Knockdown & Rebuild Checklist
Steps 1 – 14
From plan to being ready for construction!
Advertisement
Yarra 33 with Copenhagen World of Style
Checklist
Step 1
• Source a clear and legible Plan of Subdivision and title.
Step 2
• Conduct an initial discussion with a Sales Consultant to find a home design to suit your block.
Step 3
• Complete site inspection with Porter Davis to assess suitability and consider construction implications.
Step 4
• Pay $2,000 deposit to secure price and promotion.
Step 5
• Preliminary soil test survey and property information will be ordered by Porter Davis.
Step 6
Engage a demolition contractor. Note: Porter Davis recommends not to schedule demolition until they have received your building permit checklist and has been given the green light to proceed.
Step 7
• Attend a variation appointment with your Sales Consultant.
• Your file is submitted by your Sales Consultant to Porter Davis office.
Step 8
• Your project is reviewed by the Porter Davis Business Operations Team.
• You will receive an introductory call from your dedicated Building Coordinator.
• Your Building Coordinator will arrange Tender, Contract appointments plus your World of Style interior selections appointment for you.
Step 9
• Spend as much time as you like at World of Style to start choosing the finishes and fixtures for your new home.
• Attend a fixed price tender presentation, including a review of a full set of construction drawings.
Step 10
• Attend World of Style for your interior/exterior, colours and fixtures appointment.
• Pay 3% deposit.
• If dispensation is required, Porter Davis will prepare relevant paperwork and submissions for consent to affected neighbours and council.
• Finalise demolition contractor and supply the relevant plans for demolition permit to the contractor to obtain your demolition permit.
Step 11
• Attend a HIA building contract presentation, which will include final set of full working drawings.
• Pay balance of 5% deposit.
• From this stage, please note that no further variations are permitted.
Step 12
• Porter Davis will lodge plans to obtain a building permit.
• Provide any crossover relocation permits to Porter Davis if applicable.
• You will receive a checklist 3-5 days after the permit is ordered, at which stage your old dwelling can be demolished post confirmation from Porter Davis.
Step 13
• Your demolition contractor will demolish your existing dwelling.
• You will need to provide Porter Davis with a demolition permit.
• Porter Davis will order a second (final) soil test and survey and re-establishment survey (confirming your title boundaries are the same as your fence line).
• Porter Davis will confirm final site costs.
• Porter Davis will obtain a building permit for new dwelling.
• Porter Davis will complete a pre-construction inspection.
• Once the above is completed, Porter Davis will then present you with final construction drawings for your signing prior to commencing.
Step 14
Ready for Construction
Note: Porter Davis will now transfer your project to the construction team and book in your trades. Upon being transferred to construction, you will start to see site works commence approximately 2 weeks from this date. Construction usually commences 6 weeks from the completion of your demolition.