units) Overall size: 20 x 14 x 11 m (L x W x H)

Kongsberg Offshore (KOS) Yme Beta Manifold Statoil 660 000 NOK October 1995 February 1996 35 t Overall size: 9.7 x 5.4 x 2.25 m (L x W x H)

Project References - Fabrication

Page: 20 of 21


Job References Customer: Project: Operator: Contr. Value: Date of order: Load out date: Weight: Description: Customer: Project: Operator: Contr. Value: Date of order: Load out date: Weight: Description:

Customer: Project: Date of order: Load out date: Weight: Description:

Aker Stord AS Njord Floating Production Unit, Deck Sections (C) Norsk Hydro 38 MNOK May 1995 December 1995 (last section) 1300 t (7 units) Overall size: max. 23 x 32 x 9 m (L x W x H) Grootint B. V. (Aker/Kellogg J. V.) Troll Land Kollsnes (C) Norske Shell 56 MNOK October 1993 February 1995 (last shipment) Approx. 1500 t Spool fabrication – Field area piping/3200 spools, various materials (2”-36”) Corrosion Protection – Aluminium spray metalizing 14 000 m2 Elf Petroleum Norge AS Frøy Wellhead Platform Topside (EPC) October 1992 July 1994 2200 t Overall size: 52.6 x 30 x 16.8 m (L x W x H)

Project References - Fabrication

Page: 21 of 21