Agenda
Project Delivery Methods
Contracting / Compensation
Design Process
Sustainable Design
Questions & Answers
First Steps… • Define the project – Need, goal, objective – Scope – Budget – Schedule • Phasing
• Build your team – Internal – External
• Choose Project Delivery Method
Project Delivery Methods • • • •
Design-Bid-Build (traditional) Construction Manager (CM) Design – Build (DB) Integrated Project Delivery (IPD)
Design-Bid-Build • Contractual Arrangement – Owner / Architect (B101, B103, B104, B105) – Owner / Contractor (A101, A102, A103, A105, A107)
• Competitively bid – Open or pre-determined bidders
• Complete CD’s • Linear process
Construction Manager
-Construction Management at Risk (CMAR) • Contractual Arrangement – Owner / Architect (B103) – Owner / CM (A133, A134)
• CM involved during design, takes on financial risk for construction (GMP) • Overlapping phases can save time
Design Build • Contractual Arrangement – Owner / Design Build entity (A141)
• Can be architect or contractor lead • Single point of responsibility
IPD
Owner
- Integrated Project Delivery
• Contractual Arrangement – Key players bound together
• • • • •
Architect
Contractors
Shared financial risk / reward Liability waivers between stakeholders Fiscal transparency Collaborative innovation and decision-making Requires mutual respect and trust
Design – Bid - Build
Construction Manager
Design Build
Contract Options • AIA Documents • Letter Fee Agreement • Other
Most Defined
Least Defined
Methods of Design Team Compensation • • • •
Hourly Percentage of the Construction Cost Hourly (Not to Exceed) Lump Sum
How We Work‌
3D Design • • • •
Building Information Modeling Photo realistic renderings Virtual tours Excellent communication tool – Space planning – Finish selection – Workflow analysis
Traditional Floor Plan
3D Floor Plan
A great communication tool
The Design Process
Concept Design
Design Development / 3D Model
The Final Product
The Architectural Process 1. 2. 3. 4. 5. 6.
Pre-design Schematic design Design development Construction Documentation Bidding / pricing Construction administration
Design : Where to Start • • • •
Visioning Programming / Space Planning Feasibility Test fit plans
Programming • Organization • Adjacencies and efficiencies • Workstation standards • Custom employee surveys
• Personal interviews • Projections • Future flexibility • Equipment needs
Schematic Design • Study concepts + options • Further understand the program • Adjacencies • Test fit plans • Choose a scheme to develop
Design Development • • • • • •
Develop design Add detail HVAC, electrical, data Ceiling, walls Finishes, furniture Majority of decisions
Construction Documents • Accurately communicate design intent • Requires team coordination • Quality documents = – More accurate cost estimates / bids – Fewer RFI’s / Change Orders
Bidding • Have quality construction documents • Solicit bids from preferred contractors • Are bids apples to apples? – Review and compare results / alternates
• Consider subcontractors
Construction Administration • • • • • • • • •
Role shifts to observation / oversight Regular scheduled site visits Shop Drawings Requests for Information (RFI) Change Orders Review samples Mock Ups Prepare Punch List Substantial completion
Office Design Trends • 5 Generations at Work • Changing Work Styles – Informal – Collaborative – Mobile
• • • •
Flexibility Technology Smaller work spaces Sustainability
Efficient Workstations
Transparency in the Workplace
Working Together with Technology
Collaboration Spaces
Work Life Balance
Sustainable Design • • • • •
Establish your goals LEED Certification Energy incentives ($) Landlord involvement / support Green lease
Wisconsin Energy Institute UW Madison Campus • Pursuing LEED Gold Certification • 95% construction waste was recycled • Uses 48.8% less energy
Chilled beam mechanical system
Windows maximize daylighting
800 University Bay Drive • • • • •
LEED Platinum Certified Uses 38% less energy Increased site density (4x) LED lighting VRF system
Green roof doubled the sites green space
Rainwater collection tank
Showers and lockers to promote biking
UW Health Offices at 800 University Bay Drive • Recycled content finishes, low VOC materials, daylighting, healthy interiors • LEED CI Gold Certified
Thank You