Johnathan Greenage - Work Samples

Page 1

ARCHITECTURE & DESIGN JOHNATHAN GREENAGE

A. 5105 Hunters luck, Stone mountain ,GA 30088 P. 470.244.9363 E. j_greenage@outlook.com -EXPERIENCE SUMMARY55 CORPORATE AVENUE (PM) BRIDGEWATER, NEW JERSEY, USA 500,000 sqft. Business complex undergoing multiphase updates to bring the complex into a modern workplace setting including Atrium, Gym, Servery (employee cafeteria), Dining area, in addition to a multitude of smaller spaces and tenant fitouts within the •complex.Bi-weekly on-site meeting with client & contractors • As-built documentation & Verification • Construction document development, review, markup, &submission • Code Research and implementation • RFIs, Submittals, & Shop Drawing Review 3333 RIVERWOOD PARKWAY (PM) ATLANTA, GEORGIA, USA New office facilities for local Atlanta based investment firm. Due to terms of lease in existing facility ending abruptly this was a fast-track project with a very agressive schedule inlcuding move coordination. • Weekly on-site meetings with client and contractor • FFE & Material selections • Construction Drawing development • Submittal review & Approvals FOODMATE WAREHOUSE EXPANSION (PM) BALLGROUND, GEORGIA, USA • Completion of addition to warehouse as part of existing facility. • Weekly on-site meeting with client for construction review. • Construction document development, review, markup, & submission • Coordination of structural, civil, and MEP documents COACHILLIN' BUSINESS PARK (PC) DESERT HOT SPRINGS , CALIFORNIA, USA New ground up construction utilizing SIP panels on all facets of warehouse facilities. • Construction drawing development • Code Research & Implementation • Structural drawing conversion into CAD format MERCEDES BENZ STADIUM (TEAM STORES)(PC) ATLANTA, GEORGIA, USA Retail location development within new construction roles on project: • Fixture selection, layout, and modeling • Customer circulation performance analysis • Interior and exterior renderings PGA TOUR SUPERSTORES (PC to PM) ACROSS CONTINENTAL UNITED STATES Fast paced development of retail stores across US roles on projects • Coordinate with PGA store design team to achieve brand goals • Develop as-built drawings for existing building • Construction documents and local jurisdiction code research • Maintain communications with building review department CHICK FIL-A RESTAURANTS ACROSS CONTINENTAL UNITED STATES Development of new store locations and tenant remodels. • Visit existing spaces for as-built and initial design schemes. • Coordinate preliminary design with Chick-Fil-A corporate to insure design performace and goals are met. • Model restaurants and equipment. (ADDITIONAL ARCHITECTURAL PROJECT HISTORY AVAILABLE UPON REQUEST)

A. 5105 HUNTERS LUCK, STONE MOUNTAIN ,GA 30088 P. 470.244.9363 E. J_GREENAGE@OUTLOOK.COM SOUTHERN POLYTECHNIC STATE UNIVERSITY AWARDED A BACHELORS OF ARCHITECTURE FROM THE SCHOOL OF ARCHITECTURE COMPUTER AIDED DESIGN AUTO CAD, REVIT, INVENTOR, FUSION, RHINO 3D + GRASSHOPPER, SKETCHUP ADOBE PHOTOSHOP, LIGHTROOM, INDESIGN , ACROBAT GENERAL OFFICE WINDOWS, MICROSOFT OFFICE, BLUEBEAM

• Architectural professional with 8+ years of experience

• Experienced in managing projects from schematic design through construction administration

Project Manager 55 Corporate Avenue | Bridgewater, NJ Working directly alongside client, contractor, and architect of record to maintain tight schedules and high expectations of quality construction on various projects within 500,000 sqft. multitenant campus. I oversaw the initial steps of establishing program in accordance with client standards, proposing new opportunities, and development of projects from schematic design through Construction administration phases. Project Manager 3333 Riverwood Parkway | Atlanta, GA Interior tenant fit-out of full floor tenant on fast track project. I oversaw selection of project team and maintainance of schedule, files, as well as weekly on-site construction meetings to maintain aggressive project deadlines. I recieved experience in FF&E selection as well as material and furniture bid packages. I worked closely with the AoR to make sure all of the clients needs were considered.

• Exposure to a wide-variety of a projects at varying scales and scopes with project managment experience on various small to mid-scale design projects. Hunters Luck , Stone Mountain, GA 30088 | 470.244.9363 | j_greenage@outlook.com

ProjectCoachillin'CoordinatorComplex|Desert Hot Springs, CA Ground up construction of subdivided warehouses using proprietary SIP panel system for white-box construction. I oversaw 3D modeling and development of Construction drawings based on client provided program, worked with the client's consultants and engineers to get drawings through permitting.

5105

PROFESSIONAL SUMMARY JOHNATHAN GREENAGE

PROFESSIONAL SUMMARY SOUTHERNEDUCATIONPOLYTECHNIC STATE UNIVERSITY BACHELOR OF ARCHITECTURE AUTOCADPROFICIENCY|REVIT|RHINO3D | GRASSHOPPER | PHOTOSHOP | INDESIGN | MICROSOFT OFFICE 5105 Hunters Luck , Stone Mountain GA, 30088 | 470.244.9363 | Projectj_greenage@outlook.comCoordinatorMercedesBenzTeamStore|Atlanta, GA Charged with coordination and production alongside internal team with consistent adaptation with updates of overall project. Experience in modeling fixtures and manipulating interior lighting and materials for renderings. Project Coordinator Sports Warehouse | Alpharetta, GA First experience in concrete panel tilt warehouse design and construction from construction documents thru CA phase. Participation ranging from on-site OAC meetings as well as various project documentation. jgreenagePM,21:24 InternChick-Fil-AArchitectRestaurant | Detroit Metro Airport First gained experience in prototyping restaurant typology. Maintaining point of contact for coordination and client interation. Tasked with creation, maintainance, and coordination of ditial models. Typical responsibilities included on-site fieldwork, schematic design, construction documents and permitting

55 ofarea,(employeeAtrium,workplacethemultiphasecomplex500,000Bridgewater,AvenueCorporateNewJerseysqft.BusinessundergoingupdatestobringcomplexintoamodernsettingincludingGym,Serverycafeteria),Dininginadditiontoamultitudesmallerspacesandtenant fit-outs within the complex.

PGA minimalcompletedmakeresponsibilitiesTaskedcontactadministration.permittingsitefeasibilityexperienceProjectthroughoutVariousSuperstoresTourlocationscontinentalUSAmanagementfromon-sitestudiesandselectionthroughandconstructionMainpointofforclientcoordination.withassigningtoteamtosureallprojectsareonschedulewithincident. University Town Center PGA Superstore UNIVERSITY PARKWAY, SARASOTA, FLORIDA 03.20.2018DY201810CLEVELAND P: 216.468.1850 F: 216.464.3610 FORT LAUDERDALE P: 954.703.7830 F: 954.524.8604 www.dorskyyue.com DORSKY YUE INTERNATIONAL ARCHITECTURE LLC SOUTH - WEST CORNER

TAG NAME MANUFACTURER PRODUCT MASONRY VENEER 1 TBD TBD MASONRY VENEER 2 TBD TBD CANOPY ALUCOBOND ALUMINUM COPING PRE-FINISHED ALUM. CONCRETE MASONRY ECHELON TRENWYTH METAL PANELS STONEWOODNORTHCLADOR STOREFRONT FRAME KAWNEER 2500 PG SSG STOREFRONT GLASS 1" INSULATED METAL PANEL SYSTEM STONEWOODNORTHCLADORCMP1COP1SFG1SF1MV1MV2MP1CAN1CM1 D C B A A.1 T.O. 0'-0"F.F12'-0"B.O.28'-0"CMUCANOPYT.O.CANOPY32'-0" T.O. 32'-5"CANOPY Z=0'-0" Z=0'-0" Z=0'-0" Z=-0'-8"Z=7'-0"Z=6'-0"Z=2'-0" Z=0'-0" Z=0'-0"12'-0" 1'-5" 2'-7" 12'-0" 2'-0" 13'-11" 6" 2'-0" 10'-0" 2'-0" 12'-0" 2'-0" A-3011 A-3012 A-3013 A-3014 2'-0" 2'-0"A-301 SIM. 4 GRAPHIC WALL METAL PANEL CANOPY COMPOSITE METAL PANELS OR TILE OFFSET BUTT GLAZED ALUM. STOREFRONT SYSTEM COMPOSITE , METAL PANELS OR TILE CULTURED STONE HATCHVENEER,IS DARKERCOMPOSITECOLOROR METAL PANELS OFFSET BUTT GLAZED ALUM. STOREFRONT SYSTEM METAL COPING COP1 CMP1 CMP1 B2B1 SF1 SF1 CAN1 CMP2 B2B1 CMP1 OC OC OC 1 2 3 4 5 6 7 8 0'-0"F.F F.F0'-0" B.O. 12'-0"CANOPYT.O.CANOPY32'-0" T.O. 28'-0"CMU B.O. 32'-5"T.O.12'-0"CANOPYCANOPYT.O.CANOPY16'-0"T.O.CMU30'-31/2"T.O. 29'-8"CMU T.O. 30'-3CMU1/2" 1/2"21'-41/8"26'-5 Z=3'-4" Z=0'-0" Z=2'-8" Z=1'-4" Z=3'-4" Z=6'-0" 12'-0" 1'-5" 2'-7" A-3021 A-3022 A-3023 A-3024 A-3031 A-3032 EQ.43/8"7'-2 COMPOSITE METAL PANELS OR TILE OFFSET BUTT GLAZED ALUM. STOREFRONT SYSTEM METAL CANOPYPANEL METALCANOPYPANEL OFFSET BUTT GLAZED ALUM. SYSTEMSTOREFRONT METAL COPING COMPOSITE OR METAL PANELS CULTURED STONE VENEER, HATCH IS DARKER COLOR COMPOSITE METAL PANELS OR TILE EXIT DOOR COMPOSITE OR METALMETALPANELSPANELCANOPYMETAL PANELS Z=3'-4"Z=3'-4" LINE OF BEYONDROOFMP1COP1 CULTURED STONE HATCHVENEER,IS DARKER COLOR B2B1 CMP1 SF1 CMP2 CAN1 SF1 CMP1 CAN1CMP1OC OC OA OA OA OA EC A DB.5 C 0'-0"F.F T.O. 28'-0"CMU T.O.12'-0"TRUCKWELL B.O. TRUCK WELL -4'-0" B.O. 12'-0"B.O.28'-0"LEDGECANOPY T.O. 32'-5"CANOPY T.O. 16'-0"CANOPY B SCREEN Z=6'-0"Z=3'-4" Z=1'-4" Z=0'-0" Z=-35'-6"Z=0'-0" A-3034 A-304 SIM. 1 A-3103 WALLGRAPHICAREA EXIT DOOR COMPOSITE METAL PANELS OR TILE METAL CANOPYPANEL SECONDARY SCUPPER PRIMARY SCUPPER W/ DOWNSPOUT Z=1'-4" A-3033 Z=0'-0" A-303 SIM. 2 A-304 SIM. 1 COMPOSITE OR METAL PANELS CONCRETE MASONRY VENEER AT SCREEN WALL, HATCH IS DARKER COLOR LINE OF BEYONDROOF METAL COPING COP1 CM1 CMP1 CAN1 CULTURED STONE HATCHVENEER,IS DARKER COLOR B2B1 CMP1 CULTURED STONE HATCHVENEER,IS DARKER COLOR B2B1 EC OA OA 0'-0"F.F 12345678 T.O. 0'-0"F.F12'-0"B.O.28'-0"CMUCANOPYT.O.CANOPY32'-5" A-3112 A-3041 2'-0" 8" 8" 8" METALCANOPYPANEL OFFSET BUTT GLAZED ALUM. STOREFRONT SYSTEM TRUCKWELL SCREENWALL METAL CANOPYPANELMETALCANOPYPANEL LINE OF BEYONDROOFMETAL COPING COP1 CAN1 CM1 CULTURED STONE HATCHVENEER,IS DARKER COLOR B2B1CAN1 CAN1 OA OA OA OA OA OA OA OA GLASS STOREFRONT WOOD GRAIN PANELS OR TILE EXTERIOR FINISH LEGEND MASONRY VENEER 1 MASONRY VENEER 2 COMPOSITE PANEL SYSTEM (DIRECTLY UNDER CANOPY ONLY) SFG1MV1MV2 CMP1 CMP2 WALL MOUNTED UP/DOWN NARROW ANGLE SCONCE CAST HOUSING WET LABEL BRONZE FINISH 20W LED 6" X 18" 277V ALUMILITE #YRW2 620/LED 277 40K BZ MOUNT AT 14'-0" A.F.F. TO BOTTOM OFFIXTURE.EXTERIOR CUT OFF WALL PACK 277V LITHONIA# CSXWLED 30C 1000 50K TFTM 277 MOUNTDDBXD AT 18'-0" A.F.F. TO BOTTOM OF FIXTURE. LED EXTERIOR EMERGENCY BATTERY BACK-UP CUT OFF WALL PACK WITH INTEGRAL PHOTO CELL 277V LITHONIA #WSR LED 210A700/40K SR111 277 MOUNTPEELCWDDBXDAT8'-0"A.F.F. TO BOTTOM OF FIXTURE.OCOA EC EXTERIOR LIGHTING FIXTURE LEGEND A R C H I T May 07, 17355.002018 34201FLPARK,UNIVERSITYSUPERSTORETOURPGA BLVDCREEKCOOPER856305/29/2018FORPACKAGEBUILDINGSHELL ISSUED FOR A-201PRICINGEXTERIORELEVATIONS3/32"=1'-0"EW 1 WEST (FRONT) ELEVATION 3/32" = 1'-0" 2 SOUTH (SIDE) ELEVATION 3/32" = 1'-0" 3 EAST (REAR) ELEVATION 3/32" = 1'-0" 4 NORTH (DRIVE LANE SIDE) ELEVATION 3/32" = 1'-0" ABBREVIATED FINISH SCHEDULE

ExperienceoveralladaptationinternalandChargedMercedes-BenzStadium:TeamStoreAtlanta,GAwithcoordinationproductionalongsideteamwithconsistentwithupdatesofproject.inmodeling fixtures and manipulating interior lighting and materials for renderings.

ProfessionalBraseltonCenterBuford,GA Medical office / Retail shelly facility located in Bufurd, GA. The design constructionthroughdocuments were handled primarily by myseld with heavy influences based on the governing bodies design guidelines. While initially permitted in 2020 this project is breaking ground in 2022.

11109876 5432 D.3C.7B.5DCBA0"10'0"20'0"-10'6"28'0"80' 0"60' B.4A.7 1 D.5C.5 A3.26 SS S S SSS SSSWWWWWWWS WWW DS DS DS DS DS DS DS DS XXXXXXX XXX 403' 6" 6"-100' 1.5 2.5 3.5 4.5 5.5 6.5 7.5 8.5 9.5 10.5 D.58 A.6A.0 20' 0" 20' 0" 20' 0" 20' - 0" 20' 0" 20' 0" 20' 0" 20' - 0" 20' 0" 20' 0" 20' 0" 20' - 0" 20' 0" 20' 0" 20' 0" 20' - 0" 20' 0" 20' 0" 20' 0" 20' 0" 6"-28'8"22'0"-25'P1 P1P1 P1P1P1P1P1P1P1 LEASABLESPACE Pump RoomElec. 200 201 D.24"-2' PLANFLOOROVERALLANDMEDICALBRASELTON 1/16" = OVERALL1'-0" FLOOR PLAN R E V SDDATEECRPTION 0 7 / 2 0 / 2 0 2 0 P E R M I T T I N G joist bearing16'0" 11 10 9 8 7 6 5 4 3 2 1 top of roof line 30' 5 3/16" A4.22A3.43 403' - 6" 40' 0"40' 0"40' 0"40' 0"40' - 0"40' - 0"40' - 0"40' - 0"40' - 0"40' - 0" joist at elevatedopening17'7"UBR-1, TYP. MR-1, TYP. 1.52.53.54.55.56.57.58.59.510.5D.58 A3.41 1/4"5-30' 2 top of slab1156.00)FFE0'0" 111098765432 A3.21A3.11 A4.11 1 top of roof line 30' 5 3/16" A4.21 A4.22 A3.43 40' 0" 40' 0" 40' 0" 40' 0" 40' 0" 80' - 0" 40' 0" 40' 0" 40' 0" 403' 6" 86' 6" A A B A A A A C A A D A A E A A A A F A A A3.14 A4.31 UBR-1, TYP. UBR-2, TYP. MR-1, UBR-3,TYP.TYP. PREFINISHED METAL GUTTER, TYP. EIFS PANEL TO MATCH UBR-2 1.5 2.5 3.5 4.5 5.5 6.5 7.5 8.5 9.5 10.5 D.58 A3.41A3.33 1/4"5-30' C J C C J C C J C C J C C J C C C J C C C 2 LEGENDGLAZING UNIT TYPE WP MINI WALL PACK LIGHT -SEE ELEC 1t WALL PACK LIGHT FIXTURE -SEE ELEC TCMWP# "TEXTED COATING" -COLOR FINISH INDICATED BY NUMBER C JPROPOSED CONTROL JOINT LOCATION EXTERIOR FINISH SCHEDULE PRIOR TO ORDERING, PAINT COLORS TO BE VERIFIED BY THE ARCHITECT FROM SAMPLES PAINTED ON SITE. MR-1METAL ROOF TO MATCH PAC-CLAD GRAPHITE UBR-1MERIDIAN DARK GREY WIRE -WIRE CUT ALUMINUM STOREFRONT SYSTEM: PREFINISHED TO MATCH PAC-CLAD -"BLACK ANODIZED" -PAC-CLAD GRAPHITE DOWNSPOUTS:PREFINISHED TO MATCH PAC-CLAD -"BLACK ANODIZED" -PAC-CLAD GRAPHITE ROOF EDGE FLASHING @ ALL PANELS: PREFINISHED TO MATCH PAC-CLAD -"BLACK ANODIZED" -PAC-CLAD GRAPHITE DOWNSPOUTFINISHGUARDS:TOMATCH DOWNSPOUT FINISH COLOR UBR-2MERIDIAN LIGHT GRAY -WIRE CUT UBR-3MERIDIAN FLAT SET LIGHT BROWN -WIRE CUT SEALANT AT ALUMINUM STOREFRONT & WINDOWS: TO MATCH TREMCO DYMERIC 240FC, COLOR "DARK BRONZE" SEALANT (PANEL JOINTS): SEALANTTBD(HOLLOW METAL FRAMES): TO MATCH TREMCO SPECTRUM 1, COLOR "OFF WHITE" GROUT COLOR: PROPOSED COLOR SCHEME TYP.: MISC. ITEMS COLORS PROPOSED COLOR SCHEME AT ENTRIES: MR-1METAL ROOF TO MATCH PAC-CLAD GRAPHITE 1/16" = 1'-0"A3.01 WEST ELEVATION 3

SportsAlpharetta,WarehouseGA First gained experience in concrete panel tilt warehouse design and construction from construction documents thru CA phase. Participation ranging from on-site OAC meetings as well as various project documentation and submittal review and Theprocessing.project consisted of both ground up shell construction as well as interior office/ and retail design for tenant fit out.

Chick-Fil Typicalcoordinationcreation,clientcontacttypology.inFirstthroughoutVariousRestaurantsAlocationscontinentalUSAgainedexperienceprototypingrestaurantMaintainingpointofforcoordinationandinteration.Taskedwithmaintainance,andofditialmodels.responsibilities included on-site fieldwork, schematic constructiondesign,documents and permitting

sponsoredDesign-buildAtlantaBeaconBeltlinecompetitionbyAtlantaBeltline Inc. with the intent of finding a desing for benches across the beltline as the beltine expanded. One of various winner but the only design approved for long term installation. The project was underataken by myself and 4 other recent graduates and was self managed in its entirety.

Krog + DesignAtlantaGalleryIrwinBeltlineexercisetoutilised to learn workflow of Rhino 3D to Grasshopper. One modeled analysis was conducted using Revit for potential passive solar concept benefits. Finally the project was post-processed using Adobe Photoshop for rendering and presentation.

LEVELBOARDINGGALLERYLEVEL

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.