Recommended Roadway Improvements as of February

Page 1

Recommended Roadway Improvements as of February 2008 Figure 5.1

Southwestern Chatham County Sector Plan

2A sta te

Updated February 2008

16

Poo

1 1

ck R

R

oad

Ne w

d

ad

oa

5

4

A (G

4) 20

3

Ro

Ha mp s

r

Ne

o acc Qu

A

1

le

wy Pk ad tt le Li

rt Fo

gy

rd

te

hg at e B o Hig ule va

95

ad

Pa r

Ro

kw

ad

le r

r iv e

o ter R Ca r

ay

R Old

n Joh

sh Bu

Ro

ad

sta te

1A

Inte r

Inte r

2 Partial Interchange

2 6 0

0.5

1

1.5

Fo rt A

2 Miles

rg y le R

4 oa d

(G A

20

Partial Interchange

4)

1. Construct New Hampstead PUD network (three roads) 1A. Construct Saw Dust Pile Rd extension and collector to Old River Rd 2. Construct N-S facility east of Bush Rd from GA 204 to Quacco Rd 2A. New interchange at I-16 and Saw Dust Pile Rd extension 3. Construct add'l N-S linkage through Belford PUD from GA 204 to Little Neck Rd (Belford Spine) 4. Construct E-W reliever from New Hampstead Pkwy to Gateway Savannah 5. Add local road from Quacco Road to proposed road #2 6. Construct new interchange and frontage roads at I-95 with Little Neck Rd and Quacco Rd

Existing Roads

Proposed Roads

Local Road

Local Road

Major Collector

Minor Collector

Minor Arterial

Major Collector

Major Arterial

Minor Arterial

Interstate/Interchange

Major Arterial

SW Chatham County Study Area

Source: Development master plans, SW Sector Plan recommendations


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.