Prequalification Year 2014
CONSULTANCY DIGITAL INDUSTRIES OUTDOOR PRINT SIGNAGE Bahrain China Egypt Kenya Kuwait Oman Pakistan Philippines Qatar Saudi Arabia Tanzania Uganda UAE
Section 1.0 Introduction
Attachment 1 Company Brochure
W H ER E THE B R I GHTE S T I D EA S AR E B OR N
BRAND CONSULTANCY DIGITAL INDUSTRIES MEDIA OUTDOOR PR PRINT SIGNAGE
THE PIONEERS Thirty three years ago, a dream was conceived and 1976 saw the formation of a company with a 27-man workforce, focusing purely on developing neon signs. Over the years, our Chairman has nurtured this family-managed business, building it up into one of the most successful companies in the Middle East.
Now a market leader in the planning and implementation of indoor and outdoor visual communications, ENG offers an enormous array of products and services across a steadily evolving and expanding variety of business divisions.
Aman Merchant, Director; Rehan Merchant, Group CEO; Muhammed Hanif Merchant, Chairman; Hayan Merchant, Director
N
EO
N
1976 1990 Mr. Muhammed Hanif Merchant established Emirates Neon in the UAE with 27 employees
Installed first Tri-O-Vision on a Unipole at Al Ahli stadium, Dubai-Sharjah Road
1987 Opened a branch in Abu Dhabi and other branches across the UAE
1996
Produced Shopping lighting d
1990 Established Emirates Outdoor, now ENG Outdoor 1980 Signed first contract with Emirates Petroleum for their UAE filling stations
1998 Awarded the prestigious Emirates Office and Hotel Tower signage project in Dubai
1999 Installed first ultra-bright LED sign (Video Wall) in the UAE, at the Strand Cinema Building, Dubai
1997 Awarded the first ever UAE Unipole Billboards contract by Dubai Municipality on Sh. Zayed Road and the Al Ain highway
1998 Established ABC Digital Prints now (ENG Print) to cater to market print requirements
d the first Dubai g Festival lamp post decorations
1999
1998 Muhammed Rehan Merchant joined Emirates Neon as Executive Director
Established ABC Digital Net now (ENG Digital) to develop digital ambient media
2002 Established ABC Industries now (ENG Industries) to cater to castings and traffic signage in the UAE and the Middle East Region
2004
2005
Started regional market push by establishing Prime Sign in Oman
Established Prime Sign in Bahrain
2004 Established the scrap metal trading and aluminium recycling divisions within ABC Industries
2005 Established ENG Consultancy
2005
Entered into with Roof Int
a joint venture ternational, Kuwait.
2006 2008 Branched out into TV media by the acquisition of a firm representing Star TV Channels
Launched ENG Publishing with weekly and monthly titles 2006 Started world wide expansion by opening offices in North Africa, East Africa, China and Pakistan
2006 Established ENG Media for media buying and media representation
2007 Consolidated all existing business divisions under one parent company and rebranded as ENG
THE SUCCESS ENG’s 33-year history has witnessed monumental changes in infrastructure, resources, facilities, offices and manufacturing capacities. This continual assessment and re-assessment of our operating procedures has steadily paved the way for our metamorphosis into a brand name synonymous with the highest standards of quality and professionalism.
With a finger right on the pulse of the latest developments in design and manufacturing, we are able to meet and exceed the evolving needs of our clients, developing simple and manageable solutions that best meet their specific needs. Each partnership we forge makes us stronger. Our current success is credited to the stability of our clients, suppliers and employees, each taking ENG to new strengths.
THE DIVISIONS ENG offers a comprehensive range of products and services that include the creation, installation and maintenance of a host of visual communications media. From retail signage to digital advertising and print media from large unipoles to the design of way-finding systems, ENG’s expansion into complimentary business lines makes us your one point of contact for virtually all your communications requirements.
With a work force currently in excess of 1,000 talented and dedicated professionals, ENG’s continued growth has been supported through strategic partnerships through acquisitions and joint ventures on an international level.
BRAND CONSULTANCY DIGITAL INDUSTRIES MEDIA OUTDOOR PR PRINT SIGNAGE
AMPLIFYING YOUR MESSAGE Because you can’t turn it off, you can’t throw it away and you can’t click on the next page, your message is up there, reaching consumers all the time, every day. We understand the power of outdoor media and the impact that continuous exposure to the same message can have.
ENG Outdoor is one of the largest independent outdoor media owners across the GCC region with expanding offices in Africa, China and Pakistan. We offer the best and most effective media and locations that enable you to reach thousands of people every day.
BRAND CONSULTANCY DIGITAL INDUSTRIES MEDIA OUTDOOR PRINT PR SIGNAGE
1
3
2
6
5
1 Taxi Dubai Transport, Dubai 2 LED screens Al Nasser Square, Dubai 3 Bridge banners The Fairmont Dubai, Dubai 4 Wall banners Salam Street, Abu Dhabi 5 Lamp post Ras Al Khaimah 6 Billboards Sheikh Zayed Road, Dubai
4
With outdoor campaigns now forming an increasingly important part of the media mix, we can offer you the opportunity to make the most striking visual impact with our range of products. Pick and mix from our variety of media ‘vehicles’ to ensure you satisfy your advertising goals, be it brand building, tactical or promotional.
LARGE FORMAT
SMALL FORMAT
TRANSIT
DIGITAL AND AMBIENT
Oversized images are ideal for
Small format media vehicles are
Taxis, buses and mobile trucks are
Whether you want a single
brand building and product
ideal for tactical campaigns.
all highly effective means of
digital sign or dozens networked
awareness. Most importantly,
Easy to install, banners, flags,
delivering your message to a
together for multiple locations,
they help communicate the
mupis and twin-poles are ideal
specific location at a specific time.
plasma and LED screens offer
emotion
characterises
for promotional material that
Hard to miss, transit media is an
you the ability to tailor your
your company’s products and
might need regular or urgent
increasingly important element in
communications with
services.
changing
the marketing mix.
the-minute, location-appropriate
that
throughout
marketing campaign.
your
up-to-
information, targeting very
Our range of large format
specific segments of your
solutions includes unipoles
market.
(billboards), bridge banners and wall banners, offering a wide selection of hard-hitting options to choose from.
CONSOLIDATING YOUR IDENTITY It takes just three seconds to form a first impression, so at ENG Signage we never underestimate the importance of creating the right image with the right message. We understand that everybody has their own identity and that each client will have a very specific image to portray. We therefore work with a wide range of materials to guarantee you a sign that best represents your business. In today’s world, image and how you look is king, dominating every advertising campaign and every consumer demand.
BRAND CONSULTANCY DIGITAL INDUSTRIES MEDIA OUTDOOR PRINT PR SIGNAGE
1
1 Branding signs Nissan Automobiles, Dubai 2 Hotel signs Emirates Towers, Dubai 3 Hotel signs Shangri-La, Dubai 4 Traffic signs Sheikh Zayed Road, Dubai 5 Branding signs BBC World, Dubai 6 Petroleum signs Emarat petrol station, Dubai
3
2
5
4
6
They say that a business with no sign is a sign of no business; we believe there’s a lot of truth in this proverb, but would add that having a bad sign is just as bad as not having one at all. We understand the pressures of the image industry and take pride in conceiving original signs created with meticulous care invested in every detail.
RETAIL SIGNS
PETROLEUM SIGNS
WORLDWIDE HOTEL SIGNS
TRAFFIC SIGNS
No job is too ambitious, or too
With over 33 years of experience
Our elegant and durable signs are
ENG Signage is one of the largest
small, and we supply and fit
in designs, large-scale fabrication
designed for a multitude of clients
traffic signage manufacturers in
every type of fascia. We
and installation of signage and
across all our markets, for both
the UAE, producing signs adhering
carefully design, produce and
cladding of fuel stations, we have
indoor and outdoor use. We have
to
install
of
manufactured and installed signs
built a solid reputation on quality
international standards. We use
signages for large and small
for all the leading petroleum
craftsmanship
top grade materials and the best
businesses across the region.
names in the UAE.
product development.
numerous
types
and
innovative
local
municipality
and
equipment to produce outstanding quality products, all of which come
Our retail clients include: CNN, Burberry, Ferrari, Damas,
Our use of superior materials and
This combined with the way our
with a comprehensive long-term
Nestle, Magic Planet, Shoe
the most advanced technology to
signs can be made in virtually any
warranty.
City, Indigo Nation, Outfit and
build beautiful, durable signages
material to ensure a unified and
many more.
and cladding has won us contracts
personalised look, has generated
We also manufacture and supply
and an unrivalled reputation from
particular interest from reputed
galvanised, aluminium and plastic
clients including ENOC, Emarat
hotel chains. Our clients include a
coated traffic posts as well as a
and ADNOC.
range of regional and global
range of safety products including
names such as: Accor, Emirates
bollards, cones, road studs, flash
Towers, Holiday Inn, Hilton, Hyatt,
lighting, mirrors and barriers.
Kempinski, Marriott, Ritz-Carlton and Shangri-La, to name just a few.
CUTTING EDGE IDEAS ENG Consultancy was established to harness the growth that the Middle East was experiencing. As the region grew to become the most sought after tourist spot of the world, hotels, offices and organizations flocked to establish themselves here. The new culture required a better image that resonated with a global identity while also being customized to attract local tastes. ENG Consultancy took up the challenge to meet the huge demands for customized and specialised signage, as well as the need for architectural and interior design for international business chains.
BRAND CONSULTANCY DIGITAL INDUSTRIES MEDIA OUTDOOR PRINT PR SIGNAGE
1
3
2
1 Entrance signage The Palm Jumeirah Dubai, UAE 2 ENG China’s architectural and interior design services Crown Plaza, Jiangsu China 3 Way-finding sign Dubai Marine Beach & Resort Spa, UAE 4 Architectural and interior design
4
ENG consultancy is meticulous about delivering brand consistency. We ensure all signage and way-finding systems adhere to corporate brand guidelines, which guarantees a harmonious look and feel between all your signage requirements, from the main exterior sign to reception signage to car parking signs.
LARGE PROJECT CONSULTATION
PROJECT MANAGEMENT
ARCHITECTURE AND INTERIOR
Our dedicated team of designers and
Our background in signage and visual
ENG has an exceptional combination of
directors have years of experience in
communications means we are uniquely
expertise in hotel architecture and interior
working on complete branding solutions
positioned to service clients in a variety of
design across the world. We have detailed
for a variety of clients. The expertise of our
project
knowledge of the property markets,
project
initial
analysis,
them
followed by careful planning to the final
building
and
brand
implementation, we’re by your side every
planning and interior design to ensure that
assignments with multiple deliverables
step of the way. Specialists in way-finding
our clients achieve effective, efficient and
and tight deadlines.
solutions, our expertise is now expanding
commercially viable buildings that are
into brand, interior and architectural
successful environments to work in.
huge
has
From
seen
managing
managers
types.
signage
We deliver a structured approach that
technology,
energy,
space
consultancy.
guarantees the highest quality, solution
We use state-of-the-art, fully integrated
and service. A few examples of projects we
CAD technology and implement quality
have undertaken includes the Qatar
control procedures through all stages of
Olympic Stadium, Emirates Towers Hotel
design.
and Office Tower, BurJuman Centre and Madinat Jumeirah Resort.
We also provide 3D modelling, visual walk-through, so that clients can explore design concepts in greater depths.
We remain actively involved throughout the project and will always be accessible.
MAXIMISING YOUR IMPACT Content control is yours with ENG Digital’s sophisticated network of solutions. This network offers unique advertising possibilities that harness the power of the digital age to target consumers in the best possible environment while they are in the frame of mind for buying your products and services. Digital signage is highly customisable, allowing you to tailor your content and beam the most appropriate message to your chosen target audience at key locations and times. Deliver brand and tactical messages to shoppers at department stores or supermarkets and news to guests in hotels or public places, target commuters at airports or in elevators, or highlight special offers to customers at retail settings. Our highly automated networked systems provide secure, efficient and robust management of your digital signs.
BRAND CONSULTANCY DIGITAL INDUSTRIES MEDIA OUTDOOR PRINT PR SIGNAGE
1
1 Virtual Private Network (VPN) 2 Ambient signage 3 Emarat Gas Stations 4 Emarat Gas Stations 5 Emarat Gas Stations
2
3
4
5
At ENG Digital, you can choose to buy our Virtual Private Network (VPN) software and run the network yourself, or you can let us run it for you from our centralised Network Operating Centre. Here, we have all the latest equipment and capabilities to produce tailor-made corporate films and audio collateral.
VIRTUAL PRIVATE NETWORK
HOTEL IN-ROOM
(VPN)
INFORMATION CHANNEL
Our Virtual Private Networks make it
ENG Digital offers a free in-room
easy
electronically
information programme for hotels
distribute high-quality images, text
providing all the network’s hardware
and
and
for
you
video.
to
digital
signage
the
network,
ready-made programme runs on the
rotates advertisements on these
network, featuring the best of Dubai’s
screens and controls all the content
tourist information, also allowing
to be displayed.
plenty of scope for each hotel to add
software
Our
controls
software
requirements.
their own corporate messages. Ads can be scheduled to run at varying times throughout the day so you can better target different demographics. We have all the solutions to meet your needs, we perform all hardware and software set-ups, offer comprehensive training for hotel staff and ensure success.
Our
MEETING YOUR DEMANDS Test your metal with ENG Industries. Quality craftsmanship and innovation has been crucial to the solid reputation we have built up over the years as metal experts. With a variety of services on offer, our artisans are experts in advanced aluminium and steel fabrication. We have an in-house aluminium foundry and have been involved with an enormous variety of the most challenging artistic and historic projects. We take great pride in producing imaginative solutions in a comprehensive variety of ornamental and functional designs.
BRAND CONSULTANCY DIGITAL INDUSTRIES MEDIA OUTDOOR PRINT PR SIGNAGE
1 Powder coating 2 Fences 3 Metal casting Mall of the Emirates, Dubai 4 Metal casting Mall of the Emirates, Dubai 5 Alumium recycling
1
2
3
4
5
Our long-standing successes and unrivalled professional standards have underpinned our elevation to one of the UAE’s largest manufacturers of metal products, from railings to lamp posts to fences.
SCRAP TRADING
ALUMINIUM RECYCLING
POWDER COATING
METAL CASTING AND
We collect and buy scrap
Since 2004, we have collected
The powder coating plant ensures
FABRICATION
metals from the market, either
and recycled aluminium scrap
a durable finish which resists
This division was established to
to sell as is, or to feed into our
from all around the UAE. This
cracking,
peeling,
or
provide speciality architectural
recycling programme.
contributes to the well-being of
marring.
Our
state-of-the-art
products for palaces, villas and
the
are
technology enables us to meet all
buildings. We have managed to
efforts
relevant specifications for this
combine
reduce the need for landfill
treatment of metals, while with
high-volume productivity with our
space
significant
hundreds of stock colours to
understanding
energy by producing close to
choose from, we can match
demand for individuality.
pure aluminium from recycled
almost any colour scheme you
waste.
desire.
environment.
delighted
and
that
save
We
our
fading
Our
wide
the
benefits
of
range
the
of
of
market
durable,
aesthetically pleasing aluminium Our sophisticated technology
Top grade material and strictly
work can easily be installed,
enables you to enjoy all the
controlled production procedures
making ENG Industries a practical
benefits of unbeatable price,
ensure we deliver a look and
choice for quality products.
quality and availability.
finish that is second to none.
CLARIFYING YOUR MESSAGE A picture speaks a thousand words, or so the saying goes. With ENG Print, we know those words have to be spot on, so our focus is on giving you precisely the right picture. Our full colour digital graphics will help enhance your professional image, build customer awareness and a competitive edge for your company. At ENG Print, we focus on making your message stand out from the crowd.
BRAND CONSULTANCY DIGITAL INDUSTRIES MEDIA OUTDOOR PRINT PR SIGNAGE
1
1 Window graphics Abu Dhabi Shopping Mall 2 Mall graphics 3 Transit prints 4 Wall mural 5 Flags Sheikh Zayed Road, Dubai 6 Window graphics
2
4
3
5
6
We make sure our products can answer the varied and increasingly demanding requirements of the print media industry. ENG Print generates more digital print output than any other company in the region. Computerized processing enables us to create dynamic, full-color pictures and images with unprecedented detail and color quality. All assignments undergo a series of stringent quality control processes to help ensure that the correct color, tones and imaging are all in place well before the finished product is printed. The reproduction of large, color images with precision and economy is no longer a time consuming manual process. The most complicated images can be reproduced to perfection with digital technology and most importantly, within tight deadlines.
SHOWROOM WALLS AND
VEHICLES
BANNERS AND FLAGS
WINDOW GRAPHICS
Transform your fleet into a
Eye-catching designs combined
your
moveable visual feast, giving
with strong colours create a
showroom, your building or
your ad campaign an unmissable
powerful visual impact. Banners
your
presence on the streets of your
and
marketing sensation. Dynamic
target audience.
portable and affordable means
showroom walls can offer
A real head-turner, what better
of conveying your message to
customers a virtual reality tour
way to get people to your
multiple
as soon as they step into your
business, than to take your
versatility of banners makes
environment.
business to people.
them a perfect medium for just
We
can
transform
surroundings
into
a
flags
provide
audiences.
about any message.
flexible,
The
MEDIA
EMBEDDING BRANDS IN LIFESTYLES ENG Media offers clients a partnership from advising solutions for communication objectives through to providing all the media platforms needed to ensure messages are delivered to the desired audience.
BRAND CONSULTANCY DIGITAL INDUSTRIES MEDIA OUTDOOR PRINT PR SIGNAGE
2
1 iQ - Men’s Weekly 2 Insider - Celebrity and Fashion Weekly 3 Media Week ME - Media and Communications Weekly 4 BH&W - Beauty Health and Wellness Monthly
1
3
4
MEDIA
Building a platform that ensures advertisers benefit from research and flexibility to deliver effective messaging to targeted audiences.
QUALITY AND EXPERIENCE
MEDIA PLANNING & BUYING
ENG PUBLISHING
Staffed by an experienced team of planners
Our media planning team can provide a
ENG’s diversification includes a strategic move
and buyers, ENG Media possesses in-depth
complete, strategically considered package,
into publishing. Our extensive range of
knowledge of the media landscape in
from planning to execution and apply the
publications extends to both the Consumer and
markets across the Middle East and North
same planning framework to all our clients, so
Business to Business sectors. ENG Publishing’s
Africa.
even small budgets have an impact in
vision is to create products to international
generating an increase in sales.
publishing standards that are then distributed and marketed with on the ground expertise.
Our products include iQ (Weekly men’s title), Insider (Weekly Celebrity & Fashion title), ADVERTISING SALES REPRESENTATION
TELEVISION
Media Week (Weekly Media & Communications
ENG
Max Media offers you access to a vast
title) and BH&W (Monthly Beauty & Wellness
and
consumer base. The channels we represent
title).
representation in the Middle East through
include Star World, Star News, Star Plus, Star
Max Media.
One and Channel [V] International.
also
channel
offers
exclusive
advertising
television
sales
BUILDING STRONGER BRANDS As part of the trusted and established ENG network, ENG BRAND has the infrastructure and resources needed to answer any brief using a truly integrated approach; we deliver results encompassing the whole marketing spectrum.
We comprise of an international and eclectic mix of talent, brought together from a number of global agencies. Our strategic, creative and PR teams have proven track records in delivering outstanding work across all disciplines. As a division of ENG, we benefit from established best practice partnerships to implement our campaigns with great accuracy and efficiency.
Our holistic offering ensures our clients’ brand and marketing activities function at full capacity, attracting the attention of businesses and consumers alike, whilst delivering tangible results in the process.
EMIRATES NEON GROUP ENG is one of the largest communication solutions providers in the Middle East. We also operate a large network across North Africa, East Africa, China, Pakistan and UK. ENG is currently conducting aggressive expansion plans into new territories.
Businessmen by trade, we’re entrepreneurs by nature. Our historic allegiance to quality and efficiency is boosted by a commitment to innovation. This adaptability underpins our vision of providing the most imaginative communication solutions, comprehensively supported by an efficient and affordable service. Bolstered by unbeatable expertise, ours is a future of setting new industry trends.
BRAND CONSULTANCY DIGITAL INDUSTRIES MEDIA OUTDOOR PRINT PR SIGNAGE
1 Schon Website 2 Skinny Dippin Packaging 3 Libertas Press Ad 4 Profile 050 Brand Brochure 5 Ruwaad Brand Guidelines
1
2
4
5
3
ENG BRAND includes a wide range of specialists from marketing and branding experts through to PR consultants, creative designers and digital designers; all of whom contribute to a full service offering.
MARKETING RESEARCH
BRAND BUILDING
OUR TEAM
The bedrock of all the work ENG BRAND
We can ensure a unilateral approach is taken
Years
undertakes. Intelligent research provides
for any project, creating and maintaining
advertising and design agencies, working for a
answers, clears queries and can provide
strong
implement
myriad of different brands such as Nescafé,
invaluable insight into your chosen market.
campaigns across many mediums including
Black & Decker, Westfield, Vidal Sassoon,
outdoor, TV, radio, press, direct mail, web
Goodfellas Pizza, Unilever, ghd and Bentley
campaigns, PR and experimental marketing.
Motor Cars.
evaluation of research findings provides
PR isn’t just an ‘add on’, a ‘nice to have’, or
Through the ENG Network along side a global
in-depth, meaningful feedback for use in all
even just about generating press releases,
network of partners, it doesn’t matter where
aspects of planning, decision making and
here at ENG BRAND, our PR division will
you or your customers are. The world is a small
creativity.
develop a PR strategy that identifies your
place that’s getting smaller and ENG BRAND is
key messages, links to your objectives, gets
able to provide you with the support you need,
Brands have become increasingly more
relevant results and ultimately impacts your
anywhere in the world.
complex; consumers are smarter than ever
business’ bottom line.
We create bespoke research programmes
brands.
We
can
of
experience
from
international
tailored to your specific requirements. Our
and expectations can only get higher. ENG BRAND doesn’t just build brands; we help
Digital mediums, such as video, email, web
lay the solid foundations that allow each
advertising
brand to grow in its own unique way. We
powerful means of communication and can
believe that a company’s brand and
be implemented effectively as stand alone
marketing strategy should be a valuable,
work or as part of a cohesive, integrated
detailed asset - the blueprint that leads the
campaign. We have in-depth knowledge of
business and influences decisions.
the vast potential, but also the costly
and
viral
marketing,
are
pitfalls, of this medium and can create a campaign that will become a valuable element of your marketing strategy.
Contact ENG
UNITED ARAB EMIRATES
BAHRAIN
OMAN
Prime Sign WLL
Prime International LLC
ABU DHABI
P.O. Box 70032,
P.O. Box 187
Emirates Neon Group
Sitra Industrial Area,
Postal Code 112, Ruwi
Khalifa Street, Next to Mashreq Bank
Gate 240, Road 404,
Sultanate of Oman
P.O. Box 25542, Abu Dhabi, UAE
Block 604, Alqarya,
Tel
+968 24591030
Tel
+971 2 6268222
Kingdom of Bahrain
Fax
+968 24590727
Fax
+971 2 6263363
Tel
+973 1 7732731
email: infooman@engworldwide.com
Fax
+973 1 7732735
email: infoabudhabi@engworldwide.com
email: infobahrain@engworldwide.com AL AIN Emirates Neon Group
CHINA
PAKISTAN
P.O. Box 17820, Al Ain, UAE
ENG Design Consultancy
H.M. International
Tel
No. 23, Bld. zhongbang crystal,
Bungalow No. 246, Staff Lines,
lane 1066,dingxiang RD.
Fatima Jinnah Road,
Shanghai, China 200135
Saddar, Karachi, Pakistan
Tel
+86-21-33927048
Tel
+92 21 5672933
Fax
+86-21-33927046
Fax
+92 21 5671293
Fax
+971 3 7517060 +971 3 7517050
email: infoalain@engworldwide.com
DUBAI
email: infochina@engworldwide.com
email: infopakistan@engworldwide.com
Downtown Burj Dubai,
EGYPT
PHILIPPINES
P.O. Box 124028, Dubai, UAE
ENG Egypt, North Africa
Unit 303 3rd Flr. Jollibee Center
Tel
1191 Corniche El Nil., Cairo, Egypt
San Miguel Avenue Ortigas Center
World Trade Centre Cairo
Pasig City, Manila
Tel
+20 2579 2258
Philippines
Fax
+20 2579 1608
Tel
Emirates Neon Group Emaar Square, Building # 4, Level 7
Fax
+971 4 4232223 +971 4 4267369
email: infodubai@engworldwide.com
+63 24706912
email: infoegypt@engworldwide.com
email: infophilippines@engworldwide.com
P.O. Box 2798, Fujairah, UAE
KENYA
QATAR
Tel
ENG Kenya Ltd.
Tel
P.O.Box 28116-00100 GPO
email: infoqatar@engworldwide.com
FUJAIRAH Emirates Neon Group
Fax
+971 4 8812111 +971 4 8812377
email: infofujairah@engworldwide.com
Vishva Park, Warehouse No. A5 Mombasa Road, Off Syokimau
JEBEL ALI FREE ZONE
Nairobi, Kenya
SAUDI ARABIA
Tel
+254 20 2165 630
Tel
+254 20 2165 631
email: infosaudi@engworldwide.com
Emirates Neon Group P.O. Box 17357, Jebel Ali Free Zone, UAE
Fax
Tel
email: infokenya@engworldwide.com
Fax
+971 4 8812111 +971 4 8812377
+971 50 6283602
+971 50 6283602
+254 20 2165 629
TANZANIA
email: infojafza@engworldwide.com
Tel
KUWAIT
+254 722721736
email: infotanzania@engworldwide.com
Roofs International SHARJAH
P.O. Box 388, Al-Salimiya,
Emirates Neon Group
Al-Hamra Building
UGANDA
Industrial Area 1, Al Wahda Road,
Tel
+965 5757572
Tel
P.O. Box 5975, Sharjah, UAE
Fax
+965 5729295
email: infouganda@engworldwide.com
Tel
email: infokuwait@engworldwide.com
Fax
+971 6 5035555 +971 6 5331748
email: infosharjah@engworldwide.com
+254 722721736
WHERE THE BRIGHTEST IDEAS ARE BORN
Emirates Neon Group (ENG) Emaar Square, Building # 4, Level 7 Downtown Burj Dubai, P.O. Box 124028, Dubai, UAE Tel: +971 4 4232223 Fax: +971 4 4267369 www.engworldwide.com
Attachment 2 Company Description
I N TR O DU C T I O N
ENG is one of the largest communication solutions providers in the Middle East. We also operate a large network across Bahrain, China, Egypt, Kenya, Oman, Kuwait, Pakistan, Philippines, Qatar, Saudi Arabia, Tanzania and Uganda. ENG is currently conducting aggressive expansion plans into new territories. Businessmen by trade, we’re entrepreneurs by nature. Our historic allegiance to quality and efficiency is boosted by a commitment to innovation. This adaptability underpins our vision of providing the most imaginative communication solutions, comprehensively supported by an efficient and affordable service. Bolstered by unbeatable expertise, ours is a future of setting new industry trends. . Established 40 years ago, catering to a wide variety of customized signage requirements . We are the market leader in the planning and implementation of visual communications . Has been the pioneer and trend setter in the signage industry with manufacturing facilities spread over 300,000 sq.ft . Our infrastructure and resources, facilities, offices and manufacturing capacities make us one of the biggest signage companies in the Middle East.
Emirates Neon Group - Pre Qualification
Page 01
OUR P R E S E N C E
BAHRAIN
CHINA
EGYPT
KENYA
KUWAIT
OMAN
PAKISTAN
Prime Sign WLL
ENG Design Consultancy
ENG Egypt, North Africa
ENG Kenya Ltd.
Roofs International
Prime International LLC
H.M. International
P.O. Box 70032, Sitra Industrial Area,
No. 23, Bld. zhongbang crystal,
1191 Corniche El Nil., Cairo, Egypt
P.O.Box 28116-00100 GPO, Vishva Park,
P.O. Box 388, Al-Salimiya,
P.O. Box 187 Postal Code 112,
Bungalow No. 246, Staff Lines,
Gate 240, Road 404, Block 604, Alqarya,
lane 1066,dingxiang RD.
World Trade Centre Cairo
Warehouse No. A5, Mombasa Road,
Al-Hamra Building
Ruwi, Sultanate of Oman
Fatima Jinnah Road,
Kingdom of Bahrain
Shanghai, China 200135
Tel +20 2579 2258, Fax +20 2579 1608
Off Syokimau, Nairobi, Kenya
Tel +965 5757572, Fax +965 5729295
Tel +968 24591030, Fax +968 24590727
Saddar, Karachi, Pakistan
Tel +973 1 7732731, Fax +973 1 7732735
Tel +86-21-33927048, Fax +86-21-33927046
email: infoegypt@engworldwide.com
Tel +254 20 2165 630/ 631, Fax +254 20 2165 629
email: infokuwait@engworldwide.com
email: infooman@engworldwide.com
Tel +92 21 5672933, Fax +92 21 5671293
email: infobahrain@engworldwide.com
email: infochina@engworldwide.com
PHILIPPINES
QATAR
SAUDI ARABIA
TANZANIA
UGANDA
UNITED ARAB EMIRATES
Unit 303 3rd Flr. Jollibee Center
Tel
Tel
Tel
Tel
Emirates Neon Group
San Miguel Avenue Ortigas Center
email: infoqatar@engworldwide.com
+971 50 6283602
email: infopakistan@engworldwide.com
email: infokenya@engworldwide.com
+971 50 6283602
email: infosaudi@engworldwide.com
+254 722721736
email: infotanzania@engworldwide.com
+254 722721736
email: infouganda@engworldwide.com
Industrial Area 1, Al Wahda Road,
Pasig City, Manila, Philippines
P.O. Box 5975, Sharjah, UAE
Tel +63 24706912
Tel +971 6 5035555, Fax +971 6 5331748
email: infophilippines@engworldwide.com
email: infosharjah@engworldwide.com
Emirates Neon Group - Pre Qualification
Page 02
O F F ICE AND C ON T A C T D E T AI LS
1.0 Incorporation / Legal Registration Details
1.7 Contact Details
1.1 Registered Name: EMIRATES NEON LLC
1.8 Company Contact Name & Title MR. REHAN MERCHANT, Group CEO
1.2 Registered Address: P.O. Box 25542, Abu Dhabi, UAE P.O. Box 6203, Dubai,UAE P.O. Box 5975, Sharjah, United Arab Emirates
1.9 Postal Address: P.O. Box 25542, Abu Dhabi, UAE P.O. Box 6203, Dubai,UAE P.O. Box 5975, Sharjah, United Arab Emirates
1.3 Group CEO MR. REHAN MERCHANT
2.0 Telephone Number(s): Dubai : +971 (0)4 3779000 Sharjah : +971 (0)6 5035555 Abu Dhabi : +971 (0)2 6268222
1.4 Name of the Company Proprietor(s) or major Shareholders: Dubai : MR. ABDULLAH MAHMOOD USTADI MR. MOHAMMAD HANIF MERCHANT MR. MOHAMMAD REHAN MERCHANT MR. MOHAMMAD AMAN MERCHANT Sharjah :
MR. IBRAHIM AL TUNAIJI MR. ABDULLAH MAHMOOD USTADI MR. MOHAMMAD HANIF MERCHANT
1.5 Country of Incorporation / Registrations: United Arab Emirates
2.1 Fax Number(s): Dubai : +971 (0)4 3317823 Sharjah : +971 (0)6 5331 748 Abu Dhabi : +971 (0)2 6263363 2.2 E-mail: rehan.merchant@engworldwide.com info@engworldwide.com www.engworldwide.com
1.6 Incorporation / Registration Certificate No. 300395- Dubai 3516- Sharjah 1015453- Abu Dhabi
Emirates Neon Group - Pre Qualification
Page 03
GRO U P I N F O
- Retail - Projects - Traffic - Maintainence
Hotels Filling Stations Others
- Transit - Digital - Small - Large - Ambient
- VPN’s - Hotels - Filing stations
- POS - Exhibitions - Events / Press Con - Digital printing
SIGNAGE
OUTDOOR
DIGITAL
BRAND / WEB
CONSULTANCY
INDUSTRIES
MEDIA Ad sales
- Brand - Web / Digital - Creative - PR - New Innovations (R&D)
Emirates Neon Group - Pre Qualification
- Signage Design & Wayfinding - Architectural, Interiors, 3D
- Castings - Alloys - P/Coatings
- TV - Radio - Online - Publishing - MBU - Artists Mgt - Events
Distribution TV station ownership
Page 04
PRO JE C T T E A M A N D ORGA NI Z A T I ON
Chairman
Group CEO
Strategy/Planning
Project Management & Process/Product Development
Sales & Marketing
EN Production
Outdoor Media
Retail Signage
Project Management
CAD & Estimation
QA/QC & ISO 9001 Facilitation
Research & Development Process/Product
Project Signage
Project Process ABC Digital Network
Engineering Design
Product Development
PPC
PPC
Production Floor
Production Floor
Installation
Casting r
Plant Maintenance
TrafďŹ c Sign r
QA
Project Cost Control
Estimation
Process Development
QC
Concurrent Engineering
Design for Manufacture
New Technology
ISO 9001 Facilitation
Digital Print Maintenance Contracts
Stores
Design Consultancy ABC Industries
Value Engineering
ABC Production
HRD
Purchase
Admin/Personnel
Recruitment/ Training
Finance/ Accounts
IT
UAE Site Development
Business Development
Other Group Companies
UAE
OVERSEAS
GCC Bahrain
Powder Coating
Qatar/Saudi
Oman
Installation
Kuwait Plant Maintenance North Africa Stores Pakistan
ABC Alloys East Africa China & Emerging Markets
Emirates Neon Group - Pre Qualification
Page 05
LIST O F MACHI N E RIES - AREA 1
Types and Quantities of Machinery Neon / Metal - Signage Dept.
Units (Nos.)
Welding Plants - Steel
18
Welding Plants - Aluminium
6
CNC Bending Machine
3
Shearing Machine
2
CNC Router Machine
4
Profile Cutting Machine
2
10 Ton Press Machine
1
CNC Holzlek Routing Machine
1
Lathe Machine
1
CNS High Frequency OVC Stretch Welding Machine
1
Vacuum Forming Machine
1
Acrylic Sheet Cutting Machine
1
Neon Pumping and Bombarding Unit
1
Milling Machine
1
CNC Plotters
4
Painting (with full fledged stove enameling unit)
1
Poly Urethane Casting (capable for Gold, Brass, Copper, Bronze)
1
Powder Coating (with Sister concern)
1
Fleet Graphics Facility
250 sq. mtr.
Tri-O-Vision Assembly Unit
80 sq. mtr.
Store Area (Covered)
450 sq. mtr.
Store Area (Open)
1500 sq. mtr.
Emirates Neon Group - Pre Qualification
Page 06
L IST O F MACHI N E RIES - AREA 2
Casting Division SI No.
Description of Equipment and Machinery
Made by
Qty.
India
6
1
Horizontal Gravity Die Casting Machines(Jigs)750x1000mm
2
Vertical Gravity Die Casting Machines 1650x1000mm
Taiwan
2
3
Oil Fired Reverbatory Furnace 500Kg
India
1
4 5
Bale Out Type Aluminium Furnaces Capacity 300Kg Al Pyrometres Temperature Measurement Inst
India India
4 4
6
Oil Storage Pump
UAE
1
Aluminium/Steel Fabrication Division SI No.
Description of Equipment and Machinery
Traffic Signs Division Made by
Qty.
SI No.
Description of Equipment and Machinery
Italy
2
1
Taiwan
2
2
Screen Printing Equipments from PARCO
Aluminium MIG Welding Machines 320A/30
Finland/Germany
16
3
Laminators & Cutters from Flexa
Aluminium TIG Welding Machines 250
2 40
4 5
Coating Scoops
4 1/2� Pneumatic Angle Grinders
Finland/Germany Japan
Squeegees
Overhead Crane 3 Tons Capacity
Taiwan/Germany
1
6
Aqua Blaster
Finland
14
7
Sign Table
India
1
Auto Darkening Helmets
India
18
Circle Cutting Machine Hydraulic Press 50T
India Italy
1 2
12
Shear Cutting Machine
India
1
13
Lathe Machine 1500 Bet Centers 12 Spindle Speed 300mm center ht
Chez
2
14
Milling Machine
Chez
1
Thompson Rotary Cutters
2
Fly Wheel Excentric Press 10 tons
3 4 5 6 7
Arc Welding Machines 300A
8
Shot Blasting Machine
9 10 11
Qty.
Mimackhi-Japan
1
PARCO
1
Flexa
1
UAE/Taiwan UAE/Taiwan
1 1
Japan
1
UAE/Taiwan
2
Made by
Qty.
Powder Coating Division SI No.
Description of Equipment and Machinery
1
Electrostatic Overhead Conveyorised Powder Coating unit with Auto Reciprocator
PARCO/Taiwan
1
2
Batch Type Pre-heating unit
PARCO/Taiwan
1
1
3
Pre-Treatment Tanks
UAE
10
4 5
Fully Equipped Testing Laboratory
Germany USA
1 1
15
Radial Drilling Machine
Taiwan
1
16
Stand Drill Machine
Taiwan
1
Emirates Neon Group - Pre Qualification
Flat Bed Plotter Sign Blade
Made by
Reverse Osmosis Water Treatment Plant
Page 07
LIST OF PRODUCTS & SERVICES
Products Acrylic Signs Aluminium Composite Material Cladding Aluminium, Enamel, Glass, PMMA signs Antique Effect Signage Architectural Building Grills Architecture Lighting Architectural signs ATM kiosks Aviation Graphics Awnings Backdrop graphics Backlit signs Braille Signage Bridge Banners Cold Cathode Lighting & Signage Concrete Signage & Works Corporate Identity & Branding Decorative Wall Painting Digital printed banners Directional signage systems Edge-Lit Signs Exhibition Stands, Display & Graphics Fiber Glass / Metal Flagpoles Flags Flexface signs Floor graphics Glass internal signs Gold/ Silver/ Chrome/ Bronze/ Kynar coated signage GRP / GRC Works Illuminated letters Cast metal fencing Custom made Internal signage Ironmongery / Wrought Iron Signs Lamp Post banners Large-scale signs LED illuminated Signs LED screen / large-video displays Large-scale posters Lighted banners Mall kiosks Metal Stair Handrails Modular Sign Systems Multi-prism/ Tri-O-Vision signs Neon decor Neon signs Overhead Gantry TrafďŹ c Signs Plasma / LCD display systems Pop-up banners POS displays Polyurethane Resin Casting
Emirates Neon Group - Pre Qualification
Pylon, monoliths and totems RGB color-gradient lighting systems Roll-up banners Safety Signs Slim light boxes Stainless Steel Letters Themed Signage Toblerone printed signs Traffic signs Vacuum moulded signs Variable message signs Vehicle painting, livery Villa Gates/ Fencing and Balcony Railing Vinyl Lettering Wall Banners Window graphics Wood Signs
Services Artwork Calligraphy, typography Design, graphic art, photography Filming for advertisements
Ancillary Services Aluminium recycling Scrap trading
Engineering Cost Engineering Development, design & execution Prototype & sample development Value Engineering
Installation, Repair, Service & Maintenance National, international, worldwide
Digital Advertising Mall Media Media Site Selection & rentals Megacoms structures as advertising media Mobile Truck Advertising Muppies Revenue based partnerships Scaffolding structures Taxi Advertising
Production Acid Etching CNC routing Digital printing Die making & Tooling Ferrous & non-ferrous casting Gravity die-casting GRP/ GRC casting Joinery and woodworks LED Assembly Lettering center Metal fabrication Neon glass blowing Paint Shop Petrol station cladding & signage works Plastic processing Pre-assembly Centre Polyurethane Resin casting Powder coating Sand blasting Sand casting Screen-printing Stove enameling Structural fabrication Tool making Vacuum moulding Vinyl application 3D mould making
IT Implementation consulting Software for Digital media networks VPN set-ups
Media Services Ambient digital media Billboard Advertising Media Blimps Bus Advertising
Project Management General contractor Implementation, Planning, Execution Logistics & Resources Planning Managing Environmental Brand Solutions Signage Project Consultancy Total service provider
Page 08
Attachment 3 Certificates
Attachment 4 Organization Chart
ORGANISATIONAL CHART
Chairman
Group CEO
Strategy/Planning
Project Management & Process/Product Development
Sales & Marketing
EN Production
Outdoor Media
Retail Signage
Project Management
CAD & Estimation
QA/QC & ISO 9001 Facilitation
Research & Development Process/Product
Project Signage
Project Process ABC Digital Network
Engineering Design
Product Development
PPC
PPC
Production Floor
Production Floor
Installation
Casting r
Plant Maintenance
TrafďŹ c Sign r
QA
Project Cost Control
Estimation
Process Development
QC
Concurrent Engineering
Design for Manufacture
New Technology
ISO 9001 Facilitation
Digital Print Maintenance Contracts
Stores
Design Consultancy ABC Industries
Value Engineering
ABC Production
HRD
Purchase
Admin/Personnel
Recruitment/ Training
Finance/ Accounts
IT
UAE Site Development
Business Development
UAE
OVERSEAS
GCC Bahrain
Powder Coating
Qatar/Saudi
Oman
Installation
Kuwait Plant Maintenance North Africa Stores Pakistan
ABC Alloys East Africa China & Emerging Markets
Emirates Neon Group - Pre Qualification
Other Group Companies
Attachment 5 Key Personnel CV
PROFESSIONAL RESUME
SCHRIA MANU PUNNEN
Personal Data Nationality
Indian
Gender
Designation
Company
Male
Experience Years
Responsible For
4+ years
Senior Graphic DesignerSparta Industries Mumbai
designing, production coordination
7.5 years
Creative Group Head
Emirates Neon
Designing, Projects
Year
CLIENT
Position
L&T Galfar JV
Design/Build Proj. Mngr
Projects Handled
Salalah International Airport Expa2011 - Present Works Descripion: 1. Introductory Workshop – Design Basis Memorandum •
Confirmation of fonts, colors, graphics and layouts for each master sign type
•
Confirmation of all inputs CDs for artwork, wayfinding and any other design intent drawings
•
Detailed Workflow discussion
•
Details of team/ responsibilities
•
Review of original input wayfinding floor plans
•
Identification of decrease or increase in sign quantity per building
•
Location draft marking & verification
2. Workshop 1 – Detail Design, Message Schedule & Location Markings •
Detailed sign drawings for each Sign type & Sign type families
•
Review of original input message schedule for all sign type artworks for full sign quantity in project
•
Review of Location Marking
•
Identification of sign Location Marking on ancillary buildings
•
Identification or modification if any, in message schedule
3. Workshop 2 – Initial CAD • Review of Autocad Drawings with any changes in other integrated trades like Ceiling works and floor works and from FIDS supplier for screen and FIDS (MC3 contract) •
Selection of sample cross-sections details to proto-type
•
Revision after incorporation of comments on wayfinding plans
•
Revision after incorporation of comments on message schedule artworks for full sign quantity in project
brackets
4. Workshop 3 – Sample Sections •
Review of detailed sign drawings for each Sign type & Sign type families
•
Review of Autocad Drawings with any changes in other integrated trades
•
Review of prototypes of key sections from AUTOCAD B status drawings
5. Workshop 4 – Detailed CAD •
Review of any modified prototypes of key sections from AUTOCAD A status drawings
•
Finalization of wayfinding study with final signage placement and quantity finalization and artwork messages
•
Review of chosen sign type mock-ups
6. Workshop 5 – Final Drawings for IFC •
Confirmation of floor plans for Status A approvals
•
Confirmation of proto-types for Status A approvals
•
Confirmation of Message Schedule for Status A approvals
Villa Rosa Kempenski
2013 - Present
Insignia
Design Manager
Works Descripion: Phase 1 - Initial Overall Graphics & Signage Concept •
Familiarize with “the brand“ and its branding and identity standards
•
Integration of individual character and local destination
•
Consult with Client, Architect, Interior Designer and Landscape Architect to review signage requirements
•
Review with Landscape Architect for a comprehensive analysis of traffic flows for road signs and other exterior signs
•
Coordinate with Interior Designer on compatibility of interiors and signage locations
Phase 2 - Schematic & Typical Design •
Examined architectural master plan, site plans and architectural drawings
•
Analyze pedestrian paths and realistic viewing distances for signage
•
Prepared plans for coordination of locations with architectural/planning team
•
Create a hierarchy of signage
•
Developed outline specifications
Phase 3 - Design Development •
Refined signage products and wayfinding solutions
•
Clarified mounting methods, and placement standards along with power requirements and locations for mechanical integration
•
Finalize conceptual renderings of signage elements
•
Compile a complete sign schedule and location plans
Emirates Neon Group Sharjah, UAE
•
Prepare complete product specifications, including materials, sizes, graphic standards and manufacturing methods
Phase 4 - Construction Administration •
Review/comment/approve shop drawings and material/finish submittals
•
Inspect work for substantial completion, milestones and final acceptance
•
Create final punch list of signage deficiencies
D1 & Versace Palazzo
2011-2012
Ensaa Services Group
Design Manager
Phase 1 - Initial Overall Graphics & Signage Concept •
Familiarize with “the brand“ and its branding and identity standards
•
Integration of individual character and local destination
•
Consult with Client, Architect, Interior Designer and Landscape Architect to review signage requirements
•
Review with Landscape Architect for a comprehensive analysis of traffic flows for road signs and other exterior signs
•
Coordinate with Interior Designer on compatibility of interiors and signage locations
Phase 2 - Schematic & Typical Design •
Examined architectural master plan, site plans and architectural drawings
•
Analyze pedestrian paths and realistic viewing distances for signage
•
Prepared plans for coordination of locations with architectural/planning team
•
Create a hierarchy of signage
•
Developed outline specifications
Phase 3 - Design Development •
Refined signage products and wayfinding solutions
•
Clarified mounting methods, and placement standards along with power requirements and locations for architectural/mechanical integration
•
Finalize conceptual renderings of signage elements
•
Compile a complete sign schedule and location plans
•
Prepare complete product specifications, including materials, sizes, graphic standards and manufacturing methods
Jumeirah Lake Tower
2010 - 2011
Faithful & Gold
Design Manager
Phase 1 - Initial Overall Graphics & Signage Concept •
Familiarize with “the brand“ and its branding and identity standards
•
Integration of individual character and local destination
•
Consult with Client, Architect, Interior Designer and Landscape Architect to review signage requirements
•
Review with Landscape Architect for a comprehensive analysis of traffic flows for road signs and other exterior signs
•
Coordinate with Interior Designer on compatibility of interiors and signage locations
Phase 2 - Schematic & Typical Design •
Examined architectural master plan, site plans and architectural drawings
•
Analyze pedestrian paths and realistic viewing distances for signage
•
Prepared plans for coordination of locations with architectural/planning team
•
Create a hierarchy of signage
•
Developed outline specifications
Phase 3 - Design Development •
Refined signage products and wayfinding solutions
•
Clarified mounting methods, and placement standards along with power requirements and locations for mechanical integration
•
Finalize conceptual renderings of signage elements
•
Compile a complete sign schedule and location plans
•
Prepare complete product specifications, including materials, sizes, graphic standards and manufacturing methods
Shereton Hotel Muscat
2010 - 2011
Sheraton
Design Manager
Phase 1 - Initial Overall Graphics & Signage Concept •
Familiarize with “the brand“ and its branding and identity standards
•
Integration of individual character and local destination
•
Consult with Client, Architect, Interior Designer and Landscape Architect to review signage requirements
•
Review with Landscape Architect for a comprehensive analysis of traffic flows for road signs and other exterior signs
•
Coordinate with Interior Designer on compatibility of interiors and signage locations
Phase 2 - Schematic & Typical Design •
Examined architectural master plan, site plans and architectural drawings
•
Analyze pedestrian paths and realistic viewing distances for signage
•
Prepared plans for coordination of locations with architectural/planning team
•
Create a hierarchy of signage
•
Developed outline specifications
Phase 3 - Design Development •
Refined signage products and wayfinding solutions
•
Clarified mounting methods, and placement standards along with power requirements and locations for mechanical integration
•
Finalize conceptual renderings of signage elements
•
Compile a complete sign schedule and location plans
•
Prepare complete product specifications, including materials, sizes, graphic standards and manufacturing methods
Emirates Neon Group Sharjah, UAE
Other Projects Handled
Oman Tourism
Year Design Manager
Doha International Airport (EXT-INT Sig 2008-2012
NDIA
Design/Build Proj. Mngr
Various Hotel Projects (Al Bustan, Al Marsa, Intercon Hotel,etc..)
VARIOUS
Design Manager
Mirbat Marriott Hotel
Designation 2009 - 2010
2002-2007
Client
Professional Qualification Course
Specialization
Bachelor in Commerce Diploma in Graphics & Animation
Advertising
University
Institution
Mumbai
India
Mumbai
India
Institution
Technical Education Course
Specialization
University
Diploma in Graphics & Animation
Advertising
Mumbai
Seminars / Trainings Attended Title
Conducted by
Duration
Adobe
Graph East
3 days
Emirates Neon Group Sharjah, UAE
PROFESSIONAL RESUME
FERNANDO RAMIREZ
Personal Data Nationality
Filipino
Gender
Male
Experience Years
Designation
Company Responsible For Emirates Neon Group Signage Project Management
10 Years +
Project Manager
7 Years +
Project Engineer
RDPC - Philippines
Designation
Client
Year
Project Manager
RTA
2012 to Present
Projects Handled
RTA Super Signs (Dubai)
Civil Project Supervision
Works Descripion: 1. Liasing with client and finalizing award of contract 2. Involved in finalizing graphics design, structural design and shop drawings 3. Coordinating with other subcont for the other scope involved in project (powder coating, galvanizing, etc..) 4. Coordinating with third party scaffolding inspectors for the inspection and issuance of scaffolding certificates 5. Liasing with SERCO and RTA Authorities for the application/issuance of PTW and RROW-NOC 6. Responsible for ensuring that the Project Team completes the project 7. Develops the Project Plan with the team and manages the team’s performance of project tasks 8. Secure acceptance and approval of deliverables from the Consultant/Client 9. Responsible for communication, including status reporting, risk management, escalation of issues that cannot be resolved with in the team, and, in general. 10. Making sure the project is delivered in budget, on schedule, and within scope
Al Bustan Hotel (Abu Dhabi)
Project Manager
HLGroup
2012 to Present
1. Liasing with client and finalizing award of contract 2. Involved in finalizing graphics design, structural design and shop drawings 3. Coordinating with other subcont for the other scope involved in project (powder coating, galvanizing, etc..) 4. Ensuring adherence to project specifications and cost;l anticipating possible variations that will affect cost and time base on project requirements 5. Responsible for ensuring that the Project Team completes the project 6. Develops the Project Plan with the team and manages the team’s performance of project tasks 7. Secure acceptance and approval of deliverables from the Consultant/Client 8. Responsible for communication, including status reporting, risk management, escalation of issues that cannot be resolved with in the team, and, in general. 9. Making sure the project is delivered in budget, on schedule, and within scope
YAS Island Traffic Signs and Gantrys Project Manager
AL DAR-TURNER 2012 to Present
1. Involved from Tendering to Award of contract 2. Involved in preparing site demarkation plan and trial trench plan 3. Involved in finalizing graphics design, structural design, shop drawings using Abu Dhabi Traffic Sign Manual as reference 4. Coordinating with other subcont for the other scope involved in project (procurement of gantry structures, galvanizing, piling foundation, electrical works etc..) 5. Ensuring adherence to project specifications and cost;l anticipating possible variations that will affect cost and time base on project requirements 6. Responsible for ensuring that the Project Team completes the project 7. Secure acceptance and approval of deliverables from the Consultant/Client 8. Responsible for communication, including status reporting, risk management, escalation of issues that cannot be resolved with in the team, and, in general. 9. Making sure the project is delivered in budget, on schedule, and within scope
Dubai Metro RED Line and Green Lin Project Manager
JTMJV
2008 to 2012
1. Involved from Tendering to Award of contract 2. Involved in preparing Post Tender Presentation, to show to client how we are going to execute scope of works of the project 3. Involved in finalizing graphics design, structural design, shop drawings 3. Coordinating with other subcont for the other scope involved in project (powder coating, galvanizing, etc..) 4. Ensuring adherence to project specifications and cost;l anticipating possible variations that will affect cost and time base on project requirements 5. Develops the Project Plan with the team; from shop drawings, first fix sub-structural support for floor mounted and ceiling mounted signs to electrical tapping point, testing and commisioning. 6. Responsible for ensuring that the Project Team completes the project 7. Secure acceptance and approval of deliverables from the Consultant/Client 8. Responsible for communication, including status reporting, risk management, escalation of issues that cannot be resolved with in the team, and, in general. 9. Making sure the project is delivered in budget, on schedule, and within scope
Emirates Neon Group Sharjah, UAE
Designation
Client
Year
Ferrari World
Other Projects Handled
Project Manager
BESIX
2010 to 2011
Al Bustan Hotel (Oman)
Project Manager
Oman Minsitry of Tourism2010 to 2011
Marriot Hotel (Oman)
Project Manager
Oman Minsitry of Tourism2010 to 2011
Muscat and Qurum City Centre (Oman)
Project Manager
MAF
2009 to 2010
Dubai Sports City (Cricket Stadium)
Project Manager
Dubai Sports City
2009 to 2010
Dubai Old Town
Project Manager
Khansaheb
2009 to 2010
Al Marsa Hotel
Project Manager
AFC
2008 to 2009
Bahrain Financial Harbour
Project Manager
Bahrain Bay
2008 to 2009
Bahrain City Centre
Project Manager
MAF
2008 to 2009
Dubai Mall Hotel
Project Manager
CHSK
2007 to 2008
Dubai Aquarium
Project Manager
EMAAR
2007 to 2008
Jumeirah Beach Residences
Project Manager
MACE-JBR
2007 to 2008
Motor City
Project Manager
Union Properties
2007 to 2008
Baniyas Island
Project Manager
ADH Tourism
2006 to 2007
Jumeirah Lake Towers
Project Manager
JLT
2006 to 2007
Sheik Jaber Stadium - Kuwait
Project Manager
Sheik Jaber
2006 to 2007
Khalifa Stadium - Qatar
Project Manager
Khalifa Stadum
2004 to 2005
Madinat Jumeriah Hotel
Project Manager
Madinat Jumeira
2003 to 2004
Professional Qualification Course Bachelor of Science in Civil Engineering Registered Civil Engineer PRC # 008574
Specialization Project Management
University
Institution
Holy Angel University Pampanga, Philippines
Professional Regulation Commission (PRC)
Technical Education Course Graphics Design
Specialization
University
Photoshop/ Illustrator
Institution OWWA Special Education
Seminars / Trainings Attended Title
Conducted by
Duration
PMI-AGC
5 days
PRIMAVERA 4.1 CII-Best Practices Workshop
6 days
PRIMAVERA 6
3 days
Membership / Certification Organization Project Management Institute-Member Philippine Institute of Civil Engineers
Since 2007 1998
Emirates Neon Group Sharjah, UAE
PROFESSIONAL RESUME
Mohammed Shaharayar Abbasi
Personal Data Nationality
India
Gender
Male
Experience Designation
Company
2 Year +
Years
Project Manager
Emirates Neon Group
Responsible For Signage Project Management
2 Year +
Technical Manager
Blue Rhine Industries
Signage & Cladding Production and Installation
1 Year +
Technical Manager
9 year +
Estimation-CAD Manager
Emirates Neon Group
Designation
Client
Project Manager
L& T Oman
Projects Handled
Development of Salalah Airport
Specialised Metal Systems Metal Work and Cladding work Designing. Signage & Cladding work Design and Estimating. Year
2012 to Present
Works Descripion: 1. Over all responsible for implementing wayfinding signage strategy according to airport guidelines. 2. Working in co ordination with design manager on airpot various level plans and deciding way finding strategy. 3. Liasing with client's architect to finalise designed way finding strategy. 4. Organizing workshop with client representative, stake holders, consultants. 5. Conducting workshop and explaining way finding strategy to client representative, stake holders, consultants. 6. Designing installation details on various surfaces and co ordinating interfacing with different trades. 7. Develops the Project Plan with the team and manages the team’s performance of project tasks 8. Secure acceptance and approval of deliverables from the Consultant/Client 9. Responsible for communication, including status reporting, risk management, escalation of issues that cannot be resolved with in the team, and, in general. 10. Making sure the project is delivered in budget, on schedule, and within scope
Zayed University-Al Ain
Technical Manager
HMR
2011-2012
1. Over all responsible for designing way finding adhering to guideline supplied by Main consultant. 2. Involved in preparing site demarkation plan. 3. Involved in finalizing graphics design, shop drawings. 4. Coordinating with other subcont for the other scope involved in project (Electrical works, Civil etc..) 5. Ensuring adherence to project specifications and cost;l anticipating possible variations that will affect cost and time base on project requirements 6. Responsible for ensuring that the Project Team completes the project 7. Secure acceptance and approval of deliverables from the Consultant/Client 8. Responsible for communication, including status reporting, risk management, escalation of issues that cannot be resolved with in the team, and, in general. 9. Making sure the project is delivered in budget, on schedule, and within scope
Burj Khalifa- Gate Houses
Technical Manager
Samsung-Besix-Arabtec2009-2010
1. Overall responsible for Designing Cladding & Metal work for security gate houses in landscaping area. 2. Liasing with architect on fabrication and installation details of various metal and interior works. 3. Deciding Material and finishes in co ordination with architect. 4. Finalising fabrication and installation details. 5. Liase with various trades for interfacing with various finishes. 6. Checking and ensuring all shopdrawings are as required standard from client. 7. Liasing with site team on daily basis for any variance occurred in installation details. 8. Responsbile for various material and shop drawing approvals. 9. Responsible for communication, including status reporting, risk management, escalation of issues that cannot be resolved with in the team, and, in general. 10. Making sure the project is delivered in budget, on schedule, and within scope Emirates Neon Group Sharjah, UAE
Other Projects Handled
Designation
Client
Year
BESIX
2010 to 2011
Jal Fujairah Beach Resort
Project Manager
Muscat City Center
Project Manager
Oman Minsitry of Tourism 2010 to 2011
Shaikh Jaber Sport City-Kuwait
Project Manager
Oman Minsitry of Tourism 2010 to 2011
Al Raha Beach Resort-ALN
Project Manager
MAF
2009 to 2010
Khalifa Stadium - Qatar
Project Manager
Dubai Sports City
2009 to 2010
Jimmy Mall-Al Ain
Project Manager
Khansaheb
2009 to 2010
Meydan Race Course
Project Manager
AFC
2008 to 2009
Dubai Metro
Project Manager
Bahrain Bay
2008 to 2009
Bahrain City Centre
Project Manager
MAF
2008 to 2009
Dubai Mall Hotel
Project Manager
CHSK
2007 to 2008
Dubai Aquarium
Project Manager
EMAAR
2007 to 2008
Jumeirah Beach Residences
Project Manager
MACE-JBR
2007 to 2008
Motor City
Project Manager
Union Properties
2007 to 2008
Baniyas Island
Project Manager
ADH Tourism
2006 to 2007
Jumeirah Lake Towers
Project Manager
JLT
2006 to 2007
Sheik Jaber Stadium - Kuwait
Project Manager
Sheik Jaber
2006 to 2007
Khalifa Stadium - Qatar
Project Manager
Khalifa Stadum
2004 to 2005
Madinat Jumeriah Hotel
Project Manager
Madinat Jumeira
2003 to 2004
Professional Qualification Course
Specialization
University
Diploma in CAD
Auto CAD
Technical Education Board CAD Center
Institution
Certificate in Pro E
Pro E
Technical Education Board CAD Center
Course
Specialization
BS
Mechanical Engineering
University Institution Technical Education Board R C Technical Institute.
Technical Education
Seminars / Trainings Attended Title
Conducted by
Duration
Certificate in Project Management
Cheetah Institute
3 months
Membership / Certification Organization
Since
Project Management Institute
2008
Emirates Neon Group Sharjah, UAE
PROFESSIONAL RESUME
JOSE MAMUCOD JR
Personal Data Nationality
FILIPINO
Gender
Designation
Company
MALE
Experience Years
Responsible For Project supervision; structural calculation of signs; QA/QC Project management/execution
2009 to Present
Project Engineer/Structural Engineer
ENG
1 year
Project Engineer
LINC Government Services
3 years
Design Engineer
Glassalum LLC
Structural design of curtain walls and some steel and aluminum structures; QA/QC
12 years
Faculty member (Instructor)
Central Luzon State University
Teaching civil engineering subjects
1 year
Site Engineer
Adroit Construction
Project supervision
Projects Handled
RTA Super Signs (Dubai)
Designation
Client
Year
Project Engr./Structural Engr.
RTA
2012 to Present
Works Descripion: 1. Person In Charge (PIC) for the installation of Supersign 2. Prepares detailed Structural Design Calculation and third party approval for client submission 3. Liasing with RTA for the approval of sign location and message schedule 4. Responsible for daily site activities, ensuring and meeting daily task as per given plan 5. Ensuring safety of Team Members, and making sure that all has its own PPE before any works 6. Prepares daily activity reports to be submitted to Project Manager
Ferrari World (Abu Dhabi)
Project Engr./Structural Engr.
BESIX
2009 to 2010
Works Descripion: 1. Prepares detailed Structural Design Calculation and third party approval for client submission 2. Liasing with client for the approval of sign location and message schedule 3. Responsible for daily site activities, ensuring and meeting daily task as per given plan 4. Ensuring safety of Team Members, and making sure that all has its own PPE before any works 5. Prepares daily activity reports to be submitted to Project Manager Professional Qualification Course
Specialization
University Central Luzon State University
Bachelor of Science in Civil Engineering Registered Civil Engineer (PRC#0064589)
Institution Nueva Ecija, Philippines Professional Regulation Commission
Technical Education / Other Certification Course
Specialization
University
Institution
Seminars / Trainings Attended Title
Conducted by
Duration
Steel Construction Seminar
JISF/JSSC
1 day
JISF Southeast Asia Steel Construction Seminar
JISF
1 day
PICE Technical Seminars
Phil. Institute of Civil Engineers
6 days
Membership / Certification Organization Philippine Institute of Civil Engineers
Since 1992
Emirates Neon Group Sharjah, UAE
PROFESSIONAL RESUME
DENNIS
Personal Data Nationality
Filipino
Gender
Male
Experience Years
Designation
Company
2008 to Present
PROJECT ENGINEER
EMIRATES NEON
Responsible For PROJECT SUPERVISION
14.9 YEARS
TECHNICAL SUPERVISOR
PHILMETAL PROD. INC
PROJECT SUPERVISION
PROJECT ENGINEER
DEPT. OF PUBLIC WORKS & HIGHWAYS DIST. II TARLAC
PROJECT INSPECTION
PROJECT ENGINEER
MUNICIPAL ENGINEER'S OFFICE PANIQUI, TARLAC
PROJECT INSPECTION/ SUPERVISION
2 YEARS 1 YEAR
Projects Handled
RTA Super Signs (Dubai)
Designation
Client
Year
Project Engineer
RTA
2012 to Present
Works Descripion: 1. Person In Charge (PIC) for the installation of Supersign 2. Liasing with RTA for the approval of sign location and message schedule 3. Responsible for daily site activities, ensuring and meeting daily task as per given plan 4. Ensuring safety of Team Members, and making sure that all has its own PPE before any works 5. Prepares daily activity reports to be submitted to Project Manager
Al Bustan Hotel (Abu Dhabi )
Project Engineer
HLG
2012 to Present
Works Descripion: 1. Project Engineer for the installation of Supersign 2. Liasing with client for the approval of sign location and message schedule 3. Responsible for daily site activities, ensuring and meeting daily task as per given plan 4. Ensuring safety of Team Members, and making sure that all has its own PPE before any works 5. Prepares daily activity reports to be submitted to Project Manager
Dubai Metro RED Line and Green Line
Project Engineer
JTMJV
2008 to 2012
1. Person In Charge (PIC) for the installation of Supersign 2. Liasing with JTMJV for the approval of sign location and message schedule; including exact location of first fix for floor and ceiling mounted signs 3. Responsible for daily site activities, ensuring and meeting daily task as per given plan 4. Ensuring safety of Team Members, and making sure that all has its own PPE before any works 5. Prepares daily activity reports to be submitted to Project Manager Professional Qualification Course
Specialization
BS Civil Engineering
University
Institution
ST. LOUIS UNIVERSITY
Seminars / Trainings Attended Title
Conducted by
TEAM BUILDING
IN-HOUSE PHILSTEEL GROUP OF COMPANIES May 2007
Duration
Membership / Certification Organization
Since
Philippine Insttitute of Civil Engineers
1998
Emirates Neon Group Sharjah, UAE
PROFESSIONAL RESUME
ESTELA "TED" B. LIGTAS
Personal Data Nationality
FILIPINO
Gender
FEMALE
Responsible For PROJECT SUPERVISION
Experience Years
Designation
Company
2007 to Present
PROJECT ENGINEER
EMIRATES NEON GROU[
18 YEARS
PROJECT SUPERVISOR
PRYCE GROUP OF COMPANIES
Al Bustan Hotel (Abu Dhabi)
Project Engineer
HLGroup
2012 to Present
1. Project Engineer for the installation of Supersign 2. Liasing with client for the approval of sign location and message schedule 3. Responsible for daily site activities, ensuring and meeting daily task as per given plan 4. Ensuring safety of Team Members, and making sure that all has its own PPE before any works 5. Prepares daily activity reports to be submitted to Project Manager
Ferrari World (Abu Dhabi)
Project Engineer
BESIX
2009 to 2010
Works Descripion: 1. Project Engineer for the installation of Supersign 2. Liasing with client for the approval of sign location and message schedule 3. Responsible for daily site activities, ensuring and meeting daily task as per given plan 4. Ensuring safety of Team Members, and making sure that all has its own PPE before any works 5. Prepares daily activity reports to be submitted to Project Manager
Dubai Metro RED Line and Gre
Project Engineer
JTMJV
2008 to 2012
1. Person In Charge (PIC) for the installation of Supersign 2. Liasing with JTMJV for the approval of sign location and message schedule; including exact location of first fix for floor and ceiling mounted signs 3. Responsible for daily site activities, ensuring and meeting daily task as per given plan 4. Ensuring safety of Team Members, and making sure that all has its own PPE before any works 5. Prepares daily activity reports to be submitted to Project Manager Professional Qualification Course
Specialization
BS ARCHITECTURE
DESIGN/CONSTRUCTION
University
Institution CAGAYAN DE ORO COLLEGE
Seminars / Trainings Attended Title
Conducted by
Duration
COMPUTER ADIDE STRUCTURAL ANALYSIS (USING STAADPRO2004)
TESDA, PHILS.
1 MONTH
ISO9000 AWARENES S AND DEVELOPMENT TUTORIALS
PRYCE GASES INC.
1 DAY
BASIC MANAGERIAL/SUPERVISORY DEVELOPMENT PROGRAM SEMINAR WORKSHOP
PRYCE GASES INC.
2 DAYS
2D ADVANCE CADD COURSE
UM ATS-CAD/CAE TRAINING CENTER
1 MONTH
ENGINEERING AND CONSTRUCTION MANAGEMENT AND CONCRETE DESIGN PICE
1 DAY
Membership / Certification Organization UNITED ARCHITECT OF THE PHIL Philippine Institute of Civil Engineers PHIL. COAST GUAT AXILLARY
Since 1988 - Present 2001 - Present 2006
Emirates Neon Group Sharjah, UAE
PROFESSIONAL RESUME
PATRICIO D. MARIANO
Personal Data Nationality
FILIPINO
Gender
MALE
Responsible For CAD Designer
Experience Years
Designation
Company
2012 to Present
PROJECT ENGINEER
EMIRATES NEON GROUP
Planning and Design-All shop Drawing must be approved of Sharjah Municipality 1 YEAR
ARCHITECT
Al Zarwa Engineering Consultant, UAE
20 YEARS
PROJECT-SITE SUPERVISOR
Country Road Construction, Phils
Projects Handled
Salalah Internation Airport
Direct Supervision.
Designation
Client
Year
CAD - Designer
L&T
2012 to Present
Works Descripion: 1. Prepares Shop Drawings based on existing client designs; (floor plan sign lay-out, detailed fixing/installation, and detailed production drawings) 2. Involved in finalizing graphics design, structural design drawings and shop drawings 3. Coordinating with production and site team, ensuring that drawings release for consruction are being stricly implemented 4. Secure acceptance and approval of shop drawings from client Professional Qualification Course Bachelor of Science in Architecture
Specialization Architecture
University
Institution
Araullo Lyceum University
Seminars / Trainings Attended Title
Conducted by
Duration
AutoCAD 2012
FACE
2 months
Membership / Certification Organization United Architects of the Phil (UAP)
Since 1985 - Present
Emirates Neon Group Sharjah, UAE
Section 1.1 Signage Design & Way-finding Consultancy
S IG N AG E DE S I GN & W AYF I ND I N G C ONS ULT ANC Y
Our Design Consultancy division operates as a stand alone business within the group. We plan, design and implement wayfinding strategies, signage programs and other forms of visual communication in the built and natural environments With the experience and expertise in all aspects of environmental graphic design projects, we are truly international, with clients in UAE, Bahrain, Kuwait, Qatar, Saudi, Oman, Egypt, Tanzania, Uganda, Kenya, Russia and China. As a part of the signage group, we are uniquely positioned to service clients in a variety of project types. We are wayfinding specialists who make it easier for people to find their way around complex sites and facilities. We see wayfinding as much more than signs and plan wayfinding systems to solve complex problems of disorientation.
Emirates Neon Group - Pre Qualification
3.1.1
Phase 1 Overall Graphics & Signage Concept Section 1.1.0
SCOP E OF W OR K – P H AS E 1 OV E RALL GR AP HI C S A ND S I GN AGE C ONC E P T
In the initial phase of the project, we will gather all existing information, conduct research and discuss any preconceptions anyone might have. . Familiarize with “the brand“ and its branding and identity standards . Integration of individual character and local destination . Consult with Client, Architect, Consultant, Operator (if any), Interior Designer and Landscape Architect to review establishment operations, signage requirements, priority of handing over phases and priority of signs. . Review with Landscape Architect for a comprehensive analysis of traffic flows for road signs and other exterior signs . Coordinate with Interior Designer and other consultants, compatibility of interiors and signage locations Deliverables: . Conceptual Renderings of the signage – 3 varied options
Emirates Neon Group - Pre Qualification
3.1.2
S IGNAG E C O N C E PT – P H AS E 1 I n s pi r a t ions - A rc h it e c t u r a l El e m e n t s
Emirates Neon Group - Pre Qualification
3.1.3
S IGNAG E C O N C E PT – P H AS E 1 I n s pi r a t ions - I nt e ri o r E l e m e n t s
Emirates Neon Group - Pre Qualification
3.1.4
S IGNAG E C O N C E PT – P H AS E 1
3.1.5
Signag e Concept 1
Emirates Neon Group - Pre Qualification
S IGNAG E C O N C E PT – P H AS E 1 C o n cep t 1 - I nsp ira t i o n ( A r c h i t e c t u r a l / I n t e r i or )
Architectral Shape
Matte Varnished Dark Wood
Emirates Neon Group - Pre Qualification
3.1.6
Norrow Elongated Forms
Polished Edges
Fret-cut chrome plated Brass
Mirror Finish
Clean and Simple
S IGNAG E C O N C E PT – P H AS E 1 C o n cep t 1 - S ke t c h e s
Emirates Neon Group - Pre Qualification
3.1.7
S IGNAG E C O N C E PT – P H AS E 1 C o n cep t 1 - I nt e rna l S i g n F a m i l y
3.1.8
Wall Mounted Blade Sign
2200
2000
Freestanding Directory Sign
1800
Wall Mounted Area Directional Sign
Wall/Door Mounted Toilet Sign
Wall/Door Mounted Room Directional Sign
Wall/Door Mounted Hotel Room Number Sign
餐廳
Restaurant 會議室
1600
320 - 340
Meeting Rooms
L3-L5 L2
1400
客房 Guest Floors 中餐健 Chinese Restaurant 健餐健 Japanese Restaurant
健身中心
Fitness Center 游泳池
Pool
女化妝室
女化妝室
Men
Women
300 - 319
2407 Desktop Sign
会健室 Meeting Rooms 商健中心 Business Center
1200
L1
宴会心 Ballroom 自助餐心 All Day Dining 会健中心 Conference Center
1000
大堂吧
Lobby Lounge
B1
健身中心 Fitness Center 水心中心 Spa Center 健心 Car Park
B2
健心 Car Park
0
Emirates Neon Group - Pre Qualification
自助餐自 RECEPTION
S IGNAG E C O N C E PT – P H AS E 1 C o n cep t 1 - E x t e rna l S i g n F a m i l y
3.1.9
2200
2000
Freestanding Pedestrian Directional Sign
1800
Wall Mounted Map Directory Sign
Freestanding Vehicular Directional Sign
1600 宴会会
Hotel Entrance
1400 自助餐自
Parking Area
宴会会
Hotel Entrance 1200
会会中心
Villas
自助餐自
Parking Area 1000
大堂吧
Lobby Lounge
0
Emirates Neon Group - Pre Qualification
Monument Sign
S IGNAG E C O N C E PT – P H AS E 1 C o n cep t 2
3.1.10
Signag e Concept 2
Emirates Neon Group - Pre Qualification
S IGNAG E C O N C E PT – P H AS E 1 C o n cep t 2 - I nsp ira ti o n ( A r c h i t e c t u r a l / I n t e r i or ) Pattern
Modern dark wood
Emirates Neon Group - Pre Qualification
3.1.11
Pattern & Color
Opaque Glass
Polished Stainless Steel
Letters and pictograms on Wood and Glass
Geometric Art
S IGNAG E C O N C E PT – P H AS E 1 C o n cep t 2 - S ke t c h e s
3.1.12
PATTERN
Build-up aluminum framing with etched grill work and off white acrylic. Matte varnish dark wood with fret-cut messages.
Emirates Neon Group - Pre Qualification
S IGNAG E C O N C E PT – P H AS E 1 C o n cep t 2 - C onc e p t S k e t c h e s
MAP DIRECTORY SIGN
3.1.13
MONUMENT ID SIGN
VEHICULAR DIRECTIONAL SIGN
Build-up aluminum framing with grill works on gun-metal finish.
Build-up aluminum framing with grill works on gun-metal finish.
Build-up aluminum framing with grill works on gun-metal finish.
Matte varnish dark wood with fret-cut messages.
Matte varnish dark wood with build-up 3D letters spot lit.
Matte varnish dark wood with digital print-out map graphics UV laminated.
Emirates Neon Group - Pre Qualification
S IGNAG E C O N C E PT – P H AS E 1 C o n cep t 2 - I nt e rna l S i g n F a m i l y
3.1.14
Wall Projected Toilet Sign 侧挑式 洗手间标识
2200 Freestanding Lift Directory Sign(FS) 挂墙式
2000
电梯索引标识
Wall Mounted
Wall Mounted
Wall Mounted
Directional Sign
Room Directional Sign
Room ID Sign
Wall Mounted Room Number Sign
Wall/ Door Mounted Toilet Sign
挂墙式
挂墙式 房号导向标识
挂墙式 房号导向标识
挂墙式
挂墙式/贴门式
房号标识
洗手间标识
区域导向标识
1800
1600 视平线
Directory
201-250 251-290
1F Lobby
1400
2F Fitness Center
1200
3F Restaurants
1000
4F Hotel Rooms
0
Emirates Neon Group - Pre Qualification
Desktop Sign 桌面标识
自助餐自
Information
S IGNAG E C O N C E PT – P H AS E 1 C o n cep t 2 - E x t e rnal S i g n F a m i l y
3.1.15
Freestanding Map Directory Sign
2200
Freestanding Monument Sign 2000
Freestanding Vehicular Directional Sign
1800
Freestanding Pedestrian Directional Sign
1600
1400
Carpark 1200
1000
0
Emirates Neon Group - Pre Qualification
Entrance
Entrance
Exit
Exit
S IGNAG E C O N C E PT – P H AS E 1 C o n cep t 3
3.1.16
Signag e Concept 3
Emirates Neon Group - Pre Qualification
S IGNAG E C O N C E PT – P H AS E 1 C o n cep t 3 - I nsp ira ti o n ( A r c h i t e c t u r a l & I n t e r ior )
Architectral Shape
Matte Varnished Dark Wood
Emirates Neon Group - Pre Qualification
3.1.17
Norrow Elongated Forms
Router Cut
Fret-cut polished wood
Polished Edges
Clean and Simple
S IGNAG E C O N C E PT – P H AS E 1 C o n cep t 3 - S ke t c h e s
Emirates Neon Group - Pre Qualification
3.1.18
S IGNAG E C O N C E PT – P H AS E 1 C o n cep t 3 - R e nde ri n g s
Emirates Neon Group - Pre Qualification
3.1.19
S IGNAG E C O N C E PT – P H AS E 1 C o n cep t 3 - I nt e rna l S i g n F a m i l y
3.1.20
Wall Mounted Blade Sign
2200 衛生間
Restroom Wall Mounted Area Directional Sign
2000
Freestanding Directory Sign
1800
Wall/Door Mounted Toilet Sign
Wall/Door Mounted Room Directional Sign
Wall/Door Mounted Hotel Room Number Sign
餐廳
Restaurant 320 -340
會議室
健身中心
Meeting Rooms
1600
Fitness Center
健身中心
Fitness Center
L3-L5 L2
1400
客房 Guest Floors
会健室 Meeting Rooms 商健中心 Business Center
L1
宴会心 Ballroom 自助餐心 All Day Dining 会健中心 Conference Center
1000
大堂吧
Lobby Lounge
B1
健身中心 Fitness Center 水心中心 Spa Center 健心 Car Park
B2
Pool
300 -319 販賣機
女化妝室
男子
Women
Men
Vending
2407
中餐健 Chinese Restaurant 健餐健 Japanese Restaurant
1200
游泳池
健心 Car Park
0
Emirates Neon Group - Pre Qualification
Desktop Sign
S IGNAG E C O N C E PT – P H AS E 1 C o n cep t 3 - E x t e rnal S i g n F a m i l y
3.1.21
2200
2000
1800
Pedestrian Directional Sign
1600
Map Directory Sign
Monument Sign
1400
Vehicular Directional Sign
1200
餐廳
Restaurant
1000
停車場
Parking 健身中心
Fitness Center
0
Emirates Neon Group - Pre Qualification
停車場
Parking
SIG N AG E C O N C E PT – P H AS E 1 A l T ai f Hosp it a l - R e n d e r i n g s
Emirates Neon Group - Pre Qualification
3.1.22
SIG N AG E C O N C E PT – P H AS E 1 St . R eg is Ya lo ng B ay - C o n c e p t S k e t c h e s / Re n d e r in gs
3.1.23
TOP VIEW
FRONT VIEW
Emirates Neon Group - Pre Qualification
SIDE VIEW
SIGNAGE C O N C E PT – P H AS E 1 St . Reg is Ya long B a y - C o n c e p t S k e t c h e s / Re n d e r in gs
3.1.24
TOP VIEW
Hotel Lobby 酒店大堂
Meeting Rooms 会议室
Guest Rooms 客房
RENDERING
Emirates Neon Group - Pre Qualification
FRONT VIEW
SIDE VIEW
S IGNAG E C O N C E PT – P H AS E 1 Hot el Indig o - C o nc e p t S k e t c h e s / R e n d e r i n g s
Emirates Neon Group - Pre Qualification
3.1.25
SIG N AG E C O N C E PT – P H AS E 1 St . R eg is Ya lo ng B ay - C o n c e p t S k e t c h e s / R en d e r in gs
3.1.26
TOP VIEW
Guest Rooms
5F
客房
Guest Rooms
4F
客房
Hotel Lobby Lobby Lounge Business Center Meeting Rooms Guest Rooms
3F
Guest Rooms
2F
Yan Ting Chinese Restaurant Social Restaurant Ballroom Meeting Rooms Kids Club Guest Rooms
1F
Guest Rooms Parking
酒店大堂 大堂休闲吧
客房
Emirates Neon Group - Pre Qualification
FRONT VIEW
客房
杨庭中式餐厅 全日餐厅 宴会厅 会议室 儿童俱乐部 客房
B1
Marina Clubhouse GYM Spa B2 Parking
RENDERING
商务中心 会议室
客房 停车场 码头俱乐部 健身中心 水疗中心 停车场
SIDE VIEW
SIG N AG E C O N C E PT – P H AS E 1 K n o wl e dg e E c o nom i c C i t y - C o n c e p t S k e t c h e s/ Re n d e r in gs
Emirates Neon Group - Pre Qualification
3.1.27
SIGNAGE C O N C E PT – P H AS E 1 Cr own Pla z a A nt ing - C o n c e p t S k e t c h e s / R e n d e r in gs
Emirates Neon Group - Pre Qualification
3.1.28
S IGNAG E C O N C E PT – P H AS E 1 Z hu hai S h iz im e n - C o n c e p t S k e t c h e s / R e n d e rin gs
Emirates Neon Group - Pre Qualification
3.1.29
SIG N AG E C O N C E PT – P H AS E 1 Zhuhai S h iz im e n - C o n c e p t S k e t c h e s / R e n d e rin gs
Emirates Neon Group - Pre Qualification
3.1.30
SIG N AG E C O N C E PT – P H AS E 1 W u xi T a ibo - C o nc e p t S k e t c h e s / R e n d e r i n g s
Emirates Neon Group - Pre Qualification
3.1.31
SIGNAGE C O N C E PT – P H AS E 1 Wuxi Ta ib o - C onc e p t S k e t c h e s / Re n d e r i n g s
Emirates Neon Group - Pre Qualification
3.1.32
S IGNAG E C O N C E PT – P H AS E 1 C o m ci t y - C onc e p t R e n d e r i n g s
Emirates Neon Group - Pre Qualification
3.1.33
SIG N AG E C O N C E PT – P H AS E 1 St . R eg is T a nj in - C o n c e p t S k e t c h e s / R e n d e r in gs
3.1.34
7F-18F Guest Rooms 2F Chinese Restaurant Meeting Room 1F Lobby Lounge Social Restaurant B1 SPA Swimming Pool B2 Ballroom GYM B3-B4 Car Park
Emirates Neon Group - Pre Qualification
客房
中餐厅 会议室
大堂吧 西餐厅
水疗中心 游泳池
宴会厅 健身中心
停车场
SIG N AG E C O N C E PT – P H AS E 1 Shan g h a i I nd ig o - C o n c e p t S k e t c h e s / Re n d e r in gs
Emirates Neon Group - Pre Qualification
3.1.35
SIGNAGE C O N C E PT – P H AS E 1 Wuxi Int e rc ont ine nta l - C o n c e p t S k e t c h e s / Re n d e r in gs
3.1.36
TOP VIEW
Light
Light
Emirates Neon Group - Pre Qualification
S IGNAG E C O N C E PT – P H AS E 1 Wu xi In t e rc o nt ine nt a l - C o n c e p t S k e t c h e s / Re n d e r in gs
3.1.37
TOP VIEW
RENDERING
Emirates Neon Group - Pre Qualification
FRONT VIEW
SIDE VIEW
Phase 2 Schematic & Typical Design Section 1.2.0
SCOP E OF W OR K – P HA S E 2 S C HE MA TI C A ND T YP I C AL D ES I GN
Schematic Design will create overall theoretical strategies for all aspects of wayfinding and the general product designs. It will determine the standardized approach for the basis for further development of the product design. . Examine architectural master plan, site plans and architectural drawings . Analyze pedestrian paths . Analyze pedestrian vistas and realistic viewing distances for signage . Determine signage committee criteria with client . Prepare plans for coordination of locations with architectural/planning team . Create a hierarchy of signage . Develop outline specifications . Working session with architectural and planning team . Review/presentation meetings with signage committee or client Deliverables: . Typical designs of the family of signage products . Typical floor plans showing signage locations . Typical Installation details
Emirates Neon Group - Pre Qualification
3.2.1
P HASE 2 - S C HE M A T I C A ND T Y P I C A L D E S I G N Fr ees t a nd ing S ig n
3.2.2
Specifications:
① 8mm Thick Transparent Acrylic 500 350
75
225
50
③ Mirror Bronze Vinyl
225
④White Silk Screen On The Back Of The ①
① 45 22 13 12 14
12 33
75
75
② 5mm Thick Acrylic Painted Champagne Gold
②
1620
1800
④
30 75
③
FRONT VIEW Scale 1:10mm
Emirates Neon Group - Pre Qualification
SIDE VIEW
SIGN POSITION
P HASE 2 - S C HE M A TI C A N D T Y P I C A L D ES I GN Wal l Mo u nt e d D ire c t o r y S i g n
3.2.3
Specifications:
① 8mm Thick Transparent Acrylic ② 5mm Thick Acrylic Painted Champagne Gold ③ Mirror Bronze Vinyl ④White Silk Screen On The Back Of The ① TOP VIEW 顶视图
500 350
75
15
23 13
① ②
④ 850
1000
25 9 9 25
75
75
75
③
FRONT VIEW Scale 1:8mm
Emirates Neon Group - Pre Qualification
SIDE VIEW
RENDERING
SIGN POSITION
P HASE 2 - S C HE M A T I C A N D T Y P I C A L D ES I GN Des k t o p S ig n
3.2.4
Specifications:
① 8mm Thick Transparent Acrylic ② 5mm Thick Acrylic Painted Champagne Gold ③ Mirror Bronze Vinyl ④White Silk Screen On The Back Of The ①
250 25
200
12
25
① ④
③
CL
60
70
4
CL
50
6
② SIDE VIEW
1700
FRONT VIEW Scale 比例 (1:2millimeters)
Emirates Neon Group - Pre Qualification
P HA SE 2 - S C HE M A T I C A ND T Y P I C A L D E S I G N Room N u m be r S ig n
3.2.5
Specifications:
① 8mm Thick Transparent Acrylic ② 5mm Thick Acrylic Painted Champagne Gold ③ Mirror Bronze Vinyl ④White Silk Screen On The Back Of The ①
TOP VIEW 顶视图
130 90
20
8
20
5
CL 20
①
2407
④ 25
90
CL
③
④
20
130
②
FRONT VIEW Scale 1:2mm
SIDE VIEW
RENDERING
Emirates Neon Group - Pre Qualification
P HASE 2 - S C HE M A T I C A ND T Y P I C A L D E S I G N W al l P ro j e c t e d Toile t S i g n
3.2.6
Specifications:
① 8mm Thick Transparent Acrylic ② 5mm Thick Acrylic Painted Champagne Gold ③ Mirror Bronze Vinyl ④White Silk Screen On The Back Of The ①
③
TOP VIEW 顶视图
350 20 50
230
60 50
14 8 14 12 12
CL 50
① ② ③
④
120
230
CL
50
330
④
FRONT VIEW Scale 1:4mm
Emirates Neon Group - Pre Qualification
SIDE VIEW
RENDERING
P HASE 2 - S C HE M A TI C A N D T Y P I C A L D ES I GN F O H T oile t S ig n
3.2.7
Specifications:
① 8mm Thick Transparent Acrylic ② 5mm Thick Acrylic Painted Champagne Gold ③ Mirror Bronze Vinyl ④White Silk Screen On The Back Of The ① TOP VIEW 顶视图
210 30
150
30
8 5
CL
82
150
① ② ④ ③
④
30
210
30
CL
FRONT VIEW Scale 1:4mm
FRONT VIEW
Emirates Neon Group - Pre Qualification
SIDE VIEW
RENDERING
P HASE 2 - S C HE M A T I C A N D T Y P I C A L D ES I GN L i f t Di re c t ory S ig n
3.2.8
Specifications:
① 5mm Thick Acrylic Painted Champagne Gold ②Silk Screen On The Back Of The ①
TOP VIEW 顶视图
100 5 8
5
①
SIDE VIEW
1500
FRONT VIEW
1700
300
②
CONTEXT ELEVATION Scale (1:20millimeters)
Emirates Neon Group - Pre Qualification
P HA SE 2 - S C HE M A T I C A ND T Y P I C A L D E S I G N GY M D isc la im e r S ig n
3.2.9
Specifications:
① 5mm Thick Acrylic Painted Champagne Gold ②Silk Screen On The Back Of The ①
5
③Fix with 3M double sided tape.
TOP VIEW 顶视图 Scale 比例 (1:5millimeters)
475
7 12
CL GUIDELINES FOR SAFE EXERCISE Recommendations & Guidelines
①
Your exercise program can be safe and effective if you read and adhere to the following recommendations and guidelines: Consult with your doctor and obtain proper instruction. This is especially important for persons over 35 years old. If medical history suggests that you should only exercise under supervised conditions, check first to see that the fitness center is staffed. If supervision is not available, you should not use the facility. If supervision is available ,stay within the safe exercise guidelines established by your physician. If during your exercise routine you have any discomfort or dizziness, stop your exercise program immediately and notify a hotel staff member. Consult with your doctor before resuming any exercise program again. Do not strain your exercise program. Make sure your workout is at a comfortable pace and doesn’t cause stress or over exhaustion.
475
48 7
Wear appropriate exercise attire.
Exercise Workout Guidelines Your program should consist of 4 basic components:
1. Warm-Up This is a period of 5-10 minutes spent warming up the cardiovascular and muscular systems. First a series of slow stretches should be done followed by low level aerobic exercise - bicycling, walking/jogging, or rowing.
CL
Do all stretches slowly. Concentrate on keeping your muscles relaxed without strain or tension. Do not force the stretching movement. It should not hurt. Do not perform any movements in a bouncing manner.
②
2. Aerobic/Cardiovascular Conditioning This exercises the heart and the circulatory system. This should last 15-20 minutes where you maintain your heart rate in a range of 60%-80% of your maximum capacity (see chart below). Recommended activities are swimming, bicycling, rowing or walking/running.
③
The term " target zone" describes the heart beats per minute which is enough to achieve fitness but not too much to exceed safe limits. To find your pulse rate see the diagrams below. AEROBIC EXERCISE GUIDE
80% 160
195
15 6
190
15 2
185
148
TARGET
60% 120
20
11 7
25
114
30
111
35
180
144
175
14 0
TRAINING 108
40
10 5
45
170
136
165
132
160
12 8
155
124
ZONE 10 2
99
50
55
96
93
60
65
YOUR AGE
3. Muscular Conditioning
4. Cool Down
This type exercises the different muscles of the body.
This is a period of approximately 5-10 minutes when low level aerobic activity and slow stretching are utilized to give the body the chance to recover from the more vigorous exercise performed during the conditioning parts of the program.
These exercises are performed on the multi-station or individual station exercise machines. Be sure you are totally familiar with the exercise equipment before you use it. Check with the posted equipment instructions.
Informaiton needs to be provided by client.
1500
200
1700
BEATS PER MINUTE
100%
Breathe normally through the mouth while exercising. Never hold your breath. Perform all movements in a moderate and steady manner. Perform each movement 8-15 repetions. Do not use a heavy weight. Never strain while performing a movement.
FRONT VIEW 正视图 Scale 比例 (1:5 millimeters)
SIDE VIEW 侧视图 Scale 比例 (1:5millimeters)
CONTEXT ELEVATION 相关立面 Scale 比例 (1:20millimeters)
Emirates Neon Group - Pre Qualification
P HASE 2 - S C HE M A T I C A ND T Y P I C A L D E S I G N A l l D ay D ining R e st a u r a n t S i g n
3.2.10
Specifications:
① Free standing sign composed of
4 acrylic cubes w/ painted gloss finish.
② Cut-out vinyl logo fixed to cube face. ③ Optional: Top cube w/ internally illuminated logo.
300
300
②③
RENDERING 效果图
FRONT VIEW 正视图 Scale 1:10mm
1500
1700
1200
①
SIDE VIEW 侧视图
CONTEXT ELEVATION 相关立面 Scale 比例 (1:20millimeters)
Emirates Neon Group - Pre Qualification
Phase 3 Design Development/Contract Documents Section 1.3.0
SC O P E OF WOR K – P H AS E 3 DE SIG N D E V E L OPM ENT / C ONT RA C T D OC UM EN T S
The Design Review phase includes the incremental stages of product development along with the creation of contract documents that will form the package for tender. This phase will include review sessions at 30%, 60%, 95% and 100% stages of development. . Refine signage products and wayfinding solutions . Clarify mounting methods, and placement standards along with power requirements and locations for architectural/mechanical integration . Finalize conceptual renderings of signage elements . Compile a complete sign schedule and location plans to identify sign location and placement, type and information content . Complete product specifications, including materials, sizes, graphic standards and manufacturing methods, and compile into a package suitable for detailing and manufacturing . Development of samples/prototypes, if required Deliverables: . Final product specifications . Message schedule, location plans . Complete product drawings
Emirates Neon Group - Pre Qualification
3.3.1
P HASE 3 - D E S I G N D EVEL O P M E NT / C O NT RA C T DO C UM E N T S S i g n Loc a t ion M a rk i n g - B a s e m e n t
3.3.2
LEGENDS: BFI
BOH FLOOR ID SIGN
BSI
BOH STAIRS ID SIGN
BRI
BOH ROOM ID SIGN
BTI
BOH TOILET SIGN
??
BRI BRI
??
BRI
Service Lift
BFI ??
??
BRI
??
BRI
Stair
BSI
Stair
BSI
??
BRI
Stair
BSI
Stair
BSI
B1
BFI
B1
BRI Stair
Stair
??
??
??
Stair
Picto M
BSI
BSI
BRI
BRI
BRI
BSI
BTI
BFI
B1
Stair
??
Stair
??
Picto F
BSI
BRI
BSI
BRI
BTI
B1
??
BSI
BRI
Stair
BRI
??
BRI
Staff Only
BRI
??
BSI
Stair
BFI
B1
BFI
B1
BFI
??
BRI
??
BRI
??
BRI
Stair
BSI
??
BRI
??
BRI
Stair
BSI
BSI
B1
Stair
BFI
B1
BFI
B1
BFI
B1
BRI
Service Lift
BFI
Staff Only
BRI
??
BRI
??
BRI BFI
B1
BFI
BSI
B1
Stair ??
BRI Staff Only
BRI
BFI
BSI
B1
BSI
Stair
BFI
BFI
B1 BRI
ROUTE
ENTRY & EXIT
Emirates Neon Group - Pre Qualification
BSI
Stair
Lifts
BFI
DECISION MAKING POINT
B1
B1
Staff Only
BRI
BRI
Service Lift
Stair
P HASE 3 - D E S I G N DE VE L OP M EN T / C ON T R A C T D O C UM E N T S S i gn Lo c a t ion M a rk i n g - Gr o u n d F l o o r
3.3.3
LEGENDS:
Stair
BFI
B1
BSI
Stair
BSI
B1
BFI
B1
BFI
Stair
BFI
B1
BFI
B1
B1
Stair
BSI
Stair
BSI
BRI
Staff Only
BRI
Staff Only
BFI
B1
BSI
Stair
BSI
Stair
BSI
B1
Stair
BFI
BSI BFI BFI
B1
BFI
Stair
BSI
Stair
BSI
B1
BFI
DECISION MAKING POINT
ROUTE
ENTRY & EXIT
Emirates Neon Group - Pre Qualification
Stair
BSI
BRI
Staff Only
BFI
B1
B1
BFI
BOH FLOOR ID SIGN
BSI
BOH STAIRS ID SIGN
BRI
BOH ROOM ID SIGN
P HASE 3 - D E S I G N D E VE L OP M EN T / C ON T R A C T DO C UM E N T S S i gn Lo c a t ion M a rk i n g - F i r s t F l o o r
3.3.4
LEGENDS:
BRI
??
BRI
??
BSI
Stair
BSI
Stair
BTI
Picto F Stair
BFI
B1
BSI
Stair
BRI
??
BFI
B1
BRI
??
BRI
BSI
BRI
??
BFI
BSI ??
BRI
BFI
B1
B1 BRI
B1
Stair
Staff Only
??
BRI
??
BRI
??
BRI
??
BFI BFI
BTI BRI
DECISION MAKING POINT
ROUTE
ENTRY & EXIT
Emirates Neon Group - Pre Qualification
BRI
Picto M
Staff Only
BRI
??
??
B1
BFI
BOH FLOOR ID SIGN
BSI
BOH STAIRS ID SIGN
BRI
BOH ROOM ID SIGN
P HA SE 3 - D E S I G N D E VE L OP M EN T / C ON T R A C T D O C UM E N T S Mes s ag e S c h e du le
PROJECT AL MADINA TILAL
CLIENT
JOB NUMBER
AL MADINA TILAL COMPLEX
3.3.5
SCHEDULE TITLE
ENG CONSULTANCY DIVISION
REVISION
Ground Floor Plan - BOQ & Message Schedule
0.00
Design Consultancy Division PO Box 5975, Sharjah, United Arab Emirates T +971 (0)6 533 7222 F +971 (0)6 533 1748 www.emiratesneon.com
Please Note:The Signage Contractor is responsible for the correct dialect Arabic translations. The Arabic text used is for illustration purposes only. Also, the signage contractor is also responsible for verifying all site condition at proposed location. S. No.
Type
Description
1 2 3 4 5 6
FFI ICF FRI FRI FSS LLS
FOH Floor ID Sign In Case of Fire Sign FOH Room ID Sign FOH Room ID Sign FOH Stairs Sign Lift Lobby Sign
7 8 9 10 11 12 13 14
FRI FRI FRI PDS FRI HS FRI LDS
FOH Room ID Sign FOH Room ID Sign FOH Room ID Sign Parking Disclaimer Sign FOH Room ID Sign Handicapped Sign FOH Room ID Sign Lift Directory Sign
15 16 17
GS GS BDS
Graphic Sign Graphic Sign BOH Directional Sign
18
BDS
BOH Directional Sign
19
BDS
BOH Directional Sign
20
BDS
BOH Directional Sign
Emirates Neon Group - Pre Qualification
Side
A B
Message
G In case of ďŹ re do not use lift + Arabic Telephone G.4 + Arabic Electrical G.6 + Arabic Stairs + Pictogram + Arabic Residential Lift + Pictogram + Arabic Residential Lift + Pictogram + Arabic Telephone G.6 + Arabic Store + Arabic Electrical G.8 + Arabic Parking Message + Arabic Telephone G.7 + Arabic Handicapped Pictogram Service Lift + Arabic Mezzanine Level Food Court + Arabic Entertainment + Arabic Arabian Court + Arabic Department Store + Arabic Shops + Arabic G Level Grocery Store + Arabic Mini Major + Arabic Arabian Court + Arabic Department Store + Arabic Shops + Arabic Car Park + Arabic Leveling Level Car Park + Arabic Basement Level Car Park + Arabic Commercial Entrance + Arabic Residential Entrance + Pictogram + Arabic Male / Female / Handicapped Pictogram + Toilet + Arabic Commercial Lobby + Arabic Service Lift Lobby + Arabic Commercial Lobby + Arabic Service Lift Lobby + Arabic Male / Female / Handicapped Pictogram + Toilet + Arabic Male / Female / Handicapped Pictogram + Toilet + Arabic Residential Lobby + Arabic Staff Toilet + Arabic Service Lift + Arabic Male / Female / Handicapped Pictogram + Toilet + Arabic Residential Lobby + Arabic Staff Toilet + Arabic Service Lift + Arabic
Qty Level
Location Plan
Date
10 15 1 1 6 1
G G G G G G
AMT-LP-0G AMT-LP-0G AMT-LP-0G AMT-LP-0G AMT-LP-0G AMT-LP-0G
15.11.09 15.11.09 15.11.09 15.11.09 15.11.09 15.11.09
1 1 1 2 1 2 1 1
G G G G G G G G
AMT-LP-0G AMT-LP-0G AMT-LP-0G AMT-LP-0G AMT-LP-0G AMT-LP-0G AMT-LP-0G AMT-LP-0G
15.11.09 15.11.09 15.11.09 15.11.09 15.11.09 15.11.09 15.11.09 15.11.09
1 5 1
G G G
AMT-LP-0G AMT-LP-0G AMT-LP-0G
15.11.09 15.11.09 15.11.09
1
G
AMT-LP-0G
15.11.09
1
G
AMT-LP-0G
15.11.09
1
G
AMT-LP-0G
15.11.09
Tender docs
Manuf
Issued
Install Date
Remarks
P HA SE 3 - D E S I G N DE VE L OP M EN T / C ON T R A C T D O C UM E N T S Bi l l o f Q u a nt it y (B O Q )
3.3.6
Tilal Complex Summary List of Signs 191109 Sign Type Exterior Signs ES NES VDS BIS EDS EIS SPD SDS EPD AIS
Description
ENG CONSULTANCY DIVISION Mezzanine
Quantity SCP4 Stacking Car Park Level
Entrance Sign No Entry Sign Vehicular Directional Sign Building ID Sign External Directional Sign Entrance ID Sign Swimming Pool Disclaimer / Safety Sign Swimming Pool Depth Sign External Pedestrian Directional Sign Apartment ID Sign
Podium
Total
2
2
2
2
2
2
2
2
2
2
2
2
2 6 10 4
2 6 10 4
Interior Signs MD1 MD2 DS CMD1 CMD2 IS FFI ICF LDS FRI FDS RNS FTS FTB FSS GS BDS BFI BSS BTS BTB
Emirates Neon Group - Pre Qualification
Mall Directory 1) Table Type 2) Floor Mounted Desktop Sign Ceiling Mounted Directional Sign 1) Big 2) Small Information Sign (Blade Type) FOH Floor ID Sign In Case of Fire Sign Lift Directory Sign FOH Room ID Sign Floor Directional Sign Room Number Sign FOH Toilet Sign FOH Toilet Balde Sign FOH Stairs Sign Graphic Sign (Glass) BOH Directional Sign (Wall Mounted) BOH Floor ID Sign BOH Stairs Sign BOH Toilet Sign BOH Toilet Blade Sign
1 2 1 6 6 1 4 9 1 5
7 2 6 18 9 14
1 3 1
1
1 1 1
10 8 4 13 68 4 4 15
3 3
17 5 10
6 6 1 15 18 2 9 13 68 4 4 22 2 6 38 17 24
Section 1.1A DESIGN & BUILD PROJECT
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
Â
Main Contract 5 Development of Salalah Airport
Design Basis Memorandum Signage Design & Wayfinding Aconex No: SA-PIL-05WF-REP-0001 Prepared by Prime International LLC. (ENG Company)
Date 12.02.2012
Rev. No. 1
Description Submitted for Approval
SA-PIL-05WF-REP-0001_Rev 1
Prepared Fernando/ Manu
Checked
Approved
Page 1
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
Â
TABLE OF CONTENTS 1.0.0 General Overview 2.0.0 Design Intent Â
2.1.0 Family of Signs for MC5 Project 2.2.0 Buildings/ Areas Covered 2.3.0 Design Basis & Parameters 2.3.1 Maximum viewing distance guide 2.3.2 Visibility & Placement guide 2.4.0 Sign Colour Contrast Check for Legibility 2.4.1 Contrast Ratio Formula 2.4.2 MC5 Sign Family Colour Contrast Check Chart 2.5.0 MC5 Signs Mounting/ Material/ Lettering & Finishes Chart: 2.5.1 External Sign 2.5.2 Passenger & Terminal Building 2.5.3 Ancillary Building 2.6.0 Basic Sign Elements 2.6.1 Typefaces and languages 2.6.2 Colour Palette 2.6.3 Pictogram 2.6.4 Arrows 2.6.5 Pattern 2.7.0 Passenger Flow & Main Destination 2.7.1 Departure Flow & Main Destination 2.7.2 Arrival Flow & Main Destination 2.8.0 Clarifications 2.8.1 Location Marking Clarification
3.0.0 Signage Detail 3.1.0 Technical Post in Baggage Claim Area 3.2.0 Traffic Wayfinding Signage - Type T3 3.3.0 Traffic Wayfinding - TG and TC, Gantry Signs 3.4.0 Static Signage - Type P8 3.5.0 Static Signage - Type D8 3.6.0 Dynamic Signage - Type M6 3.7.0 Advertisement Signage - Type A3 3.8.0 Advertisement Signage - Type AD1 3.9.0 Outdoor Signage - Type E2 3.10.0
Door Signage
3.11.0
Ancillary Building Exterior Signage
SA-PIL-05WF-REP-0001_Rev 1
Page 2
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
1.0.0 GENERAL OVERVIEW PROJECT DESCRIPTION Salalah International Airport is one of the mega projects currently being implemented in Oman envisages expansion of its capacity to one million passengers by 2013. The new airport is expected to contribute in augmenting tourism and trade in the region. The establishment of the new airport aims at keeping pace with the growth of air traffic in Dhofar Governorate. The project includes the construction of a new Passenger Terminal Building, new 4,000 m runway, 2,200 parking spaces, 57 meter high Air Traffic Control Tower and a number of other buildings. PURPOSE OF REPORT This report is issued after a thorough review and understanding of the architectural drawings, architectural design intent report, the signage manual issued at tender stage including the graphics and specification, and the floor plan layouts. The purpose is to 1. Illustrate our understanding of the documentation till date, 2. State our queries if any 3. Propose design improvements if any for beneficial manufacturing and installation procedures. This Design Basis Memorandum will cover all sign types from the signage manual that are to be used in the MC5 project and will illustrate our understanding graphically and with illustration to proposed fixation. We have also made specific references to -
Legibility standards from ‘U.S. DOT-FHWA’ Standards
-
Color contrast standards from World Wide Web Consortium (W3C)
-
Road sign standards from ‘Muscat Municipality Standards’
THE Design Basis Memorandum The DBM will cover typical signage according to mounting types, advertisement sign, baggage claim sign, and gantry signs. This DBM does not include structural calculations, as these will happen at the drawings stage.
SA-PIL-05WF-REP-0001_Rev 1
Page 3
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
2.0 Design Intent 2.1.0 Family of Signs for MC5 Project •
Technical Post
•
Primary Signages
•
Secondary Signages
•
Dynamic/Monitor Signages
•
Advertisement (Dynamic & Static) Signages
•
Locational/Directional/Door/Statutory Signages
•
Room Signages
•
Staff Signages
•
Static Signages
•
Outdoor/External Signages
•
Traffic Wayfinding Signages (Parking area’s and Access Roads)
•
Welcome Signage
•
Fire Signages
SA-PIL-05WF-REP-0001_Rev 1
Page 4
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
2.2.0 Buildings/ Areas Covered •
Passenger Terminal Building
•
Chiller Plant
•
Crash Fire Rescue Station
•
Data Centre – 2
•
Generator Plant
•
Main Gate
•
OAMC
•
OPDS & Power Distribution Station.
•
Pump House – Utility Yard.
•
AFL Substation.
•
ATC Tower - ATM
SA-PIL-05WF-REP-0001_Rev 1
Page 5
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
2.3.0 Design Basis & Parameters 2.3.1 Viewing Distance Guide ‘U.S. DOT-FHWA’ Standards.
SA-PIL-05WF-REP-0001_Rev 1
Page 6
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
! Â
2.3.2 Maximum viewing distance guide The chart to the right shows the correlation between maximum viewing distance and character height. The blue line marks the ideal height for a set distance for someone with normal eyesight. Aspects such as visual continuity and architecture can also influence the character height. Heights measured here represent minimum requirements. Specific measurements are indicated in millimeters throughout this document. There are also references to proportional values based upon the cap height (CH) and the x-height (X). These are defined below.
SA-PIL-05WF-REP-0001_Rev 1
Page 7
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
! Â
2.3.3 Visibility & Placement guide Reading distances will depend on the size of graphics. Using a standard reading distance multiplier (260 x character height) the type sizes used on all directional, name and location signs will give an effective average reading distance of up to 20 meters with a maximum reading distance of around 25 meters. It is also useful to know the minimum reading distance, which is determined by the angle of viewing where 30 degrees is usually considered to be the maximum angle for a comfortable tilt of the head. With the minimum height of 2400mm to the base of a sign, the minimum reading distance (depending on eye height) will be between 3.75 and 4.75 meters assuming the top of the electronic display is at a maximum 3.6 meters above floor height. The height of a suspended, post-mounted or cantilevered sign from finished floor level to the sign base is set at 2.4 meters. This height should also be used for wall-mounted and fascia signs. Some signs, under special circumstances, can be positioned at a lower height.
Â
SA-PIL-05WF-REP-0001_Rev 1
Page 8
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
2.4 Sign Colour Contrast Check for Legibility 2.4.1 Contrast Ratio Formula It is primarily a tool for checking foreground & background colour combinations to determine if they provide good colour visibility. It also contains functionality to create simulations of certain visual conditions such as colour blindness. Determining "colour visibility" is based on the Contrast Ratio algorithm, suggested by the World Wide Web Consortium (W3C): Note: The contrast ratio is now a W3C recommendation (December 2008), to help determine whether or not people can read the contrast between two colours with colour blindness or other visual impairments. Contrast (Minimum): The visual presentation of text and images of text has a contrast ratio of at least 4.5:1, except for the following: (Level AA) Large Text: Large scale text and images of large-scale text have a contrast ratio of at least 3:1; Incidental: Text or images of text that are part of an inactive user interface component, that are pure decoration, that are not visible to anyone, or that are part of a picture that contains significant other visual content, have no contrast requirement. Logotypes: Text that is part of a logo or brand name has no minimum contrast requirement. Contrast (Enhanced): The visual presentation of text and images of text has a contrast ratio of at least 7:1, except for the following: (Level AAA) Large Text: Large scale text and images of large-scale text have a contrast ratio of at least 4.5:1 Incidental: Text or images of text that are part of an inactive user interface component, that are pure decoration, that are not visible to anyone, or that are part of a picture that contains significant other visual content, have no contrast requirement. Logotypes: Text that is part of a logo or brand name has no minimum contrast requirement. Refer below: ‘MC5 Sign Family Colour Contrast Check’ chart & Software Screenshots for results
SA-PIL-05WF-REP-0001_Rev 1
Page 9
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
! Â
Colour Contrast Analyzer Software Screenshots
SA-PIL-05WF-REP-0001_Rev 1
Page 10
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
2.4.2 MC5 Sign Family Colour Contrast Check Chart
!"#$%&'("#)
*"&+,#-'./0 1-(-'#
2-#3,#-'./0 1-(-'#
1-(-'#40 @AB0 *#%,5$.3))0 =%>>3#3.&30%.0 =%>>3#3.&30 1-.$#")$0?"$%- 1-CC3.$)0 675#3)5-(/0 *#%,5$.3)) %.01-(-'# -.0(3,%D%(%$E 8994:;8<
!"#$%
&'()'*+
!
!
*,*-.-')-/001
23
456-6-'7(78 9'7:
(&7)'(7
!
"
&,;-.-')-/001-
23
!"#$%
(<&)'((
!
"
+,;-.-')-/001
23
456-6-'7(78 9'7:
;(;)=<
"
"
;,=-.-')->0?
@A%BCD%
F$">>0>-#0B"$3) 456-6-'7'78E
EFCGH
&;;)'*(
!
!
'7,&.-')-/001
23
456-6-+7;78E
!"#$%
(<&)'((
!
"
+,;-.-')-/001
23
456-6-'7=78 9<7:
!"#$%
+**)'I=
!
!
&,(-.-')-/001
23
456-6-;7*78 /;79
!"#$%
&77)'+&
!
!
(,+-.-')-/001
23
456-6-(7&78E
!"#$%
;;*)<*
!
!
+-.-')-/001
23
-456-6-'7I78 /I79
'(7)&I
"
"
;,+)->0?
J00B
'=()I'
"
"
;,*-.-')->0?
@A%BCD%
!#%C"#E0F%,.)0 456-6-I7;78E 1-(-'#)
F3&-./"#E0F%,.)0 456-6-+7;78E 1-(-'#)
F$"$'$-#E0F%,.0 1-(-'#)
7#">>%&0F%,.0 1-(-'#)
1-(-'#01-/%.,0 456-6-I7;78E >-#0B"$3) -456-6-&7(78 :=7E
Notes: •
Minimum Contrast Ratio for text 4.5:1
•
Minimum Contrast Ratio for Large text 3:1
•
Minimum Contrast Ratio for Graphics - no minimum contrast requirement
•
Colour Threshold 500
•
Brightness Threshold 125
SA-PIL-05WF-REP-0001_Rev 1
Page 11
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
Â
2.5.0 MC5 Signs Mounting/ Material/ Lettering & Finishes Chart: 2.5.1 External Sign
L
W6
L
W5
L
W4
L
W3
L
W2.1
L
9
W2
L
1
W1
64
IWPS
2
ES B
15 10
ES A
3
L1
T9
2
Fire Signages
T6
4
Welcome sign
T4
5
T3
T2
L
T1
L
TC
5
TG
E4
3
Traffic Signs
Quantity
E2
Sign Type
Outdoor Signs
External Signage
198 221 18 101 48 309 78
9
22
N
N
Illumination Lit (L)/ Non-Lit (N) Location/ Mounting External Internal Ground/ Floor Wall Ceiling
L
L
N
N
N
N
N
.. ........ . . . . . . . . . . . ....... . . . .. ........ .
Column Fascia Glass Door Material SS Fixtures grade 316 Stainless Steel Aluminium grade S57 Galvanized Steel PC Aluminium Profile grade S57 Acrylic Glass Adhesive Vinyl LED Flourscent Tube Spot Lights Concrete Golden Metalic Paint Lettering Adhesive Vinyl Letters Finishes & Effects Printed Graphics Double Sided Automotive enamel Etched/ Sandblasted Brushed
.. .. ....... . ....... .. .... .. ....... .. .. .. ....... .. .. .. .. .. ....... .. .. .. . ........ . ....... .. ...... .. . ...... .. ....... .. ...... . .. ........ ....... .
SA-PIL-05WF-REP-0001_Rev 1
Page 12
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
Â
2.5.2 Passenger Terminal Building
L
L
L
N
N
N
D8
L
D7
L
D6
L
2
D5
L
28 10
D4
L
6
D3
4
D2
L
4
D1
L
6
W6
L
11
Door Sign
L
3
W3
L
18
W2
L
4
W1
L
AT2
L
24
Staff
24 12
AT1
13
AD5
12
AD2
L
10
AD1
L
10
A3
L
2
A2
L
5
A1
L
MC*
L
11
Advertisement
L
MC
L
MB
L
26
M9
L
3
M8
L
14 27
M7
16
M6
P9
8
M3
P8*
4
M2
P8
2
S9
P7
5
Monitors (FIDS)
P6*
15
S8
P6
2
S6*
P5*
29
S6
P5
Quantity
Primary
Sign Type
Secondary
Passenger Terminal Buildings (PTB)
16 68 44 144 133 12
5
16
N
N
N
Illumination Lit (L)/ Non-Lit (N)
L
L
N
N
N
N
N
N
Location/ Mounting External Internal Ground/ Floor Wall Ceiling Column
........ .... .. . . . . . .. ............. ... .. ...... . .. .... ........ .... . . . .. .
.
Fascia
.......
Glass Door Material SS Fixtures grade 316 Aluminium grade S57 Stainless Steel PC Aluminium Profile grade S57 Acrylic Glass Adhesive Vinyl LED Flourscent Tube Concrete Golden Metalic Paint Lettering Adhesive Vinyl Letters Finishes & Effects Printed Graphics Double Sided Automotive enamel
........ ........ ........ ........ ........ ........
.... .... .... .... .... ....
.. . . . . . .. .. . . . . . .. .. . . . . . .. .. . . . . . .. .. . . . . . .. .. . . . . . ..
........ . ........ .... ........ ........ .... ........ ........ ........ ........ .... ........ .... ........ .... .. . . . . . .. ........ . .. . . . . . .. ........ ........ .... .. . . . . . .. . .. ........ .... .. . . . . . .. .
Etched/ Sandblasted Brushed
SA-PIL-05WF-REP-0001_Rev 1
Page 13
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
Â
2.5.3 Ancillary Building
N
W8.1
W8
W6
W5
W4
W8.3
N
564 133 164 25 10
W8.2
81
External Signages
15 107
W3
L
W2.1
L
W2
L
372 28 44
W1
L
SWPS
6
Internal Signages
145
BWPS
8
IWPS
ES B D/S
19
ES B S/S
ES A D/S
Quantity
ES A S/S
Sign Type
Fire Signages
Ancillary Buildings
12 10
8
N
N
Illumination Lit (L)/ Non-Lit (N) Location/ Mounting External Internal Ground/ Floor Wall
L
L
L
N
N
N
N
N
N
N
. ... ....... .. . . . .. . ... ....... .. . . . ..
Ceiling Column Fascia Glass Door Material SS Fixtures grade 316 Stainless Steel Aluminium grade S57 PC Aluminium Profile grade S57
.. . . . ... .. . . . ... ... .. . . . ... ...
Acrylic Glass Adhesive Vinyl
.. . . . ... ...
LED Flourscent Tube Concrete
. ...
Golden Metalic Paint Lettering Adhesive Vinyl Letters
.. . . . ... ...
Finishes & Effects Printed Graphics Double Sided Automotive enamel
.. . . . ... ...
Etched/ Sandblasted Brushed
SA-PIL-05WF-REP-0001_Rev 1
Page 14
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
! Â
2.6.0 Basic Sign Elements This section covers the basic graphic elements used for Salalah Airport signage system and includes: 1.1.1 Typefaces and languages 1.1.2 Colour palette 1.1.3 Pictograms 1.1.4 Arrows Together these elements create a coherent, recognizable and efficient signage information system, directing, orientating and reassuring Arrival and Departure passengers. It should be noted the illustrations used in this document are not to scale and must not be used as artwork. Text shown on the signs is for illustrative purposes only.
SA-PIL-05WF-REP-0001_Rev 1
Page 15
0.3X 0.0 0.25X
X
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
0.3X 0.075X
Prime International L.L.C.
2.6.1 Typefaces and languages Arabic Typeface: Arabic Frutiger 55 Roman
English Typeface: Frutiger 55 Roman
abcdefghijklmnop qrstuvwxyz ABCDEFGHIJKLMN OPQRSTUVWXYZ 1234567890 In all signing, Arabic text always appears above the Latin text. There may be some circumstances, for example on information notices, where it may be more practical to run Arabic and Latin text on the same line. In this event, the Arabic text is ranged right and the Latin text ranged left. Note: We have received the Arabic text provided for this project and we will use as
and where applicable.
SA-PIL-05WF-REP-0001_Rev 1
Page 16
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
Â
2.6.2 Colour Palette
NCS Colour Code
Name
Nearest Pantone (PMS)
Nearest RAL
NCS S 6020-B
Dark Blue
NCS S 4020-B
Med. Blue
8201C
5015
NCS S 1010-B
Light Grey
5445C
1015
NCS S 1080-Y90R
Red
710C
2002
NCS S 2070-G20Y
Green
362C
Blue
3050C
Green
381U
NCS S 530-R80B
Blue
290U
Black
Black
White
White
NCS S 3050-B NCS S 1060-G60Y
NCS S 1030-Y10R
Gold Yellow
NCS S 3040-G60Y
Green
NCS S 2040-B
Remarks
5001
134U
6019
Blue
Paint and industrial finishes are specified using RAL colours. The Pantone Matching System (PMS) is used for matching print, vinyl and other finishes for sign colours.
SA-PIL-05WF-REP-0001_Rev 1
Page 17
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
! Â
2.6.3 Pictogram X
0.75X
X
EQ
Maximum height of pictogram
0.25X
0.3X 0.075X
EQ
0.3X 0.075X
0.75X
EQ
EQ
All pictograms sit on a common base line. Pictograms are drawn to be no bigger than 1/3 size of the pictogram bounding area, if less than this, they are centered on the width of the sign module. Pictograms vary in height up to a maximum height that aligns as illustrated. Some pictograms are combined to save space. For example, when both male and female toilets are in the same location, the joint male and female pictogram is used on directional signs and at the entrance to the toilet area.
SA-PIL-05WF-REP-0001_Rev 1
Page 18
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
Â
2.6.4 Arrows X X 0.1x 0.1x
0.65x 0.65x
0.25x 0.25x
Ahead on Right Ahead on Right
0.6X 0.6X
Up
EQ EQ
X X
EQEQ
Straight Ahead Straight Ahead
Up
Up on Right Up on Right
X 0.15x
0.15x
X
0.5x
0.5x
0.35x
0.35x
0.15x0.15x 0.5X0.5X
Left
Right
Right
0.35X0.35X
X
X
Left
Ahead on Left
Ahead on Left
Arrow Proportion Detail
Down on Right
Down on Right
Arrow Orientation Detail
X
0.65x
0.25x
0.25x
0.6X
0.6X EQ
EQ
EQ
X
X
EQ
0.1x
0.65x X
0.3X 0.3X 0.25X 0.075X 0.075X 0.3X 0.3X 0.25X 0.075X 0.075X
0.1x
Arrow Position along with text
Arrows are positioned on the far left or far right module of any given directional sign. Their size and position on a sign is fixed.
SA-PIL-05WF-REP-0001_Rev 1
Page 19
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
Â
2.6.5 Pattern
40
Primary Sign Pattern
varies
135
Pattern 1 Scale 1:1 (millimetres) Stroke thickness on sign 1.2mm
varies
180
Pattern 2 Scale 1:4 (millimetres) Stroke thickness on sign 1.2mm
Continuos pattern
varies Pattern 3 Scale 1:4 (millimetres) Stroke thickness on sign 1.2mm
SA-PIL-05WF-REP-0001_Rev 1
Page 20
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
Â
30
Secondary Sign Pattern
varies
40
Pattern 4 Scale 1:1 (millimetres) Stroke thickness on sign 1.2mm
varies Pattern 5 Scale 1:4 (millimetres) Stroke thickness on sign 1.2mm
SA-PIL-05WF-REP-0001_Rev 1
Page 21
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
! Â
Advertisement/ Dynamic Pylon Sign Pattern
150
150
Pattern 6 Scale 1:4 (millimetres) Pattern used in in continuos pattern on the sign, in multiples of 90mm
90
90
Pattern 7 Scale 1:2 (millimetres) Pattern used in in continuos pattern on the sign, in multiples of 90mm
SA-PIL-05WF-REP-0001_Rev 1
Page 22
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
Â
Pattern application on Sign chart
Sign Type
Pattern Background
Pattern stroke colour
Primary P5
NCS S 4020-B
NCS S 6020-B
P5*
NCS S 4020-B
NCS S 6020-B
P6
NCS S 4020-B
NCS S 6020-B
P6*
NCS S 4020-B
NCS S 6020-B
P7
NCS S 4020-B
NCS S 6020-B
P8
NCS S 4020-B
NCS S 6020-B
P8*
NCS S 4020-B
NCS S 6020-B
P9
NCS S 4020-B
NCS S 6020-B
S6
NCS S 6020-B
NCS S 4020-B
S6*
NCS S 6020-B
NCS S 4020-B
S8
NCS S 6020-B
NCS S 4020-B
S9
NCS S 6020-B
NCS S 4020-B
NCS S 4020-B
NCS S 6020-B
D1
NCS S 6020-B
NCS S 4020-B
D2
NCS S 6020-B
NCS S 4020-B
D3
NCS S 6020-B
NCS S 4020-B
D4
NCS S 6020-B
NCS S 4020-B
D5
NCS S 6020-B
NCS S 4020-B
D6
NCS S 6020-B
NCS S 4020-B
D7
NCS S 6020-B
NCS S 4020-B
D8
NCS S 6020-B
NCS S 4020-B
Pattern 1 Height 40
Pattern 2 Pattern 3 Height 135 Height 180
.
.
. . .
Pattern 4 Height 30
Pattern 5 Height 40
Monitors (FIDS)
Pattern 7 varies
. . . .
Secondary
M5
Pattern 6 Varies
.
. .
Door Sign (PTB)
. . . . . .
Advertisement A1 A2 AD1 AD2 AD5 AT1 AT2
. . .
.
. .
. . . . .
Note: Pattern Stroke Thickness on each sign will be 1.2mm.
SA-PIL-05WF-REP-0001_Rev 1
Page 23
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
! Â
2.7.0 Passenger Flow & Main Destination The following pages summarize passenger movements and main destination within the Salalah Airport, and provide the starting point for the deployment of physical signage. Main passenger movements at Salalah Airport are split across two levels: Arrival/ Departure Level (FFL +6.105) and Mezzanine level Level (FFL +12.210). Drop-off and pick-up facilities are located at the Ground Level outside the Terminal Building but linked externally to the station at departure/ main access level. All other areas, before and after security gates, will be shared. The Arrival/ Departure Level (FFL +6.105) and Mezzanine level Level (FFL +12.210) presents the main wayfinding challenge given its multiple functions and the probability of high passenger numbers.
For Arrival & Departure Flow Diagram refer below: 2.7.1 - Departure Flow & Main Destination 2.7.2 - Arrival Flow & Main Destination
SA-PIL-05WF-REP-0001_Rev 1
Page 24
SA-PIL-05WF-REP-0001_Rev 1
+12,210
ESCALATOR
ESCALATOR
ESCALATOR
INTERNATIONAL ARRIVALS
DOMESTIC ARRIVALS
LEGENDS
LIFT
LIFT
LIFT
PASSENGER BRIDGE 3 & 4
TOILETS
RESTAURANTS
LIFT
SECURITY CONTROL
+6,105
ONLINE CHECK-IN KIOSK
DOMESTIC DEPARTURE
ENTRANCE
DEPARTURE LOBBY
ONLINE CHECK-IN KIOSK
INT’L DEPARTURE
LIFT
Private Car Drop Off
Bus Drop Off
Taxi Drop Off
TOILETS
TFIL
PASSENGER BRIDGE 7 & 8
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com ROTALACSE
INTERNATIONAL DEPARTURE GATES 5-8
BUSINESS CLASS LOUNGE
VISA CANCELLATION SECTION
RESTAURANT
ESCALATOR
LIFT
PASSENGER BRIDGE 5 & 6
ESCALATOR
EMIGRATION CONTROL COUNTER
ESCALATOR
AIRLINE COUNTERS
CHECK-IN COUNTERS
DOMESTIC DEPARTURE GATES 1-3 INTERNATIONAL DEPARTURE GATES 4
CHECK-IN COUNTERS
PASSENGER BRIDGE 1 & 2
Prime International L.L.C.
!
2.7.1 Departure Flow & Main Destination
Page 25
SA-PIL-05WF-REP-0001_Rev 1 LIFT
ESCALATOR
ESCALATOR
ESCALATOR
ESCALATOR
LIFT
PASSENGER BRIDGE 3 & 4 LIFT
LIFT
BAGGAGE CLAIM
PASSENGER BRIDGE 1 & 2
IDENTITY PROCESSING SECTION
BAGGAGE CLAIM
LIFT
+6,105
DUTY FREE
+12,210
INTERNATIONAL ARRIVALS
DOMESTIC ARRIVALS
LEGENDS
VISA PURCHASE
ESCALATOR
LIFT
PASSENGER BRIDGE 5 & 6
TRANSFERS
ESCALATOR
LIFT
ESCALATOR
LIFT
PASSENGER BRIDGE 7 & 8
INTERNATIONAL ARRIVAL FOR IMMIGRATION/ BAGGAGE CLAIM TO MEZZANINE THROUGH LIFT/ ESCALATOR
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
EXIT
GREEN
CUSTOM CONTROL
RED
ESCALATOR
VISA COLLECTION
IMMIGRATION CONTROL COUNTER
BAGGAGE CLAIM
DOMESTIC/ INT’L ARRIVAL FOR IMMIGRATION/ BAGGAGE CLAIM TO MEZZANINE THROUGH LIFT/ ESCALATOR
Prime International L.L.C.
!
2.7.2 Arrival Flow & Main Destination
Page 26
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
2.8.0 Clarifications List
E4-101-n
PTB - Departure/ Arrival Level
Grid on Plan 17/ W1
E4-102-n
PTB - Departure/ Arrival Level
19/ W1
E4-103-n
PTB - Departure/ Arrival Level
23/ W1
E4-104-n
PTB - Departure/ Arrival Level
25/ W1
2
MB-103-n
PTB - Departure/ Arrival Level
24/ U-T
3
P8*-116-n
PTB - Departure/ Arrival Level
17-18/ N
P8*-117-n
PTB - Departure/ Arrival Level
P6-123-n
PTB - Departure/ Arrival Level
P6-124-n
PTB - Departure/ Arrival Level
5
P5-160-w
PTB - Departure/ Arrival Level
19-20/ G
6
M2-168-w
PTB - Departure/ Arrival Level
29-30/ G
7
M2-162-w
PTB - Departure/ Arrival Level
22/ E
8
MB-137-w & MB-138-e
PTB - Departure/ Arrival Level
22/ M
MB-140-w & MB-141-e
PTB - Departure/ Arrival Level
!"#$%
MB-143-w & MB-144-e
PTB - Departure/ Arrival Level
!&#$%
9
P6
PTB - Mezzanine Level
!!#$'(
10
MB
PTB - Mezzanine Level
()*!+#$'(
11
P6-052-s
PTB - Apron Level (-0,970)
!,*!&#$-
12
E2-052-s
PTB - Apron Level (-0,970)
!./#$0(
13
S6-051-s
PTB - Apron Level (-0,970)
(12#$0(
3&*+,!*4
PTB - Apron Level (-0,970)
!(#$-
3&*+,,*4
PTB - Apron Level (-0,970)
!&5#$6(
14
7&
PTB - Mezzanine Level
(1/#$6*-
15
MB-203-e & MB-203-w
PTB - Mezzanine Level
!(#$6*-
S. No Sign No 1
4
Location
SA-PIL-05WF-REP-0001_Rev 1
Clarification
ENG Comments
Remarks
Sign length given in the design book is 9M while the area available is Approx. 5M.
Pls advice
Sign Message missing in 'Message Schedule' Sign Message missing in 'Message Schedule'
Sign Message missing in 'Message Schedule' In 'Location Marking' the Sign type is 17-18/ J1 read as P6, while in the Message Schedule it's P5 In 'Location Marking' the Sign type is 18-19/ J1 read as P6, while in the Message Schedule it's P5 17-18/ N
Sign Type should be 'P5'
Sign Type should be 'P5'
In ‘Message Schedule’ the arrow for A Should be right arrow gates given as ‘BR’. It should be Right. In 'Location Marking' the Sign type is read as M2, while in the Message Schedule it's MB In 'Location Marking' the Sign type is read as M2, while in the Message Schedule it's MB Proposed ‘V’ Shaped Sign Layout for high visibility Proposed ‘V’ Shaped Sign Layout for high visibility Proposed ‘V’ Shaped Sign Layout for high visibility Additional 'P6' sign proposed with message reading as 'Baggage claim' Arrow 'L' MB sign proposed to give Additional prior info about the carousel/flight details before the passenger reached In 'Location Marking' the Sign type is read as P6, while in the Message Schedule it's P8
Sign Type should be 'MB'
Sign Type should be 'MB'
Sign Type should be 'P8'
Sign Message missing in 'Message Schedule' Message on the sign should read as Immigration or Baggage claim Message on the sign should read as 'Immigration' or 'Baggage claim' Message on the sign should read as 'Immigration' or 'Baggage claim' Additional directional P8 Sign required directing passengers to ‘L’ toilets and ‘R’ Immigration Message on the sign should read as 'Immigration' or 'Baggage claim'
Page 27
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
! Â
Clarification #1: E4-101-n to E4-104-n
Sign length given in the design book is 9M while the area available is Approx. 5M.
SA-PIL-05WF-REP-0001_Rev 1
Page 28
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
Clarification #2: MB-103-n
Sign Message missing in ‘Message Schedule’
Clarification #3: P8*-116-n & P8*-117-n
Sign Message missing in ‘Message Schedule’
SA-PIL-05WF-REP-0001_Rev 1
Page 29
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
Clarification #4: P6-123-n & P6-124-n
In 'Location Marking' the Sign type is read as P6, while in the ‘Message Schedule’ it's P5
Clarification #5: P5-160-w
In ‘Message Schedule’ the arrow for ‘A Gates’ given as ‘BR’. Is should be right.
SA-PIL-05WF-REP-0001_Rev 1
Page 30
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
! Â
Clarification #6: M2-168-w
In 'Location Marking' the Sign type is read as M2, while in the Message Schedule it's MB
Clarification #7: M2-162-w
In 'Location Marking' the Sign type is read as M2, while in the Message Schedule it's MB
SA-PIL-05WF-REP-0001_Rev 1
Page 31
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
Clarification #8: MB-137-w/ MB-138-e/ MB-140-w/ MB-141-e/ MB-143-w & MB-144-e Existing Sign Layout
Proposed ‘V’ Shaped Sign for high visibility
SA-PIL-05WF-REP-0001_Rev 1
Page 32
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
Clarification #9: Additional Sign proposed
Additional ‘P6’ sign proposed with message reading 'Baggage claim' Arrow 'L'
Clarification #10: Additional Sign proposed
Additional MB sign proposed to give prior info about the carousel/flight details before the passenger reached the Baggage claim Area
SA-PIL-05WF-REP-0001_Rev 1
Page 33
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
Clarification #11: P6-052-s
In 'Location Marking' the Sign type is read as P6, while in the Message Schedule it's P8
Clarification #12: E2-052-s
Sign Message missing in ‘Message Schedule’
SA-PIL-05WF-REP-0001_Rev 1
Page 34
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
Clarification #13: S6-051-s, S6-052-s & S6-055-s
Message on the sign should read as ‘Immigration’ or ‘Baggage claim’
Clarification #14: New Sign Proposed SA-PIL-05WF-REP-0001_Rev 1
Page 35
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
Additional directional P8 Sign required directing passengers to ‘L’ toilets and ‘R’ Immigration
Clarification #15: MB-203-e & MB-203-w
Message on Sign to read as Immigration/ Baggage Claim
SA-PIL-05WF-REP-0001_Rev 1
Page 36
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
3.0.0 SIGNAGE DETAILING 3.1.0 TECHNICAL POST IN BAGGAGE CLAIM AREA
PROPOSED DESIGN MODIFICATION
Elevation
Current Design
Side View
Proposed Design
Current Design The Technical post, 5500x1000x300mm in dimension, is built using an inner steel frame with an outer cladding of powder-coated aluminum. The two curved sides’ ends are in a groove (light bar), which is internally illuminated. The lower part’s sides are hinged and can be opened for service. As to the orientation of the monitors on the sign, there are some of these signs that are oriented in a way that baggage claimers do not have a clear view of the information on the signs’ monitors.
SA-PIL-05WF-REP-0001_Rev 1
Page 37
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
Proposed Design For signs with orientation that do not give a clearer view of the information on the sign, we propose that the orientation be changed wherein baggage claimers could have an immediate and clear view of the information on signs once they get off the escalators as shown above. Technical Clarification: -
Proposed fixation and sign orientation of LCD’s and Baggage Naming Light Box will depend on the location of the Air Binnacles
-
LCD Product Details required from MC6 (length, width, thickness, weight, etc.)
-
Data cabling and Electrical tapping point near the sign to be provided by others.
DESIGN BASIS 1. Structural steel work shall be designed in accordance with BS 5950. 2. The seismic design shall be in accordance with UBC 1997.
3.2.0 TRAFFIC WAYFINDING SIGNAGE – TYPE T3 PROPOSED MODIFICATION ON FIXING METHOD SA-PIL-05WF-REP-0001_Rev 1
Page 38
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
Â
Current Fixation
Sign post Pipe sleeve Finished level Structural slab
Pipe for cabling
Elevation
Proposed Fixation
Current Fixing Design of Column Support The current design, as we understand it, considers a post installed and fixed on the floor, which is already finished. In this case, we need to wait for the completion of the floor first before we could install any parts of the signpost on site.
Modified Proposed Fixing Design of Column Support In the proposed design, we intend to use pipe sleeves, which can be installed even before the finishing of the floor. The pipe sleeves will be anchored using SA-PIL-05WF-REP-0001_Rev 1
Page 39
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
chem. Bolts just above the structural slab. After the floor is finished, the facility of installation of a signpost can be easily achieved by the simple insertion of the sleeve into it.
Technical Clarification: -
Floor Slab Details required showing thickness of slab, screeding, water proofing membrane, floor finishing, electrical conduiting, etc..
-
Data cabling and Electrical tapping point near the sign to be provided by others.
DESIGN BASIS 1. Structural steel work shall be designed in accordance with BS 5950. 2. The seismic design shall be in accordance with UBC 1997.
3.3.0 TRAFFIC WAYFINDING SIGNAGE – TYPE TG & TC, GANTRY SIGNS
SA-PIL-05WF-REP-0001_Rev 1
Page 40
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
PROPOSED DESIGN MODIFICATION
Current Designs – Box Type Gantry
Proposed Designs – Tubular Type Gantry Current Design The current design intent is box type gantry which was adapted in Sultanate of Oman’s Highway Design Standard of 1994.
Proposed Design We have introduced to Muscat Municipality in 2004 the Tubular Type Gantry’s using UAE Standard Traffic Manual and made various traffic Sign Gantry’s all over Oman; and two years back they have issued a revised Sultanate of Oman’s Highway Design Standard 2010 using tubular type structure for all Gantry Signs.
Technical Clarification:
SA-PIL-05WF-REP-0001_Rev 1
Page 41
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
-
Electrical tapping point near the sign to be provided by others.
DESIGN BASIS 1. Structural steel work shall be designed in accordance with BS 5950. 2. The seismic design shall be in accordance with UBC 1997. 3. Wind speed is 120km/h with gust 160km/h. 3.4.0
STATIC SIGNAGE – SIGN TYPE P8
PROPOSED DESIGN MODIFICATION
Elevation
LED
aluminum back plate
Current Design for LED
SA-PIL-05WF-REP-0001_Rev 1
Page 42
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
LED
plexi-glass light diffuser
Proposed Design for LED Current Design The LED, arranged in rows, is mounted on the front face of an aluminum back plate. The arrangement in rows of LED produces shadows and hot spots during operation which make lighting not uniformed while the aluminum plate makes the sign heavy. Proposed Modification in LED Arrangement and Material The LED will be mounted on the top and bottom of a plexi glass light diffuser, a material lighter than the aluminum plate, for uniform illumination and prevent shadows and hotspots. PROPOSED FIXING DESIGN Unifix bolt threaded rod steel angle ceiling
Current Fixing Design
SA-PIL-05WF-REP-0001_Rev 1
Proposed Fixing Design
Page 43
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
Current Fixing Design The current design is showing that the tube carrying the sign, regardless of the height of the ceiling from the floor or the “finished” ceiling, is directly supported by a bracket attached to the ceiling.
Modified Proposed Fixing Design To reduce the difficulty of installing a sign from the ceiling, particularly on a high ceiling, we intend to have our first fix before ceiling starts to be closed by using Unifix bolts with long threaded rods and a steel angle suspended below. The length of the threaded rod should be long enough to hang the steel angle just above the ceiling. Onto to this steel angle, we will just install the hanging sign. This proposed fixing method was approved and used in our recent Metro Dubai Project. Technical Clarification: -
Ceiling Details Drawings showing height of ceiling trusses or floor slab to finish ceiling line; indicating any ceiling obstructions such us AC Ducts, Data and Electrical Conduits, Water/Sewer Pipes, etc.
-
Electrical tapping point near the sign to be provided by others.
-
Mounting Height is 3 meters from finish floor line to bottom of sign
3.5.0
STATIC SIGNAGE – SIGN TYPE D8
SA-PIL-05WF-REP-0001_Rev 1
Page 44
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
PROPOSED DESIGN MODIFICATION
LED
Current Design plexi-light diffuser sleeve
LED
cable Proposed Design
Current Design The current design intent of joining the blade sign to the bracket support is not that strong as there is a tendency for the sign to slide laterally past the bracket support. The LED lighting arrangement is by rows mounted in front of an aluminum frame. The arrangement in rows of LED produces shadows and hot spots during operation which make lighting not uniformed. Modified Proposed Design We propose to join the blade sign to the bracket support by simply inserting the blade sign’s protruded member to the sleeve bracket and putting a bolt to firmly join them. In this case, there is no tendency for the blade sign to slide and rotate. As to the LED lighting, we propose to mount it on top and bottom of a plexi glass light diffuser the same in Sign Type P8. SA-PIL-05WF-REP-0001_Rev 1
Page 45
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
Â
Technical Clarification: -
Wall Details Drawings showing type blocks/Gypsum or Plywood Partitions, etc..)
-
Electrical tapping point near the sign to be provided by others.
-
Mounting Height is 3 meters from finish floor line to bottom of sign
-
Mounting Height is 2.4 meters from finish floor line to bottom of sign
SA-PIL-05WF-REP-0001_Rev 1
of
walls
(concrete/hallow
Page 46
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
3.6.0 DYNAMIC SIGNAGE - TYPE M6
Elevation
Back View
Side View
Current Fixation Detail
Current Design The sign naming or labeling on top of the box casing is internally illuminated with 2 lines of LED mounted on an aluminum plate. The box casing is built with custom designed extruded polyester powder coated aluminum profiles, acrylic signage screens with print, aluminum back, and stainless steel mounting. The (monitor’s) enclosure’s back is curve with openings at the top and bottom that serve as ventilations. The monitors are part of MC6. All data cables are cat 6 and have a minimum bending radius of 60mm. Aluminum is grade S57 and steel is 316.
SA-PIL-05WF-REP-0001_Rev 1
Page 47
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
Proposed Design We propose that the LED will be mounted on a plexi glass-light diffuser instead on an aluminum plate like that of Sign Type P8 in 2.4. As to the dimensioning of the sign and determining the size of the hanging supports, we need to have the LCD’s product details such as the weight, dimensions, and other technical descriptions.
PROPOSED FIXING DESIGN Unifix bolt threaded rod steel angle ceiling
Current Fixing Design
Proposed Fixing Design
Current Fixing Design The current design proposal is showing that the tube carrying the sign, regardless of the height of the ceiling from the floor or the “finished” ceiling, is directly supported by a bracket attached to the ceiling.
Modified Proposed Fixing Design To reduce the difficulty of installing a sign from the ceiling, particularly on a high ceiling, we propose that once the concrete ceiling is ready, we intend to have our first fix by using Unifix bolts with long threaded rods and a steel angle suspended below it even before the installation of the “finished” ceiling. The length of the threaded rod should be long enough to hang the steel angle just above the uninstalled “finished” ceiling. Onto to this steel angle, we will just install the hanging sign.
SA-PIL-05WF-REP-0001_Rev 1
Page 48
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
! Â
Technical Clarification: -
Ceiling Details Drawings showing height of ceiling trusses or floor slab to finish ceiling line; indicating any ceiling obstructions such us AC Ducts, Data and Electrical Conduits, Water/Sewer Pipes, etc.
-
LCD Product Details required from MC6 ( length, width, thickness, weight, etc.)
-
Data cabling and Electrical tapping point near the sign to be provided by others
-
Mounting Height is 3 meters from finish floor line to bottom of sign
3.7.0 ADVERTISEMENT SIGNAGE - TYPE A3 SA-PIL-05WF-REP-0001_Rev 1
Page 49
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
Â
PROPOSED DESIGN MODIFICATION
Elevation
Side View
profile tensioning system flexface with cut-out or print graphics
Current Design Detail
Proposed Design
Current Design The current design flexface light box with digital print graphics with LED illumination mounted on an aluminum plate. Alu. Tensioning profile didnâ&#x20AC;&#x2122;t show how the tensioning of the canvass will be done; and how the whole sign box will be mounted on a glass wall supported by vertical glass mullion.
Proposed Design
SA-PIL-05WF-REP-0001_Rev 1
Page 50
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
! Â
The proposed design uses a profile tensioning system, which holds the printed advertisement sign. Tensioning of the printed sign makes it flat and straight. The use of plexi glass diffuser the same in Sign Type P8. For the advertisement supports, we will provide the total weight of the sign and accordingly the glass wall subcontractor can design their mullion to hold the sign box; preferably a box-type mullion, where we could hide the wirings inside without sacrificing the strength of the mullion and the aesthetic view, in general.
Technical Clarification: -
Glass Wall Details required showing mullion support sizes, thickness, etc..
-
Electrical tapping point near the sign to be provided by others.
-
Mounting Height is 0.76 meter from finish floor line to bottom of sign
3.8.0 ADVERTISEMENT SIGNAGE TYPE AD1
SA-PIL-05WF-REP-0001_Rev 1
Page 51
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
Front Elevation
Â
Side View
Monitors
Vertical Section
Cross Section
CURRENT/PROPOSED DESIGN
SA-PIL-05WF-REP-0001_Rev 1
Page 52
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
! Â
Detailed design drawings to be provided in the detailed design stage, and we donâ&#x20AC;&#x2122;t see any changes as of now and we are going to provide complete details of Alu. extrusions, steel support, floor mounting, etc.. Technical Clarification: -
Floor Slab Details required showing thickness of slab, screeding, water proofing membrane, floor finishing, electrical conduiting, etc..
-
LCD Product Details required from MC6 (length, width, thickness, weight, etc.)
-
Data cabling and Electrical tapping point near the sign to be provided by others.
SA-PIL-05WF-REP-0001_Rev 1
Page 53
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
!
3.9.0 OUTDOOR SIGNAGE – TYPE E2 PROPOSED DESIGN AND FIXING METHOD
Current Design The LED is mounted on the front face of an aluminum sheet. This arrangement in rows produces shadows, thus lighting will not be uniformed. (Same as 2.4 Static Signage - Type P8) Proposed Modification in LED Arrangement and Material The LED will be mounted on the top and bottom of a plexi glass light diffuser to distribute the lighting uniformly all-over the sign. (Same as 2.4 Static Signage - Type P8) Proposed Fixing Method The proposed fixing method is the same as that of the ceiling mounted sign types P8 and M6.
Technical Clarification: -
Ceiling Details Drawings showing height of ceiling trusses or floor slab to finish ceiling line; indicating any ceiling obstructions such us AC Ducts, Data and Electrical Conduits, Water/Sewer Pipes, etc.
-
Data cabling and Electrical tapping point near the sign to be provided by others.
-
Mounting Height is 3 meters from finish floor line to bottom of sign
SA-PIL-05WF-REP-0001_Rev 1
Page 54
Prime International L.L.C.
!
P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
Â
3.10.0 STAFF/STATUTORY/DOOR SIGNAGE
OFFICE
CURRENT/PROPOSED DESIGN Aluminum Plate with Screen Printed Graphics fix directly on Door/Wall using Double Sided Tape of Screws. Prior to mass production, detailed design drawings and actual samples to be provided in the detailed design stage; showing type of panel materials, graphics text, fixing method, etc.. Technical Clarification: -
Door/Wall Details Drawings showing type of door/walls (steel door/Alum. door/ wooden door; concrete/hallow blocks/Gypsum or Plywood Partitions, etc.) to determine if DS Tape Fixing of Screws is required for mounting.
-
Mounting Height is 1.5 meters from finish floor line to center of sign
SA-PIL-05WF-REP-0001_Rev 1
Page 55
Prime International L.L.C. P.O. Box 187, Postal Code 112, Ruwi, Sultanate of Oman Tel +968 24591030, Fax +968 24590727 www.engworldwide.com
! Â
3.11.0 Ancillary Building Exterior Way-Finding
CURRENT/PROPOSED DESIGN Aluminum Extruded Post with Alum. Extruded Frame and Alum. Panels with Screen Printed Graphics mounted on necessary concrete foundation. Detailed design drawings and actual samples to be provided in the detailed design stage; showing type of materials, graphics text, fixing method, etc.
Technical Clarification: -
Exact Location Demarcation Points, coordinates to be provided by client, making sure that no existing underground services will be affected during the construction of concrete foundation.
SA-PIL-05WF-REP-0001_Rev 1
Page 56
Section 1.1B DESIGN & BUILD PROJECT
Zhuhai SHIZIMEN CBD CHINA
Contents
目录
COVER PAGE
封面
INDEX
索引
1.0 INSPIRATIONAL IMAGES 1.1 Architectural Elements 1.2 Interior Design Elements
创意来源
2.0 CONCEPT 01 2.1.1 Inspirations - Architectural 2.1.2 Copy & Text Layouts 2.1.3 Standard Color 2.1.4 Standrad Pictogram 2.1.5 Arrow Construction and Orientation 2.1.6 Main Strategy 2.1.7 Family of Sign 2.1.8 Primary Site Identifiers 2.1.9 Pedestrian Directional's 2.1.10 Wayfinding Map Directory 2.1.11 Pedestrian Directional's 2.1.12 Primary Site Identifiers 2.2 Wayfinding Map Directory 2.2 Interior - 1 Exhibition Center 2.2.1 Inspirations 2.2.2 Arrow Construction and Orientation 2.2.3 Area Directional Sign 2.2.4 Toilet ID Sign 2.2.5 Area Directional Sign 2.3 Interior - 2 Conventional Convention Center 2.3.1 Inspirations 2.3.2 Standard Color 2.3.3 Arrow Construction and Orientation 2.3.4 Pedestrian Directional Sign 2.3.5 Directory Sign 2.3.6 Floor ID Sign 2.3.7 Toilet ID Sign 2.3.8 Room ID Sign 2.3.9 Meeting Room ID Sign 2.3.10 Family of Sign
概念一
建筑元素 室内设计元素
创意来源-建筑 标准字型 标准颜色 标准图形 标准箭头 总策略 标识总览 区域策略 第一层级形象标识 地图导向标识 第二层级形象标识 第二层级形象标识 各业态区域策略 室内概念-1 展览中心 创意来源 标准箭头
3.0 CONCEPT 02 3.1 Inspirations - Architectural 3.2 Copy & Text Layouts 3.3 Arrow Construction and Orientation 3.4 Standrad Pictogram 3.5 Color Zoning 3.6 Standard Color 3.7 Concept Rendering 3.8 Color Strategy 3.9 Family of Sign 3.9.1 Pedestrian Directional's 3.9.2 Vehicular Directional's 3.9.3 Wayfinding Map Directory 3.9.4 Secondary Site Identifiers 3.9.5 Primary Site Identifiers 3.9.6 Primary Site Directional's 3.9.7 Pedestrian Wall Identifiers 3.9.8 Concept Sketches 3.9.9 Colour & Material Standard 3.9.10 Area Directional Sign 3.9.11 Desk ID Sign 3.9.12 Floor ID Sign 3.9.13 Toilet ID Sign 3.9.14 Meeting Room Sign 3.9.15 Family of Sign
概念二
4.0 Concept 03 4.1 Inspirations - Architectural 4.2 Typography 4.3 Arrow Construction and Orientation 4.4 Standrad Pictogram 4.5 Color Zoning 4.6 Standard Color 4.7 Concept Rendering 4.8 Color Strategy 4.9 Family of Sign 4.9.1 Pedestrian Directional's 4.9.2 Vehicular Directional's 4.9.3 Secondary Site Identifiers 4.9.4 Primary Site Identifiers 4.9.5 Primary Site Directional's 4.9.6 Pedestrian Wall Identifiers
概念三
创意来源-建筑 标准字型 箭头标准 标准图形 色彩分区 标准颜色 概念图形 色彩策略 标识总览 人行导向标识 车行导向标识 地图导向标识 第二层级形象标识 第二层级形象标识 第二层级导向标识 第二层级人行导向标识(贴墙式) 概念来源 标准颜色与材料 区域方向指引标识 桌上标识 楼层号标识 洗手间标识 会议室标识 标识总览
区域方向指引标识 洗手间标识 区域方向指引标识 室内概念-2 国际会议中心 创意来源 标准颜色 标准箭头 区域导向指引标识(贴墙式) 区域导向指引标识 楼层号标识 洗手间标识 房间功能标识 会议室标识 标识总览
创意来源-建筑 标准字型 箭头标准 标准图形 色彩分区 标准颜色 概念图形 色彩策略 标识总览 人行导向标识 车行导向标识 第二层级形象标识 第二层级形象标识 第二层级导向标识 第二层级人行导向标识(贴墙式)
SIGNAGE CONCEPT Design Principle 设计原则
The physical context of Zhuhai Shizimen CBD is a direct expression of an international first-class CBD living style and spirit with best spacial planning and a forward-looking perspective for development. The design focus on the coordination of CBD and Macao, strengthen the landscape of mountain and seashore, and emphasize on such ideas of sustainability as ecology and environment protection, energy conservation and low-carbon lifestyle. A creative “city ribbon”, which combines functional aspects and scenery, effectively links the functions of convention & exhibition center, hotel, office building, etc, making the building cluster an integrated and unique landmark.The character of this development is vibrant, welcoming, unique and classic; it is an exciting blend of splendor and dynamic earth elements. It’s a seamless blend of mountain view, sea view and urban landscape, including coastline, where quiet charm meets energetic bustle. Before any designs were produced, several key attributes were examined to create a foundation of authenticity: 1) Design Criteria were developed. 2) Themes and Vocabulary were identified, using the physical environment as inspiration. 3) A Wayfinding Strategy was developed, establishing key functional objectives for the solution, and formalizing an approach to circulation and destinations.
珠海十字门的物理环境是一个国际一流的生活方式、最好的空间规划以及发展前瞻性的直接表达。设计着重于协调CBD与澳门的联系,加强山区和海滨景观,并强调保护生态环境,节约能源和低碳生活方式的可持续性。一个创造性的" 城市丝带",结合了功能与风景,有效得连接了会展中心,酒店,写字楼等,使建筑群成为综合而独特的地标建筑的特点是充满活力,热情,独特而又经典,这是一个激动人心的华丽与土地色的混合。它结合了山景,海景和城市景观, 包括海岸线,使安静的魅力与充满活力的喧嚣完美融合。
启动设计前,检查了一些关键属性以创建一个真实性的基础:1) 已有设计标准。2) 有确定的主题和词汇,使用物理环境作为灵感。3) 创建寻路系统,指引关键的目标,并指引正确的路径。
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
1.1
SIGNAGE CONCEPT Design Criteria 设计标准
1.2
The designers worked session to identify key design qualities that would characterize a wayfi nding system uniquely suited to the project. These qualities became the guiding criteria, constantly referred back to as the design process evolved: 1. A versatile design palette which can be applied throughout the development 2. Interchangeable elements to relate to specific facilities (color/pattern/icon/etc) 3. Clear & legible text and arrows 4. Sophisticated, flexible color palette, with potential for selective pops of brighter color & contrast 5. Relief and patterning, using architectural inspiration which lends authenticity
设计师会寻找关键的设计要素来适应这个项目。这些设计要素成为设计标准,顾问会在设计中回头参考这些标准:
1. 一个多功能的设计调色板,可以应用于整个开发 2. 可互换的元素,涉及到具体设施(颜色/图案/图标/等) 3. 明确和清晰的文字和箭头 4. 先进,灵活的调色板,可选择明亮的色彩和对比度 5. 图案来自建筑的灵感,体现真实性
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT Colour Inspiration 色彩灵感
The team looked to reference for color inspiration, seeking hues that would project an authenticity of place by complementing their surroundings. The colors in this illustration form a strong neutral base that is both warm and sophisticated. Zhuhai Shizimen CBD display a dynamic combination of muted architectural palettes and pops of vibrant color. The wayfi nding system incorporates both of these concepts into its palette to balance the desire for quality with the goal of projecting a cheerful image. Similarly, it is important to recognize that the colors which inspired the project palette also serve as the background setting for the signs themselves. 设计团队参照环境元素截取色彩灵感。此设计中运用的色彩有强大的自然元素,温暖而舒服。珠海十字门显示了多种色彩的组合。寻路系统集成了各个业态的调色板,以营造完美的形象。 同样地,从环境提炼而来的色彩也同样应用于各自的环境。
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
1.3.1
SIGNAGE CONCEPT Architectural Inspiration
建筑灵感
The seamless blending of mountain view, sea view and urban landscape, including coastline, provides ample source material from which to draw inspiration. By looking within the devel-opment for design elements to inform the program design, the solution becomes woven into the fabric of the Zhuhai Shizimen CBD landscape, rather than inserted into it arbitrarily. 山景,海景和城市景观,包括海岸线的完美结合,成为材料灵感的丰富来源。 寻找设计元素,解决方案是融入珠海十字门的景观,而不是随意插入。
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
1.4
SIGNAGE CONCEPT 02 概念二 Overall Theme 总体原则
1.5
Choosing design direction by analyzing the building’s form and finishing materials. 分析建筑元素及材料后选择设计方向。
MODERN
CLEAN & ELEGANT
VERSATILE
现代
简洁及优雅
多功能的
CONCEPT 1
CONCEPT 2
CONCEPT 3
CONTEMPORARY
TRADITIONAL
NEW CLASSIC
现代
传统
新古典主义
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 02 概念二 Analysis & Criteria 分析与标准
1.6
The signage and wayfinding strategy has been designed to complement the functional aspects of the development and to facilitate efficient movement of Visitor’s/ Residents to and from the Complex and other areas. This document sets out high level wayfinding principles, drawing upon best practice and international examples of good design. Due to the scale of the development and for simplicity each building have been allocated symbols but also have associated colour coding for signage and mapping purposes. The design team completed a thorough study of the Master plan and have identified core priorities for the system solution to address the unique wayfinding challenges. 标识与寻路系统是为了配合发展的功能性,以方便游客/居民找到目的地。。本设计阐述了高水平的寻路原则,借鉴最佳实践和国际优秀设计的例子。 鉴于项目的发展规模和为简单起见,每个业态都有自己的符号与颜色,便于地图上的区分。 设计团队完整研究了项目平面图,并凝练了主要的原则来挑战独一无二的寻路系统。
1. Vehicular wayfinding
车辆寻路
2. Pedestrian information needs
步行的信息需求
Focus on the essentials: get visitors quickly to parking so they can start enjoying the facilities
An informed pedestrian is comfortable, confident, and ready to explore
要领:让访客快速找到停车位,这样他们就可以开始享受周遭设施
一位知到路怎么走的行人舒适,自信,并愿意探索
3. Define/ direct to different buildings/ Facilities 定义/导引不同的建筑物/设施
Identifiable building names give visitors more to explore; plus they make wayfinding easier 建筑名称给游客更多的暗示,让游客知道如何找到目的地。
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
Section 2.1
External Sign Concept 1 EXTERNAL SIGNAGE
SIGNAGE CONCEPT 02 概念二 Inspirations - Architectural 创意来源 - 建筑
2.1.1
建筑造型 Architectural Shape
切割字 Router Cut
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
空间感 Sence of space
SIGNAGE CONCEPT 01 概念一 Copy & Text Layouts 标准字形
2.1.2
Description:
CHI NE S E F O NT S
The above fonts intended use are for Graphics and Wayfinding Chinese Normal
大堂 宴会中心 停车 一 二 三 四 五 六 七 八 九 十
functions only Notes: The fonts shown above are for reference only and is under no circumstances to be used as artwork. All copy shall be reproduced from standard type fonts. Line to line and letter to letter spacing should be maintained. All copy margins are to be maintained optically.
E NG L I S H F O NT S
Tahoma Regular
ENGLISH FONTS
Frutiger 57 cn
ABCDEFGHIJKLMNOPQRSTUVWXYZ abcdefghijklmnopqrstuvwxyz 0123456789?! ' "(),;
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
描述: 如上计划使用的字体仅用于平面及动线规划功能。 注: 上面显示的字体仅供参考,在任何情况下都不作为排版依据。所有的副本都应再现标准型字体。行距 与字母间距应维持不变。所有的副本都应保持原有页边距的比例。
SIGNAGE CONCEPT 01 概念一 Standard Color 标准颜色
2.1.3
Colour offers a powerful tool in the organisation of information and in making a message hierarchy visible. Colour coding requires a clear set of rules in order to maintain consistency.
PANTONE COLOUR | PERCENTAGE
The rationale for the selected colour palette is to maximize clarity and recognition, assisting identification of the different Areas. Sign colours have been chosen to aid contrast and definition.
PANTONE 207-1U
PANTONE 377M
PANTONE 179U
PANTONE 169-2C
The Pantone Matching System (PMS) is used for matching print, vinyl and other finishes for sign colours. Vinyl colours must be matched using the Pantone specification or by using the 3M references or an accurate match produced by other suppliers. Specially commissioned vinyl colours for illuminated signs, whether cast or printed, must be tested on prototypes to ensure colour correctness. Background Colour(s) The proposed signage strategy is based on signs forming an integrated element of the Internal Wall System, hence any change of background shade and/or finish may impact the legibility of the sign design and should be fully tested. 颜色是信息组织以及使信息层次清晰的强大工具。彩色编码需要一个明确的规则,使信息保持 一致性。 选择调色板的基本理由是为了最大限度地提高清晰度和识别度,以辨别不同的区域。标识的颜
展览中心 Exhibition Center
办公楼 Office
色被选定来增加对比度和鲜明度。 潘通配色系统(PMS)是用于校色打印,贴膜和其他处理方式是用于标识的颜色。贴膜的颜色 必须完全吻合潘通色的规范或参考3M的规格,或者准确匹配其他供应商生产的产品。特别用 于发光标识的贴膜颜色,无论是铸造或打印,必须在原型上测试以确保颜色的正确性。 背景色 建议的标识战略是结合室内墙壁系统(IWS)的元素,因为(墙面)背景(阴影或表面处理) 的任何变化都可能影响标识设计的易读性,所以应充分测试。
公寓式酒店 Serviced Apartment
会议中心 Meeting Center
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 01 概念一 Color Zoning 色彩区域分区
2.1.4
标准图形
建筑图形
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
镂空
SIGNAGE CONCEPT 01 概念一 Arrow Standard 标准箭头
2.1.5
X
Description: The above arrows intended use are for Graphics and Straight Ahead
Ahead on Right
Wayfinding functions only.
X
Notes: All arrows used in this signage package shall be of the design shown. Relationships of the arrow to copy shall be as shown on specific drawings. Up
Up on Right
描述: 如上计划使用的箭头仅用于平面及动线规划功能。 注: 此标识包里使用的所有箭头都必须如本设计所示。复制的箭头比例关系必
Arrow Proportion Detail
须如具体图纸中所示。
Left
Right
Ahead on Left
Down on Right
Typical Arrow Orientation Detail
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 01 概念一 Color Zoning 色彩区域分区
2.1.6
Colour
色彩
Pattern
Material Palette 材料
图案
会议中心 Interational Convention Center
木头
Wood
展览中心 Exhibition Center
玻璃/亚克力
Glass/Anylic
办公楼 Office
磨砂古铜金
Mat Bronze S/S
公寓式酒店 Serviced Apartment
镜面黑色不锈钢丝印图案
Mirro black S/S print pictogram
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 01 概念一 Copy & Text Layouts 标准字形
2.1.7
ZHUHAI CBD CENTER
珠 海 十 字 门
P 2.2m
網球法院
Vehicular Operation Sign (Parking Max. Height)
Vehicular Operation Sign (Wall Mounted)
第一层级交通导向标识
第一层级停车导向标识
第一层级停车导向标识
413mm x 990
725mm x 1400mm
217mm x 665mm
展览中心 Exhibition Center
A B C 展览中心 Exhibition Center
D E 办公楼 Office
酒店式公寓 Serviced Apartment
Notes: 1. Graphic text shown are holding graphics only, hotel, souk and district identities to be confirmed at at later stage. 2. Measurements shown are width x height x depth. 4. All ground mounted signs required foundations to suit size and weight of sign and ground conditions. 5. Sign messages for VDR signs vary to suit sign location. Refer to signage schedules. 6. Material may change in colour, tbc at later stage.
Primary Site Identifiers
Primary Site Directional's
第二层级形象标识
第二层级导向标识
第二层级导向标识
1000mm x 8000mm
1000mm x 4500mm
1000mm x 4500mm
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
Primary Site Directional's
Road Operation Sign
SIGNAGE CONCEPT 01 概念一 Area Strategy 区域策略
2.1.8
The rationale for the selected colour palette is to maximize clarity and recognition, assisting identification of the different Areas. Sign colours have been chosen to aid contrast and definition.
ZHUHAI CBD CENTER
珠 海 十 字 门
The Pantone Matching System (PMS) is used for matching print, vinyl and other finishes for sign colours. Vinyl colours must be matched using the Pantone specification or by using the 3M references or an accurate match produced by other suppliers. Specially commissioned vinyl colours for illuminated signs, whether cast or printed, must be tested on prototypes to ensure colour correctness. 选择调色板的基本理由是为了最大限度地提高清晰度和识别度,以辨别不同的区域。标识的颜 色被选定来增加对比度和鲜明度。 潘通配色系统(PMS)是用于校色打印,贴膜和其他处理方式是用于标识的颜色。贴膜的颜色 必须完全吻合潘通色的规范或参考3M的规格,或者准确匹配其他供应商生产的产品。特别用 于发光标识的贴膜颜色,无论是铸造或打印,必须在原型上测试以确保颜色的正确性。
Meeting Center Exhibition Center
Office Love Woods
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 01 概念一 Pedestrian Directional's 人行导向标识
3D RENDERING FRONT VIEW SIDE VIEW Scale 1:10 (millimeters) Scale 1:10 (millimeters) Size: 700mm x 2100mm SPECIFICATION: Build up structure with RHS framing cladded with aluminum painted to match color. 铝板烤80% 哑光漆箱体,文字信息亚克力立体字突出,内透光
Shizimen CBD > Zhuhai, China > External Signage Presentation
2.1.9
SIGNAGE CONCEPT 01 概念一 Wayfinding Map Directory 地图导向标识
2.1.10
中间部分镂空
FRONT VIEW Scale 1:10 (millimeters) Size: 650mm x 1650mm SPECIFICATION: Build up structure with RHS framing cladded with aluminum painted to match color. 铝板烤80% 哑光漆箱体,文字信息亚克力立体字突出,内透光
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIDE VIEW Scale 1:10 (millimeters)
3D RENDERING
SIGNAGE CONCEPT 01 概念一 Primary Site Identifiers 第二层级形象标识
FRONT VIEW Scale 1:45 (millimeters) Size: 1000mm x 8000mm
2.1.11
3D RENDERING
SPECIFICATION: Build up structure with RHS framing cladded with aluminum painted to match color.Push thru acrylic letters internally illuminated. 铝板烤80% 哑光漆箱体,文字信息亚克力立体字突出,内透光
Shizimen CBD > Zhuhai, China > External Signage Presentation
SIGNAGE CONCEPT 01 概念一 Primary Site Directional's 第二层级导向标识
2.1.12
展览厅入口 Exhibition Entrance
1 2 3
展览厅入口 Exhibition Entrance
4 5
办公楼 Office 酒店式公寓 Serviced Apartment
FRONT VIEW 3D RENDERING SIDE VIEW 3D RENDERING Scale 1:10 (millimeters) Scale 1:10 (millimeters) Size: 700mm x 2100mm SPECIFICATION: Build up structure with RHS framing cladded with aluminum painted to match color.Push thru acrylic letters internally illuminated. 铝板烤30% 哑光漆箱体,文字信息亚克力立体字突出,内透光
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 01 概念一 Copy & Text Layouts 标准字形
2.2
会议中心 Meeting Center
示意概念
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
展览中心 Exhibition Center
办公楼 Office
公寓式酒店 Serviced Apartment
Section 2.2
Interior Sign
1
Exhibition Center 展览中心
SIGNAGE CONCEPT 01 概念一 2.2.1
Concept Sketches 概念来源
光影 剔透 反射 Shadow Translucen Reflection
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 01 概念一 Arrow Standard 标准箭头
2.2.2
X
Description: The above arrows intended use are for Graphics and Straight Ahead
Ahead on Right
Wayfinding functions only.
X
Notes: All arrows used in this signage package shall be of the design shown. Relationships of the arrow to copy shall be as shown on specific drawings. Up
Up on Right
描述: 如上计划使用的箭头仅用于平面及动线规划功能。 注: 此标识包里使用的所有箭头都必须如本设计所示。复制的箭头比例关系必
Arrow Proportion Detail
须如具体图纸中所示。
Left
Right
Ahead on Left
Down on Right
Typical Arrow Orientation Detail
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 01 概念一 Area Directional Sign ( WM )
区域方向指引标识 ( 挂墙式 )
会议中心 Meeting Center 展览中心 Exhibition Center 办公楼 Office 酒店式公寓 Serviced Apartment 购物中心 Shopping Mall 影院 Cinema
餐饮区 美术馆 Art Gallary F& B Area
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
2.2.3
SIGNAGE CONCEPT 01 概念一 Tolit Sign ( BW ) 洗手间标识 ( 贴墙式 )
2.2.4
Directory 全日中国餐 GF All Day Chinese Restaurant
FRONT VIEW Scale 1:2 (millimeters) Size: 320mm x 100mm
SIDE VIEW Scale 1:2 (millimeters)
SPECIFICATION:12mm MAT Glass/Ancylic and 8mm Clear Glass/Ancylic and 3D letters SPECIFICATION: 12mm 磨砂亚克力或者玻璃,背衬8mm透明亚克力,图形蚀刻填漆,立体字切割
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING
1
酒吧酒廊 Bar Lounge
2
全日中国餐 Hall 1, 2, 3
3
全日中国餐 Hall 3 & 5
4
酒吧酒廊 Meeting Rooms 1, 2, 3
5
酒吧酒廊 Meeting Rooms 4 & 5
GF
SIGNAGE CONCEPT 01 概念一 Area Directional Sign ( WM )
区域方向指引标识 引标识 ( 挂墙式 )
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
2.2.5
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
磨砂亚克力/玻璃
图形立体切割
图形蚀刻背后添漆
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
图形立体切割 磨砂亚克力/玻璃
图形蚀刻背后添漆
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
磨砂亚克力/玻璃
图形蚀刻背后添漆
会议中心 Meeting Center
展览中心 Exhibition Center 办公楼 Office 酒店式公寓 Serviced Apartment 购物中心 Shopping Mall 影院 Cinema
餐饮区 美术馆 Art Gallary F& B Area
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
Resption Resp ption tio
询问处
心中览展 retneC noitibihxE 楼公办 eciffO 寓公式店酒 tnemtrapA decivreS 心中物购 llaM gnippohS 餐F yralla馆 aer区 A饮 B& G术 tr美 A
am院 en影 iC
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
Section 2.3
Interior Sign
2
Interantional Convention Center 国际会议中心
SIGNAGE CONCEPT 01 概念一 2.3.1
Concept Sketches 概念来源
造型 Architectural Shape
字母立体字切割 Router cut letters
线条 Irregular Edges
木头材质 Wood Material
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
建筑造型 Bizaare Interior
SIGNAGE CONCEPT 01 概念一 Colour & Material Standard 标准颜色与材料
TEXT PANTONE COLOUR
2.3.2
Colour offers a powerful tool in the organisation of information and in making a message hierarchy visible. Colour coding requires a clear set of rules in order to maintain consistency. The rationale for the selected colour palette is to maximize clarity and recognition, assisting identification of the different Areas. Sign colours have been chosen to aid contrast and definition.
PMS 492 C
BLACK 80%
The Pantone Matching System (PMS) is used for matching print, vinyl and other finishes for sign colours. Vinyl colours must be matched using the Pantone specification or by using the 3M references or an accurate match produced by other suppliers. Specially commissioned vinyl colours for illuminated signs, whether cast or printed, must be tested on prototypes to ensure colour correctness. Background Colour(s) The proposed signage strategy is based on signs forming an integrated element of the Internal Wall System, hence any change of background shade and/or finish may impact the legibility of the sign design and should be fully tested. 颜色是信息组织以及使信息层次清晰的强大工具。彩色编码需要一个明确的规则,使信息保持 一致性。 选择调色板的基本理由是为了最大限度地提高清晰度和识别度,以辨别不同的区域。标识的颜 色被选定来增加对比度和鲜明度。 潘通配色系统(PMS)是用于校色打印,贴膜和其他处理方式是用于标识的颜色。贴膜的颜色 必须完全吻合潘通色的规范或参考3M的规格,或者准确匹配其他供应商生产的产品。特别用 于发光标识的贴膜颜色,无论是铸造或打印,必须在原型上测试以确保颜色的正确性。 背景色 建议的标识战略是结合室内墙壁系统(IWS)的元素,因为(墙面)背景(阴影或表面处理) 的任何变化都可能影响标识设计的易读性,所以应充分测试。
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 01 概念一 Arrow Standard 标准箭头
2.3.3
X
Description: The above arrows intended use are for Graphics and Straight Ahead
Ahead on Right
Wayfinding functions only.
X
Notes: All arrows used in this signage package shall be of the design shown. Relationships of the arrow to copy shall be as shown on specific drawings. Up
Up on Right
描述: 如上计划使用的箭头仅用于平面及动线规划功能。 注: 此标识包里使用的所有箭头都必须如本设计所示。复制的箭头比例关系必
Arrow Proportion Detail
须如具体图纸中所示。
Left
Right
Ahead on Left
Down on Right
Typical Arrow Orientation Detail
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 01 概念一 Pedestrian Directional Sign 区域方向指引标识 ( 挂墙式 )
2.3.4
会议入口
Convention Entrance
停车场入口
Parking Entrance
FRONT VIEW 正视图 Scale 1:12 (millimeters) Size: 2000mm x 500mm
SIDE VIEW 侧视图 Scale 1:12 (millimeters)
SPECIFICATION: 1.5mm thick alluminum cladded on RHS framing mounted to dirrecly to wall 1.5mm厚铝板哑光漆折盒成造型贴与墙面
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
SIGNAGE CONCEPT 01 概念一 Directory Sign 区域方向指引标识 ( 挂墙式 )
2.3.5
礼堂 音乐厅 演讲大厅 Auditorium Concert Halls Lecture Halls
会议室 2 会议室 3 Meeting Rooms Conference Rooms
FRONT VIEW 正视图 Scale 1:3 (millimeters) Size: 115mm x 330mm
SIDE VIEW 侧视图 Scale 1:4 (millimeters)
SPECIFICATION: 1.5mm thick alluminum cladded on RHS framing mounted to dirrecly to wal 1.5mm厚铝板哑光漆折盒成造型贴与墙面
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
SIGNAGE CONCEPT 01 概念一 Floor ID Sign 楼层号标识
2.3.6
Level
Level
FRONT VIEW 正视图 Scale 1:4 (millimeters) Size: 480mm x 200mm
SIDE VIEW 侧视图 Scale 1:4 (millimeters)
3D RENDERING 效果图
SPECIFICATION: 2mm Aluminum thick sheet with mask and spray graphic’s and 5mm thick alluminum router cut for the number and arrow. 2mm厚铝板折弯造型,5mm厚立体字切割文字信息与箭头图形
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 01 概念一 Toilet ID Sign 洗手间标识
2.3.7
Directory 全日中国餐 GF All Day Chinese Restaurant 1
酒吧酒廊 Bar Lounge
2
全日中国餐 Hall 1, 2, 3
3
全日中国餐 Hall 3 & 5
4
酒吧酒廊 Meeting Rooms 1, 2, 3
5
酒吧酒廊 Meeting Rooms 4 & 5
GF
FRONT VIEW 正视图 3D RENDERING 效果图 Scale 1:20 (millimeters) Size: 500mm x 1000mm SPECIFICATION: 2mm Aluminum thick sheet with mask and spray graphic’s and 5mm thick alluminum router cut for the number and arrow. 2mm厚铝板折弯造型,5mm厚立体字切割文字信息与箭头图形
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 01 概念一 Room ID Sign 房间功能标识
2.3.8
05 Concert Halls
Directory 全日中国餐 GF All Day Chinese Restaurant 1
酒吧酒廊 Bar Lounge
2
全日中国餐 Hall 1, 2, 3
3
全日中国餐 Hall 3 & 5
4
酒吧酒廊 Meeting Rooms 1, 2, 3
5
酒吧酒廊 Meeting Rooms 4 & 5
GF
FRONT VIEW 正视图 PHOTO RENDERING 效果图 Scale 1:16 (millimeters) Size: 345mm x 700mm SPECIFICATION: 2mm Aluminum thick sheet with mask and spray graphic’s and 5mm thick alluminum router cut for the number and arrow. 2mm厚铝板折弯造型,5mm厚立体字切割文字信息与箭头图形
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 01 概念一 Meeting Room Sign 会议室标识
2.3.9
会议室 05 Meeting Room 05
FRONT VIEW 正视图 Scale 1:4 (millimeters) Size: 380mm x 460mm
SIDE VIEW 侧视图 Scale 1:4 (millimeters)
3D RENDERING 效果图
SPECIFICATION: 2mm Aluminum thick sheet with mask and spray graphic’s and 5mm thick alluminum router cut for the number and arrow. 2mm厚铝板折弯造型,5mm厚立体字切割文字信息与箭头图形
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 01 概念一 Family of Sign 标识总览
2.3.10
2200
2000
1800
会议室 05 Meeting Room 05 1600
会议入口
Convention Entrance 1400
3
等级
Level 1200
停车场入口 1000
Parking Entrance
0
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
05
音乐厅
Concert Halls
Section 3.0
External Sign Concept 2 EXTERNAL SIGNAGE
SIGNAGE CONCEPT 02 概念二 Inspirations - Architectural 创意来源 - 建筑
3.1
建筑造型 Architectural Shape
切割字 Router Cut
线条感 Norrow Elongated Forms
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 02 概念二 Color Zoning 色彩分区
3.2
Outside Property 外围区域 Vehicular & Shizimen Property Area 公共区域
Convention Center 会议中心
Neutral Zone 无色区域
Service Apartment
Office Area 办公楼
INTERSTITIAL SPACE CONNECTIONS
Coloured Zone
酒店式公寓
各业态交叉区域
色彩区域
Exhibition Center
Shopping Center 购物中心
展览中心
Neutral Zone 无色区域
Vehicular & Shizimen Property Area 公共区域
Outside Property 外围区域
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 02 概念二 Standard Color 标准颜色
3.3
Colour offers a powerful tool in the organisation of information and in making a message hierarchy visible. Colour coding requires a clear set of rules in order to maintain consistency.
PANTONE COLOUR | PERCENTAGE
The rationale for the selected colour palette is to maximize clarity and recognition, assisting identification of the different Areas. Sign colours have been chosen to aid contrast and definition.
PANTONE 583M
PANTONE 377M
PANTONE 147M
PANTONE 1545M
PANTONE 429M
PANTONE 11U
The Pantone Matching System (PMS) is used for matching print, vinyl and other finishes for sign colours. Vinyl colours must be matched using the Pantone specification or by using the 3M references or an accurate match produced by other suppliers. Specially commissioned vinyl colours for illuminated signs, whether cast or printed, must be tested on prototypes to ensure colour correctness. Background Colour(s) The proposed signage strategy is based on signs forming an integrated element of the Internal Wall System, hence any change of background shade and/or finish may impact the legibility of the sign design and should be fully tested. 颜色是信息组织以及使信息层次清晰的强大工具。彩色编码需要一个明确的规则,使信息保持 一致性。 选择调色板的基本理由是为了最大限度地提高清晰度和识别度,以辨别不同的区域。标识的颜 色被选定来增加对比度和鲜明度。
PANTONE 294M
PANTONE 2765M
PANTONE 7473M
PANTONE 330M
PANTONE 165U
PANTONE 179U
潘通配色系统(PMS)是用于校色打印,贴膜和其他处理方式是用于标识的颜色。贴膜的颜色 必须完全吻合潘通色的规范或参考3M的规格,或者准确匹配其他供应商生产的产品。特别用 于发光标识的贴膜颜色,无论是铸造或打印,必须在原型上测试以确保颜色的正确性。 背景色 建议的标识战略是结合室内墙壁系统(IWS)的元素,因为(墙面)背景(阴影或表面处理) 的任何变化都可能影响标识设计的易读性,所以应充分测试。
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 02 概念二 Concept Rendering 概念图形
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3.4
SIGNAGE CONCEPT 02 概念二 Color Strategy 色彩策略
3.5
The rationale for the selected colour palette is to maximize clarity and recognition, assisting identification of the different Areas. Sign colours have been chosen to aid contrast and definition.
MALL | CINEMA | ART GALLERY
ZHUHAI CBD CENTER
珠 海 十 字 门
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
The Pantone Matching System (PMS) is used for matching print, vinyl and other finishes for sign colours. Vinyl colours must be matched using the Pantone specification or by using the 3M references or an accurate match produced by other suppliers. Specially commissioned vinyl colours for illuminated signs, whether cast or printed, must be tested on prototypes to ensure colour correctness. 选择调色板的基本理由是为了最大限度地提高清晰度和识别度,以辨别不同的区域。标识的颜 色被选定来增加对比度和鲜明度。 潘通配色系统(PMS)是用于校色打印,贴膜和其他处理方式是用于标识的颜色。贴膜的颜色 必须完全吻合潘通色的规范或参考3M的规格,或者准确匹配其他供应商生产的产品。特别用 于发光标识的贴膜颜色,无论是铸造或打印,必须在原型上测试以确保颜色的正确性。
SIGNAGE CONCEPT 02 概念二 Family of Sign 标识总览
3.6
Scale 1:45 (millimeters)
展览中心
Exhibition Centre 会议中心
Conference Centre
Directory Map
会展中心
Hotel Entrance
服务公寓
Service Apartment
停车入口
Parking Area 地下室面
Basement Area
P 2.2m
会展中心
Street Name
Pedestrian Directional's
Wayfinding Map Directory
Street Identifiers
Pedestrian Wall Directionals
第一层级人行导向标识
第一层级地图导向标识
第一层级路边标识
第一层级人行导向标识(贴墙式)
Vehicular Operation Sign (Parking Max. Height)
Vehicular Operation Sign (Give Way)
Vehicular Operation Sign (Wall Mounted)
第一层级交通导向标识
700mm x 2100mm
1150mm x 2100mm
1000mm x 1010mm
725mm x 1240mm
第一层级停车导向标识
第一层级停车导向标识
第一层级停车导向标识
413mm x 990
725mm x 1400mm
725mm x 1400mm
217mm x 665mm
Road Operation Sign
Scale 1:90 (millimeters)
Scale 1:45 (millimeters)
服务公寓 Service Apartment
服务公寓入口
Service Apartment Entrance
游泳池
Swimming Pool
网球场
Tennis Court
购物中心
SHOPPING CENTER
宴会厅 Hotel Entrance
自助餐厅 Parking Area
会议中心 Basement Area
Primary Site Identifiers
Primary Site Directional's
Secondary Site Identifiers
Vehicular Directional's
Pedestrian Building Entry
Pedestrian Wall Identifiers
第二层级形象标识
第二层级导向标识
第二层级形象标识
第二层级车行导向标识
第二层级人行导向标识(贴墙式)
1000mm x 8000mm
1000mm x 4500mm
2500mm x 1500mm
570mm x 1050mm
第二层级建筑入口人行标识
Notes: 1. Graphic text shown are holding graphics only, hotel, souk and district identities to be confirmed at at later stage. 2. Measurements shown are width x height x depth.
4. All ground mounted signs required foundations to suit size and weight of sign and ground conditions. 5. Sign messages for VDR signs vary to suit sign location. Refer to signage schedules. 6. Material may change in colour, tbc at later stage.
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
725mm x 1240mm
725mm x 1240mm
SIGNAGE CONCEPT 02 概念二 Pedestrian Directional's 人行导向标识
3.6.1
宴会厅 Hotel Entrance 自助餐厅 Parking Area
会议中心 Basement Area
FRONT VIEW 正视图 Scale 1:10 (millimeters) Size: 700mm x 2100mm
SIDE VIEW 侧视图 Scale 1:10 (millimeters)
3D RENDERING 效果图
SPECIFICATION: Build up structure with RHS framing cladded with aluminum painted to match color.Push thru acrylic letters internally illuminated. 铝板烤30% 哑光漆箱体,文字信息亚克力立体字突出,内透光
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 02 概念二 Vehicular Directional's 车行导向标识
3.6.2
3D RENDERED IMAGE
展览中心 Exhibition Center 会议中心 Conference Center
服务公寓 Service Apartment
FRONT VIEW 正视图 Scale 1:10 (millimeters) Size: 570mm x 1050mm
SIDE VIEW 侧视图 Scale 1:10 (millimeters)
SPECIFICATION: Build up structure with RHS framing cladded with aluminum painted to match color. Push thru acrylic letters internally illuminated. 铝板烤30% 哑光漆箱体,文字信息亚克力立体字突出,内透光
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
SIGNAGE CONCEPT 02 概念二 Wayfinding Map Directory 地图导向标识
3.6.3
指南中心
Directory Map
FRONT VIEW 正视图 Scale 1:12 (millimeters) Size: 1150mm x 2100mm
SIDE VIEW 侧视图 Scale 1:12 (millimeters)
SPECIFICATION: Build up structure with RHS framing cladded with aluminum painted to match color. Push thru acrylic letters internally illuminated. 铝板烤30% 哑光漆箱体,文字信息亚克力立体字突出,内透光
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
SIGNAGE CONCEPT 02 概念二 Secondary Site Identifiers 第二层级形象标识
3.6.4
购物中心
SHOPPING CENTER
FRONT VIEW 正视图 Scale 1:10 (millimeters) Size: 2500mm x 1500mm
SIDE VIEW 侧视图 Scale 1:10 (millimeters)
SPECIFICATION: Build up structure with RHS framing cladded with aluminum painted to match color. Push thru acrylic letters internally illuminated. 铝板烤30% 哑光漆箱体,文字信息亚克力立体字突出,内透光
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
SIGNAGE CONCEPT 02 概念二 Primary Site Identifiers 第二层级形象标识
3.6.5
FRONT VIEW 正视图 Scale 1:45 (millimeters) Size: 1000mm x 8000mm
SIDE VIEW 侧视图 Scale 1:45 (millimeters)
SPECIFICATION: Build up structure with RHS framing cladded with aluminum painted to match color. Push thru acrylic letters internally illuminated. 铝板烤30% 哑光漆箱体,文字信息亚克力立体字突出,内透光
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
SIGNAGE CONCEPT 02 概念二 Primary Site Directional's 第二层级导向标识
FRONT VIEW 正视图 Scale 1:25 (millimeters) Size: 1000mm x 4500mm
3.6.6
SIDE VIEW 侧视图 Scale 1:25 (millimeters)
SPECIFICATION: Build up structure with RHS framing cladded with aluminum painted to match color. Push thru acrylic letters internally illuminated. 铝板烤30% 哑光漆箱体,文字信息亚克力立体字突出,内透光
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
SIGNAGE CONCEPT 02 概念二 Pedestrian Wall Identifiers 第二层级人行导向标识(贴墙式)
3.6.7
展览中心 Exhibition Center
会议中心 Conference Center
服务公寓 Service Apartment
FRONT VIEW 正视图 Scale 1:12 (millimeters) Size: 725mm x 1240mm
SIDE VIEW 侧视图 Scale 1:12 (millimeters)
SPECIFICATION: Build up structure with RHS framing cladded with aluminum painted to match color. Push thru acrylic letters internally illuminated. 铝板烤30% 哑光漆箱体,文字信息亚克力立体字突出,内透光
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
Section 3.9
Interior Sign
2
Interantional Convention Center 国际会议中心
SIGNAGE CONCEPT 02 概念二 Concept Sketches 概念来源
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3.9.8
SIGNAGE CONCEPT 02 概念二 Colour & Material Standard 标准颜色与材料
TEXT PANTONE COLOUR
3.9.9
Colour offers a powerful tool in the organisation of information and in making a message hierarchy visible. Colour coding requires a clear set of rules in order to maintain consistency. The rationale for the selected colour palette is to maximize clarity and recognition, assisting identification of the different Areas. Sign colours have been chosen to aid contrast and definition.
PMS 732 492 M C
BLACK 80%
The Pantone Matching System (PMS) is used for matching print, vinyl and other finishes for sign colours. Vinyl colours must be matched using the Pantone specification or by using the 3M references or an accurate match produced by other suppliers. Specially commissioned vinyl colours for illuminated signs, whether cast or printed, must be tested on prototypes to ensure colour correctness. Background Colour(s) The proposed signage strategy is based on signs forming an integrated element of the Internal Wall System, hence any change of background shade and/or finish may impact the legibility of the sign design and should be fully tested. 颜色是信息组织以及使信息层次清晰的强大工具。彩色编码需要一个明确的规则,使信息保持 一致性。 选择调色板的基本理由是为了最大限度地提高清晰度和识别度,以辨别不同的区域。标识的颜 色被选定来增加对比度和鲜明度。 潘通配色系统(PMS)是用于校色打印,贴膜和其他处理方式是用于标识的颜色。贴膜的颜色 必须完全吻合潘通色的规范或参考3M的规格,或者准确匹配其他供应商生产的产品。特别用 于发光标识的贴膜颜色,无论是铸造或打印,必须在原型上测试以确保颜色的正确性。 背景色 建议的标识战略是结合室内墙壁系统(IWS)的元素,因为(墙面)背景(阴影或表面处理) 的任何变化都可能影响标识设计的易读性,所以应充分测试。
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 02 概念二 Pedestrian Directional Sign 区域方向指引标识 ( 挂墙式 )
3.9.10
会展中心 HOTEL ENTRANCE 停车入口 PARKING ENTRANCE
地下室面 BASEMENT AREA
FRONT VIEW 正视图 Scale 1:12 (millimeters) Size: 2000mm x 350mm
SIDE VIEW 侧视图 Scale 1:12 (millimeters)
SPECIFICATION: 6mm thick varia ecoresin (color may vary from actual material) with 3mm thick fretcut letters 6mm thick aluminum decorative coated finish with cordoba cherry wood grain.
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
SIGNAGE CONCEPT 02 概念二 Directory Sign 区域方向指引标识 ( 挂墙式 )
3.9.11
接待 Reception
FRONT VIEW 正视图 Scale 1:3 (millimeters) Size: 115mm x 330mm SPECIFICATION: 12mm thick varia ecoresin (color may vary from actual material) with fretcut on 12mm thick cordoba cherry wood.
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
SIGNAGE CONCEPT 02 概念二 Floor ID Sign 楼层号标识
3.9.11
FRONT VIEW 正视图 Scale 1:4 (millimeters) Size: 480mm x 285mm
SIDE VIEW 侧视图 Scale 1:4 (millimeters)
SPECIFICATION: 6mm thick varia ecoresin (color may vary from actual material) on cordoba cherry wood. Sign directly mounted on wall.
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
SIGNAGE CONCEPT 02 概念二 Toilet ID Sign 洗手间标识
3.9.12
FRONT VIEW 正视图 Scale 1:3 (millimeters) Size: 320mm x 190mm
SIDE VIEW 侧视图 Scale 1:3 (millimeters)
SPECIFICATION: 6mm thick varia ecoresin (color may vary from actual material) on cordoba cherry wood. Sign directly mounted on wall.
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
SIGNAGE CONCEPT 02 概念二 Meeting Room Sign 会议室标识
3.9.13
会议室 Meeting Room
FRONT VIEW 正视图 Scale 1:4 (millimeters) Size: 330mm x 460mm
SIDE VIEW 侧视图 Scale 1:4 (millimeters)
SPECIFICATION: 6mm thick varia ecoresin (color may vary from actual material) on cordoba cherry wood with 3mm fretcut letters and lcd screen display.
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
SIGNAGE CONCEPT 02 概念二 Family of Sign 标识总览
3.9.14
2200
2000
1800
会展中心 HOTEL ENTRANCE 停车入口 PARKING ENTRANCE
1600
地下室面 BASEMENT AREA
1400
1200
1000
0
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
会议室
Meeting Room
Section 4.0
External Sign Concept 3 EXTERNAL SIGNAGE
SIGNAGE CONCEPT 03 概念三 Inspirations - Architectural 创意来源 - 建筑
4.1
Architectural Shape
Router Cut
Norrow Elongated Forms
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 03 概念三 Arrow Standard 标准箭头
4.3
Description: The above arrows intended use are for Graphics and Wayfinding functions only. X
Straight Ahead
Ahead on Right
Notes: All arrows used in this signage package shall be of the design shown. Relationships of the arrow to
45º
X
copy shall be as shown on specific drawings. 描述: 如上计划使用的箭头仅用于平面及动线规划功能。
Up
Up on Right
注: 此标识包里使用的所有箭头都必须如本设计所示。复制的箭头比例关系必 须如具体图纸中所示。
Arrow Proportion Detail
Left
Right
Ahead on Left
Down on Right
Typical Arrow Orientation Detail
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 02 概念二 Color Zoning 色彩分区
4.5
Outside Property 外围区域 Vehicular & Shizimen Property Area 公共区域
Convention Center 会议中心
Neutral Zone 无色区域
Service Apartment
Office Area 办公楼
INTERSTITIAL SPACE CONNECTIONS
Coloured Zone
酒店式公寓
各业态交叉区域
色彩区域
Exhibition Center
Shopping Center 购物中心
展览中心
Neutral Zone 无色区域
Vehicular & Shizimen Property Area 公共区域
Outside Property 外围区域
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 03 概念三 Concept Rendering 概念图形
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
4.6
SIGNAGE CONCEPT 03 概念三 Standard Color 标准颜色
4.7
PANTONE COLOUR | PERCENTAGE Colour offers a powerful tool in the organisation of information and in making a message hierarchy visible. Colour coding requires a clear set of rules in order to maintain consistency. The rationale for the selected colour palette is to maximize clarity and recognition, assisting identification of the different Areas. Sign colours have been chosen to aid contrast and definition.
PANTONE 583M
PANTONE 377M
PANTONE 147M
PANTONE 1545M
PANTONE 429M
PANTONE 11U
The Pantone Matching System (PMS) is used for matching print, vinyl and other finishes for sign colours. Vinyl colours must be matched using the Pantone specification or by using the 3M references or an accurate match produced by other suppliers. Specially commissioned vinyl colours for illuminated signs, whether cast or printed, must be tested on prototypes to ensure colour correctness. Background Colour(s) The proposed signage strategy is based on signs forming an integrated element of the Internal Wall System, hence any change of background shade and/or finish may impact the legibility of the sign design and should be fully tested. 颜色是信息组织以及使信息层次清晰的强大工具。彩色编码需要一个明确的规则,使信息保持
PANTONE 294M
PANTONE 2765M
PANTONE 7473M
PANTONE 330M
PANTONE 165U
PANTONE 179U
一致性。 选择调色板的基本理由是为了最大限度地提高清晰度和识别度,以辨别不同的区域。标识的颜 色被选定来增加对比度和鲜明度。 潘通配色系统(PMS)是用于校色打印,贴膜和其他处理方式是用于标识的颜色。贴膜的颜色 必须完全吻合潘通色的规范或参考3M的规格,或者准确匹配其他供应商生产的产品。特别用 于发光标识的贴膜颜色,无论是铸造或打印,必须在原型上测试以确保颜色的正确性。 背景色 建议的标识战略是结合室内墙壁系统(IWS)的元素,因为(墙面)背景(阴影或表面处理) 的任何变化都可能影响标识设计的易读性,所以应充分测试。
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
SIGNAGE CONCEPT 03 概念三 Standard Pictogram 标准图形
4.8
ZHUHAI CBD CENTER
MALL | CINEMA | ART GALLERY
珠 海 十 字 门
The rationale for the selected colour palette is to maximize clarity and recognition, assisting identification of the different Areas. Sign colours have been chosen to aid contrast and definition. The Pantone Matching System (PMS) is used for matching print, vinyl and other finishes for sign colours. Vinyl colours must be matched using the Pantone specification or by using the 3M references or an accurate match produced by other suppliers. Specially commissioned vinyl colours for illuminated signs, whether cast or printed, must be tested on prototypes to ensure colour correctness. 选择调色板的基本理由是为了最大限度地提高清晰度 和识别度,以辨别不同的区域。标识的颜色被选定来 增加对比度和鲜明度。 潘通配色系统(PMS)是用于校色打印,贴膜和其他 处理方式是用于标识的颜色。贴膜的颜色必须完全吻 合潘通色的规范或参考3M的规格,或者准确匹配其他 供应商生产的产品。特别用于发光标识的贴膜颜色,
展览中心
展览中心
展览中心
展览中心
展览中心
展览中心
Exhibition Centre
Exhibition Centre
Exhibition Centre
Exhibition Centre
Exhibition Centre
Exhibition Centre
会议中心
Conference Centre
会议中心
Conference Centre
会议中心
Conference Centre
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
会议中心
Conference Centre
会议中心
Conference Centre
会议中心
Conference Centre
无论是铸造或打印,必须在原型上测试以确保颜色的 正确性。
SIGNAGE CONCEPT 03 概念三 Family of Sign 标识总览
4.9 Scale 1:45 (millimeters)
酒店入口
Hotel Entrance
Directory Map
停车场
展览中心
Parking Area
Exhibition Centre
地下车库
会议中心
Basement Area
Conference Centre
酒店入口
服务公寓
Hotel Entrance
Service Apartment
停车场
Parking Area
会展中心
Street Name
地下停车场
Basement Area
SHOPPING CENTER
Pedestrian Directional's
Pedestrian Wall Directionals
Wayfinding Map Directory
Street Identifiers
Secondary Site Identifiers
Vehicular Directional's
第一层级人行导向标识
第一层级人行导向标识(贴墙式)
第二层级车行导向标识
1220mm x 700mm
第一层级路边标识
第二层级形象标识
2100mm x 610mm
第一层级地图导向标识
1683mm x 2400mm
1000mm x 1010mm
1600mm x 2500mm
792mm x 1875mm
Scale 1:90 (millimeters)
Scale 1:45 (millimeters)
网球场
TENNIS COURT
服务公寓入口
Service Apartment Entrance
展览中心
Exhibition Centre
P
会议中心
Conference Centre
2.2m
Primary Site Identifiers
Primary Site Directional's
Pedestrian Wall Identifiers
Pedestrian Building Entry
第二层级导向标识
第二层级人行导向标识(贴墙式)
Vehicular Operation Sign (Give Way)
Vehicular Operation Sign (Wall Mounted)
8000mm x 1600mm
3500mm x 700mm
1220mm x 700mm
第二层级建筑入口人行标识
Vehicular Operation Sign (Parking Max. Height)
Road Operation Sign
第二层级形象标识
1220mm x 700mm
停车导向标识
停车导向标识
停车导向标识
413mm x 990
725mm x 1400mm
725mm x 1400mm
217mm x 665mm
Notes: 1. Graphic text shown are holding graphics only, hotel, souk and district identities to be confirmed at at later stage. 2. Measurements shown are width x height x depth.
4. All ground mounted signs required foundations to suit size and weight of sign and ground conditions. 5. Sign messages for VDR signs vary to suit sign location. Refer to signage schedules. 6. Material may change in colour, tbc at later stage.
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
交通导向标识
SIGNAGE CONCEPT 03 概念三 Pedestrian Directional's 人行导向标识
4.9.1
展览中心
Exhibition Centre 会议中心
Conference Centre 服务公寓
Service Apartment
FRONT VIEW 正视图 Scale: nts Size: 2100mm x 610mm
SIDE VIEW 侧视图 Scale: nts (millimeters)
SPECIFICATION: Build up structure with RHS framing cladded with aluminum painted to match color. Push thru acrylic letters internally illuminated.
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
RENDERING 效3D 果图
SIGNAGE CONCEPT 03 概念三 Vehicular Directional's 车行导向标识
4.9.2
Hotel Entrance
Parking Area
Basement Area
FRONT VIEW 正视图 Scale: nts Size: 792mm x 1875mm
SIDE VIEW 侧视图 Scale: nts
SPECIFICATION: Build up structure with RHS framing cladded with aluminum painted to match color. Push thru acrylic letters internally illuminated. 铝板烤50% 哑光漆箱体,文字信息亚克力立体字突出,内透光
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
SIGNAGE CONCEPT 03 概念三 Secondary Site Identifiers 第二层级形象标识
4.9.3
購物中心
SHOPPING CENTER
FRONT VIEW 正视图 Scale: nts Size: 1600mm x 2500mm
SIDE VIEW 侧视图 Scale: nts
SPECIFICATION: Build up structure with RHS framing cladded with aluminum painted to match color. Push thru acrylic letters internally illuminated. 铝板烤50% 哑光漆箱体,文字信息亚克力立体字突出,内透光
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
SIGNAGE CONCEPT 03 概念三 Primary Site Identifiers 第二层级形象标识
4.9.4
展览中心
Exhibition Centre 会议中心
Conference Centre
FRONT VIEW 正视图 Scale 1:45 (millimeters) Size: 8000mm x 1600mm
SIDE VIEW 侧视图 Scale: nts
SPECIFICATION: Build up structure with RHS framing cladded with aluminum painted to match color. Push thru acrylic letters internally illuminated. 铝板烤50% 哑光漆箱体,文字信息亚克力立体字突出,内透光
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
SIGNAGE CONCEPT 03 概念三 Primary Site Directional's 第二层级导向标识
4.9.5
FRONT VIEW 正视图 Scale: nts Size: 4500mm x 900mm
SIDE VIEW 侧视图 Scale: nts
SPECIFICATION: Build up structure with RHS framing cladded with aluminum painted to match color. Push thru acrylic letters internally illuminated. 铝板烤50% 哑光漆箱体,文字信息亚克力立体字突出,内透光
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
SIGNAGE CONCEPT 03 概念三 Pedestrian Wall Identifiers 第二层级人行导向标识(贴墙式)
4.9.6
服务公寓
Service Apartment
游泳池
Swimming Pool
地下车库
Basement Area
FRONT VIEW 正视图 Scale: nts Size: 1220mm x 700mm
SIDE VIEW 侧视图 Scale: nts
SPECIFICATION: Build up structure with RHS framing cladded with aluminum painted to match color. Push thru acrylic letters internally illuminated.
SHIZIMEN CBD > Zhuhai, China > SIGNAGE CONCEPT PRESENTATION
3D RENDERING 效果图
PR O JEC T E X P E RI E N CE CLIENT: Qatar Airways LOCATION: Doha, Qatar
Emirates Neon Group - Pre Qualification
2.1.1A
P R OJ E C T E X PE R IENC E CLIENT: Qatar Airways LOCATION: Doha, Qatar
Emirates Neon Group - Pre Qualification
2.1.1B
P R O JE C T E XPE RIENC E CLIENT: Department of Civil Avation LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Quali cation
2.1.1D
P R O JE C T E XPE RIENC E CLIENT: Department of Civil Avation LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Quali cation
2.1.1E
P R O JE C T E XP E RIE NCE CLIENT: Bahrain Airport Company
Emirates Neon Group - Pre Quali cation
2.1.1F
LOCATION: Manama, Bahrain
P RO JE C T E X PE R I E N C E CLIENT: Jebel Ali Cargo Terminal LOCATION: Jebel Ali, United Arab Emirates
2.1.1C
AÉzŸG äGQhO Toilets
1 3 7 9 11äÉHGƒH
Gates 1, 3, 5, 7, 9, 11
QGhõdG QÉÑc ádÉ°U
VIP Lounge
QGhõdG QÉÑc ádÉ°U
AÓª©dG áeóN
Special Handling
1500
É©e
1300
350
190
VIP Lounge á°UÉÿG á
Customer Service
PLAN Dynamic displays on Front and back of panel
10 áHGƒH
Gate 10
1000
¢†zMGôe Toilets
º©£e
2600
Restaurant
COLUMN
FRONT ELEVATION
Emirates Neon Group - Pre Qualification
SIDE ELEVATION
P R O JE C T E XPE RIE NCE CLIENT: RTA Dubai Metro LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.2A
P R OJE C T E X PE R IENC E CLIENT: RTA Dubai Metro LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.2B
P R O JE C T E XPE RIE NCE CLIENT: Kempenski, Mall of Emirates LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3A
PR OJE C T E X PE R IENC E CLIENT: Al Murooj Rotana LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3B
PR O JE C T E XPERIEN C E CLIENT: Conference Palace LOCATION: Abu Dhabi, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3C
PR OJE C T E X PE R IENC E CLIENT: Madinat Jumeirah LOCATION: Dubai, United Arab Emirat es
Emirates Neon Group - Pre Qualification
2.1.3D
P R OJE C T E X PE R IENC E CLIENT: Madinat Jumeirah LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3E
PR O JE C T E X PE R I E N C E CLIENT: Traders Hotel LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3F
PR O JE C T E X PE R I E N C E CLIENT: Novotel Hotel LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3G
P R O JE C T E X PE R I E N C E CLIENT: Shangrila Hotel LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3H
P R O JE C T E X PE R I E N C E CLIENT: Shangrila Hotel LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3I
P R O JE C T E XPE RIENC E CLIENT: Grand Hyatt Dubai LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3J
P R OJ E C T E X PE R IENC E CLIENT: Grand Hyatt Dubai
Emirates Neon Group - Pre Qualification
2.1.2J
LOCATION: Dubai, United Arab Emirates
P R O JE C T E X PE R I E NC E CLIENT: Hilton LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3K
P R O JE C T E XPE RIENC E CLIENT: Le Meridien, Al Aqqa Beach LOCATION: Fujairah, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3L
PRO JE C T E X PE R I E N C E CLIENT: Fairmont Hotel LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3M
P R OJE C T E X PE R IENC E CLIENT: Fairmont Hotel LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3N
P R O JE C T E X PE R I E NC E CLIENT: Taj International Hotel LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3O
P R O JE C T E XPE RIE NCE CLIENT: Ritz Carlton Hotel LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3P
PRO JE C T E X PE R I E N C E CLIENT: Dubai Marine Beach Resort LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3Q
P R O JE C T E XPE RIENC E CLIENT: Emirates Tower Hotel LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3R
P R OJ E C T E X PE R IENC E CLIENT: Emirates Tower Hotel LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.1S
PRO JE C T E X PE R I E N C E CLIENT: Hyatt Regency Muscat LOCATION: Muscat, Sultanate of Oman
Emirates Neon Group - Pre Qualification
2.1.3T
P R OJ E C T E X PE R IENC E CLIENT: Hyatt Regency Muscat
Emirates Neon Group - Pre Qualification
2.1.2T
LOCATION: Dubai, United Arab Emirates
P R OJE C T E X PE R IEN C E CLIENT: Anantara Resort & Spa LOCATION: Abu Dhabi, United Arab Emirates
ABC Industries - Pre Qualification
2.1.3W
P R OJE C T E X PE R IEN C E CLIENT: Anantara Resort & Spa LOCATION: Abu Dhabi, United Arab Emirates
ABC Industries - Pre Qualification
2.1.3X
PR OJE C T E X PE R IENCE CLIENT: Al Busta n LOCATION: Abu Dhabi, U nited Arab Emirates
BOULEVARD
2.1.3U
SHORT TERM PARKING 15 MIN ONLY
á≤zbO 15 §≤a
MEETING@
302¤ G E301
301 to 302
304¤ G E303
303 to 304
VACANT
R
04
.4
401 - 411 áaô`Z Rooms 401 - 411
412 - 420 áaô`Z Rooms 412 - 420
Emirates Neon Group - Pre Qualification
OCCUPIED
P RO JE C T E X PE RI E N C E CLIENT: Al Bustan LOCATION: Oman
Emirates Neon Group - Pre Qualification
2.1.3.1Z
P R OJ E C T E X PE R IENC E CLIENT: Al Bustan LOCATION: Oman
Emirates Neon Group - Pre Qualification
2.1.3.2Z
PR O JE C T E X PE R I EN C E CLIENT: Marriott LOCATION: Mirbat Salalah, Sultanate of Oman
2.1.3V
|eóîà°ùŸ á¶MÓe äGQÉz°ùdG ∞bGƒe πª– πÑ≤j ø dä ƒjQÉe ™é àæe .á °UÉÿGºμàzdhƒD°ùe ∏YIQÉz°ùdG∞zbƒJ Ü Éë °UGø e Ö ∏£j .∂ dòdá é zàf IQÉ°ùN hG CQô°V…G Cø Yá zdhƒD°ùŸG .á Wô°ûdGä É£∏°ùdIQÉ°ùN hG Cç OÉM…G Cø YÆÓH’EGä GQÉz°ùdG ΩGhOä ÉYÉ°S êQÉN ä ƒjQÉe ™é àæe ä GQÉz°S ∞bƒe ‘ á Øbƒàe IQÉz°S…G C .É¡ ÑMÉ°Uá zdhƒD°ùe h á ≤Øf ∏Y∫ GõJ ± ƒ°S ÅWÉN πμ°ûHhGπª©dG Gôμ°T äƒjQÉe ™éàæe
Notice To Car Park Users Vehicles are parked entirely at own risk. Marriott Resort will not accept responsibility for any damage or loss incurred. Users are required to report any accident or loss to the Police authorities. Any vehicle parked in Marriott Resort Car Park outside of Resort hours or not parked in proper deisgnated parking space shall be liable to removal at owner’s risk and cost. Thank You Marriott Resort
Emirates Neon Group - Pre Qualification
™ªéàdG á£≤f
Assembly Point
P RO JE C T E X PE RIE NC E CLIENT: Fairmont Hotel, Bab Al Bah r LOCATION: Abu Dhabi, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3Y
P RO JE C T E X PE R I E NC E CLIENT: The Address Hotel LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.3Z
P R O JE C T E X PE R I E N C E CLIENT: Khalifa Stadium LOCATION: Doha
Emirates Neon Group - Pre Qualification
2.1.4A
P R O JE C T E X PE R I E N C E CLIENT: Khalifa Stadium LOCATION: Doha
Emirates Neon Group - Pre Qualification
2.1.4B
P RO JE C T E X PE R I E N C E CLIENT: Burjuman LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.5A
P R OJ E C T E X PE R IENC E CLIENT: Burjuman
Emirates Neon Group - Pre Qualification
2.1.2A
LOCATION: Dubai, United Arab Emirates
PR O JE CT E X PE R I E N C E CLIENT: Al Forzan LOCATION: Abu Dhabi, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.5B
P R OJE C T E X PE R I ENC E CLIENT: City Centre LOCATION: Manama, Bahrain
2.1.5C
¥ ƒ````°ù`d G THE SOUQ
I QGO’EGÖ àμ e MAN AGEM ENT OFFI CE
∫ÉLQ
MEN
q °üe äGóz°ù∏d ∏ äÉeɪM WOMEN’ S PRAYER ROOM RESTROO MS
á za É° VG E∞ bGƒe
To Other Levels
Exit
ºz∏°ùàdG á≤£æe
Delivery Yard
1 ∫ɪ°ûdG
South 1
Emirates Neon Group - Pre Qualification
∫ÉLQ
Men
∫ÉLQ
MEN
PR O JE C T E X PE R I EN C E CLIENT: City Centre LOCATION: Muscat, Sultanate of Oman
2.1.5D
≈∏°üŸG
Prayer Rooms
ä Ée Ó©à°SG E
45
Information Desk
45
Qƒ`aQÉ`c
√ÉzŸG äGQhO Rest Rooms
TENANTS NAME
Carrefour 45 45
ázFÉHô¡c ⁄Ó°S Escalator
TENANTS NAME TENANTS NAME
ázFÉHô¡c ⁄Ó°S Escalator
Qƒ`aQÉ`c
TENANTS NAME
Carrefour
TENANTS NAME
∞`bƒ`e
PARKING
Emirates Neon Group - Pre Qualification
PR O JE C T E X PE R I E N C E CLIENT: Khalidiya Mall LOCATION: Abu Dhabi, United Arab Emirates
2.1.5E
main entrance
Management Office
Emirates Neon Group - Pre Qualification
P R O JE C T E X PE R I E N C E CLIENT: Al Wahda Mall LOCATION: Abu Dhabi, United Arab Emirates
2.1.5F
gO ŸdG
e
Lift Lobby U3 3 U2 2 U1 1 UG G YOU ARE HERE B LB
G
â GQ …´ ˘dG∞ bG …e §≤ a
Parking Only
â GQ …´ ˘dG∞ bG …e §≤ a
Parking Only
â GQ …´ ˘dG∞ bG …e §≤ a
Parking Only
â Q…c O…a-„ B Ì G± GŸ U - Fıå
Food Court - ATM - Retail â GQ …´ ˘dG∞ bG …e §≤ a
Parking Only Fıå
Retail â GQ …´ ˘dG∞ bG …e §≤ a
Parking Only
Ç cQÖe ª j Ög - „ B Ì G± GŸ U - Fıå
Mosque - ATM - Retail â GQ …´ ˘dG∞ bG …e §≤ a
Parking Only Ç cQÖe ª j Ög
Hyper Market
CARPARK
MALL
LB, G, 1 & 2
âÖ j É ‡˘ ü GØ e É ˘ ‡ dGı c Ÿe ∫ƒ NO
Access to Mall on Levels LB, G, 1 & 2
ı c Ÿe
Mall Directory
Map of the Mall
Emirates Neon Group - Pre Qualification
P R O JE C T E X PE R I E N C E CLIENT: Emarat Petrol Station LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.6A
P R OJ E C T E X PE R IENC E CLIENT: Emarat Petrol Station LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.6B
PR O JE C T E X PE R I E N C E CLIENT: Enoc Filling Station LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.6C
P R OJ E C T E X PE R IENC E CLIENT: Enoc Petrol Station
Emirates Neon Group - Pre Qualification
2.1.1D
LOCATION: Dubai, United Arab Emirates
P R OJ E C T E X PE R IENC E CLIENT: Top Foam LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.6E
P R O JE C T E X PE R I E N C E CLIENT: Al Dar Besix - Ferrari World
Emirates Neon Group - Pre Qualification
2.1.4A
LOCATION: Abu Dhabi, United Arab Emirates
P RO JE C T E X PE R I E N C E CLIENT: Grand Cineplex LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.7B
P R O JE C T E X PE R I E NC E CLIENT: Al Ghurair Center Mall/ Residences/ Offices/ Carparking
Emirates Neon Group - Pre Qualification
2.1.7C
LOCATION: Dubai, United Arab Emirates
P R OJ E C T E X PE R IENC E CLIENT: Al Ghurair Center
Emirates Neon Group - Pre Qualification
2.1.6D
LOCATION: Dubai, United Arab Emirates
P RO JE C T E X PER I E N C E CLIENT: Bahrain Financial Tower
Emirates Neon Group - Pre Qualification
2.1.7E
LOCATION: Manama, Bahrain
P R OJ E C T E X PE R IENC E CLIENT: Bahrain Financial Tower LOCATION: Manama, Bahrain
Emirates Neon Group - Pre Qualification
2.1.7F
P R O JE C T E X PE R I E N C E CLIENT: Dubai British School LOCATION: Dubai, United Arab Emirates
Emirates Neon Group - Pre Qualification
2.1.7G