INDEX
01 ENTERPRISE 02 LOCATION 03 MONDRAGON COOPERATIVE CORPORATION 04 MISSION & VISION 05 PROJECT PORTFOLIO
01 Enterprise 02 Location
ENTERPRISE CONCEPT
03 MCC
FULL MANAGEMENT OF EMBLEMATIC PROJECTS 04 Mission & Vision CLADDING CONSTRUCTION Curtain wall. Metallic claddings. Indoor metallic finishes. CAPACITY TO ACTION ALL AREAS OF THE PROJECT Design, engineering, production, manufacturing, final mounting. FOCUSED ON LEADERSHIP OF MAJOR BUILDING PROJECTS Public Sector: Airports, railway transport, elevation, hospitals, sports centers, theatres... Private Sector: managerial Headquarters, hotels, work centers... TEAM OF 70 STAFF. ANNUAL TURNOVER OF 15M € LOCATED IN MONDRAGON COOPERATIVE CORPORATION
05 Projects
01 Enterprise 02 Location
LOCATION
03 MCC
HEADQUARTERS · FACTORIES · OFFICES
04 Mission & Vision 05 Projects HEADQUARTERS / PRODUCTION PLANT Pol. Bildosola Auzunea, J1. 48142 Artea . Bizkaia . SPAIN Tel. (+34) 902 541 212 Fax. (+34) 902 331 902
MADRID OFFICE Tel (+34) 639657711 Fax (+34) 902 331 902
CATALONIA OFFICE Pasaje San Antoni Abad, nº1-5 · Local P.B. 08015 · Barcelona Tel (+34) 932 929 040 Fax (+34) 902 331 908
01 Enterprise 02 Location
BUSINESS ENVIRONMENT
03 MCC
MONDRAGON COOPERATIVE CORPORATION 04 Mission & Vision
THE BIGGEST BUSINESS GROUP IN THE BASQUE COUNTRY 10th IN THE RANKING OF SPANISH COMPANIES WORLDWIDE BENCHMARK IN WORK IN CO-OPERATION: 83.860 staff 2010 TOTAL REFUNDS:14.755M € A VERY DIVERSIFIED GROUP: Financial, Industrial, Distribution and Knowledg. PRESENT IN MORE THAN 70 COUNTRIES: With 77 Production plants and 9 Corporate offices TECHNOLOGICAL INNOVATION AND INTEGRATION AS THE DRIVING FORCES BEHIND ITS DEVELOPMENT
05 Projects
01 Enterprise 02 Location
BUSINESS ENVIRONMENT
03 MCC
MCC BUSINESS AREAS / CONSTRUCTION 04 Mission & Vision 05 Projects
URSSA ORONA ULMA PROIEK BIURRARENA ELUR
01 Enterprise 02 Location
MISSION & VISION
03 MCC
PROIEK’S MAIN OBJECTIVES 04 Mission & Vision 05 Projects
To guarantee and improve constantly form the quality of the façades [metallic claddings and curtain walls] and decorative metalworks in singular buildings by the contribution in design of technically solvent solutions and the development of innovative materials; staying closely focused on our customer needs for satisfying them in terms of quality, cost and deadlines. To promote the personal development of our collaborators team, by an internal participative work methodology and sharing mutual aims, as a part of the corporate values that come from our Group.
mission vision To be a referrer in the sector, looking for the leadership in quality, offering profitable solutions to our clients, in collaboration with the architects, and based on an integral service of design, engineering, manufacture and montage.
01 Enterprise 02 Location
MISSION & VISION
03 MCC
ENTERPERISE CAPACITYS & PROJECT MANAGEMENT 04 Mission & Vision 05 Projects
CAPACITY OF ADD VALUE IN EVERY PHASE OF A PROJECT: Industrial Capacity: 6.000 m 2 factory equiped with high tech machinery. Engineering team, expert in calculations, design of exclusive solutions and advanced software use. Integral management capacity of the projects, key in hand. Financial capacity.
These capacitys are fully focused towards complex proyects, with high added value needs, due to the project volume, difficulty of execution or high class material use.
01 Enterprise 02 Location
PROJECT PORTFOLIO
03 MCC
MAIN SECTORS OF ACTUATION 04 Mission & Vision 05 Projects
INSTITUTIONAL CULTURAL BUSINESS CENTERS
HOSPITALS INFRAESTRUCTURE
AND MORE
01 Enterprise 02 Location
HOTEL CATALONIA
03 MCC
2012 · JEAN NOUVEL · DRAGADOS · 12.450m 2 04 Mission & Vision Modular system of cold ventilated façade and warm waterproofed façade. Cladding of prefabricated panel of concrete for the interior face and exclusive front of aluminium and glass for the exterior face. Multilayer isolation system of minimal thickness and the latest technology. Use of mirror finished composite panels, with up to 96% refraction. 110m high building.
05 Projects
01 Enterprise 02 Location
HOTEL CATALONIA 2012 路 JEAN NOUVEL 路 DRAGADOS 路 12.450m
03 MCC 2
04 Mission & Vision 05 Projects
01 Enterprise 02 Location
PORTA FIRAL TORRE 3 2012 路 TDA 路 IBERDROLA 路 10.000m 2 Development of Specific Modular fa莽ade system which combines affixed glass and composite panel. Exclusive and innovative fixing system of panels specially designed and developed for the project. Assembly system using suction cups and moved on rails, for an easier elevation and installation of the glass panels without using any crane or other elevation system. Corner modules made in one piece with no middle column between the two planes. More than 100m high building.
03 MCC
r in p
s s e oc
04 Mission & Vision 05 Projects
01 Enterprise 02 Location
LIFE MARINA IBIZA
03 MCC
2012 路 JEAN NOUVEL 路 GPO 04 Mission & Vision Development of the solution of handrails in terraces. Handrail composed by steel pipes, curved with different radii and a piece of fixing particularly designed for this project. Cladding of the building made of high standard aluminium carpentry, Dorma and Technal, composing sliding, folding or casement closings.
in process
05 Projects
01 Enterprise 02 Location
LIFE MARINA IBIZA
03 MCC
2012 路 JEAN NOUVEL 路 GPO 04 Mission & Vision 05 Projects
01 01 Enterprise Empresa 02 Entorno Location 02
LLEIDA ALGÜAIRE AIRPORT 2009 · B720 · DRAGADOS - OBRUM · 7590 m2 Continued roofing and cladding system, composed by three types of exterior coating: - Perforated scrolled sheet of galvanized and post-laquered steel. - Treated fir timber, R4 and solar protection. - Vegetable roofing based on 15 cm of vegetable substratum. Exclusive curtain wall formed of 300x15 mm of unique satin lacquered steel plate. Cladding in CORTEN steel of the wings of the roofing zone
03 MCC 03 Misión y Visión 04 Localización 04 Mission & Vision Projects 05Proyectos 05
01 Enterprise 02 Location
LLEIDA ALGÜAIRE AIRPORT
03 MCC
2009 · B720 · DRAGADOS - OBRUM · 7590 m2 04 Mission & Vision 05 Projects
01 Enterprise 02 Location
BARCELONA AIRPORT
03 MCC
2008 · IBERBOFIL · ACS / DRAGADOS / COMSA · 29.900m2 04 Mission & Vision Development of light structure for the façade anchorage by a patented aluminium profile of large scale dimensions. Execution of curved, boat-shaped façade profiles Use of glass profiles allowing significantly more light using special U-Glass, extraclear with metallic filaments.
05 Projects
01 Enterprise 02 Location
BARCELONA AIRPORT
03 MCC
2008 路 IBERBOFIL 路 ACS / DRAGADOS / COMSA 路 29.900m2 04 Mission & Vision 05 Projects
01 Empresa 02 Entorno
LOIU - BILBAO AIRPORT 2010 · SANTIAGO CALATRAVA · OHL · 3.000m 2 Development, production and installation of more than 10m wide stainless steel gateways made in one piece with multidirectional finishes. Development of the cladding and roofing based on solid profiles to be installed as a curtain wall
03 Misión y Visión 04 Localización 05 Proyectos
01 Empresa 02 Entorno
LOIU - BILBAO AIRPORT 2010 · SANTIAGO CALATRAVA · OHL · 3.000m 2
03 Misión y Visión 04 Localización 05 Proyectos
01 Enterprise 02 Location
UNDERGROUND STOP - BILBAO
03 MCC
2012 路 UTE METRO TXURDINAGA 路 160 Tn 04 Mission & Vision Users' entrance to the station vestibules and metallic interiors realized in AISI 316L and AISI 310S. Execution of Elements by welding or mechanics no visible fixings. Development of specific solutions of different fixings for metallic interior claddings
IN PROCESS
05 Projects
01 Enterprise 02 Location
NEW EUSKOTREN HEADQUARTERS
03 MCC
2012 · ZAHA HADID · UTE GELTOKI · 7.700m2 04 Mission & Vision Cladding in composite of Zinc - "alive” material with special characteristics of surface finishes. Development of cladding for irregular forms using 3D software tools. Technical solution to combine façade and roof.
IN PROCESS
05 Projects
01 Enterprise 02 Location
ATOCHA [ MADRID ] NEW COMPLEX
03 MCC
2010 路 RAFAEL MONEO 路 DRAGADOS 路 4.150m2 04 Mission & Vision Indoor metallic cladding by RAL9010 lacquered steel panel system of different dimensions, under indications of project and not visible fixings. Exhaustive study of irregular joints among different paraments. Development of specific solutions for metallic interior cladding fixings .
05 Projects
01 Enterprise 02 Location
ATOCHA [ MADRID ] NEW COMPLEX
03 MCC
2010 路 RAFAEL MONEO 路 DRAGADOS 路 4.150m2 04 Mission & Vision 05 Projects
01 Enterprise 02 Location
TRAMWAY STOP SHELTERS
03 MCC 04 Mission & Vision
Modular shelter system installation at the stops of the tramway lines of Bilbao and Vitoria, adaptable to the specific needs and topography of every stop. Modular design which enables to include points of information, publicity panels, ticket machines...
05 Projects
01 Enterprise 02 Location
ALTO DEBA HOSPITAL
03 MCC
2010 · JOSÉ MENCHACA · AMENABAR · 2.850m2 04 Mission & Vision Ventilated façade composed of affixed glass modules. Glass of 7 colours by silk-screen printing in face 2. Opening system made on glass profiles, with aesthetic continuity in line with the structural front.
05 Projects
01 Enterprise 02 Location
ALTO DEBA HOSPITAL
03 MCC
2010 · JOSÉ MENCHACA · AMENABAR · 2.850m2 04 Mission & Vision 05 Projects
01 Enterprise 02 Location
CRUCES HOSPITAL
03 MCC
2011 · JAVIER PÉREZ / IDOM · OTADUY· 4.300m 2 04 Mission & Vision Aluminium profile development of vertical components, 300mm deep, for the perfect fixing of the curtain wall.. Development of curtain wall tridimensional anchorage, to facilitate assembly and reduce execution times.
05 Projects
01 Enterprise 02 Location
CRUCES HOSPITAL
03 MCC
2011 · JAVIER PÉREZ / IDOM · OTADUY· 4.300m 2 04 Mission & Vision 05 Projects
01 Enterprise 02 Location
IMDEA
03 MCC
2011 路 PECSA 路 2.580m2 04 Mission & Vision Installation of double skin shaped by two layers of perforated plates, over a galvanized steel structure. Double skin module formed by an aluminum perforated sheet in the exterior face and another sheet of perforated galvanized steel sheet in the interior face
05 Projects
01 Enterprise 02 Location
IMDEA
03 MCC
2011 路 PECSA 路 2.580m2 04 Mission & Vision 05 Projects
01 Enterprise 02 Location
EXPO ACTUR 4-5 BUILDING 2012 · ESTUDIO LAMELA · UTE ACTUR 4-5 · 7.100m
03 MCC 2
04 Mission & Vision Curtain wall based on a standard SCHÜCO aluminium system, with up to 7,80m mullions built in one piece and anchored in two points, in order to create a regular glass surface. The wall surface is composed of High standard isolating glass plates and non transparent zones.
05 Projects
01 Enterprise 02 Location
EXPO ACTUR 4-5 BUILDING 2012 路 ESTUDIO LAMELA 路 UTE ACTUR 4-5 路 7.100m
03 MCC 2
04 Mission & Vision 05 Projects
01 Enterprise 02 Location
OFFICE BUILDING ERMUA
03 MCC
2010 路 AVANZINI / PALACIOS 路 OLABARRI 路 3.290m2 04 Mission & Vision Double skin of glass fa莽ade composed by a first cladding formed of aluminium carpentry and insulating high standard glass and an exterior screen formed by laminated and tempered glass fixed by structural silicone to glass buttresses, leaving the exterior structure in the simplest form.
05 Projects
01 Enterprise 02 Location
BBVA NEW HEADQUARTERS
03 MCC
2012 路 ORTIZ Y LEON 路 BBVA 04 Mission & Vision Decorative interior metalwork on the project of the new Headquarters of the BBVA in Madrid (Phase I). Execution of handrails, banisters and metallic finished interiors with special attention to meetings between the different paraments. Metallic interior doors of high standard, both multiuse and firebreak, and stainless steel carpentry and glass.
I
OC R P N
ESS
05 Projects
01 Enterprise 02 Location
SAN TELMO MUSEUM
03 MCC
2010 路 NIETO SOBEJANO 路 MOYUA / AMENABAR 路 3.880m2 04 Mission & Vision Exterior skin of the building, roof and fa莽ade, formed by 8mm molten aluminium panels with perforations in a range of angles, with a specifically designed rugose finish. Perforations made by an innovative machine which allows the execution the above mentioned perforations in different angles, producing sharp clean edges.
05 Projects
01 Enterprise 02 Location
SAN TELMO MUSEUM
03 MCC
2010 路 NIETO SOBEJANO 路 MOYUA / AMENABAR 路 3.880m2 04 Mission & Vision 05 Projects
01 Enterprise 02 Location
BODEGAS ITURRIALDE 2012 路 ATERPEAN 路 BODEGAS ITURRIALDE 1.200m
03 MCC 2
04 Mission & Vision Fa莽ade and skylight roofing executed according to LEED certifaction standards. Implementation of photovoltaic systems and development of motorised systems for the automation of the openings of the zone of greenhouses. Design of sliding doors by adjusting Jansen brand systems.
05 Projects
01 Enterprise 02 Location
BODEGAS ITURRIALDE 2012 路 ATERPEAN 路 BODEGAS ITURRIALDE 1.200m
03 MCC 2
04 Mission & Vision 05 Projects
01 Enterprise 02 Location
CARLOS SANTAMARÍA LIBRARY
03 MCC
2010 · JAAM / ANDER MARQUET RYAN · MOYUA · 2.000m2 04 Mission & Vision Stainless steel windows based on thermal break profile system of Jansen brand and isolating glass screen. Curtain wall solution of aluminim reticle installed over a previous installed wooden structure.
05 Projects
01 Enterprise 02 Location
CARLOS SANTAMARÍA LIBRARY
03 MCC
2010 · JAAM / ANDER MARQUET RYAN · MOYUA · 2.000m2 04 Mission & Vision 05 Projects
01 Enterprise 02 Location
BASQUE CULINARY CENTER
03 MCC
2011 路 JAAM / LKS 路 BCC FUNDAZIOA 路 3.690m 2 04 Mission & Vision Collaboration in design and engineering development of mettallic fa莽ade cladding and metallic coatings. Glass closing by commercial standard system of curtain wall composed of a gold anodized aluminium reticle, fixed to the concrete structur by galvanized steel anchorages.
05 Projects
01 Enterprise 02 Location
PISCINAS MENDIZORROZA
03 MCC
2008 路 FERNANDO BAJO 路 ZIKOTZ / URSSA 路 6.100m 2 04 Mission & Vision Curtain wall composed by isolating glass and aluminium system, anchored to an existent steel structure by exclusive anchors, designed specially for this project. Ventilated cladding of motorised aluminium sunscreen profiles
05 Projects
01 Enterprise 02 Location
PASARELA SALA BIKINI
03 MCC
2007 路 RCR ARCHITECTES 路 CONTRATAS Y OBRAS 04 Mission & Vision Tunnel of access to the Room Bikini of Barcelona, composed by 12 and 15 mm thick plaques of "Duplex" Stainless Steel, pioneer in architecture. Variable formats of plaques, being someone of them of up to 20 meters of length,
05 Projects
01 Enterprise 02 Location
PASARELA SALA BIKINI
03 MCC
2007 路 RCR ARCHITECTES 路 CONTRATAS Y OBRAS 04 Mission & Vision 05 Projects
01 Enterprise 02 Location
STAIR COVER - VITORIA
03 MCC
2007 路 ROBERTO ERCILLA 路 EBA S.L. 04 Mission & Vision Cover of mechanical stairs in Vitoria. Cover composed of AISI 316 stainless steel gateways, polished, tubular profiles forming different rectangles creating a warped figure.
05 Projects
01 Enterprise 02 Location
STAIR COVER - VITORIA
03 MCC
2007 路 ROBERTO ERCILLA 路 EBA S.L. 04 Mission & Vision 05 Projects
01 Enterprise 02 Location
IBERDROLA HEADQUARTERS
03 MCC
2011 · TBC · BALZOLA · 225m 2
04 Mission & Vision Interior 37th level metallic cladding, made of 1mm thick “black satin” stainless steel plaques, directly glued to a fire stopping DM panel, in order to build a continuous surface and minimize the joints. The black satin stainless steel is provided of an “antifingerprints” surface finishing, which makes the cleaning easier.
05 Projects