Portfolio_MLA

Page 1

PORTFOLIO
Pranjali Yadav

PRANJALI YADAV

Architect

I am currently pursuing a Master’s degree in Landscape Architecture at Leeds Beckett University, Leeds. I hold a Bachelor’s degree in Architecture from the University of Mumbai,India.

WORK EXPERIENCE :

PROJECT ARCHITECT

Greenzone Realtors Pvt.Ltd

JUNIOR ARCHITECT

Sankhala Associates

FREELANCER ARCHITECT

CONTACT DETAILS :

I am a skilled and enthusiastic Architect with expertise in creative conceptual design thinking and the architectural design process, as well as a keen interest in Landscape planning. My objective is to gain practical experience and grow as a designer. I am always driven to produce the highest quality work, using ideas and model-making to illustrate my concepts. Leeds, LS9 8BX

07774868695

ypranjali02@gmail.com

www.linkedin.com/in/ar-pranjali-yadav02071997

https://issuu.com/pranjaliyadav/docs/center_for_tranquility_-_thesis

EDUCATION :

Masters in Landscape Architecture (MLA) 2023 - 2024

- Leeds Beckett University, Leeds

B.R.Harne College of Architecture 2015 - 2020

- Mumbai University, India

CERTIFICATON :

Fundamentals in Garden Design Jul’2022

- Udemy Online

Revit Certified Jul’2022

Personal Projects

INTERN

Spandan Design Studio

CO - CIRRUCULAR ACITIVITIES :

Participated in Anti-Library Design

Earth Construction Training Program

Volunteer for IIA 22nd Convention Hosted by Kalyan-Dombivli Centre

May’22 - April’23

June’20 - March’21

Dec’20 - May’21

Dec’18 - Apr’19

SOFTWARE SKILLS

• Auto CAD

• Adobe Photoshop

• Adobe Aftereffects

• Microsoft Office

• Revit Architecture

• Sketch up

Competition Japan

Bhuj

Mahacon

• Lumion

• In Design

• Illustrator

02

CONTENTS

Cities Alive, Reconnecting the river & city.

Keighley & Riddlesden

Academic Project : 2023-24

Rewilding Butterly. Marsden.

Academic Project : 2023-24

Villa Angan, Lonavala, India

Professional Project : 2021

Thesis : Center for Tranquilty Ambawadi, Kolahapur, India

Academic Project : 2020

Restore Community Resilence, Marsden.

Academic Project : 2023-24

Landscape Visaual Impact Assement Marsden, Yorskhire - Key Findings

Academic Project : 2023-24

Design Process Sketches

Academic Projects : 2023-24

Misclleneous Work Model Making

Internship Projects : 2020

01 05 04 06 07 08 02 03 03

Riverside Renewal

Aim - Human & Nature wellbeing development along River Aire with respect to Climate Resilience solutions.

Objectives

1. Connect the separated city to the natural riparian landscape to strengthen the community and cultural identity of the city.

2. Identify best approach to flood control (different solutions to water treatment solutions)

3. Preserve the remaining patch of riparian habitat while providing the recreational spaces and floodplain areas.

4. Green space management (including enhancing/ conserving urban biodiversity)

5. Increase accessibility to green open spaces.

6. Increase amount of green open spaces for residents & commercial zones

7. A well-connected place – addressing the barriers to connectivity for walking and cycling across the river Aire.

8. A sense of place for all age groups which can be accessible through out the year.

Keighley’s Aire Corridor Vision Primarily

“ Rivers and their surrounding areas are designed to be versatile and multi-functional spaces that offer a range of activities and experiences for both residents and visitors. By creating a dynamic environment, these areas provide an enhanced quality of life, with opportunities for work, play, and social interaction ”

Sketch - Concept diagram 01
04

Water treatment area

Location Map

Context Map - Keighley

Zoning Diagram

Forest Zone

Forest Zone

Learning area Placemaking

Open Program area

Water treatment area

Promenade

Promenade

Placemaking

Forest Zone

As I begin to sketch out the potential areas for development in Keighley, I am taking into account a number of factors. Firstly, I am deeply considering how these areas will interact with the surrounding residential and commercial zones, ensuring that the development is seamlessly integrated into the existing landscape. Additionally, I am taking into account the needs and preferences of both locals and visitors to Keighley, ensuring that the development caters to the needs of all those who will use and enjoy the area. Finally, I am considering the long-term sustainability of the development, ensuring that it will remain a valuable and vibrant part of the Keighley community for years to come.

Site
05

Scanned with ACE Scanner

06
Above Image, shows the site observation as it felt as if RIVER AIRE IS LOST.

Recovering Stratergy

1.Existing River

• Urban runoff flows into the street

• No accessibility

• No connection of river and people

2. Proposed River

• Widen the channel

• Expand floodplain to reduce bed and bank erosion

• Increase flood capacity

• Multi-functinal infrastructure

• Water quality & Habitat quality

• Accessibility for people

• Entertainment and recreation

1. Recovery

2. Integrating

3. Regerative

Recovering the river corridor for providing an outline and structure for the infrastructure of green space.

Reconnecting the city and people to the river, give access to new green natural water edges and around it.

Regenrating the redeveloping the riverfront to bring new life and investment into existing settlements.

07

Water Management & Programs

1.Existing River channel

& Widen channel

Legends

River

Widen Channel

Seabin Collection

Water treatment points

3.New landscape elements & Circulation

Water Flow & Quality

• Water improvement system for improving water quality.

• Using the wetlands to slow the water down and allow sediments and associated pollutants to setlle out.

• Integrating Seabins at every wide channel area to collect pollutants from rivers.

• Creating dynamic and interesting water flow of water for quality and habitat.

Using gabion walls, riprap, to protect the riverbanks.

Riverbank protection

During wet season half of the flood comes from the urban runoff, half off the flood comes from upstream. Widened the channel for expanding floodplain and increasing flood capacity for flood control.

Flood Control

Create an interesting pathway system.

Increase accessibility

Provide different recreational areas of people.

Recreation zone

Circulation

Legends

Circulation for riverwalk, bikewalk & pedestrian bridge

Connectivity skywalk bridge

Connecting Recreation to river development

Increasing floodplain zone and capacity

Wetland treatment system - Reed bed plantation, riparian zone, raingarden, floating garden

08

Proposed Master Plan

Legends

1.Forest Park

2.Bird Scantury

3.Urban Farms

4.Floating deck

5.Wetland Park

6.Skate Park

7.Forest Cafe

8.Play area

9.Amphitheater

10.Floating boardwalk

11.Skywalk bridge

12.Moveable market

13.Sensory Park

14.Water treatment park

15.Energy Park

deck
Cafe
park fishingzone f ishingzone step seating step seating Sensory park (Therapeutic garden) Play area Observatory tower Observatory tower Amphitheater Amphitheater Urban Farming Bird Scantury
Floating
Canal park Forest
Skywalk
Forest park Entry Entry Entry Parking Parking Parking Parking Entry Pedestrian Entry Water treatment park Rain garden 01 03 04 05 06 07 07 08 09 10 11 12 14 13 16 15 02
NTS 09

Vegetation Communities

“Planting native vegetation in specific patterns can improve habitat quality and increase biodiversity.”

Open Woodland-A

Open Woodland-B Grove

- Hawthorn - Blackthorn

Wet Woddland

- Riparian scrub

- Reed beds

- Common Alder Alnus glutinosa

- Aspen Populus tremula

- Downy Birch Betula pubescens

Natural Colonisation Urban farms

Trees for water

Trees for fish

Trees for flooding

Trees for nature’s recovery

• provide shelter for livestock

• reduce the risk of flooding

• reduce river pollution

• improve fish stocks

• lock up carbon

• connect fragmented wildlife habitats

• help pollinating insects to recover

NTS

Open Program lawn system

- perennial ryegrass - red fescue

- open woodland and scrub established through natural processes 10

- Willow and alder dominated - Howthorn downybirch dominated - Sessile oak - Downy birch - sliver birch
- Grey Willow Salix cinerea

Vision board | Conceptual Sections

Observatory tower Walkway Walkway Jogging Track River Aire Nature bridge Park Retension pond Cycle track Play area
Key Plan 11
Retension Pond

Vision board|Conceptual Sketches

Key Plan
Boardwalk Bike Trail Forest Trail 3.5m Boardwalk trail in the nodes of wetland aquatic planting 3.5m Bike trail through river area
Plan
Plan 12
3.5m Forest trail through woodland area
Key
Key
Bird Scantury Forest Park Primary School East Riddlesden Hall Canal Park Skywalk Park Sensory Park
Vision board|Illustrations 13
Wetland Park Urban Farming
Play area

Vision board|Illustrations

Forest Park

Promenade seating area in floodplain zone

Water Sports activity

14

Vision board|Illustrations

Reedbed plantation Retention pond Observatory tower Broadwalkway
15

Rewidling Butterly - Marsden

The aim is to create a visitor hub center and manage the woodland near Butterly River. The goal is to improve the Butterly River and turn the site into a destination for nature tourism in Marsden. This can be achieved by designing the woodland in a way that connects it seamlessly with the visitor center hub, allowing visitors to enjoy a smooth transition from one place to another, thereby enhancing the overall user experience.

Location Map Marsden St. Butterly Resevoir site
02
16
Primarily Sketch
Image - Site sketch of Standedge Trail Image - Sketch of Landscape Character around Marsden
17
Image - Current Scenario Analysis

Proposed Master Plan

0-5 Years

Upper Edgemixwoodland

Woodland mix

5-10 Years

Upper Edgemixwoodland

10-30 Years

Woodland mix

Lower edge trees and scrub mix

Riparian species

Butterly Reservoir

Lower edge trees and scrub mix

Riparian species

Butterly Reservoir

Site Section through Woodland

Master Plan - Proposed Woodland Management Design
18

Bio-retention Parking

Restore Community

Reselience in Marsden, Yorkshire

Proposals demonstrating how to make more of Marsden, better integrate the Mill proposal into the village, and make a place that better meets the needs of local people and visitors.

Public Park area

Activity space

Market area

Private Office area

Public Park

Multipurpose area

Office Park

Zoning diagram “Creating proactive spaces to enhance public realm and community resilience.” Weekly Market space
Bike spare
Marsden Tourist Information Center
03 19

Legends

01. Entrance Plaza to new development

02. Space for weekly market

03. Built-in seating area

04. Lawn area

05. Lawn with seating bench

06. Cafe spillout space

07. Central space for activity & events

08. Mini Amphitheater

09. Bike spare

10. Meeting point

11. Cafe space with semi-open space

12. Parking area with strom water management

13. Waterside plantation, riparian species.

14. Installment of floating reebeds and plants

20
Green Infrastucture Planning strategy for Marsden Mill. Space for weekly market. Open space for activity and events. Business Park for Private office
21
Bike spare

Landscape and Visual Impact Assessment : Key Findings

The Concept LVIA Report of the Marsden Mill development Site & Location : Marsden, Kirklees, West Yorkshire, England

LVIA stands for Landscape and Visual Impact Assessment. Its primary purpose is to evaluate and describe how a proposed development or project might change the landscape and visual characteristics of an area. In simple terms, an LVIA report helps to understand and assess how a new building, infrastructure, or any development could affect what we see in a particular place (visual impact) and how it might change the overall look or feel of that area

The plans, for Marsden Mills proposed development are focused on rejuvenating the town center and breathing life into this significant building. The aim is to create an enhanced structure that will serve as a point, for businesses and residents. The proposal aims for partially changing the existing structure while preserving the mills facade, which holds great significance in the town's heritage.

04
22

Significant & Non-Significant View

This map shows the significant and non-significant viewpoints. Red icons are the significant ones, and the green ones are the non-significant ones. The views from the Marsden mechanics, Brougham road and from the Butterly reservoir are the significant ones and rest are the non-significant ones.

Map showing the viewpoints significant viewpoints
23
Zone of Theoretical Visibility ( ZTV), shows listed building, area of study buffer and conservation area

Viewpoint 1 (winter view) : November 2023

Grid Reference – NW

Location : Marsden, Huddersfield

Coordinates : 53°36'06.1"N 1°55'38.9"W

The proposed viewpoint point is across from the local church and cafes, on Warehouse Hill Road, facing northwest toward the application location. Photomontage characterizes the proposed planning as consisting of both maintained and newly constructed buildings.

Existing view of Mill from viewpoint 1 Cumulative photomontage view with proposed Redevelopment of Mill
24

Viewpoint 2 (winter view) : November 2023

Grid Reference – NW

Location : Marsden, Huddersfield

The suggested perspective location faces the Mill development plan's planned parking area from the northeast of the property. Views are taken from Mill Road, which eventually leads to Brougham Road.The parking structure's exterior design is for both residential and business units is demonstrated by the photomontage view, which is based on assumptions

Existing view of Mill from viewpoint 2
25
Cumulative photomontage view with proposed Parking area for Mill Development Plan

Villa Aangan, Lonaval , India

The Villa Aangan project involved designing the layout of the pool and the interior of the rooms. The pool was located adjacent to the villa so that guests could enjoy the breathtaking views around the villa. Additionally, the pool was integrated with a play area.

05
26

Legends

01. Entry towards pool

02. Built-in seating area with pool chair

03. Shower area

04. Deck area

05. Swimming pool

06. Pool walkway

07. Bamboo screnning

08. Villa

01 02 03 04 05 06 07 08 27
Proposed Master Plan for pool layout
28
3D Visualisation of Pool Layout with shower area, seating area and exiting tree plantation.

Center for Tranquility, India

To design a“Centre for Tranquility”, and promote the healthy lifestyle through Ayurveda and Yoga, which act as the space for wellbeing, self-sustained built environment that provokes mental and physical healing.

06
29

Proposed Master Plan

Total Site area - 30 Acres ( 121406 sq.m )

Proposed Total Built-up area -13,675 sq.m….(A)

F.S.I – 01

Total activities area – 40,230 sq.m….(B) (A+B )= 13,675+40,230= 53,905 sq.m

Proposed Master plan

1. Admininstration & Library 2. Training & Consulting Center 3. Multipurpose Area 4. Treatment Center 5. Dinning Area 6. Mud Bath with pool 7. Accomoation 8. Cowshed 3. Yoga & Meditation Center
30
Section of Admintration building with sunken library
31
Elevation of Admistration building with library Elevation of Yoga and Meditation Block
32
Section thru` Yoga and Meditation Block Entrance of Adminstration and library Block Entrance of Adminstration and library Block Five Elements of Nature inspired as Nature’s healing element.
33
Image showing pathway leading towards Yoga and meditation

Design Process Sketches

1. A new visionary approach to Shipleys road corridore and town center through urban landscape intervention.

2. Park Square planning near Rosebowl site next to Leeds beckett University.

Thought process sketch of Shipley which is development within the valley and alongside of river aire and leeds-liver pool canal.

07
34
35
Early stage diagram of concept which includes shipley road corridor development and market square within town centre.
36
Concept inspired by Dan Kiley philosophy and style of work using geometric pattern for planning of City Park.

MISCELLANEOUS WORK

Bamboo Cafe Model Bamboo Yurt-hut Model Bamboo Yurt-hut Model
07 37
Bamboo & brick model
14
Bamboo pedestrian bridge illustator render
15
Brick model with bird cut-out was inspired by nature. Site Images
THANK YOU y.pranjali02@gmail.com 07774868695 Linkedln

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.