Port Imperial 14+19 Handel Architects | Jan, 2016 - Present| Weehawken, NJ Zoning Study, Massing Study, Preliminary Program Layout, Podium Layout, Unit Layout, Egress Sheets, Stair Sheets RESIDENTIAL RESI. COMMON RETAIL PARKING
7 STO
RY
7 STO
7 STO
RY
7 STO 7 STO
RY
RY
RY
2 STO
2 STO
6 STO
RY
RY
6 STO
RY
RY
^/d ϭϵ > ' 'ZK^^ Z ^/ Ed/ > ;E dͿ Z ^/͘ KDDKE Z d /> W Z</E' W Z</E' KhEd
PI BLDG 14+19
^/d ϭϰ ϭϲϵϲϬϬ ^& ϭϬϭϬϱϬ ^& ϭϮϬϴϬ ^& ϯϴϮϬ ^& ϯϭϰϭϬ ^& ϳϮ ƐƉĂĐĞƐ
> ' 'ZK^^ Z ^/ Ed/ > ;E dͿ Z ^/͘ KDDKE Z d /> W Z</E' W Z</E' KhEd
ϮϳϭϳϬϬ ^& ϭϱϰϱϮϬ ^& ϭϱϰϲϬ ^& ϯϳϲϬ ^& ϱϯϯϵϬ ^& ϭϱϭ ƐƉĂĐĞƐ
OPTION 2 HANDEL ARCHITECTS LLP 2016
RESIDENTIAL
RESI. COMMON RETAIL PARKING
19 STO
19 STO
RY
RY
2 STO
2 STO
RY
RY
> ' 'ZK^^ Z ^/ Ed/ > ;E dͿ Z ^/͘ KDDKE Z d /> W Z</E' W Z</E' KhEd
PI BLDG 14+19
^/d ϭϵнϭϰ ϱϭϴϯϭϱ ^& ϯϱϱϰϳϬ ^& ϭϲϴϯϱ ^& ϭϲϱϰϬ ^& Ϯϵϱϯϱ ^& ϭϯϲ ƐƉĂĐĞƐ
OPTION 6alt HANDEL ARCHITECTS LLP 2016
RESIDENTIAL
RESI. COMMON RETAIL PARKING
7 STO
RY
7 STO 7 STO
RY
RY
2 STO
RY
6 STORY
3 STORY
3 STORY
3 STORY
3 STORY
3 STORY
> ' 'ZK^^ Z ^/ Ed/ > ;E dͿ Z ^/͘ KDDKE Z d /> W Z</E' W Z</E' KhEd
^/d ϭϵнϭϰ ϰϭϴϬϵϮ ^& ϮϮϱϰϰϬ ^& ϭϲϬϱϬ ^& ϮϰϵϮϱ ^& ϭϭϭϬϯϬ ^& ϮϲϮ ƐƉĂĐĞƐ
Pier 57 Handel Architects | Apr, 2016 - Mar, 2017 | Manhattan, NY Shop Drawing Review, Structural Coordination, Stair Code Complaince, ASI GENERAL ENCLOSURE NOTES 1.
SEE 'R' SERIES DWGS FOR SCOPE OF WORK FOR HISTORIC WINDOWS TO BE RESTORED, REPAIRED, OR REPLACED
2.
NEW STOREFRONT SYSTEM : A) TO BE SPRINKLERED AT 10'-0" A.F.F. ALONG ENTIRE APRON PERIMETER AT GRADE, INCLUDING BOTH PIER FINGER AND HEAD HOUSE CONDITIONS. B) GLAZING TO BE TEMPERED IGU, TYP. SEE GLAZING TYPES ON EXTERIOR MATERIALS SCHEDULE AND SPECIFICATION. C) ALL STOREFRONT CONSTRUCTION TO BE REINFORCED, THERMALLY BROKEN, EXTRUDED, ALUMINUM MULLIONS ANCHORED TO A CONTINUOUS CONC. CURB. D) PROVIDE ALL NECESSARY HARDWARE. E) COORDINATE WITH REQUIREMENTS OF SPRINKLER CONTRACTOR F) DOUBLE SILICON SEAL AROUND ALL OPENINGS. DISSIMILAR MATERIALS TO BE SEPARATED. G) PROVIDE MISC METAL FRAMING AS REQUIRED.
PROVIDE 2 HR RATED UL APPROVED AND WATER RESISTANT JOINT ASSEMBLY BETWEEN STEEL BEAM AND METAL PANEL 1 8
6
A-462
A-461
3
A-461
3 A-418
3.
SEE 'R' SERIES DWGS FOR SCOPE OF WORK FOR HISTORIC, TELESCOPING DOORS TO BE RESTORED, REPAIRED, OR REPLACED.
4.
TEMPORARY "FLOOD LOG" CHANNELS, PANELS, AND BRACES SHOWN DASHED.
3 4"
A-416
ȭ MULLION
CURTAIN WALL TIE BACK ȭ MULLION
MP-03
MP-03
MP-03
INSULATED METAL PANELS
ȭ MULLION
MP-03
EQ
MP-03
EQ
MP-03
EL 31.09(26.24') - VARIES B.O. FACSIA / T.O. MULLION (V.I.F.)
EXTRUDED ALUMINUM INSULATED CURTAIN WALL SYSTEM
MP-03
EXTRUDED ALUMINUM INSULATED CURTAIN WALL SYSTEM
GL-01
VARIES (V.I.F.)
ȭ MULLION
VARIES (V.I.F.)
EXISTING TELESCOPING DOORS. SEE “R” SERIES DRAWINGS FOR MORE INFO.
MP-03
GL-01
NON-RATED CURTAINWALL CONSTRUCTION
ȭ MULLION
GL-01
GL-01
E. 5
A-461
10 A-511
EL 40.41' (35.56') T.O.S. - 3RD FLOOR
8
PAVILION ROOF PLAN
4
1/8" = 1'-0"
20
11
CIVIL ENGINEER Philip Habib & Associates 102 Madison Avenue, 11th Floor New York, NY 10016 T: 212.929.5656
E. 5
10
10
A-511
A-511
EL 75.90' (71.05') T.O.F.F.-PAVILION MEZZANINE
7 20
GL-01
7'-958" HOLD
MP-03
MP-03
GL-01
ALUM. BALANCED DOOR
ALUM. BALANCED DOOR
4
2 HOUR EQUIVALENT ASSEMBLY W/ CLOSELY SPACED SPRINKLERS TO 10' A.F.F.
10'-041" VIF
METAL PANEL TYPE MP-10 BEYOND
A-461
141" 1 2"
2'-078" (V.I.F.)
141" 2'-078" (V.I.F.)
1 2"
1
EXISTING CONCRETE SLAB TO REMAIN
A-416
11
3
A-511
9
9
FOR STRUCTURAL WORK AT OR BELOW GROUND FLOOR SLAB, SEE MARINE STRUCTURAL DRAWINGS.
12.
FOR STRUCTURAL WORK ABOVE GROUND FLOOR SLAB, SEE STRUCTURAL DRAWINGS.
STRUCTURAL ENGINEER SILMAN 32 Old Slip, 10th Fl. New York, NY 10005 T: 212.620.7970 MEP ENGINEER COSENTINI ASSOCIATES Two Pennsylvania Plaza, 3rd. Fl. New York, NY 10121 T: 212.615.3600 MARINE STRUCTURAL ENGINEER MCLAREN ENGINEERING GROUP 100 Snake Hill Rd West Nyack, NY 10994 T: 845.353.6400 CIVIL ENGINEER Philip Habib & Associates 102 Madison Avenue, 11th Floor New York, NY 10016 T: 212.929.5656 ELEVATOR ENGINEER JENKINS & HUNTINGTON, INC 1251 Avenue of the Americas New York, NY 10020 T: 212.696.1818
NO. DATE -03/06/2015 -03/25/2015 -05/18/2015
INTERMEDIATE LANDING PLAN
ISSUANCE ISSUE FOR DOB ISSUE FOR DD ISSUE FOR CDs
A-511
A-511
8
8
A-511
A-511
7
7
A-511
A-511
EL 59.47' (54.62') T.O.S. - STAIR LANDING
E EL 17.46' (12.61') T.O.S. - STAIR LANDING
11 A-511
EL 89.92' (84.97') T.O.S.-ELEV MACH. ROOM
6
6
A-511
A-511
E. 5
KEY PLAN
10
SCALE: PROJECT NO:
NOTED ASASNOTED 851-10
SEAL & SIGNATURE 2
DRAWING TITLE:
221" 7" 1'-0" VIF VIF
1
CW TYPE P7: PLAN 1/2" = 1'-0"
3 4"
VIF EQ.
5"
VIF EQ.
18'-0" VIF
Curtain Wall Types Lower
221" 3 4"
1'-0" VIF
1'-0" VIF
DRAWING NO:
A-416.00 C Handel Architects LLP 2014
EL 40.41' (35.56') T.O.S. - 3RD FLOOR
6
3
3
A-511
A-511
PAVILION FLOOR PLAN
2
1/8" = 1'-0"
20
EL 81.11' (76.26') T.O.S. - STAIR LANDING
EL 48.41 (43.56') T.O.S. - STAIR LANDING
A-511
W 16th
20
11
11
E
11
SECOND FLOOR PLAN 1/8" = 1'-0"
20
11
E EL 89.92' (84.97') T.O.S.-ELEV MACH. ROOM
A-511
EL 23.03' (18.18') - VIF T.O.S. - 2ND FLOOR
2
2
A-511
A-511
1
1
11
11
A-511
A-511
A-511
A-511
SCALE: PROJECT NO:
EL 28.00' (23.15') T.O.S. - STAIR LANDING
ELEVATION DATUM NOTES
EL 23.03' (18.18') - VIF T.O.S. - 2ND FLOOR
E. 5
E. 5
1.
ORIGINAL DESIGN DRAWINGS ARE IN MARINE AVIATION DATUM WHICH IS 4.85' GREATER THAN MANHATTAN DATUM. RECENT OWNER SURVEY USES MANHATTAN DATUM.
2.
WHERE (2) ELEVATIONS ARE CALLED OUT, THE FOLLOWING CONVENTION IS USED:
E. 5
EL 17.46' (12.61') T.O.S. - STAIR LANDING
EL 11.88' (7.03') - VIF T.O. EXIST. GRD. FLOOR EL 11.34' (6.49') - VIF T.O. EXIST. GRD. FLOOR
EL 86.31' (81.46') T.O.F.F.-PAVILION ROOF
10
10
10
A-511
A-511
A-511
EL 52.57' (47.72') T.O.S. - 4TH FLOOR
EL 11.48' (6.63')
STAIR SECTION LOOKING WEST 1/8" = 1'-0"
10
STAIR SECTION LOOKING NORTH 1/8" = 1'-0"
9
EMR PLAN 1/8" = 1'-0"
5
FOURTH FLOOR PLAN 1/8" = 1'-0"
1
GROUND FLOOR PLAN 1/8" = 1'-0"
MARINE AVIATION DATUM MANHATTAN DATUM
T.O. EXIST. GRD. FLOOR
3.
11
W 15th
E
EL 32.41' (27.56') T.O.S. - STAIR LANDING
Date: 7/25/16
WEST STREET
1'-2"
8'-641"
4 A-511
10
A-511
EL 66.94' (62.09') T.O.F.F. PAVILION
EL 52.57' (47.72') T.O.S. - 4TH FLOOR
A-416
8'-641"
5 A-511
4 A-511
ADDENDUM 1
E. 5
EL 71.42' (66.57') T.O.S. - STAIR LANDING
EL 48.41 (43.56') T.O.S. - STAIR LANDING
Drawing: O:\851_pier57-v2\CAD\Current\Plots\500s\A-511.00 Stair Plans and Sections ST-E30.dwg
5"
1'-2"
1'-0"
6" 11" VIF VIF
1'-2"
5 A-511
W 15th
1 A-461
EXTRUDED ALUMINUM INSULATED CURTAIN WALL SYSTEM
11 A-511
EL 86.31' (81.46') T.O.F.F.-PAVILION ROOF
EL 81.11' (76.26') T.O.S. - STAIR LANDING
10/19/2015
KEY PLAN
CW TYPE P7: ELEVATION
1'-341"
20
11
E
EL 75.90' (71.05') T.O.F.F.-PAVILION MEZZANINE
1/2" = 1'-0"
1'-0"
Drawing: o:\851_pier57-v2\CAD\Current\Plots\400s\A-416.00 Curtain Wall Types - Lower.dwg
11.
1/8" = 1'-0"
11
EL 59.47' (54.62') T.O.S. - STAIR LANDING
2
1'-341"
Date: 7/8/16
ARCHITECT HANDEL ARCHITECTS, LLP 120 Broadway, 6th Floor New York, NY 10271 T: 212.595.4112 F: 212.595.9032 LANDSCAPE ARCHITECT !MELK URBAN DESIGN LLC 111 John Street, Suite 2650 New York, NY 10038 T: 212.513.1025 F: 212.513.1055
EL 32.41' (27.56') T.O.S. - STAIR LANDING
PAVILION MEZZANINE PLAN 1/8" = 1'-0"
EL 100.61' (95.76') T.O. EXISTING BULKHEAD
ȭ MULLION T.O. CURB EL. 13.18' (8.33')
W 16th
CW TYPE P7: SECTION 1/2" = 1'-0"
YOUNG WOO & ASSOCIATES 435 Hudson Street, 4th Floor New York, NY 10014 T: 212.477.8008
11
E. 5
EL 66.94' (62.09') T.O.F.F. PAVILION
3
TYPICAL STAIR DETAILS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND ADVISE ARCHITECT OF ALL DISCREPANCIES FROM DESIGN INTENT PRIOR TO PROCEEDING WITH WORK.
ISSUANCE
ȭ MULLION
7'-958" HOLD
1'-0"
1 2"
1'-2"
FOR TYPICAL STAIR DETAILS SEE SHEETS A-521 & A-522.
E. 5
ELEVATOR ENGINEER JENKINS & HUNTINGTON, INC 1251 Avenue of the Americas New York, NY 10020 T: 212.696.1818
DATE
GRAND STAIR WILL BE ORNAMENTAL STEEL, AS PER DETAIL DRAWINGS. STAIR SHALL MEET THE REQUIREMENTS OF ALL APPLICABLE CODES.
9.
11 A-511
ALL NEW FIRE STAIRS WILL BE CONCRETE FILLED STEEL PAN STAIRS.
8.
10.
E EL 28.00' (23.15') T.O.S. - STAIR LANDING
11 A-511
A-511
ȭ MULLION 4" VARIES VIF
2'-078" VARIES VIF
EL 11.11' (6.26') - VARIES T.O. EXISTING SLAB @ BASE OF CURB (V.I.F.)
BACK OF CURB RETURN BACK OF CURB
3'-10"
ALL EXTERIOR WALLS AT STAIR BULKHEADS SHALL BE INSULATED AND WATERPROOFED. ALL BULKHEADS TO BE PROVIDED WITH SPACE HEATERS.
PIER 57 New York, NY OWNER RXR 1330 Avenue of the Americas, Suite 500 New York, NY 10019 T: 212.797.1330 F: 212.765.3872
SIM.
10'-041" (V.I.F.)
5°
EXTERIOR POURED CONCRETE TOPPING PAVEMENT
STAIRS SHALL BE ENCLOSED BY FIRE RATED CONSTRUCTION TO MEET THE REQUIREMENTS OF THE 1968 NYC BUILDING CODE.
6.
1/8" = 1'-0"
20
11
EL 71.42' (66.57') T.O.S. - STAIR LANDING
2 HR RATED INSULATED PTD. ALUM. CLOSURE REINFORCED AS RQ'D.
1/2" MARINE GRADE 316 S.S. FLUSH-MOUNTED. FLOOD PANEL ANCHOR PLATE - MOUNTED WITH 316 S.S. BOLTS PER MANUFACTURER'S RECOMMENDATION - EMBEDDED INTO CONC. CURB.
ALL NEW STAIRS WILL MEET THE REQUIREMENTS OF ALL APPLICABLE CODES. CONTRACTOR TO DESIGN, FABRICATE AND ERECT STAIRS TO MEET THE REQUIREMENTS OF ALL APPLICABLE CODES AND ADA.
5.
7.
MEP ENGINEER COSENTINI ASSOCIATES Two Pennsylvania Plaza, 3rd. Fl. New York, NY 10121 T: 212.615.3600 MARINE STRUCTURAL ENGINEER MCLAREN ENGINEERING GROUP 100 Snake Hill Rd West Nyack, NY 10994 T: 845.353.6400
NO.
THIRD FLOOR PLAN
20
EL 13.18' (8.33') - HOLD T.O. CURB
REMOVE ALL PORTIONS OF STAIRS AS NECESSARY TO MEET THE NEW FLOOR LEVELS BY REPLACING SECTIONS OF THE STAIRS WHERE POSSIBLE. REINFORCE EXISTING STAIRS AS REQUIRED TO ALLOW FOR NEW CHANGES, BOTH TEMPORARILY DURING CONSTRUCTION AND PERMANENTLY AS NEEDED TO MEET THE REQUIREMENTS OF ALL CODES WITH JURISDICTION. CONTRACTOR'S LICENSED PROFESSIONAL ENGINEER SHALL PROVIDE SIGNED AND SEALED DRAWINGS INDICATING ANY REQUIRED STRUCTURAL CHANGES AND CODE COMPLIANCE FOR ENGINEER OF RECORD TO REVIEW.
4.
10
VERTICAL POST BEYOND
PROVIDE ALL NECESSARY ALTERATIONS TO EXISTING STAIRS TO MEET THE REQUIREMENTS OF ALL APPLICABLE CODES.
E. 5
10 A-511
EL 86.31' (81.46') T.O.F.F.-PAVILION ROOF
STRUCTURAL ENGINEER SILMAN 32 Old Slip, 10th Fl. New York, NY 10005 T: 212.620.7970
5
WIDTH OF GROUND FLOOR CONCRETE CURB @ T.O. CURB FOB FACE OF STL. FACSIA
ALL EXISTING STAIRS TO REMAIN WILL BE ALTERED AS REQUIRED TO PROVIDE ACCESS TO ALL NEW LEVELS.
2.
3.
ARCHITECT HANDEL ARCHITECTS, LLP 120 Broadway, 6th Floor New York, NY 10271 T: 212.595.4112 F: 212.595.9032 LANDSCAPE ARCHITECT !MELK URBAN DESIGN LLC 111 John Street, Suite 2650 New York, NY 10038 T: 212.513.1025 F: 212.513.1055
221"
7 A-461
221"
ȭ MULLION
27'-10" VIF
4'-821" HOLD
PROVIDE TIGHTLY SPACED SIDEWALL SPRINKLERS AT 10' AFF MIN. TO PROVIDE 2 HR EQUIVALENT RATING AROUND ENTIRE PIER APRON. SEE “P” SERIES DRAWINGS FOR ADDITIONAL INFO.
4'-821" HOLD
ȭ MULLION
EL 21.23' (16.38') - HOLD CENTER LINE OF DOUBLE MULLION
11 A-511
E
ȭ MULLION
BOTTOM OF EXTERIOR ROUND FASCIA
YOUNG WOO & ASSOCIATES 435 Hudson Street, 4th Floor New York, NY 10014 T: 212.477.8008
1. 20
11
E
11 A-511
MP-03
EQ
MP-03
ȭ MULLION
141"
TOP MULLION ELEVATION VARIES AT EACH OPENING. VIF PRIOR TO INSTALLATION. TOP CONNECTION TO ALLOW FOR MOVEMENT
VARIES (V.I.F.)
EQ
PROVIDE CONTINUOUS SEALANT AND BACKER ROD ON COMPRESSIBLE FILLER ON BOTH INTERIOR AND EXTERIOR SIDES OF JOINT. FOB FACE OF STL. FACSIA
VARIES (V.I.F.)
EL 39.54' (34.69') - VARIES T.O.S 2ND FLOOR SLAB @ BASE OF CURB (V.I.F.)
20
11
E EL 81.11' (76.26') T.O.S. - STAIR LANDING
WEST STREET
EL 40.06' (35.21') - HOLD T.O. CURB
STAIR NOTES
PIER 57 New York, NY OWNER RXR 1330 Avenue of the Americas, Suite 500 New York, NY 10019 T: 212.797.1330 F: 212.765.3872
WHERE (1) ELEVATION IS CALLED OUT THE FOLLOWING CONVENTION IS USED:
1/32" = 1'-0" 851-10
SEAL & SIGNATURE
DRAWING TITLE:
Stair Plans ST-E30-N DRAWING NO:
A-511.00
6.63'
MANHATTAN DATUM
C Handel Architects LLP 2014
15 East 30th St. Handel Architects | Feb, 2015 - Dec, 2015 | Manhattan, NY CD set, Permit set, Energy set, DOB objection compliance
Parcel O Handel Architects | Dec, 2014 - Feb, 2015 | The Yards, Washington, D.C Unit Layout Design, Facade Study, Design Submission Package
BALCONY
BALCONY
BALCONY
BALCONY
BALCONY
BALCONY
BALCONY
19 1 BED+ 753 SF
20 1 BED 663 SF
BALCONY
W/D
21 1 BED 663 SF 620~725SF
BALCONY
W/D
W/D
25 1 BED+ 731 SF
CORRIDOR 924 SF
W/D
ELEC. CLOSET
ELEC. CLOSET STAIR B
W/D
PE 1
24 1 BED+ 932 SF
W/D
W/D
TRASH & RECYCLE CLOSET
STAIR A
W/D
W/D W/D
17 2 BED 1077 SF
29 ST 601 SF
PE 1
28 2 BED 971 SF
27 1 BED 635 SF
BALCONY
W/D
W/D BALCONY
W/D 16 ST ###### 575 SF
Typical Plan
30 ST 602 SF
BALCONY
W/D
PLANTER
PLANTER
TERRACE
TERRACE
26 2 BED 1087 SF 850~925SF
PLANTER
TERRACE
PLANTER
PLANTER
TERRACE
TERRACE
PLANTER
TERRACE
TERRACE
PLANTER
PLANTER
PLANTER
TERRACE
TERRACE
TERRACE
PLANTER
7 F
26 2 BED 1099 SF 850~925SF
PLANTER
7 F
option B
BALCONY
23 1 BED+ 798 SF
22 1 BED 663 SF
PLANTER TERRACE
26 2 BED 1087 SF 850~925SF
PLANTER
BALCONY
BALCONY 18 2 BED 1049 SF
PLANTER TERRACE
27 D F 5SF
1 A10.01
BALCONY
PLANTER
26 2 BED 1099 SF
4TH FLOOR TERRACE BELOW
option C
Millennium Hollywood Handel Architects | Oct, 2014 - Jun, 2015 | Hollywood, CA Zoning study, Massing study, Core study, Schematic Design
POTENTIAL BUSTLE BELOW
POTENTIAL BUSTLE BELOW
MARCH 17, 2015 STUDY |
VIEW FROM SOUTH EAST
POTENTIAL BUSTLE BELOW
MARCH 17, 2015 STUDY |
15
VIEW FROM SOUTH EAST
VIEW FROM NORTH EAST
MARCH 17, 2015 STUDY |
16
VIEW FROM NORTH EAST
20150402 PINUP OPTION 07
20150402 PINUP OPTION 02 ALL FIGURES AND REPRESENTATIONS PRELIMINARY AND SUBJECT TO CHANGE
ALL FIGURES AND REPRESENTATIONS PRELIMINARY AND SUBJECT TO CHANGE HANDEL ARCHITECTS FOR MILLENNIUM PARTNERS | 15 APRIL 2015 | DRAFT
VIEW FROM SOUTH EAST
PAGE 11
VIEW FROM NORTH EAST
HANDEL ARCHITECTS FOR MILLENNIUM PARTNERS | 15 APRIL 2015 | DRAFT
VIEW FROM SOUTH EAST
PAGE 26
VIEW FROM NORTH EAST
20150402 PINUP OPTION 03
ALL FIGURES AND REPRESENTATIONS PRELIMINARY AND SUBJECT TO CHANGE
20150402 PINUP OPTION 08
ALL FIGURES AND REPRESENTATIONS PRELIMINARY AND SUBJECT TO CHANGE
HANDEL ARCHITECTS FOR MILLENNIUM PARTNERS | 15 APRIL 2015 | DRAFT
VIEW FROM SOUTH EAST
PAGE 14
VIEW FROM NORTH EAST
HANDEL ARCHITECTS FOR MILLENNIUM PARTNERS | 15 APRIL 2015 | DRAFT
VIEW FROM SOUTH EAST
PAGE 29
VIEW FROM NORTH EAST
20150402 PINUP OPTION 04
ALL FIGURES AND REPRESENTATIONS PRELIMINARY AND SUBJECT TO CHANGE
20150402 PINUP OPTION 09
ALL FIGURES AND REPRESENTATIONS PRELIMINARY AND SUBJECT TO CHANGE
HANDEL ARCHITECTS FOR MILLENNIUM PARTNERS | 15 APRIL 2015 | DRAFT
VIEW FROM SOUTH EAST
PAGE 17
VIEW FROM NORTH EAST
HANDEL ARCHITECTS FOR MILLENNIUM PARTNERS | 15 APRIL 2015 | DRAFT
VIEW FROM SOUTH EAST
PAGE 32
VIEW FROM NORTH EAST
20150402 PINUP OPTION 05
ALL FIGURES AND REPRESENTATIONS PRELIMINARY AND SUBJECT TO CHANGE
20150402 PINUP OPTION 10B
ALL FIGURES AND REPRESENTATIONS PRELIMINARY AND SUBJECT TO CHANGE
HANDEL ARCHITECTS FOR MILLENNIUM PARTNERS | 15 APRIL 2015 | DRAFT
VIEW FROM SOUTH EAST
PAGE 20
HANDEL ARCHITECTS FOR MILLENNIUM PARTNERS | 15 APRIL 2015 | DRAFT
VIEW FROM SOUTH EAST
VIEW FROM NORTH EAST
PAGE 38
VIEW FROM NORTH EAST
20150402 PINUP OPTION 01
20150402 PINUP OPTION 06
ALL FIGURES AND REPRESENTATIONS PRELIMINARY AND SUBJECT TO CHANGE
ALL FIGURES AND REPRESENTATIONS PRELIMINARY AND SUBJECT TO CHANGE HANDEL ARCHITECTS FOR MILLENNIUM PARTNERS | 15 APRIL 2015 | DRAFT
17
PAGE 23
HANDEL ARCHITECTS FOR MILLENNIUM PARTNERS | 15 APRIL 2015 | DRAFT
PAGE 8
Feasibility Studies Handel Architects Zoning Study, Massing Study, Preliminary Program Layout Feb, 2018 | Jersey City, NJ
May, 2017 | Santiago, Chile
Feb, 2016 | Brooklyn, NY
Summary
Feb, 2016 | Manhattan, NY
RESIDENTIAL
RESIDENTIAL
RESI. COMMON
RESI. COMMON
RETAIL
RETAIL
BOH / MECH / PKG
BOH / MECH / PKG
Scheme 1 (City) Keep the existing hotel & convention center permanently
1 BOERUM PLACE
GROUND FLOOR PLAN
GROUND FLOOR PLAN
72 NASSAU ST. HANDEL ARCHITECTS LLP 2016
HANDEL ARCHITECTS LLP 2016
RESIDENTIAL
1 BOERUM PLACE
RESIDENTIAL
RESI. COMMON
RESI. COMMON
RETAIL
RETAIL
BOH / MECH / PKG
BOH / MECH / PKG
2~8F PLAN
2~4F PLAN
72 NASSAU ST. HANDEL ARCHITECTS LLP 2016
Option A
Option B
@ Existing Hotel & Convention Center (ZFA): 39,825 m2
@ Existing Hotel & Convention Center (ZFA): 39,825 m2
@ New Area (ZFA): 52,469 m2
@ New Area (ZFA): 52,469 m2
@ Total Program Gross: 60,059 m2
@ Total Gross: 61,116 m2
@ Two Phases
@ Single Phase
HANDEL ARCHITECTS LLP 2016
RESIDENTIAL
1 BOERUM PLACE
RESIDENTIAL
RESI. COMMON
RESI. COMMON
RETAIL
RETAIL
BOH / MECH / PKG
BOH / MECH / PKG
15-18F PLAN
5-25F PLAN
72 NASSAU ST. HANDEL ARCHITECTS LLP 2016
HANDEL ARCHITECTS LLP 2016
Scheme 2 (Icon) Keep the existing hotel & convention center temporarily %2(580 3/$&(
1$66$8 67
0$66,1* 678'<
0$66,1* 678'<
+$1'(/ $5&+,7(&76 )25 /$67 83'$7('
+$1'(/ $5&+,7(&76 )25 /$67 83'$7(' 6,7( 6800$5<
6,7( 6800$5<
6,7( $5($ ÏϯÍ&#x2022;ϮϵϬ 6) )$5 ÏÏ® %$6( $//2:$%/( )/225 $5($ ÏϱϵÍ&#x2022;ϰϴϬ =)$
6,7( $5($ Ï´Í&#x2022;Ϭϰϰ 6) )$5 Ïϱ ^ >>Kt > &>KKZ Z ÏϮϬÍ&#x2022;ϲϲϬ =)$ $//2:(' 5(6, $5($ ϵϲÍ&#x2022;ϱϮϴ =)$ $//2:(' &200(5&,$/ $5($ ϮϰÍ&#x2022;ÏϯϮ =)$
Î&#x17D; ÏÏ® & Z Z Yh/Z ^ /E >h^/KE Zz ,Kh^/E'
&>KKZ Z s >KW ;Ïϱ & ZÍ¿ ÏϮϬÍ&#x2022;ϲϲϬ =)$ 5(6, '(9(/23(' )$5 ϵϲÍ&#x2022;ϱϮϴ =)$ &200(5&,$/ '(9(/23(' )$5 ϮϰÍ&#x2022;ÏϯϮ =)$
&>KKZ Z s >KW ÏϱϵÍ&#x2022;ϰϴϬ =)$
327(17,$/ (;75$ &200(5&,$/ )$5 $9$,/$%/( ,) 68%:$< ,03529(0(17 3529,'('
727$/ %8,/',1* 352*5$0 )/225 72 )/225
/(9(/
Option A
Option B
@ New Area (ZFA): 92,293.7 m2
@ New Area (ZFA): 92,293.7 m2
@ Total Program Gross: 115,354 m2
@ Total Program Gross: 118,926 m2
@ Two Phases
@ Two Phases
522) 0(&+
% %
+(,*+7 723 2) /9/
352*5$0 68%727$/
*5266 ) $ *)$
1(7 ) $ 1)$
727$/ %8,/',1* 352*5$0 =21,1* ) $ =)$
)/225 72 +(,*+7 723 2) /9/
)/225
/(9(/
*5266 ) $ *)$
522) 0(&+
%
=21,1* ) $
1)$
=)$
127(6 $// ),*85(6 $3352;,0$7( *5266 72 =)$ $668037,21 0(&+ '('8&7,21 *5266 72 1)$ $668037,21 ()),&,(1&<
1(7 ) $
127(6 $// ),*85(6 $3352;,0$7( *5266 72 =)$ $668037,21 0(&+ '('8&7,21 *5266 72 1)$ $668037,21 ()),&,(1&<
Bloomingdaleâ&#x20AC;&#x2122;s Ala Moana
[ Lead Designer ] Kevin Kennon Architect | Oct, 2013 - Oct, 2014 | Ala Moana, HI Schematic Design, SD set, Design development, 3D modeling, Presentation Rendering, Client Meeting
Collins Panama Kevin Kennon Architect | Dec, 2013 - Oct, 2014 | Ciudad de Panamรก, Panama Design development, Constrcution Document, 3D modeling, Presentation Rendering
Bloomingdale’s American Dream Kevin Kennon Architect | Sep, 2013 - Jan, 2014 | Carlstadt, NJ Concept to Schematic Design, Design development, 3D modeling, Presentation Rendering, Animation
1. FINE JEWELRY ARCADE 2. SHOES 3. FASHION ACCESSORIES 4. FEATURED DESIGNERS DISPLAY 5. HANDBAGS 6. FASHION JEWELRY 7. INTERACTIVE WORKSTATION TABLE 8. COSMETICS PALETTE WALL 9. SPA CUBE 10. FRAGRANCES STATION 11. MAKE-OVER STATION 12. CUSTOMER SERVICE 13. BATHROOMS 14. COSMETICS NEW PRODUCTS DISPLAY 15. CABINET OF CURIOSITIES
1F PLAN
1. WOMEN’S RTW - DRESSES 2. WOMEN’S RTW - COLLECTIONS 3. WOMEN’S RTW - CONTEMPORARY 4. WOMEN’S RTW - SPORTSWEAR 5. KIDS 6. INTERIORS 7. CUSTOMER SERVICE 8. FASHION STATION PLAY TABLE 9. FITTING ROOMS 10. SERVICE DESK 11. HOME THEATER 12. BATHROOM 13. MEN’S DRESS SHIRTS 14. MEN’S TIES 15. MEN’S ACCESSORIES 16. MEN’S BASICS 17. MEN’S SHOES 18. MEN’S SPORTSWEAR 19. MEN’S DENIM 20. MEN’S SUITS 21. RUNWAY OF CLOTHING 22. COLOR WHEEL
2F PLAN
STRUCTURE DIAGRAM
BloominAgdaleâ&#x20AC;&#x2122;s Stanford Kevin Kennon Architect | Oct, 2012 - Feb, 2013 | Standford, CA Schematic Design, ARB Submission Set, Presentation Rendering, DD and CD set
Bloomingdale’s Glendale Kevin Kennon Architect | Jun, 2012 - Oct, 2012 | Glendale, CA Design development, Constrcution Document, 3D modeling, Presentation Rendering
PROPOSED MATERIAL / FINISH LEGEND LIST - EXTERIOR TYPE
TAG NO.
GLASS
G-02
NAME / DESCRIPTION
COLOR / FINISH
MIN. 1/2" LOW-IRON TEMPERED GLASS
CLEAR
G-01
METAL
PICTURE / HATCH
ACID ETCHED
LOCATION / REMARKS
FACADE PANELING DOOR/STOREFRONT GLASS
G-03
MIN. 3/4" LOW-IRON TEMPERED GLASS
CLEAR
ENTRANCE
M-01
PAINTED ALUMINUM
SILVER / PPG UC106704XL DURANA® XL PLATUNUM
FACADE PANELING/MULLION
M-02
PAINTED ALUMINUM
WHITE / PPG UC55026 DURANA® BRIGHT WHITE
FACADE PANELING
M-03
PAINTED ALUMINUM
BLACK / PPG UC40577 DURANA® BLACK
S-01
WHITE MARBLE
OLYMPIAN DANBY, HONED
FACADE PANELING
S-03
BLACK MATCHPOINT TILE
ABSOLUTE BLACK, STANDARD G771 POLISHED
FACADE WALL
STONE
FACADE MULLION
C
A
-
M7
4'x8' MODULE FACADE PANEL SYSTEM TYP.
26'-8"
M5
M4
M3
M2
M1
21
20
204'-8"
30'-0"
30'-0"
30'-0"
19
18
17
141'-6" 30'-0"
30'-0"
28'-0"
21'-6"
30'-0"
30'-0"
T.O. ROOF
MF
N.I.C. 30'-0"
30'-0"
C
-
4'x8' MODULE FACADE PANEL SYSTEM TYP. 30'-0"
MD
-
MC
MB
MA
144'-4" 30'-0"
30'-0"
28'-8"
T.O. ROOF
SIGNAGE BLOOMINGDALE'S
20'-4 3/4"
20'-4 3/4"
EL. [+591'-6"]
60'-0"
17'-6"
EL. [+571'-1 1/4"] 60'-0"
T.O.S. 3RD FL.
EL. [+571'-1 1/4"]
ALUM. PANEL PAINTED SILVER T.O.S. 2ND FL.
4'x8' MODULE FACADE PANEL SYSTEM TYP. WHITE MARBLE BORDER TYP.
T.O.S. 3RD FL.
17'-6"
WHITE MARBLE BORDER TYP.
T.O.S. 2ND FL.
EL. [+553'-7 1/4"]
OPEN
OPEN
T.O.S. 1ST FL.
EL. [+535'-6"]
EL. [+535'-6"] ALUMINUM FRAMING PAINTED SILVER & CLEAR LOW-IRON TEMPERED GLASS TYP.
NORTH ELEVATION
TWILIGHT BLACK MATCHPOINT TILE
18'-1 1/4"
18'-1 1/4"
EL. [+553'-7 1/4"]
Kitchen. Bath. Outdoor. Joy.
T.O.S. 1ST FL.
1/16" = 1'-0"
25'-8"
EL. [+595'-6"]
EL. [+591'-6"]
ME
N.I.C. T.O. PARAPET
4'-0"
EL. [+595'-6"]
M6
4'-0"
T.O. PARAPET
B
-
M8
TWILIGHT BLACK MATCHPOINT TILE
SWING DOORS PAINTED BLACK
ALUMINUM FRAMING PAINTED SILVER & CLEAR LOW-IRON TEMPERED GLASS TYP.
CHARCOAL GRANITE STOREFRONT BASE TYP.
TWILIGHT BLACK MATCHPOINT TILE
EXISTING DOORS PAINTED BLACK
ALUMINUM FRAMING PAINTED SILVER & EXISTING GLASS TO REMAIN TYP.
EXISTING BRICK TO REMAIN
N.I.C. N.I.C.
EAST ELEVATION 1/16" = 1'-0"
EXISTING DOORS PAINTED BLACK
TWILIGHT BLACK MATCHPOINT TILE
NEW CANOPY
EXISTING STRUCTURAL BEAM BEYOND
GLASS DOORS W/ S.S. HARDWARE
CLEAR LOW-IRON TEMPERED GLASS & FITTING ENTRANCE SYSTEM
GLASS DOORS W/ S.S. HARDWARE
ALUMINUM FRAMING PAINTED SILVER & CLEAR LOW-IRON TEMPERED GLASS TYP.
EXISTING DOORS PAINTED BLACK CHARCOAL GRANITE STOREFRONT BASE TYP.
Macyâ&#x20AC;&#x2122;s Herald Square Kevin Kennon Architect | Feb, 2013 - Oct, 2014 | Manhattan, NY CD, Detail Set, ADA Compliance, Presentation Rendering, Construction Administration
Chin-Shan Village LWM Architects + Shanghai Yue Jie | summer, 2011 | Hsin-Dien, Taipei county, Taiwan Design development study, 3D modeling, Construction documents.
Vieshow Cinema
[ Lead Designer ] CHU Studio | summer, 2009 | Taipei city, Taiwan Site survey, Schematic design, Design development, 3D modeling, Construction drawing
D
D
D
D
C A
D
B
D
D
D
D
Hsu Residence
[ Lead Designer ] CHU Studio | spring, 2009 | Bali, Taipei county, Taiwan Site survey, Schematic design, Design development, 3D modeling, Construction drawing
J
G
F
H
E D
C A
I B
Lee Residence
[ Lead Designer ] CHU Studio | winter, 2008 | Donshi, Taichung county, Taiwan Site survey, Schematic design, Design development, Construction drawing A
A’
B
B’
㍙䰥
H 㛟㠳
㪪⬷
㪪⬷
F
恱㝦
A’
A
C
A-A’ Elavation B’
B’
㪪⬷
B
G
䆯䮈 ㍙䰥
E
㍙䰥
[ 㜏㝦
⢺Ⅎ⊂㝦
D
㪪⬷
㍙䰥
㪪⬷
壄棥㝦 㛟㠳
A
㪪⬷
B-B’ Elavation
B-B’ Elavation
A-A’ Elavation
Recreational Power Plant
[ Graduate ] Pratt Thesis Studio | spring, 2011 | Meat Packing district, Manhattan, USA Maya, 3ds Max, Rhino, AutoCAD A J
G
B C
D C
H I
E
K
G
F
H L
I
A
C D J
B
K
F
G
H
D E
I
Thermal power generator Power generating circulation
Urine tank
Solar Panel
Power generating sliding track Power generating circulation
Current Turbine
Synaptic Hotel
[ Graduate ] Pratt Vertical Studio | spring, 2010 | Brooklyn, USA Maya, 3ds Max, Rhino, AutoCAD
A
B
D
C
G E
F
H I
A
C
C
C
D C
A
A
C
C
C
C
C
C
B
C
C
E B E
B
F B
B
E