Academic & Professional Portfolio

Page 1

P O N K A R T H I C K

P O R T F O L I O


CV WORKING EXPERIENCE

PONKARTHICK G I am a highly confident , creative and dedicated person. architecture is the vision through which i have been looking at every single thing in my life.the direction of my innovative thoughts and ideas towards the field is what provoked me to step into it. To be a part of an exciting and inspiring team environment, enlighting myself with practical knowledge, exlploring my creativity and eloborating it through cognition. I think space, architectural space, is my thing. Its not about facade, elevation, making image, making money, my passion is creating space

2019 (1 year) Architect & Interior Designer Studio Gritt , Bangaluru Projects Involved Concepts,designs,3D,construction details for Residential, Corporate, Coworking Office interiors Products and Graphic design. 2017 - 2018 (1 year) Junior Architect Latitude design , Bangaluru Projects Involved Concepts,designs,3D,construction details for Hospital interiors and facade, Residential interiors and Expo stalls. Graphic design.

Tiruppur(DT), Tamilnadu 2016 (6 moths) Intern Greenpiece Landscape India Pvt Ltd , Bangaluru B.ARCH Marg institute of design and architecture swarnabhoomi (MIDAS), Kancheepuram (DT). ponkarthickg1994@gmail.com +91 9629960209 - Peter Zumthor

DESIGN SKILLS Autocad Sketch up Revit 3ds Max V Ray Keyshot Lumion Photoshop Illustrator Indesign Microsoft office

REFERENCE Ar.Jaffer AA khan, B.arch(SAP),M.Sc.(Barlett), RIBA, Faculty Spatial design, School of Art and Design, Auckland University, New Zealand. +64 226475434 Ar. Monika kejriwal, Principal Architect, Latitude Design, Bangaluru. +91 9945925960

Projects Involved Concepts,designs,3D,construction details for Residential, Commercial. 2015 (6 moths) Intern We Dzin , Bangaluru Projects Involved Concepts,designs,3D,construction details for Residential, Commercial. Graphic design.

PARTICIPATIONS - Hospitality Chief Co ordinator , 57 th Annual NASA Convention, INDIA. - Built it Like Baker by COSTFORD. (Workshop) - Earthy Construction by Ar. Chitra Vishwanath.(Lecture) - Fractal Workshop’ 13 by Takbir Fathima (Workshop). - Zakyanta Trophy (design competition) ARCHCULT’ 14 , NIT Trichy - International Building Material Expo’ 14 , Bangaluru. - International Building Material Expo’ 18 , Bangaluru.

FIELD OF INTEREST

Painting

Gaming

Photography

Graphic design


CONTENTS

t1

1

5

Thread One Clothing Store - 01

Latitude

Spatial designs - 25

2

Innov8 Chennai

3

Innov8 Fairmont

4

Farm House Ooty

6

Special Home

7

Product - Furniture

8

Graphic - Logo

Coworking space - 05

Thesis - 29

Coworking space - 12

Designs - 34

Architecture + Interior - 20

Design - 36


//// Studio Gritt Pro active Project

t1

threadone

1

Thread One Clothing Store

1


t1

threadone

=

+

tone

-

storage 50sq.ft

changing room 2 5’x4’

t1

Concept of design elements

40’

thread

threadone

changing room 1 5’x4’

seasonal display window tree

Reception Billing table Island display (low level) Installation

Vertical hanging bars Light track ( all copper bars )

shop entry

billing desk

25’ 2


Concept

-

thread + tone

Window display

Concept

-

tone

t1

threadone

Summer

Winter

Spring

Autumn

Reception Billing table

Spring

Installation

Island display (Low level)

Minimal graphic represtation of season by draw on background black board

3


Concept

-

MS bar

Mirror

Island displays

thread

MS bar

Perforated sheet

Island display

Rack

Island display

Displays racks

4


INNOV8

//// Studio Gritt Client’s Project

2 *all the renders in this project are done by ////studio gritt 3d visualizer MAHESH

Innov8 Chennai Coworking space

5


PIXELS

River Bank

Rubberwood

Orange tango

No. of floors - 3 No. of Seats - 426 (private seats) Carpet Area - 391 sq.m x 3 = 1173 sq.m (4208 sq.ft x 3 = 12626sq.ft) COLOUR

PALLETTE

SECOND FLOOR

Planter P1

Plate disposal opening

Kitchen

Refridgerator Cafe seating CS3 cafe display

Planter P2

INTERIOR LAYOUT

Cafe seating CS2 Cafe seating CS5

Cafe counter

Bar counter CS1

Bar counter CS4

Bar counter CS6

10 seater Teambox +300mm lvl +600mm lvl +900mm lvl

Dedicated Seating DS1

6 seater meeting room

display wall Reception

6 seater Teambox

Waiting area

Reception & Lounge 6seater Meeting room : 1 4seater Meeting room : 1 Cafe seating : 65 Amphitheater Workstations :80 Dedicated seating : 18 Phone booth : 1

storage area PH1

22 seater Teambox

4 seater Teambox

4 seater meeting room

vending machine Casual seating C1

13 seater Teambox

4 seater Teambox

8 seater Teambox

13 seater Teambox

200

Deep Jungle

6


RECEPTION TABLE

BAR COUNTER

STEPPED SEATING

MEETING ROOM SEATING

7


CAFE SEATING

CAFE COUNTER

DEDICATED SEATING

CASUAL SEATING

8


2300

  

285

285

285

285

570 285

285

285

285



290 290 290 290

45.0

  

290

900

750

750

90

90

90

  

290

75

580

290

290

 

290

150

150

600 75

290 580 290

290

285

2340



700

900

570

290

  

580

    

290

290

  

290

    

 

°

    

1400

1900

A'

C

 

A'

75 500

100

100



100

600





100



  

B

2100

   

2100

  

  

75

550

 

   

150

   700

1300

285



200

2300

285

75 222

285



   

222

570

285

100

40

285

100

285

900

  

285

700

285

750 bal

150

B'

A

RECEPTION TABLE

75mm 300

300

85

2

300

1800

1800 594

594

1800

A'

50

R1

 

500 100

88 88 88 88 350

450

   

88 88 88 88 350

  

 50

  900

300

450 675 750

50

75

88 88 88 88 350 50

300 450

 

7575757575757575

450

50

     

   

A'

1800

600

75

500 900

500 50

   

   

600

50

     

7575757575757575

1800

     

450

300

300

600

300

1500

300 300

  

C

76 0



  

3450

E

900

75

500

300

50

50

300

300

350

300

   

     

50

 

350

600

300

900

75

450

     

594

1200

7575757575757575 300

450

594

600 1200

600

60

0

46

450

300

600

  

25

B

50

  

600

1200

97

300

1500

801

16

  

  

300

1800

300

  

300

D

9

84

600

600

600

600

600

3600

600

1200

A

1200

1048

A'

600

84

9

  

     

 

  

600

300

600

801

  

300

600

600

201

2

600 600

600

 50

 

300

1200

600

600

600

600 0

60

6 54

600

  

3450

E

300

560

300

560

521

300

521

300

300 560

345

  

300

600 300

345

300

900

300 300

  

600

300

300 300

300

  

300

  

300

  

50

     

  

 

300

  

594

1124

450

5 79

2 48

0

R4

D

5 79

2

A

48

A'

594

748

748 2

85

50

350

350

50



A

0 76

B

560

521

521

C

560

A

560

AMPHITHEATER

CAFE SEATING 9


Pvt meeting room

THIRD FLOOR

Planter P4 CEO room

INTERIOR LAYOUT

Planter P5

117 seater Teambox

Pantry PT1 Pvt meeting room

8 seater Teambox

Coffee machine

Printer Machine

Workstations : 154 Dedicated Seating :18 Server room Phone booth : 1 Recreation

Dedicated Seating DS4

Water dispenser

CEO room PH2

Planter P3 Recreation

Dedicated Seating DS3 Dedicated Seating DS2

29 seater Teambox

200

Server room

FOURTH FLOOR Pvt meeting room

10 seater Team box

INTERIOR LAYOUT

CEO room

6 seater Team box

56 seater Team box

Printer Machine

CEO room

8 Seater conference room

6 seater Team box Coffee machine Water dispenser

31 seater Team box

Pantry PT2

Casual Seating C2 Dedicated Seating DS6

Workstations :141 Dedicated Seating :15 4seater common meeting room :1 8seater conference room :1

4 seater meeting room

Casual Seating C3

Dedicated Seating DS3 Planter P6 Dedicated Seating DS5

29 seater Team box 3 seater Team box

CEO room

200

storage area

10








 























  

















 



























 



 













 



















 





























 





 























 

  

















 



 













 











 



















 























 



 























 









































 



  

 



























































































































SECOND FLOOR ELECTRICAL DRAWING















CIRCUIT DRAWING









SECOND FLOOR





















  

















 























 



 

 





 



 

 













 





























 





 

















 

 

  

 

 







 



 













 











 



















 

















 

 







































 



















 



  

 





































































































































SECOND FLOOR LIGHTING DRAWING 11


//// Studio Gritt Client’s Project

INNOV8

3 *all the renders in this project are done by ////studio gritt 3d visualizer MAHESH

Innov8 Fairmont Coworking space

12


VECTORS

Rubberwood

Grey

Cold Flint

Isle of Capri

No. of floors : 5 No. of Seats : 566 (private seats) Carpet Area : 392 sq.m x 6 = 2352sq.m (3691 sq.ft x 6 = 22146sq.ft)

PALLETTE Planter

SERVICE TOILET

DUCT

LIFT SHAFT

SPACE FOR OUT DOOR UNITS

9th FLOOR

Informal seating  Seating with Planter

LIFT SHAFT

Server room 

7 Seater Meeting room 

UP

RISER=156MM TREAD=250MM

LIFT SHAFT

Electrical room 

Store room 

INTERIOR LAYOUT

LIFT LOBBY 3.231 X7.025

Recreational space

SERVICES DUCT

LIFT SHAFT

Gymnastic rings

Library Book rack

E.D.

F.D. janitor

Informal Meeting 

TOILET MALE

L

TOILET FEMALE

.10 m

LV

Seating with Planter

+0

Waiting area

janitor

L

Kitchen counter

0m

L

+0

.9

LV

LV

0m

0.9

VENDING MACHINE

0m .6 .3 0m +0

35

m

LV

L

LV L

+0

Cafe seating +1.

Cafe seating

+

Refrigerator

L

+0

LV

L

.3 0m

LV

Reception Kitchen

Amphitheatre

Green wall

Cafe seating

Cafeteria Seating

+0.30m LVL

Cafe seating

+0.60m LVL

MICROWAVE

+0.60m LVL

Cafe seating Cafe Counter

18'-61 2"

Cafe seating

Casual seating 

Cafe seating Casual seating 

2'-3"

COLOUR

Seating with Planter

Reception & Lounge Conference room : 1 Recreational area Cafe seating Electrical room Electrical room Server room Library space Amphitheatre Store room

9"

Earthy brown

13


RECEPTION TABLE

CAFE SEATING

BOOK SHELF

PLANTER WITH SEATING

INNOV8

14


AMPHITHEATER

CAFE COUNTER

PANTRY/PHONEBOOTH

DEDICATED SEATING

15


25

25

 

  

   40 250

308 299

750 385

750 635

 

Shelf

40



40 Drawer

40

40

 Shelf

75

3480 2130

  

 

75

40

600

 

200

600

1200

300

300 600

19 Drawer

2100

40

500

80

Shelf

       

260

500

B' 2400 1361

80

39

600

A'

    

260

75

750 635

    

40

2400

A

RECEPTION TABLE

 

 

960

450

350

185

250 160 490

 

410 150

450

C

  

162 488

38 450

800

730

225

270

270

  

250

12 450

225 225

730 B

150

 

1000

   

450

40 38

  

185 452

1038 40

A'

38

225

640

  

40 1000

38

160

38

270

238

 

150

 

690

800

38 490

1050

160

690 962

350

    

38

250

  

350

238

12

350

238

  

38

450

 

A

BOOK SHELF 16


10th FLOOR

Planter

SERVICE TOILET

DUCT

LIFT SHAFT

SPACE FOR OUT DOOR UNITS

INTERIOR LAYOUT Electrical room 

Hub room

LIFT SHAFT

SERVICES DUCT

Coffee machine

Water dispenser

10 Seater Team box 

Pantry with seating 

Printer Machine

Pantry

12 Seater Team box 

Planter

LIFT LOBBY 3.231 X7.025

LIFT SHAFT

Conference room 

UP

RISER=156MM TREAD=250MM

LIFT SHAFT F.D.

E.D.

janitor



TOILET FEMALE

TOILET MALE

Informal seating 

  Phone booths

Casual seating 

Workstations : 98 Dedicated seats : 16 Conference room : 1 4 Seater Meeting room :1 Phone booths : 3 Electrical/Server Hub

janitor

Director's Cabin 

4 Seater Meeting room 

Director's Cabin 

16 Dedicated seating 

29 Seater Team box 

25 Seater Team box 

13 Seater Team box 

10 Seater Team box  Planter

20th FLOOR

Planter

   

   

   

   

   

D

Coffee machine

TOILET MALE

Pantry

Workstations : 114 6 Seater Meeting room :1 Phone booths : 3 Electrical/Server Hub

340

300

300 300

SERVICES DUCT

220

7'-53 4"

300

87

62

8

janitor

8 49

77

854

0 84

57 8 50

0

26

0

84

670

660

378

378

368

210

Planter

Planter

400

722

440

62 Seater Team box 

800

810

820

29 Seater Team box 

Top View: MS Structure Framework

110 410 436

560

560

467 560

Director's Cabin 

Pvt Meeting room 

21

0

37777 37 618 736

736

633

653

731

623 633

455

156

   

69

9 10

4

8 50

284

336

57

618

521

599

589 600

Pantry with seating

White Board wall

1800

Casual seating 

884

Director's Cabin 

8 62

410

663

1200

854 450

594

274

Top View

150

150



Phone booths

450 660

3

326

599

589

23

619

79

0

2

110

35

406

58

2

1060

1280 1534

1200

1240 234 600

11

9 74 3 2

24

800

338

2

0

660

58

73

60 0 140

0

85 1200 450

40

40

94 12

7 77

93 14

1000

0

1

110

60

5

3 12

0 41

1000

831

00 12

2 9

1

8 1200

33 40

56

94

71 150

3

450

450



TOILET FEMALE

0

0

48

96

77

0

1

E

E.D.

56

6

56

3

0

45

45

16

3

490

13 Seater Team box 

Printer Machine

0

83

410 710

UP

janitor

56

0

45

12

0

60

0

0

11 14

0

67

77

0

60

0

60

73 4

77

1500

14 24

18

14

26 20

45

0 49

2

96

450

LIFT LOBBY 3.231 X7.025

RISER=156MM TREAD=250MM

0

Planter 1

29

34 600

LIFT SHAFT

LIFT SHAFT

502

4

81

33

26 14

80 12

81

15

43

55

11

0

15

0

A'

450

Elevation-E

   

0

0

F

10 Seater Team box  2041

56

60

1500

150

801

50

4 78

6 92

1200 1200

Water dispenser

1

Planter 1

894

40

F.D.

2

450

INTERIOR LAYOUT

LIFT SHAFT

Planter

234



94

12

45

60

C

1240

   

6

B

Electrical room 

40

40 300 300

1200

1200

   

18

 

LIFT SHAFT

6 Seater Meeting room 

260

40

300

300

260

40

660

40 260

300

849

B'

150

1000

Elevation-B    

6

82

SERVICE TOILET

DUCT SPACE FOR OUT DOOR UNITS

Server room 

40

300

40 300

260

300

Elevation-D

A

   

40

1200

   

560

AMPHITHEATER 17


Planter

SPACE FOR OUT DOOR UNITS

Electrical room 

Hub room

22nd FLOOR

SERVICE TOILET

DUCT

LIFT SHAFT

LIFT SHAFT

INTERIOR LAYOUT

13 Seater Team box 

Planter

12 Seater Team box 

LIFT LOBBY 3.231 X7.025

LIFT SHAFT

SERVICES DUCT

Planter

UP

VENDING

RISER=156MM TREAD=250MM

Informal seating

LIFT SHAFT

Pantry with seating Water dispenser

Pantry

F.D.

E.D.

Coffee machine Printer Machine

janitor



TOILET FEMALE



TOILET MALE



Phone booths

Casual seating Informal seating 

janitor

Director's Cabin 

Pvt Meeting room 

6 Seater Meeting room 

Director's Cabin 

Workstations : 112 6 Seater Meeting room :1 Phone booths : 3 Electrical/Server Hub

25 Seater Team box 

Planter

White Board wall

62 Seater Team box 

Planter

   585

Electrical room 

INTERIOR LAYOUT

LIFT SHAFT

SERVICES DUCT

3500

3200

3500

665

12 Seater Team box 

LIFT LOBBY 3.231 X7.025

LIFT SHAFT

Conference room 

UP

RISER=156MM TREAD=250MM

LIFT SHAFT 2250

2915

2915

1615

 

2915

   

3500

1655

Hub room 

10 Seater team box 

665

1210

   

23rd FLOOR

SERVICE TOILET

DUCT SPACE FOR OUT DOOR UNITS

LIFT SHAFT

585



F.D.

E.D.

75

Printer Machine Coffee machine

Pantry

185

185

75

Pantry

TOILET FEMALE

675

 

675

185

300

75

janitor TOILET MALE

Water dispenser







Phone booth Informal seating 

janitor

Director's Cabin 

     40

1485

80

1870

80

1870

80

1830

80 375

450

525

450

525

450

525

450

525

450

525

450

525

450

525

450

1830

80

1870

80 7800

 A A

1870

80

1830

80

40

375

80

80

Director's Cabin 

Workstations : 109 Phone booths : 3 Electrical/Server Hub

  

262

150

262

820

370

A'

900

D

Pvt Meeting room 

  40

305

Meeting room 

92 Seater team box 

B

40

80

Pvt Meeting room 

c

  

   

DEDICATED SEATING 18


Planter

24th FLOOR

SERVICE TOILET

DUCT SPACE FOR OUT DOOR UNITS

LIFT SHAFT

4 Seater Meeting room 

12 Seater Team box 

Hub room 

INTERIOR LAYOUT

LIFT SHAFT

SERVICES DUCT

Electrical room 

LIFT SHAFT

LIFT LOBBY 3.231 X7.025 UP

RISER=156MM TREAD=250MM

14 Seater Team box 

LIFT SHAFT E.D.

F.D. janitor



TOILET MALE



Phone booths

Casual seating 

Water dispenser



Pantry

Informal seating 

Pantry Coffee machine

TOILET FEMALE

janitor

Pvt Meeting room 

Director's Cabin 

Director's Cabin 

Workstations : 117 4 Seater Meeting room :1 Phone booths : 3 Electrical/Server Hub

29 Seater Team box  Planter

Planter

White Board wall

62 Seater Team box 

10


//// Studio Gritt Pro active Project

4 *all the renders in this project are done by ////studio gritt 3d visualizer MAHESH

Farm House Ooty Architecture + Interior

20


GREYSTONE

Black

Concrete 1

Concrete 2

COLOUR

Wood

Red

PALLETTE

A RO

SITE LOCATION TOPOGRAPHY AREA

: : :

OOTY CONTOUR 2871 (0.71ACR)

D

W

AY

21


GROUND FLOOR

FIRST FLOOR

TOP VIEW

GROUND FLOOR

FIRST FLOOR

VIEW

BEDROOM 2 TOILET

N

TOILET

BEDROOM 1

TOILET

DINING LIVING ROOM

KITCHEN

BEDROOM3

DECK

6000

00

116

OM

+

2

DRO

BE

UP

M

2.8

1500

L

LV

GROUND FLOOR PLAN

BAR

ME

HO

N

W

DO

FIRST FLOOR PLAN

140

CH

G

H

KIT

LV L

DIN IN

TC VEG

120

0

PA

+ UP

5500

+

1

M

1.4

50

M

EN

LV L

0

670

±

UP

9800

SITO

LIVING

UT

0

M

AREA

LV

L

930

0

5700

+1

M

LV L

0

SITE

PLAN

22


LIVING & KITCHEN

11.7

+ 2.8M

LVL

5.7

UP

UP

DOWN

BED

ROO

5.9

M2

+ 1.450 M LVL + 1 M LVL

1.5

9.8

HO

ME

DINING

ING

LIV

BA

R

A

E AR

+1M

6.5

9.3

LVL 1.2

1.4

KITCHEN

UP 6.7

SITOUT H

± 0 M LVL

VEG PATC

5.5

GROUND FLOOR PLAN

23


6.3

11.7

1.7

5.5

BED

ROO

5.9

M2

5.5

+ 4.1

5 M LV

9.8

FIRST FLOOR PLAN

L

9.7

8.0

4.0

BEDROOM

3

24


LATITUDESIGN Compiled Projects

5

Latitude

Spatial designs

25


26


TV UNIT

POOJA CABINET

DV SHU VLWH GLP

bottom level of true ceiling

19 mm thk ply shutter finished with laminate (as per selection)

12 mm thk backing ply finished with laminate (as per selection)

FFL

12 mm thk backing ply finished with laminate (as per selection)

(4

HT

drawer

HT

HT

FFL

drawer

FFL

X1

HT (4

19 mm thk ply framework finished with laminate (as per selection)

HT 19 mm thk ply framework finished with laminate (as per selection)

ELEVATION- TV UNIT FRONT

drawer

A

HT

HT

HT

A

drawer

HT

drawer

HT

TV

19 mm thk ply Frame finished with laminate (as per selection)

(4

HT

drawer

HT

19 mm thk ply framework finished with laminate (as per selection)

19 mm thk ply shelf finished with laminate (as per selection)

(4

HT

HT

HT

19 mm thk ply framework finished with laminate (as per selection)

HT

19 mm thk ply framework finished with laminate (as per selection)

19 mm thk ply shutter finished with laminate (as per selection)

bottom level of true ceiling

(4

X1

DV SHU VLWH GLP

DV SHU VLWH GLP

bottom level of true ceiling

SECTION- X1

SECTION- X2

X1

19 mm thk ply shutter finished with laminate (as per selection)

X1

DV SHU VLWH GLP

19 mm thk ply framework finished with laminate (as per selection)

bottom level of true ceiling

(4

HT

(4

PLAN A @ 520mm LEVEL 20 mm thk ply clad finished with laminate (as per selection)

20 mm thk granite counter top on marine ply framing (as per selection)

12 mm thk backing ply finished with laminate (as per selection)

X1

A1

A1

25 mm thk ply backing finished with laminate (as per selection)

X2

(4

(4

12 mm thk backing ply finished with laminate (as per selection)

6 mm thk glass (as per selection)

PLAN A1 @ 1650MM LEVEL

X1

X2

(4

19 mm thk ply door finished with laminate (as per selection)

19 mm thk ply shutter finished with laminate (as per selection)

ELEVATION- CABINET FRONT

HT

DV SHU VLWH GLP

HT

100 mm high recessed skirting finished with laminate (as per selection)

FFL

32 27


KITCHEN CABINET

;

DRESSING UNIT

;

as per site dimn.

false ceiling

hanging rod

100

PP WKN JUDQLWH FRXQWHU WRS RYHU PP WKN PDULQH SO\ IUDPLQJ

300

6LQN DV SHU VHOHFWLRQ

;

;

RYHUKHDG VWRUDJH

19 mm thk ply finished with laminate (as per selection)

300

;

19 mm thk ply shutter finished with laminate (as per selection)

MIRROR

750

222

drawer

2100

222

drawer

750

181 181

19 mm thk ply shutter finished with laminate (as per selection)

181

19 mm thk ply shutter finished with laminate (as per selection)

181

drawer

;

181

200 IXOO KHLJKW FDELQHW ZLWK EXLOW LQ RYHQ

181

;

drawer

750

VSDFH IRU UHIULJHUDWRU

WR EH FRQILUPHG DV SHU RYHQ VL]H

DOLJQ

100

222

drawer

100 mm high recessed ply skirting finshed with laminate (as per selection)

FFL PP WKN SO\ EHDGLQJ ILQLVKHG ZLWK ODPLQDWH DV SHU VHOHFWLRQ

ELEVATION A

;

50

PLAN @ COUNTER TOP LEVEL

150 GUDZHU HOVH GXPP\

GUDZHU

19 mm thk ply shutter finished with laminate (as per selection)

50

X1

50 EQ.

drawer

EQ.

EQ.

EQ.

PLAN @ 900MM LVL PP KLJK UHFHVVHG 66 VNLUWLQJ

100 50

GUDZHU ZLWK WDQGRP ER[

))/

6(&7,21 ;

19 mm thk ply shutter finished with laminate (as per selection)

181

(4

6LQN FDELQHW

X3

181

X2

(4

as per site dimn. GUDZHU ZLWK WDQGRP ER[

222

drawer

19 mm thk ply shutter finished with laminate (as per selection)

181

PP WKN SO\ VKXWWHU IDFLD ZLWK ODFTXHU ILQLVK DV SHU VHOHFWLRQ

PP WKN PDULQH SO\ IUDPHZRUN ILQLVKHG ZLWK ODPLQDWH DV SHU VHOHFWLRQ

GUDZHU

300 300

PP WKN JUDQLWH FRXQWHU WRS RQ PDULQH SO\ IUDPLQJ DV SHU VHOHFWLRQ

19 mm thk ply finished with laminate (as per selection)

2100

FDELQHW ZLWK EXLOW LQ RYHQ

drawer drawer

12 mm thk back ply finished with laminate (as per selection)

19 mm thk ply finished with laminate (as per selection)

19 mm thk ply finished with laminate (as per selection)

19 mm thk ply finished with laminate (as per selection)

19 mm thk ply finished with laminate (as per selection)

19 mm thk ply finished with laminate (as per selection)

12 mm thk back ply finished with laminate (as per selection)

222

PP WKN SO\ VKHOI ILQLVKHG ZLWK ODPLQDWH DV SHU VHOHFWLRQ

X3

X2

222

FKLPQH\ DV SHU VHOHFWLRQ

DV SHU VLWH GLP

RSHQ VKHOI

(4

X1

300

(4

DV SHU VLWH

(4

ERWWRP OHYHO RI WUXH FHLOLQJ

PP WKN SO\ VKXWWHU IDFLD ZLWK ODFTXHU ILQLVK DV SHU VHOHFWLRQ

ERWWRP RI OLQWHO DV SHU VLWH

AS PER SITE DIMN.

false ceiling

FFL

SECTION X2

34 28


Academic Project

6

Special Home Thesis

29


LOCATION CHENGALPATTU SITE AREA 9ACRES

Juvenile Home

where the opportunity for reform is greater, a new design strategy centered around rehabilitation should be forefront in this argument. The main objective in the design and operating processes of this juvenile detention center will be focused around the successful rehabilitation of the center’s population through rehabilitative instead of correctional treatment methods. As the facility houses fewer and fewer inmates, the complex will transform in phases to become a functioning community center focused on keeping kids out of the penal system. The architecture of this project will utilize prefabricated qualities to serve a juvenile detention center and then a community center, two physically differing applications.

30


SITE PLAN

OSR

PHASE

1

PHASE 3

E AS H P

PHASE 4

PHASE 1

PHASE 2

Admin blocks

Living Space

Residence

Watch tower

Juvenile Justice Board

Canteen

Probation Office

Cultivable land

2

PHASE 5

PHASE 3 Vocational Traning Center

PHASE 5 Place of Safety

PHASE 4

SITE APPROACH

SITE ZONING

NOISE ZONING

School

Site Entry

Osr

Very Low

Meditation Space

Juvenile Entry

Admin

Low

Health Care Unit

Service Entry

Living

Medium

Academic

High

Prison Yard

6 31


VIEW

32


SCHOOL

VOCATIONAL TRAINING CENTER

+

MULTI FAITH RELIGIOUS CENTER

PLACE OF SAFETY

+

=

+

=

+

+

=

+

=

=

33


Pro Active

7

Product - Furniture Designs

34


eclipse OCTO SPEAKER

35


Pro Active

8

Graphic - Logo Design

36


Graphics

Logo

august

t1

threadone

a d

thread

tone

threadone

37


59

19 6 mm thk glass (as per selection)

494 19 mm thk ply door finished with laminate (as per selection)

PLAN A1 @ 1650MM LEVEL

494

X1

494

252

X2

19 mm thk ply shutter finished with laminate (as per selection)


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.