![](https://assets.isu.pub/entity-article/user-assets/18965904/1179954b34df126ecf4dbe6379c9dad2b0c7d6b11675979029631.png?crop=400%2C300%2Cx0%2Cy0&originalHeight=300&originalWidth=800&zoom=1&width=720&quality=85%2C50)
2 minute read
Highlights: February 2023
Electors in Area C head to the polls in February
Advance Voting: February 15 & 22, 8am to 8pm
Pomeroy Sport Centre: 9324 96 Street, Fort St. John, BC
General Voting: February 25
Baldonnel Elementary School: 5836 Baldonnel, Baldonnel, BC
Charlie Lake Elementary School: 12655 Charlie Lake Frontage Rd
For more information on voting eligibility, what to bring with you to vote and the candidates, please visit prrd.bc.ca/getoutandvote
Parcel tax roll review panel set
The PRRD will hold a parcel tax roll review panel meeting at 9:30am on February 23. The panel will review any proposed changes to the parcel tax rolls for a number of sewer and water services.
Parcel taxes are local government taxes levied on a unit, frontage or area of a property. Property owners have the right to review the rolls for accuracy and request a correction by February 21, to be considered by the panel. To learn more visit prrd.bc.ca or call 250-784-3200.
Progress report on the new Chetwynd Public Library
![](https://assets.isu.pub/document-structure/230209204458-2b7ee43d4c803d554c7e603ee5f7dd0f/v1/f247d179cc3b0988fdeccb0c03a005f3.jpeg?width=720&quality=85%2C50)
Much work has been done on the new Chetwynd Public Library since the groundbreaking event in May 2022. The 8,600 facility being constructed northeast of the Chetwynd & District Recreation Centre, is following a ‘living room of the community’ design concept while meeting the National Energy Code and BC Energy STEP Code.
Work completed:
• Permitting
• Asphalt removal, installation of water/sewer/storm sewer
• Foundation work
• Blueskin (water-resistive barrier), tile and backfill
• Plumbing rough-ins, slab prep and slab poured
• Erection of glulam (engineered wood beam) structure
• Start of exterior framing
Work planned for next reporting period:
• Continue building framing of exterior and interior walls
• Installation of structural insulated roof panels
• Insulation and air barriers
• Window installation
• Exterior cladding and masonry work