![](https://static.isu.pub/fe/default-story-images/news.jpg?width=720&quality=85%2C50)
1 minute read
Project Map
Pools
Prevent emergency closures, stop water leaks, improve water conservation and energy efficiency
Advertisement
Playgrounds
Replace or build 10 to 20 play structures that are closed, at risk of closure, or deficient
Play Pieces
Replace equipment that needs repair and/or has tested positive for lead-based paint; address drainage and replace wood fiber play surfacing
Accessibility
![](https://assets.isu.pub/document-structure/230406182622-1b10d64cef87ab75e2c0f88d81d22612/v1/104e16646b0b77fe96941cf14e3a5307.jpeg?width=720&quality=85%2C50)
Remove access barriers in parks throughout city; a 2014 report found thousands of barriers across park system
Trails and Bridges
Preserve access to natural areas and open spaces by repairing trails and bridges
Restrooms, Other Urgent Repairs
Prevent closures, replace and repair restrooms, roofs, and other failing structures throughout the system
Protecting Workers
Improve safety, make critical upgrades, fix leaking roofs, update equipment at maintenance facilities
Pioneer Courthouse Square
Replace failing structures, fix leaks and cracks, make improvements at our most-visited park
Additional Investments since 2013: PP&R invests funds from System Development Charges, grants, and partners for growth projects and other improvements. Some Bond projects also received these funds. The additional investments shown follow neighborhood coalition boundaries.
NORTH
Acquisitions at Cathedral, Open Meadow. Improvements at Columbia Children’s Arboretum, Columbia Slough, Delta Park, North Park Greenway, Pier/Chimney Parks, Waud Blu .
NORTHWEST
Acquisitions at Terwilliger, Forest Park, Hoyt Arboretum. New park The Fields. Improvements at Wildwood Trail Barbara Walker Bridge, Halprin Sequence, Japanese Garden, Lan Su Chinese Garden, Forest Park Entry. Washington Park master plan.