Changing Dini Argeo main PCB - Process Example: 3590 Main PCB failure Engineer: 1. Replaces faulty main PCB with new main PCB from stock 2. Configures new main PCB, calibrates and tests. Cal Cert shows new main PCB serial number. Note: old serial number written on cal cert in ‘calibration notes’ section 3. Places new serial number label (Fig1) over the existing indicator serial number on housing (Fig2, Fig3) 4. Completes worksheet stating work carried out Note: On worksheet, old serial number must be noted down for Service co-ordinator to be able to update ACT. 5. Returns worksheet, calibration certificate and faulty Main PCB to PWS office.
Fig1
Fig2
Fig3
Service co-ordinator: 6. Receives worksheet and updates customer scale serial number on ACT. 7. Informs customer via email, the old serial number has been replaced with the new main PCB serial number. 8. Logs warranty call with Dini Argeo for repair of faulty main PCB
Version 1
02-07-18