ARCHITECTURE PORTFOLIO UNDERGRADUATE SELECTED WORKS | 2017-22
PRANAV ASHISH CHAUBAL I am Pranav Ashish Chaubal, I recently completed my graduation from Rachana Sansad’s Academy of Architecture. Architecture, in my opinion, is something that develops an intangible relationship with people by generating experiences that affect users’ lifestyles on a variety of scales while simultaneously changing its context in a variety of ways. This portfolio is a curation of works over the past five years. Working on these academic and extracurricular initiatives has helped me to hone various individual and teamwork skills. I want to contribute my skill set, grow it, and continue to learn.
EDUCATION 2017 - 2022
Rachana Sansad’s Academy of Architecture (Aided), Mumbai. C.G.P.I (Sem IX)- 8.66
2015 - 2017
S.S. & L.S. Patkar College of Arts and Science, Goregaon(w),Mumbai. H.S.C - 89.08%
2003 - 2015
Dr.Sarvepalli Radhakrishnan Vidyalaya ,Malad(w),Mumbai. S.S.C - 94.20%
PERSONAL INFORMATION G-8 / 14, Jankalyan CHS, Bangur Nagar, Goregaon(w), Mumbai - 400104.
+91 9820988227 English Hindi Marathi
3rd December 1999.
@pranavchaubal
pranavc17@aoamumbai.in pranavchaubal1999@gmail.com
Pranav Chaubal
SKILL SET
2
Autodesk AutoCAD
Google Sketchup
Vectorworks
Adobe Photoshop
Rhinocerous 3d
Microsoft office
Adobe Indesign
Chaos Vray
Sketching
Adobe Illustrator
Twinmotion
Model Making
PROFESSIONAL EXPERIENCE SJK Architects, Colaba, Mumbai
Dec '20 - May '21
Experienced in making GFC drawings, developing and resolving architectural details, presentation drawings, BOQ, coordinating with consultants and vendors when requisite, 3d modelling, being involved in the execution phase of two residential projects. •
Family Home - Nagpur, Maharashtra.
•
Courtyard House - Latur Maharashtra.
ACHIEVEMENTS AND EXTRA CURRICULUM COMPETITIONS NASA :
Louis I. Kahn trophy (2017-18) Documentation of Cooch Behar, West Bengal
Volume Zero :
Aquatecture (2018)
INSDAG:
International Cricket Stadium design in steel (2019-20) Shortlisted -(Top16 Nationals)
AAD Competition :
Sai Baba Temple Design (2020)
D.Y.Patil School of Architecture:
International Students Conference - Research in Architecture (2022) Research paper selected for publication
DOCUMENTATIONS WTV 7.0 :
Windows to vernacular - Documentation of Saur Village, Uttarakhand. (2019)
Study Tour : (First year)
Raghurajpur, Orissa (2017) Documentation of the Artist village of Raghurajpur.
Study Tour : (Second year)
Panchavati, Nashik (2019) Documentation of the Heritage precinct of Panchavati.
INSTALLATIONS Kala Ghoda Arts Festival :
Visual Arts Installation (2018-19) Theme - A measure of time.
Bombay Stock Exhcange :
Branding of the Event (2019) make the installation.)
Theme - Water Conservation (Reusing of waste plastic bottles to
WORKSHOPS CTBUH :
Tropical Highrise workshop (2020)
Illustrator workshop :
Adobe Illustrator workshop - By Ar. Mirza Kashif @themis_ill (2022)
ORGANISATION Student Council 2019-20 , 2021-22 :
DAC (Design Architecture Committee) Head Exhibition curation, Conducting workshops, Competitions guidance, Social Media Handling. All carried out in offline and online mediums.
3
EXPERIENCE CERTIFICATE
Date: 14.06.2021 Whomsoever it may concern Pranav Chaubal has worked with us at SJK as a trainee from 7th Dec’20 to 15th May ’21. During this period, he has worked on: Project 01: Family Home at Nagpur Assisted in updation of GFC Sections and Elevations. Interior layout options for a Guest Bedroom. Assisted in preparation and updation of GFCs for Beam Alignment Drawings, Civil Masonry Drawings for multiple levels. Assisted in preparation of ID presentation drawings for client meeting. Assisted in revising Jali drawings & in preparation of BOQ. Revising Staircase drawings. 3D modelling options for Jalis, Staircase, Courtyard posts, Door handles. Market survey for Door handles. Resolution of Roof by trying sectional options and coordination with consultants and roof vendors. Assisted in lighting layout options by updating and preparing RCP’s. Developing construction detail options for niches. Project 02: Courtyard House in Latur Assisted in updation of Plinth Beam GFC drawings for Master and Guest blocks. Assisted in preparation of Plinth Beam GFC drawings for Office, Entertainment, Dining blocks and Back of house area. Coordinating with kitchen vendor and collation of information. Preparation of presentation drawings for kitchen finish options. Assisted in preparation of Column Alignment GFC drawings for all blocks. Revising GFC details for Master & Guest Block. Assisted in preparation GFC details for Office Block and Back of House area. Assisted in updation of Site lineout drawing and Block Lineout drawing. We wish him the very best in all his future endeavours.
Shimul Digitally signed by Shimul Javeri Javeri Kadri Date: 2021.06.14 Kadri 11:59:59 +05'30'
Shimul Javeri Kadri Principal Architect – SJK Architects. Architect & Urban Planner (M.U.P –University of Michigan, Ann Arbor. COA # CA/86/9702 302/303, VEENA KILLEDAR INDUSTRIAL ESTATE, 10-14 PAIS STREET, BYCULLA(W), MUMBAI - 400 011 TEL:(91-22) 23008761/66, 23020467/0864 FAX: (91-22) 23090983 E-MAIL: design@sjkarchitect.com WEBSITE: www.sjkarchitect.com
4
LIST OF WORKS
1. FAMILY HOME AT NAGPUR
2. COURTYARD HOUSE
WORKING DRAWINGS
WORKING DRAWINGS
W.D. DETAILS
•
• • • • •
• • • • • • •
SECTIONS STAIRCASE JAALI BEAM ALLIGNMENT PLANS CIVIL MASONRY PLANS
SECTIONAL DETAILS STAIRCASE DOORS JAALI RAILINGS BEAM ALLIGNMENT DETAILS MASONRY DETAILS
• • • •
SETTING OUT PLAN BLOCK LINEOUT PLAN PLINTH BEAM ALLIGNMENT PLANS COLUMN ALLIGNMENT PLANS
W.D. DETAILS
PLINTH BEAM ALLIGNMENT DETAILS
PRESENTATION DRAWINGS •
INTERIOR FOR KITCHEN
PRESENTATION DRAWINGS •
INTERIOR FOR TOILET
MARKET SURVEY • •
DOOR HANDLES ROOFING
3D MODELLING • • • •
DOOR HANDLES JAALI TIMBER POSTS STEEL COLUMNS
B.O.Q. • •
JAALI RAILINGS
CONCEPTUAL SKETCHING •
NICHE CONSTRUCTION DETAILS
R.C.P. DRAWINGS Signature of Architect
5
6
CONTENTS 01
The Waste RE-Factory
08
02
Skill Development Centre
32
03
Celebration and business functions hub
42
04
Street Design - Recreational Cohesion
50
05
Technical Drawings
56
06
Family Home at Nagpur
60
07
Courtyard House
66
08
Louis I. Kahn Trophy
70
09
Windows to Vernacular
72
10
Kala Ghoda Arts Festival
74
11
Cricket Stadium Design in Steel (INSDAG)
76
12
Sai Baba Temple Design
82
Design Dissertation | Semester 10
Architectural Design | Semester 6
Architectural Design | Semester 5
Urban Design | Semester 7
Working drawings | Semester 6
Professional Practice | Semester 8 | SJK Architects
Professional Practice | Semester 8 | SJK Architects
Documentation | Competition - NASA (2017 - 18)
Documentation (2019)
Installation | Competition - Visual Arts (2018 - 19)
Competition - INSDAG (2019 - 20) Shortlisted TOP 16
Competition - AAD Competitions (2020)
7
01
THE WASTE RE-FACTORY -Decentralising waste mechanisms of Mumbai city
Design Dissertation | Semester 10
Thesis Guide - Ar. Prof. Snehal Gaikwad Structure Guide - Ar. Hardik Dedhia Site - Pramod Mahajan Park, Dadar , Mumbai The dissertation research looked into the existing linear model of consumption as well as the workings of Mumbai’s centralised waste disposal system. As a result, these systems have been questioned, their implications assessed, and potentially viable techniques devised to address the concerns. The project attempts to decentralise and fragment the waste mechanism of Mumbai. The project’s purpose is to intervene at a smaller scale to address the larger issue of waste, concentrating on a neighborhood-level intervention that attempts to address the current linear consumption module. By bridging the gap between the public and small-scale semi-industrial firms, this project intends to highlight the importance of segregation at the source by turning waste disposal into a communal activity. This hybrid typology serves as a bridge between the circular model of consumption and the concept of offering a platform for consumers to engage with newer items that are manufactured from their old ones by creating a forum for them to engage with the recycled items . The concept is based on the fundamental notions of optimizing physical and visual connectivity through scale, therefore using architecture as a social messenger to raise awareness, and structurally addressing the concerns by focusing on design for disassembly principles.
8
Waste mechanisms in the city of Mumbai Insight into public infrastructure India currently has inadequate systems of public transport, housing, waste management, and access to public health and sanitation. ‘Public Infrastructure are the basic physical and organizational structures and facilities needed for the operation of a society or enterprise.’ google dictionary Fig 1. infrastructure classification (Source: Author)
Paradigm shift in public infrastructure
Fig 2. Public infrastructure -Aqueducts (Source: Author)
Fig 3. Public infrastructure -Municipal Asphalt Plant (Source: Author)
Historically, infrastructure was symbol of societal progress and were associated with technological advancement and magnificent beauty. The definition of this development in the contemporary context of fast urbanization, industrialisation, and subsequent environmental deterioration is looking into including public wellbeing in the process and understanding the need for adequate public spaces as a part of the urban infrastructure. Infrastructure has been a realm where architects have not intervened much. The role of an architect in industrial or infrastructural projects remains minor or non-existent.
The current centralised waste mechanism Primary Collection and transportation Door to Door collection through hand cart. Small covered vehicles pick this up from fixed locations
Secondary Collection and transportation Segregated waste goes to dry waste collection centres for further sorting
Transfer Station to Processing site transportation
Mulund Dumping ground
Kanjurmarg Dumping ground Fig 5. Mulund dumping ground 2000 (Source: Author)
Deonar Dumping ground
Sorting Compaction Material recovery compaction
Disposal Site Residue from the plant. The direct mixed waste brought in by the garbage trucks
Fig 4. The current centralised waste mechanism of Mumbai city (Source: Author)
Fig 6. Mulund dumping ground encroachment(Source: Author)
The processing of waste has been a majorly linear system because waste has been looked at as an end result and not as a resource. In Mumbai, the garbage disposal centers (landfills) are located in Deonar, Kanjurmarg, and Mulund, all of which are located on the city’s eastern outskirts. This demonstrates how these centers are cut off from any human connectivity, whether physical or visual, rendering them virtually invisible to the rest of the city. In the current process maximum amount of waste ends up in a landfill. These landfills are loacted at the city’s fringes. Transportation of large quantities of waste accounts for spending a large amount of money. which in turn creates havoc for the people near these landfills and simultaneously causing environemntal degradation. One of the major issues of such large scale transportation activity is that it becomes difficult yo sort out waste at larger scales, hence source segregation is the most prefered way of dealing with waste.
Fig 7. The waste cycle (Source: Precious Plastic)
10
Fig 8. The waste treatment hierarchy (Source:GOI swacch Bharat mission manual)
Proposal of a decentralised module WARD -P/N Area in sqm. - 1645
Rather than collecting large amounts of unsegregated waste, then transporting them and later segregating, it should be dealt at a smaller scale. These treated and segregated waste can be used as a resource or raw material by companies or small scale industries which operate on prinicples to maximise the reuse of materials. This would look at the model of a circular economy where the concept of waste is eliminated and it is used as a resource.
WARD -P/S Area in sqm. - 60 WARD -P/S Area in sqm. - 100 WARD -K/W Area in sqm. - 200
The waste that is collected does not directly go to the landfill but it is transported to other facilities before it is finally taken to the landfill . The collected dry waste is taken to the Dry waste segregation centres (DWSC) where the dry waste is sorted out and sent for further processing to the respective units.
WARD -K/W Area in sqm. - 140 WARD -K/W Area in sqm. - 200 WARD - K/E Area in sqm. - 581
Only the segregated dry waste is brought to these interventions. The dry waste mixed with the wet waste is either directly taken to the landfills or is brought to the Refuse transfer stations (RTSs).
WARD -H/E Area in sqm. - 120
WARD -H/W Area in sqm. - 800 WARD -G/S Area in sqm. - 75
There are a total of 46 DWSCs minimum one per ward and 3 RTSs located at Mahalaxmi, Versova and Kurla. These DWSCs are either operated directly by MCGM or leased out to NGOs. DWSCs with contrasting contexts where one is secluded and cutoff from daily commute paths, whereas the other is highly accessible. Thus assessing the impact it has on the awareness of the people in its context.
WARD -G/S Area in sqm. - 40 WARD - F/S Area in sqm. - 15 WARD - E Area in sqm. - 25 WARD - D Area in sqm. - 81 WARD - B Area in sqm. - 39 WARD - A Area in sqm. - 4849
Fig 10. A possible Decentralised System (Source: Author)
Fig 9. Dry Waste Segregation Centres in Mumbai (Source: Author)
The case of existing waste segments There is a lack of knowledge that these segments exist within the urban fabric. These even though existing within the city have been placed in a way that there is minimum visual and physcial transaction between these spaces and the general public.Thus an attempt was made to study these existing segments with respect to their context. Selecting two DWSCs with contrasting contexts where one is secluded and cutoff from daily commute paths, whereas the other is highly accessible. Thus assessing the impact it has on the awareness of the people in its context. DWSC of P/S ward
Location - Goregaon(W), Under Veer Savarkar Flyover Stakeholders - MCGM No of waste collectors associated - 5 Site Area - 100sqm. Daily Waste intake - 3400kg ap.
Fig 11. Goregaon west (P/S ward) DWSC location (Source: Author)
Fig 12. Goregaon west (P/S ward) DWSC approach (Source: Author)
Fig 13. Visual connectivity (Source: Author)
Fig 14. The trash in context (Source: Author)
DWSC of E ward
Location - Near Mahalaxmi racecourse Stakeholders - Stree mukti Sangathna No of waste collectors associated - 6 Site Area - 100sqm. Daily Waste intake - 1020kg ap.
Fig 15. Mahalxmi (E ward) DWSC location (Source: Author)
Fig 17. Wall as a visual informer (Source: Author)
Fig 16. Mahalxmi (E ward) DWSC approach (Source: Author)
Fig 18. Informative elements (Source: Author)
The P-ward DWSC is physically secluded and visually disconnected from the daily life of people. The E-ward DWSC , which is more public in nature , establishes its presence both phycisally and psychologically contact with the locals on a daily basis. Hence higher rates of segregationa as high as 30% more than usual were recorded by the Mahalaxmi DWSC. 11
About the site
Pramod Mahajan Park is located in G/N ward, Dadar west near the Dadar wholesale flower market. It is located in a locale of very high influence with major landmarks around the site like the Dadar flower market, Manish market, a busy residential and mixed typology. The site is much more accessible to the pedestrians now due to the current street project that is transforming streets along the Senapati Bapat marg. The edges correspond to completely different setups, allowing the site to visually interact with both edges thus making it possible to send across the message the intervention tries to convey through the project.
N
Fo o t o v e r bridge
informal back entry SWD
Department building
Manish market (cloth market) Dadar Flower market
1. SITE AND CONTEXT ENTRY POINTS
STP Electric substation
Main nursery canopy Redundant strcutures
3. BUILT FORM USAGE 12
2. IMMEDIATE CONTEXT AND BUILT FABRIC
4. SITE PROFILE OVERLAYING ALL FACTORS
Programme
Waste generation Collect and transport
The stimulation of the basic idea for the programme is to move away from the current linear and open ended system of consumption to a more circular and closed loop system.
Lesser generation of waste
Waste generation
Collect and transport
Reusing
Segregation at source
Collection center
Reduction at source
Sort and transport Generating public awareness
Collection
Transfer station Unrecyclable/ Inert waste
Recyclable waste Recycling center
Landfill Unrecyclabl e residue
Current centralised system
Recycling center
Transport to neighborhood facility
Treated and processed waste
Material based research
For newer materials
Partially to research Sorting/ Processing
Within the facility
Majority to new
Proposed DEcentralised system Lesser generation of waste
Waste generation
Collect and transport
Reusing
Segregation at source
Reduction at source
Generating public awareness
Collection
Transport to neighborhood facility
Material based research
For newer materials
Partially to research Sorting/ Processing
Within the facility
Majority to new
Proposed DEcentralised system
49.90%
PROGRAMME INTENTS
Engage
PROGRAMMES
5.90%
32.40%
21477kg/month
Educate
Empower
Community/ Public Interface
The Market interface
Public square / Community gathering space
The RE-market
The park interrvention interface
3020kg/month
Encourage
Revenue generator
Support
Management
Innovation
The Life of Discard
Co-creative spaces
Collection spaces
MCGM/ALM workspaces
Material Exploration spaces
Sorting spaces
NGO workspaces
Exhibition space
15%
Active street intervention interface
11.80%
2079kg/month
12263kg/month
25%
The RE-makery (recycling spaces)
Canteen
5%
The UP-cyclery – Upcycling pacees
Zero waste Cafe
35%
15%
GOVERNING STRATEGIES ACTORS IN THE NETWORK
Celebratory Consumers
Recreation and exchange Rag pickers
Market vendors
Fun
Socially interactive machine NGOs
Designers
Design for behavioural change Artists
ALM
MCGM Officials
13
Design Massing and Evolution
1. RETAINING THE EXISTING STRUCTURES
2. CENTRAL SPINE REDIRECTING PEDESTRIAN FLOW
3. DEMARKATING PUBLIC AREAS WRT ACTIVITY MAPPING
4. ALLOCATING BASIC ZONING AND MASSING
5. DEFINING PUBLIC, SERVICE ENTRY POINTS AND ESTABLISHING PARKING ZONE WITH VEHICULAR CIRCULATION
6. STRUCTURAL EXPRESSIONISM AS THE KEY FACTOR OF DESIGN TO DEFINE THE ARCHITECTURAL LANGUAGE
LEGEND
14
RE-Makery Plastic
UP-Cyclery
Office spaces
RE-Makery Fabric
WaREhouse
Cafe
RE-Makery Paper
RE-Market
RE-factory Zoning
Journey of a discard in RE-Factory waREhouse UP-cyclery RE-makery RE-market
The journey of discard in the RE-factory is circular in nature as it enters the site and leaves it as a completely different prospect than how it had been recieved and will again enter the RE-factory as something else. This is symbolic of how a circular economy works where the material is reused into some thing new thus reducing the need for virgin materials
LEGEND Plastic Fabric Paper Glass 15
Axonometric The south side thus houses the solar panels contributing to fulfilling the energy requirements of the RE-factory
This retained structure opens up to the public creating a sense of empowerment due to its large volume.
16
A central courtyard houses the vertical transportation while simultaneously segregating the public and private accesss
Y-columns are used to allow for larger spans, these angular members continue to house the north light truss thus creating a structural harmony.
The portal frames creat for the daily commuters a framework to the tran produce of the RE-makery
The steel framework of the market space attempts to continuing the language of the portal frames on a smaller scale
Continuing the language of the portal frames into the waREhouse
te an alternate public passage simultaneously also serving as nsportation mechanism for the y and UP-cyclery
17
Components of the Waste RE-Factory Collection Atrium - Collectarium The collectarium creates an intriguing public interface with colour as an element to draw attention and better corelate by using colour coding on a large scale. This is a large volume space generating an empowering feeling for the disposer.
Street Interface to RE-Factory
The Collection Atrium appeals to the public with its large scale and vibrant colours
18
The sorting Pit
The sorting pit owing to the colle sorted material based on the ba disposal. Coming through the sorting pipes element of design. The large area o for the sorting to be more efficient a
ectarium gets 1st level asic categorization of
s which also form an of the pit further allows and quick.
The discard conveyor The conveyor belts transport this 2 level of sorted discard into the upper spaces of RE-makery and UP-cyclery . These also create framed pathway leading into the site
19
Components of the Waste RE-Factory
The Cart The cart carries 4 boxes at one time on the rails suspended from the portal frames.
Entrance to the RE-Factory
The Portals create a welcoming gesture intriguing the commuters by the carts overhead
20
The Transcart spine The portal frames of the spine act as a support system to transport the storage carts from the RE-Makery and UP-cyclery spaces to the waREhouse. These also create a passageway for the people that are transitioning across the site trough the central pathway.
21
Ground Level Plan
0
Collectarium
Sorting Pit
Level 1 Basic sorting done at source by materiality
5 10
20
N
50
Public Square
Level 2 Sorting of the deposited discard
As a transition function to existing park
1 2 3
4
5 6 7
8 10 9 10
Public - RE-factory interface
11 12 24 25
Th et
ran
26 28
32
33
27
22
30
sp ort
13
14
29 31
16
17
20 15
Public square extension
As an extended area for public activities and pause point in the transportation spine
RE-Market
A platform that allows the repurposed goods to be reutilised
22
ine
23
34
Cafe and other functions
sp
21
19 18
37
36
35
Storage waREhouse and ancillary functions Pumproom Biogas Flower waste and UGT plant recycling workshop
Public square view
The public entry along the spine is highlighted by the scissor staircase, glass lifts and the emerging of cart tracks.
LEGEND A. Collectorium
1. The entry 2. Weighing and scaling 3. Deposition and collection
B. Sorting Pit
4. Unloading zone 5. Sorting space 6. Loading Zone
C. Public Square
7. Park connector 8. Bicycle shredder 9. Event space 10. Public access to UP-cyclery 11. Staff and personell access 12. Public access stair and elevator
D. RE-Market
13. Transport spine frontage shops 14. Internal shops 15. Garment Retail shops 16. Exhibition space 17. Central courtyard 18. Trial rooms 19. Toilets 20. waREhouse access 21. Parking
E. Public Square Extention 22. Open space 23. Stepped seating
F. Cafe and Commercial functions 24. Existing toilets 25. Emergency room 26. Cafe reception 27. Open seating 28. Covered seating 29. Stepped seating 30. Food counter 31. Kitchen prep area 32. Storage 33. Loading/ Unloading 34. Office Entry lobby
G. Storage waREhouse 35. Admin area 36. Assembly area 37. Toilets
23
First Level Plan
0
Collectarium
20
50
The sorted materials come into the RE-Makery spaces via the conveyor belts from the sorting pit
Level 2 Sorting of the deposited discard
1
UP-Cyclery
2
Products that can be upcycled are identified in the sorting pit and sent up for upcycling
3 5
4 1
6 2
7 8
3
1 1 5
2
6
4 3
7
8 8 7
9
2 10
Public - RE-factory interface
11
6 4
5 3
Th et
ran
sp ort
sp
ine
11
Cafe and other functions
9 10
Public square extension
As an extended area for public activities and pause point in the transportation spine
RE-Market
A platform that allows the repurposed goods to be reutilised
24
N
RE-Makery
Sorting Pit
Level 1 Basic sorting done at source by materiality
5 10
12
Storage waREhouse and ancillary functions
RE-market exhibition space
The recycled goods appeal to the people passing by through the large display space of the RE-market
LEGEND A. Collectorium B. Sorting Pit C. RE-Makery Plastic
1. Recieve and wash 2. Colour and type storage 3. Shredding workspace 4. Shredded material storage as space seperator 5. Shredded material storage as facade element 6. Injection, extrusion and sheetpressing space 7. Assembly 8. Designer workspace
Fabric
1. Recieve and wash 2. Sewing Cutting 3. Garment to Garment Recycing
Paper
1. Recieve 2. Shredding 3. Pulping 4. Sheetmaking 5. Fabric mixing 6. Sheetpressing 7. Sheet straightner 8. Sheetcutting 9. Co-creating setup 10. Printing 11. Designer workspace
E. Storage waREhouse
9. Cart recieving platform 10. Vertical object trasporter 11. Staff common breakout space 12. Storage space
F. RE-Market G. Public square extension H. Cafe and commercial functions
D. UP-Cyclery
1. Plastic upcycling 2. Fabric upcycling 3. Paper upcycling 4. Glass upcycling 5. Produce storage 6. Cart departure bay 7. Stepped seating 8. 3D printing, laser cutting workshop 25
Street Elevation
0
5
10
20
Collectorium Sorting-pit RE-Makery UP-Cyclery
Park Elevation
0
5
10
UP-Cyclery
26
Transport spine
20
RE-Makery
t
13.05m
9.9m
5.4m
GL
Cafe Offices RE-Market waREhouse
13.05m
8.4m 6.9m
0.9m
Sorting Pit
Collectorium
27
Section AA’
0
5
10
20
13.05m 9.9m
5.4m
GL
Collectorium frontage
Section BB’
0
Collectorium
2
5
Sorting Pit
10
13.05m
8.4m
5.4m
GL
Parking Lot
28
RE-Market entry
The Courtyard
RE-Market Exhibitio
on
RE-Makery
Shop frontage
The Courtyard
Transport Spine
UP-Cyclery
UP-Cyclery
29
Suspended Staircase Details
The Staircases are suspended to achieve a minimum footprint on the ground thus reducing the demolition debris and aligning with the idea for design to disassembly
A
Detail- Suspended staircase isometric
RE-Makery Structural Anatomy
Y-columns are used to allow for larger spans, these angular members continue to house the north light truss thus creating a structural harmony. 30
A Detail- RE-makery Structural isometric
2000
2000
20mm dia. tension rod to hold staircase by pin joints Pin joint connecting midlanding beam to intermediat trusses by tension rod. Intermediate trusses of 100x150mm at 2m c/c for recieving suspended staircase via pin joint. 50mm thk plate to recieve the pin joint connected to midlanding beam M.S. pin joint connecting midlanding beam to column 250x350mm builtup sections angular beam.
the
M.S.box
Intermediate I-section as stringer beam and seperator 200mm deep channel section as stringer beam for staircase suspensed to the truss Y Columns with 400x300mm trunk and 250x300 branches mm builtup by using M.S. box sections connected to foundation via pin joint
Detail @A- Suspended staircase Solar panels on the south sloping roofside, covering an area of 3900sq.m. generating 2670m kwh/ day. 3m deep north light truss with 10mm thick high performance glass with a low ‘E’ value. 75x125 mm box section purlins to support the solar panels. 100x150mm M.S. box sections in warren truss style arrangement with 4m c/c on either slopes of the roof 600mm wide fins of recycled palstic sheer with aluminium framework at 600mm c/c on east facade acting as a shading device Sliding windows above 1200mm for allowing controlled natural ventillation . 1200mm high fixed glass in association with the plastic shredding storage as a facade element 200x1000mm warren truss spanning 22m connected to columns via pin joints 400X300mm builtup sections beam.
M.S.box
Y Columns with 400x300mm trunk and 250x300 branches mm builtup by using M.S. box sections connected to foundation via pin joint
Detail @A- RE-makery 31
02 Skill Development Centre Architectural Design | Semester 6
Guide - Ar. Mahesh Nilakh Site - Jodhpur, Rajasthan The Skill Development centre aims to produce skilled, self-supporting professionals contributing to national progress with individual expertise. This centre intends to promote ‘Gandhian Principles’ , advocate it further at various national and international levels for it to spread into the world order. Thus when designing this sensitive and intensive piece of architecture, the challenge was to understand the direct and indirect attributes of Gandhian philosophy and their relevance in the current scenario. Then acknowledging these attributes by balancing them in the architecture presented.
32
SITE AND SITE CONTEXT
GANDHIAN PHILOSOPHY
The site is located in Jodhpur,Rajasthan. It is along National Highway in vicinity with other centres of learning. Some of the centres along the highway are IIT Jodhpur, NIFT Jodhpur. There is a stone crusher and numerous brick kilns within 2km radius.
One of the main agendas of this institution related to Gandhian principles is to promote one’s skills, producing self -supporting professionals, who contribute to the national progress. Understanding the direct and indirect attributes of Gandhian Philosophy and its relevance in the current scenario and balancing of these attributes in the architectural sense. POROSITY
SELF RELIANCE
Visual and physical connectivity
Material within close vicinity
TRANSPERENCY
SUSTAINABILITY
True nature of materials
Passive colling techniques
Source - Google Maps
1. CREATING A FOCAL POINT
2. SEGREGATION OF PUBLIC AND PRIVATE FUNCTIONS
PR I
P P
PR
34
P
3. CREATING ALLEYS FOR WIND PASSAGE AND FURTHER SEGREGATION
4. ZONING OF PUBLIC (P), INSTITUTION (I) AND PRIVATE (PR) FUNCTIONS
5. ESTABLISHING INTERNAL CONNECTIVITY
6. FINAL FORM- FLUID NATURE OF PUBLIC STRUCTURED NATURE OF PRIVATE
A
22 19 23
12
18 16
10 9 11
8
15
17
7 14 21
1 5 6
4
3
2
13 20
N
Ground Level Plan Cut@3.00
0
5
10
15
A’
25m
N A
LEGEND PUBLIC ZONE 1.Entrance Foyer 2.Reception 3.Back Office 4.Common Toilet 5.Conference Room 6.Library 7.Exhibtion Space 8.Amphitheatre 9.Cafeteria 10.Auditorium 11.Museum 12.Auditorium drop-off
INSTITUTION ZONE 13.Institute Entry 14.Public Avenue 15.Gem Art 16.Jewellery Making 17.Dance zone 18.E-Commerce 19.Culinary Arts
ACCOMODATIONS
20.Boys accomodation 21.Girls accomodartion 22.Dean accomodation 23.Faculty accomodation
Roof Plan
A’
35
Sectional Perspectives
Entrance to In
Central Op 36
nstitute Zone
pen Space 37
180MM THK 3 LAYERED BRICK TILE VAULT (EACH LAYER BRICKS 40MM PERPENDICULAR TO ADJACENT)
THK
CURVED ROOF USING RADIANT COOLING TECHNOLOGY.
(EXTERNAL CONVEX SCATTERS HEAT. INTERNAL CONCAVE HELPS CONCENTRATE THE COOLING.)
100MM THK HOLLOW BRICK LAYER ALLOWS RADIANT COOLING PIPES TO PASS THROUGH 900MM CHAJJA PROTECTS UPPER WINDOWS FROM SUNLIGHT ALSO ACTS AS A GUTTER
PIVOT WINDOWS AT TOP FOR VENTILLATION TRAPEZOIDAL RCC FINS SHADE THE BIGGER WINDOWS.
SUPPORT THE CHAJJA EFFECTIVELY TAKING LOAD OF THE BRICK VAULTS
End Wall Detail (Climate response, Vault system-Beam Junction, Chajja and Gutter)
Section AA’ 38
180MM THK 3 LAYERED BRICK TILE VAULT
(EACH LAYER BRICKS 40MM THK , PERPENDICULAR TO ADJACENT)
CURVED ROOF USING RADIANT COOLING TECHNOLOGY.
(EXTERNAL CONVEX SCATTERS HEAT. INTERNAL CONCAVE HELPS CONCENTRATE THE COOLING.)
R.C.C. PEDESTAL RECIEVING THE CATALAN VAULTS
ANCHOR REBARS 16MM DIA
(TO ANCHOR BRICK REINFORCED VAULT INTO PEDESTAL.)
R.C.C. Pedestal Detail (Catalan vault Foundation Junction) Main Entry
+11.5m
+8.5m
+0.0m
39
Axonometric
R
BRICK REINFORCED ROOF THE INSTITUTE ZONE FOLLOWS A FORMAL LANGUAGE WITH STARK HORIZONTALS AND VERTICALS IN THE FORM OF TRAPEZOIDAL BEAMS AND COLUMNS. PUBLIC ZONE FOLLOWS A FLUID LANGUAGE DEFINED BY THE USAGE OF CATALAN VAULTS
G
FUNCTIONS CENTRAL PUBLIC AVENUE SEGRERATING THE PUBLIC AND PRIVATE FUNCTIONS. INSTITUTE FUNCTIONS IN CLOSE VICINITY TO PUBLIC AND PRIVATE FUNCTIONS.
PUBLIC FUNCTIONS NEAR THE MAIN ENTRY. ACCOMODATIONS AT THE FAR ENDS
40
41
03 Celebrations and Business Functions Hub Architectural Design | Semester 5
Guide - Ar. Mahesh Khanolkar Site - Queens Lawn, Borivali, Mumbai The project, intensive in its approach, with varied styles, themes, conceptions and planning ideas, demanded dynamic spaces filled with aura and elegance stimulating the right environment for ‘celebrating’ memories and moments. This was to be achieved by employing inspiration and spirit of architrectural style/ concept drawn out of the design language, features and overall reflections of a famous architects practice. It was expected that the project be approached in two stages Stage 1 : This stage demanded the study of the works of some of the famous architects and lasting influences of their innovative and individualistic architectural styles. Stage 2 : Designing the project incorporating the language of a selected architect and improvising on the philosophies while simultaneously planning and creating the same spirit as that of the studied architect.
42
SITE AND SITE CONTEXT Queens Lawn is located in Borivali,Mumbai. It is located along the linking road and is in vicinity to other resorts and banquet halls . It has Eskay Resorts to its north-west, Saffron Banquets to its north-east ,Rani Laxmibai Joggers Park to the east.
SELECTED ARCHITECT Ar. Charles Correa Studying the works of Sir Charles Correa , his ideology, design approach and principles were understood which became the source of inspiration for the concept of this Celebration space. Some elements from his ideology that were translated into this design are as follows COURTYARDS
HORIZONTALITY
For interaction
Using architectural elements for visual connectivity
GRID
LEVELS
Breaking the grid to create spaces
Using the dynamics of levels for interactions
Source - Google Maps
44
1. CONE OF VISION AFTER ENTERING THE SITE
2. ESTABLISHING AXIS BASED ON CONE OF VISION
3. GENERATING A GRID BASED ON THE VISION AXIS
4. ARTICULATION OF THE FUNCTIONS INTO THE GIRD
5. ALIGNING THE FIRST SMALL HALL TO THE AXIS OF ENTRY
6.VOLUMETRIC INCREASE ALONG THE AXIS OF VISION
B
1
12
A N 3
2
11
4
10
6
5
9 7 8
B' LEGEND
1.Main Entry 2.Small Hall drop-off 3.Small Hall 1 4.Small Hall 2 5.Fine Dine drop-off 6.Fine Dine 7.Medium, Large Hall drop-off 8.Medium, Large Hall Foyer 9.Ground Parking 10.Loading - Unloading 11.Central Kitchen 12.Back Office
Ground Level Plan Cut@3.00
A'
0
2
4
6
10m
45
B
A
N
8
6 5 7 1 2
4
B' 3
LEGEND
1.Medium, Large Hall drop-off 2.Common Lift lobby 3.Large Hall foyer 4.Large Hall 5.Medium Hall foyer 6.Medium Hall 7.Common Courtyard 8.Open space - Medium Hall
A'
First Level Plan Cut@3.00 46
0
2
4
6
10m
1
MEDIUM HALL (FOR 500) LARGE HALL (FOR 1000)
SKYLIGHTS
TO ENSURE LIGHT AND PROVIDE A LARGE VOLUME
G
SMALL HALLS (FOR 100-150) FINE DINE (FOR 150) BACK OFFICE
B
PARKING
Axonometric 47
Section AA’
Section BB’
48
+18.1 m +15.2 m +10.1 m
+ 4.1 m + 0.0 m
- 3.6 m
+17.6 m +13.6 m
+4.8 m
+0.0 m
-3.6 m
49
04 Street Design - Recreational Cohesion Urban Design | Semester 7
Guide - Ar. Shekoba Sanap Site - Bangur Nagar, Goregaon, Mumbai The goal was to understand and facilitate efficient pedestrian and vehicular movement while celebrating various interactions that take place on the street and preparing maps indicating the street network, figure and ground, building use, vehicular intensity and street infrastructure. The site chosen is a street in Bangur Nagar, Goregaon West. The low vehicular intensity of the street provides an opportunity for people to claim the public space for a multitude of activities such as cycling and jogging without being inconvenienced by vehicles. However, at the same time, by night, the lack of human activity creates a rather unsafe atmosphere. To cater to the above mentioned observations, the design proposes the following elements: Street Park: Transforming the street end into a park which could serve as a gathering space and recreational area. Jogging track and Seating spaces: Dedicating a zone for residents to jog ,walk and sit by segregating it from the vehicular movement. Parking Spaces: Considering the need of various user groups for parking on the street, a dedicated parking zone has been provided. Cycle track and Pedestrian Walkway: Segregating the vehicular traffic and creating a cycling loop for residents to cycle especially during evening and night hours. The overall objective of these elements is to activate the redundant and lesser used pockets of spaces on the street to serve the needs of the local residents. The idea is also to minimise any kerfuffle between pedestrians and vehicles. Infrastructural refinements such as raised pedestrian crossings, ramps, visual street dividers, curb bulbs and seating have also been introduced onto the street.
50
SITE -Bangur Nagar and Motilal Nagar, Goregaon (w), Mumbai
Street Selection
Selected Street
Initial Ideas
Allowing vehicular thoroughfare incorporating safety elements such as curb bulbs, raised pedestrian crossing
52
Increased pedestrian walkway width, Side seating spaces utilised by pedestrians, joggers.
1. PEDESTRIAN WALKWAYS- ensuring pedestrian safety 2. CYCLING LOOP - continuous cycling path that ensures cycler safety activited mainly in early morning and evening time. Connects to different parts of locality 3. JOGGING TRACK - Allowing for pedestrian thoroughfare and activating as a dedicated jogging,walking space in the evening for the residents. 4.PARKING SPACES - Relocation of the informal parking on the streets retaining its shade by trees on either sides. 5. STREET PARK - Treatment of the dead end of the streets by restriction of vehicular movement to allow for activites such as play , gatherings
Master Plan
C
A
B
STREET WIDTHS A - 18.3m B - 16.6m C - 15.6m D - 16.6m
D 53
Programme Overview
54
Street Park
Jogging track and seating
Transforming the street end into a park which could serve as a gathering space and recreational area.
Dedicating a zone for residents to jog ,walk and sit by segregating it from the vehicular movement.
Cycle track and pedestrian walkway
Parking spaces
Segregating the vehicular traffic and creating a cycing loop for residents to cycle especially during evening and night hours
Considering the need of various user groups for parking on the street, a dedicated parking zone has been provided.
10 9 12 3 4
10 11
12 6 78
Master Plan
5
Street Plan
9 11
1
2
34
1.5m 0.6m 3m 1m
Street 3d
12
10
5
Elements of Design Street Elements
1. 1.5m wide clear walkway 2. 0.6m wide frontage zone 3. 3m wide two way cycle track 4. 1m wide plantation segregating cycle and other vehicles. 5. 6m wide two way carraigeway 6. 2m wide parking zone 7. Bio-swales for SWD 8. 2.4m wide two way jogging track
6m
Safety/ Comfort Elements 9
10 11
9. Raised Pedestrian crossing 10. Ramps (Universally accessible) 11. Visual street dividers 12. Curb Bulb
12
Key Considerations 7
5 Street 3d
6m
6 2m
8 1.2m 2.4m 0.9m
1. A continuous cycle track in a loop near the pedestrian walkways to minimise vehicular interference. 2. The pedestrian walkway forms the innermost loop, shaded by the adjacent buildings and trees. 3. Parking spaces for incorporating the existing parking and avoid inconvenience due to lack of parking space. 55
DOUBLE ANGLE SECTIONS BACK TO BACK
80 M
ALTERNATIVELY ATTACHED ON EITHER SIDE OF GUSSET PLATE
Technical Drawings 850
450
20
(SPAN 5500MM) RESTING ON BOX SECTIONS SQUARE BOX SECTIONS (50x50MM @450MM c/c) STEEL TRUSS RESTING ON R.C.C. COLUMN COMBINED WORKSHOP B60 STEEL TRUSS (ANGLE CLEAT NUT-BOLTED TO M.S. PLATE) M.S GUSSET PLATE (10MM THK) PLACED ON TOP CHORD OF TIEBACK=4290 CONNECTS DIFFERENT MEMBER BY NUT-BOLT SPAN=7300 R.C.C. BEAM (230x450MM) TOP CHORD ISA 6565 (10MM THK) DOUBLE ANGLE SECTIONS BACK TO BACK WITH 25MM EXTERNAL PLASTER
B103
450
450
P
N OF NORTH LIGHT TRUSS 1:20kamat Guide - Ar. SCALE Nakul
Q
A
450
40
B93
MANGALORE TILES
PERFORMING AREA
540
B103 R.C.C. BEAM (230x450MM)
CONNECTS DIFFERENT MEMBER BY NUT-BOLT GENERAL NOTES
SELFDRILLING
1) All R.C.C. dimensions are in 'millimeters' unless STEEL TRUSS RESTING ON COLUMN
10
450
WELDED TO COLUMN REBARS
A-4
SHEETS
M.S GUSSET PLATE (10MM THK) M.S. BASE PLATE (280x500MM 20MM THK)
RESTING ON TIMBER BATTENS
Site - Panchavati, Nashik
1
DETAILED SECTION OF WOR ZINC-AL 2
25°
MANGALORE TILE (260x540MM)
PRODUCED BY AN AUTODESK 40 STUDENT VERSION
5
ANGLE CLEATS ISA 6565 (10MM THK) ISA 5555 (8MM THK) A-403d CONNECTS THE TRUSS TO COLUMN ANGLE STRUTS ALTERNATIVELY ATTACHED ON EITHER SIDE NUT BOLTED TO GUSSET PLATE 360 10 OF GUSSET PLATE NUT BOLTED ON M.S. PLATE
450
M
55
BEDDED MONOPITCH RIDGE PIECE (270x520MM) BOTTOM CHORD ISA 6565 (10MM THK) DOUBLE ANGLE SECTIONS BACK TO BACK MANGALORE TILE (260x540MM) CONNECTS DIFFERENT MEMBER BY NUT-BOLT
M.S GUSSET PLATE (10MM THK)
120
2150
SPAN=6050
PRODUCED BY AN AUTODESK STUDENT VERSION
Q
Working Drawings | Semester 6 B93
550
K
P
25°
05
AREA
ANGLE STRUTS ISA 5555 (8MM THK)
65
K
specified
65
(ANGLE CLEAT NUT-BOLTED M.S. PLATE) STEEL BOX SECTIONS (50x50MM @450MM c/c) 2) The TO drawing is not to be scaled. The 230 The Semester 4 Architectural Design project was carried dimensions are strictly SCREWS PLACED ON TOP CHORD OF STEEL TRUSS WITH 25MM EXTERNAL PLASTER 230 to be followed. SPAN=6050 R.C.C. BEAM (230x450MM) TO TOP CHORD) forward for making of Working drawings and(WELDED further detailing. 3) All levels are unfinished levels unless HALF ROUND PVC PIPE GUTTER
C5- 230x500
ANGLE CLEATS ISA 6565
65
10
940 1000 2210
1650
7000
1270
B
280
990
02 A-201
TERRACE DETAIL 09
3900
08
450
W1
3140 24890
3070
2210
1650
W1 1080
1600
5150
1500
2190
350
1010
280
W1
w.c. 1650
370
450
1410
C66- 230x500
450
D5
W1 1380
1290
C24- 230x500 C67- 230x500
C
D
E
F
G
H
J
65
100
LEGENDS :
C27- 230x230
L
C28- 230x230
C29- 230x230
C30- 230x230
C31- 230x230
280
280
280
280
M
N
ACADEMY OF ARCHITECTURE EXTERNAL FLOORING
P
TILE DROP SIGN AND STAMP COLUMN
12 1270
990
50 150 100 NORTH
PROJECT NAME:
ROLLSHEET NO.TITLE:
07
GROUND FLOOR ARCHITECTURAL PLAN
SCALE : 1:50
NAME : PRANAV A SEMESTER 6
7190
1270
230 MM THICK BRICK WALL 08-04-2020 500MM THICK BRICK WALL
K
6900
FFL=+1.05M
A - 101
NAME : PRANAV ASHISH CHAUBAL PANCHAVATI ANE 150 MM THICK BRICK WALL
C70- 230x500
SEMESTER 6
02 A-301b
SHEET NUMBER:
01
6750
C69- 230x500
REVISION
PANCHAVATI ANECDOTES GROUND FLOOR ARCHITECTURAL PLAN
SCALE : 1:50
13
450
230x500 C68-C25230x500
DATE
PROJECT NAME:
SHEET TITLE: 02
14
UP
1600
D6
500
1410
03
710 810
170
2490
660
W.C.
C18- 230x230
1290
IPS FLOORING 280
D5
1300
280
D6
REVISION TABLE
B22
04
C14- 230x500
950 1200
FFL=+0.9M SSL=+0.86M C17-850 230x230
450
1290
C65- 230x500
C60- 230x500
D9
C13- 230x500
05
15
STONE TILING
710
06
C53- 230x230
7000
40
23
C59- 230x500
IPS FLOORING 3090
CERAMIC TILING
W1 1230
CONNECTS VERTICAL STRUTS TO TOP CHORDS AND ANGLE STRUTS BY NUT BOLTS
C9- 230x500
FFL=+1.50M UFL=+1.46M
(1.6M WIDE) FFL=+0.15M
900 WAITING AREA800 D5
C16- 230x230
280 380
370
940
1800
M.S GUSSET PLATE (10MM THK)
12050
06
620
P W.C.
C52- 230x230
1990
to be followed. 3) All levels are unfinished levels unless specified. 4) The contractor shall verify all on site dimensions including elevations prior to the commencement of work on site. 5) The contractor shall inform the architect and/or project engineer on site regarding any conditions/modifications required to be done prior to the commencement of work. 6) The contractor shall coordinate and verify the work indicated on the drawings between the architectural and various trade drawings, including but not limited to structural, electrical, plumbing, fire protection and exterior enclosure systems. 7) All work shall conform to relevant BIS codes and shall be best practice of each trade. 8) Any discrepancy is to be brought to the notice of the architect/ consultant before commencement of the site. 9) All work is to be completed to the satisfaction of site engineer/ project manager and architects
T.W. SKYLIGHT (150MM THK) SCALE FRAME 1:10 FIXED ONTO THE TRUSS BY NUT BOLTING
C44- 230x230
850
7190 4100
280
A-403g
940 1000
980
1280
05
C43- 230x230
07 08
D5
800 710
710
C15- 230x230
CENTRAL COURTYARD PAVER BLOCKS
08-04
2070
ACADEMY OF ARCHITE
11
SIGN AND STAMP
UP
4100
3850 1620
26300
2820
6900
UP
FFL=+0.6M 3070
4.0 M WIDE ROAD
07
C32- 230x500
3
1720
2050
3600
5900
26460
UP
2
1600
710 810 3100
280
1270
1990
IPS FLOORING
TILE DROP
COLUMN
28MM THK DOUBLE GLAZED UNIT MOULD 10MM DEEP
BEAM DRIP FIXED INTO T.W. FRAME LEVEL=+0.0M 10
17
D10
FFL=+3.0M SSL=+2.96M
3350
RECEPTION
FFL=+0.15M SSL=-0.07M
C62- 230x500
TEMPLE PLINTH
D2
D3
C37- 230x230
1800
W1
FFL=+0.75M 02 SSL=+0.65M A-301a
A
C36- 230x230
C7- 230x500
15
UP
C8- 230x500
HIS
SLATE TILING
1200
1800
01
SERVICE ALLEY
FFL=+0.15M D5 SSL=-0.07M 710 810
1570 450
1150 1250
11C51-12230x500 13 14
10
09
10
11
12
13 14
2300
15
D5
370C23- 230x500 380
1110
C64- 230x500
280
C35- 230x230
C6- 230x500
C47- 230x500
EXTERNAL FLOOR
@ 4200MM c/c (150MM THK)WITH 25MM EXT.PLASTER GENERAL NOTES 11 ATTACHED TO TOP CHORDS BY GUSSET PLATE 1) All dimensions are in 'millimeters' unless R.C.C. BEAM (230x450MM) specified 2) The drawing is not to be scaled. The WITH 25MM EXTERNALdimensions PLASTER are strictly 26300
C34- 230x230
3100
1150
1650
3850
B22
09
C58- 230x500
1620
PANTRY
230x500 CERAMIC C12TILING 400 810 280 710
1200
08
500MM THICK BRIC
10MM THK WATERPROOFING 100MM BBC FOR SLOPING VERTICAL STRUTS ISA 5555 (8MM THK) R.C.C. TERRACE SLAB 12
C42- 500 DIA
135°
1010
1270
SCALE PASSAGE 1:5
(3040x1570MM) HER FFL=+0.15M FFL=+0.13M IPS FLOORING SSL=-0.07M
N W.C.
07
FFL=+1.35M SSL=+1.31M
1220
C22- 230x500
5830
C63- 230x500
280
990
16
710
D8
280
1270
P
550
15 40 550
M
810
06
N
STEPS
1610
C50- 230x500
C57- 230x500
3040
D4
280
IPS FLOORING
C61- 230x500
280
1270
135°
C46- 230x500
STONE TILING
1070
UP FFL=+0.9M SSL=+0.86M
05
1010
6200
C70- 230x500
3620
01
C5- 230x500
M
50 UP
DISPLAY AREA
C54- 230x500
01
D2
11
UP
550
45°
5150
460 1350 8060
IPS FLOORING
FFL=+0.60M SSL=+0.56M
1300
06
(6200x2940MM)
1480
1050
C49- 500 DIA
05
C56- 230x500
DN
280
55
02 FFL=+1.35M
02
04
10560
04
DN
FFL=+1.05M
03
03
IPS FLOORING
1050
03 02
C31- 230x230
2340
C21- 230x500
525
800
2200
3350
1820
LIPS FLOORING
04
C30- 230x230
UP
1410
L
01
02
04
1300
RS
05
D2
SHOP 24 (3100x2200 MM) 25 FFL=+0.75M 26 SSL=+0.71M
K 01
C45- 230x500
1300
1520
3100
2050 1950
D1
11440
K
22 23
UP
1050
03 02
2050
04
J
02
1250
C29- 230x230
LEGENDS :
150 MM THICK BRIC
230 MM THICK BRIC
DOUBLE ANGLE SECTIONS BACK TO BACK
C28- 230x230
1620
6900
1670
3070
12050
05
01
02
06
21
525
550 230
IPS FLOORING
05
03
ROUGH TEXTURED,ANTI SKID
TOP CHORD ISA 6565 (10MM THK) 25MM THK SCREEDING
100
1350
06
1200
1050
H C41- 230x500
FFL=+1.35M SSL=+1.31M
1890
20
1330
06
07
13
C25- 230x500
100 100
1410
03
G
2300
C11- 230x500
08
C69- 230x5001150
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
525
550
19
C55- 230x500
C24- 230x500
450
C27- 230x230
04
DETAIL OF SKYLIGHT A-403c 07
1290 1290
2340
1410
REVISION TABLE (850MM TALL BRICK MASONRY WALL)
1050
1410
CONNECTS VERTICAL STRUTS TO TOP CHORDS AND ANGLE STRUTS BY NUT BOLTS UP
C40- 230x500
D7
6750
D5
2260
E N T
10 0
150
50
1050
1290
M.S GUSSET PLATE (10MM THK)
1610
17 2200 18
14
M.S. PLATE (5MM THK) DATE REVISION DESCRIPTION ASPHALT SKIRTING HIGH) FIX T.W. FRAME ON ANGLE SECTION(60MM BY 15MM THK SLATE NUT BOLTING THROUGH FRAME TILING
6900
415 IPS 16FLOORING
C14- 230x500
D6
60 1800
TEMPLE PLINTH
1650
1390 1110 1050 2050
(3100x2200 MM) FFL=+0.75M 15 SSL=+0.71M
1500
1050
280
2820 C53- 230x230
SERVICE CORRIDOR (11200x1100MM)
5080
RS
2050
3100
2050 1950
D1
WELDED TOBELOW TRUSSCOPING TO PREVENT ANY NUT BOLTED TOSEEPAGE MS PLATE THROUGH T.W. FRAME TO FIX SKYLIGHT ON TRUSS 230MM THKPANEL PARAPET WALL
w.c.
C18- 230x230
IPS FLOORING 280
280
PAVER BLOCKS
F
D2
850
620
710 810
C16- 230x230
280
SCALE
15
D9
1600
FFL=+0.75M FIXED ONTO THE TRUSS BY NUT BOLTING SSL=+0.65M C44- 230x230 100
C38- 230x500
950
1280
150
26300
980
50
2940
C15- 230x230
C23- 230x500
1150 1250
D3
24890
C9- 230x500
1010
11440 3350
SERVICE CORRIDOR (11200x1100MM)
C22- 230x500
A-403g
50MM THK D.P.C. ISA 5555 (8MM THK)
1990
C13- 230x500
FFL=+0.9M SSL=+0.86M C17- 230x230
FFL=+1.05M
C4- 230x500
IPS FLOORING
3620
5080
1050
1480
1570
C12- 230x500
1670
1390 1110
1160
UP
1
01
850 100 450
7190
IPS FLOORING
65
3900
FFL=+0.60M SSL=+0.56M
2300 2300
2050 1050
3070
1720 2065
525
550 1330 550 230
525
1050
2050 1950
3100
D2
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
2190 2730 1270
1890 2080
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
525
800
C26- 230x500
FFL=-0.55M SSL=-0.84M
08
1350
IPS FLOORING
1050
525
800
56
IPS FLOORING
1800
1410
A-301b 01
11
IPS FLOORING
FFL=+0.15M
CENTRAL T.W. SKYLIGHT FRAME (150MM THK) 07 COURTYARD
C52- 230x230
D2
1990
FFL=+3.0M SSL=+2.96M
(150MM THK)
M.S GUSSET PLATE (10MM THK) MOULD 10MMBY DEEP(20MMØ) CONNECTSDRIP DIFFERENT MEMBER NUT-BOLT
C7- 230x500
15
PRODUCED BY AN AUTODESK
01 A-301a
1270
2050
SHOP (3100x2200 MM) FFL=+0.75M SSL=+0.71M D2
12
D5
D8
C21- 230x500
D3
PUMP ROOM
10
C20- 230x500
2300
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
RS
D2
1150
525 3100
2050 1950
2730
D1
2300
2050
C19- 230x500
01
11
01
UP
2200
UP
FFL=+0.15M
IPS FLOORING
01
FIXED INTO T.W. FRAME
C20- 230x500
1150
IPS FLOORING
1050
1330
IPS FLOORING
550 230
1270
J D2
525
FFL=+0.6M UFL=+0.2M 13
IPS FLOORING
1050
H
IPS FLOORING
C48- 230x500
3100SHOP 14
09
1050 2830
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
525
1150
SHOP (3100x2200 MM) 02 FFL=+0.75M SSL=+0.71M RS 3100
2050 1950
2080
G
D1
550
F
10280
UP
26
14
C8- 230x500
3040
FFL=+0.9M SSL=+0.86M
DN
02
25
C32- 230x500
C3- 230x500
13
D2
E
2200
12
C68- 230x500
03
IPS FLOORING
W1
450
1050
525
550 1330
C10- 230x500 C67- 230x500
550
1270
D2
RS
UP
1050
UP
1380
2200
14
24
13
135°
04
04 03
12
20 23
W1
450
D1
UFL=+0.2M
FFL=+0.60M SSL=+0.56M
3100
D1
22 23
11
DETAIL OF VENT
135°
SHOP (3100x2200 MM) W1 FFL=+0.75M SSL=+0.71M RS
05
1080
01
05
135°
C66- 230x500
ROUGH
25MM 10MM 100MM AND RO R.C.C. (150MM SCALE R.C.C
17
16
10
UP
135°
450
02
06
21
135°
3140 24890
15
80
1110FFL=+0.6M
SERVICE CORRIDOR (11200x1100MM)
2200
2050
1300
D6
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
525
06
SHOP C D (3100x2200 MM) FFL=+0.75M SSL=+0.71M
B
415
780
1150
IPS FLOORING
450
03
07
20
28MM THK DOUBLE GLAZED UNITWAITING AREA 08
FFL=+0.6M
C60- 230x500 C39- 230x500
C2- 230x500
2490
10280
950
C1- 230x500
P
D10
1270
C33- 230x230
190
1160
55
350
UP
660
2050 1950
500
2830
1220
W1
370
UP
08
19
P
850 170
09
(6200x2940MM)
C11- 230x500
18
U
16
W.C.
4
UP
02
65
UP
A 07
N
C6- 230x500
08
°
D5
3
07
6200
D2
3
06
DISPLAY AREA
10
D7
05
°
D5
1 2 1200
04 03
2070 2
2050
3600
UP
710
800
900
05
C43- 230x230
1390 1110
1160
390 5900
26460
1
08 STONE TILING
3090
1250
950
C37- 230x230
PRODUCED BY AN AUTODESK STUDENT VERSION
UP
FFL=+1.50M UFL=+1.46M
CERAMIC TILING
17
08
1050
3100 525
800
C26- 230x500
°
RECEPTION
C59- 230x500
FFL=+0.15M SSL=-0.07M
- 230x500
1890
2050 1050 2050
525
550 230 2050 1950
120
IPS FLOORING
D2
09
M
C5- 230x500 04
02 UP A-201
10560
FFL=+1.35M SSL=+1.31M
135
°
HIS
L
990 280 VERTICAL STRUTS ISA 5555 (8MM THK) 09 @ 4200MM c/c SERVICE ALLEY PANTRY (1.6M WIDE) ATTACHED TO TOP CHORDS BY GUSSET PLATE UP (3040x1570MM)
280
1270
1520
D2
C4- 230x500
16
01
1150
SHOP (3100x2200 MM) FFL=+0.75M SSL=+0.71M
3100 14
17
06
1050
525
550
C19- 230x500
D2
LATE TILING
D2
10 09
1050
3100
IPS FLOORING
C42- 500 DIA RS
°
10
PASSAGE
K
135
BHAANDI
E N T R Y
01 A-201
J
IPS FLOORING
15
2260
C51- 230x500
H
LEVEL=+0.0M DOUBLE ANGLE SECTIONS BACK TO BACK
12
C36- 230x230
07
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
1270
SHOP (3100x2200 MM) FFL=+0.75M SSL=+0.71M
135
135
°
23 40
135
D1
280
01
LEVEL=+0.0M
BAZAAR
06 07
08
UP
20 23
135
C58- 230x500 1:5 SCALE
2730
920
550
550 STREET
P
U
F SKYLIGHT
55
°
A-301b C47230x500
G
IPS FLOORING
11
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
525
550 2050 1950
2080
10280
400
D1
1010
11
3350
STONE TILING
EL=+0.0M
1270
C3- 230x500
FFL=-0.55M SSL=-0.84M
13
1150
IPS FLOORING
135
01 A-301a
F
PUMP ROOM
415
550
525
280
D2
FFL=+0.6M UFL=+0.2M
12
7.5 M WIDE ROAD
15 40
D2
C10- 230x500
RS
STEPS
1610
E
TOP CHORD ISA 6565 (10MM THK) 4.0 M WIDE ROAD
C35- 230x230
IPS FLOORING
1330
1270
SHOP (3100x2200 MM) FFL=+0.75M C34230x230 SSL=+0.71M
40
65 05
FFL=+0.6M STORAGE UFL=+0.2M (3100x1150 MM) IPS FLOORING
525 3100
2050 1950
100
RS
2200
UP
D
4100
3850 2830
D1
1330
1800
780
6900
40
1010
UP
C2- 230x500 1110
1150
2200
50 FFL=+1.35M
C
FIX T.W. FRAME ON ANGLE SECTION BY UP NUT BOLTING THROUGH FRAME
ASPH 15MM
GENERAL NOTES
1) All dimensions are in 'm specified 2) The drawing is not to b dimensions are strictly to be followed. 3) All levels are unfinishe specified. 4) The contractor shall ve dimensions including elevations prior to the com site. 5) The contractor shall inf project engineer on site regarding conditions/modifications required to be done prior of work. 6) The contractor shall co work indicated on the drawings between various trade drawings, including but no electrical, plumbing, fire protection a systems. 7) All work shall conform and shall be best practice of each trad 8) Any discrepancy is to b of the architect/ consultant befo the site. 9) All work is to be compl of site engineer/ project manage
BEDDED MONOPITCH RIDGE PIECE WITH 2 (270x520MM) 25MM THK EXTERNAL PLASTER DOUBLE COAT NEERU FINISH PLASTER BEAM MANGALORE TILE (260x540MM) B22 RESTING ON TIMBER BATTENS SADDLE BACK STONE COPING TERRACE DET
11
M.S. PLATE (5MM THK)
B
2200
C33- 230x230 SCALE 1:5
13
C50- 230x500
FFL=+0.15M SSL=-0.07M
1270
24890
4
3
1410
GLASS PANELS AIR SPACE DESSICANT SEALANT
FFL=+1.35M SSL=+1.31M
E
280
C1- 230x500 2
1
16
50
1620
C29- 230x230
1270
A-403b
1620
T.W. BEEDING PATTI
C46- 230x500
11
230 MM THICK BRICK WALL
DETAIL OF TRUSS END JUNCTION
280
70
65
70
17
1010
150 MM THICK BRICK WALL
R.C.C. BEAM (230x450MM)
RESTING ON TIMBER BATTENS
WITH 25MM EXTERNAL PLASTER 500MM THICK BRICK WALL T.W. SKYLIGHT FRAME (150MM THK) M.S GUSSET PLATE (10MM THK) HALF ROUND PVC PIPE GUTTER 55 FIXED ONTO THE TRUSS BY NUT BOLTING EXTERNAL FLOORING CONNECTS DIFFERENT MEMBER BY NUT-BOLT (200MMØ) TILE DROP SUPPORTED ON G.I. STRAP HELD ON BATTEN C30-ISA 230x230 5555 C31- 230x230 (8MM THK) COLUMN 12 WELDED TO TRUSS M.S GUSSET PLATE (10MM THK) 280 990 280 NUT BOLTED TO MS PLATE THROUGH T.W. A-403f CONNECTS VERTICAL STRUTS TO TOP SCALE FRAME TO FIX SKYLIGHT PANEL ON1:5 TRUSS CHORDS AND ANGLE STRUTS BY NUT BOLTS
A
T.W MIDDLE RAIL
02
230MM
(850MM
PRODUCED BY AN AUTODESK STUDENT VERSION
1010
C28- 230x230
1410
UP
04
65
MANGALORE TILE (260x540MM) 3100
190
C27- 230x230
14
03
FIXED INTO T.W. FRAME
C25- 230x500
PRODUCED BY AN AUTODESK STUDENT VERSION
FFL=+1.05M
02
BELOW 0 ANY1SE
450
C24- 230x500
230
TEMPLE PLINTH
FFL=+1.05M
1600
1650
1290
6900
01
50MM
100
1410
15
5 M WIDE ROAD
D5
PAVER BLOCKS
01
DRIP M
13 BEDDED MONOPITCH RIDGE PIECE M.S. BASE PLATE (280x500MM 20MM THK) 28MM THK DOUBLE GLAZED UNIT (270x520MM) WELDED TO COLUMN REBARS LEGENDS :
2340
FFL=+0.75M SSL=+0.65M
SADD
(150MM
10
CENTRAL COURTYARD
1410
280
60
1290
25MM
DOUBL
700
2
1800
DETAIL OF SKYLIGHT 100 A-403c
0
1010
IPS FLOORING 280
280
100
280
1290
C23- 230x500
1150 1250
C18- 230x230
65
55
FFL=+0.9M
SSL=+0.86M C17- 230x230 C16- 230x230 1:5 SCALE
C15- 230x230
80
800 710
D6
3620
1800
C22- 230x500
7- 230x500
7000
C13- 230x500
A-
CONNECTS DIFFERENT MEMBER BY NUT-BOLT TOP CHORD ISA 6565 (10MM THK) DOUBLE ANGLE SECTIONS BACK TO BACK (200MMØ) C14- 230x500 800 SUPPORTED ON G.I. STRAP HELD ON BATTEN 14 ANGLE CLEATS ISA 6565 (10MM THK) 1600 VERTICAL STRUTS ISA 5555 (8MM THK) CONNECTS THE TRUSS TO COLUMN w.c. @ 4200MM c/c NUT BOLTED TO GUSSET PLATE ATTACHED TO TOP CHORDS BY GUSSET NUTPLATE BOLTED ON M.S. PLATE
HALFD9ROUND PVC PIPE GUTTER
100
IPS FLOORING
TAIL OF TRUSS END JUNCTION WAITING AREA
M.S GUSSET PLATE (10MM THK) SCREWS
WITH 25MM EXTERNAL PLASTER
B93
(1.6M WIDE) FFL=+0.15M
C12- 230x500
D8
(SPAN 5500MM) FIX T.W. FRAME ON ANGLE SECTION BY SELFNUT BOLTING THROUGH FRAME DRILLING
R.C.C. BEAM (230x450MM)15
710 810
620
100
IPS FLOORING
1990
C9- 230x500
550 ALLEY SERVICE
710 810
1570
120
D5
M.S. PLATE (5MM THK)
WELDED TO COLUMN REBARS
IPS FLOORING
1270
MANGALORE BOTTOM CHORD ISA 6565 TILES
450
390 STUDENT VERSION PRODUCED BY AN AUTODESK
DN
PANTRY
(3040x1570MM) FFL=+0.15M IPS FLOORING
01
M.S. BASE PLATE
C8- 230x500
3040
UP FFL=+0.9M SSL=+0.86M
04
15
1650
1480
05
6200
200
01
06
14
ZINC-AL SHEETS
600
23002
13
SCALE
10
07
12
UP
C11- 230x500 03
11
AT RIDGE JUNCTIO
TOP CHORD ISA 6565
ISA 5555
2210
UP
(6200x2940MM)
08
940 1000
09
20
08
40
2940
07
M.S GUSSET PLATE
2
400
06
DISPLAY AREA
D7
920
05
980
50
IPS FLOORING
1250
950
04
1280
450
TOP CHORD 10560
2940
20 C4- 230x500
DETAIL STEEL BOX SECTIONS
M.S GUSSET PLATE
BOX SECTION
FFL=+1.35M SSL=+1.31M
10
MANGALORE TILE
M
PRODUCED BY AN AUTODESK STUDENT VERSION
230x500
02
L
24890
M
03
K
1500
J
100
65
H
10
65
40
MANGALORE TILES
BEDDED MONOPITCH RIDGE PIECE
PRODUCED BY AN AUTODESK STUDENT VERSION
G
MANGALORE TILE
BOTTOM CHORD ISA 6565
PRODUCED BY AN AUTODESK STUDENT VERSION
F
site. 5) The contractor shall inform the architect and/or 55 project engineer on site regarding any (260x540MM) conditions/modifications required to be done prior to the commencement RESTING ON TIMBER BATTENS (10MM THK) of work. K 6) The contractor shall coordinate and verify the DOUBLE ANGLE SECTIONS BACK TO BACK (270x520MM) work indicated 450 (SPAN 5500MM) on the drawings between the architectural and (260x540MM) various trade (50x50MM @450MM N P drawings, including but not limited toc/c) structural, A-403e RESTING ON TIMBER BATTENS (10MM THK) PLACED ON TOP CHORD electrical, OF STEEL TRUSS plumbing, fire protection and exterior enclosure CONNECTS DIFFERENT MEMBER BY NUT-BOLT (WELDED TO TOP CHORD) systems. 7) All work shall conform to relevant BIS codes (10MM THK) 55 and shall be C6- 230x500 CONNECTS DIFFERENT MEMBER BY NUT-BOLT best(10MM practice ofTHK) each trade. 17 80 8) Any discrepancy is to be brought to the notice (10MM THK) DOUBLE ANGLE SECTIONS BACK TO BACK 80 (8MM THK) of the D10 CONNECTS THE TRUSS TO COLUMN architect/ consultant before commencement of WELDED TO TRUSS the site. NUT BOLTED TO GUSSET PLATE 9) All work is to be completed to the satisfaction NUT BOLTED TO MS10PLATE THROUGH T.W. NUT BOLTED ON M.S. PLATE 16 of site C7- 230x500 FRAME TO FIX SKYLIGHT PANEL ON TRUSS engineer/ project manager and architects 1990 (10MM THK) (280x500MM 20MM THK) FFL=+3.0M 120 SSL=+2.96M DOUBLE ANGLE SECTIONS BACK TO BACK
55
SCALE 1:5
120
0 10
DOUBLE ANGLE SECTIONS BACK TO BACK DETAILED SECTION OF NORTH LIGHT TRUSS DETAILA-403a OF TRUSS END JUNCTION SCALE 1:20
A-403b
E
specified. WITH 25MM EXTERNAL PLASTER (200MMØ) 4) The contractor shall verify all on site P Q dimensions including SUPPORTED ON G.I. STRAP HELD ON BATTEN elevations prior to the commencement of work on
M TOP CHORD ISA 6565 (10MM THK)
65
80
55
K
80
02
PRODUCED BY AN AUTODESK STUDENT VERSION
A
C
D
E
F
G
H
J
K
L
M
N
P
Q OHT TOP LEVEL +17.2M
PRODUCED BY AN AUTODESK STUDENT VERSION
A
B
C
D
E
F
G
H
J
K
L
M
N
P
GEN
Q
RCC OVERHEAD TANK
1) All d specif 2) The dimen to be 3) All specif 4) The dimen elevat site. 5) The projec engine condit requir of wor 6) The work i on the variou drawin electri plumb system 7) All and sh best p 8) Any of the archite N the sit 9) All of site engine
OHT TOP LEVEL +17.2M
PRODUCED BY AN AUTODESK STUDENT VERSION
1) All dimensions are in 'millimeters' unless specified 2) The drawing is not to be scaled. The dimensions are strictly to be followed. TERRACE PARAPET LEVEL 3) All levels are unfinished levels unless specified. +13.8M 4) The contractor shall verify all on site dimensions including elevations prior to the commencement of work on TERRACE FLOOR LEVEL site. +12.7M 5) The contractor shall inform the architect and/or project engineer on site regarding any conditions/modifications required to be done prior to the commencement of work. 6) The contractor shall coordinate and verify the work indicated PERFORMING AREA ROOF TOP on the drawings between the architectural and +10.28M various trade drawings, including but not limited to structural, WORKSHOP ROOF TOP A B C D E electrical, +10.00M plumbing, fire protection and exterior enclosure B93 systems. 7) All work shall conform to relevant BIS codes and shall be PERFORMING AREA SECOND FLOOR LEVEL best practice of each trade. FFL=+5.40M 8) Any discrepancy is to be brought to the notice +8.70M SSL=+4.75 M of the IPS FLOORING architect/ consultant before commencement of the site. 9) All work is to be completed to the satisfaction of site engineer/ project manager and architects
NORTH LIGHT STEEL TRUSS NUT BOLTED ON RCC BEAMS. (FOR PERFORMING AREA) 65 64 63 62 61
RIDGE PIECE
60
MANGLORE TILE (250MM x540MM)
59
TERRACE PARAPET LEVEL +13.8M
BOX SECTIONS (50MM x 50MM) GUSSET PLATE CONNECTING DIFFERENT MEMBERS
58 57 56 55 54
65
TERRACE FLOOR LEVEL +12.7M
64 63 62 61 60
450
CORRIDOR FFL=+0.60M SSL=+0.56M
2350
13
B91
12
ANTISKID GRIP ON RAMP
B114
3980
B111
B121
B114
07
FIRST FLOOR LEVEL +4.80M
65 64 63 62 61
RIDGE PIECE
03
60
MANGLORE TILE (250MM x540MM)
02
59
57 56
GUSSET PLATE CONNECTING DIFFERENT MEMBERS
2550
2550
610
09
55 54
PB96
07
PB105
PB111
PB113
PB132
PB137
BRICK MASONRY WALL(230MM THK)
36
12
25 MM THK EXTERNAL PLASTER
33
09 BEDDED 10 MONOPITCH 11
23
24
25
10
07
09
06
08
05
04
07
03
06
02
05
01
04
300
300
300
300
300
300
3003910 300
300
300
300
450 1440
Ø120
2550
70
580
80
4540
1040
70
1240
Ø120
580
80 2000
65 20
150
0
150
10
20
1250
25
450
3660
20
150
150
25
2150
65
2980
20
2940
2030
2420
0
1500
2090
2830
2420
560
100
100
15
20 15
25
100
25
140
140
150
8
60
580
ON P.C.C. BASE
P.C.C. BASE (150MM THK) RUBBLE SOLING (230MM THK)
COMPACT MURUM R.C.C. PLINTH BEAM
PB82
P.C.C. BED FOR PLINTH BEAM(100MM THK)
ANCHOR FASTENERS USED P.C.C. BASE (150MM TO FIX THE BASE PLATE TOTHK) RUBBLE SOLING KEY PLAN- SCALE 1:500 TREAD (230MM THK) 12MM RISER TILE- RESTILE MURUM PANCHAVATI ANECDOTES STEP-UPCOMPACT TILE 140 150
0 10
580
3140
3660
150 50
1050
1600
1600
UP
3910 300
PLACED AT AN ANGLE)
SHEET TITLE:
12MM TREAD TILING
1100MM TALL
RESTILE STEP UP TILE 12MM TREAD TILING WITH MATTE FINISH,ANTI-SKID RESTILE STEP UP TILE AND BULL-NOSE NOSING WITH MATTE FINISH,ANTI-SKID (1520x310MM)
AND BULL-NOSE NOSING
160
20
SHE
AR DET
(1520x150MM) MATTE FINISH SHEET NUMBER:
R.C.C. PLINTH BEAM A - 403
ARCHITECTURAL DETAILS
(230x450MM)
8MM TOR LINKS TIEING P.C.C. BED FOR PLINTH MAIN STEEL IN STEPS BEAM THK) 150MM FOLDED SLAB 08-04-2020 R.C.C. ROLL NO. STAIRCASE ACADEMY OFFOR ARCHITECTURE 07
SCALE : 1:20/1:10 1:5 / 1:2
SC
NORTH
NAME : PRANAV ASHISH CHAUBAL (100MM
SIGN AND STAMP
NA
SEM
AC
SIG
SCALE 1:2
SCALE 1:10
Ø60
PRO
PA
PROJECT NAME:
SEMESTER 6
R.C.C. BEAM (230x450MM)
STAINLESS STEEL STAINLESS STEEL HOLLOW CIRCULAR SECTION HOLLOW CIRCULAR SECTION 1100MM TALL
01
DATE
UP
25MM THK SCREEDING
ON P.C.C. BASE
REVISION
RAMP (10MM THK TILES ANTI SKID GRIP SELF PLACED AT AN ANGLE) EMBOSSED PROJECTIONS 25MM THK SCREEDING ON TREAD
WITH 25MM EXTERNAL PLASTER
80MM Ø NEWEL POST
02
10 10 10 10 10STEEL 30 10MM TOR MAIN REINFORCEMENTS ANTI SKID GRIP ON
30
ANTI SKID GRIP ON RAMP(10MM THK TILES
(230x450MM)
TO PREVENT INJURIES
25MM THICK SCREEDING
BETWEEN TILING AND RCC STAIRS
100
R.C.C. BEAM (230x450MM)(150MM THK)WITH 25MM EXT.PLASTER MIDLANDING TILING
80MM Ø NEWEL POST
03
1380
UP
850
1050
60
CHORDS AND ANGLE STRUTS BY NUT BOLTS
0
08
1600
11
450
3390
2940
580
2030
0
150
C21- 230x500
1380
09
600
12
1600
10
DRIP MOULD 10MM DEEP(20MMØ)
DESCRIPTION
BULL-NOSE EDGE
220
10 10 10 10 10
DOUBLE COAT NEERU FINISH PLASTER
850
100
50
100
26
70
REVISION
12MM TREAD TILE- RESTILE STEP-UP TILE
RESTILE TECHNO SLABS TILE RESTILE TECHNO SLABS TILE CENTRAL CENTRAL BEAM DRIP MOULD 10MM DEEP 25MM THICK EXTERNAL WITH 25MM EXTERNAL PLASTER B22 MATTE FINISHED(1520x600MM) MATTE FINISHED(1520x600MM) DETAIL AT ENTRANCE RAMP A-403h NEERU FINISH PLASTER COURTYARD COURTYARD BEAM DRIP MOULD 10MM DEEP TERRACE DETAIL SCALE 1:10 A-403g B22 DETAIL AT ENTRANCE RAMP FFL=+0.75M FFL=+0.75M SCALE 1:10 A-403h DETAIL OF TREAD AND RISER DETAIL OF TREAD AND RISERSCALE 1:10 TERRACE A-402dDETAIL A-402d SSL=+0.65M SSL=+0.65M A-403g SCALE 1:2
600 4200
11
1050
2150
2420
2980
2420
3380
2090
1520
2420
26
Ø800
2000
1340
1340
70
580
1100
3140
1500
3380
1520
22
D
(1520x310MM) MATTE FINISH
300
70
SCALE 1:5
100
25
DATE
SCALE 1:5
SADDLE BACK STONE COPING 220
25
21 24
RE
PB38
REVISION TABLE
TOP CHORD ISA 6565 (10MM THK)
DOUBLE NEERU FINISH PLASTER DETAIL OF VENTCOAT AND ROOF 300
100
2023
55
ZINC COATED (5MMØ 100MM LONG)
RESTING ON TIMBER BATTENS
BELOW COPING TO PREVENT 230MM THK PARAPET WALL 230x500MM RCC COLUMN ANY SEEPAGE 28MM THK DOUBLE GLAZED UNIT TALL BRICK MASONRY WALL) SUPPORTING THE STAIRCASE230MM THK PARAPET (850MM 230x500MM RCC COLUMN WALL FIXED INTO T.W. FRAME ASPHALT SKIRTING (60MM HIGH) 28MM THK DOUBLE GLAZED (850MM TALL BRICK MASONRY WALL) (WITH 25MM EXTERNAL PLASTER) SUPPORTING THE UNIT STAIRCASE FIXED INTO T.W. FRAME ASPHALT SKIRTING (60MM HIGH)THK SLATE TILING 15MM (WITH 25MM EXTERNAL PLASTER) 15MM THK SLATE TILING ROUGH TEXTURED,ANTI SKID T.W. SKYLIGHT FRAME (150MM THK) ROUGH TEXTURED,ANTI SKID T.W. SKYLIGHT FRAME (150MM THK) FIXED ONTO THE TRUSS BY NUT BOLTING 60MM Ø HANDRAIL FIXED ONTO THE TRUSS BY NUT BOLTING 25MM THK SCREEDING25MM THK SCREEDING PB82 60MM Ø HANDRAIL STAINLESS STEEL 10MM THK WATERPROOFING 10MM THK WATERPROOFING STAINLESS STEEL E 100MM BBC FOR SLOPING HOLLOW CIRCULAR SECTION 100MM BBC FOR SLOPING E M.S GUSSET HOLLOWPLATE CIRCULAR SECTION (10MM THK) M.S GUSSET PLATE (10MM THK) C21230x500 R.C.C. TERRACE SLAB CONNECTS VERTICAL STRUTS TO TOP R.C.C. TERRACE SLAB (150MM THK)WITH 25MM EXT.PLASTER CONNECTS VERTICAL STRUTS TO TOP F @ 4200MM c/c ATTACHED TO TOP CHORDS BY GUSSET PLATE
BEA
DOUBLE ANGLE SCALE SECTIONS BACK 1:5 TO BACK
M.S. SELF DRILLING SCREWS
MANGALORE TILE (260x540MM)
DOUBLE ANGLE SECTIONS BACK DETAIL OF VENT AND TO BACK ROOF
THK) 25MM THK EXTERNAL (150MM PLASTER
450
01
01
C22- 230x500
A-402cON TIMBER BATTENS RESTING PB47
PB53
DETAIL EDGE BEAM HANDRAIL TO PREVENT TOPAND CHORD ISA 6565 (10MM THK) A-402c WATER LEAKAGE
(WITH 12MM THK INTERNAL PLASTER SADDLE BACK STONE COPING TOP CHORD ISA 6565 (10MM VERTICAL STRUTS ISATHK) 5555 (8MM THK) (150MM THK) 50MM THK D.P.C. 230MM THICKBACK BRICK MASONRY DOUBLE ANGLE SECTIONS TO BACK 25MM THICK WALL EXTERNAL NEERU FINISH PLASTER) C22230x500 @ 4200MM c/c BELOW COPING TO PREVENT DRIP MOULD 10MM DEEP(20MMØ) (WITH 12MM THK INTERNAL PLASTER F 100 ATTACHED TO TOP CHORDS BY GUSSET PLATE ANY SEEPAGE 25MM STRUTS THICK EXTERNAL NEERU VERTICAL ISA 5555 (8MM THK) FINISH PLASTER) 50MM THK D.P.C.
100
02
A-403f
230MM THICK BRICK MASONRY WALL
450
03
02
FIX T.W. FRAME ON ANGLE SECTION BY DOUBLE ANGLE SECTIONS BACK TO BACK
1000
04
03
A-403f
THICK CHORDS AND ANGLEMIDLANDING STRUTS 12MM BY NUTTILING BOLTS 12MM THICK
13
110 40
ZINC COATED (5MMØ 100MM LONG)
25MM THICK EXTERNAL NEERU FINISH DETAIL EDGE MANGALORE TILE (260x540MM)
FOLLOWING ROOF PROFILE PB56 ATTACHED TO METAL CHIMNEY PB61 PB68 SCREWED TO MANGLORE TILES
25MM THK EXTERNAL PLASTER
TOP CHORD ISA 6565 (10MM THK) M.S. PLATE (5MM THK) NUT BOLTING THROUGH FRAME
ATTACHED TO ZINC-AL SHEETS
150 GALVANIZED PREZINC-AL PLASTER PAINTED SHEETS (2MM THK)
SILICONE SEALANT
110 40
20
1110 1000
05
PB2
20
70
PRODUCED BY AN AUTODESK STUDENT VERSION
600
55
06
16
PB73
150
800
600x230MM RCC PLINTH
ACAD 150MM R.C.C. FOLDED S SIGN STAIRCASE
+0.75M FOLLOWING ROOF PROFILE
ATTACHED TO IN METAL CHIMNEY 8MM TOR LINKS STEEL 20 TIEING MAIN SCREWED TO MANGLORE TILES STEPS FORMING STAIRCASE PUMP THE ROOM FOLDED FLOOR LEVEL 25MM THICK EXTERNAL -0.55M SILICONE SEALANT 150MM R.C.C. FOLDED SLAB FOR PLASTER TO PREVENT WATER LEAKAGE STAIRCASE METAL CHIMNEY (700x700MM) M.S. SELF DRILLING SCREWS 17
TILING IN CENTRAL COURTYARD
100
1500 65
1000
190
330
SCALE 1:5
310
(200MMØ)
14 FRAME TO FIX SKYLIGHT PANEL ON TRUSS 14 14
1450
12
1240
2250
1240
65
2420
65
04
SW1
700
RESTING ON TIMBER BATTENS 80MM BLOCKS SUPPORTED ONTHICK G.I. STRAPPAVER HELD ON BATTEN
FIX T.W. FRAME ON ANGLE SECTION BY 14 WELDED TO TRUSS NUT BOLTING THROUGH FRAME NUT BOLTED TO MS PLATE THROUGH T.W.
120 390
1000
190
55
600
05
SW2
M.S. BASE PLATE (280x500MM 20MM THK) A-301a THROUGH STAIRCASE FLIGHTS ANDTILES TOILET WELDED TOSECTION COLUMNSTEEL REBARS STAINLESS SCALE SELF-1:50 HOLLOW CIRCULAR SECTION 80MM THICK PAVER BLOCKS R.C.C. BEAMMONOPITCH (230x450MM) BEDDED RIDGE PIECE DRILLING 1100MM TALL TILING IN CENTRAL COURTYARD WITH 25MM EXTERNAL PLASTER (270x520MM) SCREWS HALF ROUND PVCTILE PIPE (260x540MM) GUTTER MANGALORE
BEDDED MONOPITCH RIDGE PIECE 600x230MM RCC PLINTH (270x520MM) ISA 5555 (8MM THK) BEAM (ON 100MM THK PCC BED)
DN
DN
MIDLANDING MIDLANDING DETAIL OF SKYLIGHT A-403c FFL=+2.70M FFL=+2.70M SCALE 1:5 SSL=+2.66M DETAIL OF SKYLIGHT SSL=+2.66M A-403c
600 4200
1500
1570 40 920
40
390 55
600
600
600
06
300
23
22
21
20
19
18
B46 ALTERNATIVELY ATTACHED ON EITHER SIDE OF GUSSET PLATE
UP
07
0 16 19817 18 21 1922 20
18
PB22
SEME
B41
150
15
17
300
2130
65
08
14
16
300
07
PB26
CONNECTS DIFFERENT MEMBER BY NUT-BOLT
PB22
100
300 300 330 300 300 300 300 300 300 2130
08
PB38
SCA
GROUND
8MM TOR LINKS TIEING M STEPS FORMING THENAM FO
26
25
24
ANGLE STRUTS ISAGROUND 5555 (8MM THK) LEVEL
B51'
150
1240
13
PB22
SCALE 1:5
100
300
PB47
BEAM (ON 100MM THK PCC BED) M.S GUSSET PLATE (10MM THK)
SCALE 1:20
SCALE 1:20
13 12
THK SCREEDING APPLIED ON P.C.C. PB2 ZINC-AL GALVANIZED PREDOUBLE ANGLE SECTIONS BACK TO BACK 150MM THK PCCGROUND IN PLINTH PLINTH LEVEL PAINTED SHEETS (2MM THK)
01
UNDERGROUND WATER TANK CONNECTS DIFFERENT MEMBERR.C.C. BY NUT-BOLT M.S.(3200x3900x1500MM) PLATE (5MM THK) CAPACITY=15M³ ISA 5555 (8MM THK)
400
SEALANT
07
25MM TOP CHORD ISA 6565 (10MM THK)
B51
MANGALORE TILES
80MM THICK PAVER BLOCKS METAL CHIMNEY (700x700MM)
WELDED TO TOP CHORD OF STEEL TRUSS
ROLL NO. PUMP ROOM IN CENTRAL COURTYARD M.S GUSSET PLATE (10MM FLOORING THK) ATTACHED SHEETS UNDERGROUND TANK TO ZINC-AL FFL=-0.55M PB26 PB22 SW2 SW1 CONNECTS DIFFERENT MEMBER BY NUT-BOLT SSL=-0.51M
03
02
MANGALORE TILE (260x540MM) UNDERGROUND R.C.C. WATER 70 WELDED TO TRUSS TANK RESTING ON TIMBER BATTENS NUT BOLTED TO MS PLATE THROUGH T.W. (3200x3900x1500MM) CAPACITY=15M³ FRAME TO FIX SKYLIGHT PANEL ON TRUSS M.S GUSSET PLATE (10MM THK)
DESSICANT DETAILED SECTION OF STAIRCASE
1240
1500
SW2
SW2
DETAILED SECTION OF STAIRCASE
A-402b SPACE 18 AIR
01 A-402b
120
920
70
1570
1010 70 1010
400
01 PANELS
18
TANK
Ø800
600
FFL=+0.75M SSL=+0.65M
1:5
DETAIL OF TRUSS END JUNCTION
450 UNDERGROUND
T.W. BEEDING PATTI
14 80 15
600
PB53
T.W MIDDLE RAIL450
65
600
3660
2420
2980 40
720
SW1
50
0
02
UNDERGROUND TANK A-403b
18GLASS
1200
2420
2150
20 2090
2420
560
100
2030
1520
300
1090
100
580 300
2980
04
02 SCALE 01
SW1
07
06
05
04
55 SIGN AND STAMP B56
600
PRODUCED BY AN AUTODESK STUDENT VERSION
05
08-04-2020
08
ZINC-AL PB47 PB38 SHEETS ACADEMY OF ARCHITECTURE
40
70
06
(1520x310MM)
(SPAN 5500MM)
04
03
02
01
B41
PRODUCED BY AN AUTODESK STUDENT VERSION
03
09
NUT STAINLESS BOLTED ONSTEEL M.S. PLATE RESTILE STEP UP TILE SW1 WITH MATTE FINISH,ANTI-SKID CIRCULAR SECTION PUMP ROOM FLOOR LEVEL M.S.HOLLOW BASE PLATE (280x500MM BOTTOM CHORD ISA 6565 (10MM THK)20MM THK) AND BULL-NOSE NOSING -0.55M 1090MM TALL PB2 BACK WELDED TO SECTIONS COLUMN REBARS DOUBLE ANGLE TO BACK
05
42
41
40
39
B46'
SELF- UNDERGROUND TANK DETAIL AT RIDGE JUNCTION CENTRAL A-403e R.C.C. BEAM (230x450MM) 12MM TREAD TILING DRILLING 700 M.S GUSSET PLATE (10MM THK) SCALE 1:5 STEPMEMBER UP TILE WITHRESTILE 25MM EXTERNAL PLASTER TOILET CONNECTS DIFFERENT BY NUT-BOLT COURTYARD SCREWS FFL=+0.75M 80MM Ø NEWEL POST WITH MATTE FINISH,ANTI-SKID SSL=+0.71M HALFAND ROUND PVCNOSING PIPE GUTTER FFL=+0.75M BULL-NOSE STAINLESS STEEL ANGLE CLEATS ISA 6565 (10MM THK) (200MMØ) (1520x310MM) ZINC-AL 0 SSL=+0.65M 01 HOLLOW CIRCULAR SECTION 0 CONNECTS THE TRUSS TO COLUMN 8 CENTRAL SUPPORTED ON G.I. STRAP HELD ON BATTEN SHEETS NUT BOLTED TO GUSSET PLATE 1100MM TALL 0 NUT BOLTED ON M.S. PLATE COURTYARD ARCHITECTURAL1 SECTIONMANGALORE 02 GROUND LEVEL 80MM Ø NEWEL POST PB56
PB61
PB68 04
PB73
UNDERGROUND TANK
230
18
600
05
PB73
B93
07
SW2
09
08
07
06
SECT SSL=-0.51M 12MM TILE MANGALORE TILESCALE (260x540MM) 1:5 RISER TILE- RESTILE STEP-UP 25MM THK SCREEDING A RESTING ON TIMBER BATTENS WITH MATTE FINISH (1520x150MM) NORTH HOLLOW STEEL BOX SECTIONS 150MM THK PCC IN PLIN
13 12
11
10
10
720
230
PB22
120
12
10
48
47
46
45
44
100
SCALE : 1:50
55
10
13
80MM THICK PAVER BLO 11
49
SEMESTER 6
GROUND PLINTH LEVEL PB53 PB56 +0.75M
12MM TREAD TILING 80MM Ø NEWEL POST
2
2030
550
TOP CHORD THE ISA 6565 (10MM THK) CONNECTS TRUSS TO COLUMN DOUBLE ANGLE SECTIONS BACK TO BACK NUT BOLTED TO GUSSETGROUND PLATELEVEL PB61 PB68
12MM TREAD TILERESTILE TILE ANGLE STRUTS ISASTEP-UP 5555
43
600
08
PB26
06
01
(50x50MM @450MM c/c) B3 NAME : PRANAV ASHISH CHAUBAL
0
09
02
01
M.S GUSSET PLATE 20MM THK STAINLESS STEEL BASE PLATE TOP CHORD ISA 6565 12MM RISER TILE- REST
DETAIL AT RIDGE JUNCTION
10
PB38
07
03
55
12
11
31
30
29
28
27
28
27
40
08
GROUND LEVEL
04
36
35
34
33
DETAILED SECTION OF WORKSHOP TRUSS
M.S GUSSET PLATE (10MM80MM THK) Ø NEWEL POST40 B3 5 CONNECTS DIFFERENT MEMBER BY NUT-BOLT STAINLESS STEEL STEEL BOXROOM SECTIONS (50x50MM @450MM c/c) 150MM THK FOLDED PUMP PLACEDFFL=-0.55M ON TOP CHORD OF STEEL TRUSS R.C.C STAIRCASE HOLLOW CIRCULAR SECTION SSL=-0.51M (WELDED TO TOP CHORD) 1090MM TALL WITH NEERU FINISH PLASTER ANGLE CLEATS ISA 6565 (10MM THK)
10
09
07 06 05
DETAIL OF TRUSS END 03 JUNCTION
A-403b
19
1450
17 16
10
10
B17
39
38
37
32
31
30
29
16
B41
2
PB47
Q 26
25
08
GROUND LEVEL
200
160
1500
450
02
18
17
13
450
PUMP ROOM FFL=+0.55M SSL=+0.25M
LASS ANELS R SPACE ESSICANT 19 EALANT
21
24
23
22
21
20
19
24
18
26
25
25MM THK SCREEDING ON R.C.C SLAB 150MM THK FOLDED BOTTOM CHORD ISA 6565 R.C.C STAIRCASE 230 x 450MM PERIPHERAL FLOOR LANDING R.C.C BEAM
23
20
B46
TOP CHORD ISA 6565
B17
29
28
22
19
K
33 32
31 30
32
01
UP
230 x 450MM PERIPHERAL FLOOR LANDING R.C.C BEAM
65
5
PB53
11
P B17
SCALE 1:20
TOILET 12 ARCHITECTURAL SECTION FFL=+0.75M 17
14
13PB56
W. EEDING ATTI160
B51'
12
25
11 SSL=+0.71M 80 SECTION THROUGH STAIRCASE FLIGHTS AND TOILET 16 TOP CHORD 10 80 15 SCALE 1:50 0 09
FFL=+0.55M TS AND TOILET SSL=+0.25M SCALE 1:50
W IDDLE AIL
23
22
MANGALORE TILES 21 20 19 BOX SECTION 18
B93
CTIONPUMP ROOM 12 PB61
26
13
24
65
A-301a
16
15
14
M
B51
B56
B103 27
560
3140
450
1090
580
550
13 10
18
B56
17
450
MIDLANDING FFL=+2.70M 02 SSL=+2.66M
19
DETAILED SECTION OF 120 NORTH LIGHT TRUSS
20
3690
2170 3690
200
A-403a
PRODUCED BY AN AUTODESK STUDENT VERSION
2170
K
23
27
13
33
03
39
12
39
38
37
36
35
34
HOLLOW STEEL BOX SECTIONS 80MMØ NEWEL POST - STAINLESS STEEL HOLLOW CIRCULAR SECTION 12MM TREAD TILE- REST
0
B41
B41
22
28
12MM THICK TILING
38
37
36
35 34
02
10
20
25
24
23
22
21
20
19
29
SPAN=605021
43
42
41
UP
80
B32
FLOOR LANDING FFL=+4.80M SSL=+4.72M
2455 FLOOR 25 LANDING FFL=+4.80M SSL=+4.76M
HOLLOW CIRCULAR SEC SCALE 1:20 40MMØ BALUSTERS - STAINLESS STEEL DOUBLE-PITCH RIDGE PIECE HOLLOW CIRCULAR SECTIONS 20MM THK STAINLESS S (@300MM C/C) MANGALORE TILE
54
53
40
80MMØ NEWEL POST - S
61
60
59
58
57
65
MIDLANDING FFL=+2.70M SSL=+2.66M
0
30 8 B46' PERFORMING AREA
230 26
18
42 41
40 39
DETAILED SECTION OF WORKSHOP TRUSS
56
39
58
57
56
55
54
25°
B93 TOP CHORD
31
26
45 44
43
32
45
HOLLOW CIRCULAR SEC (@300MM C/C)
53
55
44
64
63
62
61
60
59
80MMØ HANDRAIL- STAINLESS STEEL HOLLOW CIRCULAR SECTION
62
03
48
46
B76 40MMØ BALUSTERS - ST
CORRIDOR
64
25MM THK SCREEDING ON STEEL BOX SECTIONS R.C.C SLAB
47
46
65
5
27
48
B68
63
49
12MM THICK TILING 47
49
B46
33
25°
BOX SECTION 40
40MM Ø HANDRAIL
FLOOR LANDINGMANGALORE TILE FFL=+4.80M 40MM Ø BALUSTERS SSL=+4.76M
1250
34
43 42
41
40
B51
B14
28 2250
B32
45 44
63
B51
53
29
450
450
65
35
65
62
61 60 59 58
1100
K
36
40MM Ø BALUSTERS
65
64
54
B25
80MMØ HANDRAIL- STA HOLLOW CIRCULAR SEC 65
R.C.C. BEAM
57 56 55
GE
RIDGE PIECE
METAL CHIMNEY
COMBINED WORKSHOP 1
PRODUCED BY AN AUTODESK STUDENT VERSION
930
37
100MM THK BRICK BAT COBA TO PROVIDE SLOPE TO TERRACE 450
2940
38
MANGALORE TILES
48 47 46
Q
B26
2830
49
MANGLORE TILE ROOF TILE SIZE(250MM x540MM)
2150
39
P
100MM THK BRICK BAT COBA TO PROVIDE SLOPE TO TERRACE
32SCALE 1:20 31 30
1500
2110
1500
FLOOR LANDING FFL=+8.70M
MANGLORE TILE ROOF SSL=+8.66M TILE SIZE(250MM x540MM) P Q
M
850
930
K FOLDED RCC STAIRCASE 150MM THK
40MM Ø HANDRAIL
B60
2830
B38
37
B26
14
1110
18
SPAN=6050 MIDLANDING 36 FFL=+6.60M 35 K M 34 SSL=+6.56MDETAILED SECTION OF NORTH LIGHT TRUSS 33 A-403a
50
1040
1050
B103
B18
3390
38
ANGLE STRUTS ISA 5555
M.S GUSSET PLATE
PRODUCED BY AN AUTODESK STUDENT VERSION
450
FOLDED RCC STAIRCASE 150MM THK
COPING STONE 150 MM THK WITH 25MM EXTERNAL PLASTER AND PAINT
01
25°
25°
PARAPET WALL 1050MM HIGH (230MM THK BRICK MASONRY)
04 03 02
4540
B14
COPING STONE 150 MM THK WITH 25MM EXTERNAL PLASTER AND PAINT
39 PERFORMING AREA
230
PRODUCED BY AN AUTODESK STUDENT VERSION
PARAPET WALL 1050MM HIGH (230MM THK BRICK MASONRY)
B25
93
06 05
8
850 2150 18
450
450 MIDLANDING FFL=+6.60M SSL=+6.56M
08 07
TOP CHORD ISA 6565
PRODUCED BY AN AUTODESK STUDENT VERSION
19
11 10 09
B14
1340
13 12
SQUARE BOX SECTIONS
RCC OVERHEAD TANK (1500MM DEEP)
B114
B1
4540
18 19TILE (260x540MM) MANGALORE
17
B111
OHT TOP LEVEL DOUBLE-PITCH +17.2M (360x520MM)
2030
16
360
IPS FLOORING
2980
14 15
13
12MM THK NEERU FINISHED INTERNAL PLASTER
0
12
01
19
2550
11
18
80
10
CORRIDOR FFL=+0.60M17 SSL=+0.56M
16
25
09
14 15
13
1) A spe 2) T dim to b RESTING ON BOX SECTIONS 3) A OHT TOP LEVEL (50x50MM @450MM c/c) spe +17.2M ANTISKID GRIP ON RAMP 700 D3 (700x700MM) 4) T PLACED ON TOP CHORD OF STEEL TRUSS dim 0 SCREWED TO MANGALORE TILES 5 4 PRODUCED BY AN AUTODESK STUDENT VERSION elev site B1 (10MM THK) TRUSS BOTTOM CHORD NUT 5) T 14 DOUBLE ANGLE SECTIONS BACK TO BACK B14 REVIS pro BOLTED TO BASE PLATE, BASE B25 B1 GROUND LEVEL eng PLATE IS WELDED BEAM con DATE REVISION TABLE PB96 PB105 PB111 PB113 PB132 PB137 PB139 MIDLANDING REBARS req PB89 (8MM THK) of w FFL=+2.70M DATE REVISION DESCRIPTION PB82 B18 SSL=+2.66M 6) T ALTERNATIVELY ATTACHED ON EITHER SIDE TERRACE PARAPET LEVEL wor +13.8M OF B38 GUSSET PLATE TERRACE PARAPET LEVELB26 FLOOR LANDING (MATTE FINISH WELDED TOonB +13.8M var (10MM THK) FFL=+8.70M B25 dra SSL=+8.66MTERRACE FLOOR LEVEL CONNECTS DIFFERENT MEMBER BY NUT-BOLT elec STAINLESS STEEL 01 02 03 04 05 06 07 08 09 +12.7M 10 11 12 plum MIDLANDING TERRACE FLOOR LEVEL B3 PRODUCED BY AN AUTODESK STUDENT VERSION sys MIDLANDING +12.7M HOLLOW CIRCULAR SECTION FFL=+2.70M STEEL TRUSS RESTING ON R.C.C. COLUMN 7) B18 SSL=+2.66M FFL=+2.70M and (ANGLE CLEAT NUT-BOLTED TO M.S. PLATE) SSL=+2.66M TIEBACK=4290 bes GENER 2390 FLOOR LANDING (WELDED8)OA SPAN=7300 FFL=+8.70M PRODUCED BY AN AUTODESK STUDENT VERSION RCC OVERHEAD TANK 1) All dim (230x450MM) of t 40 B25 SSL=+8.66M (1500MM DEEP) 80 specified arc WITH 25MM EXTERNAL PLASTER A B 2) Thethe dr GENERAL NOTES STAINLESS STEEL A B B3 dimensio 9) A B3 RIDGE PIECE BEDDED MONOPITCH 1) All dimensions are in 'millimeters' unless 360 to be follo of s (MATTE FINISH WELDED TO BALUSTERS) HOLLOW CIRCULAR SECTION (270x520MM) specified 3) All leve eng WORKSHOP TOP WORKSHOP ROOF TOP A-403d DOUBLE-PITCH RIDGE PIECE 2) The drawingROOF is not to be scaled. The B14 MANGALORE TILE (260x540MM) specified. dimensions are strictly +10.00M (360x520MM) +10.00M to be followed. RESTING ON BOX SECTIONS 02 4) The co STAINLESS STEEL 360 3) All levels are unfinished levels unless B46 (MATTE FINISH WELDED dimensio TO BA B32 MIDLANDING SQUARE BOX SECTIONS(50x50MM @450MM c/c) specified. HOLLOW CIRCULAR SECTION RESTILE TECHNO SLABS TILE B25700 (260x540MM) elevation METAL CHIMNEY (700x700MM) 4) The contractor shall verify all on site PLACED ON TOP CHORD OF STEEL TRUSS FFL=+6.60M SECOND FLOOR LEVEL dimensions including site. SCREWED TO MANGALORE TILESSECOND FLOOR LEVEL SSL=+6.56M RESTING ON TIMBER BATTENSMATTE FINISHED(1520x600MM) 450 elevations prior to the commencement of work on +8.70M 5) The co FLOOR LANDING site. (670x520MM) +8.70M TOP CHORD ISA 6565 (10MM THK) TRUSS BOTTOM CHORD NUT (WELDED PARAPET WALL 1050MM HIGH ON BASE PLATE) project 5) The contractor shall inform the architect and/or FFL=+4.80M (230MM THK BRICK MASONRY) 01 DOUBLE ANGLE SECTIONS BACK TO BACK 70 project BOLTED TO BASE PLATE, BASE B3 (260x540MM) (ANCHOR FASTENED TO engineer STAIR SSL=+4.72M 01 40 80 B14 0 engineer on site regarding any PLATE IS WELDED BEAM condition 54 80 B46' B41 conditions/modifications RESTING ON TIMBER BATTENSTHROUGH TILE AND SCREEDI REBARS required t STAINLESS STEEL required to be done prior to the commencement MIDLANDING COPING STONE 150 MM THK ANGLE STRUTS ISA 5555 (8MM(50x50MM THK) @450MM c/c) of work. of work. WITH 25MM EXTERNAL MIDLANDING 300 FFL=+6.60M HOLLOW CIRCULAR SECTION PLASTER AND PAINT 6) The contractor shall coordinate and verify the ALTERNATIVELY ATTACHED ONOF EITHER SIDETRUSS 6) The co PLACED ON TOP CHORD STEEL SSL=+6.56M work indicated B26 B38 FFL=+6.60M (50x50MM @450MM c/c) OF GUSSET PLATE work indi on the drawings between the architectural and 110 SSL=+6.56M (WELDED TO TOP CHORD) WELDED TOvarious TOP CHORD OF STEEL TRUSS on the dra trade M.S GUSSET PLATE B3(10MM THK) FLOOR LANDING (MATTE FINISH WELDEDdrawings, TO BASE PLATE) including but not limited to structural, various tr CONNECTS DIFFERENT MEMBER BY NUT-BOLT electrical, WITH MATTE FINISH,ANTI-SKID RESTILE TECHNO SLABS TILE FFL=+4.80M drawings B3 plumbing, fire protection and exterior enclosure FOLDED RCC STAIRCASE (10MMNOSING THK) SSL=+4.72M B68 B76 (10MM THK) 150MM THK systems. MATTE FINISHED(1520x600MM) B51 B41 (1520x310MM) electrical, STEEL TRUSS RESTING ON R.C.C. COLUMN COMBINED WORKSHOP 1 B60 7) All work shall conform to relevant BIS codes plumbing CONNECTS and DIFFERENT MEMBER BYMIDLANDING NUT-BOLT DOUBLE ANGLE SECTIONS BACK TO BACK shall be CORRIDOR (ANGLE CLEAT NUT-BOLTED TO M.S. PLATE) B17 systems. TIEBACK=4290 55 70 KEY PLAN practice of each trade.TREAD 200 (ANCHOR FASTENED TObest STAIRCASE 2390 FFL=+2.70M 7) All wo (10MM THK) SPAN=7300 8) Any discrepancy is to be brought to the notice 55 80 SSL=+2.66M R.C.C. BEAM (230x450MM) of the and shall THROUGH TILE AND SCREEDING) FIRST FLOOR LEVEL BACK TO architect/SECTIONS consultant before commencement of BACK 100 DOUBLE ANGLE B51' B46 best prac WITH 25MM EXTERNAL PLASTER MANGLORE TILE ROOF 300 WITH MATTE FINISH (1520x150 the site. PROJECT NAME: +4.80M TILE SIZE(250MM x540MM) 8) Any dis A B 9) All work is to be completed to the satisfaction FIRST of site FLOOR LEVEL of the MIDLANDING PANCHAVATI ANECDOTES 110 (10MM THK) engineer/ project manager and architects A-403d PROJE +4.80M architect/ (8MM THK) FFL=+2.70M DOUBLE ANGLE SECTIONS BACK TO BACK SCALE 1:20 the site. SSL=+2.66M WITH MATTE FINISH,ANTI-SKID AND BULL-NOSE 100MM THK BRICK SHEET BAT COBATITLE: SHEET NUMBER: B3 ALTERNATIVELY ATTACHED ON EITHER SIDE 360 MIDLANDING WITH NEERU FINISH PLASTER TO PROVIDE SLOPE TO TERRACE 9) PAN All wor B17 TOILET (SPAN 5500MM) SECTIONS NOSING (1520x310MM) MANGALORE TILE (260x540MM) OF GUSSET PLATE FLOORING IN CENTRAL COUR B51 of site B46A FFL=+2.70M - 301a FFL=+0.75M DOUBLE-PITCH RIDGE PIECE B32 PUMP ROOM RESTING SSL=+0.71M ON TIMBER BATTENS SSL=+2.66M engineer/ SHEET (670x520MM) 200 A-403e FFL=-0.55M
(270x520MM)
08
RIDGE
12 PIECE
1040
08
3390
07
IPS FLOORIN
19
02
1500
06
PERFORMING FFL=+5.40 SSL=+4.75
18
B109
B
140 150
05
17
1250
04
28
B91
80
03
30 29
B82
A
25
02
B74
16
03
150
01
B66
RCCQ OVERHEAD TANK (1500MM DEEP)
14 15
100
P
31
3980
M
13
32
WITH WHITE PAINT PRODUCED BY AN AUTODESK STUDENT VERSION
PB152
K
35 34
450
SECTION THROUGH WORKSHOP AND PERFORMING AREA SCALE 1:50 RCC SILL (125MMPB152 THK)
PB139
37
D10
11
610
10
300
IPS FLOORING
1500
FFL=+4.80M SSL=+4.76 M
09
440
450 300
750
W2
02
1050
GROUND LEVEL
ARCHITECTURAL 03 04 05 06 07 SECTION 08
PB139
2020
01 A-301a
01
B93
ARCHITECTURAL SECTION
SECTION THROUGH WORKSHOP AND PERFORMING AREA SCALE 1:50
25
PB137
PB137
39 38
1240
750
PB82
PB132 GROUND PLINTH LEVEL +0.75M
IPS FLOORING
90
PB113
1150
PB111
PB152
01 A-301a
SSL=+4.76M
920
PB105
B76
GROUND PLINTH LEVEL CORRIDOR +0.75M FFL=+4.80M
COMBINED WORKSHOP 1
GROUND LEVEL (3070x4020 MM)
PRODUCED BY AN AUTODESK STUDENT VERSION
PB96 PB89
B68
600
B60
RCC BEAM 230MM x 600MM
600 150
STEEL TRUSS TO SUPPORT ROOF (NUT BOLTED VIA STEEL PLATE TO RCC BEAM)
2550
2550
01
600
PB89 PB82
02
RCC CHAJJA (75MM THK)
07
ARCHITE SECTION THROUGH
PB139
06
03
06
01 A-301a
GROUND LEVEL
08
05
05
GROUND PLINTH LEVEL +0.75M
58
BOX SECTIONS (50MM x 50MM)
01
04
PB132
FIRST FLOOR LEVEL +4.80M
FIRST FLOOR LEVEL +4.80M
05
10
D3
2110
B121
04
13
GROUND LEVEL
M
139
06
139
12 11
B121
B114
610
08
D3
2110
450
01
300
B109
IPS FLOORING
L
139
NORTH LIGHT STEEL TRUSS NUT BOLTED ON RCC BEAMS. (FOR PERFORMING AREA)
09
02
K
B103
610 B111
10
03
2020
01
11
CORRIDOR FFL=+0.60M SSL=+0.56M
J
02
B109 2020
B82
440
B74
B111
03
IPS FLOORING
IPS FLOORING
01
2550
PERFORMING AREA FFL=+5.40M SSL=+4.75 M
28
3980
1240 90
1440
920
32 31 30 12MM THK NEERU FINISHED 29 INTERNAL PLASTER
450
B103
COPING STONE 150 MM THK WITH 25MM EXTERNAL PLASTER AND PAINT
B91 440
34 33
H
02
B109 2020
B82
G
03
28
300
B74
450
B66
36
450
2080
B93
B103
PERFORMING AREA FFL=+5.40M SSL=+4.75 M
30 29
IPS FLOORING
35
PRODUCED BY AN AUTODESK STUDENT VERSION
SECOND FLOOR LEVEL +8.70M F
2350
RCC OVERHEAD TANK
31
37
D10
WORKSHOP ROOF TOP +10.00M
440
450
B93
34 33
1240
920
39 38
IPS FLOORING
B66
36 35
SECOND FLOOR LEVEL +8.70M
2350
IPS FLOORING
38 37
32
CORRIDOR BRICK MASONRY WALL(230MM THK) FFL=+4.80M 25 MM THK EXTERNAL PLASTER SSL=+4.76M WITH WHITE PAINT
90
600 150
RCC SILL (125MM THK)
39
+10.00M
450
IPS FLOORING
B76
1440
600
600 450 300
COMBINED WORKSHOP 1 (3070x4020 MM) FFL=+4.80M SSL=+4.76 M
1150
W2
B68
PERFORMING AREA ROOF TOP +10.28M
1440
600 150
450 300
W2 B60
B76
CORRIDOR FFL=+4.80M COMBINED WORKSHOP 1 SSL=+4.76M PERFORMING AREA ROOF TOP (3070x4020 MM) IPS FLOORING +10.28M FFL=+4.80M SSL=+4.76 M WORKSHOP ROOF D10 TOP
1150
RCC CHAJJA (75MM THK)
B68
600
600
B60
55 54
2080
59
56 RCC BEAM 230MM x 600MM
TERRACE FLOOR LEVEL +12.7M
450
OHT TOP LEVEL +17.2M
STEEL TRUSS TO SUPPORT ROOF 58 (NUT BOLTED VIA STEEL PLATE TO RCC BEAM) 57
TERRACE PARAPET LEVEL +13.8M
GENERAL NOTES
Q
750
P
450
N
2550
COPING STONE 150 MM THK WITH 25MM EXTERNAL LPLASTER AND PAINTM
K
300
J
2080
H
PRODUCED BY AN AUTODESK STUDENT VERSION
G
PB113
7
B
460MM THK BRICK MASONRY WALL
460MM THK BRICK MASONRY WALL Ø60 70
Ø60 60MMØ HANDRAIL - STAINLESS
STEEL, HOLLOW CIRCULAR 60MMØ HANDRAIL - STAINLESS SECTION(WELDED TO STEEL PLATE) STEEL, HOLLOW CIRCULAR 5MM THICK STEEL PLATE 160 20
(WELDED TO HANDRAIL AND SOLID
SECTION(WELDED TO STEEL PLATE) 20
5MM THICK STEEL PLATE
Ø60
70
57
PROJECT
PANCH
SHEET TIT
STAIRCA
PRODUCED BY AN AUTO
160
BEAM (ON 100MM THK PCC BED)
70
450
PB2
UNDERGROUND R.C.C. WATER TANK (3200x3900x1500MM) CAPACITY=15M³
19
18
19
18
01 A-402b
14
DETAILED SECTION OF STAIRCASE
14
SCALE 1:20
230MM THICK BRICK MASONRY WALL
(WITH 12MM THK INTERNAL PLASTER 25MM THICK EXTERNAL NEERU FINISH PLASTER)
C22- 230x500 F
300
1240
300 300 2130
300
230x500MM RCC COLUMN SUPPORTING THE STAIRCASE
330
300
1000
300
(WITH 25MM EXTERNAL PLASTER)
1000
C4- 230x500 600
F
DN
1500 600
08
E
14 600
16
17
18
19
06
05
20
04
21
03
22
02
23
60MM Ø HANDRAIL
01
24
25
C21- 230x500
26
1450 Ø800
600
600 4200
MIDLANDING FFL=+2.70M SSL=+2.66M 13
12
11
10
09
08
07
06
05
04
03
02
E
STAINLESS STEEL HOLLOW CIRCULAR SECTION
12MM THICK MIDLANDING TILING
CENTRAL COURTYARD FFL=+0.75M SSL=+0.65M
1600
C3- 230x500
15
07
RESTILE TECHNO SLABS TILE MATTE FINISHED(1520x600MM)
80MM Ø NEWEL POST STAINLESS STEEL HOLLOW CIRCULAR SECTION 1100MM TALL
01
600
12MM TREAD TILING 1380
UP 3910 600
1200
310
300
300
300
300
300
300
300
300
300
300
300
RESTILE STEP UP TILE WITH MATTE FINISH,ANTI-SKID AND BULL-NOSE NOSING (1520x310MM)
1600
01 A-402
300
60MM Ø HANDRAIL
B
140
B
C2- 230x500
STAINLESS STEEL HOLLOW CIRCULAR SECTION FIXED ON WALL
460
C20- 230x500
19
18
DETAILED PLAN OF STAIRCASE A-402a
14
SCALE 1:20
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION 19
14
18
MIDLANDING FFL=+6.60M SSL=+6.56M
40MM Ø HANDRAIL
36
35
32
15
12
300
16
31
30
29
20
21
22
28
24
23
27
FLOOR LANDING FFL=+4.80M SSL=+4.76M
12MM THICK TILING
RESTILE TECHNO SLABS TILE MATTE FINISHED(1520x600MM)
25MM THK SCREEDING ON R.C.C SLAB
26
230 x 450MM PERIPHERAL FLOOR LANDING R.C.C BEAM
25
B17
150MM THK FOLDED R.C.C STAIRCASE
WITH NEERU FINISH PLASTER
80MM Ø NEWEL POST
11
10
09
08
07
06
05
04
03
2980
PUMP ROOM FFL=+0.55M SSL=+0.25M 2030
17
18
19
STAINLESS STEEL HOLLOW CIRCULAR SECTION
STAINLESS STEEL HOLLOW CIRCULAR SECTION 1090MM TALL
3380
1090
580
14
13
02
01
12MM TREAD TILING
RESTILE STEP UP TILE WITH MATTE FINISH,ANTI-SKID AND BULL-NOSE NOSING (1520x310MM)
CENTRAL COURTYARD FFL=+0.75M SSL=+0.65M
80MM Ø NEWEL POST STAINLESS STEEL HOLLOW CIRCULAR SECTION 1100MM TALL
80MM THICK PAVER BLOCKS
GL
UNDERGROUND TANK
1500
SW1
160
1570
TILING IN CENTRAL COURTYARD 720
PRODUCED BY AN AUTODESK STUDENT VERSION
33
3690
2170
MIDLANDING FFL=+2.70M SSL=+2.66M
B3
40MM Ø BALUSTERS
34
1100
37
2250
38
930
B3
STAINLESS STEEL HOLLOW CIRCULAR SECTION
1110
39
SW2
PB22
600x230MM RCC PLINTH BEAM (ON 100MM THK PCC BED)
450
PB2
UNDERGROUND R.C.C. WATER TANK (3200x3900x1500MM) CAPACITY=15M³
19 19
18 18
01 A-402b
DETAILED SECTION OF STAIRCASE SCALE 1:20
14 14
230MM THICK BRICK MASONRY WALL
58
(WITH 12MM THK INTERNAL PLASTER 25MM THICK EXTERNAL NEERU FINISH PLASTER)
C22- 230x500 F
C4- 230x500
F
03
PRODUCED B
01
02
03
04
05
06
PRODUCED BY AN AUTODESK STU
01
C63- 230x500
01
02
03
C61- 230x500
04
05
C56- 230x500
230MM THICK BRICK MASONRY WALL
06
SILVER FINISH(1650x650MM) SILVER FINISH(1650x650MM) GL
250
270
250
03
H
04
03
05
04
06
05
3180
D
F
02
PB73
B
D
PB73
DETA A-401b
01
01
SCALE SCALE 1:25 1:25
F
2530
H
PVC NAHANI TRAP(100MMØ) PVC NAHANI TRAP (100MMØ)
06
DETAILED PLANPLAN OF TOILET DETAILED OF TOILET A-401a A-401a
GL
800
210
210
2100 1410 800 4290
WASH BASIN- COUNTER TOP
CERA WASH BASINS-OVAL (SNOW WHITE)(560x470MM) (SNOW WHITE)(560x470MM) CODE-S2030104 CODE-S2030104
BELGIAN GLASS MIRROR BELGIAN GLASS MIRROR
W1
1520
W1
400
PARRYWARE(WHITE)(450x675x60MM) LARGE URINAL DIVISION (WHITE)(450x675x60MM) CODE- C0507 CODE- C0507
450
PARRYWARE LARGE URINAL DIVISION URINAL PARTITION
WASH BASINTOP CERACOUNTER WASH BASINS-OVAL
270
600
800
URINAL PARTITION
660
15 A-401d
1000 200
260 260
3180
1100
1100
(STAR WHITE)(460x300x710) HINDWARE URINALS (STAR WHITE)(460x300x710)
870
1620 800
710
15 02 A-401d
1410
1600
1600
OLYMPUS STANDARD URINAL
660
800
02
15 15 A-401c A-401c
B5
F
C59- 230x500 C59- 230x500
01
2100
710 2560
FFL=+0.15M PORCELAIN TILING SSL=-0.07M
770
1200
710
1200
WITH 12MM THK INTERNAL PLASTER
05
450
8401680
1680
920
840 840
340
340 01
WALL
WITH 12MM THK INTERNAL PLASTER
URINALS OLYMPUSHINDWARE STANDARD URINAL
250
H
B56
150MM INTERNAL WALL F
HIS
70 70
C67230x500 C67230x500 H
D5
HEIGHT-2400MM SOMANY TILES (POLO BIANCO) (GLOSSY WHITE)(300x300x12.5MM) HEIGHT-2400MM 150MM INTERNAL
250
250
B
B
B
TWO PIECE WALL HUNG WC
TWOWC PIECE WALL HUNG WC CERA CALLAGHAN CERA CALLAGHAN WC (SNOW WHITE)(630x405x730MM) CODE-S1031104 P TRAP (SNOW WHITE)(630x405x730MM)
B98
400
800
CODE-S1031104 P TRAP
9MM THICK FLOOR TILING
RESTILE GRANAMTIE COLLECTION 9MM THICK FLOOR TILING (STEEL GREY)(300x300MM) RESTILE GRANAMTIE COLLECTION B86
B93
B98
B93
WIRE (1200MM LONG) B87' GYPSUM BOARD PANELS
D
PB102
F
450
PB93
D
PB93
450
2410 2850
CRISP AIR EXHAUST FAN OPERABLE USHA LOUVERED (IVORY) CODE- B009ZBD3KO WINDOWS(600x500MM) DADO CLADDING OPERABLE LOUVERED
200
200
B87'
USHA CRISP AIR EXHAUST FAN (IVORY) CODEB009ZBD3KOFAN(150MMØ) EXHAUST
1520
SOMANY TILES (POLO BIANCO) WINDOWS(600x500MM) (GLOSSY WHITE)(300x300x12.5MM) DADO CLADDING HEIGHT-2400MM
SOMANY TILES (POLO BIANCO) OLYMPUS STANDARD URINAL
(GLOSSY WHITE)(300x300x12.5MM) HINDWARE URINALS HEIGHT-2400MM (STAR WHITE)(460x300x710)
350
400 800
400 800 1520 PB86
SCALE 1:25
EXHAUST FAN (150MMØ) 10MM THK (600x600MM)
600 400
1520 800
350
F
350 400 800
1520 350
430
900
1100430
500
100
1520
900
1520
2870
100
DETAILED SECTION OF TOILET-02
A-401c
4300
200
600
4300
200
450
450
450
450
250
2870 200
2420
PB102
A-401c
B87
160MM BBC FOR SLOPING FALSE CEILING HANGER WIRE (1200MM LONG) FALSE CEILING HANGER GYPSUM BOARD PANELS
500
1100
2420 400 800
400 800
350
1520
1520 PB112
PB112
B87
25MM THK SCREEDING
(600x600MM) 10MM THK
200
4500
250
4500
250
GREY)(300x300MM) 25MM THK (STEEL SCREEDING
160MM B86 BBC FOR SLOPING
250
B102
400
800 B102
350
PRODUCED BY AN AUTODESK STUDENT VERSION
W1
CODE-F8030401AB CERA FAUCETS (POM FAUCET) WITH 1.2M BRAIDED HOSE PIPE DADO CLADDING CODE-F8030401AB
SOMANY TILES (POLO BIANCO)
05
06
B
(GLOSSY WHITE)(300x300x12.5MM) DADO CLADDING B56
06
250
PORCELAIN TILING
D5
D
D5
OLYMPUS STANDARD URINAL
HINDWARE URINALS HEALTH FAUCET
(STAR CERA FAUCETS (POMWHITE)(460x300x710) FAUCET) WITH 1.2M BRAIDED HOSE PIPE CODE-F8030401AB HEALTH FAUCET FAUCETS 9MM THICKCERA FLOOR TILING(POM FAUCET)
RESTILE GRANAMTIE COLLECTION PB87 WITH 1.2M BRAIDED HOSE PIPE (STEEL GREY)(300x300MM) CODE-F8030401AB
B
PB86
9MM THICK FLOOR TILING
B
B
RESTILE GRANAMTIE COLLECTION (STEEL GREY)(300x300MM)
PB87
B
DETAILED SECTION OF TOILET-02 SCALE 1:25
59
T VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
W1
1300
C49- 500 DIA
FFL=+0.15M HIS SSL=-0.07M
870
1300
D
07 07
D5
WITH 1.2M BRAIDED HOSE PIPE HEALTH FAUCET
08 08
C58- 230x500
D4
920
840
1150
CODE-S2030104
CERA WASH BASINS-OVAL HEALTH FAUCET (SNOW WHITE)(560x470MM) CODE-S2030104 CERA FAUCETS (POM FAUCET)
C49- 500 DIA
09 10 09
D4
770
C66- 230x500
870 720
2560
800
800
1100 1000
1150
1000
(SNOW WHITE)(560x470MM) C45C 230x500 WASH BASIN- COUNTER TOP
1620
C66- 230x500 F
10 11
C58- 230x500
SLATE TILING
F
C66(230x500MM)
11
TOP
1520
D5
12
B46
CODE-S1031104 TRAP TWO PIECE WALL HUNGPWC
CERA CALLAGHAN WC C (SNOW WHITE)(630x405x730MM) WASH BASIN- COUNTER CODE-S1031104 P TRAP CERA WASH BASINS-OVAL
C45- 230x500
13
B51
(WITH 12MM THK INTERNAL PLASTER WITH 15MM DADO TWOCLADDING PIECE WALL HUNG WC B51 DN25MM THICK CERA EXTERNAL NEERU WC CALLAGHAN FINISH PLASTER) (SNOW WHITE)(630x405x730MM) B
01
440
C54- 230x500
SSL=-0.07M PASSAGEWAY SLATE TILING
02
440
14
C57- 230x500
FFL=+0.15M
02
C54- 230x500
13 C57- 230x500
FFL=+0.15M SSL=-0.07M 1100
03
03
800
710
C66(230x500MM)
800 710
1600
D5
04
1000
14
PASSAGEWAY
05
04
1000
12
2100
C62- 230x500
1600
W1
2100
06
05
DN
PORCELAIN TILING
C62- 230x500
1000
W1
720
710
1000
D
C65- 230x500
800
800
300
250
300
C65- 230x500
D4
15
260
280
D
300
D4
PORCELAIN TILING
HER
FFL=+0.15M SSL=+0.01M
250
300
D5
710
260 W1
FFL=+0.15M SSL=+0.01M
15
870
D5
C W1
710
270
C
06
HER
1000
800
D5
710
1200
W1
710
1200 D5
2701300
280
340
W1
C56- 230x500
N AUTODESK STUDENT VERSION
-A-401b
1000
C61- 230x500
1300
340
-A-401b
02
B
C63- 230x500 B
01
(WITH 12MM THK INTERNAL PLASTER WITH 15MM DADO CLADDING 230MM THICK BRICK 25MM THICK EXTERNAL NEERU MASONRYFINISH WALLPLASTER) 01
B
06 Family Home at Nagpur
Professional Practice | Semester 8 | SJK Architects
Guided by - Ar. Payal Jain, Ar. Vaishali Shankar Project type - Residential Site - Nagpur, Maharashtra Site area - 922 sqm. B.U.A. - 1817sqm. The Nagpur house reinterprets the idea of a ‘haveli’ to adapt to an urban, contemporary circumstance. Designed for a traditional Indian joint family - the emphasis is to ensure a variety of semi-open and enclosed common spaces that encourage a sense of togetherness and community, spaces that can help hold a large family together. Available ground area coverage led to a G+5 storied structure, at the physical and symbolic heart of which is a ‘chowk’ that brings in light and connects different levels and spaces. The skylight above the ‘chowk’ is a ‘jali’ – crafted in wood with traditional motifs, it will help diffuse the harsh Nagpur sun in the summer months; the motifs forming ever changing shadow patterns on the walls and floor of the ‘chowk’ with the movement of the sun. The jali’s also protects the verandah’s and jharokha’s of the bedroom’s while allowing for the flexible creation of interior micro-climates through their many layers. The aesthetic that emerges is both contemporary as well as seeped in tradition and aptly represents this family, navigating 21st century India with much celebration of 3 generations living together. There are 8 bedrooms, 6 living rooms and kitchens and pantries spread across 5 floors - all wrapping around the central atrium. The 4th floor is envisioned as an independant entity in a lighweight steel framework & is used to entertain guests, comprising - formal living, dining & bar. The top 5th floor serves as an amenity space with spas, a gym & storage.
60
Sections GFC Family home at Nagpur
TASK: Resolution of section,mainly for fourth and fifth floors. Updating section GFC drawings with reference to the same. Working towards resolution of staircase and roof and reflecting the same in section. Preparing and updating details for necessary junctions.
A
B
620
AA
AB
1615
B'
AC C
D
7000
1620
AD
E
AE
AF
2230
H
AG
5745
AH
I
1905
Centre of R7
11745
2115
Centre of R3 ,R4
J 620
4020
Skylight
Roof Level T.O.S.+23.100m Roof Level Eaves End T.O.S.+22.500m
Centre of post
Fifth Floor
Centre of post
Centre of post
Centre of post
150 200
200
200
150
Building Edge
3225
2400
2400
Existing Building Extent
200
150
R1
B16
6-8mm thk Internal Ceiling Plaster
D1
Verandah 2400
955
Non Structural Posts & Railing around courtyard
150
200
R3 B6b
R1
R3
MS Bracket in PVD finish
2380
2385
False Ceiling
955
Living Room Fixed railing
F.F.L.+4.600m
+0.000m STRUCTURAL:
MEP:
PMC:
Complete MEP Design Solutions
MANJUNATH & CO. CONSULTING ENGINEERS -2;665, Millernium, Veer Savarkar Marg, #236 5th CROSS, Dadar (W), K.G. NAGAR, Mumbai-400028. BANGALORE - 560019 TEL.NO.: 080- 26616610 nimish.shah@meptekcons ultants.com email: manjaxe2010@gmail.com
This "drawing" is the copyright of SJK Architects and shall not be used for any purpose other than
Roof Level T.O.S.+23.800m
Wooden screen and glass sandwiched window shutter
MS Staircase with Old BTC treads
230mm thk Brick wall 115mm thk Brick wall
Compacted Earth
200mm thk Light weight AAC wall
2400
Rubble Soling PCC
100
100
Note: Refer detail drawings for Steel open riser staircase
1. All Plinth Beams to be revised as per final Structural Drawings. 2. Staircase and Courtyard Railings have not been shown in the drawings for clarity. 3. Refer latest revision for relevant detailed drawings. 4. Refer latest revision of ID detailed drawing as mentioned
MATERIAL LEGEND
R1
100
3800
Informal Living Room
100mm thk Light weight AAC wall Brick Bat Coba
OTLA M.G.L
Brick Bat Coba with Waterproofing
PB1
PB3
RCC Slab / Beams
SECTION 2-2
GENERAL NOTES:
SPECIFIC NOTES / LEGEND:
1. All Dimensions Are In MILLIMETERS Unless Otherwise Specified. 2. All Dimensions Specified Are UnFinished Dimensions, Unless Otherwise specified. 3. All structural dimensions shall be referred as per Consultants' drawings. 4. DO NOT SCALE Drawing 5. Any10 Discrepancies In09 the Drawings Shall Be Brought To The Notice Of The Architect,Prior to Execution.
1. All Boxed Dimensions are finished dimensions (i.e. after plaster, dado etc). Remaining are unfinished dimensions. 2. All External surfaces of walls shall have 20mm thk External Sandfaced Plaster. 3. All Internal surfaces of walls shall have 12mm thk Backing Coat of Plaster + POP Punning. (Except toilet walls, which will receive waterproofing and dado finish).
600
250
150
150 3800
Dining Room
R3
D1
PB4
PB4
PB1 Refer NH-WD-DET-001 Section Q-Q
Ground Level
that for which it has been loaned.
Refer NH-WD-DET-005 Section J-J
D2
100 250
600
T.O.S.+0.550m
100
Plinth Level
302-303,VEENA KILLEDAR INDL.EST. ,10/14,PAIS STREET, BYCULLA-WEST, MUMBAI-400 011 TEL.NO.: 022- 2300 8766, 022-23008761 FAX.NO. : 022-2309 0983 email: design @sjkarchitect.com
R3 B6b
1450
Existing Compound Wall
2900
ON HOLD
Refer NH-WD-DET-004 Section E-E
D1
2400
2900
F.F.L.+0.600m
250
Caretaker's Room
3950
Ground Level
D7
2250
Refer NH-WD-DET-004 Section C-C
B.O.Chajja.+4.30m
B6
2400
First Floor Chajja Level
B4A
900
B4
2400
T.O.S.+4.550m
200
150
150
Fixed Glass
First Floor
ARCHITECT:
Note:
Sliding Jali
D4
11250 mm
3275
2385
3300
1310
Chajja Edge
Balcony Edge
Corridor
Refer NH-WD-DET-009 Section J-J
2400
2400
2400
Brickwall in elevation First Floor
R3 B6b
2385
Courtyard
Refer NH-WD-DET-008 Section E-E
D1
Pantry 2550
3500
WIW
2380
2400
B6
D7
D2
RCC Lift Shaft in elevation
2388
2400
2400
B4A
750
B4
Second Floor Chajja Level
2385
2388
T.O.S.+8.050m B.O.Chajja.+7.85m
1310
Corridor
250 200
150
Second Floor
150
Refer NH-WD-DET-008 Section C-C
F.F.L.+8.125m
B18
D2
D4
150
Pantry 2475
3500
WIW
Refer NH-WD-DET-012 Section J-J
Refer NH-WD-DET-011 Section E-E
D1
D7
D2
Second Floor
2400
3450
2400
B6
800
B4
Third Floor Chajja Level B.O.Chajja.+11.35m Wooden screen and glass sandwiched window shutter
400
T.O.S.+11.550m
2400
Third Floor
B16
D2
150
150
F.F.L.+11.625m
150
Refer NH-WD-DET-011 Section C-C
R.C.C. Chajja
Fixed Post/Railing Refer NH-WD-DET-014 Section F-F
D4
Verandah
2400
2475
3500
WIW
3263
2400
Refer NH-WD-DET-011 Section E-E
D1
D2
R4 B6b
2400
B.O.Chajja.+14.85m
Refer NH-WD-DET-013 Section D-D
3225
750
B6
Fourth Floor Chajja Level
Third Floor
3263
3263 200
T.O.S.+15.050m
False Ceiling 150 mm dia steel Column Sliding window
150
200
B2
200
200
1250
Fourth Floor Courtyard
Ext. false ceiling panel
Bar
2400
Pantry
F.F.L.+15.300m
Fourth Floor
D4
3263
4400
Fourth Floor
Refer NH-WD-DET-017 Section E-E
Refer NH-WD-DET-017 Section C-C
D1
2000
Chajja Edge
200
Balcony Edge
RCC upstand beam Composite Steel Beam
R5 B12
200
Refer NH-WD-DET-016 Section F-F
T.O.S.+15.250m
R7 B8a
B6
737
R6 B4
Building Edge
2850
T.O.S.+19.450m
150
B2
150
300
Fifth Floor
3300
T.O.S.+19.625m
150
T.O.S.+19.700m Fifth Floor Courtyard
PCC non-structural
KEY PLAN
REVISION NOTES:
PROJECT:
NAGPUR HOUSE
07
04A
4500
03A
1635
1310
04
03
02
02A
5170 2550
DRAWING TITLE:
SECTION 2-2
CLIENT:
JAIN FAMILY
08
DRAWING NO: NH-DD-SEC-001-R0
01A
01 R0 REV NO: DATE OF REVISION:
4500
1310
1635
DATE OF ISSUE: SCALE:
600
Skylight
02-03-2021
1:75
SHEET SIZE:
A2
PURPOSE : GFC DRAWING
Roof Level Eaves End T.O.S.+22.500m
Fifth Floor F.F.L.+19.700m
Fixed railing
Fifth Floor Courtyard
200 mm thk Brick bat coba
B3b R5
Fixed Post
Building Edge Balcony Edge
Terrace
2400
Fourth Floor F.F.L.+15.300m
Refer NH-WD-DET-018 Section H-H 3275
3263
Formal living room
3263
Refer NH-WD-DET-016 Section G-G False ceiling
4400
150 mm dia steel Column
R5
737
B3a
Ext. False ceiling panel
150
150
R5
B7
737
737
R5
Composite Steel Beam
1137
T.O.S.+19.450m
B1
150
250
Fifth Floor
150
T.O.S.+19.625m
Chajja Edge
Fourth Floor Courtyard
Fourth Floor Chajja Level
3450
Refer NH-WD-DET-014 Section H-H
B9a
200
200
B7
200
B3a
200
CB1
B1
B.O.Chajja.+14.85m
150
T.O.S.+15.050m
150
200
Fourth Floor
200
200
T.O.S.+15.250m
B.O.Chajja.+14.85m Fourth Floor Chajja Level
Building Edge
B7
200
200 3237
B7
200
2412 250
Refer NH-WD-DET-004 Section E-E
Informal Living Room
Lobby
250
MATERIAL LEGEND B9
PB1
Ground Level
230mm thk Brick wall
RCC column in elevation
115mm thk Brick wall 200mm thk Light weight AAC wall
PB4
+0.000m MEP:
Complete MEP Design Solutions
-2;665, Millernium, Veer
PMC:
100
100
250
100
550
T.O.S.+0.550m
MANJUNATH & CO. CONSULTING ENGINEERS
First Floor Chajja Level
Existing Compound Wall
Plinth Level
STRUCTURAL:
Wooden screen and glass sandwiched window shutter
B.O.Chajja.+4.30m Refer NH-WD-DET-004 Section A-A
Existing Compound Wall
ARCHITECT:
1. All Plinth Beams to be revised as per final Structural Drawings. 2. Staircase and Courtyard Railings have not been shown in the drawings for clarity. 3. Refer latest revision for relevant detailed drawings. 4. Refer latest revision of ID detailed drawing as mentioned
Brick wall in elevation
2412
Refer NH-WD-DET-008 Section A-A
600mm wide RCC Chajja
2900
F.F.L. +0.600m
3012
2400
Semi-Formal Living
3700
4000
Ground Level
Non Structural Fixed Posts & Railings around Courtyard
Note:
D2
1310
150
CB1
B.O.Chajja.+4.30m
B11a
Corridor
2550
for HVAC
200
B3
Courtyard
B5
3800
First Floor Chajja Level
B1
250
150
1500
900
T.O.S.+4.550m
Toilet
R1
Refer NH-WD-DET-011 Section A-A
Refer NH-WD-DET-008 Section E-E
150
Corridor 1310
First Floor
200
B5
3300
3012
3262
2862
3500
Refer NH-WD-DET-005 Section G-G
600mm wide RCC Chajja
First Floor
Toilet
Toilet
500 200
CB1
R3a
D2
Refer NH-WD-DET-011 Section E-E
20 mm thk External Sandfaced Plaster
F.F.L. +4.600m
Jharokha in elevation
3000
250
B3
200
200
T.O.S.+8.050m
B7
B5
150
Refer NH-WD-DET-009 Section G-G
Second Floor
Balcony
2400
Toilet
2979
3229
CB1
2400
12 mm thk Internal Backing Plaster + POP Punning
2829
3500
B3
Second Floor
Living Room
1310
150
B1
F.F.L. +8.125m
Corridor
2550
150
250
200
T.O.S.+11.550m
Courtyard
150
Refer NH-WD-DET-012 Section G-G
Chajja Edge
Third Floor
Corridor
3300
F.F.L. +11.625m
Toilet
1310
Balcony Edge
200
Third Floor
3225
3441
3500
3429
R.C.C. Chajja
PB2
PB2
M.G.L
100mm thk Light weight AAC wall Brick Bat Coba Brick Bat Coba with Waterproofing RCC Slab / Beams
PB1
SECTION 6-6
PCC non-structural
KEY PLAN REVISION of NOTES: NH-DD-SEC-003-R0 DRAWING The drawings are intellectual property SJK ArchitectsPROJECT: and cannot be used for anyNO: other purposes
GENERAL NOTES:
SPECIFIC NOTES / LEGEND:
1. All Dimensions Are In MILLIMETERS Unless Otherwise Specified. 2. All Dimensions Specified Are UnFinished Dimensions, Unless Otherwise specified.
1. All Boxed Dimensions are finished dimensions (i.e. after plaster, dado etc). Remaining are unfinished dimensions. 2. All External surfaces of walls shall have 20mm thk External Sandfaced Plaster. 3. All Internal surfaces of walls shall have 12mm thk Backing Coat of Plaster + POP Punning. (Except toilet walls, which will receive waterproofing and dado finish).
NAGPUR HOUSE CLIENT:
DRAWING TITLE:
SECTION 6-6
61
Beam Allignment GFC Family home at Nagpur
TASK: Trying out a couple options for peripheral twin steel columns by taking all
structural constraints and the visual impact into consideration. Rearranging spaces for better utilization of the floor space and better experience. Reflecting the same in the Fourth floor Beam Allignment GFC and updating respective details for the same. SLAB LEGEND
15.05m
5
RCC Beam
15.25m
6
100mm dia Sleeve, B.O. Sleeve at 50mm above Slab
7
RCC Column/Shear wall
Plumbing Shaft (900mm x 300mm)
200mm thk RCC slab
S2b
Plumbing Shaft (1150mm x 300mm)
S3
Electrical Shaft (900mm x 300mm)
S5
Storm water Shaft (125mm x 175mm)
02A
75
Ceiling plaster
T.O.S.+15.050m
B.O.S.+14.850m
H
15.05m
50mm thk Finished floor 25mm thk IPS Fourth Floor
Waterproofing
R4
Start point for steel
NORTH AD
AE
This "drawing" is the copyright of SJK Architects Column stops at 15.250m
08
05
S2a
Plumbing Shaft (900mm x 300mm)
S2b
Plumbing Shaft (1150mm x 300mm)
S3
Electrical Shaft (900mm x 300mm)
S5
Storm water Shaft (125mm x 175mm)
600 1500
1410
B6
LIFT
Toilet
eq 1800
300 300
100 04B
09
REVISION NOTES:
PROJ
Y B18
285
x
300
SC7
Note: Refer detail drawings for Steel open riser staircase
CB1
R0 03-11-20 300
R1
R2
B3
NAG
Slab edges and beam typology updated
02-12-20
F
B3a
B6
1310
04A
F Shaft sizes updated, Sunk slab added,
Column/Beam nomenclature and sizes updated.Change in drain location.
12-03-21 B3
x
x
x
S2 0.65 x 0.2 x
B7
C1
R4
175
955
Corridor
C1
B7
C1a
0.9 x 0.3 S2a
x
E
Bar
B16
B18
285 400
x
300
300
200
JAIN
03A
REV DATE
04
SC7
1100 E
B7
D
E1
2000
Detail D
SC6
CLIEN
07
1345 H
SC7
100 x
COURTYARD
SC7
B6b
D 75
175
B7
W1 2330
75
B6
Caretaker 02
C1a
C1a
S2b S3 FOURTH FLOOR 1.15 x 0.3 0.9 x 0.3 405 T.O.S. +15.225 M 100mm thk slab band
C
SC6
E1
SC7
515
600
02A 03
x
03 x
Plumbing Shaft (650mm x 200mm)
S1 0.255 x 1.355 x
x
W2
1010
300
B1
B16
Formal Living Room
x
B3a
485
B2
300
Detail A
Detail B
1015
300
S2
Note: Exact location of these walls shall be as per Fourth Floor Masonry drawing
x
x
HVAC & Plumbing Shaft (255mm x 1355mm)
B6a 2435
Toilet
785
1800
5170
SERVICES CUTOUT LEGEND
BUILDING EXTENT
17400
06
C1b
B3b
CHAJJA EXTENT
SC6D-D Section
08
Caretaker 03
eq
that for which it has been loaned.
B14
1130
C
1570
and shall not be used for any purpose other than
S1
SC7
3700
TEL.NO.: 080- 26616610 email: manjaxe2010@gmail.com
Dadar (W), Mumbai-400028. nimish.shah@meptekcons ultants.com
A
1. All Boxed Dimensions are finished dimensions (i.e. after plaster, dado etc). Remaining are 1570 1570 unfinished dimensions B10 B8 2. All External surfaces of walls shall have 20mm thk External Sandfaced Plaster. 570 895 FOURTH FLOOR x x x x 3. All Internal surfaces of walls shall have 12mm thk Backing Coat of Plaster + POP Punning. T.O.S. +15.250 M (Except toilet walls, which will receive waterproofing and dado finish). 4. Refer to Site Plan for Otla all around the Building.
x
TEL.NO.: 022- 2300 8766, 022-23008761 FAX.NO. : 022-2309 0983
SC7
NORTH
x
CHAJJA EXTENT
MANJUNATH & CO.
A
1285 200
x
100mm dia Sleeve, B.O. Sleeve at CONSULTING ENGINEERS -2;665, Millernium, Veer This beam can be partially 302-303,VEENA Savarkar Marg, 50mm above Slab KILLEDAR INDL.EST. upstand or downstand #236 5th CROSS, depending
Complete MEP Design Solutions
B2
B
530
6
Steel Column email: design @sjkarchitect.com
SC7
Staircase Slab Detail (1:10) B1
SPECIFIC NOTES / LEGEND:
1. All Dimensions Are In 2395 MILLIMETERS Unless Otherwise Specified. 300 300 2. All Dimensions Specified Are SC6 Unless UnFinished Dimensions, Otherwise specified. 3. All structural dimensions shall be 600 1315 referred as per Consultants' drawings. 4. DO NOT SCALE Drawing C1b 5. Any Discrepancies In the Drawings Shall Be Brought To The Notice Of The Architect,Prior to Execution.
CLIENT: 200mm deep metal stringer of 2 plates 12mm with a 16mm gap JAINthk FAMILY
2115
R1
SC7
x
15.25m
C1c
H
Detail C B2
1315
B8a
FOURTH FLOOR T.O.S. +15.250 M
B10a x
285
x
300
FOURTH FLOOR
x
300 01A
SC7
Terrace B16
T.O.S. +15.050 M
B18 Y
300
300
300
Formal Dining
B5
300
600
Pantry
300
4500
SC7
B5
FOLD IN SLAB
300
9
SC7
S5a
x
15.05m
RCC Beam
8
SC7
x
RCC Concealed Beam
5
K.G. NAGAR,
SC6
1310
4
on adjoining slab condition BANGALORE - 560019
1905
REV NO: 200mm thk RCCOFSlab REVISION: 12-03-20 DATE
75
15.25m
4500
15.05m
RCC Upstand Beam
NOTE 2:
GENERAL NOTES:
PMC:
RCC Downstand Beam
,10/14,PAIS STREET, BYCULLA-WEST,
SC6
175
NOTE 1: 1. Sizes of all Structural members shall be confirmed with Structural drawings prior to ordering or execution. 2. All these Structural beams are concealed in the RCC slab
MEP:
3
MUMBAI-400 RCC Column/Shear wall 011
1265
09
STRUCTURAL:
2
7
S5a
Shaft sizes updated, Sunk slab added, Column/Beam nomenclature and sizes 515 J updated.Change in drain location.
BALCONY
75
T.O.B. Level
15.25m
SC5
175
with a 50mm gap
1680
R1
12-03-21 I
H
Glazing as per detail dwg
1310
Type
ARCHITECT: R4 - ISMC 200 B/B
(Scale 1:40)
ISMC 200 B/B with a 50mm gap
x
BEAM/ COLUMN LEGEND Hatch
1
10
Detail D
RCC Chajja Wall on slab
200mm deep metal stringer of 2 plates 12mm thk with a 16mm gap
Plate as per structural detail
-
G1
AG
03-11-20 2560
X
G 1130
R0
AF
X E1
200mm thk Brick Bat coba PROJECT: filling Tread and Riser as per staircase detail dwgNAGPUR HOUSE
REVISION NOTES:
B
x
25 thk IPS
300
25 thk IPS R4
15.225m
EXTENT
300
15.225m
100
toCHAJJA be cast with the main slab
1820
150, Cantilevered
5
-
1470
25 thk IPS
800
15.225m
4
6
Waterproofing Toilet
that for which it has been loaned.
300 (Brick Bat Coba) =
02A 200
3
x
15.05m
15.05m 200mm 100 100 sunk+100mm raise Waterproofing
x
15.05m
04
2670
200
x
200
2a
1615
200
2
BALCONY
1d
15.05m
B6b
Note: Refer Staircase drawings for Stringer beam detail
100
1c
15.05m
25mm thk IPS 6mm x 6mm groove
SPECIFIC NOTES / LEGEND:
100
T.O.B/ T.O.S.+15.225m 150mm thk RCC slab
150mm thk RCC PMC: GENERAL NOTES: Cantilevered Slab (at 25mm 1. All Dimensions Are In level drop = 15.225m)
MEP:
Complete MEP Design Solutions
15.25m
115
200, Cantilevered 200, Cantilevered
1b
No
2330 Tension cables fixed slab to slab through stringer plates
90 50 90 100
4500
200
NH-WD-DET-014-R1 AE
185
200
1a
SECTION H-H
Fourth FloorDimensions are finished dimensions (i.e. after plaster, 1. All Boxed dado etc). Remaining are column centreline AB AC D grid spacing E MILLIMETERS Unless Otherwise AA unfinished dimensions 100 B.O.S.+15.075m 200100 (Brick Bat Coba) 2. All External surfaces of walls shall have 20mm thk External Sandfaced Plaster. 2000200mm thk RCCSpecified. Slab (at X X X=2230 X X 2. All Dimensions Specified Are 12mm 3. All Internal surfaces of walls shall have 12mm thk Backing Coat of Plaster + POP Punning. internal plaster thk 25mm level dropUnFinished = 15.225m) Dimensions, Unless (Except toilet walls, which will receive waterproofing and dado finish). A B C Otherwise specified. 4. Refer to Site6-8mm Plan for Otla MANJUNATH & CO. thkall around the Building. Terrace CONSULTING ENGINEERS -2;665, Millernium, Veer 22230 3. All structural dimensions shall be 302-303,VEENA KILLEDAR INDL.EST. Savarkar Marg, #236 5th CROSS, Waterproofing Dadar (W), ,10/14,PAIS STREET, BYCULLA-WEST, K.G. NAGAR, Ceiling plaster referred as per Consultants' drawings. Mumbai-400028. MUMBAI-400 011 BANGALORE - 560019 1615 7000 3850 1670 TEL.NO.: 022- 2300 8766, 022-23008761 TEL.NO.: 08026616610 nimish.shah@meptekcons NOTE 3:email: Waterproofing to 4. DO NOT SCALE Drawing 115 ultants.com FAX.NO. : 022-2309 0983 200 (Brick Bat Coba) email: design @sjkarchitect.com manjaxe2010@gmail.com continue on vertical surfaces for 5. BALCONY Any Discrepancies In the 25mm Drawings thk cement mortar with BUILDING EXTENT Toilet This "drawing" is the copyright of SJK Architects300mm above floor finish 115 115 Shall Be Brought To The Notice Of mesh as per struc detail Waterproofing weld Terraceother than and shall not be used for any purpose The Architect,Prior to Execution. Filling depth (mm)
Section
Corridor Slab D
Y
1
T.O.S. Level B6b
Fourth Floor B.O.S.+14.650m
135
100
Thickness(mm)
Fourth Floor B.O.S.+14.850m
12mm thk internal plaster
230mmB7 thk brick masonry aligned to RCC beam below as per Third floor Section H-H masonry
Centre of Detail - Staircase Slab G' R4
STRUCTURAL:
Fourth Floor T.O.S.+15.050m
55
Staircase Slab Detail
150
SLAB LEGEND Hatch
115
Fourth Floor
Section E1-E1
No
Fourth Floor T.O.B.+15.250m
230mm thk brick masonry B.O.B.+14.650m wall aligned to RCC beam as per Third floor masonry
Corridor Slab Detail (1:10)
100mm thk slab projection
25mm dro
structural dwg
6-8mm thk Ceiling plaster 115 Tread and riser as per staircase detail dwg
25mm thk IPS
25mm drop in corridor slab 12mm thk internal plaster
230mm thk brick masonry aligned to RCC beam below as per Third floor masonry
ARCHITECT:
03
200mm thk RCC slab
Fourth Floor
plaster
2330
13
25mm thk IPS
Fixed post as per detail dwg
50mm thk Finished floor
B7
Fixed post as per detail dwg
Twin Column view options
02A 142
Glazing as per detail dwg 50mm thk Finished floor
Fourth Floor
100
6-8mm thk Ceiling thk plaster 12mm internal
600mm wide RCC chajja
Fourth Floor Slab in elevation Glazing as per detail dwg T.O.B.+15.250m 12mm thk plate as per
175
Fourth Floor 150mm thk RCC slab B.O.S.+15.075m Fourth Floor 6-8mm thk
55
Centre of ISMC B/B
(Scale 1:40)
04 Column as per structural dwg 1310
6mm x 6mm groove T.O.S.+15.225m
100
S2a
100
NH-WD-DET-013-R2
Living Room Chajja Detail
200mm thk Brick Bat coba filling Column as per structural dwg
In-ground Light fixture within floor finish as per detail dwg
200mm thk Brick Bat coba filling with waterproofing for terraces
100
Plumbing Shaft (650mm x 200mm)
04
25mm drop in corridor/ slabdwg Fixed postlanding as per detail
25mm thk IPS
HVAC & Plumbing Shaft (255mm x 1355mm)
S2
DETAIL DetailBB
Section B-B
NH-WD-DET-013-R2 (Scale 1:40)
1310
6 X 6mm groove
S1
DETAIL DetailAA
20
Detail - Services Shafts 03
02A
50mm thk Finished floor
Column stops at 15.250m
SERVICES CUTOUT LEGEND
115
142
Glazing as per detail dwg
Steel Column
9
04 45
115
12 75
15.25m
RCC Concealed Beam
Fourth Floor B.O.S.+14.850m
25(w) x 6(d) mm Drip edge in plaster (Opt #1)
14170
RCC Upstand Beam
4
03A
185
3
6-8mm thk Ceiling plaster
4500
15.05m
1310
RCC Downstand Beam
Fourth Floor T.O.S.+15.050m
Vata in external plaster
5170
2
NOTE 1: 1. Sizes of all Structural members shall be confirmed with Structural drawings prior to ordering or execution. 2. All these Structural beams are concealed in the RCC slab NOTE 2: This beam can be partially upstand or downstand depending on adjoining slab condition
20 mm thick external sandfaced B3a plaster
2550
15.25m
8
W2
T.O.B. Level
R4 - ISMC 200 B/B with a 50mm gap
masonry
C1a
300
Type
1
08
sunkslab)
300
BEAM/ COLUMN LEGEND
300
06
X X(B.O.Sleeve at 50mm from top of
S1
1310
Wall on slab Hatch
300
200mm thk RCC slab
100mm dia sleeve in B1
B1 XX
Fourth Floor T.O.B.+15.250m
S3
Y
RCC Chajja
03A
Balcony Extent Chajja Extent
230mm thk Brick S2b
Y=14170 / 5=2834
6
-
405
BUILDING EXTENT
25 thk IPS
XX
200
25 thk IPS
15.225m
B6
200
15.225m
100
B6a
200mm thk Brick Bat coba filling
900
6mm x 6mm groove
200
150, Cantilevered
5
-
600
50mm thk Finished floor
300
4
25 thk IPS
1130
1150 CB1 X X
200mm thk Brick Bat coba filling XX for cantilevered slab with waterproofing for terraces
OUT
300
15.225m
485
Building Extent
300
200
08
IN
Tile drop
G
B14
10
1615 1500
300
3
Glazing as per detail dwg
B10
AD
300
15.05m
B3a
300
15.05m
200
C1b
B3b
300
15.05m
200
09
185
300
200
2a
04B
Column as per structural dwg
X X 300 X X
NOTE 3: Waterproofing to continue on vertical surfaces for 300mm above floor finish
Toilet Waterproofing Terrace Waterproofing 300 (Brick Bat Coba) = Toilet 200mm sunk+100mm raise Waterproofing
2
E1
100
-
200 (Brick Bat Coba)
1d
No
E 04A
50
15.05m
B'
25
1c
AB
Terrace Waterproofing
200
1b
A'
-
-
1570
15.05m
Waterproofing
50
200, Cantilevered 200, Cantilevered
Filling depth (mm)
200 (Brick Bat Coba)
200
15.25m
200
200
200
15.05m
1a
50 100
T.O.S. Level
200
600
Thickness(mm)
25
Hatch
1
50 100 200
No
S5a
B9
SC7
SC7
B9
SC7
SC7
B9
01B
02
SC6
600
01
SC7
300
SC7
300
B9
300
SC7
1500
SC7
300
S5a
BALCONY
1615
02
CHAJJA EXTENT 1690
1345
Beam Allignment Plan - Fourth Floor 62
ARCHITECT:
STRUCTURAL:
MEP:
Complete MEP Design Solutions
PMC:
A
1815 A'
A1 1615
15765 B' 1620
7000 B
C
D
1440
1840
2230 E
F
2465 G'
1905 H
2115 I
J
x=115mm
FOURTH FLOOR BEAM ALIGNMENT PLAN SCALE 1:75
GENERAL NOTES:
SPECIFIC NOTES / LEGEND:
1. All Dimensions Are In MILLIMETERS Unless Otherwise Specified. 2. All Dimensions Specified Are UnFinished Dimensions, Unless
1. All Boxed Dimensions are finished dimensions (i.e. after plaster, dado etc). Remaining are unfinished dimensions 2. All External surfaces of walls shall have 20mm thk External Sandfaced Plaster. 3. All Internal surfaces of walls shall have 12mm thk Backing Coat of Plaster + POP Punning. (Except toilet walls, which will receive waterproofing and dado finish).
NORTH
REVISION NOTES: R0 03-11-20
R1
02-12-20
Slab edges and beam typology updated
PROJECT:
DRAWING NO:NH-WD-PLN-BA-04
NAGPUR HOUSE
DRAWING TITLE:
CLIENT:
FOURTH FLOOR BEAM ALIGNMENT LAYOUT
Staircase GFC Family home at Nagpur
TASK: Trying out different options in 3D for spacing of tension cables in the staircase to take
a call on what works functionally, structurally and visually. Working out fourth and fifth floor flights. Reflecting the same in plans and sections. Preparation of stringer and beam junction details.
DRAWING TITLE:
STAIRCASE DETAIL DRAWING NO: NH-ID-DET-005-R0 DATE OF ISSUE: 16-03-2021 SHEET SIZE: A2
SCALE: 1:50
REV NO: R0 DATE OF REVISION: 04-02-2021 PURPOSE : INTERIOR DESIGN PROJECT:
NAGPUR HOUSE CLIENT: 08
07
5170
1310
JAIN FAMILY 08
03
2550
07
04
03
5170
REVISION NOTES: 1310
1310
2550
1310
90
89
UP
950
230mm deep metal stringer
A 101
1025
Tension cables fixed slab to slab through stringer plates
78
T4
79
80
81
82
83
84
85
86
87
112 111 110
104
F.F.L.+11.625 m
103 102
Fifth mid-landing F.F.L.+17.640m
101 100
GENERAL NOTES:
98
99
08
07
B
03
2550
12mm thk internal plaster
1310
Brick Bat Coba filling
1. All Dimensions Are In MILLIMETERS Unless 97 Otherwise Specified. 96 2. All Dimensions Specified Are UnFinished Dimensions,95 Unless Otherwise specified. 94 3. All structural dimensions shall be referred as per Consultants' drawings. 4. DO NOT SCALE Drawing 5. Any Discrepancies In the Drawings Shall Be Brought To The Notice Of The Architect,Prior to Execution.
93 92 91 89 88 86
1. All Boxed Dimensions are finished dimensions (i.e. after plaster, dado etc). Remaining are unfinished dimensions. 2. All External surfaces of walls shall have 20mm thk External Sandfaced Plaster. 3. All Internal surfaces of walls shall have 12mm thk 280 TYP. Backing Coat of Plaster + POP Punning. 81 (Except toilet walls, which will receive waterproofing and 80 dado finish).
99
1000 A
98
97
96
95
94
93
92
91
90
89
88
100
950
B7
78
1190
A
101 102 103 104 105 106 107 108 109 110 111 112
DN
T4 T4 T4 T4 T4 T4 T4 T4 T4 T4
82
79
T4 T4 T4 T4 T4 T4 T4 T4 T4 T4 T4
77
Fourth mid-landing
76
LEGEND (in elevation)
F.F.L.+13.463m
75
74 73 72
R.C.C. members
T4=250
71 70
3750
F.F.L.+17.640 m
69 68
Masonry wall
F.F.L.+19.800 m
T.O.S.+15.050m Fourth Floor
85 84 83
200
3700
87
167.045TYP.
H
F.F.L.+15.300m Fourth Floor Courtyard
90
SPECIFIC NOTES / LEGEND: 200
1310
04
B
5170
Roof Level
R4
107
105
T3=280
3700
F.F.L.+17.640 m
FOURTH FLOOR PLAN @1:50
108
250 TYP. 106
tread finished in wood
T.O.S.+19.450m
109
R4
DN
T3 T3 T3 T3 T3 T3 T3 T3
Roof Level
KEY PLAN
1140
100
A
F.F.L.+19.800m
T4=250
88
300
91
737
92
H=4500
93
H=3675
94
3263
95
150
96
3525
97
180TYP.
98
T4 T4 T4 T4 T4 T4 T4 T4 T4 T4
300
99
1000
150
1000
2000
25mm overlap for nosing
975
C1c
H mid-landing finished in wood
04
B
67 66
F.F.L.+11.625m
65
64
Third Floor
63
LEGEND (in section/plan)
54
18
250
36
10
Brick 34 bat coba filling 32 31 16mm dia M.S. cables 30 fixed slab to slab 33
12mm thk metal plate (support for mid-landing)
29 28
11
12mm thk metal plate (support for mid-landing)
27
W1
26
SECTION EE' @1:50
25 24 22
450
230mm deep metal stringer
Detail H-H'
5170 1310 40mm x 70mm wooden hand-rail
First Floor
280 TYP.
10 09
16 15 13
F.F.L.+2.687m
08
12
PMC:
STRUCTURAL: 11
10
MEP: 09 08
finished floor
Ground Level
07
06 Complete MEP Design Solutions
04
05 04
03
03
02 01
F.F.L.+0.600m
MANJUNATH & CO. CONSULTING ENGINEERS #236 5th CROSS, K.G. NAGAR, BANGALORE - 560019 TEL.NO.: 080- 26616610 email: manjaxe2010@gmail.com
-2;665, Millernium, Veer Savarkar Marg, Dadar (W), Mumbai-400028. nimish.shah@meptekcons ultants.com
02
01
Detail G-G'
100mm thk Grade slab 230x2100mm 16mm thk Base Plate
H (clear finished floor to finished floor height) = 4000/3525/3500/3675/4500mm (considering *50mm thickness as floor finish at slab and plinth levels) R at Ground to first floor= H/23 = 173.913 mm R at First to Second floor= H/21 = 167.857 mm R at Second to Third floor= H/21 = 166.667 mm R at Third to fourth floor= H/22 = 167.045 mm R at Fourth to fifth floor= H/25 = 180mm T at Ground to first floor & third to fourth floor= 280mm T at First to second floor & second to third floor= 300mm T at Fourth to fifth floor = 250mm
06
05
100
173.913TYP.
07
W1
Detail F-F' 1&2
18 17
14
1310
First mid-landing
11
8mm thk glass for railing 230mm deep metal stringer
2550
280 TYP.
B7
3750
03
173.913TYP.
04
19
200
07
F.F.L.+4.600m
23
21 20
08
F.F.L.+8.125m Second Floor
8mm thk ceiling plaster
H=4000
12
Second mid-landing F.F.L.+6.446m
B7
W1
B7
ARCHITECT:
SECTION DD' @1:50
PB2
SECTION AA' @1:50
600
First mid-landing
Detail C-C'
39
Indication of wooden tread, 38 37 steel plate 35
16 14 13
F.F.L.+2.687m
Detail E-E'
17
15
8mm thk glass for railing
B7
40
H=3525
280 TYP.
finished floor 44
41
300 TYP.
3300
19
W1
173.913TYP.
200
40mm x 70mm wooden hand-rail
45
42
Internal plaster
167.857TYP.
21 20
200mm thk RCC slab
200mm thk RCC slab 40mm x 70mm wooden hand-rail 8mm thk glass for railing
200
22
23
250
F.F.L.+4.600m
46
43
450
First Floor
48
P.C.C.
finished floor
Brick Bat Coba filling
49 47
finished floor
1310
200
2550
50
250
1310
51
R.C.C. slab/ beam/ column
230mm deep metal stringer
5170
H=3500
115mm thick Brick Masonry wall 53 52 W1
03
58
55
3300
230mm thick Brick 57 Masonry wall 56
F.F.L.+9.958m
04
B7
59
tread finished in wood
07
61
60
mid-landing finished in wood Third mid-landing
08
62
300 TYP.
200
250
B
166.667TYP.
FIFTH FLOOR PLAN @1:50
F.F.L.+0.600m Plinth Level +0.000m Made-up ground Level
The drawings are intellectual property of SJK Architects and cannot be used for any other purposes 302-303,VEENA KILLEDAR INDL.EST. ,10/14,PAIS STREET, BYCULLA-WEST, MUMBAI-400 011 TEL.NO.: 022- 2300 8766, 022-23008761 FAX.NO. : 022-2309 0983 email: design @sjkarchitect.com
63
Jaalis Family home at Nagpur
TASK: Trying out options for the look and feel of the jaali with
respect to the different railing patterns, the solid void proportion of the jaali in sketcup. Assisting in the structural resolution of the jaali framework and its members. Reflecting the same in GFC drawings and updating respective details.
A- TW frame for sliding shutters of the wooden Jali B- TW and glass Sandwich Jali sliding shutter C- TW patterned jali sliding shutter D- TW railing for Jali frame E- TW and glass fixed sandwich panel for railing F - TW patterned panel for railing
Jaali Railing - Solid Void options
GRID Balcony Extent Fixed railing 50mm thk Floor finish 12mm thk M.S. Base plate
Slope 1:150
6mm x 6mm groove 25 mm thk IPS
T.O.S. Level
200mm thk RCC slab Vata 100
75
100
200
(NOTE: 2nd or 3rd Slab) Guide strips
20 mm thick external sandfaced plaster
B.O.Chajja Level
25(w) x 6(d) mm Drip edge in plaster (Opt #1)
100
6 - 8 mm thk Ext. sandfaced Ceiling plaster 45 x 330mm Frame for tracks and guides for sliding shutters
DETAIL C 1:10
58 x 105mm Top Rail for sliding shutters fitting into tracks and guides
Graphic -Jaali
200
Details -Jaali
Frame for fixing tracks and guides for sliding shutters along with mosquito mesh 350 S01 Sliding Jali shutter (S02 and S03)(no glass)
S02
15 x 20mm Metal Bracing member (S03) 2120 - 2150 approx
S03
Drywall partition with wooden finish (seperate item) S03
S02
S01
S01
S02
S03
3300
3500
Sliding Jali and glass sandwich shutters (S01)
OUT
7230
IN EQ
45
2350
55
2230
1000
835
Fixed Jali and Glass Sandwich railing in Jharokha area
55 835
2230
Fixed railing 1000
1000 240
EQ
45
105
Guide strips
45
100 100 75
75
RCC Slab projection
75
45
Floor finish Detail C
SECTION 1-1
BALCONY
BALCONY
ELEVATION
Details -Jaali 64
RCC Column Al Sliding folding glass window (seperate item)
W03 50
2335
2
IN 100
W03
1 2260
100
2335
50
Interior Presentation Drawings Family home at Nagpur TASK: Preparation of presentation drawings of toilets for client meeting. Trying out options for wall pattern proportions, shower cubicle and WC door locations. Minor resolutions for storage unit. Reflecting the same in the drawings.
SECOND FLOOR MASTER TOILET PLAN
SECOND FLOOR MASTER TOILET (North)
SECOND FLOOR MASTER TOILET (South)
SECOND FLOOR MASTER TOILET (West)
SECOND FLOOR MASTER TOILET (East)
SECOND FLOOR MASTER TOILET (South) The drawings are intellectual property of SJK Architects and cannot be used for any other purposes
65
07 Courtyard House
Professional Practice | Semester 8 | SJK Architects
Guided by - Ar. Nikita Shahdadpuri, Ar. Vaishali Shankar Project type - Residential Site - Latur, Maharashtra. Site area - 39833 SQM. The Courtyard house is an ongoing residential project that takes cues from its context, which reflects in the scales, elements and configuration of the house. The wind movement guides the proportions of the courtyards enabling the spaces to be naturally ventilated and lit throughout the year. The Jaali openings as seen in the facade allow fresh air into the washrooms while also bringing in lightness to the elevation. The jaali breaks the scale of the elevation visually whereas the courtyards reach deep into the house, blurring the boundary between inside and outside.
66
Block Lineout Plan Courtyard House
TASK: Locating the different types of spaces within the main house plot boundary with reference to the setting out plan, marking necessary reference points and checking the same. M1
M9
G1
G9
C1
C5
C9
73000 DETAIL A
EQ.
EQ.
20650
10200
20370
LEGEND
8290
6620
6670
1
1
House boundary as per Vastu (73m x 45m) Blocks as per function
Master Block
Guest Block 0.45M LVL
0.55M LVL
Office Block 2830
0.45M LVL
0.55M LVL
3790 0.55M LVL
2420
2010
620
2600
6
0.55M LVL
2420
Bhramasthan
845
0.45M LVL
100
Entertainment Block
BOH
chk. 3575
0.45M LVL
chk. 4900
14 D
1170
chk. 4030
16 18
1480
1620
1670
0.55M LVL
0.55M LVL
18
0.45M LVL
chk. 6520
17500
3630
725
4780
14
2420
2185 3070
10 11
1475
B
4070
4145
Dining room
0.45M LVL
3110
10930
2100
8
5775
Entertainment Block
10500
45000
chk. 14880
6
°
2770
16
. 74
2300
9
5
2135 2010
EQ.
2380
5
EQ.
14630
14630
Circulation areas Open to sky courtyardsNo slab
Plot centrelines to locate house on site (for reference)
9850
9850
0.45M LVL
Entertainment Block
M1
0.55M LVL
19950
5270
M1
E2
3940
E4
18510
5115
E6
7945
E10
E12
5400
E15
100
27
6670
C5
1
100
27
C9 DETAIL A
Plot centrelines to locate house on site (for reference) ARCHITECT:
STRUCTURAL:
PMC:
MEP:
AEON Integrated Manjunath & Co. Building Design Consulting Engineers 302-303,VEENA KILLEDAR INDL.EST. Consultant LLP No 236 , 5th Cross ,10/14,PAIS STREET, BYCULLA-WEST, K G Nagar MUMBAI-400 011 Head Office: A-23, 3rd Near Shankarpuram TEL.NO.: 022- 2300 8766, 022-23008761 Telephone Exchange Floor Sector 9, Noida, FAX.NO. : 022-2309 0983 Bull Temple Road UP – 201301 email: design @sjkarchitect.com Bangalore - 560 019 Mumbai Office : Vijay Diamond, No. A3&B2, Tel. No.: (080) MIDC, Andheri (East) 26616610, 26616611 This "drawing" is the copyright of SJK Mumbai-93�M : +91 E-MAIL: Architects and shall not be used for any 9910491740 manjaxe2010@gmail.co purpose other than that for which it has been m
(Typical detail to locate built form wrt gridlines) Scale 1:50
GENERAL NOTES:
SPECIFIC NOTES / LEGEND:
1. All Dimensions Are In MILLIMETERS Unless Otherwise Specified. 2. All Dimensions Specified Are UnFinished Dimensions, Unless Otherwise specified. 3. All structural dimensions shall be referred as per Consultants' drawings. 4. DO NOT SCALE Drawing 5. Any Discrepancies In the Drawings Shall Be Brought To The Notice Of The Architect,Prior to Execution.
Refer to dwg no. CH- SET- PLN -01 for setting house on the plot
REV NO: R0 DATE OF REVISION:
KEY PLAN
DD/YY/MM
REVISION NOTES: R1
All structural dimensions shall be referred as per Consultants' drawings.
R1
All structural dimensions shall be referred as per Consultants' drawings.
R1
All structural dimensions shall be referred as per Consultants' drawings.
DD-MM-YY
Setting Out Plan Courtyard House
DD-MM-YY
N
DD-MM-YY
loaned.
PROJECT:
DWG NO.
COURTYARD HOUSE
DRAWING TITLE: MAIN HOUSE
CH - SET- PLN - 02
SETTING OUT
CLIENT:
21 FARMS PVT. LTD.
SCALE: 1:250
PURPOSE : GOOD FOR
SHEET SIZE: A3
DATE OF ISSUE: 08-05-2021
CONSTRUCTION
TASK:Locating the main house and the ancillary block on site with
respect to the site survey drawings for the new site by marking necessary reference points and checking the same for excavation. 281486 eq.
eq. 30000
14500
8855
Straight line joining plot end points
6260
6440
3°
5022
1 7.
.9
k ch
12700 9650
74672
chk. 60720
Ancillary Block
9500
k.6
ch 3°
9.4
chk. 23
eq.
675 C9
Plot boundary as per survey
1
00 730
Main House
° 96.21
74 .1
6°
D 121
B
chk.1
157413
c
86
0
61 hk. 9
6 328
M1
1
A
Existing road
40
00 450
27
C9 90.00 °
0
0 365
7° 4.1 ch k.1 2
44
eq. chk. 6397 2
620 k.1
ch
04
°
8° .7
10
05 °
k.1
35 .
ch
ch
59
362
k.1
438
116
80
k. ch
6
0
0 365
chk.
chk.
Straight line joining plot end points
C
5° .9
chk. 1465
M1
chk.
27
eq. chk. 81901
eq. chk. 163715 245616
The drawings are intellectual property of SJK Architects and cannot be used for any other purposes
67
Plinth Beam Allignment GFC
Bathtub Detail - Master Block
Master Block
2
Non structural RCC beam for sunken bath tub
1
1630
TASK: Resolution of Plinth beams with reference to the architectural layout of the Master Block. Updating GFC drawings for the same. Updating sectional details with reference to Plinth Allignment drawings. Understanding Column locations and their design relevance from Plinth beam GFCs and architectural set. Preparation of Column Allignment GFC drawings based on the same to get further clarity of their exact location on site. Continuing with updating sectional details for Master block.
Plinth FFL
150
(Construction of bathtub and its finishes to be detailed at a later stage)
(Courtyard)
+0.60M
OUT
(Bathtub)
TOS grade slab +0.55M Sleeve for drain pipe(to be detailed by Structural consultant)
450 50
450mm thk avg brickbat coba with waterproofing as per specs
MGL/TOS Sunk slab +0.00M
200
900
150mm thk RCC Sunk slab PB6
Rubble soling 230thk brick wall to contain waterproofing
TOS Bathtub slab
y y
PB2
-0.50M 50mm thk Box type waterproofing as per specs.
100mm thk PCC Rubble soling
RCC foundation column (in elevation) C1
C1
200 200
y y
SECTION - FF' 450mm thk avg brickbat coba with waterproofing as per specs
Steps constructed out of Stone slabs laid on metal plate(to access and service the plumbing pipes below,passing through hollow air cavity)
1 (Courtyard)
Top of grade slab
+0.55M
PB6
y
y
y
MGL
MGL
+0.00M 150mm thk PCC as per consultant's detail
This "drawing" is the copyright of SJK
Architects and shall not be used for any
450
AEON Integrated Building Design Consultant LLP
Head Office: A-23, 3rd Floor Sector 9, Noida, UP – 201301 Mumbai Office : Vijay Diamond, No. A3&B2, MIDC, Andheri (East) Mumbai-93�M : +91 9910491740
y y
SPECIFIC NOTES / LEGEND:
1. This drawing is to be red only for plinth and frame beam alignments and levels.All structural member sizes to be referred from structural drawings. 2. Routing of all the services through plinth level shall be referred to in conjunction with MEP co-ordinated drawings. 3. Do not refer these drawings for finishes.The same shall be updated post developement of Landscape finishes and Architectural finishes
PB1 600
PB26
y y y y
100
PB1 PB1
y y
y
y
PB13
y
y
TOS -0.05M
PLINTH BEAM ALIGNMENT LAYOUT MASTER BLOCK
a12
2225
l
AEON Integrated Building Design Consultant LLP
PMC:
g
6520
965
y
2570
y
5
y
410
y
y
y
y
y
ALIGN y
y
y
ALIGN
2125
1770
M6
GENERAL NOTES:
SPECIFIC NOTES / LEGEND:
1. All Dimensions Are In MILLIMETERS Unless Otherwise Specified. 2. All Dimensions Specified Are UnFinished Dimensions, Unless Otherwise specified.
1. This drawings is to be read only for plinth and frame beam alignments. All structural member sizes to be referred from structural drawing. 2.Refer dwgs CH-SET-PLN-01 & CH-LINE-PLN-02 for location of Start Point@ Grid Intersection M-1 and all other Column locations and alignments respectively. 3. Routing of all services through plinth level shall be referred to in conjunction with MEP co-ordinated drawings.
1270
E1
2400
2830
M8
M9
KEY PLAN
E3 REVISION NOTES:
Master block
Guest block
Dining
Office block
Entertainment block
Concealed Beam
-0.05 M LVL
Top of beam aligns with bottom of sunk slab
-0.20 M LVL
All beams are 200mm wide unless specified
9
SLABS LEGEND x = 200mm y = 100mm z = 150mm
NOTE: THIS PORTION TO BE READ FROM: CH - DIN - PB - PLN - 04
5440
+0.25 M LVL
All beams are 300mm wide unless specified
C1
470
a9
+0.40 M LVL
Top of beam aligns with bottom of grade slab All beams are 200mm wide unless specified
6 7
2190
PB45
y
Top of beam aligns with bottom of grade slab All beams are 200mm wide unless specified
2010
y y
BEAM TOP/ SLAB BOTTOM LEVELS
BEAMS
PB22
6130
M4a M5
Service pipes
2760
4770 eq.
a8
y
PB25
3090
250x250 RCC Pedestal (upto plinth level) for MS Columns
SERVICES
eq. 2650
C1
PB44 y
Stub columns upto Plinth level
1080
eq.
y PB41
TOS +0.55M
y
PB24
Stone Piers underneath cantilevered plinth beam (as per structural consultants detail)
ALIGN
y
M3
3040
5200
2650
OPENING
PB43
y
C1
y
y
2225
ALIGN
PB21
y
1100
h
y
C1 y
a10 j
y
y
y
y
1080
y
PB39 PB38
RCC jamb without corbel
Center-lines of columns are not gridlines. Therefore, centering and alignment of columns to be as per dimensions indicated in the column alignment plan
250mmx250mm cutout in slab for drainage pipes to pass through
a7
OPENING
ALIGN
2050
y
y RCC jamb corbel
TOS +0.55M
K'
COLUMN LEGEND
4
TOS +0.55M
y
team
Refer sheet no. CH-OB-PB-PLN 03 for Detail D
3e
y
y
RCC jamb corbel
y y PB23
2225
eq.
ALIGN
2050
z
PB35 y
C1
TOS +0.55M
y 2225
C1
TOS +0.55M
a11
2025
M2 MEP:
1550
k
3575
M1 STRUCTURAL:
y
y
y 1860
Note: Sizes yet DETAIL B be vetted by (Non-structural RCC jambs for doors/windows) to the structural
y
ALIGN
ALIGN
y
y
y
y
200
y
PB17
y
y
x
ALIGN y
Manjunath & Co. Consulting Engineers No 236 , 5th Cross K G Nagar Near Shankarpuram Telephone Exchange Bull Temple Road Bangalore - 560 019 Tel. No.: (080) 26616610, 26616611
z
y y
y
y
y y
ALIGN
Gridlines are center-lines of columns
ALIGN
RCC jamb without corbel
L' y
400
ALIGN
y
ALIGN
y
y
K
ALIGN
TOS +0.55M
y
y
y
TOS +0.55M
(To be detailed as per Landscape consultants Design)
C2 ALIGN
y
50
3a
a6
y
L
ALIGN
y
C2
y
TOS +0.55M
Ramp
+0.40M
RCC jamb corbel
z
TOS +0.55M
PB20
y 2600
TOS Passage
TOS +0.55M
y
C2
PB28
1090
PB19
6
TOS +0.55M
ALIGN
COURTYARD
RCC jamb corbel
ALIGN
COURTYARD
y
y
4d
ALIGN
y
M2
y PB27
1340
y
J'
Water body slab to be cast at a later stage
y
PB18
y
C1
C2
Align edge of plinth beam to the gridline
y
3 a5
PB36
C2
ALIGN
C1
M6 3d
600
J
PB16
ALIGN
x
300 x
PB31
y
y
220
1260
4c
y
y TOS +0.55M
y
C1
PB14
ALIGN DETAIL B
TOS -0.05M
M'
C1
y
DETAIL A
Scale-1:25
2b
RCC jamb without corbel
C2
y
C1
PB15
y
x5
TOS +0.55M
SHEET SIZE: A3
50
y
WATER BODY
TOS -0.05M
ALIGN
ALIGN
eq.
1080
y
z
CB2
RCC jamb corbel
RCC jamb without corbel
PB2
DATE OF ISSUE: 200
(Typical detail for M.S. column pedestal )
a4
C1
TOS +0.55M C1
y
TOS -0.05M ALIGN
C1
z
y
z
2340
4a
z TOS -0.05M
z y
SCALE: 1:25
1PURPOSE : GFC
1630 y
Confirm stub column
z
y
y
4
z
PB1 SECTION C2 PLINTH 01
SHEET SIZE: A3
DATE OF ISSUE:
19240
C1
y (To be detailed as per Landscape consultants Design)
CB1
PB30
PB26
2650
OPENING
5200
TOS +0.55M
RCC jamb corbel
D'
Centre1:25 of steel SCALE:
21 FARMS PVT. LTD. column
Scale-1:25
M
ALIGN
z
D
CLIENT:
2470
PB42
PB40
TOS -0.05M PB9
y
y
y eq.
C'
ALIGN
ALIGN DWGPlinth NO.beam : CH - MB - PB M1- SEC - 02 a y DWG NO.1180 : CH - MB - PB - SEC - 02 Centre of
PROJECT:
995
y
NOTE : SECTION - BB' 1) All Structural information toNOTE be cross : checked in structural drawing prior to execution. 1) All Structural information to be cross checked in structural drawing prior 2)All AAC walls to have patli beams and columns as to execution. per tender specifications. 2)All AAC walls to have patli beams and columns as 3)Landscape details have notper been shown in these tender specifications. drawings 3)Landscape details have not been shown in these 4)Unless specified tender specifications drawings shall apply. 4)Unless specified tender specifications shall apply.
2
4100
540 y
C1
y
y
C1
TOS +0.55M
x
y
C1
a6 HVAC drain pipe exit
ARCHITECT:
y
y
PB12
RCC jamb without corbel
600 400 y y
68
TOS -0.05M PB8
x
RCC Strip footing
150mm deep sand bed (As 100mm deep PCC per Structural Consultant's 150mm deep sand bed (As recommendation) per Structural Consultant's recommendation) y=100mm y=100mm
M4
y
eq.
y
Align edge of plinth beam to the gridline
a5
Scale-1:75
x
C1
C1
C
ALIGN
y y
y y
y TOS -0.05M
y
y
600 y 400
y
RCC jamb without corbel
F'
y
TOS +0.55M
a13
9
PROJECT:
PURPOSE : GFC
Align edge of plinth beam to the gridline 'f'
G'
RCC jamb without corbel
PB37
A'
RCC jamb corbel
RCC foundation column(in elevation)
ALIGN DD/YY/MM HOUSE COURTYARD DRAWING TITLE: MASTER BLOCK 1HOUSE COURTYARD DRAWING TITLE: MASTER BLOCK PLINTH SECTION 01
PB5
y
PB6
RCC jamb corbel
C1
R0
y
H'
z
3
M9
E'
TOS -0.50M
eq.
y
2650
PB26
OPENING
MODULE
5040
y
PB32
ALIGN
a14
y
E
y
PB4
DETAIL D
B'
y
y
PB33
y eq.
ALIGN
eq.
2
6670
x
500
300 y C1
PB29
B
500
C2
loaned.
DD/YY/MM
M7
y y
PB1
Architects and shall not be used for any
purpose other than that for which it has been
1630
Centre of steel column 25mm off gridline 1
ALIGN
R0
REV NO:
KEY PLAN
M4a M5
21 FARMS PVT. LTD.
Mumbai-93�M : +91 9910491740 DETAIL A This "drawing" is the copyright of SJK
Bangalore - 560 019
x
1
a
ALIGN
20650
M4
y
loaned.
M3
ALIGN
Architects and shall not be used for any purpose other than that for which it has been
y
B L Manjunath Structural Consultant Head Office: A-23, 3rd Manjunath & Co302-303,VEENA KILLEDAR INDL.EST. Floor Sector 9, Noida, No 236 , 5th Cross ,10/14,PAIS STREET, BYCULLA-WEST, 1180 UP – 201301 K G Nagar MUMBAI-400 011 Mumbai Office : Vijay Near Shankarpuram TEL.NO.: 022- 2300 8766, 022-23008761 No. A3&B2, eq. Telephone Exchange Diamond, FAX.NO. : 022-2309 0983 MIDC, Andheri (East) Bull Temple Road email: design @sjkarchitect.com
y
Centre of Plinth beam This "drawing" is the copyright of SJK
1605
302-303,VEENA KILLEDAR INDL.EST. ,10/14,PAIS STREET, BYCULLA-WEST, MUMBAI-400 011 TEL.NO.: 022- 2300 8766, 022-23008761 FAX.NO. : 022-2309 0983 email: design @sjkarchitect.com
SPECIFIC NOTES / LEGEND:
GENERAL NOTES:
DATE OF REVISION: 1. This drawing is to be red only for plinth and frame REV NO: SPECIFIC NOTES / LEGEND: GENERAL NOTES: KEY PLAN Master Office Guest Unless Otherwise Specified. beam alignments and levels.All structural member sizes DATE OF REVISION: blockand frame block 1. to Allbe Dimensions Are structural In MILLIMETERS 1. This drawing is to beblock red only for plinth 2. All Dimensions Specified Are referred from drawings. REVISIONGuest NOTES:3865 GEM Engineering Master Office 5600 Dimensions, Unless 3685 2835 965 structural member 3700 Otherwise alignments and levels.All sizes Services UnFinished Otherwise Unless 2. Routing of allSpecified. the services through plinthbeam level shall be block block block 2. referred All Dimensions Specifiedwith Are MEP co-ordinated to be referred 3800 from structural drawings. Entertainment REVISION NOTES: specified. to in conjunction CLIENT: R1 All structural dimensions shall be referred as AEON Integrated Dining y Otherwise 2. Routing of all the services through plinth level blockshall be 3. All structural dimensions drawings.Dimensions, Unless bshall be cUnFinished d e f Building Design perEntertainment Consultants' drawings. DD-MM-YY specified. referred LLP referred asConsultant per Consultants' drawings. 3. Do not refer these drawings for finishes.The sameto in conjunction with MEP co-ordinated B L Manjunath R1 ALIGNAll structural dimensions shall be referred as Dining 1080 815be 285 915drawings. 1635 3.400 All structural dimensions shall Structural Consultant BOH 4. DO NOT Drawing shall be updated post developement of Landscape a1 a2 a3 block HeadSCALE Office: A-23, 3rd Manjunath & Co DD-MM-YY R1 All structural dimensions shall be referred asper Consultants' drawings. referred asand per Architectural Consultants' finishes drawings. 3. Do not refer these drawings for finishes.The same Floor Sector 9, Noida, 5. Cross Any Discrepancies In theeq. Drawings finishes OPENING No 236 , 5th UP – 201301 per Consultants' drawings. BOH 4. DO NOT SCALE Drawing shall be updated post developement of Landscape DD-MM-YY K G Nagar Shall Be Brought To The Notice Of The 1100 2650 Mumbai Office : Vijay R1 All structural dimensions shall be referred as Near Shankarpuram G 5. Any Discrepancies In the Drawings finishes and Architectural finishes A3&B2, toNo.Execution. Telephone Architect,Prior Exchange Diamond, MIDC, DD-MM-YY A Andheri (East) R1 All structural dimensions shall be referred asper Consultants' drawings. Shall Be Brought To The Notice Of The Bull Temple Road 920 C1 F 920 C1 N Mumbai-93�M : +91 PB1 H PB2 C1 Architect,Prior 265 C1 Bangalore - 560 019 C1 ALIGN per Consultants' PB3 drawings. C1 to Execution. DD-MM-YY 9910491740 R1 All structural dimensions shall be referred as N per Consultants' drawings. DD-MM-YY C2
GEM Engineering Services
All structural dimensions shall be referred as
RCC Strip footing
SECTION - AA'
PMC: 1. All Dimensions Are In MILLIMETERS STRUCTURAL: MEP:
M1
AEON Integrated Building Design Consultant LLP
R1
RCC foundation column(in elevation) for MS column above ground.
100mm deep PCC
25
PMC:
MEP:
ARCHITECT:
y
STRUCTURAL:
N
RCC Foundation beam
RCC Strip footing
Plint Beam Alignment Layout - Master Block ARCHITECT:
All structural dimensions shall be referred as
per Consultants' drawings. 100mm DD-MM-YY thk PCC bed for plinth protection detail
FB1
SECTION - BB'
SECTION - AA'
MGL
R1
+0.00M per Consultants' drawings.
RCC Foundation beam
150mm deep sand bed (As per Structural Consultant's 150mm deep sand bed (As recommendation) per Structural Consultant's recommendation)
Eq.
DD-MM-YY
All structural dimensions shall be referred as per Consultants' drawings.
Grade slab: Top of Slab is 550mm above MGL Toilet slab sunk by 600mm from grade slab
MGL = +0.00m Toilet slab sunk by 1050mm from NOTE: grade slab Please note site level +95.00m has been indicated as MGL(+0.00m) for RCC ease of reading the drawing RCC wall and RCC door jambs PROJECT:
COURTYARD HOUSE CLIENT:
PRO
CO
CLIE
21 F
DD-MM-YY
RCC foundation column(in elevation)
100mm deep PCC
Eq. Eq.
R1
eq.
RCC Strip footing 100mm deep PCC
Eq.
DD/YY/MM
REVISION NOTES:
Rubble soling
RCC foundation column(in elevation) for MS column above ground.
y y
FB1
RCC Foundation beam
eq.
100mm thk PCC
Entertainment block
100mm thk PCC bed for plinth protection detail
y y
eq.
+0.55M REV NO: R0 DATE OF REVISION:
Office block
Guest block
MGL Dining
+0.00M PB1 BOH
C2
eq.
Master
Rubble solingblock
C2
RCC foundation column (in elevation)
RCC Foundation beam
Top of grade slab
100mm thk KEY PCC PLAN
GENERAL NOTES:
loaned.
RCC foundation column (in elevation)
+0.60M
Top of grade slab
1. All Dimensions Are In MILLIMETERS Unless Otherwise Specified. 2. All Dimensions Specified Are UnFinished Dimensions, Unless Otherwise specified. 3. All structural dimensions shall be referred as per Consultants' drawings. 4. DO NOT SCALE Drawing 5. Any Discrepancies In the Drawings Shall Be Brought To The Notice Of The Architect,Prior to Execution.
purpose other than that for which it has been
Rubble soling
FB2
50 GEM Engineering Services
B L Manjunath Structural Consultant Manjunath & Co No 236 , 5th Cross K G Nagar Near Shankarpuram Telephone Exchange Bull Temple Road Bangalore - 560 019
Rubble soling Footing for steps in solid concrete masonry or Footing for steps in solid brickwork(As per Structural concrete masonry or consultant's detail) brickwork(As per Structural consultant's detail) 100mm deep PCC bed 100mm deep PCC bed
FB2
PMC:
MEP:
SECTION - (Verandah) HH'
+0.55M
25-30mm thk stone for plinth 600 protection PB26 100
302-303,VEENA KILLEDAR INDL.EST. ,10/14,PAIS STREET, BYCULLA-WEST, MUMBAI-400 011 TEL.NO.: 022- 2300 8766, 022-23008761 FAX.NO. : 022-2309 0983 email: design @sjkarchitect.com
PB29 +0.00M 150mm thk PCC as per consultant's detail
y
STRUCTURAL:
Plinth FFL
+0.60M
50
PB29
PB29
+0.55M ARCHITECT: 25-30mm thk stone for plinth protection 100mm thk PCC
150mm thk RCC grade slab
Plinth FFL
195
200
PB6 PB4
PB29
750
DWG NO. : 100mm CH - MBthk - PB - SEC - 04 PCC
PB4
20mm thk external sandfaced plaster
(in elevation)
OUT
750
Top of grade slab
200
C1
OUT OUT (Verandah)
200
FFL 20mmPlinth thk external sandfaced plaster +0.60M
+0.60M
RCC beam design as per structural consultant's detail
OUT 300thk AAC wall
100
R=300mm T=150mm
y y
100
150mm thk RCC grade slab 300thk AAC wall
Plinth FFL
Plinth Beam
100mm thk PCC
150m x 150mm 'diamond soling with pin 150m x 150mm 'diamond shaped'Rubble MS column joints at top and bottom shaped' MS column with pin RCC foundation column 150mm thk RCC grade slab joints at top and bottom
750
IN
150mm thk Grade Slab
a Plinth Beam MGL/TOS Sunk slab
200
100
150mm thk RCC grade slab
IN
OUT
150mm thk Grade Plumbing pipe Slab exit
a
M1
PB2
200
RCC beam design as per structural consultant's detail
OUT
100
150m x 150mm 'diamond shaped' R=300mm MS column with pin joints atT=150mm top and bottom
125mm thk AAC walls
+0.00M
200
25
750
150m x 150mm 'diamond shaped' MS column with pin joints at top and bottom
2
Steps constructed in solid concrete masonry or brickwork 150mm thk RCC Sunk slab
200
1
M1
Steps constructed in solid concrete masonry or brickwork
MATERIAL LEGEND
AAC blockwork walls
125mm thk AAC walls
2
Centre of steel column 25mm off the gridline 1
25
TOS grade slab AAC blockwork walls +0.55M
200mm thk blockwork
Centre of Plinth beam
1
Centre of steel column 25mm off the gridline 1
+0.60M MATERIAL LEGEND
Corbelled Plinth Beam Detail - Master Block
200
Centre of Plinth beam
Plinth FFL
150
Entrance Step Detail - Master Block
OUT
+0.550M LVL -0.05M LVL -0.50M LVL
DRAWING NO: CH - MB - PB - PLN - 01 DRAWING TITLE: MASTER BLOCK
PLINTH BEAM ALIGNMENT
PU
Interior Finish Options Drawings Courtyard House
TASK: Trying out options for counter-top , shutters, shutter hardware and sanitaryware finishes. Creating mood boards for the same. Preparation of presentation drawings of these kitchen options for client meeting.
OPTION 1 : Prisne PU for shutter finish
SECTION 1
MOOD BOARD 1
OPTION 2 : PU Graphite for shutter finish
SECTION 2
MOOD BOARD 2
OPTION 3 : PU Quicksilver for shutter finish
SECTION 3
MOOD BOARD 3 The drawings are intellectual property of SJK Architects and cannot be used for any other purposes
69
08
Louis I. Kahn Trophy
Documentation | Competition NASA (2017-18)
Site - Sagar Dighi, Cooch Behar Theme - Heritage and democracy Team Strength - 19 The aim of the 2017-18 Louis I. Kahn Trophy was to document buildings / complexes/ sites which are symbols of democracy. The structures which play an important role in the smooth functioning of the government. It was expected to document such administrative structures of any era, pre Mughal, Mughal, pre-colonial, colonial, post-independence but not built later than 1967.
INTRODUCTION
COOCH BEHAR IS THE LARGEST TOWN AND DISTRICT HEADQUARTER OF NORTHERN BENGAL. IT LIES AT THE FOOTHILLS OF EASTERN HIMALAYAS UNDER THE ADMINISTRATIVE DIVISION OF JALPAIGURI. IT IS THE ONLY PLANNED TOWN IN THIS REGION WITH THE REMNANTS OF ROYAL HERITAGE. IT FOLLOWS THE GRID IRON PATTERN, THE TOWN ROADS HAVE BEEN PLANNED ACCORIDNGLY MEETING AT RIGHT ANGLES. IN THE SOUTH-SOUTH-EAST END THE GRID ALLIGNS ITSELF WITH THE RIVER. THIS GRID IRON DIVIDES THE TOWN INTO 4 PRIMARY ZONES, DEMARCATING DIFFERENT TYPOLOGIES OF PUBLIC AND WELFARE BUILDINGS. EACH SECTOR ENCOMPASSES A DIGHI (TANK). THE INTER RELATIONSHIP OF DIGHIS IS IN HIERARCHIAL ORDER WITH RESPECT TO PROPORTION OF ITS ZONE. LOCATED AT THE SOUTH-WEST CORNER OF THE TOWN COOCH BEHAR, SAGAR DIGHI IS THE LARGEST OF ITS KIND IN THE TOWN. IT HAS BEEN PRECISELY ALLIGNED TO THE CARDINAL AXIS. SOME OF THE MAJOR ARCHITECTURAL AND ADMINISTRATIVE DEVELOPMENTS THAT COOCH BEHAR BOASTS OF ARE SITUATED AROUND THIS TANK.
70
TREASURY
A 147 YEAR OLD STRUCTURE, THE TREASURY HOUSES MULTIPLE GOVERNMENT DEPARTMENTS OF COOCH BEHAR. EACH OF THE DEPARTMENTS ARE DEMARCATED BY HIGHLIGHTING PORCHES.
DETAILS
71
09
Windows to Vernacular 7.0 Saur Documentation WtV (2019)
SAUR
Site - Saur village, Uttarakhand Team Strength - 19
UTTARAKHAND
“Somewhere in-between the start of the climb and the point you reach the summit lies the mystery as to why we climb. “ My story is about this between. Once upon a time, a long time ago there was a dainty village nestled amongst the mighty Himalayas, overlooking the valley below
and guarded by the green around. But often in the final In W.T.V. 7.0, there is a focus on documenting and learning the tangible2019 and intangible aspects quarter of the year, the greens seem to disappear. With white taking over, by the villagers tried to stand still, of the village of Saur ,with the help of traditional artisans and families. This wastheachieved as they waddled and struggled to move past the white. understanding the basic elements and spaces of the built fabric and the underlying The hillprinciples would be engulfed in the smell of pine and burning embers as they would struggle once again to that it originates from in the form of climate, material and knowledge systems that is the available. survive frosty winter. With the ground floor covered snow and nowhere to go, with very little to eat; man Understanding the role of history, context and culture in structuring and shapinginandthe practice animal longed for a morsel to sleep. and processes of building structures. A solution was must, the struggle and hope to survive they couldn’t trust. In search for a life without struggle, they took upon a journey down. Losing men and animals on the way in search of the ne3w land was often condemned, but the journey continue. Through treachourous terrains and pine forest, they settled in a place that suited what they thought would work, a winter without snow as the hardscape. Down below but still to a land where summers and winters were warm. A concern that continued. The new location proved as a challenge against the heat this time again, and it was time to move away from Rishikesh to the location in the hills that they once moved away from. The need for a perfect balance and an apt setting got them back to the place that they one startred from. The unsatisfied human mind made them move up and down, down and up. A search for a land that provided them with it all, not too cold nor too hot, where the soil is so fertile; food is never not enough, water as pure as spring water, air as fresh as the scent of a newly blossomed rose. Accidentally finding what they hoped for; searching lengths and breadths of the Himalayas, and there I was sitting and wondering.
M y n am e is S au r an d t h is is my sto ry....
SAUR VILLAGE DRONE SHOT
My rugged terrain was altered to create places to sow the first seeds to build the first house. In a series of firsts, a year received rainfall like no other, A sudden downpour, that destroyed anything in its path. Crumbling to regain the strength and stability the terrain was wiped of its glory, with flatter terraces, shallower slopes and suddenly created meadows. Providing my new inhabitants with land so fertile, that a variety grew through the year, reducing their dependency to the world beyond me. Years passed by the land continue to yield, sometimes even more than what they need. They finally found a place they called home. Growing and living through the summers and winters. The produce was often sold in the markets of Chamba and Mussorie. A journey uphill that sometimes wouldn’t be worth the fruit it reaped. Secluded and sitting away from the hustle bustle of the development around, what was once sought after was no longer profound. Some moved out some remained. Some new villages like me came into existence like of Jaadipaani, Sunngaon, Khurait, Pujaldi, Khakwadi. I was the seed that branched out into these settlements, with their genesis still lying here with me.
.
t , e y y s . s A
t . , r
KEY SITE PLA N
Section
Plan 72
Geographically Saur sits in the bottom of a valley or a bowl, surrounded by hills on all four sides and a narrow stream delineating the bottom of the hills. The hills are transformed into terraced farming lands, however, the primary occupation of the people of the village is shepherding.
Believed to be of the Garhwali descent, a region encompassing the northwest of present-day Uttarakhand Saur is a village nestled amongst the Himalayas with a style borrowed from the region has variations to suit the need and adapt to the valley. Common planning principals followed through the region with alterations as per needs where animals shared a common dwelling.
The rooms in the ground floor are used for keeping their cattle or as storage rooms. The upper floor is used by the people as their habitable area. The frontyard is used as feeding area for cattle and for various other daily activities like cooking, washing clothes and vessels. The typical elements of a Saur house are small openings , small verandah projection supported on brackets, verandah posts to support roof and allow for semi-open space, small roof overhang projections. The small windows allow for minimum transfer for heat thus maintain a comfortable temperature.
TYPICAL SAUR HOUSE (PARAMLALJI’S HOUSE)
ANATOMY OF A TYPICAL SAUR HOUSE (PARAMLALJI’S HOUSE)
Small Roof Overhang
Verandah Posts
Brackets
Small Window Openings
ELEMENTS OF A SAUR HOUSE
Isometric 73
10
Kala Ghoda Arts Festival
Installation | Competition Visual Arts (2018-19)
Site- Kalaghoda Precinct, Mumbai Theme - A measure of time Team Strength - 17 The installation expresses the importance of time defining and capturing events that can never be created in the exact same manner. A union of space and time creates an event. Event cannot individually exist without time. This pavillion is a pause in the event. The change of time transforms the space and this idea is amplified through the play of light and shadow within the pavillion and in a manner that the pavillion gets inhabited by the people. The perception of this break in the event through the passage of time is unique for each individual, thereby getting inscribed in ones memory as a moment in time.
Materials PVC DRAINAGE PIPES - 6” DIA
(AS A CONNECTOR)
74
PVC WATER SUPPLY PIPES - 1” DIA (AS FRAMEWORK)
PLASTIC TIES
ACRYLIC SHEETS
STEEL RODS
9” LONG (TO TIE FRAMEWORK AND CONNECTORS)
-2MM THK (AS COLOUR FILTERS)
-10MM THK (AS COLUMN AND BASIC WING SUPPORT)
The Idea
The light passing through the colours of the pavillion to create patterns on the ground that would create interest among the visitors and making them pause to take a glimpse of it.
Further working on the physical manifestation of the idea the form of the pavillion was resloved into the simpler triangular shape. Inclusion of the voids
The Process
The process begins with a PVC drainage pipe
Drilling holes to house further members
Cutting into seperate rings
This ring is the junction joining different triangles
Connecting multiple such junctions resulting into forming multiple triangles. These multiple triangles form one basic unit.
A smaller diameter pipe is placed concentric to restrict unnecessary movement
Making of the exoskeleton. Steel rod is passed through the PVC pipes framework
Inserting PVC water supply pipes into the larger ring, tieing it to the inner ring with plastic ties.
Tying the internal unit arrangment with the PVC pipe framework on the exoskeleton
The columns are place on site.
The wing units are installed on the columns.
The coloured acrylic sheets are tied to the triangular units with the help of plastic ties.
75
11
INSDAG Cricket stadium design in steel Competition (2019-20)
Guides - Ar. Ronak Savla, Ar. Hardik Dedhia, Ar. Nakul Kamat Site - Ghaziabad, Uttar Pradesh Team - Aditya Vaidya, Shalom Pereira, Tanmay Kotkar, Pranav Chaubal The aim of INSDAG brief is to create interest about structural steel for architectural expression by exploiting and exploring steel as a material. To achieve this the design brief of 2019-20 was to use steel, for designing an international cricket stadium cum academy for a capacity of 45000 people in the city of Ghaziabad in Uttar Pradesh. Our intent of the design was to make steel iconic but simultaneously optimizing the use of steel to make the roof structurally and visually lighter and breaking away from conventional column beam grid and creating a columnless facade by the use of arch as an element.
SITE AND CONTEXT
The given site is located in Morti region of Ghaziabad, Uttar Pradesh. Sitting on a plot area of 33 acres the site is in close proximity to multiple modes of transpotation.
ZONING
By road - National Highway By railway - Ghaziabad Railway Station By metro - Shaheed sthal metro Station Airbase - Hindon Airbase
N
Site Plan 76
Site Planning
INTRODUCTION Originating from the impression of mughal architecture (Indigenous to the region of North India), The International Cricket Stadium carries a significant mark of the Mughal style. The Arch representing the grandeur, the monumental scale and artistic exploration of the project aspires to invite global attention to the city of Ghaziabad. The Jaalis take care of the ornamentation and natural ventillation. The Char Bagh, has been incorporated in the overall planning of the site. The arches not only form the structural system but are an integral part of the skin of the project.
Char Bagh system has been incorporated for better circulation
Arch as a prominent element
Raised Plinth segregates the pedestrian and vehicular circulation.
The scale and gradeur of the arch has been incorporated.
Ground Tier Plan Cut @+7.5m
N
Section AA’
77
Structural System
Hogging and Sagging in Members
First Tier Plan Cut @+13.5m
N
West Side Elevation
78
Load Transfer
Detail -
Detail -
Arch Pencil End Foundation
Structural Arch Foundation
Detail -
Arch Ring Tension Cable
STRUCTURAL ARCHES HOLDING THE ROOF TRUSSES
ARCHITECTURAL MEMBRANE ON ROOF TRUSSES
EXTERNAL AND INTERNAL RINGS TIEING THE TRUSSES TOGETHER
TRUSSES HELD BY ARCHES AND STRUCTURAL FACADE
THE STRUCTURAL FACADE THE ARCHITECTURAL MEMBRANE ON THE FACADE
Detail -
WOOD COMPOSITE PLASTIC JAALI
Truss and Tension Cable
GLASS FACADE
ARCHITECTURAL MEMBRANE CANOPY
Exploded Axonometric 79
Construction Stages
1. The lower stands are built
2. The facade starts building up
3. The facade completes
4. The external ring ties the facade
5. The trusses are in place
6. The inner ring ties the trusses
7. The tension cables hold the trusses
Physical Model
80
8. The architectural membrane shelters the stands
9. The glass and jaali complete the facade
81
12
Sai Baba Temple Design Competition (2020)
Site - Patalpani Waterfalls, Madhya Pradesh Team - Jeel Patel, Priyal Vasaiwala, Pranav Chaubal Indore being a second tier city in India, is on its way to becoming a Smart city with many conservational and heritage projects on its way. Traditional Nagara style temples are already prevalent in the state of Madhya Pradesh. Thus, a contemporary interpretation of the same Nagara Temple would be an addition to the tourist attraction in the city whilst establishing a modern language of religious architecture in Northern India. Sai Baba identified himself with not only people but with everything that nature provided. Similarly the chosen site- Patalpaani Waterfalls, is at a decent altitude from the mean sea level and in an isolated lush green tranquil setting. It is ideal for a peace giving spiritual abode for pilgrims who look forward to connecting with nature. Patalpaani Waterfalls is an existing tourist attraction about an hour away from the city of Indore via a good network of roads. This temple will not only enhance the experience of the waterfall but also turn into an iconic landmark for tourism in the city and state.
82
The void in the design under which thee idol sits, is a representative of Sai Baba’s detachment from the idea of following a particular religion and shows that he didn’t belong to one. He sits in a neutral unbounded space that seamlessly connects upto the sky. The void provides a view of the waterfall behind the idol establishing a connect between nature and devottee. The design is a modern take on religious architecture as a parametric form. The extensive ornamentation in the form of repetetive carvings on the traditional Nagara style temple have been broken down into simpler grid of members that add depth to the space underneath.
83
Thank You Pranav Ashish Chaubal Academy of Architecture