Construction Information Residenza “Al Mulino” Via Contra 49, 6645 Brione s/Minusio, Tessin, Switzerland Parcel No. 1738
This construction information is intended to give a general overview of the planned development and its construction. The materials and their intended use sites will be itemized in the execution plan specifications. The drawings of furniture and cabinets are renderings of possible furnishing configurations and are not to be considered a component of the construction information. Residences House A: First floor
room, separate laundry room No. 3 + 4 room,
No. 5 rooms) room,
Mezzanine
Elevator: The elevator services every floor, from the Residenza Al Mulino development's entryways to the individual residences. The elevator leads directly into the respective residences. Swimming pool: The swimming pool is situated approx. 60 cm deeper than the first floor. The swimming pool's dimension are 6.0 m x 3.00. Gardens:
4 ½ rooms 3 bedrooms, 2 baths, kitchen, living/dining portico, outdoor sitting area, basement and
Second floor 4 ½ rooms 3 bedrooms, 2 baths, kitchen, living/dining
separate laundry room
1059 m2
Community features:
Introduction
No. 1 + 2
Plot area: Parcel 1738
portico, outdoor seating area, basement and 2 ½ rooms (can later be refitted to 3 ½ 1 bedroom, 1 bath, kitchen, living/dining outdoor seating area
Gardens: walkways and sitting areas made partially of granite or wood/ greenery and regionally appropriate landscaping as per the architect's recommendations
0
-
-
Overview
1
Comments on construction information
10 Surveys, physiographic studies
Site preparation
The following building plan encompasses all scheduled activities of the construction project. Any items not mentioned in this information are not component parts of the construction plan or within the scope of this description. Additionally, this construction information shall also serve as a valid supplement to the architectural project plans.
101 Existing land-use studies Land use surveys of buildable land/building sites, infrastructure (thoroughfare studies, underground cables, utility connections and neighboring construction and facilities) are available through the builder.
The construction execution plan is in keeping with the following standards:
11 Site preparation
all applicable mandatory provisions of public law, particularly with regards to local-, health-, construction- and fire-related ordinances, which are known and applicable up to this point of construction permitting and licensing, are accommodated for. possible regulatory requirements pertaining to building and construction permits the construction permit building plans are the definitive plans for its construction. Only sound, proven and tested materials will be used. The buyer has a say in the selection of interior fittings to the extent that the status of the project allows (countertops, plasterwork, choice of colors, appliances, etc.) The right to make changes in building plans, construction description and execution which do not compromise the quality of build is reserved until construction has been completed. The architect's and specialists' definitive execution plans shall be the deciding factors for its execution. The interior finishes and color themes will be established by the architect in conjunction with the buyer's personal preferences. The exterior appearance and color themes will be determined by the architect.
111 Clearing the site Removal of existing plants, including root removal 13 Overall construction site configuration 131/211 Construction site configuration Overall construction site configuration, including designated areas for materials storage and parking. 135/211 Provisional installations Provisions for drainage, electric and water during the construction process. 136 Energy, water etc. costs Estimated costs for water, electric etc. during the construction process. 15/16
Modifications to existing utility infrastructures
Upon completion of Houses A + B: clean-up, repair of any damages to and restoration of any local public infrastructure which may have been damaged or adversely affected as a result of the construction activity, or its related equipment.
20 Excavation 201 Excavated material 201.1 Earthworks Top soil removal. Sequence of the excavation activities; including access roads, ramps and sites, foundation pits, grading, removal of excavation material, foundation excavations, trench excavating and backfilling for underground plumbing, etc., drainage, possible foundation and trench groundwater drainage, pumps, sedimentation tanks, disposal of excess soil and excavation materials, backfill with appropriate materials and compacting and tamping of soil and backfill between excavation embankments and structures. 21 Structural Works 1 211 Building site management 211.0 Configuration of construction sites Configuration of construction site; including machinery and equipment, accommodations and storerooms, power and other necessary utility connections. Establishment of delivery, setup, reconfiguration and removal of temporary safety fences and enclosures. 211.1 Scaffolding All necessary scaffolding and safety scaffolding. 211.2 External sealing and waterproofing Combiflex strips used as needed to seal sill plate or wall plate joints. Bitumen sealant and sheet membrane applied to the external walls. Garage roof sealed with bitumen rolls. 211.3 Contractor excavations (see also sec. 201.1) Excavation and backfilling for underground plumbing, water and electrical connections to houses. Final grading/ expansion of foundation pits as needed, etc.
211.4 Interior water and sewage lines Sewage and drainage PVC piping as per local regulations. Subsoil drainage piping and drainage mats in basement and subterranean garage areas. Cement sewer shafts as per architectural plans Areaway drainage for hard surface coverings. 211.5 Concrete and reinforced concrete works Concrete foundation slab 20 cm strength, BH PC kg/m3 300, reinforced, with sealant Substratum concrete BN PC kg/m2 150, 5-10 cm strength Concrete walls, 20 cm strength, B 35/25, PB 300 kg/m3 reinforced with sealant Concrete exterior stairs Concrete B 35/25, PC 300 kg/m3, 20 to 30 cm strength, reinforced, dimensions of concrete works available through the contracted construction/masonry engineer 211.6 Masonry Exterior walls: Brick walls (MBN) of standard bricks, 15 or 17.5 cm strength, thermally insulating Interior load-bearing walls: Brick walls (MBN) of standard bricks, 12.5 15 or 17.5 cm strength. Dwelling separation walls between houses: Double- partition noise insulating wall, with mineral fiber insulation board between the partitions Partition MBN 15 cm Insulation 4 cm Partition MBN 15 cm Chimney: Incoming- and outgoing air ducts as per fire regulations Up to above the rooftop: Schiedel chimney products to be used Chimney enclosures in conformance with local guidelines Interior basement walls: Walls made of sand-lime brick KS 12 or 15 cm strength Brick walls 12.5 or 15 cm strength
214
Carpentry and millwork
214.1 Carpentry work Construction of roof: Gable roof; roof beams and rafters made of planed solid wood or glue-laminated timber. Visible roof ceiling wood paneling mm20, with or without bevels. Planed spruce/ pine. 22
Structural Works 2
221.0 Windows, exterior doors and gates 221.0 Wood-framed windows Windows in the living areas: Noise-insulating windows framed in pinewood, painted or varnished, with rubber seals IV-glass, glass U-value 1.1 V/m2K 221.6 Metal exterior doors and gates House entry doors: Exterior doors made of insulated wood, triple locks including cylinder lock and fittings. Rubber seals. Garage gate: Fully automatic, remote-controlled steel entry gate with derived timber product planking. As per architect's design. 222
Sheet metal work Guttering, chimney enclosures, roof runoff pipes, ventilation made of copper sheet metal or UGINOX copper .6 mm
224
Roofing works Baffle Mineral fiber insulation wool 12 cm as per architectural plans Sub-roof Ventilation, battens
225
Special weatherstripping and insulation
225.1 Joint seals Seals between different construction components and closures, as well as between different construction materials 225.2 Special insulation materials 12 cm thermal insulation adhered to all subterranean surfaces with cold bitumen adhesive, filter mats (Sickermatte). Floor-to-wall joints protected with sealing strips. Subsurface garage roof is protected and sealed against incoming moisture with bitumen rolls. Bitumen sealant and sheet membrane applied to the external walls. 226
Lathing and plastering
226.2 Stucco insulation: Stucco insulated with polystyrol EPS 12 to 14 cm. First coat with reinforcing mesh. Colored silicate finishing coat to 2 mm coarseness, second reinforcing mesh coat in basement area. 227
Exterior surface finishes
227.1 Exterior finishes Color schemes are to be established by the architect during the course of construction. Woodwork will be either painted or clear-coated with veneer in accordance with architect's color scheme. Wooden construction in the projecting roof will retain its natural color. Metal constructions: primer and resin coating House entry doors and gates will be painted. 228
Window treatments
228.2 Blinds: Motor-operated aluminum vertical blinds, blind width approx. 90 mm, for living area windows. Basement area windows will not be outfitted with window treatments.
23
Electrical
230
Electrical installation Electrical main service switch with separate conduits and meters for each house Light fixture wiring, 3-pronged outlets, switches and hookups. Telephone, cable or satellite TV hookup in living room and master bedroom. Individual installation of customized security systems available on special request.
Shower/toilet wall basin hot/cold combination faucet mirror cabinet wall toilet specific fixtures and fittings to be determined by builder in agreement with the buyer 258
233
Kitchen:
Lighting and lamps Exterior lighting as per the architect's recommendations Electrical installations exterior to the building as per the architectural plan
The kitchens can be modified for each residence in accordance with the buyer's preferences. The following represents the standard configuration features.
24
Radiant heating, ventilation, air conditioning systems
240
Heating, ventilation systems Heating Air-source heat pump, dimensions obtainable from the contracted professional. Specific type, brand and style have not yet been determined. Heat distribution Floor heating with adjustable zone controls
Cabinet panels outfitted in Multiplex real wood. Stainless steel door and drawer handles. Rubbish concealer with trash sorter.
25
Sanitary facilities
250
Installation of sanitary facilities Laundry room: Washer and dryer in for every residence Washing trough with cold and hot water hookups Bathroom: Bathtub 180 X 75, white Bathroom furniture combination Bathroom sink vanity Wall mirror
Work surfaces: granite, Fantastic black or similar Backsplash: granite, Fantastic black or similar Appliances: installed self-cleaning oven (ChromLine) glass ceramic cooking surface stove installable refrigerator with freezer drawers dishwasher range hood kitchen materials to be determined by builder in agreement with buyer. 27
Finishing Construction 1
271
Plaster work
271.0 Finish coats All interior walls in the living areas and bedrooms to be treated with plaster coat and white Q2 finish coat. Edge trim, structure of finish coat and color to be determined by buyer's specifications. Basement walls finished in paint-ready white Q2 coat.
272
Metal work
272.2 Overall metal work (metalworker construction) Stairway handrails and balustrades: powder-coated galvanized steel finish. Balustrades to be fitted according to respective requirements of corresponding structures. 273
Carpenter and joiner work
273.0 Interior wooden doors Basement doors Smooth medium-strength double wing doors with paintable surfaces. Handles and protective plates made of aluminum alloy. Fireretardant doors (El 30) as per building permit specifications. Room doors Smooth, medium-strength double wing veneer doors with profile packing. Surfaces are not meant to be painted. Real wood, varnished door leaves. Planetdichtung (profile packing?) on request.
281.6 Tile floor coverings Bulk order, incl. MWST, incl. tile work CHF/m2 90.00 Living room: natural or ceramic tiles Kitchen, hallways: natural or ceramic tiles Bath and shower: natural or ceramic tiles Bedroom: natural or ceramic tiles Outdoor areas: sitting areas, walkways partially made of granite tiles 282
Wall coverings
282.3 Tile wall coverings Bulk order, incl. MWST, incl. tile work CHF/m2 90.00 Bath and shower: natural or ceramic tile, up to height of door frame
28
Finishing Construction 2
Fireplace-fitting Fittings for fireplace and fresh air intake for chimney or oven are available
281
Floor coverings
285
281.0 Subflooring Floating subfloors made of 7 cm cement mortar. First floor: Polystyrol EPS insulation, 6 cm and 2 cm Impact noise absorption, Polystyrol with aluminum coating (eg: Metalplast T/SE) Second floor: Polystyrol EPS insulation, 2 cm and impact noise absorption 2 cm, Polystyrol with aluminum coating (eg: Metalplast T/SE) 281
Jointless floor coverings
281.5 Artificial stone flooring Concrete or composite stone flooring in the garage
284
Interior surfaces
285.1 Interior painting The architect will establish a color theme during the course of construction. White primed ceilings will be painted white. Basement will be partially painted with cement floor paint. Basement doors will be painted. Interior doors will have be treated with clear veneer or painted. Wood construction will be left in its natural state.
287
29
Construction clean-up Provisional primary cleaning during construction phase. One-time final cleaning of all rooms, floors, glass surfaces prior to turnover, upon completion of construction. Certificates of payment
291
Architecture Certificate of payment for architectural works and project management 292
Construction engineer Certificate of payment for construction engineering works and site management 293
Electrical engineer Certificate of payment for electrical engineering works
294
Heating and sanitation engineer Certificate of payment for heating, sanitation engineering works
296
Specialists Certificates of payment for all necessary specialists whose services were utilized preparatory to and during the course of construction.
4
Environment
41
Structural and finishing works
411.4 Draining and sewage systems outside the building Drainage and sewage pipes led by PVC pipe into the existing public works, wastewater seepage conduits in PVC . 411.5 Exterior retaining walls Retaining walls in reinforced concrete or partially made of quarry stone with or without mortar grouting. 416
Exterior pavements Driveway and forecourt to the garage in asphalt or connecting pavers
42
Gardens
421
Landscaping As per architectural renderings Generalized and detailed landscaping areas to be seeded with grass seeds for lawns Dirt from the excavations to be used for backfills: 1 frost-resistant exterior water outlet and 1 exterior wall socket connected to house Retaining walls in garden area made of concrete, partially finished with granite
422
Enclosures/fences and balustrades Granite posts with chestnut wood beams or metal balustrades with chrome cables in accordance with building permit specifications.
5
Additional construction-related expenses
General:
51
Licensing, fees
511
Licensing, permits (fees) Fees for licensing permits, drainage/sewer system permits, fire permits. Construction permits, fees for inspections, controls and final acceptance of construction work.
External cladding/features The colors and external finishes of the exterior walls, balconies and outdoor areas will be determined by the architect and/or builders.
512
Utility hookup fees Utility hookup fees (contribution toward network costs) for water and electricity. 52
Samples, models, copies, documentation
521
Samples, trial materials Floor- and wall-covering samples, as well as surface treatments.
524
Photocopies, plan copies Costs of reproductions, plans and blueprints for construction project, project management, construction phases and revisions. Photocopies and copies of plans and blueprints resulting from changes requested by the buyer will be billed to the buyer.
531
Construction period insurance Mandatory insurance premiums for the insurance coverage of the construction site for the duration of the construction period.
532
9
Special insurances Insurance premiums for civil engineering and construction insurance for completion during the engineering construction period. Premiums for builder's liability insurance. Furnishings Furnishings will be provided and purchased by the buyers.
Buyer's requests The customized requests of pre-construction buyers can be accommodated for within the framework of this construction description. Changes and modifications Modifications resulting from a buyer's wishes are billed separately and are not a condition of this construction description. They can only be accommodated for and agreed to in writing by both parties. Resultant increases in installation/hook-up fees, overall additional expenses as well as increases in professional fees will be the burden of the buyer. Price reductions cannot be given as a result of requested reductions of standard features or subtracted against the addition of other features or modifications. Special requests made by the buyer, including changes in floor plan, are only possible to the degree that these can be implemented within the existing construction and architectural design framework and without damage to the existing construction sequence. The feasibility of such requests will be determined by the project's draftsman, planners and statisticians. Royalties An additional royalty of 13% of all modifications and additional costs shall be awarded to the architect. Building permits Building permits for the completion of the Residenza “Al Mulino� development shall be issued by the Brione s/Minusio municipality, or as the case may be, the Tessin canton. Sedrun, 6 Jan. 2009/ Rev. 9 Oct. 2009