HIU FAI CHOI - PM's Library Week4

Page 1

Reading: • Dispersion and the Encyclopaedic (Towards New Techniques for the City, in backlog 1989, by Ian McDougall • Originality, in Transition #47, by Michael Markam • Contradiction Adapted in Complexity and Contradiction in Architecture (The Museum of Modern Art, New York, 1966), by Robert Venturi • The History Wars – The Monthly, by Robert Manne • Movie: Dons Party – 1976 Australian Film • Research: Examples of Australian domestic and institutional architecture • Debate: “More Ideas Less Refinement” • Design: Camp David

week 4: camp david design


International Style Architecture 1950s

Examples

1978s

oppotunities

Present

- The idea of landscape continuity

- Material interpretation: Glass

The transition between Public & Private

Accessibility

design aimming approach scope

Mies van der Rohe

Method: Free floor plan

Issue: How to provide an adequate privacy responds in spatial hierachy

Le Cobusier

Method: Lifting up from ground

Issue: How to activate the vacant space


Material Interpretation - Glass

PRIVATE

Private Classical

revolution & process

PRIVATE

Public Modern


01. columns (type 1) & landscape contiunity villa savoye, by le cobusier, 1928 -31


ned kelly series, by sidney noland “return the beauty of the australian landscape continurity�


02. columns (types 2) & landscape contiunity casa farnsworth, by mies van der rohe, 1949 -50


design method: - constuction possibility - columns (types 2) & steel columns - columns & spatial planning “return the beauty of the australian landscape continurity�


Programme order & spatial hierachy

Transition space from semi-public to private Vacant space re-activation

PRIVATE 5 Private

Community

Studio

Private

4

Enclosed Garden Activation

Entrance X

Green Vacant space re-activation

3

2 Living area

01. Featherston House, 1968, inner suburb of Melbourne by Robin Boyd

1


Programmes Order & Spatial hierachy 0

Carpark

outside semi - outside

DINING

public 1

activate the entile space

LIVING ROOM threshold 2

POOL + GARDEN

STUDIO

Private

BEDROOM

3

activate the entile space

Movement & Architectural Elements Garden 1

2 LIVING ROOM

DINING

Fire place

Garden

0 3 4

STUDIO

BEDROOM Garden


Open plan & Mobility + Structural characteristic

Material: Light weight bottom verses Heavy top Mies’s open floor plan method

Heavy

Roof

Window Glazing Light

02. Daby’s Bay Victoria, 1959 by Grounds, Romberg and Boyd


Transition space & Hierachy

LANDSCAPE

PRIVATE 2

2

3

COMMUNITY SPACE PRIVATE 1 3

1 OUTSIDE


Landscape continuity & Spatial hierahy

Reference: Le cobusier project: Savoye Adaptation: Australian Landscape

PRIVATE

ACCESS SEMI PRIVATE

03. Rose Seidler House,1948-50 by Harry Seidler

SEMI PRIVATE

ACCESS

PRIVATE


Accessibility: landscape & private Wall types & inter - relationship with spatial hierachy

landscape

landscape Semi- Public PRIVATE

PRIVATE

landscape

Private

Stone wall - defind building on landscape Partition wall defind spatial between landscale and private

landscape First Floor Plan - Landscape & Private

landscape Private

S ACCES

Diagram 2 - Accessing

Private

Private S CE AC

S

landscape

Private

landscape

landscape

Diagram 1 - Accessing

Diagram 3 - Accessing

landscape


Landscape continuity & Material interpretation

The level of freedom on public accessability The emerage from classisal (enclose space) into modern (open space)

SOLID

Unite d Habitation, 1952, Marseille by LeCorbusier

GLAZING

landscape continuity

04. Imperial Chemical Industries House (ICI), 1955 – 58, by Bates, Smart


Public accessability & programme orders + lift up ground methord Spatial transition between Public & Private

PUBLIC

Garden Private

Private

Community area & flexible programme

PUBLIC

Private


Lift Up Ground & Construction Technique

The flexible function on an open ground floor The interrelationship between two seperate wings & the cntral court

ADMI

05 Menzies College at La Trobe University, 1968 by Robin Boyd

COURT

RIGHT WING

RIGHT WING

LEFT WING

COURT

LEFT WING

COMMON


Mobility & Spatial distance

Methord: Mobility & negative space resulted in circulation development

PUBLIC

PRIVATE

SEMI PUBLIC

PRIVATE

PUBLIC

Circulation & Programmes order

PUBLIC

PUBLIC

PRIVATE

PUBLIC COURT

PRIVATE

PRIVATE

COURT

PRIVATE

PUBLIC

Mobility & negative space


Lift Up Ground & Spatial control

Extrior structural steel framing

I

I

FREE FLOOR PLAN

I I I

I

CORE

FREE FLOOR PLAN

I

I

+

PRIVATE

I

PRIVATE

I

I I

Public

Public

spatial clarity =

vacant space subtraction + construction technique

06 BHP House, 1974 , William Street by Yuncken Freeman


Spatial Maximize - Spatial equality between Public & Private 6 OFFICE OPEN PLAN 5 OFFICE OPEN PLAN

4 OFFICE OPEN PLAN 3 OFFICE OPEN PLAN

2

OFFICE OPEN PLAN

1

= PUBLIC OPEN PLAN

PUBLIC

PUBLIC

0


method summerise

columns order & spatial planning spatial hierachy define public & private landscape contiunity lift up from ground constuction possibilirty


Debating: “More ideas and less refinement�


CARLO SCARPA - REFINEMENT BRINGS THE CLARITY OF IDEA -

01. The clarity of idea on Carlo’s projects seeks to refine the harmony (material)


- REFINEMENT BRINGS THE HARMONY OF IDEA -

Brion Tomb, Italy, by Carlo Scarpa


Liège-Guillemins TGV Station, Liège

The Milwaukee Art Museum

Santiago Calatrava 02. The clarity of idea on Santiago’s project seeks to refine harmony (construction)

Puente del Alamillo


Capsule Tower revolution Caputle hotel

03. poorlest refinement on idea - In-plug unit


8 HOUSE BY BIG

05. approaching the refinement on idea: void-reactivation

Robinhood Garden


Building Moduler

06. less refinement & cho

Massive production


03. camp david design robert gordon menzies & national leaders FCAATSI Delegation meeting with Prime Minister Menzies in September 1963


3 5 61

13 7

residential

residential

68 59 71

73

jeparit train line

ill

t rd

residential

site boundary

25 34

nh

ill

residential

-jepa ri

t rd

53

13 40

38

38

residential

vancancy 1

45 54

tr ee t

commercial 39-43

ro ys

23

tr ee t

lot 50

-jepa ri

ro ys

nh

35

39

48-50

commercial 23 42

site plan 1:1000 N

jeparit

36

community reactivation - jeparit

Vacancy 2

site condition - jeparit

responds to

materiality, color & spatial hierachy


spatial hierachy & clumns order meeting

private

office & guet room

semi private

underground

PM OFFICE

b

up

up

void

c up

DOWN

a

public

open garden

NICE SPOT

RELAXING AREA

underground

GUEST PRIVATE

VIEW POINT basement - summit space

SECOND FLOOR PLAN

private

summit space

GROUND FLOOR PLAN

PERSPECTIVE VIEW


ROBERT GORDON MENZIE CAMP DAVID

GUEST PRIVATE ROOM open garden

PRIVATE MEETING ROOM summit room

PM’S OFFICE open garden

private semi private public private PERSPECTIVE VIEW


method 2 steel columns & framming

method 1 concrete columns & space second floor

first floor

ground floor

basement

axo diagrams



END WEEK 4


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.