Portfolio

Page 1

PORTFOLIO PEDRO J. GÁMEZ


CV

PEDRO J GÁMEZ

ARCHITECT

ACADEMIC

PERSONAL

SOFTWARE

FINAL THESIS IN ARCHITECTURE Alhambra Center, Hotel and Restaurant ETSAM, Technical University of Madrid September 2012 – June 2014 Final thesis Director, Raúl del Valle

NAME PEDRO J GÁMEZ PALOMARES D.O.B JANUARY 29TH, 1988 - JAÉN (SPAIN) ADDRESS MEDELLÍN 5 - 4º 2 28010 MADRID PHONE (+86) 627 702 925 E-MAIL PJGAMEZ@HOTMAIL.COM

AUTODESK REVIT 2016 Fluent modelling and design skills with render editing Certification from ETSAM. June 2013

BACHELOR and MASTER IN ARCHITECTURE from ETSAM, Technical University of Madrid September 2006 – June 2012 ÉCOLE NATIONALE SUPERIEURE D’ARCHITECTURE PARIS - MALAQUAIS École de Beaux Arts, Paris September 2010 – June 2011 Symbio-cité, Pascal Gontier New Territories, François Roche

COMPETITIONS SINO-GERMAN ECO PARK (China) July 2016 ZHENGZHOU SCIENCE MUSEUM (China) FIRST PRIZE August 2015 EMS FONDATION LA ROZAVÈRE (Switzerland) May 2015

WORKSHOPS ENSA PARIS - MALAQUAIS Franchissements. Workshop Paris, May 2011

Model building and structural performance

TSINGHUA-TONGJI Universities International workshop Beijing-Shanghai, March 2009 Architectural exchange program promoted by UPM

JOB EXPERIENCE TONGJI ARCHITECTURAL DESIGN (TJAD) www.tjadri.com ARCHITECT - Shanghai, China June 2015 - August 2016 Architectural design, Urban design 3D modeling, plan layout, competitions LEMANARC SA www.lemanarc.com ARCHITECT - Shanghai, China December 2014 - May 2015 Arch. design, 3D mod., plan layout, comp. GRAPHIC DESIGNER FREELANCE - Madrid, Spain June 2011 - Present Marketing and advertising-based works Identity branding for local-based companies MODEL BUILDING FREELANCE - Madrid, Spain January 2008 - Present Hand-cut and laser-cut models

LANGUAGES SPANISH: Native, mother language ENGLISH: 14 years of learning TOEFL iBT 98/120. February 2014 Proficient in spoken and writing skills FRENCH: 8 years of learning Proficient in spoken and writing skills g

ITALIAN: Basic spoken and written level

AUTODESK AUTOCAD 2016 Proficient level in 2D & 3D design Certification from ETSAM. January 2013 ARCHICAD 20 Fluent modelling and design skills with render editing ADOBE CREATIVE SUITE 6 Proficient skills in Photoshop, InDesign and Illustrator Certification from ETSAM September - December 2012 RHINOCEROS Advanced modelling skills Certification from ETSAM September - December 2012 SKETCHUP PRO Advanced skills for modelling and textures Certification from ETSAM. June 2012 APPLE SOFTWARE Pages, Numbers, Keynote MICROSOFT OFFICE Work, Excel, Outlook and PowerPoint Proficient in Apple OS X and Microsoft Windows platforms

OTHERS PHOTOGRAPHY MUSICAL OFFICIAL STUDIES Specialization Piano Professional School of Music, Jaén September 1997 - June 2005


INDEX THESIS, ETSAM MADRID

ALHAMBRA CENTER, HOTEL & SPA 2012

4

LEMANARC, SHANGHAI

EMS FONDATION LA ROZAVÈRE. 2015

10

SHANGHAI XINCHANG HOSPITAL. 2015

14

TONGJI ARCHITECTURAL DESIGN, SHANGHAI

ZHENGZHOU SCIENCE PARK. 2015

18

SINO-GERMAN ECO PARK. QINGDAO. 2016

24

QINGDAO HIGH SCHOOL. 2015

30

QINGDAO MIDDLE SCHOOL. 2016

36

QINGDAO PRIMARY SCHOOL. 2016

40

CHANGCHUN SPORTS PALACE. 2015

44

CHUANSHA STADIUM, SHANGHAI. 2015

46

ETSAM, MADRID

NEW GOURNA. EGYPT 2010

48

SYMBIOCITÉ. PARIS 2011

50

URBAN STRATEGIES. TANGER-MED 2011

54

RETIRO 2010

58

MODELS 2010-2016

60


ALHAMBRA CENTER, HOTEL & SPA 2012

An abandoned hotel just in front of Alhambra Palace, Granada, and Thousand of tourists passing by every day. The project consists of refurbishing many existing buildings on site, designing new ones and giving the area a new status after the urban planning proposed by UNESCO for this area.


5 HAND-CUT MODELS DEVELOPMENT PROCESS

OCCUPIED ESTATES

PROPIETARY P. OF ALHAMBRA CURRENT USE RESIDENTIAL CONSTRUCTION AREA 3.900 m2 ABANDONED SINCE 1988

PROPIETARY HOTUSA S.L. CURRENT USE HOTEL CONSTRUCTION AREA 1.906 m2 ABANDONED SINCE 2001

PROPIETARY PRIVATE CURRENT USE RESIDENTIAL CONSTRUCTION AREA 4.500 m2 TO BE REFURBISHED

PROPIETARY JUNTA ANDALUCÍA CURRENT USE SANITARY CONSTRUCTION AREA 6.000 m2 TO BE REFURBISHED

1928

CURRENT SITUATION

OTHER HANDICAPS

TWO INTER-RELATED HOTELS

MISSING BUILDING

NORTH ORIENTED HOTEL MANY RESIDUAL SPACES

?

WASHINGTON IRVING HOTEL HIISTORICAL BACKGROUND MAIN REFERENCE ALHAMBRA PALACE

INTENTIONS

PROPOSED INTERVENTION

THE SQUARE IN ALHAMBRA CARLOS V PALACE TOWERS CHAMBERS PLASTERWORK CERAMICS TIMBER LOUVERS

LENGHTENING OF THE EXISTENT WALL

TWISTED PATHS EMULATING ARAB ARCHITECTURE


Every decision was made concerning Alhambra Palace : Geometry, relationship between pieces, spatial conditions or materials. It consists of a reinterpretation of arab architecture in order to design a modern building well integrated on site. The project is inspired by the all-concave shape of Alhambra walls, as a container that guards every building inside

GROUND PLAN

SECTION A

SECTION B

PROPORTIONS IN ALHAMBRA SECTION

SPATIAL PROPORTIONS IN CURRENT PROJECT

LASER-CUT MODEL SURROUNDING AREA / ALHAMBRA WALLS


PROJECT VIEWS HOTEL ENTRANCE COURT MAIN ENTRANCE RESTORATION WORKPLACE CAFETERIA

ALCAZABA ALHAMBRA CENTER

PALACES HOTEL

GARDENS RESTAURANT

SECTION 1 CAFETERIA / HOTEL

SECTION 2 EXHIBIT CENTRE / AUDITORIUM

SECTION 3 ALHAMBRA CENTER

7


DETAILS

STRUCTURAL ANALYSIS

CONSTRUCTION SECTION


9


EMS FONDATION LA ROZAVÈRE. 2015

622 621

620

619 618 617 616 615

614

R2

613

612 +614'91

611

610 R1

609

R3 +621

,4

ING

PARK

THIS PROJECT IN SWITZERLAND COMPLETES A NURSING HOME THROUGH A NEW VOLUME THAT LINKs EVERY EXISTING BULIDING, SURROUNDS THE PARK AND GIVES A NEW FACADE TO THE WESTERN STREET.


11

FLOWS 1 STREET LEVEL

2

BASEMENT PARK

CONNECTION TO EXISTING BUILDINGS CONNECTION TO PARK

MODEL ThIS project complements the establishment of La Rozavère by a separate building representing an entity of its own. While linking the two existing buildings with access to different levels, this new construction recognizes and values ​​the geographical proximity between the existing elements. INTERIOR VIEW. COMMON ROOM GROUND FLOOR MAIN ENTRANCE LINKED TO BUILDING 1

FLOORS 1 & 2

EXTERIOR VIEW. SOUTH

LINKED TO BUILDING 2

L

K

HUB LAUNDRY SERVICE KITCHEN SERVICE


132,8 m2 307 VEF

39,1 m2 307 VEH

24,1 m2 Local tecnique (ventilation)

20,3 m2 103A CHS

66,8 m2 104A SUN/SMU

nel

son

ria

7

85,

5

36,

102A 101A

A

7

16,

CH1

2

m

2

m

2

m

per

été

Caf

PER

BAI

106

0

A 107 P WC

26,

2

m

302

T MA

A

2

8,6

m

DM

A

6

2

m

I

SO

113

ELEV.

21,

005 ESC

COMPRESSEUR COMPRESSEUR COMPRESSEUR POUR PRODUCTION POUR PRODUCTION POUR FROID POSITIF FROID NEGATIF CELLULE MIXTE

4 m2 110A DLP

112A

004 ASC 107A 107A WCH WCV

VID

2

2

4m NET

111A

003

24,4

EXTERIOR VIEW. WEST

m 2 105A

4m DLP

005 ASC

110A

DLS/

3 CONDENSEURS POUR PRODUCTION FROID +/-

111A

107A WCH

+0 m (611,59

2

4m ET

DLS/N

m)

107A WCP

ESC

TIS

UNDERGROUND LEVEL

The outline of the building evolved from a careful fit in response to various constraints and also respondS to an internal organization strategy. The result is a space articulated towards different directions, which visually reducES the scale of the building.

SOUTH ELEVATION

EAST-WEST SECTION


13

13,1 m2 209 SCO-F

130,0 m2 201 HAL

6 m2 207 WCV

16,1 m2 305 PHA

6 m2 206 WCP

6 m2 208 NET

15,4 m2 303 INF

6 m2 208 NET

6 m2 210 DMA

15,6 m2 304 MED

6 m2 210 DMA

16,1 m2 301 COL/ENT

CYBER CAFÉ

49,0 m2 204 ANI

115A TER 50,0 m2 204 ANI

18 m2 106A BAI 36,7 m2 SUN

pente 5 %

N.F. + 2.02 N.F. + 2.12

13

167,4 m2 201 HAL

12 11

m2

09 08

COL

07

/ENT

N.F. + 3.29 101N.B. + 3.42

LOCAL VENTILATION

06 05

s. chape m. béton armé p. béton armé

04 03 02

17,3

01

m2

202

CH2 25.83 m2

CH2 25.12 m2

10

203

Cage escalier 21.72 m2

surface 37.7 m2

N.F. ± 0.00 N.B. - 0.23 s. perméable m. béton type 4 surface 50.1 m2

BUR

3.91 m2

6.16 m2 CH1 12.50 m2

VID / DMA 13.10 m2

102A 17,3

m2

202

101A BUR

m2

202

2

12 2

surface 411.6 m2

m 4,7 A WCP

4 m2 110A DLP

005 ASC 202

BUR 2

WCH

WCH

205

205

2

A SOI

113

003

m

2

4m ET

111A

DLS/N

112A

107A WCH

004 ASC 107A 107A WCH WCV

VID

2

2

4m NET

INE

CUIS

111A

ESC

003

WCV

4m DLP

005 ASC

CH2 24.14 m2

110A

U

/SM

2

61,5

m 2 SALLE

m 2 105A

CH1 15.95 m2

DLS/

ESC

WCP

24,4

85,8

3.72 m2

3.69 m2

m)

004 ASC

m)

BUR

56,6

205 205

A DMA

114

17m

+6,94 m (618,53

m2

202

m

m

104A

SUN

TIS

À MANGE

R

FIRST FLOOR

3.72 m2

3.50 m2

4.09 m2

108

107A WCP

+3,32 m (614,91

17,3

m2

3.71 m2

3.60 m2

005 ESC N.F. + 3.29 N.B. + 3.42 s. imperméable

BUR

A

Couloir 50.88 m2

005 ESC 17,3

17,3

SUN 10.26 m2

5.50 m2

CH1

B

17,3

SECOND FLOOR

WEST ELEVATION

NORTH-SOUTH SECTION

CH1 14.50 m2

CH1 15.00 m2

CH1 14.95 m2

CH1 15.64 m2

CH2 24.22 m2


SHANGHAI XINCHANG HOSPITAL. 2015

this HOSPITAL IN PUDONG DISTRICT, SHANGHAI was designed AFTER THE STUDY AND OPTIMIZATION OF CIRCULATIONS, FLOWS AND USAGE by PATIENTS AND STAFF. IT IS A LOW RISE BUILDINGS THAT WORKS EFFICIENTLY UNDER EMERGENCY SITUATIONS, MAKES the MOST OF SUNLIGHT AND SEEKS THE BEST RELATIONSHIP WITH NATURE AND LANDSCAPE.


15 DIAGRAMS

IDEAS

ACCESS

EVACUATION

LAUNDRY/FOOD SERVICES

DISTRIBUTION OF USERS OVER MANY UNITS

QUICK AND EASY ESCAPE ON EMERGENCIES

TO DISTRIBUTION ON THE LOWEST FLOOR

WEDGES

SUNLIGHT

APERTURE TO LANDSCAPE THROUGH ROTATIONAL VOID SPACES

ENERGY EFFICIENCY THOUGHT ORIENTATION

SERVICE CORRIDOR CAFÉ, WIFI, SHOP, PRESS ON EVERY FLOOR

THE MAIN GOAL FOR THIS PROJECT WAS TO ACHIEVE THE BEST FUNCTIONALITY WE COULD GET WITH A MODERN DESIGN AND WITH AN OPTIMIZATION OF THE VIEWS AND RELATIONS WITH THE LANDSCAPE. WE CAND FIND THE SQUARED SHAPE AT EVERY SCALE, FROM URBAN DESIGN TO CONSTRUCTION DETAIL, THROUGH STRUCTURAL GRID AND COURTYARDS. THE HOSPITAL IS BASED AT SHANGHAI PUDONG DISTRICT, NEAR AN INTERNATIONAL AIRPORT AND IN AN AREA WITH CONSTANT GROWTH AND DEVELOPMENT.

VIEW FROM LAKE


A2

C

THIRD FLOOR

UP

UP UP

UP

UP

B1

UP

A1

UP

0 2 5

FOURTH FLOOR

FIFTH FLOOR

20

50

SIXTH FLOOR

C

SECOND FLOOR

10

3rd Floor

1:1000 AERIAL VIEW


GREEN FACADES GREENERY RUNS ALL OVER THE FACADES OF THE VOLUMES IN ORDER TO APROACH PATIENTS TO NATURE AND ENVIRONMENT. FLOOR PLANS THE PLANS FOLLOW A SQUARED GRID WHICH PERMITS SIMPLE AND CLEAR CIRCULATIONS INSIDE THE BUILDING, LEADING USERS FROM ONE BUILDING TO ANOTHER THROUGH BIG CORRIDORS OPENED TO COURYARDS.

MAIN ENTRANCE AREA

17


ZHENGZHOU SCIENCE PARK. 2015 this competition, awarded first prize, was conceived as a pixel cloud. many openings on the facades transfer from monumental to human scale in every volume of the project. it happens from left to right in the museum and from top to bottom in both office and hotel towers.


main axis

public space

MASTERPLAN IDEAS

DIAGRAMS

MODEL

PIXEL CLOUD

THIS PROJECT IS PART OF A LARGE MASTERPLAN IN THE NEW AREA OF ZHENGZHOU CITY, IN CHINA. IT CONSISTS OF A SCIENCE MUSEUM, 4D CINEMA, COMMERCIAL CENTRE, CIRCUS PAVILLION, OFFICE TOWER AND HOTEL. IT ALL EVOLVES AROUND THE MAIN AXIS OF THE MASTERPLAN, THE PUBLIC SPACES AND THE VISUAL AND SPATIAL RELATIONSHIP BETWEEN THE DIFFERENT VOLUMES. CENTRAL PUBLIC SPACE

VOLUMES HIERARCHY

VISUAL CONNECTION

CONNECTION PLATFORM

UNDERGROUND COMMERCIAL

4D CINEMA & CIRCUS

19


GENERAL PROGRAM

SCIENCE MUSEUM permanent EXHIBITION

SCIENCE MUSEUM temporary EXHIBITION

cafe / restaurants

workshop

parking

SCIENCE MUSEUM 1. THE MUSEUM BUILDING WAS CONCEIVED AS A SUM OF BOXES INSIDE AN ENVELOPE. THE EXHIBITION STARTS ON THE UPPER FLOOR AND USERS WILL FOLLOW A PATH THAT GOES DOWN ALL OVER THE BUILDING. THEY CAN ALSO INTERACT WITH MANY WORKSHOPS AND TEMPORARY EXHIBITIONS THROUGHOUT THEIR VISIT.

1. museum LAYOUT: Linked boxes, mixed program.

2. THE BUILDING TRIES TO CREATE AN INTERACTION BETWEEN VISITORS, LEADING THEM TO DISCOVER NEW EXHIBITION ROOMS AND SPEND MORE OR LESS TIME INSIDE THE MUSEUM ACCORDING TO THEIR PREFERENCES.

3. facade transition. FRACTAL

3. THE EXTERNAL FACADE IS DESIGNED AS A FRACTAL SYSTEM, REFLECTING THE INTENAL BOXED STRATEGY AS WELL AS SERVING THE CITY AS AN SCULPTURAL AND MONUMENTAL ELEMENT. IT REMARKS A SINGLE GEOMETRY ON THE WEST SIDE AND A multi-box surface

ATRIUM interior views

2. main exhibition

CIRCUS, OFFICE TOWER AND HOTEL


21

general program

circus

retail

OFFICE

hotel

PARKING

SECTION A

sections

SECTION B

SECTION C

FLOOR PLAN

our site is divided in two parts that must be liked both over and under the street. both parts will be connected on level -1 through a sunken plaza and on level 2 through a platform.


SCIENCE MUSEUM


elevated plaza

NORTH ELEVATION

museum - north facade

23


SINO-GERMAN ECO PARK, QINGDAO. 2016

A NEW PHASE INSIDE THE SINOGERMAN TECHNOLOGY CAMPUS is to be built in qingdao, china.

GENERAL MASTERPLAN

PARK & GREEN AREAS

PUBLIC TRANSPORT

USERS PATHWAYS

THIS NEW AREA WILL HOST TEACHING BUILDINGS, HOUSING FOR TEACHERS, DORMITORIES FOR STUDENTS, RESEARCH BUILDINGS AND MANY OTHER SERVICES. THE PROJECT was DEVELOPED FOLLOWING A FUNCTIONAL AND SUSTAINABLE PRINCIPLE OF DESIGN.


25

TEACHER´S HOUSING

STUDENT´S DORMITORIES

LABORATORY BUILDINGS

the client wanted energy efficient buildings, with funcional and modern design. The proposal seeks a simple solution to those requirements maximizing the green areas and the relationship between architecture and nature. The project is going to be built on two different phases to reduce the impact on the area.

SERVICE BUILDINGS


LIBRARY & TEACHING BUILDING

VIEW PLATFORM SIGHTSEEING AREA TOWARDS THE WALLEY AND GREEN AREAS

CONNECTION BRIDGE

CROSS SECTION

LIBRARY FACADE

STANDARD FLOOR PLAN

TEACHING BUILDING FACADE

ROOF GARDEN. FLOOR PLAN.


27 PARKING

THIS PARKING BUILDING IS OPENED TO THE EXTERIOR. A SIMPLE LAYOUT WITH TWO RAMPS TO MAXIMIZE THE PARKING AREA.

HOTEL

The design of the buildings makes every solar system invisible from the street level, so it will not make any impact on the urban design. The solar roofs can generate their own clean and more affordable energy from sunlight through the use of photovoltaic systems. A Green roof will be available under every solar panel system.

ENERGY SAVING

solar roofing The photovoltaic roof systems will occupy more than 90.000 squared meters surface and will provide 20% of renewable energy for every building.

GREEN ROOF

SOLAR SYSTEM

these systems include: 1. SOLAR ENERGY COLLECTION 2. RAINWATER COLLECTION. versatile facade facade panels can according to use.

be

opened

OPENED LAYOUT

CLOSED LAYOUT



CAMPUS HEADQUARTERS

29


QINGDAO HIGH SCHOOL. 2015


31 GENERAL DIAGRAM

DORMITORIES + CLASSROOM AREA

SPORT + MEETING + CONFERENCE ROOMS

OTHER SPORTS AND ARTS

TEACHING PROGRAM

72 HIGH SCHOOL UNITS 24 offices Lab and research sports facilities

FACADE CONCEPT DESIGN

PRIMARY SCHOOL MIDDLE SCHOOL SERVICES


librarY

STANDARD CLASSROOM

SCIENCE LAB


33 our proposal for the school combines a fonctional layout with an organic design in order to reach all the clients requirements with a quality, modern and attractive design. The relationship with courtyards, exterior landscape and sunlight were always tge main principles of design.

TEACHING AREAS

TEACHING AREAS

inner CIRCULATIONS



35


QINGDAO MIDDLE SCHOOL. 2016

400m SPORTS TRACK REQUIRED VOLUME

ELEVATED TRACK SPLIT VOLUME

OPENINGS OURTYARD

TWO PLAYGROUNDS CLOSED AREAS

FINAL PROPOSAL


37

TEACHING

SPORTS

ARTS & LABS

SPORTS & PARKING

WORKSHOP

TRANSPORT HUB & PARKING

TRADITIONAL LAYOUT

PROPOSED LAYOUT

OUR CLIENT ASKED FOR A MODERN AND ICONIC DESIGN FOR THIS SCHOOL. AS IT WAS A PRIVATE CENTRE, THEY WANTED A REMARKABLE BUILDING IN THIS FAST-GROWING DISTRICT IN QINGDAO CITY, AS A MONUMENTAL ELEMENT THAT LINKS THE PLAYGROUND WITH THE PUBLIC SPACES.


FIRST FLOOR

FIFTH FLOOR

GROUND FLOOR

THIRD & FOURTH FLOOR

PARKING

SECOND FLOOR


39

FACADE SYSTEM FINS

AERIAL VIEW

COURTYARD VIEW


QINGDAO PRIMARY SCHOOL. 2016


41

SCHEMATIC PLANS

DIAGRAMS

ENTRANCE SQUARE

VEHICLES CIRCULATION

the client’s requirement for this project led us to a basic layout, with north-south oriented classrooms and linking corridors. the building was conceived as a terraced garden to be used by all students the students maximizing green areas and interaction between them. RENDERS


GROUND FLOOR

FIRST FLOOR

SECTION A

SECTION B

COR-TEN STEEL FACADE TO THE EAST: MAIN STREET & ENTRANCE PLAZA POLYCARBONATE COLOURED FACADE TO THE WEST: PLAYGROUND & SPORTS AREAS PUBLIC USES ON LOWER FLOORS AND TEACHING AREA ON UPPER FLOORS. EVERY CLASSROOM WILL HAVE ACCES TO ALL REQUIRED FACILITIES AND SERVICES AS WELL AS EASY ACCESS TO GREEN AREAS. EACH OF THE CLASSROOM UNITS WILL BE OPENED TOWARDS A COURTYARD, TO OPTIMIZE LIGHTNING CONDITIONS AND PRIVACY ON EVERY CLASSROOM AND LABORATORy. THE TERRACES LET USES GO ALL OVER THE BUILDING, FROM THE ENTRANCE PLAZA TO THE UPPER FLOOR.


43

SECOND FLOOR

THIRD FLOOR

EAST FACADE: MAIN STREET & ENTRANCE PLAZA

WEST FACADE: PLAYGROUND & SPORTS AREAS

FOURTH FLOOR


CHANGCHUN SPORTS PALACE. 2015 the project´s main idea was to unify the required spaces under a continuous facade, with a modern and sustainable design, as a new and modern element on the masterplan.

GROUND FLOOR

FIRST FLOOR

SECOND FLOOR


45

PATTERN

ROOFING

GRADIENT

MAIN UNITS

MUTATION

ENVELOPE


CHUANSHA STADIUM, SHANGHAI. 2015

GENERAL VOLUME

MAIN HALLS

WAVY ROOF

PROPOSAL 1 THE HIGHLIGHT OT This BUILDING IS A WAVY ROOF TO BE SEEN AS A SCULTPTURAL ELEMENT FROM THE HIGHWAY.

WIND-MOVING SYSTEM METAL ELEMENTS MOVE WITH THE WIND AND CREATE A DYNAMIC EFFECT ALL OVER the facades.

ENTRANCE PLAZA


47

MONUMENTAL SCALE

CUTTINGS

OVERLAYING VOLUMES

PROPOSAL 2 A FACETED VOLUME WITH SOLID GEOMETRY AND TRANSLUCENT FACADES.

DIGITAL LED SYSTEM A LED GRID COVERS THE FACADES AS A GIANT DIGITAL SCREEN TO DISPLAY ACCORDINGLY TO ANY VENUE.

LAYERED ROOF


NEW GOURNA. EGYPT 2010

NEW GOURNA VILLAGE, LUXOR, EGYPT. A TIPICAL ARCHAEOLOGICAL SITE IS BEING FORGOTTEN ABOUT. IN ORDER TO PRESERVE THIS FIELDS, SOME HOUSES FOR ARCHAEOLOGISTS WILL BE BUILT, AS WELL AS A HOTEL & SPA COMPLEX TO ATTRACT ATTENTION OF THOSE INTERESTED IN EGYPT AND ITS HISTORY.


EVERY PIECE WILL BE EXECUTED WITH PRECAST REINFORCED CONCRETE WALLING UNITS. THEY WILL BE TRANSPORTED THERE THROUGH THE NILE RIVER AND SET UP THERE BY LOCAL BUILDERS. ALL THOSE MEASURES ARE PLANNED IN ORDER TO REDUCE COST AND DEVELOP THE ECONOMY OF BOTH BUILDING AND TRANSPORTATION INDUSTRIES ON THE VILLAGE.

RELATION WITH CITY

PROGRAM

1 Hotel entrance 2 Reception 3 Restaurant 5 Rooms 6 Hall 7 Changing rooms 8 Hamman / Spa

49 C B A C B A

Ground plan

HOTEL - CORRIDOR SECTION

HOTEL - ROOM SECTION

HOTEL - NORTH ELEVATION

First plan

HOTEL - SOUTH ELEVATION

HAMMAN SECTION

Section C

HAMMAN SOUTH ELEVATION

Section B

Section A


SYMBIOCITÉ. PARIS 2011

Saint Denis parisian metro station. A narrow and dangerous tunnel as the only way to connect both sides of the railways. The project aims to connect east and west sides of the station as well as TO CREATE a grid of cycle tracks and pedestrian pathways. the station problems will be fixed AND a park, housing buildings AND A MALL will be built on the area.


51

LA SEINE RIVER

SAINT DENIS CANAL

HOUSING

URBAN PARK

RETAIL

REFURBISHED METRO STATION

CYCLE TRACKS AND PEDESTRIAN WALKWAYS


HOUSING

WEST ELEVATION TYPE 1

TYPOLOGIES

ONE PERSON STUDIO SINGLE MODULE - 18 m2 THREE HOUSING TYPES ARE PROPOSED FOR THESE RESIDENTIAL BUILDINGS, WITH ONE, TWO OR THREE MODULES FOR EACH HOUSING UNIT.

HOUSING MODULES

TYPE 2

TWO PEOPLE APARTMENT DOUBLE MODULE - 32 m2

AS THEY COMBINE WITH EACH OTHER, THEY WILL CREATE A DYNAMIC ELEVATION THAT WILL CAST DIFFERENT SHADOWS THROUGOUT THE DAY.

ACCESS POINTS

TYPE 3

VERTICAL COMMUNICATION CORES

FOUR PEOPLE APARTMENT TRIPLE MODULE - 32 m2

EACH UNIT IS DESIGNED AS A MINIMAL LIVING UNIT, IN ORDER TO REDUCE COST AND CONTRIBUTE TO ENVIRONMENTAL CARE.

GROUND PLAN THE NEW BUILDINGS PROLONG THE EXISTING ONE, CREATING A DYNAMIC SHAPE ALONGSIDE THE RIVER

REFURBISHED METRO STATION A

A

B

B

UPPER DECK THE NEW METRO STATION CONNECTS BOTH SIDES OF THE RAILWAYS AND ELIMINATES THE CURRENT TUNNEL

LOWER DECK THIS FLOOR CONNECTS THE METRO STATION WITH A NEW RETAIL BIULDING AND A RESTORATION PLAZA

SECTION A THE NEW MALL PLAZA AND METRO STATION

SECTION B MALL LOCALS CONNECTED TO THE METRO STATION

THE CURRENT METRO STATION IS REBUILT TO CONNECT BOTH SIDES OF THE RAILWAYS AND ELIMINATE A DANGEROUS TUNNEL EXISTING NOW, WHICH IS THE ONLY WAY TO PASS FROM ONE SIDE YO THE OTHER.


53 SECTION A

SECTION B

A

A B

B

TYPOLOGIES

URBAN PARK A NEW PARK IS TO BE BUILT AS AN ARTIFICIAL TOPOGRAPHY THAT CREATES MANY DIFFERENT SHAPES, BOTH CONCAVE OR CONVEX, WHERE MANY DIFFERENT ACTIVITIES MAY BE HELD:

RESTAURANT / BAR INNER FOAM SPACE PLAYGROUND

-

RESTAURANT / BAR PLAYGROUND THEATRE SKATEBOARD READING / RELAX SPORTS HIP HOP / BREAKDANCE

THEATRE PATHWAYS SKATEBOARD

READING / RELAX CONVEX TOPOGRAPHIES

SPORTS

CONCAVE TOPOGRAPHIES

HIP HOP / BREAKDANCE


URBAN STRATEGIES. TANGER-MED 2011 A giant seaport in Tanger, Morocco. Thousands of people to work at a non-existent city. This tree-level project proposes an urban system for a fast growing city. Secondly, it develops one area of the city and the forms and volumes that would define its skyline. To end up with, it defines one of the buildings that might be arised there.


55

MAX. CONVEXITY LINES

MAX. CONCAVITY LINES

MAIN NODES

CURRENT ROAD SYSTEM

PROPOSED ROAD SYSTEM

BUILT AREAS

PRIVATE USE AREAS

PUBLIC AREAS

ROAD GRID

THE URBAN SYSTEM IS CAPABLE OF SPREADING THROUGHOUT THE TOPOGRAPHY AS THE CITY GROWS. THE ROAD GRID IS JERARCHISED IN TWO LEVELS: PRIMARY LEVEL (PARALLEL TO TOPOGRAPHY)

SECONDARY LEVEL (PERPENDICULAR TO TOPOGAPHY)

HAND-CUT MODEL TOPOGRAPHY


THE GEOMETRY OF THE VOLUMES IS DETERMINED BY THE TOPOGRAPHY, AS EVERY BUILT FLOOR IS BORN AND GROWS FROM IT.

TYPE A

TYPE B THERE ARE TWO MAIN KINDS OF COMPOUNDS. TYPE A: BUILT IN LOW SLOPE AREAS LOW DENSITY EXTENSIVE GROWTH

TYPE B: BUILT IN HIGH SLOPE AREAS HIGH DENSITY HIGH RISE GROWTH

+11

+11

+26

+26

+8

+8

+8

+8

+5

+5

+5

+5

+0

+0

+0

+0


57

layered growth

Rainwater collection system

EVERY UNIT WILL BE EQUIPPED WITH, AT LEAST, ONE HIGH TOWER DOMINATING THE COMPOUND, AND A PODIUM OVER THE GROUND WHERE OTHER ACTIVITIES TAKE PLACE, SUCH AS COMMERCIAL, ENTERTAINMENT AND OTHER PUBLIC ACTIVITIES.

waste collection and recycling system


RETIRO 2010

THE BIGGEST PARK ON THE SPANISH CAPITAL CITY, MADRID, A BIG POND AT ITS HEART. THE PROPOSED METALIC AND TEXTILE STRUCTURE CREATES A FOOTBRIDGE THAT LINKS NORTH AND SOUTH AREAS AND BRINGS THE USER WITH NEW SPACES FOR MANY ACTIVITIES TO BE DONE AND WALKTHROUGHS TO BE ENJOYED.


59 MAIN STRUCTURAL PILLAR

ELEVATION Pillars

Modules

Footbridge

ELEMENTS

TEXTILE COVER LAYERS

Pillars

Frames

Joints

Roofing

SINGLE MODULE ELEMENTS

ON SITE STRUCTURE

PLAN

SECTION

Result

Platforms

Textile cover


MODELS 2010-2016

Alhambra Center, Hotel & Spa Granada

LASER-CUT MODEL

Housing for archaeologists Egypt

HAND-CUT MODELS

House in Madrid

HAND-CUT MODELS


61

Silhouette pavillion

LASER-CUT MODEL

ZHENGZHOU SCIENCE PARK CHUANSHA STADIUM, SHANGHAI

COMPETITION MODELS

Monument in Shanghai

STEEL MODEL


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.