PRAWITA CANDRA SARI
1994 Denpasar, Bali
prawitacandra@gmail.com +6282 322 522 541
EDUCATION 2010 - 2013 | SMA Negeri 1 Denpasar 2013 - 2017 | Sarjana Teknik Arsitektur UGM (GPA 3.64) 2018 - 2019 | Program Profesi Arsitek UGM (GPA 3.75)
WORKING EXPERIENCES 2014 2015 2017 2018 2019 - now
BAMBOEXPLORACTION|UGM x SYDNEY UNI ft Effan Adhiwira SOMIA DESIGN BALI, BALI|full time internship MISC DESIGN INDONESIA, YOGYAKARTA|full time internship PT. AIRMAS ASRI, JAKARTA|full time internship POPO DANES ARCHITECT|full time architect
ACHIEVEMENTS 2015
1st winner SAYEMBARA STUDIO ARSITEKTUR 4 ARCHITECTURE DEPARTMENT, UGM
2016
2nd winner SAYEMBARA DESAIN KANTIN JUTAP ARCHITECTURE DEPARTMENT, UGM
2017
1st winner SAYEMBARA DESAIN COWORKING PIKA UGM
2020
BIG 6 SAYEMBARA DESAIN LANDMARK LABUAN BAJO
SKILLS AutoCAD Adobe Illustrator Skecth Up CorelDraw Adobe Photoshop Adobe InDesign
ACADEMIC WORK 1
SERENDIPITY LAB ACADEMIC WORK 2
REVIVING KRIDOSONO
SELECTED PROJECTS
PROJECT 1
MILK BY ARTEMY PROJECT 2
MAHARANI PROJECT 3
AKASIA COFFEE PROJECT 4
AKASIA CO
COMPETITION 1
PIKA COWORKING SPACE COMPETITION 2
HOME FOR ALL COMPETITION 3
BANDARA CEPU COMPETITION 4
PASAR GODEAN COMPETITION 5
LANDMARK LABUAN BAJO
ACADEMIC PROJECT
PUBLIC SEMI-PUBLIC
PRIVATE
the area based 1 dividing on the zoning
innercourt in the 3 creating center of the building to
round 2 choosing to create a
building mass with 4 dividing three main access to the
circulation.
massing circular
give a better view to site.
innercourt.
Lecturer
Kurnia Widiastuti, ST.,MT.
Location
Jalan W.R. Supratman, Denpasar Area
Head
1000m2 Body
Year
2017 (Final Project)
Leg
Serendipity lab is a place for creative people where they can explore new ideas for 24 hours non-stop. Work with a casual transformed in design by providing a room where scholars can work anywhere that they like while eating or discussing. The possibility to meet people with a different basic knowledge is expected to engender the discussions of creative and inspiring. The theory of cross programming applied to the zoning and the circulatory system, where it aims to create the BCIC as a trigger tool for the development of creative industries in internal context at once capable of become typology study for the government on the other areas for the external context. Visual interaction between the visitors and the users of the BCIC is expected to trigger a desire of visitors to develop creative industries in their respective regions and by that the national creative industries development become faster & more efficient. Scan here for more.
prawitacandrasari
serendipity lab
There are four design transformation results are applied in the BCIC, include: (1) system module dining areas-work-an interactive exhibits, dynamic and flexible; (2) the circulation building on the site creates a series of experiences for visitors; (3) application of Balinese architecture innovation i.e. head-body-leg; (4) integration between visitors (external) dining area with users (internal) dining area.
DROP OFF
EATING
EVENT AREA
THEATER
EXHIBITION
GALLERY
VIEW DECK
DISPLAY
WORKING
EAT
WORK
Creative Area
Barrier
Barrier
Restaurant
Divide the area into the spring of public and public-private. The front area was made into a public area due to easier access from the main road.
Polypropylene (PP)
FLEXIBLE WORKING DESK
MOVING KITCHEN
MODULAR PANEL
The use of the furniture com-pact which don't take up much space.
Aims to facilitate scholars to improve cooking activities.
Can be used for exhibition as well as function as seating furniture.
Polypropylene (PP) Wall = Furniture
FLEXIBLE DINING DESK
MULTIFUNCTION SOFA
WALL CHAIR
A table that can be adjusted to the width of user activity.
This sofa is used for the discussion area as well as relaxing simultaneously.
To save storage area, the chair is designed to be a wall barrier.
prawitacandrasari
serendipity lab
serendipity lab
Team
Acintya Hapsari, Annisa Nikmah, Adi Malaikosa, Hakim Fandika, Prawita Candra Sari, Sasikarani, Sayyid H. Location
Kridosono Area
15000m2 Year
2016 (Pasca KKA)
Open green space in the city of Yogyakarta in the year 2015 amount have been eligible for a minimum of 30% of the total green open space of the city. However, very few green open space that are public so that procurement of the City Park in Yogyakarta become very limited. While the population continues to rise and the need for increasingly unbridled green open space still need to be maintained, as well as public spaces. The addition of a new layer in the form of public space vertically can be a solution to improve the efficiency of land use in the future.
node of 6 main street in Jogja
node in the mobility room
FUNCTION
CONTEXT
turn on the concept of Garden City
community
public space supports people's lifestyles to be more environmentally friendly environmentally friendly lifestyle of the Jogja community; SEGO SEGAWE
Regional Spatial Planning; public spaces that function sports and recreation
TRANSPORT INTEGRATION
BRIDGING CONTEXT DIFFERENCES
GIVING NEW LAYER IN ORDER TO GIVE NEW LIFE
appreciation for the heritage elements of the region (colonial region) public space identity
as
regional
Scan here for more.
existing buildings are removed to open the green line prawitacandrasari
reviving kridosono
access to the main road continues as the axis dividing the segment
garden arrangement follows the road section and the midpoint is used as an assembly point
the function of indoor sports buildings is maintained by underground buildings
multilevel mass for commercial areas with walkable green roof
penambahan jalur sepeda spiral sebagai area rekreatif sekaligus akses sekunder menuju greenroof
Forest and water
Srawung
Sport
Flowers
Walkable Green Roof
Bycycle line
Swimming Pool
Culinary
Landscape
GOR (underground)
prawitacandrasari
reviving kridosono
PROFESSIONAL PROJECT
3
Office
MISC Indonesia Location
Pasar Kranggan Area
100m2 Team
Gempa Tri Muryono Marchello Whisnu Mahendra Prawita Candra Ignatius Wendy Jobdesc
3d Building Render Photoshop
MILK by Artemy is a re-branding of an existing gelato cafe in Yogyakarta, Kranggan Market. The client does not want to change the existing structure, therefore we strive to customize the design renovation of the existing building. The selection of the high facade aims to cover the exsisting roof, its using 10x10 cm white tiles with steel structure.
prawitacandrasari
milk by artemy
3
prawitacandrasari
milk by artemy
Office
MISC Indonesia Location
Prawirotaman Area
400m2 Team
Gempa Tri Muryono Marchello Whisnu Mahendra Sheila Monica Nabila Luthfa Igantius Wendy Prawita Candra Jobdesc
Render Photoshop
prawitacandrasari
maharani restaurant
prawitacandrasari
maharani restaurant
Team
Solo Project Location
Denpasar Area
500m2 Year
2021
prawitacandrasari
akasia coffee
prawitacandrasari
akasia coffee
Office
POPO DANES ARCHITECT Location
Ubud, Bali Area
15.000m2 Team
Popo Danes GIan Luvmi Prawita Candra Erick Andoko
Jobdesc
PIC after former PIC left the office
prawitacandrasari
adiwana suweta
prawitacandrasari
adiwana suweta
COMPETITION PROJECT
1 1st Winner Held by
PIKA UGM Location
Gedung Pusat, UGM Area
500m2 Team
Aldy Putra Ismayogi Prawita Candra Sari Jobdesc
FIN. THANK YOU.
Concept 3D Interior Graphic Diagram Self-selection in a co working space is an attempt to create an interactive atmosphere where it is capable of triggering the existence of more intense interactions between users spaces in the PIKA. The concept is to divide the space into several zones namely relaxed area, casual-serious area and serious area. Each zone is distinguished by its furniture. Then the user can have the work area corresporending to their needs. Self-selection itself manifested in structuring the layout and shape of the furniture.
Scan here for more.
prawitacandrasari
pika coworking space
prawitacandrasari
pika coworking space
Entry Held by
Home for All Location
Odaka, Japan Area
1000m2 Team
Kevin Oscar Prawita Candra Sari Qanita Qamarani Jobdesc
Concept Render Montage Graphic Diagram
Scan here for more.
prawitacandrasari
reviving odaka
The Great East Japan Earthquake on March 11, 2011 was a severe disaster which caused a tsunami followed by nuclear meltdowns in Fukushima Daiichi Nuclear Power Plant. It takes up to 2020 to be able to recover everything (according to Reconstruction Agency). Home-for-all (initiated by Toyo Ito) which was for the most part built close to the temporary housings has succeeded in healing the society. What lies beyond this is the next question – to those who have returned to their cities, what about them? Odaka, Minamisoma City, located within a 20-kilometer radius of the power plant, yet, since 2016, the evacuation order was lifted. Even though the city has been claimed to be completely decontaminated, agricultural products from this area are still struggling for acceptance. Moreover, only 19% of Odaka's residents who are mostly in their 50s, 60s, or older have returned. The fear of long-term radiation effect and not having a prospective career still haunt the youth from returning home. PROPOSAL This proposal seeks to solve the problems above. The proposal suggest 3 phases of community development program to revive Odaka.
prawitacandrasari
reviving odaka
entry Held by
PT Propan Raya Location
Cepu, Jawa Tengah Area
± 5000m2 Team
Adi Utomo Hatmoko, IAI Ahmad Muarif Khrisna Adiputra Kevin Oscar Prawita Candra Sari Reza Ahmed Qanita Qamarani Jobdesc
3D Interior Floor Plan Graphic Diagram
prawitacandrasari
gate of hope
prawitacandrasari
gate of hope
Entry Held by
IAI JAWA TENGAH Location
Godean, Yogyakarta Area
± 10.000m2 Team
Kevin Oscar Prawita Candra Sari Qanita Qamarani Reza Ahmed Jobdesc
Concept Render Graphic Diagram
prawitacandrasari
pasar bumi sembada
prawitacandrasari
pasar bumi sembada
BIG 6 Held by
IAI NTT Location
Labuan Bajo Area
± 20.000m2 Team
Alfian Reza Almajid Hakim Fandika Prawita Candra Sari Qanita Qamarani Yuramia Oksilasari Jobdesc
Concept Render Graphic Diagram
prawitacandrasari
labuan ma diata ambun
prawitacandrasari
labuan ma diata ambun
FIN. THANK YOU. prawitacandra@gmail.com +6282 322 522 541
contact prawitacandra@gmail.com +6282 322 522 541