SECTION A-A_SCALE 1:100

3


TECHNICAL SYSTEMS

1. TWO COATS BITUMINOUS ALUMINIUM PAINT FINISH ON ONE LAYER DERBIGUM SP4 WATERPROOFING MEMBRANE ON MIN. 30mm “POLITERM BLU” THERMAL INSULATING SCREED WITH 45° FILLET ON ENDS LAID @ MIN. 1:80 FALLS AND CROSS-FALLS TO FULL BORE OUTLETS ON 300mm RC STORM-WATER CHANNEL TO ENG. DETAIL 2. KLIP-LOK 700 ® ROOF SHEETING FIXED WITH NO.10 - 16 x 16mm LONG SELF-DRILLING WAFER HEAD PH2 SCREWS ON 75 x 50mm GALVANISED STEEL LIPPED ‘Z’ SECTION PURLIN @ 950mm C/C ON REFLECTIVE FOIL LAMINATE ON 250mm POLYISOCYANURATE (PIR) INSULATED ROOF PANEL FIXED TO (PIR) INSULATED WALL PANELS ON EACH END 3. 12mm FLUSH-PLASTERED AND PAINTED CEILING ON 6.4mm GYPSUM PLASTERBOARD FIXED TO 38 x 38mm S.A.P BRANDERING @ MIN. 600mm C/C FIXED TO 228 x 50mm S.A.P WALL-HUNG CEILING JOISTS 4. 90 DEGREES 50 x 228 x 2mm STEEL TRUSS HANGER 5. 500 x 600mm RC RING BEAM TO ENG. DETAIL 6. KLIP-LOK ROOF SHEETING FIXED WITH NO.10 - 16 x 16mm LONG SELF-DRILLING WAFER HEAD PH2 SCREWS ON 75 x 50mm GALVANISED STEEL LIPPED ‘Z’ SECTION PURLIN ON REFLECTIVE FOIL LAMINATE ON 250mm POLYISOCYANURATE (PIR) INSULATED WALL PANEL 7. 230mm STOCK BRICK WALL PLASTERED ON BOTH SIDES 8. NUTRIENT FILM TECHNIQUE HYDROPONIC FARMING SYSTEM 8a. Ø100mm PVC PLANTING STEPS 8b. 380 x 450mm WATER PUMP 9a. ALUMINIUM PLATE BOX WINDOW TRIM WITH A 130mm PROTRUSION FIXED TO UNDERSIDE OF RC RING BEAM AND UNDERSIDE OF CUSTOM PRE-CAST WINDOW SILL 9b. ALUMINIUM BENT PROFILE WINDOW SILL SCREWED TO CUSTOM PRECAST CONCRETE SILL ON DPC. 9c. 290mm FACE-BRICK VENEER CAVITY WALL WITH 30mm RIGID INSULATION WITH GALVANISED BUTTERFLY WALL TIES & BRICK-FORCE AT EVERY 4 COURSES TO ENG. DETAIL. BRICK VENEER SUPPORTED ON 120 x 120 x 8mm STEEL EQUAL SHELF ANGLE. BRICKS PLACED 40mm AWAY FROM RC STRUCTURAL FRAME 10. DOUBLE WALL CAVITY STORAGE SPACE 11. 750 x 455mm WOODEN PLANTER ON STEEL STAND FIXED TO STEEL CHANNELS FIXED TO SLAB EDGE WITH PEIKKO® STEEL THERMALLY INSULATED BALCONY CONNECTOR TO MANUFACTURER’S SPECIFICATION AND DETAIL 12. PLANTER DRAIN CONNECTED TO 10 x 75mm GALVANISED STEEL SQUARE DOWN-PIPE 13. 290mm FACE BRICK CAVITY WALL WITH 30mm RIGID INSULATION WITH GALVANISED BUTTERFLY WALL TIES & BRICKFORCE AT EVERY 4 COURSES TO ENG. DETAIL. 14. 500 x 500mm OUTDOOR CERAMIC TILES ON ONE LAYER DERBIGUM CG4/CG3 WATERPROOFING MEMBRANE PLACED IN BETWEEN CEMENT SCREED & TILE MORTAR BED WITH MINIMUM THICKNESS OF 45mm. 15. STEEL TRELLIS MESH WELDED TO STEEL C-CHANNEL OF RAISED PLANTING BED 16. MIN 45mm CEMENT SCREED LAID TO MIN. 1:80 FALL TO STAINLESS STEEL LINEAR DRAINAGE CHANNEL TO Ø100mm PVC DRAINAGE PIPE ENCASED IN 500 x 500mm RC COLUMN TO PLANTER BELOW 17. 330mm FACE-BRICK CAVITY WALL WITH 110mm WEAK CONCRETE INFILL TO ENG. DETAIL. 18. CERAMIC TILES ON MIN. 40mm SCREED ON 255mm RC SLAB 19. 203 x 133mm STEEL I-BEAM INTERMEDIATE SUPPORT FOR GLASS BLOCK FLOOR 20. 500 x 500mm RC COLUMN 21. 140mm DRYWALL MARKET STALL PARTITIONS 22. DIMPLED DRAINAGE MEMBRANE ON TORCH-ON WATERPROOFING MEMBRANE ON BITUMINOUS WATERPROOFING MEMBRANE ON ELASTOMERIC – WASHED 400mm RC RETAINING WALL TO ENG. DETAIL 23. CERAMIC FLOOR TILES ON MIN. 40mm CEMENT SCREED ON 170mm RC RAFT FOUNDATION TO ENG. DETAIL ON DPM ON CONTINUOUS BITUMINOUS WATERPROOFING MEMBRANE ON 80mm SAND-BINDING LAYER ON WELL-RAMMED HARDCORE 24. 870mm RC RAFT FOUNDATION EDGE BEAM TO ENG. DETAIL 25. WASHED DRAINAGE FILL AROUND Ø100mm AGRICULTURAL DRAIN WRAPPED IN BIDEM CLOTH, TOPPED WITH GEO-TEXTILE DRAINAGE FABRIC TO PREVENT FINER MATERIAL FROM SETTLING IN THE DRAINAGE LAYER 26. 1:12 REINFORCED CONCRETE DISABLED ACCESS RAMP TO ENG. DETAIL ON CONTINUOUS BITUMINOUS WATERPROOFING MEMBRANE ON SAND-BINDING LAYER ON WELL-RAMMED HARDCORE

Perimeter Section 4


DETAILS

Detail 1: SIP wall panel to storm-water channel connection detail 5


DETAILS

Detail 2: SIP roof panel to wall panel connection detail 6


DETAILS

Detail 3: SIP wall panel to ring beam connection detail 7


African Union Embassy in Braamfontein

8

2019


700

Custom made precast concrete coping with drip groove laid onto 'Derbigum' acrylic torch-on counter flashing / cementitious bandage or any other approved SABS product to be installed by approved contractor with at least 10 year guarantee (to overlap torch-on waterproofing on parapet wall) 400 x 2515mm RC Upstand Beam to engineer's detail

Corobrik Firelight Travertine FBS Face Brick Standard Facade

120x120x8mm steel angle bolted on to RC Upstand Beam. All to Structural Engineer's specification and detail.

100x100x10mm mild steel I-beam section

125

180

400

890

300

250

Corobrik Firelight Travertine FBS Face Brick Standard Facade

60

110

170

Intensive trafficable green roof: Grass & plant cover on 250mm extensive single-course substrate, on 300mm mineral subsoil substrate, on bidem cloth, on gravel, on ziplock drainage mat, on protection course, on roof seal, on 10mm High Density Polystrene thermal insulation, on 'Derbigum' torcheon waterproofing, on structural screed laid @ min 1:80 fall to cast iron full bore outlet, on 525mm RC slab

525

100

45° screed fillet with torch-on waterproofing on top

425

Cast Iron Full bore outlet

Ø100mm HDP Raimwater downpipe running through the slab and down the column

2050

525mm RC waffle slab

20mm polyethylene filler (expansion joint)

1000

HVAC pipes and other services to run within suspended ceiling void

230mm load-bearing wall

Ø100mm HDP Raimwater downpipe running through the slab and down the column

120x100x8mm mild steel shelf angle bolted to the wall

10 230

645

100x100x10mm mild steel I-beam section 100x100x10mm stainless steel T-section bolted to steel I-beam section

38x38 SAP battens fixed to underside of steel shelf angle and fixed to top of steel T-section

6mm gypsum ceiling board screwed to 38x38mm SAP battens

RC lintol

DETAIL 1 SCALE 1:5

Detail section of Rooftop Garden

Aluminium framed glazing system. All fixing brackets as per manufacturer's details

8mm Glass window with aluminum framing finished with natural anoxidation

9


10130

Custom made precast concrete coping with drip groove laid onto 'Derbigum' acrylic torch-on counter flashing / cementitous bandage or any other approved SABS product on RC Upstand beam

1665 x 400mm RC USB

1330

1240

Cast iron full bore outlet Ø 19/25mm crushed stone on derbigum torch-on waterproofing or any other similar SABS approved product applied by approved specialist with at least 10 year guarantee on 30mm EPS rigid insulation on vapour control membrane on screed laid to minimum 1:80 fall to cast iron full bore outlet on 525mm RC Waffle Roof Slab to engineer's detail

+52.700 m T.O.C Roof Slab 525

10mm safety toughened single glazed curtain wall supported by 80x200x80mm aluminum mullions to facade eng. detail

200mmx80mm aluminum mullion supported by 200x100mm aluminum beam to engineers detail 1570

50mm Aerolite Think Pink Insulation on suspended ceiling

50 x 50 x 10mm steel shadowline cornice

200mmx100mm dark black anodized aluminum beam or any alternative to support mullions all to facade engineers details with end cap to conceal junction between mullion and beam

HVAC pipes and other services to run within suspended ceiling void Gyproc Celotex Fine Fissured mineral fibre ceiling tiles, size 1195x5950x15mm thick Donn® T38FR ceiling grid consisting of Donn® T38FR main tees and Donn® QRC T32V cross tees, all suspended with 19mm strap galvanised suspension hangers at hanger centres not exceeding 1200mm.

MULTI-PURPOSE HALL WOODEN FLOOR TILES FFL: +10 240

6675

6625

110mm facebrick breathable skin

65x120mm aluminium sliding door top rail frame

12mm MDF Leeyin® grooved sound absorbing panels fixed to 38mm SAP timber batten subframe fixed to 340mm cavity wall

DETAIL 3 3700

5800

45mm Isowall Wall Insulation Cavity

RECORDING STUDIO E CARPETS FFL:

+46 390

65x120mm aluminium sliding door bottom rail frame

Corrugated roof sheeting fixed with 'clearfix' screws to steel bracket fixed on 340mm cavity wall

400x400x10mm Terrazzo tiles on one layer Derbigum CG4/CG3 waterproofing on screed laid to min 1:80 fall to Ø50mm PVC pipe weep hole placed in brick upstand

Ø50mm PVC weep hole placed in brick to drain balcony

+15.240 m Carpet on 40mm screed

525

T.O.C Second Floor

DPC laid on top of mortar fillet to fall to cavity weep hole 110mm brick screen on 8mm steel shelf angle fixed to 525mm RC waffle slab to engineer's detail

525mm RC waffle slab 685

+46.425 m

525

T.O.C Seventh Floor

6mm gypsum ceiling board fixed to 38 x 38mm SA Pine brandering fixed to 152 x 50mm SAP timber joist

Exposed slab and services

50 x 50 x 10mm steel shadowline cornice

4475

Gyproc Celotex Fine Fissured mineral fibre ceiling tiles, size 1195x5950x15mm thick Donn® T38FR ceiling grid consisting of Donn® T38FR main tees and Donn® QRC T32V cross tees, all suspended with 19mm strap galvanised suspension hangers at hanger centres not exceeding 1200mm.

LIBRARY

4415

HVAC pipes and other services to run within suspended ceiling void

CARPET FFL: +10 240

Frameless glass pop-out window box

3145

1000

50mm Aerolite Think Pink Insulation on suspended ceiling

12mm toughened glass Steel angle balustrade with 3.2mm High quality marine grade stainless steel wire tightened with an M5x3.2mm jaw&jaw bottle screw

12mm MDF Leeyin® grooved sound absorbing panels fixed to 38mm SAP timber batten subframe fixed to 340mm cavity wall

595

300mm RC slab on 950x300mm RC upstand beam

CARPET 4460

1450

1080

RECORDING STUDIO B FFL:

Window seat

DETAIL 4

45mm Isowall Wall Insulation Cavity

+40 440

Storage cupboard

+10.240 m

525

50

T.O.C First Floor Corrugated roof sheeting fixed with 'clearfix' screws to steel bracket fixed on 340mm cavity wall

Off shutter 525mm RC waffle slab with chamfered edges and 40mm Drip Grove to Engineer's Detail

DPC laid on top of mortar fillet to fall to cavity weep hole

+40.445 m T.O.C Sixth Floor

1000

525mm RC waffle slab

5143

1000 x 1750mm RC beam

Ø50mm drip in RC Slab

1000x800mm RC beam

165x50mm dark black anodized aluminum beam or any alternative to support mullions all to facade eng. details with end cap to conceal junction between mullion and beam

Ø800mm slanted RC Column

7825

Curtain wall

EXHIBITION

CERAMIC FLOOR TILES FFL: +1 840

11230

280

800

VEGETATION FFL: +28 440

DETAIL 1

Intensive trafficable green roof: Grass & plant cover on 250mm extensive single-course substrate, on 300mm mineral subsoil substrate, on bidem cloth, on gravel, on ziplock drainage mat, on protection course, on roof seal, on 10mm thermal insulation, on 'Derbigum' torcheon waterproofing, on screed laid @ min 1:80 fall to cast iron full bore outlet on 525mm RC slab

40°

Custom precast concrete coping on mortar bed on 230x935mm non-structural masonry wall on 525mm RC waffle slab

Custom made precast concrete coping with drip groove laid onto 'Derbigum' acrylic torch-on counter flashing / cementitous bandage or any other approved SABS product on RC Upstand beam

Ø800mm slanted RC Column

3630mm high TURNSTAR Curved Glass turnstile / automatic revolving door to manufacturer's specifications 300x300x14mm Terrazzo tiles on one layer Derbigum CG4/CG3 waterproofing on min 40mm screed laid to min 1:80 fall on 385mm RC Slab to eng. detail

+1.840 m

20mm concrete pavers on Compacted Earth fill in 150mm layers

T.O.C Ground Floor 385

Cast iron full bore outlet

2350

ROOF GARDEN

1007

1000

45° screed fillet with torch-on waterproofing to engineer's detail

2515x400mm RC upstand beam 555mm RC slab

+28.440 m 800x1000mm RC transfer beam

T.O.C Fourth Floor

Ø100mm HDP Raimwater downpipe running through the slab and down the column

900

3940

900

5030

20mm Polyethylene filler (Expansion joint)

400

Tanked Excavation Basement detail shown

1525

BASEMENT PARKING SCREED FFL:

-1 560

2840

3285

Facebrick slanted wall HVAC pipes and other services to run within suspended ceiling void

Ø500mm piles seen in elevation with gunnite spray over it Derbigum Torch-on waterproofing with at least 10 year guarantee or any other similar SABS approved product 450 x 900mm RC Column 40mm protective screed on 255mm RC structural floor on DPM laid on top of 100mm concrete base on top of 150mm binding layer on top of 150mm gravel laid to fall to Ø110mm agricultural drain wrapped in bidem cloth

Glass window with aluminum framing finished with natural anoxidation

LANGUAGE LEARNING CENTRE

T.O.C Basement

255

2195

-2.000 m Facebrick Facade sitting on 100x100x10mm mild steel I-beam section bolted to concrete slab and concrete upstand beam

630

3195

3245

CARPET FFL: +23 440

400

60x160mm aluminium window frame on steel window sill laid on top of DPC

SW Channel

RC DSB to eng. detail Pile Cap to eng. detal

Gravel backfill to engineers detail

Custom precast concrete window sill 15mm porcelain tile internal sill 800

Ø110mm agricultural drain pipe

230mm masonry wall 995

Bidem cloth wrapped around agricultural drain

1mm self-levelling epoxy on primer on 45mm concrete screed on 255mm RC slab to eng. spec.

+23.440 m T.O.C Third Floor

Bidem cloth put down to engineer's spec.

Pile to eng. detail

525

DETAIL 2 525mm RC waffle slab

PERIMETER SECTION SCALE 1:25

1000

450mm 10mm safety toughened glass spandrel panel supported by 200mmx55mm aluminum mullions all to facade engineers detail

HVAC pipes and other services to run within suspended ceiling void

10

Mineral Wool 70mm high density thermal and sound insulation to manufacturers specification 55mmx75mm wide aluminum shadow line cornice fixed to aluminum mullion

Perimeter Section


Ø 100mm HDP RWDP encased in 800 x 800mm RC column to drain to street

Ø 100mm HDP RWDP encased in 800 x 800mm RC column to drain to street

Ø 50mm overflow outlets placed 20mm above F.F.L of Flat Roof

f.b.o

f.b.o

f.b.o

f.b.o

Full bore outlet

Ø 50mm overflow outlets placed 20mm above F.F.L of Flat Roof

KEY: f.b.o = Fullbore Outlet

Fall Grass

Ø 50mm overflow outlets placed 20mm above F.F.L of Flat Roof

Ø 100mm HDP RWDP encased in 800 x 800mm RC column to drain to street

Slanted Columns above Ø 100mm HDP RWDP encased in 800 x 800mm RC column to drain to street

230 x 850mm brick wall dividing green roof containers

Container 3

Container 4

f.b.o

Container 5

Container 6 f.b.o

Ø 50mm overflow outlets placed 20mm above F.F.L of Flat Roof

ROOF A INTENSIVE GREEN ROOF

Ø 50mm overflow outlets placed 20mm above F.F.L of Flat Roof

1360mm high RC parapet wall with precast cooping with drip groove laid on to of acrylic flashing or any other similar SABS approved product

Container 2

Timber decking

ADDITIONAL NOTES:

Area of Ø 100mm RWDP: = π(r)² = π(5 cm)² = 78.55 Therefore, Ø 100mm RWDP can take 78.55 m² of the roof area. Roof A:

Total Area = 632 m² Area of Timber Decking = 245 m² Area of Green Roof = 366 m²

f.b.o

Number of RWDP's: Ø 100mm HDP RWDP encased in 800 x 800mm RC column to drain to street

Container 1

Container 7

1:12 RAMP 2 1 T: 400 mm R: 170 mm

·

Timber Decking: 245 m² / 78.55 m² = 3.11 RWDP's Therefore, 3-off RWDP's & 2-off overflow pipes required.

·

Grass: 366 m² / 78.55 m² = 4.6 RWDP's Therefore, 5-off RWDP's & 4-off overflow pipes required.

·

Total Area: 632 m² / 78.55 m² = 8.04 RWDP's Therefore, 8-off RWDP's & 7-off overflow pipes required.

ROOF PLAN SCALE 1:20

Rooftop Garden Plan 11


Plant Control Room at the Coal Mine Infrastructure in Belfast

2018

PROJECT DESCRIPTION

Client: EXXARO Work for NPN Architects I was involved in updating working drawings for development of some of the buildings on a coal mine in Belfast, Mpumalanga.

3D Views 12


3

4

6

C

NBC-ARP-AR-0174

7

8

9

B

NBC-ARP-AR-0174

10

A

11

12

A

C

NBC-ARP-AR-0174

NBC-ARP-AR-0174

13

230

3985

230

3510

UPS/ SERVER ROOM

110

STAIR CASE TO D7 ENGINEER DETAILS D18 AND SPECIFICATIONS SEE ENGINEER DRAWINGS

1

STAIR

D6 D14

FIRST FLOOR WC WC WHB

W2 W16

ROOF LINE W5 W20

SUGGESTED LIGHTWEIGHT FILL WITH MOCK CONCRETE SLAB FOR TILING

W2 W19

W3 W13

1821 220

900 220

110 110 3005

3650

230

2230

230

220

220

220 10540

230 1100

HANDRAIL TO DETAIL

UP

1m HIGH STEEL BALUSTRADE

900

B NBC-ARP-AR-0174

170mm HIGH 220mm WALL TO SUPPORT GLASS PANE

3230 230 985

10990

7910

1

GLASS PANEL FLOOR TO CEILING (SEE DHK)

2230

230 300 900

UP

FACEBRICK A: AGATE TRAVERTINE

2520

1400 110 5555

5555

2

STAIR CASE TO ENGINEER DETAILS AND SPECIFICATIONS SEE ENGINEER DRAWINGS

FACEBRICK COLOUR LEGEND:

1m HIGH STEEL BALUSTRADE

300

FACEBRICK B: ROAN TRAVERTINE

D9 D10

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

STOCK BRICK FOR PLASTER

4656

340

UR

220

220

220 110 1400

220

220 10660

3705

1735

NBC-ARP-AR-0181

WALLS TO U/S ROOF SHEETING. ENSURE TRUSSES DO NOT ALIGN. ANY CABLE PENETRATION TO BE FIRE STOPPED

230

230

01

FACEBRICK

FOR ACCESS FLOOR PARAPET AND STAIR DETAILS REFER TO SHEET 0174

1m HIGH STEEL BALUSTRADE

SF3 D11

3365

230 900 110

NBC-ARP-AR-0174

RWDP

2660

230

NBC-ARP-AR-0174

1500

UP

LANDING

110 1172 220

SF3 D02

2230

B

CONTROL ROOM

340

110 1172 110 1172 220

13560

220

14000

2

FIRST FLOOR TOC

CHROMADEK METAL ROOF SHEETING, 22.5° ROOF PITCH. STRUCTURE TO ENGINEER AND/OR MANUFACTURERS DETAILS AND SPECS. TIMBER TRUSS DESIGN DETAILS & SPECIFICATIONS BY ROOF SPECIALIST

1

10880

C NBC-ARP-AR-0174

A

SCALE 1 : 100

WALLPLATE 6120

A NBC-ARP-AR-0174

CHROMADEK METAL ROOF SHEETING, 22.5° ROOF PITCH. STRUCTURE TO ENGINEER AND/OR MANUFACTURERS DETAILS AND SPECS. TIMBER TRUSS DESIGN DETAILS & SPECIFICATIONS BY ROOF SPECIALIST

B

WALLPLATE 6120

W1a W01

3230

TOC 0

B

EAST ELEVATION IT B X O B

R ALO SYTEM EPR N AM SEC TO V EIN 1:60FW C N O FH 10Ø N E H C IT K

8 7

6 5 A

4 C

3

1

2

B D

0 1

E 9

F G

H

2

3 A

4

5 B C D

9

E 2 1

6

C

B

A

4

8

A

5

PLANT CONTROL ROOM

H F

.

. R

7

WINDOW REMOVED TO ACCOMODATE SPACE FOR TV SCREEN

B

6120

3

A

2

2

B

E

1

1

M

D

G

F

E

H J

O

N

L

K

H F

5

6 7

R

8 9

1

re

C 0 1

I R T H F

2

H F

R

A

E

4

B

C

F

G

H F

R

B

1 1

2 1

3

3 1

2

D

A

WINDOW REPOSITIONED

04

1m HIGH STEEL BALUSTRADE

B D

W3 W10

SF3 D01

W3 W09

W3 W08

3230

2100

B D F R .H

X O X B O D B B IT

1

2100

H R F

R

C

2100

IT

R H B F D

H F

B D R

B

6120

/C A

D

R

H F

A

3230

5

4

B D

IT

H F

/C A

2100

A

H D F R B 3

C

F

ER KSP EA C

R F H

TOC 0

D E

S A P M D N

W1a W07

GUTTER TO PREVENT DISCHARGE OF RAIN WATER ABOVE ENTRANCE ONLY

H E U P T A

BOE WINDOW SILL

SEW TO D RAP

W3 W18

BOE LINTOL

TOC 0

B C

P IT H C

K

A

M

FIRST FLOOR TOC 3230

B

H

G

1

ESITG R O FH B/12Y76543 D AC PIAS PEN H ELTC .TR O C SM D VH C ETN R AD

1

04

T/O RAISED ACCESS FLOOR 3400

2

A

C D 3 2

H T P I

TELPI G W

2

STEEL STAIRCASE TO ENGINEER

5

4

150m m IA.S D

4 3

SF3 D11

T/O RAISED ACCESS FLOOR 3400

A B

6

L O E T P OC T OS T D E A C

NO GUTTER TO FIRST FLOOR 100mm OVP

1m HIGH STEEL BALUSTRADE

1 4 3 2 1 7

C R S E

E T O P OS T D E T A C L O

WALLPLATE 6120

NO GUTTER TO FIRST FLOOR

110mm PVC OVP

W6 W21

CHROMADEK METAL ROOF SHEETING, 22.5° ROOF PITCH. STRUCTURE TO ENGINEER AND/OR MANUFACTURERS DETAILS AND SPECS. TIMBER TRUSS DESIGN DETAILS & SPECIFICATIONS BY ROOF SPECIALIST

E G K N Y R T O R K N E G A X O B .R T lW A D

WALLPLATE 6120

A C R S E

J

1800

B

T S .R D H F /C IA B 0 5 3 U L O

CHROMADEK METAL ROOF SHEETING, 22.5° ROOF PITCH. STRUCTURE TO ENGINEER AND/OR MANUFACTURERS DETAILS AND SPECS. TIMBER TRUSS DESIGN DETAILS & SPECIFICATIONS BY ROOF SPECIALIST

2

7060

3

1

2026

1

SCALE 1 : 100

2

SCALE 1 : 100

2890

2100

RWDP TO PROVIDE DISCHARGE OF RAIN WATER ONTO APRON SLAB ABOVE ENTRANCE ONLY

NORTH ELEVATION

FIRST FLOOR TOC 3230

GUTTER TO PREVENT DISCHARGE OF RAIN WATER ABOVE ENTRANCE ONLY

NGL

RWDP

H

SF3 D02

2890

NGL

W3 W06

2100

TOC 0

2100

2100

3230

?

2100

W2 W02

T/O RAISED ACCESS FLOOR 3400

W2 W19

590

W2 W03

W3 W13

W5 W20

1700

W2 W04

BRICK ON EDGE WINDOW SILL

2100

W2 W05

2890

FIRST FLOOR TOC 3230 6120

6120

G

T/O RAISED ACCESS FLOOR 3400

W2 W16

170

FIRST FLOOR TOC 3230

2100

2890

NO GUTTER TO FIRST FLOOR 1m HIGH STEEL BALUSTRADE

B D

SCALE 1 : 100

C NBC-ARP-AR-0174

3

GROUND FLOOR PLAN F

A NBC-ARP-AR-0174

B D

220

MALE

WHB WHB

1m HIGH STEEL BALUSTRADE

ROOF LINE LINE OVER

A D

3530

W2 W05

1. ALL LEVELS, HEIGHTS, DEPTHS AND DIMENSIONS TO BE CHECKED BY CONTRACTOR ON SITE BEFORE BUILDING. 2. ALL WORK TO BE IN ACCORDANCE WITH THE LATEST EDITION OF THE NATIONAL BUILDING REGULATIONS. 3. ALL BUILDING MATERIALS AND COMPONENTS TO BE TREATED IN ACCORDANCE WITH THE MANUFACTURERS SPECIFICATIONS. 4. FIGURED DIMENSIONS TO BE READ IN PREFERENCE TO SCALING. ELECTRICAL: ALL ELECTRICAL WORK TO BE CARRIED OUT BY A REGISTERED ELECTRICIAN. VENTILATION AND LIGHT: TO MECHANICAL AND ELECTRICAL ENG'S DETAIL TO COMPLY WITH NHBR'S. DRAINAGE NOTES: 1. WASTE FITTINGS TO HAVE RESEAL TRAPS. 2. WASTE PIPES TO BE FULLY ACCESSIBLE FOR SERVICING 3. SEWER PIPES TO HAVE IE'S AT ALL BENDS AND JUNCTIONS WITH MARKED COVERS AT GROUND LEVEL. 4. NO BENDS OR JUNCTIONS ALLOWED UNDER FLOORS OR FOUNDATIONS. 5. SEWER PIPES AND WASTE PIPES TO HAVE VENTILATION VALVES. 6. OVP'S TO BE Ø100mm PVC - OVP TOP COVER TO BE AIRVENT COWEL AS PER MARLEY OR SIMILAR APPROVED 7. ASVP'S TO BE Ø50mm PVC 8. SOIL PIPES TO BE Ø100mm PVC @ 1:60 MIN. FALL 9. WASH HAND BASIN PIPES TO BE Ø40mm 10. SINK DRAIN PIPES TO BE Ø40mm 11. ALL DRAINAGE TO COMPLY WITH PART P OF THE NATIONAL BUILDING REGULATIONS. 12. ALL DRAINAGE TO BE IN STRICT ACCORDANCE WITH THE LOCAL AUTHORITY'S BY-LAWS. 13. WHERE DRAINS RUN THROUGH WALL BRICK WORK TO BE BRIDGED WITH R.C. LINTOL/BEAM TO SATISFACTION OF LOCAL AUTHORITY FOUNDATIONS: SANS 10400 PART H ALL FOUNDATIONS AND SURFACE BEDS TO STRUCTURAL ENGINEER'S DETAILS. 250 MICRON USB GREEN UNDERLAY ON WELL COMPACTED AND POISONED FILL TO ENG'S DETAIL. DPC TO ALL WALLS WITH MIN. 100mm OVERLAPS AT ALL JUNCTIONS. INSTALL BRICKGRIP DPC TO ALL WINDOW CILLS. GUNDLE 250 MICRON DAMP PROOF MEMBRANE CARRIED UP A MIN OF 2No. BRICK COURSES ABOVE G.L. TO FORM DPC'S TO PROTECT ALL WALLS. BRICKWORK: SANS 10400 PART K - BRICKS TO BE LAID IN STRETCHER BOND WITH JOINTS NOT EXCEEDING 12mm. BRICK REINFORCING: BRICKFORCE STEEL WIRE REINFORCING TO BE INSTALLED IN EVERY COURSE OF FOUNDATION BRICKWORK FOR MIN 5 COURSES AND EVERY 3RD COURSE THEREAFTER. BRICKFORCE TO BE INSTALLED IN EVERY COURSE BELOW GROUND SLAB WHERE BRICK WALL IS 110mm. BRICKFORCE REQUIRED OVER LINTOLS. WALLS: EXTERNAL WALLS - 220mm SOLID WALLS UNLESS SHOWN OTHERWISE. INTERNAL WALLS - 110mm AND 220mm SOLID WALLS. WALLS TO UNDERSIDE OF ROOF STRUCTURE UNLESS SHOWN OTHERWISE. EXTERNAL WALLS TO HAVE STEPPED DPC'S AT FLOOR LEVEL AND AROUND ALL OPENINGS. EXTERNAL WALLS TO BE FACEBRICK AS SHOWN ON ELEVATIONS AND ALL RELEVANT DRAWINGS. PLASTER WORK: ALL INTERNAL PLASTERWORK TO BE ONE COAT CEMENT PLASTER (1:5) STEEL TROWELED SMOOTH AND ONE COAT RHINOLIGHT FINISHING PLASTER ON BRICKWORK GLAZING: GLAZING TO COMPLY WITH SANS 10400 PART N. ALL GLAZING TO BE CLEAR UNLESS OTHERWISE SPECIFIED IN ARCHITECT'S DETAILS & SCHEDULES. INSULATION: 135mm THICK THINK PINK TO SPECIALIST DETAILS & SPECIFICATION AS PER SANS 204 ROOF: 0.8mm CHROMADEK ROOF SHEETING,IBR PROFILE (686/690 PROFILE TBC) ROOF PITCH AS PER ROOF PLAN. STRUCTURE TO ENGINEER AND/OR MANUFACTURERS DETAILS AND SPECS. CHROMADEK FINISH: CHARCOAL GREY C2S FASCIA: BATTLESHIP GREY CHROMADEK GUTTERS AND DOWN PIPES: CHARCOAL GREY C2S WATERPROOFING: FOR ROOF PENETRATION DETAIL & SPECS TO ROOF SPECIALIST AS PER STANDARD CHROMADEK WATERPROOFING DETAILS PAINT: FOR ALL PAINT SPECIFICATIONS SEE SEPARATE PAINT FINISHES DOCUMENT GENERAL: ALL MATERIALS & UNCERTAINTIES REGARDING WORK TO BE CHECKED BEFOREHAND WITH ARCHITECT. ALL MEASUREMENTS & HEIGHTS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF ANY BUILDING WORK. BALUSTRADE TO BE 1000mm HIGH WITH MAX 100mm OPENINGS.

BRICK HATCH LEGEND:

D2 D15

220

W5 W20

STEEL T-SECTION TO ALLOW FOR BRICK ON EDGE LINTOL TO ENGINEER DETAILS AND SPECS 340

D6 D06

220

W3 W06

D6 D07

B

04

KITCHENETTE FF

W6 W21

220

ENTRANCE

W2 W04

WC

340

STAIR

UP

E

SHR-01 D16

D7 D08

1190

1665

3530

LANDING

SHR

3510

4355

INSTRUMENT STORE

W2 W03

WC

D7 D04

STAIR CASE TO ENGINEER'S DETAILS AND SPECIFICATIONS SEE ENGINEER DRAWINGS

D1 D12

STAIR CASE TO ENGINEER'S DETAILS AND SPECIFICATIONS SEE ENGINEER DRAWINGS

D6 D05

WHB

475

FHR

17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

D6 D09

FEMALE

475

NBC-ARP-AR-0174

W2 W02

WC

SHR-01 D17

D8 D03

04 6955

W1a W01

SHR

W1a W07

220

220

1995

450

1500

110

110

110

4565

ENGINEERING ROOM

900

1995 900

11100

230

3715

230

DB FIRST FLOOR

2445

4215

230

1000

2745

230

3510

1000

230

1

1545

3650

220

W18

220

PLAZA

110

11100

SF3 D01

220

13000

- FINISHED FLOOR LEVEL - NATURAL GROUND LEVEL - TOP OF BRICK WORK - TOP OF CONCRETE - DAMP PROOF COURSE - OPEN VENT PIPE - RAIN WATER DOWN PIPE - RODDING EYE - DISTRIBUTION BOARD - INFORMATION TECHNOLOGY

WINDOW REMOVED TO ACCOMODATE SPACE FOR TV SCREEN W3

220

340

340

110 1400

220

D 220

1.5m CONCRETE APRON TO ENGINEER DETAILS AND SPECIFICATIONS SEE ENGINEER DRAWINGS

W3 W10

W3 W09

13560

110 220 450

450

3530

D2 D13

B

10540

10880

2665

220

220

3530

DB GROUND W3 FLOOR W08

2

220

220

2165

10445

110 220 450 1020

C

2895

10880

220

1

14000

10665

11100

220

16

GENERAL NOTES:

FFL NGL TO BWK TOC DPC OVP RWDP RE DB IT

13780

14000

15

ABBREVIATIONS:

B

13780

A

14

B

A

B

5

A

C

2

D

1

BOE WINDOW SILL

KEY PLAN SOUTH ELEVATION

L

SCALE1 : 15000

WEST ELEVATION

SCALE 1 : 100

SCALE 1 : 100

FLOOR

GROUND & FIRST FLOOR

NBC-ARP-ME-0029

M

DRAWING DESCRIPTION

REV

DATE

REVISION DESCRIPTION

COMBINED SERVICES - MECHANICAL GA'S

0A

2015.10.10 EXXARO IDC

NBC-ARP-CL-0148

CIVIL STRUCTURAL LAYOUT

00

2015.11.06 ISSUED FOR CONSTRUCTION

NBC-ARP-CL-0145

CIVIL ARRAMGEMENT AND DETAILS

01

2018.08.28 STRUCTURAL MODEL, RAISED ACCESS FLOOR, UPS ROOM WALLS, WINDOW PLACEMENT

02

2018.09.19 MAIN STAIR HANDRAIL & DETAIL, RAISED ACCESS FLOOR BALUSTRADE DETAIL, FIRST FLOOR WC WHB CHANGE, SHOWER DOOR

03

2018.11.19 FEMALE BATHROOM LAYOUT UPDATED

04

2018.11.28 WINDOW TYPE ADDED

DRN CHK APP

NAME

CONSULTING ENGINEERS

54 5th Street, Linden 2195 (011) 782 3333 I drawings@npn.co.za 1145-17- NBC-ARP-AR-0173

DATE

NPN VERSION NUMBER

04

10 High Street, Melrose Arch Melrose, 2196 Postnet Suite No. 93, Private Bag X1 Melrose Arch, 2078

DRAWING NUMBER

237717-B-CA-0008-01

PROFESSIONAL ARCHITECT

S. ZENHA .................................. PROF. Reg. No : 4800 ......................................... NAME :

DATE :

NAME ARCHITECTURAL

SIGNATURE

DATE

MECHANICAL

MECHANICAL

CHECKED BY

Neill Powell Neill Architects (PTY) LTD

NPN JOB / PROJECT NUMBER

CONSULTANT APPROVAL

DRAWN BY

N P N

REVISIONS

REFERENCE DRAWINGS DRAWING No

A R C H I T E C T S

WBS REFERENCE NUMBER ECB - BCM - INF - 100 - IBU - BLD - 012

........./......../...............

SIGNATURE

ELECTRICAL

ELECTRICAL CIVIL STRUCTURAL INSTRUMENTATION PROCESS

SIGNATURE : ............................................. MANAGER ENG.

......../........../............

STRUCTURAL ARCHITECTURAL

THIS DRAWING IS THE PROPERTY OF EXXARO AND MAY NOT BE COPIED OR REPRODUCED EITHER WHOLLY OR IN PART WITHOUT WRITTEN PERMISSION

EMP. No.

......../........../............

CIVIL

POWERING POSSIBILITY

EXXARO ACCEPTANCE

......../........../............

JOB / PROJECT NUMBER

237717-00

......../........../............ ......../........../............

SIGNATURE OWNERS REPRESENTATIVE AREA / PROJECT MANAGER

MANAGER ENGINEERING PROCESS & PIPING INSTRUMENTATION

NORTH BLOCK COMPLEX BELFAST COAL MINE INFRASTRUCTURE ......../........../............ AREA 100 ......../........../............ BUILDINGS ......../........../............ PLANT CONTROL ROOM PLAN & ELEVATIONS ......../........../............ CENTRE

EMP. No.

......../........../............

SCALE

AS SHOWN

DRAWING NUMBER

NBC-ARP-AR-0173

SHEET REV

1/1 04

A1

FILE NAME : D:\d. NPN\EXXARO\1145-17 Plant Control Room_detached.rvt

13


5

1

6

7

8

2 10880

'01 1000

T/O RAISED ACCESS FLOOR 3400

A

'01

14

15

15mm SS PIN

B

13780

16

50 GRADE 304 0.9mm STAINLESS STEEL BRUSHED FINISH

50mm SS POST

SSE 100 M TRIM

KITCHENETTE FFSEE

TOC 0

W3 W08

BRICK ON EDGE WINDOWS SILL APRON TO ENGINEER SPECS AND DETAILS

DPC

230

220mm BRICKWORK PARAPET STEEL LINTOLS TO ENGINEER SPEC

CONTROL ROOM

ACCESS FLOOR BUMPER HANDRAIL DETAIL

UNDERSIDE OF LINTOL 3230

B

GUTTER TO PREVENT DISCHARGE OF RAIN WATER ABOVE ENTRANCE

NEW FINISH TILE

CERAMIC TILE SKIRTING

6120

APRON TO ENG. SPECS AND DETAILS

T/O RAISED ACCESS FLOOR 3400

W3 W18

ENGINEERING ROOM

ACCESS FLOOR BUMPER HANDRAIL SECTION SCALE 1 : 20

FEMALE

W3 W09

W3 W10

HD

FINISHED ACCESS FLOOR

T.O.C

'01

D6 D09

DPC

1 OFF IN CONTROL ROOM - LENGTH: 1700mm 1 OFF IN SERVER ROOM - LENGTH: 1100mm

SHOPFRONT - REFER TO MANUFACTURER'S SPECS AND DETAILS

'01 50

VARIES

50

50

DPC

NGL

SCALE 1 : 100

15mm SS PIN

'01 BALUSTRADE IN ELEVATION 230

SCALE 1 : 100

D

50mm SS POST TILED UPSTAND 935

SECTION B-B

50mm SS HANDRAIL

50

ALL FOUNDATIONS AND SURFACE BED TO STRUCTURAL ENGINEER'S DETAILS. 250 MICRON USB GREEN PLASTIC UNDERLAY ON WELL COMPACTED & POISONED FILL, ALL TO ENGINEER'S DETAILS.

1050

ALL FOUNDATIONS AND SURFACE BED TO STRUCTURAL ENGINEER'S DETAILS. 250 MICRON USB GREEN PLASTIC UNDERLAY ON WELL COMPACTED & POISONED FILL, ALL TO ENGINEER'S DETAILS.

SECTION A-A

FIXING TO HAVE A BASE PLATE BOLTED TO ACCESS FLOOR PARAPET

50 50

220mm BRICKWORK PARAPET

FINISHED ACCESS FLOOR

20mm SS RODS EPOXY GROUTED INTO WALL @ SUITABLE CENTRES/HILTI ANCHOR RODS EPOXIED IN PLACE - TO INSTALLER'S SPECIFICATION

1000mm A.A.F.L

T/O RAISED ACCESS FLOOR 3400

TOC 0

ENTRANCE

W1a W07

NGL

SCALE 1 : 20

600

B

13780

230mm BRICK WALL

T-STEEL LINTOL TO ENGINEER SPECIFICATIONS & DETAILS

1165

SCALE 1 : 20

CL

CHROMADEK ROOF SHEETING, TO ENGINEER AND/OR MANUFACTURERS DETAILS AND SPECS.

K

HEADWALL/ ROOF FLASHING DETAIL CHROMADEK RIDGE FLASHING TO MATCH SHEET METAL COLOUR AND PROFILE

22.5°

TOC

CHROMADEK ROOF SHEETING, 22.5 DEG ROOF PITCH. STRUCTURE TO ENGINEER AND/OR MANUFACTURERS DETAILS AND SPECS.

22.5°

ROOF PLAN

150

RWDP TO PROVIDE DISCHARGE OF RAIN WATER ONTO APRON SLAB

SCALE 1 : 100

1.5m WIDE CONCRETE APRON TO ENGINEER'S DETAILS

RIDGE FLASHING

FFL

WALL DETAIL

CL

L

DAMP PROOF MEMBRANE

TOC

FALL

2

GUTTER TO PREVENT DISCHARGE OF RAIN WATER ABOVE ENTRANCE

FACEBRICK B

FFL

LINE OF BUILDING BELOW

22.5°

20mm BULLNOSE DAMP PROOF MEMBRANE

CERAMIC TILES ON SCREED

SCALE 1 : 10

INTERNAL WINDOW SILL TO BE PLASTERED & PAINTED TO MATCH WALL COLOUR

CHANGE IN FACEBRICK COLOUR LEVEL

125x75x8 L - SHORT FACE TO BE CUT TO 50mm GALVANIZED AND FIXED TO SLAB WITH M16 'HILTI HSA' ANCHORS @ 300 c/c

170

UP

110

'SIKA MONO TOP-615HB' MORTAR REEDED OVER WIDTH OF DOORWAY

P.C ALUMINIUM WINDOW FRAME TO WINDOW SCHEDULES

EXTERNAL BRICK ON EDGE WINDOW CILL

90

22.5°

ALL ROOF & MECHANICAL VENTILATORS TO M.E.P. DETAILS & SPECIFICATIONS

220mm FIRE WALLS TO U/S OF SHEETING - FIRE STOPPED

110

EXTERIOR ALUMINIUM DOOR

22.5°

22.5°

PLASTER TO WRAP AROUND CORNER AND BE FLUSH WITH STEEL T-LINTOL AND PAINTED SAME AS WALLS

FACEBRICK A

220

170

ALL ROOF & MECHANICAL VENTILATORS TO M.E.P. DETAILS & SPECIFICATIONS

CUT BOE

200x200mm STEEL T-SECTION LINTOL ENGINEER DETAILS AND SPECIFICATIONS PAINTED: CHARCOAL GREY ON EXTERIOR SIDE & WALL PAINT COLOUR ON INTERIOR

2100

22 .50°

ROOF EAVE DETAIL @ ENTRANCE ONLY

UP

PLASTER & PAINT TO SPECIALIST

T-STEEL LINTOL TO ENGINEER SPECIFICATIONS & DETAILS

DOWNPIPES TO BE FIXED TO BRICK WALL WITH CLAMPS

CHROMADEK ROOF SHEETING @22.5º DUAL-PITCH ROOF AS INDICATED. STRUCTURE TO ENGINEER AND/OR MANUFACTURES DETAILS AND SPECS. FIXING TO 38x38mm SAP BRANDERING @ max 400mm C/C FIXED TO 38x114mm SAP TRUSS

22.5°

LINE OF WALL BELOW

SCALE 1 : 20

FASCIA - COLOUR TBC

GI ROOF FLASHING

CHROMADEK ROOF SHEETING, TO ENGINEER AND/OR MANUFACTURERS DETAILS AND SPECS.

EAVE DETAIL @ FIRST FLOOR

FACEBRICK

B.O.E

GI COUNTER FLASHING CUT INTO WALL

1

135mm AEROLITE CARBON FIBRE INSULATION O.E.A.A

FASCIA - COLOUR BATTLESHIP GREY

SEAMLESS GUTTERS TO SPECIALIST (SUCH AS SA GUTTERS® OR SIMILAR APPROVED) NOTE: GUTTER DETAIL ONLY APPLICABLE WHERE SHOWN ON ROOF PLAN - COLOUR TBC

NUTEC CEILING

PVC OVP WITH TOP AIRVENT COWEL AS PER MARLEY OR SIMILAR APPROVED

10880

CHROMADEK ROOF SHEETING @ 22.5º DUAL-PITCH ROOF - AS INDICATED. STRUCTURE TO ENGINEER AND/OR MANUFACTURES DETAILS AND SPECS. 22 .50°

38 114

SCALE 1 : 10

A

CHROMADEK ROOF SHEETING @ 22.5º DUAL-PITCH ROOF - AS INDICATED. STRUCTURE TO ENGINEER AND/OR MANUFACTURES DETAILS AND SPECS.

1

RAISED FLOORING STAIR DETAIL

SECTION C-C

J

40

STAIR HANDRAIL SECTION

SCALE 1 : 10

TOC ALL FOUNDATIONS AND SURFACE BED TO STRUCTURAL ENGINEER'S DETAILS. 250 MICRON USB GREEN PLASTIC UNDERLAY ON WELL COMPACTED & POISONED FILL, ALL TO ENGINEER'S DETAILS.

SCALE 1 : 100

STAIR HANDRAIL DETAIL

300 WIDE TILE TREAD

FLOOR FINISH TO MATCH FLOOR TILES

170mm STEP CONSTRUCTED WITH MASONRY BRICKWORK

DPC

600

SCALE 1 : 10

3230

APRON TO ENG. SPECS AND DETAILS

PLAZA

SCALE 1 : 20

T.O.C

22 .50°

3230

F

ACCESS FLOOR STEP SECTION (x3)

F.F.L

FINISHED PLASTER

ACCESS FLOOR PARAPET WALL

1 OFF IN CONTROL ROOM - LENGTH: 1650mm 1 OFF IN SERVER ROOM - LENGTH: 1050mm

85 49

CONC. SLAB BY ENG.

6120

SEE BALUSTRADE DETAIL

VARIES

50mmm SS HANDRAIL

170

CONTROL ROOM

2890

'01

FIRST FLOOR TOC 3230

G

100

TOC

GUTTER TO PREVENT DISCHARGE OF RAIN WATER ABOVE ENTRANCE

25

FINISHED ACCESS FLOOR

1

15

CERAMIC TILE CILL

934

CHROMADEK METAL ROOF SHEETING, 22.5 DEG ROOF PITCH. STRUCTURE TO ENGINEER AND/OR MANUFACTURERS DETAILS AND SPECS.

WALLPLATE 6120

E

CERAMIC TILE SKIRTING

1000

NOTE: CEILINGS BY DHK

T.O.C

50

1 10880

1000mm A.A.F.L

170

2

SHOPFRONT

170

SSE 100 M TRIM

H

13

50mm SS HANDRAIL

CONC. SLAB BY ENG. & TO SLOPE AWAY FROM BUILDING DUE TO RAINWATER

FIRST FLOOR TOC 3230

6120 3230

ENGINEERING ROOM

DPC

C

12

1m HIGH STEEL BALUSTRADE OPENINGS NOT EXCEED 100mm

2890

2890

STAIR

KITCHENETTE FF

CONC. SLAB BY ENG.

TOC 0

11

110 PVC OVP. WALLPLATE 6120

RAISED SERVER ROOM FLOOR TO DETAIL

FIRST FLOOR TOC 3230

10

ROOF STRUCTURE BY ENG.

CHROMADEK METAL ROOF SHEETING, 22.5 DEG ROOF PITCH. STRUCTURE TO ENGINEER AND/OR MANUFACTURERS DETAILS AND SPECS. WALLPLATE 6120

B

9

CHROMADEK METAL ROOF SHEETING, 22.5° ROOF PITCH. STRUCTURE TO ENGINEER AND/OR MANUFACTURERS DETAILS AND SPECS. TIMBER TRUSS DESIGN DETAILS & SPECIFICATIONS BY ROOF SPECIALIST

50

A

4

1050

3

170

2

170

1

CONCRETE SLAB TO ENGINEER'S DETAIL

SCALE 1 : 20

CONCRETE FOUNDATIONS TO ENGINEER'S DETAIL

TYPICAL DOOR THRESHOLD DETAIL

SCALE 1 : 20

SCALE 1 : 10

FLOOR

GROUND & FIRST FLOOR

DRAWING No NBC-ARP-ME-0029

M

DRAWING DESCRIPTION

REV

DATE

REVISION DESCRIPTION

COMBINED SERVICES - MECHANICAL GA'S

0A

2015.10.10 EXXARO IDC

NBC-ARP-CL-0148

CIVIL STRUCTURAL LAYOUT

00

2015.11.06 ISSUED FOR CONSTRUCTION

NBC-ARP-CL-0145

CIVIL ARRAMGEMENT AND DETAILS

01

2018.11.19 STRUCTURAL MODEL, RAISED ACCESS FLOOR, UPS ROOM WALLS, WINDOW PLACEMENT, FEMALE BATHROOM LAYOUT UPDATED

DRN CHK APP

NAME

CONSULTING ENGINEERS

54 5th Street, Linden 2195 (011) 782 3333 I drawings@npn.co.za 1145-17- NBC-ARP-AR-0174

DATE

DRAWN BY

Neill Powell Neill Architects (PTY) LTD

NPN JOB / PROJECT NUMBER

CONSULTANT APPROVAL

NPN VERSION NUMBER

'01

10 High Street, Melrose Arch Melrose, 2196 Postnet Suite No. 93, Private Bag X1 Melrose Arch, 2078

DRAWING NUMBER

237717-B-CA-0008-02

PROFESSIONAL ARCHITECT

S. ZENHA .................................. PROF. Reg. No : 4800 ......................................... NAME :

DATE :

NAME ARCHITECTURAL

SIGNATURE

DATE

MECHANICAL

MECHANICAL

CHECKED BY

N P N

REVISIONS

REFERENCE DRAWINGS

A R C H I T E C T S

WBS REFERENCE NUMBER ECB - BCM - INF - 100 - IBU - BLD - 012

........./......../...............

SIGNATURE

STRUCTURAL INSTRUMENTATION PROCESS

SIGNATURE : ............................................. MANAGER ENG.

......../........../............

CIVIL

POWERING POSSIBILITY

......../........../............

STRUCTURAL ARCHITECTURAL

THIS DRAWING IS THE PROPERTY OF EXXARO AND MAY NOT BE COPIED OR REPRODUCED EITHER WHOLLY OR IN PART WITHOUT WRITTEN PERMISSION

EMP. No.

......../........../............

ELECTRICAL

ELECTRICAL CIVIL

EXXARO ACCEPTANCE

JOB / PROJECT NUMBER

237717-00

......../........../............ ......../........../............

SIGNATURE OWNERS REPRESENTATIVE AREA / PROJECT MANAGER

MANAGER ENGINEERING PROCESS & PIPING INSTRUMENTATION

NORTH BLOCK COMPLEX BELFAST COAL MINE INFRASTRUCTURE ......../........../............ AREA 100 ......../........../............ BUILDINGS ......../........../............ PLANT CONTROL ROOM SECTIONS & DETAILS ......../........../............ CENTRE

EMP. No.

......../........../............

SCALE

AS SHOWN

FILE NAME : D:\d. NPN\EXXARO\1145-17 Plant Control Room_detached.rvt

14

DRAWING NUMBER

NBC-ARP-AR-0174

SHEET REV

1/1 01

A1


1

2

3

4

5

2 110

A

2520

7

8

B

340

1520

6

10

11

12

2

220

1172

WALLPLATE 6120

1000

9

586

110

1172

586

586

2520

WALLPLATE 6120

586

14

15

B

340

110

13

110

1953

110

1172

WALLPLATE 6120

567

586

110

1172

586 110 586

SHR-01

220

WALLPLATE 6120

586

900

FIRST FLOOR WC

SCALE 1 : 50

SCALE 1 : 50

B

B 0182 12

230

1172

110

EQ

1172

EQ

EQ

EQ

SCALE 1 : 50

FIRST FLOOR TOC 3230

890

845

1545 595

2

2

340

220

TOC

P.C. ALUMINIUM

IRONMONGERY

HANDLE, LOCKSET, & HINGES. REFER TO IRONMONGERY SCHEDULE

REMARKS

SEE REMARKS

170mm STEP

LOCATION

SWING

D16 MALE D17 FEMALE Grand total

OTHER

1280

1 1 2

NOTE: - ASQE 80 FOR TILES 6mm - 7mm THICK - ASQE 100 FOR TILES 8mm - 9mm THICK

FIRST FLOOR TOC 3230

1220

U/S OF SLAB 2975

100mm CUT TILE TO MATCH WALL TILE

D7 D08

D6 D07

100mm CUT TILE TO MATCH WALL TILE

WALL FINISHES MAY VARY FROM DETAIL REFER TO DWG 106 FOR SPECIFICATIONS

D6 D06

MALE

W2 W05

MALE

TRH

AQSE 100 M.TRIM-BL- MATT BLACK FULL HEIGHT -TRIM TO PROJECT 2mm FROM FINISHED PLASTER

100mm CUT TILE TO MATCH WALL TILE

HD

2612

13 0182

WHB

WC

TOC 0

340

WC

TOC 0

* CORNER PROTECTOR SCALE 1 : 5

TOC 0

2

PLASTER / TILE

W2 W19

ELEVATION 9

ELEVATION 10

SCALE 1 : 50

SCALE 1 : 50

SCALE 1 : 50

FF DETAIL BATHROOMS

900

EQ

1995

EQ

220

220

EQ

B

FEMALE

220

2612

WHB

EQ

FIRST FLOOR TOC 3230

MALE 100mm CUT TILE TO MATCH WALL TILE

HD

863

WHB

MALE 430 110 586

W2 W05

586

6 0182

WHB

CLEAR SILICONE TO PERIMETER OF VANITY

220

340

475

UR

1723 230

110

EQ

110

EQ

985

EQ

230

230

FIRST FLOOR TOC 3230

EQ

2745 EQ

230

EQ

EQ

EQ

U/S OF SLAB 2975

1100

'01

895

110

900 EQ

220 230

EQ

FIRST FLOOR TOC 3230

FIRST FLOOR TOC 3230

U/S OF SLAB 2975

'01

2745

FEMALE

2

100mm CUT TILE SKIRTING

MIRROR 900x900mm

TRH

GF DETAIL BATHROOMS

D7 D04

WHB

100mm CUT TILE TO MATCH WALL TILE

TOC 0

SHR

110

450

1735 512

FIRST FLOOR TOC 3230

1224

U/S OF SLAB 2975

U/S OF SLAB 2975

FEMALE

'01

FEMALE

HD

100mm CUT TILE TO MATCH WALL TILE

WC

1172

3005

FEMALE

900 450

W2 W02

D6 D09

HD

TOC 0

100mm CUT TILE TO MATCH WALL TILE

2612

430

EQ

900

1095

9 0182

8 0182

EQ

110

2612

1190

7 0182

*

110

10 0182

835

NO LINTOL VOID ABOVE DOOR

900

900

363

W2 W04

220

363

TRH 11 0182

HD

1735 230

WC

SCALE 1 : 10

B 230

365

SHR-01 D16

B

2610

SHR

D7 D08

TYPICAL VANITY DETAIL

SCALE 1 : 50

230

100x100mm MOSAIC CUT TILE TO MATCH FLOOR

F.F.L

ELEVATION 7

SCALE 1 : 50

MILD STEEL FRAMEWORK TO SUPPORT VANITY DESIGN SUPPLY

TOC 0

SHR

GRANITE / CAESAR STONE VANITY WITH POLISHED SQUARE EDGE

CHROME BOTTLE TRAP TO SPEC

SCREED TO FALL AND WATERPROOF

WHB

TOC 0

ELEVATION 6

SCALE 1 : 50

1735

230

D7 D04

VAAL - WEAVER BASIN COUNTER TOP - WHITE 455x575mm CODE: 704201WH

U/S OF SLAB 2975

170

592

230

230

MIRROR 1723x900mm

100mm CUT TILE TO MATCH WALL TILE

WHB

ELEVATION 5

3390

W2 W03

TRH

WHB WC

900 2500

100mm CUT TILE TO MATCH TOC WALL TILE 0

WC

SHR

1545

475

*

NO LINTOL VOID ABOVE DOOR

1 0181

FEMALE

3 0181

K

2

TRH

340

2 0181

4 0181

1260

HD

110

J

EQ

110

WC

DPC

900

230

230 2745

H

L

W2 W02

110

900

TRH

5 0182

MALE

UR

'01

SHR-01 D17

385

U/S OF SLAB 2975

900

900

1280

1735

490

110

EQ

110

'01

220

G 985

1665

740

110

220

854

900

20

DECK MOUNTED TAP TO SPEC

FIRST FLOOR TOC 3230

2612

230

1995

EQ

230

900

110

EQ

1723

1900

900

EQ

110

260

230

1172

FIRST FLOOR TOC 3230 U/S OF SLAB 2975

455

2

854

SCALE 1 : 50

110

EQ

475

20

126

230

20

160

B

B

220

250

B

740

F

ELEVATION 8

363

220

363 255

586

14 0182

110 586

Qty.

LH LH

110

UR

E

1820

1940

U/S OF SLAB 2975

DOOR FINISH

FRAME FINISH

170

FFL

20mm FROSTED/ OBSCURE GLASS PANEL. PIVOT DOOR

MALE

W2 W16

TRH

FIRST FLOOR TOC 3230

DOOR DESCRIPTION

FRAME DESCRIPTION

FIXED PANEL

DOOR No.

2500

FIRST FLOOR TOC 3230

950

U/S OF SLAB 2975

WHB

2

110

W2 W04

FIRST FLOOR WC

100

SCALE 1 : 50

U/S OF SLAB 2975

15 0182

170

ELEVATION 15

1735

220

512 2520

ELEVATION 14 220

110

D

U/S OF SLAB 2975

740

110

2020

FIRST FLOOR TOC 3230

854

NOTE: FINISH FLOOR LEVEL IS 170mm ABOVE TOC

985

100mm CUT TILE TO MATCH WALL TILE

363

ELEVATION 13

FIRST FLOOR WC

NO LINTOL OVER

WC FIRST FLOOR TOC 3230 U/S OF SLAB 2975

ELEVATION 12

D6 D14

TRH

170 100

740 170 100

170

100

FIRST FLOOR TOC 3230

FIRST FLOOR WC

100mm CUT TILE TO MATCH WALL TILE

1900

260

TRH

FIRST FLOOR WC LOBBY

2441

900

WHB

WC

WC

U/S OF SLAB 2975

C

100mm CUT TILE TO MATCH WALL TILE

MIRROR 900x1172mmHD

854

2890

FIRST FLOOR WC

NOTE: 170mm FLOOR TO ALIGN WITH ACCESS FLOOR

B

750

W2 W19

2441

W2 W16

16

WC TRH

D6 D09

WHB

TOC 0

TOC 0

220

ELEVATION 1

B

SCALE 1 : 50

ELEVATION 2

SCALE 1 : 50

ELEVATION 3

SCALE 1 : 50

ELEVATION 4

SCALE 1 : 50

SCALE 1 : 50

FLOOR

REV

DATE

COMBINED SERVICES - MECHANICAL GA'S

00

2018/11/09 ISSUED FOR CONSTRUCTION

NBC-ARP-CL-0148

CIVIL STRUCTURAL LAYOUT

01

2018/11/14 FEMALE BATHROOM LAYOUT UPDATED

NBC-ARP-CL-0145

CIVIL ARRAMGEMENT AND DETAILS

NBC-ARP-ME-0029

M

DRAWING DESCRIPTION

REVISION DESCRIPTION

DRN CHK APP

NAME

CONSULTING ENGINEERS

54 5th Street, Linden 2195 (011) 782 3333 I drawings@npn.co.za 1145-17- NBC-ARP-AR-0181

DATE

NPN VERSION NUMBER

'01

10 High Street, Melrose Arch Melrose, 2196 Postnet Suite No. 93, Private Bag X1 Melrose Arch, 2078

DRAWING NUMBER

237717-B-CD-0008-12

PROFESSIONAL ARCHITECT

S. ZENHA .................................. PROF. Reg. No : 4800 ......................................... NAME :

DATE :

NAME ARCHITECTURAL

SIGNATURE

DATE

MECHANICAL

MECHANICAL

CHECKED BY

Neill Powell Neill Architects (PTY) LTD

NPN JOB / PROJECT NUMBER

CONSULTANT APPROVAL

DRAWN BY

N P N

REVISIONS

REFERENCE DRAWINGS DRAWING No

A R C H I T E C T S

WBS REFERENCE NUMBER

........./......../...............

SIGNATURE

ELECTRICAL

ELECTRICAL CIVIL STRUCTURAL INSTRUMENTATION PROCESS

SIGNATURE : ............................................. MANAGER ENG.

......../........../............

STRUCTURAL ARCHITECTURAL

THIS DRAWING IS THE PROPERTY OF EXXARO AND MAY NOT BE COPIED OR REPRODUCED EITHER WHOLLY OR IN PART WITHOUT WRITTEN PERMISSION

EMP. No.

......../........../............

CIVIL

POWERING POSSIBILITY

EXXARO ACCEPTANCE

......../........../............

JOB / PROJECT NUMBER

......../........../............ ......../........../............

SIGNATURE OWNERS REPRESENTATIVE AREA / PROJECT MANAGER

MANAGER ENGINEERING PROCESS & PIPING INSTRUMENTATION

NORTH BLOCK COMPLEX BELFAST COAL MINE INFRASTRUCTURE ......../........../............ AREA 100 ......../........../............ BUILDINGS ......../........../............ PLANT CONTROL ROOM ABLUTION ELEVATIONS ......../........../............ CENTRE

EMP. No.

......../........../............

237717-00

SCALE

DRAWING NUMBER

NBC-ARP-AR-0181

SHEET REV

1/1 01

A1

FILE NAME : D:\d. NPN\EXXARO\1145-17 Plant Control Room_detached.rvt

15


Main Office Block at the Coal Mine Infrastructure in Belfast PROJECT DESCRIPTION

Client: EXXARO Work for NPN Architects I was involved in updating working drawings for development of some of the buildings on a coal mine in Belfast, Mpumalanga.

16

2018


1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

ABBREVIATIONS: FFL NGL TO BWK TOC DPC OVP RWDP RE DB IT

A

1

2

3

3610

6430

4

5

3610

18890

6

7

3610

8

6430

3610

- FINISHED FLOOR LEVEL - NATURAL GROUND LEVEL - TOP OF BRICK WORK - TOP OF CONCRETE - DAMP PROOF COURSE - OPEN VENT PIPE - RAIN WATER DOWN PIPE - RODDING EYE - DISTRIBUTION BOARD - INFORMATION TECHNOLOGY

1. ALL LEVELS, HEIGHTS, DEPTHS AND DIMENSIONS TO BE CHECKED BY CONTRACTOR ON SITE BEFORE BUILDING. 2. ALL WORK TO BE IN ACCORDANCE WITH THE LATEST EDITION OF THE NATIONAL BUILDING REGULATIONS. 3. ALL BUILDING MATERIALS AND COMPONENTS TO BE TREATED IN ACCORDANCE WITH THE MANUFACTURERS SPECIFICATIONS. 4. FIGURED DIMENSIONS TO BE READ IN PREFERENCE TO SCALING. ELECTRICAL: ALL ELECTRICAL WORK TO BE CARRIED OUT BY A REGISTERED ELECTRICIAN. VENTILATION AND LIGHT: TO MECHANICAL AND ELECTRICAL ENG'S DETAIL TO COMPLY WITH NHBR'S. DRAINAGE NOTES: 1. WASTE FITTINGS TO HAVE RESEAL TRAPS. 2. WASTE PIPES TO BE FULLY ACCESSIBLE FOR SERVICING 3. SEWER PIPES TO HAVE IE'S AT ALL BENDS AND JUNCTIONS WITH MARKED COVERS AT GROUND LEVEL. 4. NO BENDS OR JUNCTIONS ALLOWED UNDER FLOORS OR FOUNDATIONS. 5. SEWER PIPES AND WASTE PIPES TO HAVE VENTILATION VALVES. 6. OVP'S TO BE Ø100mm PVC - OVP TOP COVER TO BE AIRVENT COWEL AS PER MARLEY OR SIMILAR APROVED 7. ASVP'S TO BE Ø50mm PVC 8. SOIL PIPES TO BE Ø100mm PVC @ 1:60 MIN. FALL 9. WASH HAND BASIN PIPES TO BE Ø40mm 10. SINK DRAIN PIPES TO BE Ø40mm 11. ALL DRAINAGE TO COMPLY WITH PART P OF THE NATIONAL BUILDING REGULATIONS. 12. ALL DRAINAGE TO BE IN STRICT ACCORDANCE WITH THE LOCAL AUTHORITY'S BY-LAWS. 13. WHERE DRAINS RUN THROUGH WALL BRICK WORK TO BE BRIDGED WITH R.C. LINTOL/BEAM TO SATISFACTION OF LOCAL AUTHORITY FOUNDATIONS: SANS 10400 PART H ALL FOUNDATIONS AND SURFACE BEDS TO STRUCTURAL ENGINEER'S DETAILS. 250 MICRON USB GREEN UNDERLAY ON WELL COMPACTED AND POISONED FILL TO ENG'S DETAIL. DPC TO ALL WALLS WITH MIN. 100mm OVERLAPS AT ALL JUNCTIONS. INSTALL BRICKGRIP DPC TO ALL WINDOW CILLS. GUNDLE 250 MICRON DAMP PROOF MEMBRANE CARRIED UP A MIN OF 2No. BRICK COURSES ABOVE G.L. TO FORM DPC'S TO PROTECT ALL WALLS. BRICKWORK: SANS 10400 PART K - BRICKS TO BE LAID IN STRETCHER BOND WITH JOINTS NOT EXCEEDING 12mm. BRICK REINFORCING: BRICKFORCE STEEL WIRE REINFORCING TO BE INSTALLED IN EVERY COURSE OF FOUNDATION BRICKWORK FOR MIN 5 COURSES AND EVERY 3RD COURSE THEREAFTER. BRICKFORCE TO BE INSTALLED IN EVERY COURSE BELOW GROUND SLAB WHERE BRICK WALL IS 110mm. BRICKFORCE REQUIRED OVER LINTOLS. WALLS: EXTERNAL WALLS - 220mm SOLID WALLS UNLESS SHOWN OTHERWISE. INTERNAL WALLS - 110mm AND 220mm SOLID WALLS. WALLS TO UNDERSIDE OF ROOF STRUCTURE UNLESS SHOWN OTHERWISE. EXTERNAL WALLS TO HAVE STEPPED DPC'S AT FLOOR LEVEL AND AROUND ALL OPENINGS. EXTERNAL WALLS TO BE FACEBRICK AS SHOWN ON ELEVATIONS AND ALL RELEVANT DRAWINGS. PLASTER WORK: ALL INTERNAL PLASTERWORK TO BE ONE COAT CEMENT PLASTER (1:5) STEEL TROWELLED SMOOTH AND ONE COAT RHINOLIGHT FINISHING PLASTER ON BRICKWORK GLAZING: GLAZING TO COMPLY WITH SANS 10400 PART N. ALL GLAZING TO BE CLEAR UNLESS OTHERWISE SPECIFIED IN ARCHITECT'S DETAILS & SCHEDULES. INSULATION: 135mm THICK THINK PINK TO SPECIALIST DETAILS & SPECIFICATION AS PER SANS 204 ROOF: 0.8mm CHROMADEK ROOF SHEETING,IBR PROFILE (686/690 PROFILE TBC) ROOF PITCH AS PER ROOF PLAN. STRUCTURE TO ENGINEER AND/OR MANUFACTURERS DETAILS AND SPECS. CHROMADEK FINISH: CHARCOAL GREY C2S FASCIA: BATTLESHIP GREY CHROMADEK GUTTERS AND DOWN PIPES: CHARCOAL GREY C2S WATERPROOFING: FOR ROOF PENETRATION DETAIL & SPECS TO ROOF SPECIALIST AS PER STANDARD CHROMADEK WATERPROOFING DETAILS PAINT: FOR ALL PAINT SPECIFICATIONS SEE SEPARATE PAINT FINISHES DOCUMENT GENERAL: ALL MATERIALS & UNCERTAINTIES REGARDING WORK TO BE CHECKED BEFOREHAND WITH ARCHITECT. ALL MEASUREMENTS & HEIGHTS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF ANY BUILDING WORK. ALUSTRADE TO BE 1000mm HIGH WITH MAX 100mm OPENINGS.

BRICK HATCH LEGEND:

CL

FACEBRICK STOCK BRICK FOR PLASTER

B

FACEBRICK COLOUR LEGEND: FACEBRICK A: AGATE TRAVERTINE

B NBC-ARP-AR-0157 3700

B

FACEBRICK B: ROAN TRAVERTINE

A

C

C

D COFFEE STATION

8 12150

1

NBC-ARP-AR-0160

ELEVATION DETAIL A.2

ELEVATION DETAIL A.1

6 NBC-ARP-AR-0157

12

NBC-ARP-AR1416 0275

17 SERVICE 15

3 6 NBC-ARP-AR-0275

E

SERVICE DUCT

6 NBC-ARP-AR-0157

WC MALE 13

11

FHR

5 NBC-ARP-AR-0275 WC MALE 2

E

FHR

5

PAVED ENTRANCE

NBC-ARP-AR-0160

BLOCK A

D

DUCT

7 4

F

SERVER ROOM

109 NBC-ARP-AR-0275

1

WC

STRONG ROOM

NBC-ARP-AR19 WC FEMALE 0275

UP

8 NBC-ARP-AR-0275

E

NBC-ARP-AR18 PARAPLEGIC 0275 20

21

10350

WC FEMALE

PPE STORAGE STORE ROOM

F DB

3685

3

9

7610

3 NBC-ARP-AR-0156

GARDENNBC-ARP-AR-0156 COVERED WALKWAY

3695

G

FEMALE CHANGE ROOM

MALE CHANGE ROOM

F

F

10 1,5m CONCRETE APRON

ELEVATION DETAIL B

G

H

16

GENERAL NOTES:

11345

11345

DB FHR

F

32405 1 H R F B D A IT B

A B B IT D

/C A H R F

C D

R .H F

X O B

X O B O B X D I B T

B D

A B

IT R H B F D

6 5

5

4

3

2

1

4

3 2 1 7

C 4

D

H

3 2

1

C

D

E

F

G

C H 10Ø N O F EP R N SEVAM W TO C 1:60F EIN

R ALO SYTEM

A B

L O E T P OC T OS T D E A C

H T P I

N E H C IT K

C R S E

GR K N Y R E T O . A B lK T E G A R X O D N W M

E T O P OS T D E T A C L O

8

S A P M D N

7

6

TELPI O BIYT12G D ES/C AR H G W G V .TM O C SPN D ID R TSO A76543BEFH ER C C AN D ETSW D R H O EASLTC PI ETR H AP SPER R K E AC

H E U P T A

150m m IA.S D

P IT H C

24

NBC-ARP-AR 27 28 WC -0275 FEMALE

C R S E

22 NBC-ARP-AR -0275

/C F R .H D 0 5 3 S B IT U A L O

NBC-ARP-AR 25 26 -0275 WC MALE

2 3

CLEANER TEA ROOM

5 A

4 3 C

H F

R

2 1 B D

H

R

0 1

E

B D

H F

R

9

F G

23

H

1

B NBC-ARP-AR-0157

2

3

A

4

5

B C D

9

E

2

H F

. R

1

3

B C

A

4

A

8

5

6

B D

.

7

B

B D

A

B

2

2

A D

3

C

B E

1

1

D

J

H F

O

G

F

E

H

J

L

K

H F

D

M

5

N

6

7

R

8 9

1 re

2

H F

0 1 IT R

H F

R

A

6895

3 4

B

C

D

E

F

G

H F

C

1

R

2

3 1

A

MAIN OFFICE BUILDING

4 3 2 1 R F H /C A

A B

C

32625

B

1 2 1

6670

B D

K

BLOCK A & B COMBINED PLAN

3D PERSPECTIVE OF OFFICE BLOCK

SCALE1 : 150

KEY PLAN

SCALE

1 : 15000

L

FLOOR WBS REFERENCE NUMBER ECB - BCM - INF - 100 - IBU - BLD - 004 REV

DATE

REVISION DESCRIPTION

M.E.P COMBINED SERVICES LAYOUT

0A

2015/10/13

EXXARO IDC

NBC-ARP-CL-0159

CIVIL STRUCTURAL LAYOUT

00

2015/11/06

ISSUED FOR CONSTRUCTION

01

2016/07/18

INTERNAL LAYOUT REVISED

DRN CHK APP JVDM UB WPB

NAME

CONSULTING ENGINEERS

54 5th Street, Linden 2195 (011) 782 3333 I drawings@npn.co.za 1145-17-

NBC-ARP-AR-0159

DATE

NPN VERSION NUMBER

F

10 High Street, Melrose Arch Melrose, 2196 Postnet Suite No. 93, Private Bag X1 Melrose Arch, 2078

DRAWING NUMBER

237717-B-CD-0006-01

PROFESSIONAL ENGINEER

S. ZENHA .................................. PROF. Reg. No : 4800 ......................................... NAME :

DATE :

NAME ARCHITECTURAL

SIGNATURE

DATE

MECHANICAL

MECHANICAL

CHECKED BY

Neill Powell Neill Architects (PTY) LTD

NPN JOB / PROJECT NUMBER

CONSULTANT APPROVAL

DRAWN BY

N P N

M

DRAWING DESCRIPTION

NBC-ARP-ME-0018

A R C H I T E C T S

REVISIONS

REFERENCE DRAWINGS DRAWING No

........./......../...............

SIGNATURE

ELECTRICAL

ELECTRICAL CIVIL STRUCTURAL INSTRUMENTATION PROCESS

SIGNATURE : ............................................. MANAGER ENG.

......../........../............

STRUCTURAL ARCHITECTURAL

THIS DRAWING IS THE PROPERTY OF EXXARO AND MAY NOT BE COPIED OR REPRODUCED EITHER WHOLLY OR IN PART WITHOUT WRITTEN PERMISSION

EMP. No.

......../........../............

CIVIL

POWERING POSSIBILITY

EXXARO ACCEPTANCE

......../........../............

JOB / PROJECT NUMBER

237717-00

......../........../............ ......../........../............

SIGNATURE OWNERS REPRESENTATIVE AREA / PROJECT MANAGER

MANAGER ENGINEERING PROCESS & PIPING INSTRUMENTATION

NORTH BLOCK COMPLEX BELFAST COAL MINE INFRASTRUCTURE ......../........../............ AREA 100 ......../........../............ BUILDINGS ......../........../............ MAIN OFFICE BLOCK COMBINED PLAN ......../........../............ CENTRE

EMP. No.

......../........../............

SCALE

AS SHOWN

DRAWING NUMBER

NBC-ARP-AR-0159

SHEET

REV

1/1

01

A1

FILE NAME : D:\d. NPN\EXXARO\1145-17 Main Office Block_detached.rvt

17


1

2

3

4

5

8

6

7

8

9

10

10

11

12

4

13

9

14

15

16

1

A

4 ALL ROOF & MECHANICAL VENTILATORS TO M.E.P. DETAILS & SPECIFICATIONS

GUTTER TO PREVENT DISCHARGE OF RAINWATER ABOVE ENTRANCE

WALLPLATE 2720

STEEL LINTOLS AS PER ENGINEER

WC MALE UR

D7 D38

1.5m CONCRETE APRON TO ENGINEERS DETAIL & SPECS.

UR

D6 D27

D6 D26

W1 W16

W1 W42

SF1 D01

W1 D33

W1 W41

W1 W22

W1 W23

W1 W24

BOE

DPC

STEEL LINTOLS AS PER ENGINEER

W1 W26

D8 D39

RAISED ACCESS FLOOR 170

BOE

DPC

DPC

2720

CHROMADEK METAL ROOF SHEETING, 22.5° ROOF PITCH. STRUCTURE TO ENGINEER AND/OR MANUFACTURERS DETAILS AND SPECS. TIMBER TRUSS DESIGN DETAILS & SPECIFICATIONS BY ROOF SPECIALIST

B

100mm OVP

NBC-ARP-AR-0157

TOC - A 0

DPC NGL

6

SECTION A - A

1.5m CONCRETE APRON TO ENGINEERS DETAIL & SPECS.

11 NBC-ARP-AR-0157

1 : 100 A

B

C

D

E

ALL ROOF & MECHANICAL VENTILATORS TO M.E.P. DETAILS & SPECIFICATIONS

F

G

H

3 NBC-ARP-AR-0157 PVC OVP

CHROMADEK METAL ROOF SHEETING, 22.5° ROOF PITCH. STRUCTURE TO ENGINEER AND/OR MANUFACTURERS DETAILS AND SPECS. TIMBER TRUSS DESIGN DETAILS & SPECIFICATIONS BY ROOF SPECIALIST

D

ALL FOUNDATIONS AND SURFACE BED TO STRUCTURAL ENGINEER'S DETAILS. 250 MICRON USB GREEN PLASTIC UNDERLAY ON WELL COMPACTED & POISONED FILL, ALL TO ENGINEER'S DETAILS.

ENTRANCE A

WALLPLATE 2720

STEEL LINTOL

1165

2720

STEEL LINTOL W1 W05

W1 W03

W1 W02

RWDP

BOE WINDOW SILL

935

D4 D19

SF2 D03

DPC

STEEL LINTOL

TOC - A 0

1.5m CONCRETE APRON TO ENGINEERS DETAIL & SPECS.

1.5m CONCRETE APRON TO ENGINEERS DETAIL & SPECS.

DPC

ALL FOUNDATIONS AND SURFACE BED TO STRUCTURAL ENGINEER'S DETAILS. 250 MICRON USB GREEN PLASTIC UNDERLAY ON WELL COMPACTED & POISONED FILL, NBC-ARP-AR-0157 ALL TO ENGINEER'S DETAILS.

TOC - B 85

NGL

ALL FOUNDATIONS AND SURFACE BED TO STRUCTURAL ENGINEER'S DETAILS. 250 MICRON USB GREEN PLASTIC UNDERLAY ON WELL COMPACTED & POISONED FILL, ALL TO ENGINEER'S DETAILS.

12

SCALE 1 : 100

STEEL LINTOLS AS PER ENGINEER

DPC

DPC

E

SECTION B - B

W1 W56

BLOCK B

2635

C

ALL FOUNDATIONS AND SURFACE BED TO STRUCTURAL ENGINEER'S DETAILS. 250 MICRON USB GREEN PLASTIC UNDERLAY ON WELL COMPACTED & POISONED FILL, ALL TO ENGINEER'S DETAILS.

CL

220 110

110

230

F

50

50mm SS HANDRAIL

50

50

50mm SS POST

SSE 100 M TRIM

NEW FINISH TILE

FIXING TO HAVE A BASE PLATE BOLTED TO THE ACCESS FLOOR PARAPET

CERAMIC TILE SKIRTING 220mm BRICKWORK PARAPET

FINISHED ACCESS FLOOR

15

T.O.C.

1690

H

SERVER ROOM ACCESS FLOOR BUMPER 7 HANDRAIL 1 : 20

RIDGE FLASHING

CL

TOC

SCALE 1 : 10

CL

220 110

EXTERIOR ALUMINIUM DOOR

PLASTER TO WRAP AROUND CORNER AND BE FLUSH WITH STEEL T-LINTOL AND PAINTED SAME AS WALLS P.C ALUMINIUM WINDOW FRAME TO WINDOW SCHEDULES

CHROMADEK VALLEY FLASHING TO MATCH SHEET METAL COLOUR AND PROFILE

300 WIDE TILE TREAD

DAMP PROOF MEMBRANE DAMP PROOF MEMBRANE

1

170

170

K

1.5m WIDE CONCRETE APRON TO ENGINEER'S DETAILS

FFL TOC

FALL

FFL

170

CHROMADEK ROOF SHEETING, 22.5 DEG ROOF PITCH. STRUCTURE TO ENGINEER AND/OR MANUFACTURERS DETAILS AND SPECS.

FINISHED ACCESS FLOOR

TOC

20mm BULLNOSE

125x75x8 L - SHORT FACE TO BE CUT TO 50mm GALVANIZED AND FIXED TO SLAB WITH M16 'HILTI HSA' ANCHORS @ 300 c/c

FINISH: WOOD FLOAT

170mm STEP CONSTRUCTED WITH MASONRY BRICKWORK

INTERNAL WINDOW SILL TO BE PLASTERED & PAINTED TO MATCH WALL COLOUR

CHANGE IN BRICK COLOUR LEVEL

110

'SIKA MONO TOP-615HB' MORTAR REEDED OVER WIDTH OF DOORWAY

FLOOR FINISH TO MATCH FLOOR TILES

CERAMIC TILE CILL

220mm BRICKWORK PARAPET

CUT BOE

DOWNPIPES TO BE FIXED TO BRICK WALL WITH CLAMPS 200x200mm STEEL T-SECTION LINTOL ENGINEER DETAILS AND SPECIFICATIONS PAINTED: CHARCOAL GREY ON EXTERIOR SIDE & WALL PAINT COLOUR ON INTERIOR

170

SHOPFRONT

CERAMIC TILE SKIRTING

PLASTER & PAINT TO SPECIALIST

EXTERNAL BRICK ON EDGE WINDOW CILL

J

SSE 100 M TRIM

CL

ENTRANCE - APRON DETAIL

SCALE 1 : 20

CL

135mm AEROLITE CARBON FIBRE INSULATION O.E.A.A

T-STEEL LINTOL TO ENGINEER SPECIFICATIONS & DETAILS

CONCRETE APRON TO ENGINEER DETAILS & SPECIFICATIONS

170

170

FINISHED ACCESS FLOOR

T.O.C.

FFL FALL

CHROMADEK ROOF SHEETING, 22.5 DEG ROOF PITCH. STRUCTURE TO ENGINEER AND/OR MANUFACTURERS DETAILS AND SPECS.

TILE UPSTAND

935

1050

1050

G

SEAMLESS GUTTERS TO SPECIALIST (SUCH AS SA GUTTERS® OR SIMILAR APPROVED) NOTE: GUTTER DETAIL ONLY APPLICABLE WHERE SHOWN ON ROOF PLAN - COLOUR CHROMADEK CHARCOAL FASCIA - COLOUR BATTLESHIP GREY FACEBRICK

FINISH: WOOD FLOAT 40

CHROMADEK RIDGE FLASHING TO MATCH SHEET METAL COLOUR AND PROFILE

50mm SS POST

22 .50°

15mm SS PIN

50

15mm SS PIN

GALVANIZED AND FIXED TO SLAB WITH M16 'HILTI HSA' ANCHORS @ 300 c/c

50mm BRICK RAMP AT 1:12 MAX 3mm THRESHOLD AT DOOR

1165

1740 50

50

CHROMADEK ROOF SHEETING @ 22.5º DUAL-PITCH ROOF - AS INDICATED. STRUCTURE TO ENGINEER AND/OR MANUFACTURES DETAILS AND SPECS.

2099

50

50mm SS HANDRAIL

125x75x8 L - SHORT FACE TO BE CUT TO 50mm

GRADE 304 0.9mm STAINLESS STEEL BRUSHED FINISH

934

F

152mm HIP RAFTER

CONCRETE SLAB TO ENGINEER'S DETAIL

TOC

ACCESS FLOOR WALL 2 PARAPET 1 : 10

RAISED FLOORING STAIR 5 DETAIL 1 : 10

CL

VALLEY FLASHING DETAIL

WALL DETAIL

150

SCALE 1 : 20

SCALE 1 : 20

TYPICAL DOOR THRESHOLD DETAIL

L

CONCRETE FOUNDATIONS TO ENGINEER'S DETAIL

SCALE 1 : 10

FLOOR WBS REFERENCE NUMBER ECB - BCM - INF - 100 - IBU - BLD - 004 REV

DATE

REVISION DESCRIPTION

NBC-ARP-ME-0018

M.E.P COMBINED SERVICES LAYOUT

0A

2015/10/13

EXXARO IDC

NBC-ARP-CL-0159

CIVIL STRUCTURAL LAYOUT

00

2015/11/06

ISSUED FOR CONSTRUCTION

01

2016/07/18

INTERNAL LAYOUT REVISED

DRN CHK APP JVDM UB WPB

NAME

CONSULTING ENGINEERS

54 5th Street, Linden 2195 (011) 782 3333 I drawings@npn.co.za 1145-17-

NBC-ARP-AR-0157

DATE

NPN VERSION NUMBER

F

10 High Street, Melrose Arch Melrose, 2196 Postnet Suite No. 93, Private Bag X1 Melrose Arch, 2078

DRAWING NUMBER

237717-B-CA-0006-05

PROFESSIONAL ENGINEER

S. ZENHA .................................. PROF. Reg. No : 4800 ......................................... NAME :

DATE :

NAME ARCHITECTURAL

SIGNATURE

DATE

MECHANICAL

MECHANICAL

CHECKED BY

Neill Powell Neill Architects (PTY) LTD

NPN JOB / PROJECT NUMBER

CONSULTANT APPROVAL

DRAWN BY

N P N

M

DRAWING DESCRIPTION

A R C H I T E C T S

REVISIONS

REFERENCE DRAWINGS DRAWING No

........./......../...............

SIGNATURE

ELECTRICAL

ELECTRICAL CIVIL STRUCTURAL INSTRUMENTATION PROCESS

SIGNATURE : ............................................. MANAGER ENG.

......../........../............

STRUCTURAL ARCHITECTURAL

THIS DRAWING IS THE PROPERTY OF EXXARO AND MAY NOT BE COPIED OR REPRODUCED EITHER WHOLLY OR IN PART WITHOUT WRITTEN PERMISSION

EMP. No.

......../........../............

CIVIL

POWERING POSSIBILITY

EXXARO ACCEPTANCE

......../........../............

JOB / PROJECT NUMBER

237717-00

......../........../............ ......../........../............

SIGNATURE OWNERS REPRESENTATIVE AREA / PROJECT MANAGER

MANAGER ENGINEERING PROCESS & PIPING INSTRUMENTATION

NORTH BLOCK COMPLEX BELFAST COAL MINE INFRASTRUCTURE ......../........../............ AREA 100 ......../........../............ BUILDINGS ......../........../............ MAIN OFFICE BLOCK SECTIONS & DETAILS ......../........../............ CENTRE

EMP. No.

......../........../............

SCALE

AS SHOWN

FILE NAME : D:\d. NPN\EXXARO\1145-17 Main Office Block_detached.rvt

18

DRAWING NUMBER

NBC-ARP-AR-0157

SHEET

REV

1/1

01

A1


2

110

1500

CL

EQ

1390 EQ

WALLPLATE 2720

CL

110

220

880

EQ

EQ

CL

110 EQ

880 CL

EQ

220 EQ

WALLPLATE 2720

WC MALE

740

UR

D6 D15

100mm CUT TILE SKIRTING TO MATCH WALL TILE

D6 D14

TOC - A 0

TRH

TRH WC

WC

TOC - A 0

TOC - A 0

Elevation 2

Elevation 3

3

1 : 50

900

1680

1 : 50

EQ

CL

220

110

220

110

EQ

Elevation 4

4

E 3090

1910

URINAL SCREEN

FHR

110

CL

EQ

WALLPLATE 2720

WC MALE

EQ

1070 EQ

CL

110

1000

110

110

1000

110

EQ

1 : 50

3205 1070 EQ

CL

EQ

110

CL

EQ

EQ

WALLPLATE 2720 100mm CUT TILE SKIRTING TO MATCH WALL TILE

WC FEMALE

UR

D7 D09

D1 D10

SD

D7 D11

1500

WHB

WHB 900

900

2025

MIRROR 900x2025mm UR

490 250 160

110

110

SERVICE DUCT

WC MALE

TOC - A 0

TOC - A 0

110 EQ

880 EQ

CL

EQ

1390 EQ

CL

220

220

220

3370

220 475

EQ

2895 CL

EQ

WALLPLATE 2720

110

220

110

EQ

3205 1295

WALLPLATE 2720

EQ

CL

1910 EQ

900

1000

110

110

1000

110

3090 1910 CL

EQ

SERVICE DUCT

110 500 110 1180

EQ

843

110 500 110 CL

WALLPLATE 2720

338

WC MALE

FHR

HD

100mm CUT TILE TO MATCH WALL TILE

WHB

110

EQ

WC FEMALE

HD

SD

CL

EQ

WC FEMALE

WC

HD

100mm CUT TILE SKIRTING TO MATCH WALL TILE

TOC - A 0

Elevation 7

TOC - A 0

Elevation 8

8

1 : 50

REFER TO DHK CEILING FOR HEIGHT OF WALL TILES

FOR TILE SPECIFICATIONS DEE DHK DRAWINGS

3370 1980

880

CL

220 915

1100

695

220

475 220

220 475

220 475

CL

1010

WALLPLATE 2720

110

1101

CL

WC FEMALE

110

1575

110

565

WC FEMALE

D6 D13

1. ALL LEVELS, HEIGHTS, DEPTHS AND DIMENSIONS TO BE CHECKED BY CONTRACTOR ON SITE BEFORE BUILDING. 2. ALL WORK TO BE IN ACCORDANCE WITH THE LATEST EDITION OF THE NATIONAL BUILDING REGULATIONS. 3. ALL BUILDING MATERIALS AND COMPONENTS TO BE TREATED IN ACCORDANCE WITH THE MANUFACTURERS SPECIFICATIONS. 4. FIGURED DIMENSIONS TO BE READ IN PREFERENCE TO SCALING. ELECTRICAL: ALL ELECTRICAL WORK TO BE CARRIED OUT BY A REGISTERED ELECTRICIAN. VENTILATION AND LIGHT: TO MECHANICAL AND ELECTRICAL ENG'S DETAIL TO COMPLY WITH NHBR'S. DRAINAGE NOTES: 1. WASTE FITTINGS TO HAVE RESEAL TRAPS. 2. WASTE PIPES TO BE FULLY ACCESSIBLE FOR SERVICING 3. SEWER PIPES TO HAVE IE'S AT ALL BENDS AND JUNCTIONS WITH MARKED COVERS AT GROUND LEVEL. 4. NO BENDS OR JUNCTIONS ALLOWED UNDER FLOORS OR FOUNDATIONS. 5. SEWER PIPES AND WASTE PIPES TO HAVE VENTILATION VALVES. 6. OVP'S TO BE Ø100mm PVC - OVP TOP COVER TO BE AIRVENT COWEL AS PER MARLEY OR SIMILAR APROVED 7. ASVP'S TO BE Ø50mm PVC 8. SOIL PIPES TO BE Ø100mm PVC @ 1:60 MIN. FALL 9. WASH HAND BASIN PIPES TO BE Ø40mm 10. SINK DRAIN PIPES TO BE Ø40mm 11. ALL DRAINAGE TO COMPLY WITH PART P OF THE NATIONAL BUILDING REGULATIONS. 12. ALL DRAINAGE TO BE IN STRICT ACCORDANCE WITH THE LOCAL AUTHORITY'S BY-LAWS. 13. WHERE DRAINS RUN THROUGH WALL BRICK WORK TO BE BRIDGED WITH R.C. LINTOL/BEAM TO SATISFACTION OF LOCAL AUTHORITY FOUNDATIONS: SANS 10400 PART H ALL FOUNDATIONS AND SURFACE BEDS TO STRUCTURAL ENGINEER'S DETAILS. 250 MICRON USB GREEN UNDERLAY ON WELL COMPACTED AND POISONED FILL TO ENG'S DETAIL. DPC TO ALL WALLS WITH MIN. 100mm OVERLAPS AT ALL JUNCTIONS. INSTALL BRICKGRIP DPC TO ALL WINDOW CILLS. GUNDLE 250 MICRON DAMP PROOF MEMBRANE CARRIED UP A MIN OF 2No. BRICK COURSES ABOVE G.L. TO FORM DPC'S TO PROTECT ALL WALLS. BRICKWORK: SANS 10400 PART K - BRICKS TO BE LAID IN STRETCHER BOND WITH JOINTS NOT EXCEEDING 12mm. BRICK REINFORCING: BRICKFORCE STEEL WIRE REINFORCING TO BE INSTALLED IN EVERY COURSE OF FOUNDATION BRICKWORK FOR MIN 5 COURSES AND EVERY 3RD COURSE THEREAFTER. BRICKFORCE TO BE INSTALLED IN EVERY COURSE BELOW GROUND SLAB WHERE BRICK WALL IS 110mm. BRICKFORCE REQUIRED OVER LINTOLS. WALLS: EXTERNAL WALLS - 220mm SOLID WALLS UNLESS SHOWN OTHERWISE. INTERNAL WALLS - 110mm AND 220mm SOLID WALLS. WALLS TO UNDERSIDE OF ROOF STRUCTURE UNLESS SHOWN OTHERWISE. EXTERNAL WALLS TO HAVE STEPPED DPC'S AT FLOOR LEVEL AND AROUND ALL OPENINGS. EXTERNAL WALLS TO BE FACEBRICK AS SHOWN ON ELEVATIONS AND ALL RELEVANT DRAWINGS. PLASTER WORK: ALL INTERNAL PLASTERWORK TO BE ONE COAT CEMENT PLASTER (1:5) STEEL TROWELLED SMOOTH AND ONE COAT RHINOLIGHT FINISHING PLASTER ON BRICKWORK GLAZING: GLAZING TO COMPLY WITH SANS 10400 PART N. ALL GLAZING TO BE CLEAR UNLESS OTHERWISE SPECIFIED IN ARCHITECT'S DETAILS & SCHEDULES. INSULATION: 135mm THICK THINK PINK TO SPECIALIST DETAILS & SPECIFICATION AS PER SANS 204 ROOF: 0.8mm CHROMADEK ROOF SHEETING,IBR PROFILE (686/690 PROFILE TBC) ROOF PITCH AS PER ROOF PLAN. STRUCTURE TO ENGINEER AND/OR MANUFACTURERS DETAILS AND SPECS. CHROMADEK FINISH: CHARCOAL GREY C2S FASCIA: BATTLESHIP GREY CHROMADEK GUTTERS AND DOWN PIPES: CHARCOAL GREY C2S WATERPROOFING: FOR ROOF PENETRATION DETAIL & SPECS TO ROOF SPECIALIST AS PER STANDARD CHROMADEK WATERPROOFING DETAILS PAINT: FOR ALL PAINT SPECIFICATIONS SEE SEPARATE PAINT FINISHES DOCUMENT GENERAL: ALL MATERIALS & UNCERTAINTIES REGARDING WORK TO BE CHECKED BEFOREHAND WITH ARCHITECT. ALL MEASUREMENTS & HEIGHTS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF ANY BUILDING WORK. ALUSTRADE TO BE 1000mm HIGH WITH MAX 100mm OPENINGS.

SD

CL

110

1000

110

1805

110

1000

110

1215

PARAPLEGIC WC

3265 1800 EQ

SERVICE DUCT

CL

110

1355

EQ

CL

795

220

220

220

220

560

900

220

475 220 CL

NOTE:

EQ

ALL TILES TO BE LAID STRICTLY IN ACCORDANCE WITH INSTRUCTIONS BY TAL OR EQUALLY APPROVED ADHESIVES

WALLPLATE 2720

WHERE TILES MEET PERIMETER WALL LEAVE AN OPEN JOINT 8mm WITH NO GROUT

WC MALE

WC MALE

- FINISHED FLOOR LEVEL - NATURAL GROUND LEVEL - TOP OF BRICK WORK - TOP OF CONCRETE - DAMP PROOF COURSE - OPEN VENT PIPE - RAIN WATER DOWN PIPE - RODDING EYE - DISTRIBUTION BOARD - INFORMATION TECHNOLOGY

NOTE: FACILITIES FOR PERSONS WITH DISABILITIES SHALL COMPLY WITH PART S OF SANS 10400

220

2985 EQ

WALLPLATE 2720

WHB

D7 D22

D7a D23

D1 D24

100mm CUT TILE SKIRTING TO MATCH WALL TILE

100mm CUT TILE SKIRTING TO MATCH WALL TILE

D7 D25

WHB

TOC - A 0

3460

FFL NGL TO BWK TOC DPC OVP RWDP RE DB IT

ALL TILE JOINTS TO BE 3mm SPACING MIXED WITH "TAL" BOND AND NO WATER TO BE ADDED.

WATERPROOFING AND GROUT NOTE:

100mm CUT TILE SKIRTING TO MATCH WALL TILE

D6 D12

590

1805

WC

HD

SHOWERS: TAL SUPERFLEX WATERPROOFING TO BE APPLIED TO WALLS AND FLOORS

SD WHB 900

220

1575

21 0275

NOTE:

1 : 50

E

20 0275

1130

Elevation 9

9

1 : 50

260

7

1805

17 0275

16

ABBREVIATIONS:

220

TOC - A 0

SHOWERS AND FIRST FLOOR ABLUTIONS: TAL WALL AND FLOOR GROUT TO BE MIXED WITH TAL BOND

TOC - A 0

MOSAICS: 100x100mm CUT TILE TO BE FIXED WITH TAL GOLDSTAR ADHESIVE AND TAL BOND AND GROUTED WITH TAL WALL AND FLOOR GROUT MIXED WITH TAL BOND.

220

NOTE: BONDING AND GROUTING TO BE DONE AT THE SAME TIME

10

Elevation 10

11

1 : 50

Elevation 11

12

1 : 50

Elevation 12

FLOOR GROUTING - DARK GREY WALL GROUTING - DOVE GREY

1 : 50

FLOOR WBS REFERENCE NUMBER

0A

DATE 2018/12/12

REVISION DESCRIPTION ISSUED FOR REVIEW

A R C H I T E C T S

REVISIONS REV

DRN CHK APP JVDM UB WPB

NAME

CONSULTING ENGINEERS

54 5th Street, Linden 2195 (011) 782 3333 I drawings@npn.co.za 1145-17-

NBC-ARP-AR-0275

DATE

NPN VERSION NUMBER

10 High Street, Melrose Arch Melrose, 2196 Postnet Suite No. 93, Private Bag X1 Melrose Arch, 2078

DRAWING NUMBER

PROFESSIONAL ENGINEER

S. ZENHA .................................. PROF. Reg. No : 4800 ......................................... NAME :

DATE :

NAME ARCHITECTURAL

SIGNATURE

DATE

MECHANICAL

MECHANICAL

CHECKED BY

Neill Powell Neill Architects (PTY) LTD

NPN JOB / PROJECT NUMBER

CONSULTANT APPROVAL

DRAWN BY

N P N

1150

220

740

URINAL SCREEN

WHB

1 : 50 E

220

110

Elevation 6

6

TOC - A 0

110

CIVIL STRUCTURAL LAYOUT

CL

110

WC

220

NBC-ARP-CL-0159

CL

EQ

3370

220

900

900

SERVICE DUCT

WC

1390

110m WALL

220 M.E.P COMBINED SERVICES LAYOUT

695

220

260

EQ

3590 1800

100mm CUT TILE SKIRTING TO MATCH WALL TILE

BLOCK A DETAIL 2 14 BATHROOMS 1 : 50 NBC-ARP-ME-0018

100mm CUT TILE TO MATCH WALL TILE

100mm CUT TILE TO MATCH WALL TILE

WC

UR

WC FEMALE

110

UR

3460

DRAWING DESCRIPTION

1450

900 260

110

19 0275

110

1980

15 0275

370

WC

2200

915

WC MALE

1000

18 0275

110

110

*

TRH

110 1575

110 1575 220

1000

110

885 440

740

WC

1200

365

475 220

WALLPLATE 2720

1 : 50

REFERENCE DRAWINGS

M

110

1765 14 0275

110

1000

900

740

110

WHB

HD

220

DRAWING No

CL

110

2025 13 0275

WHB

12 0275

WC FEMALE

220

EQ

Elevation 5

880 EQ

SERVICE DUCT

WHB

L

EQ

1000

3370

220

D6 D28

1130

EQ

220

WC

TRH

110

CL

CL

EQ

220 220

220

TRH

WHB

HD

K

225

3370

HD

5

WHB

D7 D22

1800

110

WC

HD SD

440 1690

370

TRH

D7a D23

110

WHB

2

100mm CUT TILE SKIRTING TO MATCH WALL TILE

475 220

220 1355 110

*

D6 D27

PARAPLEGIC WC

1805

110 1000 110 1805

E

1800

SD

160

1295 220 3265

WC MALE

D1 D24

110

CL

EQ

220

1005

D7 D25

WC

110

220

220

16 0275

110

11 0275

880

TRH

110

CL

955

220

1480

D6 D26

1295

595

475

1390

110

1800

WC MALE

1 : 50 3205

110

BLOCK A DETAIL 1 13 BATHROOMS 1 : 50 880

15

110

110

NO CUT SKIRTING AT URINAL WALL

915

1980

14

E

110

110

13

NO CUT SKIRTING AT URINAL WALL

100mm CUT TILE SKIRTING

SD

WC FEMALE

9 0274

880

UR

J

URINAL SCREEN

Elevation 1

1

SD

1980

220

1180

500

WALLPLATE 2720

WHB

110

110

110

12

GENERAL NOTES:

WHB HD

220

H

EQ

TOC - A 0

WHB

WC FEMALE

880

WHB

110 550

*

925

110

D6 D12

600

600 110

*

TRH

550

1800

TRH

8 0274

MIRROR 900x1910mm

HD

1000

WC

7 0274

11

500 110

480

D7 D09

D1 D10

10 0274

G

CL

EQ

110

WC

220

EQ

WC MALE

1910

950

UR

SERVICE DUCT

F

CL

EQ

1680

220 500

110 220

110mm WALL

WC

WC

220

1350

3590

220

220

1910

110 480

UR

*

TRH

10

1070

TRH

D6 D13

E

3370

220

1070

4 0274

*

D6 D15

9

740

220 1205 110

D6 D14

110

1800

220

D7 D11

D

220

URINAL SCREEN

WC MALE

3 0274

8

E

110

HD

110

8015

E

1 0274

480

7

220

SD WHB

1000

C

365

FHR 950

6

220

915

D8 D39

WHB 480

5

1500

110

2 0274

880

475

220

1390

110

5 0274

880

4

220

260

1980

220

B

1350

900

110

6 0274

220

A

3

1910

740

220

740

1

........./......../...............

SIGNATURE

ELECTRICAL

ELECTRICAL CIVIL STRUCTURAL INSTRUMENTATION PROCESS

SIGNATURE : ............................................. MANAGER ENG.

......../........../............

STRUCTURAL ARCHITECTURAL

THIS DRAWING IS THE PROPERTY OF EXXARO AND MAY NOT BE COPIED OR REPRODUCED EITHER WHOLLY OR IN PART WITHOUT WRITTEN PERMISSION

EMP. No.

......../........../............

CIVIL

POWERING POSSIBILITY

EXXARO ACCEPTANCE

......../........../............

JOB / PROJECT NUMBER

237717-00

......../........../............ ......../........../............

SIGNATURE OWNERS REPRESENTATIVE AREA / PROJECT MANAGER

MANAGER ENGINEERING PROCESS & PIPING INSTRUMENTATION

NORTH BLOCK COMPLEX BELFAST COAL MINE INFRASTRUCTURE ......../........../............ AREA 100 ......../........../............ BUILDINGS ......../........../............ MAIN OFFICE BLOCK BLOCK A ABLUTION ELEVATIONS ......../........../............ CENTRE

EMP. No.

......../........../............

SCALE

AS SHOWN

DRAWING NUMBER

NBC-ARP-AR-0275

SHEET

REV

1/3

0A

A1

FILE NAME : D:\d. NPN\EXXARO\1145-17 Main Office Block_detached.rvt

19


Sensory Play Exhibition at The Gateway School

20

2018


PROJECT DESCRIPTION

Client: Play Africa Work for Counterspace Studio The exhibition was a part of a greater Inclusivity Exhibition for the Children’s Museum. It is specifically designed to consider the needs of children with Autism Spectrum Disorder (ASD) and their families. The aim of this exhibition is to make learning accessible and inclusive for all South African children and families through hands-on play. The concept underscores an ‘African bushveld’ theme, also encompassing motifs around the South African national flora and fauna. The exhibition consists of an several elements which work together as a whole. These are an interactive wall; mobile ottoman seats; a play mat; a water table; a carrying trailer and a sunglass stand. My involvement in this project was in work stage 4 -producing working drawings and assigning materials to enable the construction of the final product.

Sensory Panel Image

Elevations and Section 21


22


23


Contemporary African Theatre in Braamfontein (3rd Year)

2017

1. GENERAL NOTES:

9

8 8400

10

8400

SERVITUDE

whb

ie

ie

ie re

wc

RECEPTION AREA

TILED FFL: +11 025

FFL:

TILED +11 025

Disabled Toilet hd

4.5m2

hd

hd

Handrail

∅110mm PVC SP ∅110mm PVC SP

BOOK STORE

Ø100mm uPVC Wate Stack and Open Vent Pipe (Ø150mm sleeve in concrete slab)

PORCELAIN TILES FFL: +11 025

23 22 21 20 19 18 17 16 15 14 13

up to first floor T = 280mm

1 R = 175mm 2 3 4 5 6 7 8 9 11 12

3. CONSTRUCTION NOTES CONTINUED:

Ø50mm WP (Ø70mm sleeve in slab) suspended on the U/S of concrete slab to specialist detail

B

T = 280mm R = 175mm HVAC DUCT

DATA DUCT

15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

CAFE

PORCELAIN TILES FFL: +11 025

Fire Cupboard

UP

fire escape

PUBLIC INFORMATION DESK

16 17 18 19 20 21 22 23 24 25 26 27 28

LOBBY

8mm Equitone fibre cement cladding panels on 120mm steel back-up support system on 400 mm cavity wall

TIMBER FFL: +11 025

LIGHT GREY CEMENT SCREED FFL: +11 025

PUBLIC FORECOURT

PUBLIC FORECOURT

TIMBER FFL: +11 025

PASSENGER'S LIFT

PASSENGER'S LIFT

PORCELAIN TILES FFL: +10 855

PASSENGER'S LIFT

31 M BOUNDARY LINE

UP

ELECTRICAL DUCT

31 M BOUNDARY LINE

up from basement

Ø100mm uPVC Waste Stack and Open Vent Pipe

Ø50mm PVC WP

whb

SECURITY OFFICE / ROOM

ie re

female toilets

SCREED FFL: +11 025

ie

Ø50mm PVC WP

LT ROOM

TICKET OFFICE

2. CONSTRUCTION NOTES:

LOBBY

TIMBER FFL: +11 025

CHANGE ROOM / LOCKERS

T = 280mm R = 175mm

UP

PORCELAIN TILES FFL: +11 025

Line of second floor structure above

T = 280mm 1 R = 200mm

1. All dimensions to be carefully checked on site before any work is done. The roof fabricator is to take all necessary measurements on site before designing, fabricating or erecting the roof structure as the case may be. 2. Virgin soil to be ripped scarified and compacted to at least 95% Mod. AASHTO each layer of fill to be compacted is not to exceed 150mm in depth at a time. Ground under new surface beds shall be treated with approved ant/termite and weed poisoning & certificate is to be handed to Architect. 3. Foundations: SABS 0400 Part H - All foundations to be 650x300mm concrete 25MPa strip foundations, unless otherwise specified on Architects and/or Engineers drawings or specifications. 4. Damp-proofing: SABS 0400 Part J (JJ3) and Part K (KK15) - Install 375 micron USB Green damp-proof membrane to underside of all ground slabs and 375 micron"Brickgrip" DPC to all walls with min. 100mm overlaps at all junctions. Install brickgrip DPC to all window cills. 5. Concrete surface bed to engineer's specification to be laid on waterproofing membrane laid on well compacted ground fill, compaction layers not exceed 150mm in thickness & to 95% min Mod. AASHTO. Laboratory is to undertake compaction tests & results to be handed to Architect prior to casting concrete. 6. All Foundations and Reinforced Concrete Components to be built in accordance with the Structural/Civil Engineer's drawings and details , Concrete Suspended Floors and Roof Structures are to be to the Structural/Civil Engineer's Approval

fire escape

∅110mm Soil Stack and Open Vent Pipe (∅150mm sleeve in concrete slab) Ø50mm PVC WP

ur

whb

ur

TILED +11 025

TILED FFL: +11 025

whb

wc wc

20m2

ie ovp

ie

ur

duct

FFL:

Porcelain Tiles

ie

MANAGEMENT OFFICE

FIRE EXIT

TILED 25.90 M2 FFL: +11 025

13 4840

A

wc

EXIT

LIGHT GREY CEMENT SCREED FFL: +11 025

LIGHT GREY CEMENT SCREED 25.90 M2 FFL: +40

male toilets

whb

REFUSE ROOM

GEN. ROOM

SCREED FFL: +40

re ie ovp

re ie

ie re

whb

SCREED FFL: +11 025

COAT & BAG STORAGE ROOM SWSD

main entrance to basement

HT ROOM

GOOD'S LIFT TILED FFL: +11 025

12 8401

Ø110 uPVC SP laid @ min 1:40 fall under basement floor to sewer MH ∅110mm Soil Stack and Open Vent Pipe

ramp to fall @ 1:8

GOOD'S LIFT LOBBY

8400

Min. Ø150mm municipal sewer line @ 1:40 fall to MH

94.34 M BOUNDARY LINE

ramp to fall @ 1:8

11

8400

20m2

7 8408

Porcelain Tiles

6 8400

wc

5 8400

wc

4 8400

wc

5600

wc

3

7640

wc

2

1

1.1. All work is to comply with National Building Regulations and the Local Authority 1.2. All Materials and Workmanship is to be the best of their perspective kinds. Building materials used in this contract are to conform to SABS Specifications 1.3. All work is to be carried out in strict accordance with the architects instructions 1.4. All Foundations and Reinforced concrete to be built in accordance with the Structural Engineers drawings and Details, Concrete suspended Floors and roof structures are to be to the Structural Engineers Approval. 1.5. All Waterproofing is to be according to specialists Details 1.6. Drainage system to comply with the National Building Regulations and the reqiirements of the Local Authority. Inspection Eyes at all bends and junctions. Rodding eyes to comply with the requirements of the local authority

UNDER-STAGE

2 3 4 5 6 7

FFL:

A C

Line of fouth floor structure above

Theatre above

TILED +11 025

1. Brickwork: SABS 0400 Part K - Bricks to be laid in stretcher bond with joints not exceeding 12mm. Brick walls to receive galvanized brick force every 4th course up to lintel height & every single course above lintels up to wall plate height. 2. Lintels: Precast concrete lintels used over all openings. Installed according to manufacturers specification. 3. Plaster Work: All internal and external plaster work to be min. 10mm thick. A test panel to be done to Architects satisfaction, prior to commencement of all plaster work. 4. Glazing: SABS 0400 Part N - All glazing to be clear unless otherwise specified in Architect's details and schedules. Glass thickness according to the following: (unless otherwise indicated) 0.75 Sq.m - 3mm 1.5 Sq.m - 4mm 2.1 Sq.m - 5mm 3.2 Sq.m - 6mm - Glazing in sliding and folding doors to be 6mm laminated safety glass. - Glazing in bathrooms to be opaque unless otherwise specified. - All glazing in door panels to be 6mm laminated safety glass. - All sliding doors to have safety markers. 5. Drainage: SABS 0400 Part P Sink, Prepbowl 40mm dia PVC Bath, Shower, WHB 50mm dia PVC WC 110mm dia PVC Vent pipes 110mm dia UPVC Stack pipes 110mm dia UPVC 6. Rain Water Goods - Seamless aluminium Ogee profile gutters & down pipes

UP

LOADING BAY

LIGHT GREY CEMENT SCREED FFL: +11 025

A ramp to fall @ 1:12

Line of first floor structure above

MANAGEMENT OFFICE CARPET TILES FFL: +11 025

STAFF OFFICE STAFF OFFICE CARPET TILES FFL: +11 025

CARPET TILES FFL: +11 025

CHANGE ROOM / LOCKERS PORCELAIN TILES FFL: +11 025

PUBLIC FORECOURT PORCELAIN TILES FFL: +9 700

T = 280mm R = 175mm

D PUBLIC FORECOURT

Line of fouth floor structure above

PORCELAIN TILES FFL: +9 700

REV:

UP

TILED 10.80 M2 FFL: -2025

E 94.34 M BOUNDARY LINE

DATE:

DESCRIPTION:

Drawings must not be scaled. Figured dimensions only may be used. Dimensions should be verified on site and any discrepancies reported to the Architects immediatlely.

RAMP LANDING

This drawing is copyright and is property of and must not be retained, copied or used without authority. LECTURER'S MARK:

PROJECT:

Scale 1:100

N

BUS STOP

Ground Floor Plan

WORKING DRAWINGS DRAWING:

JUTA STREET

GROUND FLOOR PLAN Date:

06/09/2017

Scale:

1:100

COURSE NAME: THEORY AND PRACTICE OF CONSTRUCTION III

Drawn By:

CODE: ARPL3031 YEAR: 2017

1111768

DWG NO.

P7-W-002

Ground Floor Plan 24

REV.

0


1. GENERAL NOTES:

9

10

9

1.1. All work is to comply with National Building Regulations and the Local Authority 1.2. All Materials and Workmanship is to be the best of their perspective kinds. Building materials used in this contract are to conform to SABS Specifications 1.3. All work is to be carried out in strict accordance with the architects instructions 1.4. All Foundations and Reinforced concrete to be built in accordance with the Structural Engineers drawings and Details, Concrete suspended Floors and roof structures are to be to the Structural Engineers Approval. 1.5. All Waterproofing is to be according to specialists Details 1.6. Drainage system to comply with the National Building FRANKE stainless steel Regulations and the reqiirements of the Local Authority. wall mounted soap dispenser Inspection Eyes at all bends and junctions. Rodding eyes to comply with the requirements of the local authority

10

Plan of Vanity Scale 1:10

420 375 373

FRANKE Protronic - C battery powered polished chronium-plated brass sensor tap

500

hd

Lobby

Data Duct

503 1180 2020

1010

2018

1010

1010

1275

2020

1010

2020

1010

S

755

1816

1345

whb os

755

858

925

S

2655

S

Lobby

B

hd

2345

1705

896

A

hd

Electrical Duct

1403

1415

2655

whb

Data Duct

HVAC Duct

os

2655

1. Brickwork: SABS 0400 Part K - Bricks to be laid in stretcher bond with joints not exceeding 12mm. Brick walls to receive galvanized brick force every 4th course up to lintel height & every single course above lintels up to wall plate height. 2. Lintels: Precast concrete lintels used over all openings. Installed according to manufacturers specification. 3. Plaster Work: All internal and external plaster work to be min. 10mm thick. A test panel to be done to Architects satisfaction, prior to commencement of all plaster work. Suspended Ceiling 4. Glazing: SABS 0400 Part N - All glazing to be clear unless otherwise specified in Architect's details and schedules. Glass thickness according to the following: (unless otherwise indicated) 0.75 Sq.m - 3mm 1.5 Sq.m - 4mm 575x65x90mm SPAZZIO LIGHTING 2.1 Sq.m - 5mm mirror light with acrylic diffuser 3.2 Sq.m - 6mm & aluminium base - Glazing in sliding and folding doors to be 6mm laminated safety glass. 230mm masonry wall - Glazing in bathrooms to be opaque unless otherwise specified. 230mm masonry wall (in elevation)- All glazing in door panels to be 6mm laminated safety glass. 4x1625x500mm mirror screwed into- wall to All sliding doors to have safety markers. manufacturers specs. 5. Drainage: SABS 0400 Part P Sink, Prepbowl 40mm dia PVC Bath, Shower, WHB 50mm dia PVC WC 110mm dia PVC Vent pipes 110mm dia UPVC Stack pipes 110mm dia UPVC

1570

1856

2566

HVAC Duct

3. CONSTRUCTION NOTES CONTINUED:

1414

A

1040 os

whb

hd

Electrical Duct

2400

os

os

B

255

Wheelchair space

1045

Porcelain Tiles

500

1250

Disabled Toilet

Ø15mm HW supply to fitting (lagged with 15mm insulation)

270

whb

45 45

300

Scale 1:10 S

Ø15mm CW supply to fitting

1620

4.5m²

1182 1010

wc

whb

677

677 1453 hd

whb

whb

1030

whb hd

Duct

1255 500

2655

wc

185

Section A-A of Vanity

135

wc

50

2. CONSTRUCTION NOTES:

1. All dimensions to be carefully checked on site before any work is done. The roof fabricator is to take all necessary measurements on site before designing, fabricating or erecting the roof structure as the case may be. 230mm masonry wall 2. Virgin soil to be ripped scarified and compacted to at least 95% Mod. AASHTO each layer of fill to be compacted is not to exceed 150mm in depth at a time. Ground under new surface beds shall be treated with approved ant/termite and weed poisoning & certificate is to be handed to Architect. 3. Savannah Foundations: SABS 0400 Part H - All foundations to be 420x420x165mm white VAAL 650x300mm concrete 25MPa strip foundations, unless Design surface mounted basin with otherwise specified on Architects and/or Engineers drawings intergrated overflow or specifications. Union Tiles Black Granite stone top 4. Damp-proofing: SABS 0400 Part J (JJ3) and Part K floating vanity (KK15) - Install 375 micron USB Green damp-proof membrane to underside of all ground slabs and 375 micron"Brickgrip" DPC to all walls with min. 100mm overlaps at all junctions. Install brickgrip DPC to all window cills. 5. Concrete surface bed to engineer's specification to be laid on waterproofing membrane laid on well compacted ground fill, compaction layers not exceed 150mm in thickness & to 95% min Mod. AASHTO. Laboratory is to undertake compaction tests & results to be handed to Architect prior to casting concrete. 6. All Foundations and Reinforced Concrete Components to be built in accordance with the Structural/Civil Engineer's drawings and details , Concrete Suspended Floors and Roof Structures are to be to the Structural/Civil Engineer's Approval

os

2655

Ø28mm HW Dropper with isolating valves in bothe directions

wc

hd

1010

Angle regulating valve

Ø28mm CW Dropper with isolating valves in both directions

whb

hd

185 300

255

1250

20m² 500

Ø50mm uPVC WP @ min 1:60 fall

20m²

755

755

Porcelain Tiles

whb

Porcelain Tiles

1010

Male Ablution

Female Ablution

755

whb

2655

wc

500

2180

ur

1010

1150

whb

850

Ø110mm uPVC SP @ min 1:60 fall

wc

90

2518

1010 wc

Ø35mm Main Supply

os

ur

Extractor Fan mounted to suspended ceiling which is fixed to U/S of first floor slab with ventilation sleeve to mechanical eng. detail

500

Ø22mm Supply to WC

Ø15mm HW supply to fitting (lagged with 15mm insulation)

wc

ur

Angle regulating valve

Basin Mounted Soap Dispenser Ø15mm CW supply to fitting

Ø110mm uPVC OVP

1010

wc

755

Isolating Valve

ur

Ø22mm CW supply pipe chased into wall connect directly to concealed cistern

ur

Ø65mm rising cold water main

whb

1257

1010

755

Ø35mm main supply chased in wall Angle regulating valve

wc 1010

wc

ur

Ø35mm main supply chased in wall

A

A

475

500

A

475

A

A

1010

A

6. Rain Water Goods - Seamless aluminium Ogee profile gutters & down pipes To main connection

300

300

Electrical Plan

Drainage & Water Reticulation Plan

Scale 1:50

500 x 200 x 8 mm glazed ceramic tiles fixed with 3mm TAL MARBLEFIX grout to wall to manufacturer's spec.

FRANKE Protronic - C battery powered polished chronium-plated brass sensor tap to manufacturer's spec. REV:

Scale 1:50

Electrical Reticulation Legend 170

Drainage & Water Reticulation Legend

Fluorescent Light Fitting : Ceiling Mounted

DATE:

DESCRIPTION:

Drawings must not be scaled. Figured dimensions only may be used. 420x420x165mm white VAAL Savannah Dimensions Design surface mounted basin with should be verified on site and any discrepancies reported to the Architects immediatlely. intergrated overflow to manufacturer's spec. This drawing is copyright and is property of and must not be retained, copied or used without authority.

Dounble Switch Socket Outlet (15 Amp)

LECTURER'S MARK:

Ø70mm pre-cut vanity surface outlet hole

whb

- Wash Hand Basin

Ceiling Surface Light

Hot Water Supply Pipe

wc

- Water Closet

One-Way Wall light fixture switch

Cold Water Supply Pipe

ur

- Wall Hung Urinal

Two-Way Wall light fixture switch

Drainage : Soil Pipe

ie

- Inspection eye

Wall Mounted Light Fitting

Drainage : Waste Pipe

re

- rodding eye

os

Drainage : Ventillation

sp

- soil pipe

S

165

Main Water Riser from municipal connection

Union Tiles Black Granite floating vanity 150x300mm RC Beam to support floating vanity Ø15mm CW Supply pipe

Ø50mm PVC Basin P-trap 15x300x500mm porcelain tiles to manufacturer's spec.

650

Smoke Sensor Sensor

32x114mm continuous timber wall cleat anchored to wall surface

CW angle regulating valve 20x10mm M-TRIM aluminium wall tile listello

Drainage : Pipe Beneath Slab

NOTE

1. All WHBs have galvanized steel drain cover to Ø50mm Waste pipe with S-Trap 2. All Urinals have bottom outlet Galvanized drain cover to Ø50mm Waste pipe with S-Trap 3. All Disabled Toilet WCs have Ø110mm soil pipe with S-Trap to duct OVP 4. All Concealed Water Cisterns are directly supplied with Ø22mm CW pipe from mains

Drawings must not be scaled. Only figured dimensions must be used. Dimensions should be verified on site. Any discrepancies must be reported to the architect immediately .

Smoke Alarm

NOTE Drawings must not be scaled. Only figured dimensions must be used. Dimensions should be verified on site or on the lighting and electrical schedules. Any discrepancies must be reported to the architect immediately . NOTE : FOR FULL DETAILS PLEASE REFER TO THE CONSULTANTS DRAWINGS

NOTE : FOR FULL DETAILS PLEASE REFER TO THE CONSULTANTS DRAWINGS

15x100x500mm porcelain tile skirting with 3mm TAL MARBLEFIX to manufacturer's spec. 15x500x500mm porcelain tiles with 3mm TAL MARBLEFIX to floor to manufacturer's PROJECT: spec on 35mm screed on 255mm RC slab

CONTEMPORARY AFRICAN THEATRE DRAWING:

· ·

Date: Scale:

DRAINAGE & WATER RETICULATION PLAN ELECTRICAL PLAN 25/10/2017

Drainage and Water circulation Plan

Vanity Detail Plan and Section

Drawn By:

1:50

COURSE NAME: THEORY AND PRACTICE OF CONSTRUCTION III

CODE: ARPL3031 YEAR: 2017

1111768

DWG NO.

P7-W-007

REV.

0

25


Section A-A 1. GENERAL NOTES:

2

3

4

5

6

7

9

8

10

11

12

13

Custom made precast concrete coping with drip groove laid onto 'Derbigum' acrylic torch-on counter flashing / cementitous bandage or any other approved SABS product to be installed by approved contractor with at least 10 year guarantee (to overlap waterproofing on parapet wall)

+40 815 +40 815

T.O. Roof Parapet & RC USB T.O.C Roof Slab

+40 815

U/S Fly Tower SLab

8400

8400

8400

8400

8400

4840

Custom made precast concrete coping with drip groove laid onto 'Derbigum' acrylic torch-on counter flashing / cementitous bandage or any other approved SABS product to be installed by approved contractor with at least 10 year guarantee (to overlap waterproofing on parapet wall)

255mm RC Roof Slab to eng detail with derbigum torch-on waterproofing or any other similar SABS approved product on 60mm 'Politerm Blu' thermal insulating screed laid @ min 1:80 fall to FBO's

HVAC Plant Room

+41 340 +41 040 +40 825

'Politerm Blu' thermal insulating screed laid @ min 1:80 fall to F.B.O

255mm RC Roof Slab to eng detail with derbigum torch-on waterproofing or any other similar SABS approved product on 60mm 'Politerm Blu' thermal insulating screed laid @ min 1:80 fall to Green roof Container 5

'Derbigum' torch-on waterproofing or any other similar SABS approved product on 255 x

35 x 450 x 450mm permeable concrete pavers on plastic spacers with crushed rock in between joints laid to fall to Green roof Container 5

500mm RC Green roof USB to eng detail

Suspended Ceiling

HVAC pipes and other services to run within suspended ceiling void

200 mm top soil on 200 mm sub-soil on 100 mm stone layer on 'Derbigum' torch-on waterproofing or any other similar SABS approved product on 100 mm

280mm off shutter concrete wall

LOBBY

ROOF GARDEN

GRASS & CONCRETE PAVERS FFL: +35 125

715mm spandrel panel with double glazed laminated 12mm glass all to facade engineers approval

PLASTER & WALLPAPER FFL: +35 175

THEATRE RESTAURANT

SMOKING AREA

PLASTER & PAINT FFL: +35 175

Fillet

TIMBER FLOOR FFL: +35 175

Suspended Ceiling

HVAC pipes and other services to run within suspended ceiling void

METAL WORKSHOP & STEEL STORE PLASTER & PAINT FFL: +30 275 8mm Equitone fibre cement cladding panels on 120mm steel back-up support system on 400 mm cavity wall

Suspended Ceiling

500mm ceiling void to accomodate pipes laid to fall 255mm RC Green roof container slab. RC to eng. spec.

LOBBY

INTERIOR EXHIBITION SPACE

BALCONY

RESEARCH OFFICE

PLASTER & WALLPAPER FFL: +30 275

PLASTER & PAINT FFL: +30 275

PLASTER & PAINT FFL: +30 275

TIMBER FLOOR FFL: +30 275

T.O. Roof Parapet & RC USB

T.O.C Roof Slab

+39 550

U/S Fourth Floor RC DSB

+38 945 +38 645

T.O. Roof Parapet & RC USB T.O.C. Fire Staircase Slab

12mm laminated double glazed curtain wall supported by 50x150x50mm aluminum mullions to facade engineers detail

T.O. Roof Parapet & RC USB

+35 175

T.O.C Fourth Floor Slab

+34 650

U/S Third Floor RC DSB

50x150x50mm aluminum mullions to facade engineers detail on 40mm screed on DPC on concrete slab Steel lintol cavity tray

TRAINING ROOM

FLY TOWER

PLASTERED & PAINTED

ACOUSTIC PANELS FFL: +25 375

RECITAL HALL PRACTICE & CHANGE ROOMS

THEATRE COMMONS

ADMIN

LOBBY

TIMBER FLOOR FFL: +25 375

TIMBER FLOOR FFL: +25 375

PLASTER & PAINT FFL: +25 375

PLASTER & WALLPAPER FFL: +25 375 Section through 230mm slanted masonry wall

70 x 50mm aluminium window frame on steel window sill laid on top of DPC

Donn Ceilings Flush plastered and painted plasterboard ceiling with Z section shadow line cornice suspended below beam & slab to specialist later detail

Ceiling sound insulation in ceiling void to acoustics specialist specs

CONSTRUCTION ROOM & WOOD STORE

8mm Equitone fibre cement cladding panels on 120mm steel back-up support system on 400 mm cavity wall

ADMIN

PLASTER & PAINT FFL: +25 375

Glass window with aluminium framing finished with natural anoxidation

PLASTER & PAINT FFL: +15 050

BACKSTAGE FACE BRICK FFL: +15 050

600x900x30mm galvanized steel I-Transfer Beam to be fixed on insitu concrete structure with M12 rawl bolts

PRIMARY THEATRE

MAIN STAGE

ACOUSTIC PANELS

ACOUSTIC PANELS FFL: +15 050

525

Steel window sill laid on top of DPC

HVAC pipes and other services to run within suspended ceiling void

HVAC pipes and other services to run within suspended ceiling void

140 x 50mm aluminium window frame

ADMIN

PLASTER & PAINT FFL: +25 375 Suspended skimmed & painted gypsum board ceiling as per Architect's shadowline detail. Fixing to manufacturer's instruction.

4375

PLASTER & PAINT FFL: +25 375

+25 375

T.O.C Second Floor Slab

+24 850

U/S First Floor RC DSB

525

SCULPTURE STORE

PLASTER & PAINT FFL: +25 375

U/S Second Floor RC DSB

8mm Equitone fibre cement cladding panels on 120mm steel back-up support system on 400 mm cavity wall

Exterior Soffit Metal Suspended Ceiling System with C-Shaped Wood Grain Suspended Ceiling Tiles to later detail

SOUND & LIGHTING

ACOUSTIC PANELS FFL: +16 275

THEATRE COMMONS ACOUSTIC PANELS FFL: +16 275

LOBBY

PLASTER & WALLPAPER FFL: +16 275

RECEPTION, BAR & PUBLIC WAITING AREA

715mm spandrel panel with double glazed laminated 12mm glass all to facade engineers approval

12mm laminated double glazed curtain wall supported by 50x150x50mm aluminum mullions to facade engineers detail

FACE BRICK FFL: +16 275

8575

SCULPTURE WORKSHOP RC Concrete Beam and slab to engineers specs

T.O.C Third Floor Slab

+29 750

32795

Suspended Ceiling

HVAC pipes and other services to run within suspended ceiling void

+30 275

60mm high density insulation to later spec.

Off shutter concrete walls with acoustic panels to acoustic eng spec

+16 275

T.O.C First Floor Slab

+15 750 +15 050

U/S Ground Floor RC DSB T.O.C Stage Level Floor Slab

+14 525

U/S Ground Floor RC DSB

+11 025

T.O.C Ground Floor Slab

+10 500

U/S Basment RC DSB

Wooden stage to eng. spec.

LOBBY

PLASTER & WALLPAPER FFL: +11 025

HVAC pipes and other services to run within suspended ceiling void

LOADING BAY LOBBY

UNDER STAGE

PLASTER & PAINT FFL: +7000

RC Concrete Beam and slab to engineer's specs

PLASTER & PAINT FFL: +7000

PUBLIC INFORMATION DESK

Stage lift to mech. eng. spec.

PLASTER & PAINT FFL: +7000

TICKET BOOTH PLASTER & PAINT FFL: +7000

RC Concrete Beam and slab to engineer's specs

3500

Unpainted concrete soffit rubbed down to Architect's approval

1050mm spandrel panel with double glazed laminated 12mm glass all to facade engineers approval

60 mm hardwood Information Desk 110mm single leaf wall

Brick paving

basement ramp falls at 1:8

Unpainted concrete soffit rubbed down to Architect's approval

FIRST FLOOR BASEMENT

Suspended Lift pit to engineers detail

400 x 400 x 14mm natural slate tile, with charcoal colour grouting on 40mm screed on 255mm RC structural floor

cementitous bandage or any other similar SABS approved counter flashing product

Derbigum Torch-on waterproofing with atleast 10 year guarantee or any other similar SABS approved product

basement ramp falls at 1:8

Bidem cloth wrapped around agricultural drain

∅110mm

agricultural drain pipe

RC DSB to eng. detail

DPM laid on top of 100mm concrete base on top of 150mm binding layer on top of 150mm gravel laid to fall to Ø110mm agricultural drain wrapped in bidem cloth

Pile Cap to eng. detail Ø500mm Contiguous bore pile to eng. detail

Pile under ground beam to eng. detail

Section A - A Scale 1:100

26

DPM laid on top of 100mm concrete base on top of 150mm binding layer on top of 150mm gravel laid to fall to Ø110mm agricultural drain

N

RC ground beam to eng. detail

255mm RC structural floor on 40mm protective screed

255mm RC structural floor on 40mm protective screed

DPM laid on top of 100mm concrete base on top of 150mm binding layer on top of 150mm gravel laid to fall to Ø110mm agricultural drain wrapped in bidem cloth

DPM laid on top of 100mm concrete base on top of 150mm binding layer on top of 150mm gravel laid to fall to Ø110mm agricultural drain wrapped in bidem cloth

All foundation components to engineers specs

+7 000

T.O.C Basement Floor Slab

+6 475

U/S Basement RC DSB

LOBBY

CONCRETE FFL: +2975

255mm RC structural floor on 40mm protective screed

Bidem cloth put down to engineer's spec.

PLASTER & WALLPAPER FFL: +7000

Brushed concrete finish to Architect's approval

SECOND FLOOR BASEMENT

Gravel backfill to engineers detail SW Channel

400 x 400 x 14mm natural slate tile, with charcoal colour grouting on 40mm screed on 255mm RC structural floor

DESCRIPTION:

This drawing is copyright and is property of and must not be retained, copied or used without authority. LECTURER'S MARK:

LOBBY

CONCRETE FFL: +7000

Torch-on waterproofing laid above 255mm RC stepped ground floor slab with 50mm screed above

DATE:

3500

Compacted Earth fill in 150mm layers

REV:

Drawings must not be scaled. Figured dimensions only may be used. Dimensions should be verified on site and any discrepancies reported to the Architects immediatlely.

525

Weephole and dpc

Tanked Excavation Basement detail shown

PLASTER & WALLPAPER FFL: +2975

Ø500mm piles seen in elevation with gunnite spray over it

255mm RC structural floor on 40mm protective screed

DPM laid on top of 100mm concrete base on top of 150mm binding layer on top of 150mm gravel laid to fall to Ø110mm agricultural drain wrapped in bidem cloth

8050

Plenum space to mech. eng. spec.

525 700 525

6. Rain Water Goods - Seamless aluminium Ogee profile gutters & down pipes

525

400mm external cavity wall with 60mm cavity with galvanized butterfly wall ties and and brickforce at every 4 courses to engineers detail

1. Brickwork: SABS 0400 Part K - Bricks to be laid in stretcher bond with joints not exceeding 12mm. Brick walls to receive galvanized brick force every 4th course up to lintel height & every single course above lintels up to wall plate height. 2. Lintels: Precast concrete lintels used over all openings. Installed according to manufacturers specification. 3. Plaster Work: All internal and external plaster work to be min. 10mm thick. A test panel to be done to Architects satisfaction, prior to commencement of all plaster work. 4. Glazing: SABS 0400 Part N - All glazing to be clear unless otherwise specified in Architect's details and schedules. Glass thickness according to the following: (unless otherwise indicated) 0.75 Sq.m - 3mm 1.5 Sq.m - 4mm 2.1 Sq.m - 5mm 3.2 Sq.m - 6mm - Glazing in sliding and folding doors to be 6mm laminated safety glass. - Glazing in bathrooms to be opaque unless otherwise specified. - All glazing in door panels to be 6mm laminated safety glass. - All sliding doors to have safety markers. 5. Drainage: SABS 0400 Part P Sink, Prepbowl 40mm dia PVC Bath, Shower, WHB 50mm dia PVC WC 110mm dia PVC Vent pipes 110mm dia UPVC Stack pipes 110mm dia UPVC

3500

Internal skin of cavity to be coated with paint-on water vapour barrier

2. CONSTRUCTION NOTES:

1. All dimensions to be carefully checked on site before any work is done. The roof fabricator is to take all necessary measurements on site before designing, fabricating or erecting the roof structure as the case may be. 2. Virgin soil to be ripped scarified and compacted to at least 95% Mod. AASHTO each layer of fill to be compacted is not to exceed 150mm in depth at a time. Ground under new surface beds shall be treated with approved ant/termite and weed poisoning & certificate is to be handed to Architect. 3. Foundations: SABS 0400 Part H - All foundations to be 650x300mm concrete 25MPa strip foundations, unless otherwise specified on Architects and/or Engineers drawings or specifications. 4. Damp-proofing: SABS 0400 Part J (JJ3) and Part K (KK15) - Install 375 micron USB Green damp-proof membrane to underside of all ground slabs and 375 micron"Brickgrip" DPC to all walls with min. 100mm overlaps at all junctions. Install brickgrip DPC to all window cills. 5. Concrete surface bed to engineer's specification to be laid on waterproofing membrane laid on well compacted ground fill, compaction layers not exceed 150mm in thickness & to 95% min Mod. AASHTO. Laboratory is to undertake compaction tests & results to be handed to Architect prior to casting concrete. 6. All Foundations and Reinforced Concrete Components to be built in accordance with the Structural/Civil Engineer's drawings and details , Concrete Suspended Floors and Roof Structures are to be to the Structural/Civil Engineer's Approval

3. CONSTRUCTION NOTES CONTINUED:

70 x 50mm aluminium window frame on steel window sill laid on top of DPC

HVAC pipes and other services to run within suspended ceiling void

Weephole and dpc

RESEARCH OFFICE

PLASTER & PAINT FFL: +30 275

T.O. Roof Parapet & RC USB T.O.C. Fly Tower Slab

+40 075

+35 755

110 x 400mm single cavity masonry wall to protect waterproofing

HVAC pipes and other services to run within suspended ceiling void

T.O. Roof Parapet & RC USB T.O.C Roof Slab

Custom made precast concrete coping with drip groove laid onto 'Derbigum' acrylic torch-on counter flashing / cementitous bandage or any other approved SABS product

400 x 750mm RC USB to eng detail Stainless steel balustrade @ 1150mm above roof bolted to RC USB to later detail

Stainless steel balustrade @ 1150mm above roof bolted to RC USB to later detail

+43 820 +43 520

300

8400

2695

255mm RC Roof Slab to eng detail with derbigum torch-on waterproofing or any other similar SABS approved product on 60mm 'Politerm Blu' thermal insulating screed laid @ min 1:80 fall to FBO's

8400

1045 525 750 300

8400

600x900x30mm galvanized steel I-Transfer Beam to be fixed on insitu concrete structure with M12 rawl bolts

2450

8400

525 580

5600

4375

7640

Weephole and dpc

1.1. All work is to comply with National Building Regulations and the Local Authority 1.2. All Materials and Workmanship is to be the best of their perspective kinds. Building materials used in this contract are to conform to SABS Specifications 1.3. All work is to be carried out in strict accordance with the architects instructions 1.4. All Foundations and Reinforced concrete to be built in accordance with the Structural Engineers drawings and Details, Concrete suspended Floors and roof structures are to be to the Structural Engineers Approval. 1.5. All Waterproofing is to be according to specialists Details 1.6. Drainage system to comply with the National Building Regulations and the reqiirements of the Local Authority. Inspection Eyes at all bends and junctions. Rodding eyes to comply with the requirements of the local authority

BL boundary line

1

boundary line

BL

+2 975

RC DSB to eng. detail Pile Cap to eng. detail

T.O.C Basement Surface Bed

PROJECT:

WORKING DRAWINGS DRAWING:

SECTION A - A Date:

06/09/2017

Scale:

1:100

COURSE NAME: THEORY AND PRACTICE OF CONSTRUCTION III

Drawn By:

CODE: ARPL3031 YEAR: 2017

1111768

DWG NO.

P7-W-003

REV.

0


1. GENERAL NOTES: 1.1. All work is to comply with National Building Regulations and the Local Authority 1.2. All Materials and Workmanship is to be the best of their perspective kinds. Building materials used in this contract are to conform to SABS Specifications 1.3. All work is to be carried out in strict accordance with the architects instructions 1.4. All Foundations and Reinforced concrete to be built in accordance with the Structural Engineers drawings and Details, Concrete suspended Floors and roof structures are to be to the Structural Engineers Approval. 1.5. All Waterproofing is to be according to specialists Details 1.6. Drainage system to comply with the National Building Regulations and the reqiirements of the Local Authority. Inspection Eyes at all bends and junctions. Rodding eyes to comply with the requirements of the local authority

16mm rawl bolts fixing 10mm S/S balustrade base plate to RC USB to engineer's detail

45° 'Politerm Blu' thermal insulating screed fillet with torch-on waterproofing to engineer's detail

Non-woven continuous filament needle-punched polyester geotextile with minimum 150 mm side laps on woven synthetic sheet on 40mm "zipcore™PRO" cupsated sheet by "kaytech" on one layer of bitumen waterproofing memebrane, with 75mm side laps and 100mm end laps, sealed to primed surface to falls and crossfalls by "torchfusion"

Derbigum torch-on waterproofing or any other similar SABS approved product on 60mm 'Politerm Blu' thermal insulating screed laid @ min 1:80 fall to Green roof Container 5 on 255mm RC Slab to eng. spec.

Ø10mm brushed S/S rods @ 125mm c/c as balustrade panel infill to later detail

Custom made precast concrete coping with drip groove laid onto 'Derbigum' acrylic torch-on counter flashing / cementitous bandage or any other approved SABS product to be installed by approved contractor with at least 10 year guarantee (to overlap waterproofing on parapet wall)

+29 750

2. CONSTRUCTION NOTES:

8mm Equitone fibre cement panels fixed with Equitone rivets on 32mm steel vertical profile on 90mm steel SHS on 340 mm cavity wall

T.O Roof Parapet & USB

Min. 30mm cement screed with 45° fillet on ends laid @ min 1:80 fall to full bore outlet on 100mm expanded polystyrene (eps) insulation with a density of 20kg/m² faced on both sides with bitupaper, laid with edges butt-joined on 255mm RC Green roof container 5 RC slab to eng. spec.

50mm 'Aerolite' fibreglass ceiling insulation

220 x 495mm masonry wall to separate Green roof containers 1350

Weephole & DPC Header course&Lintol Weephole DPC

Gyproc Celotex Fine Fissured mineral fibre ceiling tiles, size 1195x5950x15mm thick Donn® T38FR ceiling grid consisting of Donn® T38FR main tees and Donn® QRC T32V cross tees, all suspended with 19mm strap galvanised suspension hangers at hanger centres not exceeding 1200mm.

Mortar Fill

Glass window with aluminium framing finished with natural anoxidation

T.O.C Roof Slab

20mm Polyethylene filler (Expansion joint)

U/S Roof Slab

2760

+33 895

Bitumen waterproofing membrane in between domed grating frame and roof screed

4375

255

8mm Equitone fibre cement panels fixed with Equitone rivets on 32mm steel vertical profile on 90mm steel SHS on 340 mm cavity wall

1. All dimensions to be carefully checked on site before any work is done. The roof fabricator is to take all necessary measurements on site before designing, fabricating or erecting the roof structure as the case may be. 2. Virgin soil to be ripped scarified and compacted to at least 95% Mod. AASHTO each layer of fill to be compacted is not to exceed 150mm in depth at a time. Ground under new surface beds shall be treated with approved ant/termite and weed poisoning & certificate is to be handed to Architect. 3. Foundations: SABS 0400 Part H - All foundations to be 650x300mm concrete 25MPa strip foundations, unless otherwise specified on Architects and/or Engineers drawings or specifications. 4. Damp-proofing: SABS 0400 Part J (JJ3) and Part K (KK15) - Install 375 micron USB Green damp-proof membrane to underside of all ground slabs and 375 micron"Brickgrip" DPC to all walls with min. 100mm overlaps at all junctions. Install brickgrip DPC to all window cills. 5. Concrete surface bed to engineer's specification to be laid on waterproofing membrane laid on well compacted ground fill, compaction layers not exceed 150mm in thickness & to 95% min Mod. AASHTO. Laboratory is to undertake compaction tests & results to be handed to Architect prior to casting concrete. 6. All Foundations and Reinforced Concrete Components to be built in accordance with the Structural/Civil Engineer's drawings and details , Concrete Suspended Floors and Roof Structures are to be to the Structural/Civil Engineer's Approval

Suspended ceiling 340mm cavity wall with 70mm polystyrene insulation with galvanized butterfly wall ties & brickforce at every 4 courses to eng. detail

+34 150

340mm cavity wall with 70mm polystyrene insulation with galvanized butterfly wall ties & brickforce at every 4 courses to eng. detail

Equitone Rivets with colour matched heads to that of the panel to man. spec.

U/S 2nd Floor DSB

+35 500

35 x 450 x 450mm permeable concrete pavers on plastic spacers with crushed rock in between joints laid on 10x325x200mm S/S C-channel to fall to Green roof Container 5

20mm Polyethylene filler (Expansion joint)

525

Grass cover on 200mm growing medium on 200 mm sub-soil as per landscape architect's detail

110 x 1190 mm single non-loadbearing wall that supports the balustrade and steel c-channel

Ø10mm S/S rod fixing handrail to 75x40mm Polished S/S balustrade beam @ 1500 c/c to eng. spec. fixed to RC USB with rawl bolts to engineer's detail

+30 275

T.O.C 3rd Floor Slab

Stainless steel balustrade @ 1300mm above roof bolted to RC USB to later detail

Ø80mm Polished S/S hand-rail @ 1155mm above roof f.f.l fixed to Ø10mm brushed S/S rod to eng. spec.

60x160mm aluminium window frame on steel window sill laid on top of DPC

255mm RC slab with Full Bore Outlet and Rainwater outlet incased to eng. spec.

3. CONSTRUCTION NOTES CONTINUED:

Mortar fill 400 x 750mm RC USB to eng detail

DPI Plastics 100mm diameter Ultraflo® PVCM Rain Water Down

Pipe incased in 400x600mm RC column to street pavement

Saint Gobain Pipelines South Africa 150mm 90° centre bolt side roof outlet with dome grating

500mm suspended ceiling void to accomodate pipes laid to fall

DPI Plastics 100mm Ø Ultraflo® PVCM Rainwater outlet pressure pipe incased in concrete with integral rubber ring joint or any other similar approved products, to fall @ min 1:40 to RWDP incased in column

METAL WORKSHOP & STEEL STORE

50 x 50 x 10mm steel shadowline cornice Screw to secure aluminium bent profile window sill to precast sill

PLASTER & PAINT FFL: +30 275

DPC

SCULPTURE WORKSHOP

Aluminium bent profile window sill on precast concrete sill

PLASTER & PAINT FFL:

PERIMETER SECTION 1

+25 375

15mm porcelain tile internal sill 10mm plaster and paint

T.O.C First Floor Slab

U/S Ground Floor RC DSB

510

+15 750

1220

500x10mm safety toughened glass spandrel panel supported by 200x55mm aluminum mullions all to facade eng. detail

1195 x 5950 x 15 mm decorative faux tin ceiling tiles, all suspended with 19mm strap galvanised suspension hangers at hanger centres not exceeding 1200mm

400 x 525mm RC DSB to eng detail

525

60x220mm steel bracket bolted to RC concrete slab & fixed to vertical aluminium mullions of curtain wall

1mm self-levelling epoxy on primer on 45mm concrete screed on 255mm RC slab to eng. spec.

+23 750

T.O.C 2nd Floor Slab

645

20mm carpet flooring on 30mm screed on 255 RC slab to eng. spec

765

DPC and cavity lintol

+16 275

+24 850

U/S 1st Floor RC DSB

11

1. Brickwork: SABS 0400 Part K - Bricks to be laid in stretcher bond with joints not exceeding 12mm. Brick walls to receive galvanized brick force every 4th course up to lintel height & every single course above lintels up to wall plate height. 2. Lintels: Precast concrete lintels used over all openings. Installed according to manufacturers specification. 3. Plaster Work: All internal and external plaster work to be min. 10mm thick. A test panel to be done to Architects satisfaction, prior to commencement of all plaster work. 4. Glazing: SABS 0400 Part N - All glazing to be clear unless otherwise specified in Architect's details and schedules. Glass thickness according to the following: (unless otherwise indicated) 0.75 Sq.m - 3mm 1.5 Sq.m - 4mm 2.1 Sq.m - 5mm 3.2 Sq.m - 6mm - Glazing in sliding and folding doors to be 6mm laminated safety glass. - Glazing in bathrooms to be opaque unless otherwise specified. - All glazing in door panels to be 6mm laminated safety glass. - All sliding doors to have safety markers. 5. Drainage: SABS 0400 Part P Sink, Prepbowl 40mm dia PVC Bath, Shower, WHB 50mm dia PVC WC 110mm dia PVC Vent pipes 110mm dia UPVC Stack pipes 110mm dia UPVC 6. Rain Water Goods - Seamless aluminium Ogee profile gutters & down pipes

PERIMETER SECTION 2

70mm mineral wool high density thermal and sound insulation to manufacturers specification

50x60mm wide aluminum shadow line cornice fixed to aluminum mullion REV:

450x10mm safety toughened glass spandrel panel supported by 200x80mm aluminum mullions all to facade engineers detail

PERIMETER SECTION 3

REFERENCE SECTION SCALE 1:500

10mm safety toughened single glazed curtain wall supported by 80x200x80mm aluminum mullions to facade engineers detail

This drawing is copyright and is property of and must not be retained, copied or used without authority.

BL

1

2

3

4

5

6

7

9

8

10

11

7640

5600

8400

+40 815 +40 815 +40 815

65x120mm aluminium automatic sliding door top rail frame

8400

8400

8400

8400

8400

8400

8400

8400

13

BL

4840

T.O. Roof Parapet & RC USB T.O.C Roof Slab U/S Fly Tower SLab

LOBBY

ROOF GARDEN

SMOKING AREA

PLASTER & PAINT FFL: +35 175

TIMBER FLOOR FFL: +35 175

LOBBY

INTERIOR EXHIBITION SPACE

BALCONY

RESEARCH OFFICE

PLASTER & WALLPAPER FFL: +30 275

PLASTER & PAINT FFL: +30 275

PLASTER & PAINT FFL: +30 275

METAL WORKSHOP & STEEL STORE

PLASTER & WALLPAPER FFL: +35 175

THEATRE RESTAURANT

GRASS & CONCRETE PAVERS FFL: +35 125

65x120mm aluminium automatic sliding door bottom rail frame

TIMBER FLOOR FFL: +30 275

RESEARCH OFFICE

PLASTER & PAINT FFL: +30 275

PLASTER & PAINT FFL: +30 275

SCULPTURE WORKSHOP

12mm laminated floor on 2mm foam underlay on 40mm screed on 255 RC slab

SCULPTURE STORE

PLASTER & PAINT FFL: +25 375

PLASTER & PAINT FFL: +25 375

TRAINING ROOM

FLY TOWER

PLASTERED & PAINTED

ACOUSTIC PANELS FFL: +25 375

RECITAL HALL PRACTICE & CHANGE ROOMS

THEATRE COMMONS

ADMIN

LOBBY

TIMBER FLOOR FFL: +25 375

TIMBER FLOOR FFL: +25 375

PLASTER & WALLPAPER FFL: +25 375

PLASTER & PAINT FFL: +25 375

CONSTRUCTION ROOM & WOOD STORE PLASTER & PAINT FFL: +15 050

+11 025

BACKSTAGE FACE BRICK FFL: +15 050

MAIN STAGE

ACOUSTIC PANELS FFL: +15 050

PRIMARY THEATRE ACOUSTIC PANELS

SOUND & LIGHTING

ACOUSTIC PANELS FFL: +16 275

THEATRE COMMONS ACOUSTIC PANELS FFL: +16 275

LOBBY

PLASTER & WALLPAPER FFL: +16 275

T.O.C Ground Floor Slab LOBBY

LOADING BAY LOBBY PLASTER & PAINT FFL: +7000

UNDER STAGE PLASTER & PAINT FFL: +7000

PUBLIC INFORMATION DESK PLASTER & PAINT FFL: +7000

FIRST FLOOR BASEMENT CONCRETE FFL: +7000

SECOND FLOOR BASEMENT CONCRETE FFL: +2975

+10 500

U/S Basment RC DSB

TICKET BOOTH

PLASTER & WALLPAPER FFL: +11 025

PLASTER & PAINT FFL: +7000

ADMIN

PLASTER & PAINT FFL: +25 375

ADMIN

PLASTER & PAINT FFL: +25 375

PROJECT:

HVAC pipes and other services to run within suspended ceiling void

12x3000x4500mm grey MATCO premier grip entrance mat in a wooden Matwell frame screwed to screed

12

boundary line

300x300x14mm Terrazzo tiles on cementitious bandage on min 40mm screed laid to min 1:40 fall on bituminous waterproof membrane on 255mm RC Slab to eng. detail

boundary line

190x80mm dark black anodized aluminum beam or any alternative to support mullions all to facade eng. details with end cap to conceal junction between mullion and beam

DESCRIPTION:

LECTURER'S MARK:

3000

190mmx40mm aluminum mullion supported by 190mmx80mm aluminum beam to eng. detail

DATE:

Drawings must not be scaled. Figured dimensions only may be used. Dimensions should be verified on site and any discrepancies reported to the Architects immediatlely.

RECEPTION, BAR & PUBLIC WAITING AREA FACE BRICK FFL: +16 275

CONTEMPORARY AFRICAN THEATRE DRAWING:

PERIMETER SECTION LOBBY

PLASTER & WALLPAPER FFL: +7000

LOBBY

PLASTER & WALLPAPER FFL: +2975

Date:

06/09/2017

Scale:

1:20

COURSE NAME: THEORY AND PRACTICE OF CONSTRUCTION III

Drawn By:

CODE: ARPL3031 YEAR: 2017

1111768

DWG NO.

P7-W-005

REV.

0

27


Timber-framed House in Melville (2nd Year)

28

2016


GENERAL

THIS EXPLODED METRIC SHOWS TIMBER COMPO TIMBER FRAME STRUCTION

IT IS OF THE BO SHOWN IN THE URAL PLANS (SEE DRAWING

38 38 MM S.S. PINE BATTENS @ 400 C/C ONTO WHICH THE CEDAR SHINGLES ARE NAILED 12 MM THICK OSB SHEATHING WITH BITUMINOUS MEMBRANE ONTOP OF IT

38 X 114 MM RAFTER 38 X 114 MM TIMBER STUDS AT 400 MM C/C

15298

114 X 114 MM TIMBER TRUSS

W 15

W 16

1162 W 14

1455

3250 W 13

8302

NOGGINGS

3948

D GUEST TOILET 14 FFL: +3125 MM TILED

4376

17

No Off:

Window Type:

Location: Window No:

STUDS JAMB STUD

Glazing

16

No Off:

Location:

Window Type: Glazing

Window Sill

Frame finish: Window Sill

JACK STUD

WATERPROOFING AND DAMP PROOFING: 375 MICRON BRICKGRIPPOLYTHENE D.P.C. D.P.C.'S UNDER ALL WALLS AND SCREEN WALLS TO BE 150 MM ABOVE FINISH GROUND LEVEL. · D.P.C.'S UNDER ALL CILLS, BEHIND WEATHER BOARDS AND UNDER RIDGE TILES. VERTICAL D.P.C.'S TO ALL CHANGES IN FLOOR LEVEL. SURFACE BEDS TO BE ON APPROVED WATERPROOFING FORMING A CONTINUOUS SEALED MEMBRANE WITH THE D.P.C.' UNDER WALLS. FLASHINGS TO ALL CHANGES OF ROOF LEVELS AND TO CHIMNEYS. IMPERVIOUS COPINGS TO ALL PARAPETS. · ·

1000

SILL RAIL

1300 650

1880

D 13

BOTTOM PLATE

650

LIVING ROOM FFL: +3125 MM T & G WOODEN FLOOR

No Off:

Location:

A

Glazing

Window No:

Frame finish:

Window Type:

Window Sill

Glazing

698

11

FLOORS: · MINIMUM 25 MM CEMENT SCREED TO ALL FLOORS. · FINISHED SCREED LEVELED TO ENSURE THAT FINAL FINISHES ARE LEVELED THROUGHOUT. · THRESHOLDS TO BE WATERPROOFED. · ALL PATIOS TO BE SCREEDED WITH 1 : 200 FALL.

1885 700

630

625

630

2324

·

DOUBLE 38 X 114 MM BOTTOM RAIL (SITS ABOVE BEARER)

1126

76 X 50 MM JOISTS @ 400 C/C

2058

1162

WALLS: 230 MM BRICK WALL PLASTERED AND PAINTED INTERIOR AND EXTERIOR UNLESS STATED OTHERWISE. BRICK FORCE EVERY 6 COURSES AND EVERY 4 COURSES ABOVE OPENINGS. · ALL BRICK WORK MINIMUM 7 MPA CLASS II. · ALL PAINTWORK TO COMPLY WITH MANUFACTURER'S SPECIFICATION WITH NECESSARY UNDERCOATS. · WINDOWS BUILT IN WITH GUNDLE BRICKGRIP D.P.C. ·

Window No:

13

No Off:

Location:

Window Type: Glazing

Window No:

Frame finish:

Window Type:

12

No Off:

Location:

STAIRS: 1 M HIGH BALUSTRADES TO COMPLY WITH SABS.

·

Glazing

75 X 228 MM BEARER @ 1200 C/C

1161

WINDOWS AND DOORS: AS SHOWN. DONE ACCORDING TO WINDOW AND DOOR SCHEDULES. WINDOW SCHEDULES FOR THE EXISTING BUILDING NOT SHOWN. (ONLY THOSE THAT HAVE BEEN CHANGED OR ADDED HAVE BEEN SHOWN). · WINDOW AND DOOR SCHEDULES AT SCALE 1 : 40 · · ·

CEDAR SHINGLES: · WOVEN AT THE CORNERS TO AVOID CORNER BOARDS. EXPOSED EDGES ARE TREATED WITH POLYWAX SEALER. BUILDING PAPER IS USED TO FLASH CORNERS OF THE TRIMMED SHINGLES.

Frame finish: Window Sill

10

12

14

13

16

9

15

7

8

4

5

3

6

2

1

17

FOUNDATIONS: · ALL FOUNDATIONS, FOUNDATION WALLS, STRUCTURAL CONCRETE WORK AND SUB SOIL STORMWATER DRAINAGE TO CIVIL ENG'S SPECIFICATIONS. · ALL SOIL COMPACTION TO CIVIL ENG'S SPECIFICATIONS. · ALL FOUNDATIONS TO BE REINFORCED AS REQUIRED BY ENGINEER.

Window Sill

Window Sill

2438

Location:

4608

W 11

1166

No Off:

22 MM TONGUE AND GROOVE FLOORING

700

2836

4538

OUTDOOR VERANDA FFL: +2490 MM SHUTTERPLY BOARD

18

14

Frame finish:

W 12

BEDROOM 2 FFL: +3125 MM T & G WOODEN FLOOR

3489

15

2100

D 13

5176

Window No: Window Type:

1540

D 12

960

379

A

NATURAL LIGHT AND GLAZING: · ALL HABITABLE ROOMS TO HAVE MINIMUM 10% NATURAL LIGHT. · ALL GLAZING TO COMPLY WITH PART N OF THE N.B.R. AND SABS 0137-2000 CODE OF PRACTICE; SAFETY AND LAMINATED GLASS TO CONFORM TO SABS 1263. · MINIMUM THICKNESS OF GLAZING PANES: PANES NOT EXCEEDING 0,75SQ.M=3MM THICK, PANES NOT EXCEEDING 1,5SQ.M=4MM THICK, PANES EXCEEDING 1,5SQ.M=6MM THICK. · SAFETY GLASS TO WINDOW PANES LOWER THAN 300 MM FROM FINISHED FLOOR LEVEL.

987

914

BATHROOM FFL: +3125 MM W TILED 17

BEDROOM 1 FFL: +3125 MM T & G WOODEN FLOOR

6713

3476

D 14

3667

2297

800

1989

Window No:

Frame finish:

STUDY ROOM D FFL: +3125 MM 14 T & G WOODEN FLOOR

Arquine Arquine

4603

2360

OPEN PLAN KITCHEN FFL: +3125 MM TILED

DOUBLE 50 X 228 MM HEADER (LINTOL) WITH 14 MM PLYWOOD SPACER

600

1238

600

762

1000

1350

886

W 16

1200

2114

1041

491 1110

1182

2217

560 600

560

530 1199

GENERAL NOTES: · ALL WORK TO COMPLY WITH NATIONAL BUILDING REGULATIONS AND BUILDING STANDARDS, SABS 0400 1990, LOCAL COUNCIL REQUIREMENTS AND ALL RELEVANT SPECIFICATIONS AND CODES. · FIGURED DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALING. OVERALL DIMENSIONS (EXTERNAL) TO TAKE PRECEDENCE. · ALL DIMENSIONS, LEVELS AND HEIGHTS TO BE CHECKED ON SITE AND ANY DISCREPANCIES TO BE REPORTED TO THE ARCHITECTS BEFORE ANY WORK IS PUT IN HAND. · ALL CONCRETE FOUNDATIONS TO BE MINIMUM 600 X 200 MM UNLESS SHOWN OTHERWISE. TOP OF CONCRETE FOUNDATION TO BE A MINIMUM OF 300 MM BELOW NGL. · FINISHED FLOOR LEVELS TO BE A MINIMUM OF 150 MM ABOVE NGL UNLESS OTHERWISE SHOWN. · ALL DOORS TO THE EXTERIOR THAT OPENS OUTWARDS ARE TO HAVE A 15 MM STEP UP TO THE INSIDE OF THE DOOR LEAF, AND THOSE OPENING INWARD ARE TO HAVE A 15 MM STEP UP ALONG THE LONGITUDINAL CENTRELINE OF THE DOOR LEAF. · THE CONTRACTOR IS RESPONSIBLE FOR ALL SITE VISITS BY LOCAL AUTHORITIES AND INSPECTORS AND SHALL PAY ALL FEES IN CONNECTION THEREWITH. · THE SITE TO BE TREATED IN ACCORDANCE WITH S.A.B.S. CODE OF PRACTICE NO.0124-1977 WITH 'SHELLDRITE' TERMITEPRUFE SOIL POISONER. · 170 MM CONCRETE SURFACE BED TO BE ON 'GUNPLAS' USB GREEN DAMP PROOF MEMBRANE ON MINIMUM 50 MM SAND BINDING LAYER ON WELL COMPACTED FILL. (D.P.M. TO BE OVERLAPPED WITH D.P.C. AS REQUIRED).

1200

1120

13754

850

B

GENERAL NOTES

2870 937

UP

38 X 114 MM WALL PLATE

NAME OF SCHOOL

937

UPPER PROPSED NEW DWELLING Scale 1:50

UNIVERSITY OF WIT SCHOOL OF ARCHIT & PLANNING PROJECT TITLE

650

RISER : 193 MM TREAD: 250 MM

B

996

PROJECT 2 - FR MELVILLE HOU 50 7th AVENUE, DRAWING TITLE

NAME OF SCHOOL

813

813

Window No:

813

Window Type: Glazing

2032

00

00

2032

00

Upper Floor Plan

2032

Frame finish:

Exploded Axonometric

Window Sill

11

No Off:

Location:

EXPLODED AXO

UNIVERSITY OF WITWATERSRAND PRISCILLIA 1111 SCHOOL OF ARCHITECTURE N 1 : 20 & PLANNING ARCHITECT

SCALE

PROJECT TITLE

DATE

2016/04/13

PROJECT 2 - FRAMED MELVILLE HOUSE 50 7th AVENUE, MELVILLE29

DR


bound

G

T/0 ROOF +7680

T/0 ROOF +7125

T/0 ROOF +7125 T/0 ROOF +6940

T/0 ROOF +6940

16°

CORRUGATED IRON SHEETING

T/0 ROOF +7680

CEDAR SHINGLES NAILED TO 38X38MM BATTENS. ROOF PITCH IS 16°

114 MM THICK FIBREGLASS THERMAL INSULATION

1 M LANDING TIMBER STAIRCASE RISER: 195 MM TREAD: 345 MM 1 M HIGH TIMBER RAILING

BOUNDARY LINE

CEDAR SHINGLES IN ELEVATION

CEDAR SHINGLES IN ELEVATION 1040

1200

1200

1015 U/S TIMBER RAIL +5215

U/S TIMBER RAIL +5215

W 16

D 13

W 16

75 X 228 BEARER

FFL +3130 U/S WALL PLATE +2765

T/O TERRACE +2490 U/S WALL PLATE +2160

LEISURE ROOM Plastered and Painted

D 7

D 4

TEACHER'S AND ASSISTANT'S OFFICE

75 X 220 MM BULLNOSE BRICK WINDOW SILL PLASTERED AND PAINTED STAIRCASE BALUSTRADE

Plastered and Painted

FFL +0.00

VERANDA LEVEL -105 U/S SLAB -195

WELL COMPACTED HARDCORE 230 MM BRICK BALUSTRADE

BELOW FFL -1115

BELOW FFL -1115

NATU · A · A 0 T · M E 1 · S F

FOUN · A C C · A · A E

170 MM CONCRETE SLAB

KITCHEN FFL +0.00

75 X 110 MM CONCRETE LINTOLS

T/0 LINTEL +2085

Plastered and Painted

U/S CONC. SLAB -215

WATE 3 D A · D U F W W O A

EXPOSED RAFTER

BEDROOM 1 Plastered and Painted

Plastered and Painted

T/0 LINTEL +1570

EXPOSED TRUSS TREATED WITH POLYWAX SEALER 76 MM ISOTHERM INSULATION IN BETWEEN JOISTS

· ·

LIVING SPACE/ OPEN PLAN KITCHEN

600 MM OVERHAND TO FORM TERRACE

GENE A A R C · F S P · A S A · A U T · F N · A H T A · T L F · T O S · 1 G B O ·

230 X 610 MM CONCRETE FOUNDATION TO ENG. SPEC EARTH UNDISTURBED

FLOO · M · F A · T · A

WALL 2 E · B A · A · A S · W ·

SECTION A-A Scale 1:50 30

Section A-A

WIND A D W (

· · ·


Detail and Perimeter Section 31


PRISCILLIA BOKOKO Candidate Architect

2022


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.