PMS System

Page 1

POWE ARCHITECTS

ARCHITECTURE

MASTERPLANNING

POWE ARCHITECTS PRACTICE MANAGEMENT SYSTEM A guide for application of a practice wide Quality Assurance system. Thursday, 2 July 2009

DESIGN


1.0

OUTLINE

POWE ARCHITECTS

ARCHITECTURE

1.0 Contents 2.0 Scope of the Practice Management System 3.0 The Practice 4.0 Office Systems Manual 5.0 Procedures 6.0 Checklists 7.0 Project Proformas 8.0 Non-Project Proformas 9.0 Instruction Manuals & Indexes 10.0 Employment Agreement and Policies 11.0 Internal Aduits 12.0 Quality Control of the “Quality Control”

Thursday, 2 July 2009

MASTERPLANNING

DESIGN


2.0

SCOPE OF THE PRACTICE MANAGEMENT SYSTEM

POWE ARCHITECTS

ARCHITECTURE

2.0 Scope 2.0.1 Objective 2.0.2 AS/NZS ISO 9001 - 2008 2.0.3 Quality of outcomes 2.0.4 Effective production 2.0.5 Profitability

2.1. Amendments & Changes 2.1.1 Review

2.2 Definitions & terminology

Thursday, 2 July 2009

MASTERPLANNING

DESIGN


3.0

THE PRACTICE

POWE ARCHITECTS

ARCHITECTURE

3.0.1 Practice profile 3.0.2 Office structure Position Vs Role DR - Director PM - Practice Manager TL - Team Leader DV - Design Reviewer PA - Project Architect PS - Project Staff OM - Assistant Office Manager FM - Financial Manager CM - Office CAD Manager AA - Administration Assistant

3.0.3 Practice policy 3.0.4 Practice objectives Thursday, 2 July 2009

MASTERPLANNING

DESIGN


4.0

OFFICE SYSTEMS MANUAL - SYSTEM STRUCTURE

POWE ARCHITECTS

ARCHITECTURE

4.0.1 System structure Office Systems Manual Procedures Project Profiles Checklists & Proforma

AS/NZS ISO 9001:2008 Applicable standard Quality “system elements”

Thursday, 2 July 2009

MASTERPLANNING

DESIGN


4.0

OFFICE SYSTEMS MANUAL

POWE ARCHITECTS

ARCHITECTURE

4.1 Management Responsibility roles, authority and responsibilities resources the “Practice Manager”

4.2 Office Manual the purpose of Procedures and Project Profiles

4.3 Agreement & Brief creating the baseline against which to measure our “product” and how to move the goalposts

4.4 Design & Documentation planning, co-ordinating, forming design criteria, design checking, verification and validation amendments to the brief by client acceptance of the design

Thursday, 2 July 2009

MASTERPLANNING

DESIGN


4.0 OFFICE SYSTEMS MANUAL

POWE ARCHITECTS

ARCHITECTURE

4.5 Document Control controlling the checking, revising and issuing of documents

4.6 Employing Subconsultants We donâ€&#x;t engage subconsultants! We do nominate them from Consultant Register

4.7 Control of information supplied by the client 4.9 The design process, documentation, tendering & contract administration 4.10 Review & Audit 4.12 Design reviews & site inspection reports

Thursday, 2 July 2009

MASTERPLANNING

DESIGN


4.0 OFFICE SYSTEMS MANUAL

POWE ARCHITECTS

ARCHITECTURE

4.13 Incomplete documents Discrepancies Errors & Omissions

4.14 Correcting & preventing errors & omissions identification & corrective actions preventing future occurrences project & Practice wide

4.16 Records identification, storage, protection, retrieval, retention, and disposal

4.17 Internal audits (under development) 4.18 Professional development professional development and training schedule

Thursday, 2 July 2009

MASTERPLANNING

DESIGN


5.0

PROCEDURES - SYSTEM STRUCTURE

POWE ARCHITECTS

ARCHITECTURE

System structure Office Systems Manual Procedures Project Profiles Checklists & Proforma

Thursday, 2 July 2009

MASTERPLANNING

DESIGN


5.0 PROCEDURES – SYSTEM STRUCTURE

POWE ARCHITECTS

ARCHITECTURE

5.5. Project procedures – Design 5.5.1. 5.5.2. 5.5.3. 5.5.4. 5.5.5. 5.5.6. 5.5.7. 5.5.8. 5.5.9. 5.5.10. 5.5.11. 5.5.12. 5.5.13. 5.5.14. 5.5.15. 5.5.16. 5.5.17. 5.5.18. 5.5.19. 5.5.20. 5.5.21. 5.5.22. 5.5.23. 5.5.24.

Thursday, 2 July 2009

Project Profiles Design criteria Project brief Relevant Authorities Conflicts or Omissions Briefing secondary consultants Consultant engagement Project Files Design program Design review Project document control Issuing Documents Received documents Records Practice Management System improvement Co-ordination Client Review Schematic Design Incomplete documents Design review Changes to the project brief Design changes Client Approval Project audits

MASTERPLANNING

5.6. Project procedures – Documentation 5.6.1. 5.6.2. 5.6.3. 5.6.4. 5.6.5. 5.6.6. 5.6.7. 5.6.8. 5.6.9. 5.6.10. 5.6.11. 5.6.12. 5.6.13. 5.6.14. 5.6.15. 5.6.16. 5.6.17. 5.6.18. 5.6.19. 5.6.20. 5.6.21. 5.6.22. 5.6.23. 5.6.24. 5.6.25. 5.6.26. 5.6.27. 5.6.28. 5.6.29.

Document planning Changes to the project brief Client Approval Client supplied information Document criteria Relevant Authorises Conflicts or Omissions Secondary consultants Consultant engagement Documentation Documentation requirements Documentation program Draft Documentation review Design review Project document control Issuing documents Received Documents Records Practice Management System improvement Document control Drawing Issue – For Approval Drawing Issue – Revised drawings Incomplete documents Co-ordination of Consultant‟s documentation Client Review Documentation review Design verification Client approval to tender Project audits

DESIGN


5.1.

Procedures – Generally

POWE ARCHITECTS

ARCHITECTURE

5.1.1 Staff resources 5.1.2 Potential work 5.1.3 Stationery supplies & petty cash 5.1.4 Document & data control 5.1.5 Incoming mail 5.1.6 Outgoing mail 5.1.7 Telephones 5.1.8 Incoming faxes 5.1.9 Outgoing faxes 5.1.10 Drawing issue and identification 5.1.11 Virus and Spam protection 5.1.12 Data backup 5.1.13 Project numbers 5.1.14 Correspondence

Thursday, 2 July 2009

MASTERPLANNING

5.1.15 Email Correspondence 5.1.16 Time sheets 5.1.17 Leave Requests 5.1.18 Invoicing 5.1.19 Filing 5.1.20 Archived projects 5.1.21 Booking meetings and resources 5.1.22 Vehicle use 5.1.23 Professional development 5.1.24 Staff training 5.1.25 Client Satisfaction 5.1.26 Photocopying and Printing 5.1.27 Computer Support Services 5.1.28 Close of business

DESIGN


5.2.

Maintenance of the Practice Management System

POWE ARCHITECTS

ARCHITECTURE

5.2.1 Practice Manager 5.2.2 Review by directors 5.2.3 Document & data control ...of the Practice Management System

5.2.4 Consultant Database 5.2.5 Builder Database 5.2.6 Client Database 5.2.7 Correcting errors – Project Level 5.2.8 Correcting errors – Practice Level 5.2.9 Preventing errors 5.2.10 Register of errors and omissions 5.2.11 Internal audits

Thursday, 2 July 2009

MASTERPLANNING

DESIGN


5.3.

Project procedures - Agreement & brief

POWE ARCHITECTS

ARCHITECTURE

5.3.1 Project Capability 5.3.2 Review of agreement 5.3.3 Project Procurement Method 5.3.4 Amendment to the scope of service 5.3.5 Records This is all largely done by the Directors, but... ...It forms the standard by which all outputs are measured!

Thursday, 2 July 2009

MASTERPLANNING

DESIGN


5.4.

Project procedures – Project Profiles

POWE ARCHITECTS

ARCHITECTURE

5.4.1 Project Profiles 5.4.2 Project Resources 5.4.3 Nominate Consultants 5.4.4 Design Reviewer 5.4.5 Review Schedule 5.4.6 Design 5.4.7 Management approval 5.4.8 Maintain the Project Profiles

Thursday, 2 July 2009

MASTERPLANNING

DESIGN


5.5.

Project procedures – Design

POWE ARCHITECTS

ARCHITECTURE

5.5.1 Project Profiles 5.5.2 Design criteria 5.5.3 Project brief 5.5.4 Relevant Authorities 5.5.5 Conflicts or Omissions 5.5.6 Briefing secondary consultants 5.5.7 Consultant engagement 5.5.8 Project Files 5.5.9 Design program 5.5.10 Design review 5.5.11 Project document control 5.5.12 Issuing Documents

Thursday, 2 July 2009

5.5.13 Received documents 5.5.14 Records 5.5.15 Practice Management System improvement 5.5.16 Co-ordination 5.5.17 Client Review 5.5.18 Schematic Design 5.5.19 Incomplete documents 5.5.20 Design review 5.5.21 Changes to the project brief 5.5.22 Design changes 5.5.23 Client Approval 5.5.24 Project audits

MASTERPLANNING

DESIGN


5.6.

Project procedures – Documentation

POWE ARCHITECTS

ARCHITECTURE

5.6.1 Document planning 5.6.2 Changes to the project brief 5.6.3 Client Approval 5.6.4 Client supplied information 5.6.5 Document criteria 5.6.6 Relevant Authorises 5.6.7 Conflicts or Omissions 5.6.8 Secondary consultants 5.6.9 Consultant engagement 5.6.10 Documentation 5.6.11 Documentation requirements 5.6.12 Documentation program 5.6.13 Draft Documentation review 5.6.14 Design review 5.6.15 Project document control

Thursday, 2 July 2009

MASTERPLANNING

5.6.16 Issuing documents 5.6.17 Received Documents 5.6.18 Records 5.6.19 Practice Management System improvement 5.6.20 Document control 5.6.21 Drawing Issue – For Approval 5.6.22 Drawing Issue – Revised drawings 5.6.23 Incomplete documents 5.6.24 Co-ordination of Consultant‟s documentation 5.6.25 Client Review 5.6.26 Documentation review 5.6.27 Design verification 5.6.28 Client approval to tender 5.6.29 Project audits

DESIGN


5.7. Project procedures – Tendering

POWE ARCHITECTS

ARCHITECTURE

Refer back to “5.3.3 Project Procurement Method” is tendering part of the agreed brief? application may be modified by the TL

5.7.1 Tendering 5.7.2 Tender Documents 5.7.3 Document control 5.7.4 Tender Issue 5.7.5 Inquiries 5.7.6 Correcting errors and omissions 5.7.7 Closing tenders 5.7.8 Tender assessment 5.7.9 Records 5.7.10 Project audit

Thursday, 2 July 2009

MASTERPLANNING

DESIGN


5.8.

Project procedures - Contract Administration

POWE ARCHITECTS

ARCHITECTURE

MASTERPLANNING

Refer back to “5.3.3 Project Procurement Method” are construction stage services part of the agreed brief? application may be modified by the TL

5.8.1 Contract administration 5.8.2 Architect duties 5.8.3 Office set of drawings 5.8.4 Project document control 5.8.5 Drawing issue – For Approval / Construction 5.8.6 Drawing issue – Revised Drawings 5.8.7 Issuing Documents 5.8.8 Defects inspections 5.8.9 Certificate of Practical Completion

Thursday, 2 July 2009

5.8.10 Design validation – Final inspection 5.8.11 Final certificate 5.8.12 „As built‟ drawings 5.8.13 Identifying errors and omissions 5.8.14 Correcting errors and omissions 5.8.15 Monitoring errors and omissions 5.8.16 Project register of errors and omissions 5.8.17 Records 5.8.18 Project audit

DESIGN


6.0, 7.0 & 8.0

CHECKLISTS & PROFORMA

POWE ARCHITECTS

ARCHITECTURE

System structure Office Systems Manual Procedures Project Profiles Checklists & Proforma Project Non-Project

Thursday, 2 July 2009

MASTERPLANNING

DESIGN


6.0, 7.0 & 8.0

CHECKLISTS & PROFORMA

POWE ARCHITECTS

ARCHITECTURE

6.0 PROJECT CHECKLISTS

7.0 PROJECT PROFORMA

6.1 - Selection of project resources 6.2 - Review of Client / Architect Agreement 6.3 - Design/Documentation criteria 6.4 - Design/Documentation criteria Relevant authorities 6.5 - Schematic Design & Documentation 6.6 - Design/Documentation review 6.7 - Design/Documentation Verification 6.8 - Changes in the scope of services 6.9 – Documentation drawings

Thursday, 2 July 2009

MASTERPLANNING

DESIGN

8.0 NON-PROJECT PROFORMA

07-01 Project Profile 07-02 Document transmittal Template 07-03 Contract Architect's instruction 07-04 Contract Evidence of Insurance 07-05 Contract Progress Certificate 07-06 Contract PA Contract Price Adjustment 07-07 Contract Adjustment of time 07-08 Contract Practical Completion 07-09 Defects Notice 07-10 Project Register of Errors & Omissions 07-11 Addenda Acknowledgement 07-12 Document Control Stamps

08-01 PA Cover Letter template 08-02 File Note Template 08-03 Time sheets 08-04 Meeting Minutes 08-05 Expense claim form 08-06 Consultant Services Invoice template 08-07 Consultant Database 08-08 Client Database 08-09 Builder Database 08-10 Practice Register of Errors & Omissions


9.0

INSTRUCTION MANUALS & INDEXES

POWE ARCHITECTS

ARCHITECTURE

9.1 Master Filing Index 9.2 Product Catalogue Index 9.3 Document Numbering Manual 9.4 ArchiCAD Instruction Manual 9.5 Maintenance Manual and Records 9.6 Meeting minutes Instructions

Thursday, 2 July 2009

MASTERPLANNING

DESIGN


10.0

EMPLOYMENT AGREEMENT & POLICIES

POWE ARCHITECTS

ARCHITECTURE

10.1 Overview 10.2 The Position 10.3 Probationary Period 10.4 Termination of employment 10.5 Salary package details 10.6 Review 10.7 Working hours 10.8 Overtime 10.9 Holidays, leave, sick leave, bereavement leave, etc. 10.10 Office procedure 10.11 Allowances 10.12 Occupational Health & Safety

Thursday, 2 July 2009

MASTERPLANNING

10.13 Appropriate Workplace Behaviour 10.14 Standard of Dress 10.15 Outside or Alternative Employment 10.16 Quality Assurance 10.17 Non-Solicitation 10.18 Computer Software/Property 10.19 Intellectual Property 10.20 Drafting equipment and special clothing 10.21 Spare time Practice (private jobs) 10.22 Use of office project material 10.23 Variations to the Agreement

DESIGN


11.0

INTERNAL AUDIT CHECKLISTS

POWE ARCHITECTS

ARCHITECTURE

Currently under development for use in Internal Audits

Thursday, 2 July 2009

MASTERPLANNING

DESIGN


CONCLUSION

POWE ARCHITECTS

ARCHITECTURE

Thursday, 2 July 2009

MASTERPLANNING

DESIGN


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.