PETER TRAVIS a r c h i t e ct u r e portfolio
TA B L E O F C O N T E N TS
4
PROFESSIONAL WORK
8
URBAN NODE
18
RIBBON HOUSING
26
ASSEMBLY SQUARE
32
BERLIN BLOCKS
38
SPLIT IDENTITIES
44
CORNER WEBBING
48
BOOK BILLBOARD
54
COMMON STUDY
4
HANDEL ARCHITECTS Journal Squared | Jersey City, NJ
New York, NY During my time at Handel Architects I worked on the project team from DDs through CDs for Journal Squared, a 54 story residential high rise in Jersey City, New Jersey. I worked on a range of drawings from podium sections to different building codes drawings such as light and air easements. In addition to Journal Squared, I also worked on Millennium Hollywood during schematic design, a mixed use development in Los Angeles, creating different presentation diagrams and materials for client and city reviews.
* Rendering created by HWKN, for reference
2 A-320
PROPERTY LINE EXTENT OF PATH LIGHT & AIR EASEMENT
4
WEST SHEARWALL
A-319
30'-0"
30'-0" MECH PLENUM
1&2 A-310
EXTENT OF PATH LIGHT & AIR EASEMENT
3 A-310
SW5
1 A-311
SW5
LEVEL 9 T.O.S. EL. +97'-8"
T.O. SHEAR WALL EL. 95'-2"
T.O. PARAPET EL. +78'-6"
LEVEL 8/CLUB T.O.S. EL. +77'-8"
LEVEL 8/CLUB T.O.S. EL. +77'-8"
LEVEL 8/CLUB TERRACE T.O.S. EL. +76'-9"
LEVEL 8/CLUB TERRACE T.O.S. EL. +76'-9"
LEVEL 7/PARKING T.O.S. EL. +65'-0"
LEVEL 7/PARKING T.O.S. EL. +65'-0" EDGE OF CORE BOX
EDGE OF CORE BOX
CHANGE IN SLAB THICKNESS
LEVEL 6/PARKING T.O.S. EL. +56'-3"
BASE OF PATH LIGHT & AIR EASEMENT CHANGE IN SLAB THICKNESS
LEVEL 6/PARKING T.O.S. EL. +56'-3" EDGE OF CORE BOX
El. +53'-6"
LEVEL 5/PARKING T.O.S. EL. +47'-6"
BASE OF PATH LIGHT & AIR EASEMENT EL. 53'-6"
EDGE OF CORE BOX
LEVEL 5/PARKING T.O.S. EL. +47'-6" CHANGE IN SLAB THICKNESS
LEVEL 4/PARKING T.O.S. EL. +38'-9"
LEVEL 4/PARKING T.O.S. EL. +38'-9" EDGE OF CORE BOX
EDGE OF CORE BOX
CONC. VEHICLE BARRIER (TYP)
LEVEL 3/PARKING T.O.S. EL. +30'-0"
SW5
SW5
LEVEL 3/PARKING T.O.S. EL. +30'-0" CHANGE IN SLAB THICKNESS
BASEMENT INTAKE VENT LI-1 IN 2HR ENCLOSURE
LEVEL 2/PARKING T.O.S. EL. 20'-0"
CONC. VEHICLE BARRIER EL. 12'-5" TYP (VB2)
8'4" MIN HOLD
8'4" MIN HOLD
SEE M-102
ROLL DOWN DOORS HOUSING ON STEEL POSTS BELOW BASEMENT INTAKE
BASMENT INTAKE VENT SEE M-102
LEVEL 2/PARKING T.O.S. EL. +15'-11"
RAMP LANDING T.O.S. EL. 9'-8"
15'-0" CHANGE IN RAMP THICKNESS
LEVEL 1/LOBBY T.O.S. EL. 0'-0"/GLOBAL ELEV 88'-6"
CONC VEHICLE BARRIER (TYP) ROLL-DOWN SECURITY SCREEN (NIC)
RAMP MEZZANINE EL. 9'-8"
PARKING RAMP
EDGE OF CORE BOX
TRENCH DRAIN
LEVEL 1/LOBBY T.O.S. EL. 0'-0"/GLOBAL ELEV. 88'-6"
6
EDGE OF CORE BOX
A-340
TOPPING SLAB
LOWER PATH SURFACE LOT EL. -5'-3"
TRENCH DRAIN
LOADING T.O.S. EL. -5'-3" SW5
SW5
4" CURB
BASEMENT LEVEL T.O.S. EL. -15'-6"
HYDRAULIC PATH SECURITY BOLLARDS (NIC)
9'-1"
LEVEL 2/PARKING T.O.S. EL. +15'-11"
BASEMENT LEVEL T.O.S. EL. -15'-6" 14'-117 8"
PROPERTY LINE
BUILDING SETBACK LINE
PROPERTY LINE
110'-0"
BUILDING SETBACK LINE
PROPERTY LINE
PROPERTY LINE
T.O. PARAPET EL. +294'-9 3/4"
PODIUM PARKING SECTION
PODIUM PARKING SECTION 5
6
1
A-427
A-427
1 3 12" 2 2" 4"
30"
3
7
A-427
A-427
30"
UNDERSIDE OF STRUCT. SLAB TYP.
2"
27"
30"
18"
A-427 21 4"
18"
ALIGN FRONT OF CABINET WITH FRONT OF END PANEL
K-4
ST-5
30" CAB-1
30" K-3B
SP
7 A-427
1 3 12" 2 2" 4"
TILE-12
T-7B
2'-0"
FILLER PANEL TO MATCH CABINETS (@ ALL SIDES)
3/4" END PANEL TO MATCH CABINETS; ALIGN WITH FRONT OF COUNTER TOP
ST-5 SP 3 T-21
CABINET INSERT TO MATCH CABINETS 2"
3'-0"
5 A-427
6'-0"
2'-0"
6 A-427 42" TYP.
3'-0" P-36
CAB-1
TILE-12
CABINET INSERT TO MATCH CABINETS UNDERSIDE OF STRUCT. SLAB TYP.
F-28
27" K-1B
1
A-427
30" CAB-1
18"
A-427
18" K-2B
42" TYP.
CAB-1
FILLER PANEL TO MATCH CABINETS (@ ALL SIDES) 14'-117 8"
2'-0"
CAB-1
3'-0"
3'-0"
F-28
10'-0"
P-8
1'-6"
P-8
6"
6"
FIN. SOFFIT @8'-0" A.F.F. TYP.
21 4"
WD-2
T.O. FIN. FLOOR FIN. SOFFIT @8'-0" A.F.F. TYP.
ST-5
SP
3'-0"
CORRIDOR
STORAGE P-36
LEVEL 5/PARKING T.O.S. EL. +47'-6"
LEVEL 4/PARKING T.O.S. EL. +38'-9"
LEVEL 3/PARKING T.O.S. EL. +30'-0"
LEVEL 2/PARKING T.O.S. EL. +20'-0" B.O. PEDESTRIAN WALKWAY CEILING EL. +17'-6"
ELEV. LOBBY
LEVEL 6 PARKING
ELEV. LOBBY
LEVEL 5 PARKING
ELEV. LOBBY
LEVEL 4 PARKING
ELEV. LOBBY
LEVEL 3 PARKING
ELEV. LOBBY
LEVEL 2 PARKING
CAB-1
6" TILE-12
T-7B
ST-5 SP T-21
K-1B
CAB-1
K-2B
WD-2 REMOVABLE BASE CABINET
REMOVABLE BASE CABINET
BATHROOM ELEVATION 5
6
A-427
7
A-427
2
A-427
3
A-427
A-427
THICKENED SLAB 2" UNDERSIDE OF STRUCT. SLAB TYP.
30"
12"
2"
30"
UNDERSIDE OF STRUCT. LINK BEAM @7'-9" A.F.F.
1 4"1 2"
30"
24"
13 4"
6"
P-8
36" TALL CABINETS ON LVL 18, 39 AND 53/PH
FILLER PANEL TO MATCH CABINETS (@ ALL SIDES)
CAB-1
ALIGN FRONT OF CABINET WITH FRONT OF END PANEL
T-7B 2'-0"
TILE-12
2'-0" P-36
2"
12"
30"
P-36
SP
2
3
A-427
3
1 4"1 2"
K-2A24"
A-427 T-21
30"
2'-0" T-21
3/4" END PANEL TO MATCH CABINETS; ALIGN W/ EDGE OF COUNTER TOP P-36
K-1B
K-2A
42" TYP.
42" TYP.
CABINET INSERT TO MATCH CABINETS
SP
WD-2
T.O. FIN. FLOOR REMOVABLE BASE CABINET
T-7B
TILE-12
2'-0" 3'-0"
SP
WD-2
F-28
36" TALL CABINETS ON LVL 18, 39 AND 53/PH
ST-5
BATHROOM ELEVATION
FILLER PANEL TO MATCH CABINETS (@ ALL SIDES)
P-8 CAB-1
ALIGN FRONT OF CABINET WITH FRONT OF END PANEL
TILE-12
ST-5
P-36
13 4"
REMOVABLE BASE CABINET
1'-6"
2'-6"
36" TALL CABINETS ON LVL 18, 39 AND 53/PH
FILLER PANEL TO MATCH CABINETS (@ ALL SIDES)
PODIUM PARKING SECTION
K-1B 27"
WD-2
6"
1'-0"
P-8 F-28
7 A-427
3/4" END PANEL TO MATCH CABINETS; ALIGN W/ EDGE OF COUNTER TOP
SOFFIT PAINTED WITH P-8 ON LVL 18, 39 AND 53/PH
REMOVABLE BASE CABINET
BUILDING SETBACK LINE
CABINET INSERT TO MATCH CABINETS 2"
30"
WD-2
2'-6"
UNDERSIDE OF STRUCT. SLAB TYP. UNDERSIDE OF STRUCT. LINK BEAM @7'-9" A.F.F. T.O. FIN. FLOOR FIN. SOFFIT @7'-6" A.F.F. TYP.
REMOVABLE BASE CABINET
3'-0"
PROPERTY LINE
42" TYP.
A-427
VERIZON ROOM
6'-0"
TEL. SERVICE
42" TYP.
A-427 EJECTOR ROOM
3'-0"
STORAGE
6'-0"
SP 6
5 ELEVATOR CONTROL ROOM
SW6
NONOCCUPIABLE SPACE
3'-0"
ST-5
6"
PE5 T.O. PIT SLAB EL. -5'-7"
F-28
36" TALL CABINETS ON LVL 18, 39 AND 53/PH
ST-5
TILE-12
2'-6"
2'-6"
1'-6"
1'-0"
P-8 F-28
6"
FIN. SOFFIT @7'-6" A.F.F. TYP.
LEVEL 1/WALKWAY T.O.S. EL. -0'-11"
3
27"
SOFFIT PAINTED WITH P-8 ON LVL 18, 39 AND 53/PH
OPEN AIR
LEVEL 1/LOBBY T.O.S. EL. 0'-0"/GLOBAL ELEV. 88'-6"
SUMP PIT, REFER STRUCTURAL DRAWINGS
FILLER PANEL TO MATCH CABINETS (@ ALL SIDES)
3/4" END PANEL TO MATCH CABINETS; ALIGN WITH FRONT OF COUNTER TOP
CABINET INSERT TO MATCH CABINETS K-3B
T.O. FIN. FLOOR
SW6 LEVEL 6/PARKING T.O.S. EL. +56'-3"
BASEMENT LEVEL T.O.S. EL. -15'-6"
2'-0"
2'-0"
TILE-12
CABINET INSERT TO MATCH CABINETS
LEVEL 7/PARKING T.O.S. EL. +65'-0" FUTURE SIGNAGE BY OWNER (N.I.C.)
3'-0"
3'-0"
4
42" TYP.
3
2'-0"
2
LEVEL 8/CLUB TERRACE T.O.S. EL. +76'-9" HOIST BEAM (HOOK) 9000# CAPACITY BY OTHERS
CAB-1
3'-0"
4
K-4
FILLER PANEL TO MATCH CABINETS (@ ALL SIDES)
SIM
LEVEL 8/CLUB TERRACE T.F.F. EL. +77'-8"
F-28 ALIGN FRONT OF CABINET WITH FRONT OF END PANEL
6'-0"
A-318
CAB-1
CAB-1
42" TYP.
T.O. PARAPET EL. +78'-6"
REMOVABLE BASE CABINET
P-8
1'-6"
F-28
1&2 A-316
3&4
6"
REMOVABLE BASE CABINET
P-8
FILLER PANEL TO MATCH CABINETS (@ ALL SIDES)
BUILDING SECTION
5 1
2
A-334-B
A-337-A
1
2
A-334-B
A-337-A SW6
7
12'-9"
10'-3"
12'-9" SW6
25'-8"
SIM
T.O.S. ROOF EL.+572'-7" T.O. OUTRIGGER WALL EL.+570'-2" T.O.S. ROOF EL.+572'-7" T.O. OUTRIGGER WALL EL.+570'-2"
A-360
20'-0"
SIM
LEVEL 9 T.O.S. EL. +97'-8"
12'-9"
2'-8" 10'-3"
12'-9"
CLADDING
CLADDING
21'-10"
BEAM
2 LEVEL 5/PARKING T.O.S. EL. +47'-6"
LEVEL 5/PARKING T.O.S. EL. +47'-6"
LEVEL 4/PARKING T.O.S. EL. +38'-9"
LEVEL 4/PARKING T.O.S. EL. +38'-9"
LEVEL 3/PARKING T.O.S. EL. +30'-0"
2
T.O.S. MECHANICAL LEVEL EL.+543'-10"
T.O.S. MECHANICAL LEVEL EL.+543'-10"
8'-8"
12'-10"
2'-8" 8'-8"
LEVEL 6/PARKING T.O.S. EL. +56'-3"
11'-6"
LEVEL 6/PARKINGT.O.S. EL. +56'-3"
RING BEAM
RING BEAM
FALSE BEAM
T.O.S. LEVEL 54/CLUB EL.+530'-8"
11'-0"
LEVEL 7/PARKING T.O.S. EL. +65'-0"
T.O.S. LEVEL 54/CLUB EL.+530'-8"
T.O.S. LEVEL 53/PH EL.+517'-10"
T.O.S. LEVEL 53/PH EL.+517'-10"
2'-8"
11'-0"
LEVEL 7/PARKING T.O.S. EL. +65'-0"
FALSE BEAM FRAMING FALSE BEAM FALSE BEAM FRAMING
RAISED PLANTER SEE LANDSCAPE DWGS
6'-0"
LEVEL 8/CLUB TERRACE T.O.S. EL. +76'-9"
21'-10"
6'-0"
RAISED PLANTER SEE LANDSCAPE DWGS
2'-8"
BEAM
RING BEAM
11'-6"
SW8
1&2 A-351
26'-9"
RING BEAM
3 A-681
RAISED PLANTER LEVEL 8/CLUB T.O.S. EL. +77'-8"
12'-10"
A-320
T.O. PARAPET EL. +78'-6"
26'-9"
2
SECTION 1/8"=1'-0"
SECTION
ROOFTOP SECTION
1/8"=1'-0"
LEVEL 3/PARKING T.O.S. EL. +30'-0" 02
T.O. BUILDING PARAPET EL. +23'-6"
A-336-A
THICKENED SLAB
LEVEL 2/PARKING T.O.S. EL. +20'-0"
THICKENED SLAB
GEN ROOM T.O.S. EL. +15'-11"
02 A-336-A
3
02
FAA LIGHT AT THE CORNER. SEE E-114 OUTRIGGER WALL
SIM
FAA LIGHT AT THE CORNER. SEE E-114 OUTRIGGER WALL
SIM
A-336-A
02 A-336-A
26'-4" 26'-4"
T.O.S. ROOF EL.+572'-7" T.O. OUTRIGGER WALL EL.+570'-2" T.O.S. ROOF EL.+572'-7" T.O. OUTRIGGER WALL EL.+570'-2"
12'-9"
26'-4"
LEVEL 1/LOBBY T.O.S.
LEVEL 1/LOBBY T.O.S. EL. 0'-0"/GLOBAL ELEV. 88'-6"
26'-4"
12'-9"
A-681
13'-7" 13'-2"
T.O.S. MECHANICAL LEVEL EL.+543'-10"
13'-2"
11'-10"
T.O.S. MECHANICAL LEVEL EL.+543'-10"
T.O.S. LEVEL 54/CLUB EL.+530'-8"
PODIUM PARKING SECTION
1
1
1/8"=1'-0"
SECTION 1/8"=1'-0"
ROOFTOP SECTION
8'-8"
12'-10"
8'-8"2'-8"
11'-6"
2'-8"
SECTION
T.O.S. LEVEL 54/CLUB EL.+530'-8"
12'-10"
11'-6"
11'-6"
8'-8"
11'-6"
12'-10"
8'-8"2'-8"
PROPERTY LINE
2'-8"
PROPERTY LINE
12'-10"
1'-4"
11'-10"
11'-10"
13'-2"
1'-4"
11'-10"
13'-2"
BASEMENT LEVEL T.O.S. EL. -15'-6"
1'-4"
SW8
12'-3"
1'-4"
12'-3"
13'-7"
El. 0'-0"
T.O.S. LEVEL 53/PH EL.+517'-10"
T.O.S. LEVEL 53/PH EL.+517'-10"
SECTION GENERAL NOTES 1.
REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION & ALL FOUNDATION CONDITIONS.
2. REFER TO MEPGENERAL DRAWINGS FOR ADDITIONAL SECTION NOTES 1. 3. 2. 4. 3.
4.
AIR
AIR
LIGHT
LIGHT
AIR
AIR 17
18
18
LVG/DNG U04
LVG/DNG U04
LIGHT
19
BR U07
20
LVR/BR U04
BR U07
20
20
LVG/DNG U04
K.03 U06 SIM
TX
PANTRY U14
26x16
17
CL U08
CL U08 HALLWAY U01 WIC U09
K.10 U06
B.06 U10 OPP
B.02 U10 OPP
B.03 U12
K.14 U06
LVG/DNG U04
W/D U03
HALLWAY U01
TX
32x10
B.04 U11
TX
CS
60X31
LVG U04
HALLWAY U01
SP
DNG U04
CL U02
AIR
22x20
K.11 U06
CORRIDOR 260 SF 1905
CL U02
CL U02
TXE 22x20
W/D U03
32x10
HALLWAY U01
28
CL U02
20
K.12 U06 W/D U03
TX
MBR U07
B.01 U10
HALLWAY U01
CL U02
HALLWAY U01 W/D U03
CL U08
W/D U03
CL U02
AIR
LIGHT
K.03 U06 SIM
W/D U03 BR U07
LIGHT
BR U07
CL U02
21
LIGHT
STR
ETC
HER
28 BR U07
24"
x 84"
24x50
B.08 U10 SIM
SERVICE RM 46 SF 1902
B.02 U10
BR U07
TRASH RM 29 SF 1903
WIC U09
AIR
TX
ELEC 81 SF 1904
32x10
ELEV. LOBBY 232 SF 1901
21
WIC U09 TX
GX
TX 14x22 16x26
LVG/DNG U04
12x26
SP
W/D U03
27
AIR
21X95
B.03 U12
LIGHT
CL U02
DEN U05 K.13 U06
09
CS
LVG/BR U01 TX
LIGHT
18x18 24x50
B.02 U10 OPP
CORRIDOR 218 SF 1906
BR U07
CL U02
W/D U03 TX
18x24
26
AIR
CL U02
HALLWAY U01
32x10
TX
32x10
B.02 U10
CL U08
K.10 U06 OPP
W/D U03
HALLWAY U01
CL U02
HALLWAY U01
B.06 U10
CL U08
HALLWAY U01
CL U02
TX
BR U07
AIR
LIGHT
LIGHT AND AIR CALCULATIONS
26
LVG/DNG U04
K.16 U06
W/D U03 TX 36x12
HALLWAY U01 CL U02
B.02 U10 OPP
K.10 U06 W/D U03
W/D U03
CL U08
CL U08
B.06 U10 OPP
K.03 U06 SIM
LIGHT
WIC U09
PANTRY U14
HALLWAY U01
CL U08
27
CL U08
23 BR U04
AIR
K.03 U06 SIM
25
LVG/DNG U04
25
BR U07
24
BR U07
LVG/DNG U04
24
23
LVG/DNG U04
AIR
LIGHT
LIGHT
INFORMATION. REFER TO STRUCTURAL DRAWINGS FOR MECHANICAL EQUIPMENT IS SHOWN FOR ADDITIONAL INFORMATION & ALL FOUNDATION COORDINATION PURPOSES ONLY. REFER TO CONDITIONS. MECH. DWGS. FOR DESIGN AND SPECIFICATIONS. REFER TO MEP DRAWINGS FOR ADDITIONAL REFER TO RCP'S FOR CLEARANCE INFORMATION. REQUIREMENTS. MECHANICAL EQUIPMENT IS SHOWN FOR COORDINATION PURPOSES ONLY. REFER TO MECH. DWGS. FOR DESIGN AND SPECIFICATIONS. REFER TO RCP'S FOR CLEARANCE REQUIREMENTS.
6
UTILE INC.
GENERAL NOTES:
1. WINDOW QUANTITIES AND LOCATIONS MAY 1. WINDOW VARY FROM QUANTITIES AND LO THOSE INDICATED ON ENLARGED UNIT PLANS. THOSE REFER INDICATED TO ON ENLARGED BUILDING FLOOR PLANS AND ELEVATIONS BUILDING FOR WINDOW FLOOR PLANS AND ELE QUANTITY AND LOCATIONS. QUANTITY AND LOCATIONS.
Metromark Apartments | Jamaica Plain, MA
2. REFER TO FINISH SCHEDULE ON G01 FOR 2. ADDITIONAL REFER TO FINISH SCHEDULE O INFORMATION. INFORMATION.
Boston, MA
3. ALL DIMENSIONS ARE TO FACE OF FRAMING, 3. ALLU.N.O. DIMENSIONS ARE TO FACE
4. ALL DOORS LOCATED 4" FROM WALL, U.N.O. 4. ALL DOORS LOCATED 4" FROM
5. CONFIRM SHOWER/TUB OPENING DIMENSIONS 5. CONFIRM WITHSHOWER/TUB OPENI FINAL UNIT SELECTION. FINAL UNIT SELECTION.
While at Utile Inc. I worked on the project team for Metromark Apartments, a 283-unit residential development located in Boston. I was on the project from the end of SDs through CDs where I was primarily responsible for the design and management of over 70 unique unit types as well as their corresponding bathroom and kitchen layouts. I also was involved on 26 West Broadway during CA, a mid-rise residential project in South Boston.
6. INTERIOR CLOSET SHELVING SHALL BE VINYL 6. INTERIOR COATED CLOSET SHELVING S STEEL ROD SHELVING WITH 9-11 MIL PVC COATING, STEEL ROD 1" SHELVING WITH 9-11 CROSS DECK SPACING, BY CLOSETMAID. PROVIDE CROSS DECK ONE SPACING, 18" BY CLOS WIDE SWEATER STACK IN EACH BEDROOMWIDE CLOSET. SWEATER STACK IN EACH REMAINDER OF SHELVING IN CLOSET TO BE REMAINDER DIVIDED OF SHELVING IN CLO EQUALLY BETWEEN SINGLE AND DOUBLE STACK EQUALLY SHELVES. BETWEEN SINGLE AND PROVIDE 5 - 16" SHELVES IN LINEN/PANTRYPROVIDE CLOSETS5 - 16" SHELVES IN LINE (EXCLUDING LINEN CABINETS). (EXCLUDING LINEN CABINETS).
7. MULTIPLE CEILING AND SOFFIT CONDITIONS 7. MULTIPLE MAY EXIST CEILING AND SOFFIT FOR SAME UNIT TYPE. RCP SHOWN CORRESPONDS FOR SAMETO UNIT TYPE. RCP SHOW MOST COMMON CONDITION. REFER TO OVERALL MOST COMMON BUILDINGCONDITION. REF RCPS (A200 SERIES) FOR SPECIFIC CEILINGRCPS AND (A200 SOFFIT SERIES) FOR SPECIF CONDITIONS. CONDITIONS.
* Rendering created as part of design team, Utile Inc. 4' - 1 3/4"
4' - 4 3/4"
CLOSET 2 GWB 9' - 0 1/8"A.S.F.
1
SC1
SC1
3' - 0 5/8"
8' - 10 7/8"
8' - 10 7/8"
3' - 9 1/8"
7' - 2 7/8" 6' - 4 1/4"
2' - 8"
3' - 3 9/16" W/D
2
B
2' - 2 3/8"
2' - 11 15/16" 1
BEDROOM 2 LIVING ROOM
BEDROOM 2
X3B
2' - 1 11/16"
BEDROOM 1
2A 3 1/4" = 1'-0" 3C.2 3 1/4" = 1'-0"
1/4" = 1'-0"
1 5/8" 5'12' - 6- 3/8"
GWB 7' - 6"A.S.F.
1A B
1
GWB GWBTO 7' - 6"A.S.F.MOUNTED BOTTOM OF UPPER 7' - 6"A.S.F. CABINET OVER SINK
GWB MOUNTED TO 7' - 6"A.S.F. BOTTOM OF UPPER CABINET OVER SINK2 CLOSET GWB 9' - 0 1/8"A.S.F. SW8
MECH
MECH SW8
UP
KITCHEN TYPE 16 - SIM OPP
CLOSET 2 GWB 9' - 0 1/8"A.S.F.
1
SC1 GWB 9' - 0 1/8"A.S.F.
1
GWB 9' - 0 1/8"A.S.F.
1
MECH
1
2' - 9 1/16" 5' - 3 3/4"
2' - 8 7/16"
LIVING ROOM GWB 9' - 0 1/8"A.S.F.
2' - 9 1/16" LIVING ROOM GWB 9' - 0 1/8"A.S.F.
1 BEDROOM 2
SC1
SC1 LIVING ROOM GWB 9' - 0 1/8"A.S.F.
LIVING ROOM GWB 9' - 0 1/8"A.S.F.
8
3D.2 - RCP 1/4" = 1'-0"
2
3D.2 - RCP 8 1/4" = 1'-0" 3C.1 - RCP 1/4" = 1'-0"
LIVING ROOM
1
2' - 9 3/8" 3' - 3 3/16"
LIVING ROOM
STEP UP TO DECK
1
1/4" = 1'-0"
3D.2
1/4" = 1'-0"
1
1/4" = 1'-0"
3' - 3 3/4"
1 F
4' - 1 1/4"
2
CLOSET 2 1
G
GENERAL NOTE: GENERAL NOTE: PROVIDE CRUMB RUBBER ACOUSTIC PROVIDE CRUMB RUBBER ACOUSTIC FLOOR UNDERLAYMENT IN ALL NON-TILED FLOOR UNDERLAYMENT IN ALL NON-TILED SPACES AT LEVEL B2 SPACES AT LEVEL B2
EX5
1' - 4 15/16"
1' - 4 15/16" 4' - 1 1/4" 6' - 2 5/16"
MOVABLE3' - 7 1/4" ISLAND
2' - 8 1/4"
6' - 2 5/16"
1' - 10" DN
1' - 5 1/16" SC1
SC1
1/4" = 1'-0"
1/4" = 1'-0"
2
E10
3D.2 7 7 TYPICAL DUPLEX RCP AND FLOOR PLAN3C.1(LEVEL 2) 3C.1 - RCP 3C.1 2
0' -110 13/16"
1
KITCHEN TYPE 16 - SIM OPP CLOSET 2 MECH 1 1
1
3' - 3 3/16"
1
2' - 8 7/16"
UP
G
1 MOVABLE 2' - 5 1/2" ISLAND
2' - 5 1/2"
1
F
SC5
3' - 3 3/4" 2A
6' - 2 7/8"
E10 E7 CLOSET 1 3' - 3 3/4" 1 1 CLOSET 5
1
2A
POWDER TYPE 2
1
E15 1 E10 0' - 10 13/16" E7 CLOSET 1
CLOSET 5
6A
B
1
2A 1 3' - 3 3/4" B 2A
6' - 2 7/8" 1
LINEN
1A
POWDER 5' - TYPE 10 7/16"2
KITCHEN TYPE 20
1
6A 6' - 4 3/16" BATHROOM 2 TYPE 8
7' - 3 1/2"
E15
1 3'1- 9 1/16" B
5' - 10 7/16"
KITCHEN TYPE 20 CLOSET 1
1A
1A
A
1' - 10"
2' - 1 1/2"
3' - 9 1/16"
1A
R
2' - 6 15/16" 6A
STORAGE LINENBEDROOM 3 1 1 B
BEDROOM 3 1 1
SC1
SC1
CLOSET 2 E7
A
1' - 10 5/8" 6' - 4 3/16"3' - 4 1/2" BATHROOM3'2- 0 5/8" MIN. TYPE 8
E10
DN
3' - 7 1/4"
1 2' - 8 1/4" 1' - 5 1/16"
2' - 9 3/8"
2' - 6 3/4"
SC5
2' - 6 15/16"
2' - 5" 7' - 3 1/2"
6A
STORAGE
F
GWB 7' - 2"A.S.F.
SC1
B
CLOSET 2 3' - 4 1/8" E7
SC5 CLOSET 1
CLOSET 5 GWB GWB 7' - 2"A.S.F. 9' - 0 1/8"A.S.F.
CLOSET 5 GWB 9' - 0 1/8"A.S.F.
R
SW1
11' - 11 1/4"
12' - 9 1/16" 1' - 5 3/4"
6A
BATHROOM 1 TYPE 2
1
1A
TYPICAL DUPLEX RCP AND FLOOR 3D.1 PLAN (LEVEL 1) 3D.1 - RCP 3D.1 1/4" = 1'-0"
3' - 0 1/2"
6' - 2 5/16"
6A
B
3' - 9 1/8"
1A
1A
3' - 4 1/2" 3' - 0 5/8" MIN.
SC1
SC1
SC5
1A
1
1' - 5 3/4"
POWDER TYPE 2 GWB-MR 9' - 0 1/8"A.S.F.
1' - 10 5/8"
2' - 1 1/8"
1A
BATHROOM 2 TYPE 8 GWB-MR 9' - 0 1/8"A.S.F. LINEN
BATHROOM 2 TYPE 8 F GWB-MR 9' - 0 1/8"A.S.F. SW7 GWB STORAGE LINENSW7 GWB STORAGE SW1 GWB 9' - 0 1/8"A.S.F. GWB 9' - 0 1/8"A.S.F. 9' - 0 1/8"A.S.F. 9' - 0 1/8"A.S.F. SC1 SC1 GWB-MR GWB-MR POWDER 9' - 0 1/8"A.S.F. 9' - 0 1/8"A.S.F. TYPE 2 F MOUNTED TO MOUNTED GWB-MRTO BOTTOM OF UPPER OF UPPER 9'BOTTOM - 0 1/8"A.S.F. CABINET OVER SINK CABINET OVER SINK
1' - 7 5/8"
D
6A
1
BEDROOM 1 BEDROOM 2
5
5' - 6 3/8"
3' - 0 1/2"
6A
F
1
1
D
1' - 7 11/16"
1
BEDROOM 1
3C.2
MECH G
4' - 0 1/4"
3' - 8 3/4"
2' - 4 3/4"
1
2' - 3 1/4"
3' - 3 9/16"
1' - 5 5/8"
3' - 11 1/16" 2' - 2 3/8" 2' - 1'11- 15/16" 4' - 5 1/8" 9 1/2" 1
1'
1
1
7' - 2 7/8"
2' - 5"
W/D
B
E10
11
3' - 4 1/8"
3
3' - 2 3/4"
2' - 3 1/4"
2' - 4 3/4"
2' - 1 7/8" 1' - 10 1/8" 4' - 4 3/4"
E10
1
1
3' - 1 5/8"
6' - 5 3/4" 1
CLOSET 2 2' - 3 1/4"
2' - 4 3/4"
2' - 4 3/4" 2' - 1 7/8"
3' - 8 3/4"
MOVABLE 4' - 0 1/4" 2' - 3 1/4" ISLAND
LINEN
2' - 8"
3' - 1 5/8"
1' - 10 1/8"
2
CLOSET 4
1' - 8 1/8"
2' - 2 5/8" 3' - 7 5/8"
1' - 5 5/8"
4' - 5 1/8" 4' - 1 1/4"
2' - 0 5/8"
2' - 4 1/2"
1
E10
SW1
BEDROOM 3
E3
E15BATHROOM 1 TYPE 2
1
1/4" = 1'-0"
1
2 B
6' - 2 5/16"
B
3' - 3 3/4"
CLOSET 4
1A
5' - 3 3/4"
5
1
B
E10 B
CLOSET 3 E5 1
1' - 10 5/8"
A
2A
1A KITCHEN TYPE 2
12
1 BEDROOM 3BEDROOM 2
STEP UP TO DECK
1/4" = 1'-0"
1
1 B
4' - 11 3/4" 1
EX5
6
1' - 8 1/8"
3' - 0 5/8" 5' - 5"
5' - 5"
4' - 1 1/4"
2' - 2 5/8" 2' - 0 5/8"
1' - 4 15/16"
1' - 4 15/16" 4' - 1 1/4"
3' - 7 5/8" 4' - 5 1/8"
4' - 1 1/4" 2' - 4 1/2"
2' - 8"
1' - 9 1/2"
6' - 0 3/4"
1 BEDROOM 3 LIVING ROOM
1/4" = 1'-0"
GWB 9' - 0 1/8"A.S.F.
1
2
CLOSET 1
BEDROOM 2 GWB 9' - 0 1/8"A.S.F.
SC1
4' - 5 1/8"
SC1
2' - 1 1/4"2' - 1 1/8"
1
1A
1' - 10 1/8"
1
BEDROOM 2 GWB 9' - 0 1/8"A.S.F.
1
1 W/D CLOSET 4
D
3' - 2 5/8" 3' - 0 5/8" MIN.
CLOSET 3 1
BATHROOM 2 6A TYPE 6
B
1A
1
1 6A
1
G DN
1
C1 E10
3' - 11 1/16"
13' - 4 1/2"
1 1
1
1 2' - 1 11/16"
1
MECH
4' - 3 1/4" 1
B CLOSET 1
1
1' - 7 5/8"
CLOSET 3
BEDROOM 1 GWB 9' - 0 1/8"A.S.F.
SC1
3' - 0" 5' - 10 1/4"
1 E3
1
1' - 5 3/8"
3' - 3 3/4"
CLOSET 4
1' - 10 1/8"
D
1' - 10 1/8"
B
CLOSET 2 GWB 9' - 0 1/8"A.S.F.
1
CLOSET 5
D
2' - 6 3/4"
1
CLOSET 3 1
W/D
1
1/4" = 1'-0"
SW1
GWB 9' - 0 1/8"A.S.F.
2' - 11 7/16" 1
CLOSET 1
E10
SW1
B
1A
1A
12' - 1 5/8"
1
C1
W/D
4
1/4" = 1'-0"
2' - 8"
1
2' - 9 1/4"
1
6A
1
1
B
6' - 0 3/4" 4' - 11 3/4"
SC1
1
1
SC1
UP
1' - 10 1/8"
2
E15
F SW1
1
E10
1' - 10 5/8"
B
2' - 101 3/4"
2' - 11 7/16" C1
CLOSET 3
4
6' - 0 1/4"
F
BEDROOM 2 GWB 9' - 0 1/8"A.S.F.
LINEN
B
BEDROOM 2 GWB 9' - 0 1/8"A.S.F.
1
TYPE 6
1
1
C1
2' - 10 3/4"
- 0 11/16" 0' - 11 1/4" 5' - 12'1/2" E10
SC1
BEDROOM 3
DEN
2' - 4 1/2"
SC6
BATHROOM 1 TYPE 2 GWB-MR 9' - 0 1/8"A.S.F.
1/4" = 1'-0"
1
B
2' - 8 1/4"
GWB-MR 8' - 0"A.S.F.
BATHROOM 1 TYPE 2 GWB-MR 9' - 0 1/8"A.S.F.
2' - 10 3/4"
GWB 8' - 6 1/8"A.S.F.
BEDROOM BEDROOM 3 2 GWB GWB 9' - 0 1/8"A.S.F. 9' - 0 1/8"A.S.F.
SC1
SC1
SC1
G
1' - 5 3/8"
CLOSET 4
CLOSET 1
2' - 10 1/4"
1
6'1'--653/4" 1/2"
3' - 2 3/4" BE10
A
MECH UP
1
2' - 4 1/2"
W/D GWB 9' - 0 1/8"A.S.F. GWB-MR 8' - 0"A.S.F.
CLOSET 1 GWB 9' - 0 1/8"A.S.F. SC6
BEDROOM 1 GWB 9' - 0 1/8"A.S.F.
DEN
2' - 9 1/4"
W/D GWB 9' - 0 1/8"A.S.F.
CLOSET 1 GWB 9' - 0 1/8"A.S.F.
GWB 9' - 0 1/8"A.S.F.
BEDROOM 2 GWB 9' - 0 1/8"A.S.F.
BEDROOM 3 GWB 9' - 0 1/8"A.S.F.
LIVING ROOM GWB 9' - 0 1/8"A.S.F.
2A - RCP 2A 3 TYPICAL TWO BEDROOM RCP AND FLOOR PLAN 3C.2 - RCP 3C.2 - RCP
1' - 105'5/8" - 1 11/16"
GWB 9' - 0 1/8"A.S.F.
CLOSET 4
CLOSET 4 GWB 9' - 0 1/8"A.S.F.
A
2A
1
0' - 11 1/4"
CLOSET 5
W/D
D
BEDROOM 1
4A
1
11' - 0 13/16"
11' - 0 13/16"
SC6
CLOSET 4
1
SC1
G
2' - 8 1/4"
CLOSET 3 GWB 9' - 0 1/8"A.S.F.
4' - 4 3/4"
MECH
1
GWB 8' - 6 1/8"A.S.F. GWB 3 9' -CLOSET 0 1/8"A.S.F. GWB 9' - 0 1/8"A.S.F.
BEDROOM 1 GWB 9' - 0 1/8"A.S.F.
SC1
1/4" = 1'-0"
GWB 9' - 0 1/8"A.S.F.
GWB 9' - 0 1/8"A.S.F.
2' - 5" LIVING ROOM GWB 9' - 0 1/8"A.S.F.
A
SC1
GWB 9' - 0 1/8"A.S.F.
1
3' - 0 5/8" MIN.
4' - 3 1/4" 16A
1A
KITCHEN 1A TYPE 2
0' - 11 1/4"
2' - 1 1/2"
7
GWB 8' - 6 1/8"A.S.F.
DEN GWB 9' - 0 1/8"A.S.F.SC6
SC10
SC10
6A
B
1A
1
1/4" = 1'-0"
2' - 4 1/2"
SC1
CLOSET SW15 GWB 9' - 0 1/8"A.S.F. CLOSET 2 GWB SC10 9' - 0 1/8"A.S.F. GWB SC10 9' - 0 1/8"A.S.F.
W/D GWB 9' - 0 1/8"A.S.F.
3' - 4 3/4"
2' - 0 11/16"
1 6' - 3 3/4"1' - 10 5/8" 3' - 2 5/8"
CLOSET 3 B BATHROOM 1 E5 DNBATHROOM TYPE 5 2A
1 B
BATHROOM TYPE 6
6A
BEDROOM 1 2' - 10 3/4"
2' - 0 11/16"
X3B
1/4" = 1'-0"
MECH
2' - 4 1/2"
DEN GWB 9' - 0 1/8"A.S.F.
CLOSET 5 GWB 9' - 0 1/8"A.S.F.
LINEN
SC6
3' - 4 3/4"
EX5
5' - 1 11/16"
GWB 9' - 0 1/8"A.S.F.
F
SC1 SW1 MOUNTED TO BOTTOM OF UPPER CABINET OVER SINK CLOSET 2 GWB 9' - 0 1/8"A.S.F.
GWB 9' - 0 1/8"A.S.F.
SC6
1A
B 2' - 10 1/4"
STEP UP TO DECK
EX5 EX7
7
GWB SW8 8' - 6 1/8"A.S.F.
W/D GWB 9' - 0 1/8"A.S.F.
GENERAL NOTE: GENERAL NOTE: PROVIDE CRUMB RUBBER ACOUSTIC PROVIDE CRUMB RUBBER ACOUSTIC FLOOR UNDERLAYMENT IN ALL NON-TILED FLOOR UNDERLAYMENT IN ALL NON-TILED SPACES AT UNIT B222 SPACES AT UNIT B222
1/4" = 1'-0"
MECH
RCP
DN
3' - 7 1/4"
2A - RCP 4A TYPICAL STUDIO RCP AND FLOOR PLAN 3D.2 - RCP 3D.2 3D.2
SW8
1
DN
3' - 7 1/4"
SC1
STEP UP TO DECK
8
SC10
LIVING ROOM
EX7
"
CLOSET 1 GWB 9' - 0 1/8"A.S.F.
BATHROOM 1 TYPE 5 2A
1 GWB 9' - 0 1/8"A.S.F.
1 LINEN BATHROOM 1 BEDROOM 1 TYPE 5 - SIM OPP
3' - 0 5/8" 2' - 0 11/16" B
2A
11' - 11 1/4"
LIVING ROOM GWB 9' - 0 1/8"A.S.F.
SC6
6' - 0 1/4"
SC1
BATHROOM 2 TYPE 6 F GWB-MR 9' - 0 1/8"A.S.F. BATHROOM TYPE 6 GWBGWB-MR 9' - 0 1/8"A.S.F. 9' - 0 1/8"A.S.F.
CLOSET 3 GWB 9' - 0 1/8"A.S.F.
W/D GWB 9' - 0 1/8"A.S.F.
SW8
GWB 9' - 0 1/8"A.S.F.
2' - 4 3/4"
SC1
2' - 4 1/2"
1A
6' - 6 3/4"
1
BEDROOM 1 GWB 9' - 0 1/8"A.S.F.
1' - 5 1/8"
LIVING ROOM
LIVING ROOM GWBROOM LIVING 9' - 0 1/8"A.S.F. GWB 9' - 0 1/8"A.S.F.
MOVABLE ISLAND
5' - 7 3/8"
12' - 9 1/16"
SC1
E10
CLOSET 3 GWB 9' - 0 1/8"A.S.F.
W/DSW1 GWB 9' - 0 1/8"A.S.F.
MECH F BATHROOM TYPE 6 GWB-MR 9' - 0 1/8"A.S.F.
6' - 3 3/4"
3' - 0 5/8"
F
2' - 8"
SC1
1
1
2' -111 5/8"
1' - 5 1/8"
LIVING ROOM GWB 9' - 0 1/8"A.S.F.
1 G
MOVABLE ISLAND
5' - 7 3/8"
4' - 1 3/4"
5' - 8 1/16" MOVABLE ISLAND
1 MECH E10
SW1
5' - 8 1/16"
1
ALIGN
2'2'--11 5/8" 5 1/2"
SC1
MOUNTED TO BOTTOM OF UPPER CABINET OVER SINK
2A CLOSET 2 KITCHEN TYPE 16 - SIM OPP
GWB 9' - 0 1/8"A.S.F.SC6SW1
F
1
1
SW8
LINEN BATHROOM 1 TYPE 5 - SIM OPP
2' - 1 1/4"
1 G
1
ALIGN
SC5
CLOSET 3 BATHROOM 2 GWB TYPE 69' - 0 1/8"A.S.F. GWB-MR 9' - 0 1/8"A.S.F.
MECH
GWB GWB 9' - 0 1/8"A.S.F.7' - 6"A.S.F. SC5
1
B
F
SW1
F
SC1
BEDROOM 1 GWB 9' - 0 1/8"A.S.F.
13' - 4 1/2"
1 MECH
1 2' - 5 1/2"
3' - 0"
1 CLOSET 1 1 GWB D W/D 9' - 0 1/8"A.S.F. 2A CLOSET 2 KITCHEN TYPE 16 - SIM OPP SC10
W/D
F SW1
CLOSET 3 1 BATHROOM GWB 1TYPE 5 9' - 0 GWB-MR 1/8"A.S.F. 9' - 0 1/8"A.S.F. 0' - 10 13/16"
E10 GWB 7' - 16"A.S.F.
5' - 10 1/4"
11' - 11 1/4"
1' - 6 5/8"
1' - 5 7/8"
2' - 2 1/8"
2
1 1 BATHROOM TYPE 5 E15 0' - 10 13/16" F CLOSET 5 GWB 9' - 0 1/8"A.S.F. SW1F
BEDROOM 1 GWB 9' - 0 1/8"A.S.F.
SC1
3' - 3 3/4"
5' - 4 7/16"
SC10
MECH SC1 SW8 GWB 9' - 0 1/8"A.S.F.
1 1A
GWB 9' - 0 1/8"A.S.F.
2A
2' - 4 3/4"
SC10 SW8
1' - 4 5/8"
MECH SC1
GWB 9' - 0 1/8"A.S.F.
D
E10
2' - 1 1/4"
1' - 6 5/8" 11' - 11 1/4"
SW1 SC5
W/D MOUNTED TO CLOSET 2 W/D MOUNTED TO CLOSET 2 GWBTO GWB GWB MOUNTED GWB BOTTOM OF UPPER GWB BOTTOM OF UPPER BOTTOM OF UPPER 7' - 6"A.S.F. 9' - 0 1/8"A.S.F. CABINET OVER 9' - 0 1/8"A.S.F. 9' - 0 1/8"A.S.F. 9' SINK - 0 1/8"A.S.F. CABINET OVER SINK CABINET OVER SINK
MOUNTED GWB TO 7'BOTTOM - 6"A.S.F.OF UPPER CABINET OVER SINK
1A KITCHEN TYPE 9
2
5' - 10 7/16" 1
6' - 2 5/16"
SC1
KITCHEN TYPE 9
BATHROOM 1 TYPE 5 1 GWB-MR BATHROOM 1 TYPE 9' - 50 1/8"A.S.F.
CLOSET 5
GWBBATHROOM 1 9' - 0 1/8"A.S.F. TYPE 5 - SIM OPP GWB-MR 9' - 0 1/8"A.S.F.
BATHROOM 1 TYPE 5 - SIM OPP GWB-MR 9' - 0 1/8"A.S.F.
B
2A 1 3' - 3 3/4"
2' - 5"
SW1
SC5
SC5
F
E15
CLOSET 1 3' -19 1/16" E5 1 LINEN
5' - 10 7/16" 1
LINEN
1
A
5' - 4 7/16"
SC1 SC5
SC1
GWB 9' - 0 1/8"A.S.F.
CLOSET 1 3' - 9 1/16" E5 1
3' - 10 1/16"
CLOSET 5 GWB 9' - 0 1/8"A.S.F.
TYPE 5 GWB-MR 9' - 0 1/8"A.S.F.
A
6A
BATHROOM 2 TYPE 8
1A
2' - 4 1/2"
3' - 0 1/2"
6A
3 4' - 2 3/8" 2'BEDROOM - 1" B
2' - 8 1/4"
1' - 4 5/8"
GWB 7' - 6"A.S.F.
GWB-MR 9'BATHROOM - 0 1/8"A.S.F.
4'1'- -210 3/8"5/8"
6A
BATHROOM 2 TYPE 8
1A 2' - 8 1/4" BEDROOM 2' - 1" 3
1' - 10 5/8"
1' - 4 5/8"
GWB 9' - 0 1/8"A.S.F.
SC1 GWB-MR 9' - 0BATHROOM 1/8"A.S.F. CLOSET 1 CLOSET 1 TYPE 5 GWB-MR 9' GWB - 0 1/8"A.S.F. 9' - 0 1/8"A.S.F. SC1 GWB 7' - 6"A.S.F. GWB 9' - 0 1/8"A.S.F. CLOSET 5 GWB 9' - 0 1/8"A.S.F. F
F
1' - 4 5/8"
SC1
F
BATHROOM 2 TYPE 8 GWB-MR 9' - 0 1/8"A.S.F.
1' - 5 7/8"
GWB 9' - 0 1/8"A.S.F.
BATHROOM 2 TYPE 8 GWB-MR 9' - 0 1/8"A.S.F.
14' - 2 11/16"
GWB 9' - 0 1/8"A.S.F.
5' - 6 3/8"
6A
2' - 2 1/8"
BEDROOM 3
BEDROOM 3
3' - 0 1/2"
SW1
3' - 10 1/16" 2' - 1 1/4" 14' - 2 11/16"
SW1
12' 5' --613/8" 5/8"
6' - 2 5/16"
12' - 1 5/8"
RCP
"
GENERAL NOTES:
BLDG BLDG B STEEL B STEEL PLANS PLANS CONSTRUCTION CONSTRUCTION DOCUMENTS DOCUMENTS
2'2'- -0"8 3/4" 1'0' -- 3" 1" 2' - 3" PAPER TOWEL DISPENSER AND WASTE RECEPTACLE
2' - 6"
2' - 3" ARCHITECTURE + URBAN DESIGN
14 A642 A
BEFORE INSTALLATION 2' - 6"BEFORE 1' - 6"INSTALLATION 1' -2'6"- 0" TOILET TOILET
2' - 0" 2' - 6"
2' - 8 3/4"
1' - 9"
0' - 2 1/4"
LevelLevel B2 B2 12' - 12' 8" - 8"
Level 2c A2 2c 15' - 4"
2' - 10 3/4"1' - 6"
1' - 6"2' - 6"
2' - 6" 2' - 0"
TOILET
SLIDE IN RANGE SLIDE IN RANGE
2'1'- -0"3"
1' - 3"2' - 6"
Level A2 15' - 4"
2' - 6"1' - 3"
6' - 0"
AS REQ'D.
2' - 6"
2' - 0"
AS REQ'D.
2' - 6"1' - 3"
1' - 3"2' - 8 3/4" 0' - 1"
2' - 8 3/4" 0' - 1"
Level B3WALL TYPES 23' - 4"
0" FRAMING, 1' -2'0"- 6" U.N.O.2' - 6" 2' - 0" 2 6. ALL DIMENSIONS ARE TO FACE1' - OF DIMENSIONS FOR INTERIOR DOORS ARE TO CENTERLINEASOF DOOR, U REQ'D. AS RE
0' - 1"
3 5' - 1
1/4" 8' - 10
4
1/16"
3' - 4
7/8"
4' - 11
1/2"
A302-A
3A
A308 SB - SIM OPP AFF.
3' - 10 5/8" 15/16"
A
9/16"
E8
7' - 11
B
A
3' - 4
B
D
3/16" 6' - 2
B
C6
3' - 4 7/8"
C8
7' - 3 9/16"
7' - 3 9/16"
3' - 4 7/8"
7' - 3 9/16"
1' - 6"
1' - 6" 3' - 0"
1' - 6"
6' - 0"
6' - 0"
1' - 6"
1' - 6"
6' - 0"
3' - 0"
6' - 0"
5' - 3 3/16" 5' - 1 1/4"
2' - 9" 2' - 3" 18" TOWEL ROD
2' - 3"
2' - 6"
2' - 6"
2' - 3"
36X48 1d A630 NOMINAL GWB SOFFIT AND SHOWER GWB SOFFIT AND AS REQ'D. AS REQ'D.TYP. FASCIA, TYP. FASCIA, 1c 1' - 0"
2'1'- -3"0"
0' - 1"
1' - 6"
HOOD
GWB SOFFIT AND GWB SOFF FASCIA, TYP. FASCIA, TY
FILLER PANEL TO FILLER PA MATCH CABINET MATCH CA FACE FACE
HOOD SHELF FOR SHELF FOR MICROWAVE MICROWAVE
TOILET
CM
1b
FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE 3' - 0"
1' - 6"
PROVIDE BLOCKING FOR FUTURE GRAB BAR BTW. 30" AND 38" A.F.F. TO 6" BEYOND WIDEST POINT OF TOILET
3' - 0"
10' - 4 15/16"
1' - 6"
Level B3 23' - 4"
DOOR LOCATION VAIRES, SEE ENLARGED UNIT PLANS
6' - 0"
4' - 2 3/8" 4' - 7 15/16" 3' - 5 3/4"
2' - 8 3/4" 1' - 0" 0'0'--1"1"
1a
BATHROOM FAUCET
11/26/2014 12:39:01 PM 6' - 0"
15/16 " 15/16 "
A301-A
GLAZED WALL TILE GLAZED W UP TO UNDERSIDE UP TO UND OF UPPER OF UPPER CABINETS, TYP.CABINETS
GLAZED WALL TILE GLAZED WALL TILE UP TO UNDERSIDE UP TO UNDERSIDE OF UPPER OF UPPER CABINETS, TYP.CABINETS, TYP.
FILLER PANEL TO FILLER PA
FILLER PANEL TO FILLER PANEL TO
MATCH CABINET MATCH CA CABINET BATHROOMMATCH TYPE 1,MATCH 1B,CABINET 1C, 1D - PLAN FACE FACE FACE FACE
1 REFRIGERATOR REFRIGERATOR
0' - 1"
2' - 0' 8 3/4" - 1"
2'0' - 81"3/4"
1/2" = 1'-0"
SLIDE IN RANGE SLIDE IN RANGE
2' - 3"0' - 1"
2' - 3"
2' - 6"
2' - 6"
2' - 3"
Level B2 12' - 8"
2' - 3" AS REQ'D.
Level B2 12' - 8"
AS REQ'D.
6
TYPE 3_KITCH TYPE 6 1/2" = 1 1/2" = 1'-0"
1
TYPE 1_KITCH TYPE 1 1/2" = 1 1/2" = 1'-0"
10' 4
TYPE 3_KITCHEN TYPE 3_KITCHEN - IE2 - IE2 7 1/2" = 1'-0" 1/2" = 1'-0"
1/4"
14 A642
9/16" 9' - 10
2' - 6"
HOOD
HOOD
2' - 6"
14 A642
2' - 6"
Level B2 12' - 8"
GWB SOFFIT AND GWB SOFFIT AND FASCIA, TYP. FASCIA, TYP. AS REQ'D. FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE 3' - 0"
1' - 6"
AS REQ'D. 2' - 9"
1' - 6" 6' - 0"
FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE 3' - 0"
CN
SLIDE IN RANGE SLIDE IN RANGE
2' - 6"
2' - 9"
3' - 0"
FINISHED FULLFINISHED DEPTH FULL DEPTH END PANEL, TYPICAL END PANEL, TYPICAL BOTH SIDES OFBOTH ISLAND SIDES OF ISLAND
3' - 5
15/16 "
2' - 0" 2' - 6"
1' - 6"
1' - 6"
GLAZED WALL TILE GLAZED WALL TILE UP TO UNDERSIDE UP TO UNDERSIDE OF UPPER OF UPPER CABINETS, TYP.CABINETS, TYP.
3' - 0"
3/4" 3' - 9
2'1'--0"0"
3' - 0"
3' - 0"
3/4" 3' - 5 1/4"
7/8"
6' - 6 5/16"
C9 6
BUILDING A LEVEL THREE PLAN
KITCHEN FAUCET KITCHEN FAUCET
Level B2 12' - 8"
REFRIGERATOR REFRIGERATOR
Level B2
AS REQ'D.
2
1/4"
5/8" 3' - 4
7' - 3 9/16"
C7
7/8"
X1B 7' - 3 9/16"
3' - 1
3' - 4 7/8"
3' - 0"
X1B A309 1T
E15
2
5' - 1
G
4
C5
CP
4
E7
0' - 1"
TYPE 5_KITCHEN TYPE 5_KITCHEN - IE1 - IE1 1/2" = 11 1'-0" 1/2" = 1'-0"
2' - 0" AS REQ'D.
2' - 0" 2' - 6"
2' - 6"
2' - 6"
0' - 1" 2' - 6"
0'2'--1"8 3/4"
2' - 8 0'3/4" - 1"
12' - 8" 0' - 1"
Level B2 12' - 8"
7' - 4 7/8"
A307 1C
2C
G
7/8"
2C
3' - 4
8' - 0"
G
2C A
A310 1S
7' - 3 9/16"
1/2" 6' - 2 1/16"
3' - 8 B
4D
REFRIGERATOR REFRIGERATOR
FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE
5' - 1
E10
9/16"
E10
2' - 0" 2' - 6"
AJ
2' - 7
4 E10
B
D
E5
4
3' - 5 11/16 "
3' - 0"
A306 1C
B
B
CL
3' - 0"
3' - 0"
3' - 0"
3/4"
3' - 0"
R
G
D
2' - 3
1/4" 16' 4
G
A
X1B
1' - 6"
1' - 6"
3' - 0" 1' - 6" 3' - 0"
3' - 0"
1/4"
4
1'2'- -3"0"
B
2C
MATCHLINE SEE A103.1-B
Level B3 LevelTYPE B3 BATHROOM 2, 2B, 2C - PLAN - 4" 23' - 4" 2 1' - 3"1/2"23' = 1'-0" 2' - 8 3/4"
2' - 6"1' - 3"
MIRROR
AS2' REQ'D. - 9"
1' - 0"
TYPE 1_KITCHEN TYPE 1_KITCHEN - IE3 - IE3 3 1/2" EX7= 1'-0" 1/2" = 1'-0"
4
E10
A322 CORRIDOR
2D
12' 5 1/2 " A325 STORAGE R A324 STORAGE 1
1' - 3"
E10
B
E10
7
3' - 0"
3' - 0"
1/2"
7/16"
5' - 3
0' - 1"
A305 1C
AS REQ'D.
A
1' -2'0"- 6"
11
DISHWASHER DISHWASHER
3 D
2D
3
6' - 8
A301-A
2'0' - 81"3/4"
1' - 6" 2' - 8 3/4" AS REQ'D.
Level 1 0' - 0"
A501-A
2D
E10
11/16 "
3' - 4
CK
4' - 1
AS REQ'D.
2C
Level 1 0' - 0"
TYPE 2_KITCHEN TYPE 2_KITCHEN - IE1 3 - IE1 4 1/2" = 1'-0" 1/2" = 1'-0"
4
1/8"
SHAFT
4
4
1' - 6" AS REQ'D.
7/8"
B
REFRIGERATOR REFRIGERATOR
3/4"
5' - 0
9/16"
X3B
16' 7
3A
G B
7' - 1
3E
A319 UP STAIR A1
E10
A311 2W
7/8"
6' - 0"
4' - 2 6' - 0" 1/8" 3' - 5 7/16" 4' - 7
2E B
F.E.
N
AS REQ'D.
X2B
E10
G
2C
1/4"
E10
B
3' - 5
B
AS REQ'D.
7/8" 2' 4' - 11 - 1 15/16 3/16" "
C4
3' - 5
1' - 6"
1' - 3"
Level 1 0' - 0"
7
KITCHEN SINK KITCHEN SINK
5 A713
Q
FILLER PANEL TO FILLER PANEL TO A321 MATCH CABINET MATCH CABINET FACE FACE ELEV 1&2
D A
4
1/8"
2' - 6"1' - 3"
Level 1 0' - 0"
1' - 10
3 A510
FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE
7' - 5
2' - 0" 2' - 6"
TYPE 2_KITCHEN TYPE 2_KITCHEN - IE2 - IE2 5 1/2" = 1'-0" 1/2" = 1'-0"
3' - 4
5
2'1'--0"0"
2C
A323 ELEC.
5/8"
3/4" 3' - 5 3/4"
2' -1'6"- 0" B
4
3E
FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE
A
2C
6' - 7
3' - 4
GLAZED WALL TILE GLAZED WALL TILE UP TO UNDERSIDE UP TO UNDERSIDE E13 OF UPPER OF UPPER CABINETS, TYP.CABINETS, TYP.
2C E8
0' - 10
SHAFT
1E
GLAZED WALL TILE GLAZED WALL TILE UP TO UNDERSIDE UP TO UNDERSIDE OF UPPER OF UPPER CABINETS, TYP.CABINETS, TYP. 3E
EX7
E10
B
2E
9/16"
1/16"
2' - 1 3/4"
D
B
5
D
3' - 6"
1'2'--0"0"
B
2E
3
A502-AAS REQ'D. AS REQ'D. 2' - 9"
2' - 9"
6' - 7
8' - 10
FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH B CABINET FACE
E10 FACE
B
SHELF FOR SHELF FOR MICROWAVE MICROWAVE
E10
2' - 6"
0' - 10 2'"- 6"
A
E5
B 2'AS- 6"REQ'D.
AS REQ'D.
1' - 3"
2c
UP
3' - 5
HOOD
KITCHEN SINK KITCHEN SINK
1/4"
10' - 1' - 6" 5 1/8 "
3' - 0"
FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE
KITCHEN FAUCET KITCHEN FAUCET
E10
GWB SOFFIT AND GWB SOFFIT AND FASCIA, TYP. FASCIA, TYP.
2'1'- -0"3"
E10
A320 STAIR A2
3/16" 5' - 6 1/8"
HOOD
9/16" 5' - 1
G
GWB SOFFIT AND GWB SOFFIT AND FASCIA, TYP. FASCIA, TYP.
B
A
B
D
E10
AS REQ'D.
2' - 6" 2' - 0"
Level B2 12' - 8"
A303 TYPE 3_KITCHEN TYPE 3_KITCHEN - IE3 - IE3 8 1/2" = 1'-0" 2I 1/2" = 1'-0"
8
15/16 3' - 4 " 7/8"
7' - 1
3' - 0"
3/4"
AS REQ'D. 2' - 3"
2' - 6"D
Level B2 12' - 8"
1' - 6"
2' - 3"
SLIDE IN RANGE SLIDE IN RANGE DISHWASHER DISHWASHER E10
7/8"
1/2"
1/2" = 1'-0"
2E
N
2D
2' - 2
C3
2' - 6"
E7
B
A313 2A
3/4" 3' - 4
2' - 6"
AS REQ'D.
1a
B DISHWASHER DISHWASHER
4
A304 SB
4
B 3' - 0"
AS REQ'D. 2' - 0" 0' - 1"
FINISHED FULLFINISHED DEPTH FULL DEPTH END PANEL, TYPICAL END PANEL, TYPICAL
BOTH SIDES OFBOTH ISLAND SIDES OF ISLAND - IE1 TYPE 1_BATHROOM
B
4' - 4
3' - 8
G
3' - 0"
2' - 0"
0' - 1"
Level B3 23' - 4"
A630
4
E10
2' - 9"1' - 0"
15" MIN.
ENLARGED BATHROOM PLANS
REMOVABLE VANITY FINISH WALLS AND CENTER BETWEEN BEHIND VANITY BASEBOARD DOORBEFORE TRIM AND INSTALLATION SHOWER FOR TYPE 1D
E10
G
A
7/8" 5' - 3 9/16"
3/8"
3' - 3
2' - 8 3/4"
0' - 1"
Level B3 23' - 4"
2C
KITCHEN SINK KITCHEN SINK
A
Level B3 23' - 4"
1' - 6"
2' - 6"
B
C2
A302-A
2' - 6"
G
1/16"
7' - 4
7' - 2"
E13
EX72' - 8 3/4" 0' - 1"
TYPE 4_KITCHEN TYPE 4_KITCHEN - IE1 - IE1 9 1/2" = 1'-0" 1/2" = 1'-0"
18" LINEN CABINET FOR TYPE 1B ONLY
2b
A630
1' - 5"
AS REQ'D. FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE UTILE PROJECT NUMBER FACE 1309.2
SCALE As indicated
PROVIDE BLOCKING FOR FUTURE SEAT + GRAB BARS TO 48" ABOVE FLOOR E10 AT ALL SHOWER WALLS
MATCH CABINET MATCH CABINET TYPE 1_BATHROOM BATHROOM - IE2 TYPE 2C 1, 1B, 1C, 1D - PLAN FACE 1b 1/2" =FACE 1'-0" E3 1 1/2" = 1'-0"
B
PRESSURE BALANCE
KITCHEN FAUCET KITCHEN FAUCET
2C
FILLER PANEL TO FILLER PANEL TO
2d
TYPE 5_KITCHEN TYPE 5_KITCHEN - IE2 - IE2 1/2" = 12 1'-0" 1/2" = 1'-0"
3/4" 4' - 1
5' - 1 A
E5
9
A312 2B
F.E.
D
7/8"
1/4"
B
4
3' - 4
5' - 1
G
A
2E
E15
X3E
1/4"
B 9
A701
E12
REFRIGERATOR REFRIGERATOR
X2B
SHOWER HEAD 18" LINEN CABINET FOR TYPE 1B ONLY
D
AS2' REQ'D. - 9"
2a
30X60 NOMINAL BAT/ SHOWER
AS REQ'D.
LIGHT FIXTURE
A
B
B
3/4"
C1
2' - 6"1' - 3"
1' - 3"2' - 6"
13' 0
Level B3 23' - 4"
E14
B
16' 10
2'1'- -0"3"
Level B3 1' - 3" 23' - 4"
A301 2G
1c
4
GLAZED WALL TILE GLAZED WALL TILE DOOR LOCATION SEETO UNDERSIDE UP TO VAIRES, UNDERSIDE UP ENLARGEDOF UNIT PLANS OF UPPER UPPER CABINETS, TYP.CABINETS, TYP.
E2
0' - 10
2C
A318 STAIR A3 B
D
1/4"
2' - 6" 2' - 0"
AS REQ'D.
TYPE 4_KITCHEN TYPE 4_KITCHEN - IE2 4 - IE2 1/2" = 10 1'-0" 1/2" = 1'-0"
E5
C1
5' - 1
1' - 6"2' - 6"
SLIDE IN RANGE SLIDE IN RANGE
12
B
G
B
Level Level B3 B3 23' 23' -- 4" 4"
3' - 0"
7/8"
3' -DISHWASHER DISHWASHER 8 7/1 6" 3' - 5 3/4"
EX7
3 A503-A
N
B
4' - 10
AS REQ'D.
9/16"
D
2E
A315 2J AFF.
10
B
CD
TYPE TYPE1_BATHROOM 1_BATHROOM- IE3 - IE1 1c1a1/2"1/2"= 1'-0" = 1'-0"
1' - 6"
B
5/8"
KITCHEN SINK KITCHEN SINK
E15
TOILET
AS REQ'D.
1' - 6"
1b
A630
G
E10
INNER CORNER
HOOD
Level B3 23' - 4"
B
1d
AS REQ'D.
FILLER PANEL TO PROVIDE BLOCKING FOR FILLER PANEL TO MATCH CABINET MATCH CABINET FUTURE GRAB BAR BTW. 30" D2 FACE AND 38" A.F.F. TO 42" FROMFACE
AS REQ'D. FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE
TOILET
"JULIET-STYLE" BALCONY WITH SLIDING DOOR, TYP. 1' - 3" 1'2'- -3"0"
5' - 5 1/4"
0' - 1"
E10
36X48 GWB SOFFIT AND GWB SOFFIT AND NOMINAL FASCIA, TYP. FASCIA, TYP. SHOWER
AS1'REQ'D. - 0"
1'2'--0"0"
0' - 1" 0' - 1"
15" MIN.
A302 G2 2U GROUP 2A
3' - 0"
1' - 11
1' - 6"
A314 1B
G
A
1/4"
CC
HOOD
BEFORE INSTALLATION
3' - 0"
16' 2
REMOVABLE VANITY FINISH WALLS AND HOOD BASEBOARD BEHIND VANITY
C12
1' - 5"
1' - 5"
1' - 6"
1' - 3"
DISHWASHER DISHWASHER SLIDE IN RANGE SLIDE IN RANGE
B2 Level B2 - IE1 TYPE Level 2_BATHROOM 12' - 8" 12' - 8"
E10
1a
2' - 9" 2' - 0" 18" TOWEL ROD
2a
= -1'-0" 5 3/4" 3' - 52'3/4" - 81/2" 3/4" 3'
2' - 8 3/4"
0' - 1"
TYPE 6_KITCHEN TYPE 6_KITCHEN - IE1 - IE1 1/2" = 13 1'-0" 1/2" = 1'-0"
B
PROVIDE BLOCKING FOR FUTURE GRAB BAR BTW. X2B 30" AND 38" A.F.F. TO 6" PROVIDE BLOCKING FOR BEYOND FUTURE SEATWIDEST + GRAB POINT BARS OF TOILET TO 48" ABOVE FLOOR AT ALL SHOWER WALLS
1' - 6"
2D
3' - 5
FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET A302-A FACE FACE 1
3' - 0"
7' - 2"
E15
2C
2E E10
7' - 1 11/16"
2C A
1/4"
EX7 E5
2C 4 G
5' - 1
- 9" AS2' REQ'D.
AS REQ'D.
1' - 3"
KITCHEN FAUCET KITCHEN FAUCET
Level B3 Level B3 23' - 4"23' - 4"
1/4"
FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET
FACE FACE TYPE TYPE 1_BATHROOM 1_BATHROOM - IE2 - IE4 1b 1d1/2" =1/2"1'-0"= 1'-0"
2' - 6"1' - 3"
1/16"
E15
4 B
B
13' 0
D A
RECESSED ROLL SHELF FOR HOLDER SHELF FOR MICROWAVE MICROWAVE
1' - 3"2' - 6"
5' - 1
1/2" = 1'-0"
G
4
EX7
MIRROR
2'1'- -0"3"
PRESSURE BALANCE 24" TOWEL ROD PROVIDE BLOCKING FOR FUTURE SEAT +DOOR GRAB CENTER BETWEEN TO 48" ABOVE TRIMBARS AND SHOWER FOR FLOOR TYPEAT1DALL SHOWER WALLS
AS REQ'D.
4
BATHROOM FAUCET
2' - 6" 2' - 0"
18" LINEN CABINET FOR TYPE 1B ONLY
CABINETS, TYP.CABINETS, TYP.
4
B
SHOWER HEAD ROBE HOOK
2 2' - 6"
BATHROOM FAUCET
1' - 6"
Level B3 A316 23' - 4"1B
B
TYPE 1_BATHROOM - IE3 B
RECESSED MEDICINE 2' -REQ'D. 3" 2' - 3" AS CABINET
AS REQ'D.
1' - 6"
E15
GWB SOFFIT AND GWB SOFFIT AND FASCIA, TYP. FASCIA, TYP.
PROVIDE BLOCKING FOR
FUTURE BAR BTW. PROVIDEGRAB BLOCKING FOR30" X3B FILLER PANEL TO FILLER PANEL TO AND 38" A.F.F. 42" FROM FUTURE SEATTO + GRAB BARS MATCH CABINET MATCH CABINET 1/4 INNER TO" 48"CORNER ABOVE FLOOR AT ALL FACE FACE SHOWER WALLS 6' - 5 5/16" 4' - 8 11/16 " 3' GLAZED WALL TILE GLAZED WALL TILE - 5 3/4 UP"TO UNDERSIDE UP TO UNDERSIDE OF UPPER OF UPPER
5' - 1
8' - 9 7/8"
1cD 4
5' - 1
3' - 0"
B
B
X3F
A302-A
C11 1/4"
3' - 0"
9' - 0
1/4" 5' - 10 15/16 "
3/4"
4' - 6
3' - 5
PROVIDE BLOCKING FOR FUTURE SEAT + GRAB BARS TO 48" ABOVE FLOOR AT ALL SHOWER WALLS EX7
E10
E15
13
LIGHT FIXTURE SHOWER BAR
3' - 0"
7/8"
CB
DOOR LOCATION VARIES SEE ENLARGED UNIT PLANS
A630 A630
AS REQ'D.
X2B
HOOD
REMOVABLE VANITY FINISH WALLS AND BASEBOARD BEHIND VANITY BEFORE INSTALLATION
REFRIGERATOR REFRIGERATOR
10' - 52'1/8" - 3"
14 A642
2' - 6"1' - 3"
SHELF FOR SHELF FOR MICROWAVE MICROWAVE BATHROOM FAUCET
FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE
Level B3 23' - 4"
1'2'- -0"3"
1' -2'0"- 6"
MIRROR
GLAZED WALL TILE GLAZED WALL TILE UP TO UP TO UNDERSIDE OFUNDERSIDE OF UPPER CABINETS, UPPER CABINETS, TYP. TYP.
C14
A15
TUB SPOUT
2'1'- -3"0"
18" TOWEL BAR
SHELF FOR SHELF FORPRESSURE BALANCE MICROWAVE MICROWAVE DOOR LOCATION VARIES, SEE ENLARGED UNIT PROVIDE BLOCKING FOR PLANS FUTURE GRAB BARS TO 48" ABOVE TUB BOTTOM AT ALL TUB WALLS 12" LINEN CABINET FOR TYPE 2B ONLY
1 2b
6' - 7
CA
AS REQ'D.
FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE
3' - 5
AS REQ'D.
TYPE 6_KITCHEN TYPE 6_KITCHEN - IE2 - IE2 14 1/2" = 14 1'-0" 1/2" = 1'-0" BATHROOM BATHROOM TYPE TYPE 1, 1, 1B,1B, 1C, 1C, 1D1D - PLAN - PLAN 1 1 1/2"1/2" = 1'-0" = 1'-0"
LIGHT FIXTURE
SHOWER BAR
3' - 0"
3' - 0"
AS REQ'D.
12" LINEN CABINET FOR
LIGHT FIXTURE 2' -AS 0" REQ'D. 2' - 0" 2' - 3"
TYPE 2B ONLY A301-A
11/26/2014 12:39:01 PM 11/26/2014 12:39:01 PM
AS REQ'D.
1' - 6"
1' - 6"
1' - 6"
1' - 6"
AS REQ'D.
PROVIDE BLOCKING FOR FUTURE FOLD-UP GRAB BAR BTW. 30" AND 44" 24" TOWEL BAR6"FOR TYPE A.F.F. TO BEYOND 2C ONLY WIDEST POINT OF TOILET
15" MIN.
GWB SOFFIT AND GWB SOFFIT AND FASCIA, TYP. FASCIA, TYP. AS REQ'D.
GWB SOFFIT AND GWB SOFFIT AND FASCIA, TYP. FASCIA, TYP. AS REQ'D. FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE
2' - 3" SHOWER 2' - 9" HEAD AS REQ'D. 2' - 9"
2' - 0" 2' - 3"
ENLARGED ENLARGED BATHROOM BATHROOM Level B2 Level B2 PLANS PLANS 6 1/8"2C - PLAN TYPE 2_BATHROOM BATHROOM - IE2TYPE 2,2' -2B, 12' - 8" 12' - 8" 2b 5' 1/2" = 1'-0" 3' - 523/4"1/2" = 1'-0" - 4 5/8" 3' - 5 3/4" 7' - 5 1/8" 7' - 11" 1' - 0"
CENTER CENTER BETWEEN BETWEEN DOOR DOOR TRIMTRIM ANDAND SHOWER SHOWER FORFOR TYPE TYPE 1D 1D 2' - 6"1' - 6" 1' - 6"
1' - 6"2' - 6"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
1' - 6"
DOOR DOOR LOCATION LOCATION VAIRES, VAIRES, SEESEE ENLARGED ENLARGED UNITUNIT PLANS PLANS AS REQ'D.
TYPE 6_KITCHEN TYPE 6_KITCHEN - IE3 - IE3 1/2" = 15 1'-0" 1/2" = 1'-0"
SHOWER ROD
5' - 8
4
E13
CJ
1/8"
RECESSED ROLL HOLDER
3' - 5 3/4"
CI
Level Level B3 B3 23' 23' - 4"- 4"
23'23' - 4"- 4"
SLIDE IN RANGE SLIDE IN RANGE
1' - 0"
3' - 0"
CH
2' -1'6"- 0"
1' - 6"
1/2" = 1'-0"
5' - 5
E10
CENTER BETWEEN DOOR TRIM AND SHOWER FOR TYPE 1D
6' - 4 1/8"
1d
3/4"
E13
B
24" TOWEL ROD BATHROOM FAUCET
Level B3 23' - 4"
A302-A 3
2' - 0" 2' - 6"
6' - 0"
7' - 7 7/8" 7' - 2" 7' - 2" 3' - 5 3/4"
CG
C10
ROBE HOOK RECESSED MEDICINE CABINET
CF
3' - 5
A317 DOOR LOCATION VARIES SEE 2K ENLARGED UNIT PLANS
LIGHT FIXTURE
TYPE 1_BATHROOM - IE4
2"
15 TYPE TYPE 1_BATHROOM 1_BATHROOM - IE1 - IE1 1a1a1/2"1/2" = 1'-0" = 1'-0"
2'1'--0"0"
FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE
Level B2 Level- B2 TYPE IE3 TYPE2_BATHROOM 2_BATHROOM - IE1 12' - 8" 12' - 8" 2c2a1/2"1/2"= 1'-0" = 1'-0"
TOILET TOILET 1' - 0"
11' 2"
3' - 5 3/4" SHOWER ROD
TYPE TYPE 1_BATHROOM 1_BATHROOM - IE2 - IE2 1b 7' -1b1/2"1/2" = 1'-0" = 1'-0"
DISHWASHER DISHWASHER
TYPE TYPE 2_BATHROOM 2_BATHROOM - IE2 - IE4 2b 2d1/2" =1/2"1'-0"= 1'-0"
Level Level B3 B3 23' 23' - 4"- 4"
A630
1/4"
REMOVABLE REMOVABLE VANITY VANITY - FINISH FINISH WALLS WALLS ANDAND BASEBOARD BASEBOARD BEHIND BEHIND VANITY VANITY BEFORE BEFORE INSTALLATION INSTALLATION
6' - 0"
5' - 1
EX7
1/2" = 1'-0"
3' - 0"
- 2 3/1 6"
PROVIDE PROVIDE BLOCKING BLOCKING FORFOR FUTURE FUTURE SEAT SEAT + GRAB + GRAB BARS BARS TO 48" TO ABOVE 48" ABOVE FLOOR FLOOR AT ALL AT ALL SHOWER SHOWER WALLS WALLS
Level B3
23'TYPE -1B4" 1B 18" LINEN 18" LINEN CABINET CABINET FORFOR TYPE ONLY ONLY
ENLARGED BATHROOM PLANS - IE3 TYPE 2_BATHROOM
1' - 6"
Level Level B3 B3 23' 6' 23' - 4"- 4"
TYPE TYPE 1_BATHROOM 1_BATHROOM - IE3 - IE3TYPE 1, 1B, 1C, 1D - PLAN BATHROOM 1c1c1/2"1/2" = 1'-0" = 1'-0" 1 1/2" = 1'-0"
PROVIDE BLOCKING FOR FUTURE SEAT + GRAB BARS TO 48" ABOVE FLOOR AT ALL SHOWER WALLS
2c
1c 1c
5' - 5 1/4" 0' - 10 "
CENTER BETWEEN DOOR TRIM AND SHOWER FOR TYPE 1D
1/2" = 1'-0"
AS REQ'D. 2' - 0"
A16 C13
1d 1d A630A630 1b 1b
1/2"
PROVIDE PROVIDE BLOCKING BLOCKING FORFOR 23' - 4" FUTURE FUTURE SEAT SEAT + GRAB + GRAB BARS BARS TO 48" TO ABOVE 48" ABOVE FLOOR FLOOR AT ALL AT ALL SHOWER SHOWER WALLS WALLS
TYPE 2_BATHROOMCE - IE4
36X48 36X48 NOMINAL NOMINAL SHOWER SHOWER
FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE
SHOWER ROD
AS REQ'D.
FILLER PANEL FILLER PANEL FILLER PANEL TO FILLER PANEL TO TO MATCH TO MATCH MATCH CABINET MATCH CABINETCABINET FACECABINET FACE FACE FACE
24" TOWEL BAR FOR TYPE 2C ONLY
1/4"
Level B3
2d
DOOR LOCATION VAIRES, SEE ENLARGED UNIT PLANS
TUB SPOUT PROVIDE PROVIDE BLOCKING BLOCKING FORFOR FUTURE FUTURE GRAB GRAB BARBAR BTW. BTW. Level Level B3B3 30" AND 30" AND 38" A.F.F. 38" A.F.F. TO 6" TO 6" - 4" 23'23'-BEYOND 4" BEYOND WIDEST WIDEST POINT POINT OF OF TOILET TOILET
RECESSED MEDICINE CABINET
14 A642
15" MIN.
GWB SOFFIT AND GWB SOFFIT AND LIGHT FIXTURE AS REQ'D. 2' - 6" AS REQ'D. FASCIA, TYP. FASCIA, TYP.
2' - 6"
HOOD PROVIDE BLOCKING FORHOOD GLAZED WALL TILE GLAZED WALL TILE 2a FUTURE GRAB BARS TO 48" UP TO UNDERSIDE UP TO UNDERSIDE BATHROOM FAUCET BATHROOM FAUCET ABOVE TUB BOTTOM AT 18"ALL LINEN 18" LINEN CABINET CABINET FORFOR OF UPPER OF UPPER 30X60 TUB WALLS TYPE TYPE 1B ONLY 1B ONLY CABINETS, TYP.CABINETS, GLAZED WALL TILE GLAZED WALL TILE 2d TYP. A630 NOMINAL UP TO UNDERSIDE UP TO SHOWER UNDERSIDE REMOVABLE VANITY BAT/ FINISH WALLS AND OF UPPER OF UPPER RECESSED ROLL 2c CABINETS, TYP.CABINETS, TYP. BASEBOARD BEHIND VANITY HOLDER BEFORE INSTALLATION FILLER PANEL FILLER PANEL TO MATCH TUB TOILET FILLER PANEL TO SCALE SCALE FILLER PANEL TO UTILE UTILE PROJECT PROJECT NUMBER NUMBER TO MATCH FACECABINET FACE MATCH CABINET MATCH CABINETCABINET As indicated As indicated 1309.2 1309.2 Level Level B3B3 FACE FACE
1a 1a
PROVIDE BLOCKING FOR FUTURE GRAB BARS TO 48" ABOVE TUB BOTTOM AT ALL TUB WALLS
18" TOWEL 18" TOWEL RODROD
PRESSURE PRESSURE BALANCE BALANCE
TUB
UTILE PROJECT NUMBER 1309.2
3' - 0"
PROVIDE PROVIDE BLOCKING BLOCKING FORFOR FUTURE FUTURE GRAB GRAB BARSCALE BAR BTW. BTW. 30" 30" As indicated ANDAND 38" A.F.F. 38" A.F.F. TO 42" TO FROM 42" FROM INNER INNER CORNER CORNER
PRESSURE BALANCE
PROVIDE BLOCKING FOR MIRROR MIRROR KITCHEN FAUCET KITCHEN FAUCET FUTURE GRAB BAR BTW. 30" AND BATHROOM 38" A.F.F. BATHROOM FAUCET FAUCET KITCHEN SINK KITCHEN SINK
RECESSED ROLL HOLDER
CENTER CENTER BETWEEN BETWEEN DOOR DOOR TRIMTRIM ANDAND SHOWER SHOWER FORFOR TYPE TYPE 1D 1D
ROLL L
PROVIDE BLOCKING FOR PROVIDE BLOCKING FOR FUTURE GRAB BARS TO 48" FUTURE GRAB BARS TO 48" SHOWER SHOWER HEAD HEAD BATHROOM ABOVE TUBFAUCET BOTTOM AT ALL ABOVE TUB BOTTOM AT ALL TUB WALLS TUB WALLS
PROVIDE BLOCKING 18"FOR LINEN CABINET FOR FUTURE GRAB BAR BTW. TYPE 1B30" ONLY AND 38" A.F.F.
1' - 6"
1b
1c
24" TOWEL 24" TOWEL RODROD
2' - 6"
MIRROR 24" TOWEL ROD 18" TOWEL BAR
3' - 0"
A630
12" LINEN CABINET FOR TYPE 2B ONLY LIGHT LIGHT FIXTURE FIXTURE
3' - 0"
1d
24" TOWEL ROD
SHOWER SHOWER BARBAR
1a
36X48 NOMINAL SHOWER
24" TOWEL BAR FOR TYPE 2C ONLY
PROVIDE BLOCKING FOR ROBE HOOK FUTURE FOLD-UP GRAB BAR BTW. 30" AND 44" A.F.F. TO 6" BEYOND DOOR LOCATION VARIES SEE WIDEST POINT OF TOILET ENLARGED UNIT PLANS
7/8"
OOM FAUCET
DOOR LOCATION VARIES SEE ENLARGED UNIT PLANS
11/26/2014 12:39:01 PM
DOOR DOOR LOCATION LOCATION VARIES VARIES SEESEE ENLARGED ENLARGED UNITUNIT PLANS PLANS PROVIDE BLOCKING FOR FUTURE GRAB BARS TO 48" ABOVE TUB BOTTOM AT ALL ROBE ROBE HOOK HOOK TUB WALLS
BATHROOM TYPE 3, 3B, 3C, 3D - PLAN TYPE 7_KITCHEN TYPE 7_KITCHEN - IE1 - IE1 1/2"16 = 1'-0" 1/2" = 16 1'-0" 1/2" = 1'-0"
3
1' - 5"
1' - 6"
1' - 5" 1' - 5" 1' - 6" 1' - 6" 1' - 6" LIGHT FIXTURE 1' - 6"2' - 6" SHOWER ROD 15" MIN. 15" MIN.
SHOWER HEAD
RECESSED MEDICINE CABINET
6' - 5
LIGHT FIXTURE
SHOWER ROD ROBE HOOK
3' - 0"
1' - 6"
1' - 6"
SLIDE IN RANGS ELIDE IN RDAISNHGW EASHER DISHW
5. LOCATE FRAMING TO ENSURE WALL FINISH FACES ALIGN AT DIFFE
Level B3 23' - 4" 0' - 1"
1
1' - 5"
SHOWER ROD
SHOWER ROD
15" MIN.
30X60 KITCHEN SINK KITCHE
3c
BATHROOM BATHROOM TYPE TYPE 2, 2, 2B,2B, 2C2C - PLAN - PLAN 2 2 1/2"1/2" = 1'-0" = 1'-0"
A401 SHOWER ROD
2
SHELF
4. REFER TO ENLARGED UNIT PLANS FOR ROOM NAMES, DOOR TYPE KITCHEN AND BATHROOM TYPES WITHIN RESIDENTIAL UNIT
REFRIGERATOR EFRIGERATOR
TUB
2' - 0" 2' - 6" AS REQ'D.
2' - 0"
SHELF FOR
NOMINAL 3d 3b A630 3. REFER TO SHEET G02 FOR TYPICAL INTERIOR PARTITION TYPES AN BAT/ SHOWER ADDITIONAL NOTES.
12" LINEN CABINET FOR TYPE 3B ONLY
18" LINEN CABINET FOR TYPE 3D ONLY TYPICAL
Level B2 12' - 8" 1' - 6"2' - 6"
AS REQ'D. 2' - 6"
2. REFER TO SHEET A901 FOR TYPICAL3aEXTERIOR WALL TYPES KITCHEN FAUCET KITCHE
PRESSURE BALANCE PROVIDE BLOCKING FOR FUTURE GRAB BARS TO 48" ABOVE TUB BOTTOM AT ALL TUB WALLS
1' - 6"
1/2" = 1'-0"
1' -2'0"- 6"
3' - 0"
GENERAL NOTES:
A640
TYPE 1_KITCHEN
1' - 6" AS REQ'D.
15" MIN. 1' - 0"
COMPACT COMP 1. REFER TO STRUCTURAL DRAWINGS FOR INTERIOR AND EXTERIOR MICROWAVE MICRO HOOD HOOD BEARING WALL LOCATIONS AND CONSTRUCTION.
TUB SPOUT
TYPE 3_BATHROOM - IE1 3aTYPE=8_KITCHEN TYPE 8_KITCHEN - IE1 - IE1 1'-0" 17 1/2"1/2" = 17 1'-0" 1/2" = 1'-0"
AS REQ'D.
3' - 0"
GWB SOFFIT AND GWB SOFFIT AND FASCIA, TYP. FASCIA, TYP. AS REQ'D. FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE
AS REQ'D. 2' - 9"
KITCHEN FAUCET KITCHEN FAUCET KITCHEN SINK KITCHEN SINK
SLIDE IN RANGS ELIDE IN RADNIS GHEWASHER DISHWASHER
Level A2 15' - 4"
1' - 3"
TYPE 3_BATHROOM BATHROOM - IE2TYPE 3, 3B, 3C, 3D - PLAN 1/2" = 1'-0" 3 1/2" = 1'-0"
3' - 0"
1' - 6" 3' - 0"
1' - 6"
1' - 3"2' - 9"
PROVIDE BLOCKING FOR FUTURE FOLD-UP GRAB BAR BTW. 30" AND 44" A.F.F. TO 6" BEYOND WIDEST POINT OF TOILET
SHELF FOR SHELF FOR HOOD MICROWAVE MICROWAVE
HOOD
GLAZED WALL TILE GLAZED WALL TILE UP TO UNDERSIDE UP TO UNDERSIDE MIRROR OF UPPER OF UPPER
Level B2 12' - 8"
2' - 10 3/4"
3b TYPE 9_KITCHEN TYPE 9_KITCHEN - IE1 - IE1 18 1/2" = 18 1'-0" 1/2" = 1'-0"
3' - 0"
1' - 6" 1' - 6"
3' - 0" 3' - 0"
3' - 0" DISHWASHER DISHWASHER
12" LINEN 12" LINEN CABINET CABINET FORFOR TYPE TYPE 2B ONLY 2B ONLY
0' - 2 1/4"
3' - 0"
3' - 0" 3' - 0"
1' - 6"
1' - 6"
6' - 0"
6' - 0"
1' - 6"
3' - 0"
1' - 6" 2d 2d A630A630 2b 2b
Level A2 15' - 4" 0' - 1"
2'0' - 81"3/4"
3c
1 1' - 5"
2' - 6"1' - 3"
SHOWER HEAD
TYP.CABINETS, TYP. GLAZED WALL TILE GLAZED WALL CABINETS, TILE UP TO UNDERSIDE UP TO UNDERSIDE 18" TOWEL ROD 30X60 OF UPPER OF UPPER NOMINAL BATHROOM FAUCET CABINETS, TYP.CABINETS, TYP. PROVIDE BLOCKING FOR BAT/ SHOWER FUTURE GRAB BARS TO 48" FILLERVANITY PANEL TO REMOVABLE -FILLER PANEL TO ABOVE TUB BOTTOM ATFILLER ALL PANEL TO FILLER PANEL TO FINISHMATCH WALLSCABINET AND MATCH CABINET TUB WALLS FACE BEHIND FACE MATCH CABINET MATCH CABINET BASEBOARD VANITY FACE FACE BEFORE INSTALLATION
3b
A630
2' - 6"
FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET LIGHT FIXTURE FACE FACE
HOOD
3a
KITCHEN SINK KITCHEN SINK 3d
2' - 3"
TYPICAL KITCHEN ELEVATIONS
TYPE TYPE 2_BATHROOM 2_BATHROOM - IE1 - IE1 2a2a1/2"1/2" = 1'-0" = 1'-0"
TYPE TYPE 2_BATHROOM 2_BATHROOM - IE2 - IE2 2b2b1/2"1/2" = 1'-0" = 1'-0"
6' - 0"
REFR30X60 IGE30X60 RATOR EFRIGERATOR NOMINAL NOMINAL BAT/BAT/ SHOWER SHOWER
2' - 6" 1' - 9"
TYPE TYPE3_BATHROOM 3_BATHROOM- IE3 - IE1 3c3a1/2"1/2"= 1'-0" = 1'-0"
Level Level B3 B3 TYPE TYPE 3_BATHROOM 3_BATHROOM - IE2 - IE4 - 4"- 4" 3b 3d1/2" =1/2"1'-0"= 1'-0" TYPE 10_KITCHEN TYPE 10_KITCHEN - IE1 - IE1 23' 23' 19 1/2" = 19 1'-0" 1/2" = 1'-0"
SHELF FOR SHELF FOR HOOD MICROWAVE MICROWAVE KITCHEN FAUCET KITCHEN FAUCET
PRESSURE BALANCE PROVIDE BLOCKING FOR FUTURE GRAB BAR BTW. 30" 24" TOWEL BARBAR FOR FOR TYPE TYPE 18" LINEN CABINET FOR24" TOWEL AND 38" A.F.F. 2C ONLY 2C ONLY FOR TYPE 3DPROVIDE ONLY BLOCKING 12" LINEN CABINET FOR FUTURE GRAB BARS TO 48" TYPE 3B ONLY ABOVE TUB BOTTOM AT ALL TUB WALLS 18" LINEN CABINET FOR DOOR DOOR LOCATION LOCATION VARIES, VARIES, TYPE 3D ONLY SEESEE ENLARGED ENLARGED UNITUNIT TUB SPOUT PLANS PLANS REFRIGERATOR REFRIGERATOR TUB
FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE2a 2a
2' - 3"
1/2" = 1'-0"
1' - 6"
1/2" = 1'-0"
TYPICAL BATHROOM PLAN AND ELEVATIONS
TYPE TYPE 2_BATHROOM 2_BATHROOM - IE3 - IE3 TYPE 2, 2B, 2C - PLAN BATHROOM 2c2c1/2"1/2" 2 1/2" = 1'-0" = 1'-0" = 1'-0"
REMOVABLE REMOVABLE VANITY - Level Level B2B2 VANITY FINISH FINISH WALLS WALLS ANDAND 12' 12'BASEBOARD - 8"- 8" BEHIND BASEBOARD BEHIND VANITY VANITY
1' - 6"2' - 6"
GLAZED WALL TILE GLAZED WALL TILE UP TO UNDERSIDE UP TO UNDERSIDE OF UPPER OF UPPER CABINETS, TYP.CABINETS, TYP.
2' - 6"
TYPE 1_KITCHEN - IE1
3' - 0"
Level Level B3 B3 23' 23' - 4"- 4"
1' - 6"
1' - 6"2' - 6"
1
1' - 6"
TYPE 3_BATHROOM - IE3
1' - 6"
3' - 0" 1' - 6" 1' - 6"
TUBTUB SPOUT SPOUT
3c
PROVIDE BLOCKING FOR FUTURE FOLD-UP GRAB BAR BTW. 30" AND 44" A.F.F. TO 6" BEYOND WIDEST POINT OF TOILET 12" LINEN CABINET FOR TYPE 3B ONLY
15" MIN. 15" MIN.
1' - 6"
1/2" = 1'-0"
SHOWER ROD
SHOWER ROD
SHOWER HEAD
AS REQ'D.
12'12'- 8" - 8"
6' - 0"
1/2" = 1'-0"
3' - 0"
PROVIDE PROVIDE BLOCKING BLOCKING FORFOR FUTURE FUTURE GRAB GRAB BARS BARS TO 48" TO 48" ABOVE ABOVE TUBTUB BOTTOM BOTTOM AT ALL AT ALL TUBTUB WALLS WALLS
Level B2 12' - 8"
RECESSED RECESSED ROLL ROLL HOLDER HOLDER
AS 1'REQ'D. - 3"
TYPE 1_KITCHEN - IE2
3' - 0"
12" LINEN CABINET FOR TYPE 2B ONLY
Level Level B3 B3 23' 23' - 4"- 4"
2' - 6"1' - 3"
1/2" = 1'-0" 0' - 1"
AS REQ'D.
A640
UTILE PR
BATHROOM 4, 4B, 4C, 4DKITCHEN - PLAN ELEVA Level LevelTYPE B2B2
4
1' - 0" 2' - 8 3/4"
1' - 6"
Level B2 12' - 8" TUBTUB
2' - 6"
SCALE As indicated
3' - 0"
ABOVE ABOVE TUBTUB BOTTOM BOTTOM AT ALL AT ALL PLANS TUBTUB WALLS WALLS
2b
A630
TYPE 3_BATHROOM - IE4
15" MIN. 2' - 3"
1'2'- -0"3"
2' -1'6"- 0"
REFRIGERATOR
2' - 6" 2' - 3" 0' - 1"
2' - 6"
4b
4c
FILLER PANEL TO MATCH CABINET FACE
SLIDE IN RANGE
2' - 0"
AS REQ'D.
A630
4d
36X48 NOMINAL GLAZED WALL TILE SHOWER UP TO UNDERSIDE OF UPPER CABINETS, TYP.
1' - 6"
2d
2c
3d
1' - 6"2' - 6"
2
Level B4 34' - 0"
3' - 0"
30X60 NOMINAL BAT/ SHOWER
BATHROOM BATHROOM FAUCET FAUCET
2' - 9" 1' - 6"
1' - 5" 1' - 5"
1' - 6" 1' - 6"
KITCHEN FAUCET KITCHEN FAUCET 18" TOWEL ROD PROVIDE BLOCKING FOR KITCHEN SINK KITCHEN SINK FUTURE GRAB BARS TO 48" BATHROOM FAUCET KITCHEN FAUCETFOR PROVIDE BLOCKING MIRROR MIRROR ABOVE TUB BOTTOM AT ALL FUTURE GRAB BARS TO 48" TUBREMOVABLE WALLS VANITY ABOVE TUB BOTTOM AT ALL 18" TOWEL 18" TOWEL BARBAR FINISH WALLS AND TUB WALLS BASEBOARD BEHIND VANITY RECESSED ROLL BEFORE INSTALLATION HOLDER BATHROOM BATHROOM FAUCET FAUCET TOILET SLIDE IN RANGS ELIDE IN RANGE DISHWASHER DISHWASHER
PRESSURE PRESSURE BALANCE BALANCE 3' - 0"
RECESSED ROLL PROVIDE PROVIDE BLOCKING BLOCKING FOR FOR HOLDER DOOR LOCATION VARIES, FUTURE FUTURE GRAB GRAB BARS BARS TO 48" TO 48" UNIT SEE ENLARGED
1' - 6"
PROVIDE PROVIDE BLOCKING BLOCKING FORFOR FUTURE FUTURE FOLD-UP FOLD-UP GRAB GRAB PROVIDE BLOCKING FOR BARBAR BTW. BTW. 30"FUTURE AND 30" AND 44" GRAB 44" BAR BTW. 30" A.F.F. A.F.F. TO 6" TOBEYOND 6" BEYOND AND 38" A.F.F. WIDEST WIDEST POINT POINT OF TOILET OF TOILET
LIGHT FIXTURE SHOWER ROD
REVISIONS ON SHEET
AS REQ'D.
- 9" AS2' REQ'D.
AS REQ'D.
0' - 1"
GWB SOFFIT AND GWB SOFFIT AND FASCIA, TYP. FASCIA, TYP.
1' - 6"
FILLER PANEL TO FILLER PANEL TO SHOWER ROD MATCH CABINET MATCH CABINET FACE FACE
FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE
2' - 8 3/4"
1_KITCHEN TYPE 1_KITCHEN TYPETYPE 1_KITCHEN - IE3 - IE1 - IE2 1 = 1'-0" 1/2" 1/2" =21'-0" 1/2" = 1'-0" 1' - 5"
REMOVABLE VANITY FINISH WALLS AND BASEBOARD BEHIND VANITY BEFORE INSTALLATION
UTILE PROJECT NUMBER 1309.2
SHE MICR
1' - 6"
AS2'REQ'D. - 9"
24" TOWEL ROD HOOD RECESSED SHELF FOR SHELF FOR LIGHT LIGHT FIXTURE FIXTURE MICROWAVE MICROWAVE MEDICINE CABINET MIRROR
HOOD
SHOWER SHOWER HEAD HEAD 12" LINEN CABINET FOR TYPE 3B ONLY 18" LINEN CABINET FOR TYPE 3D ONLY 12" LINEN 12" LINEN CABINET CABINET FORFOR TYPE TYPE 2B ONLY 2B ONLY
3' - 0"
1' - 6"
3' - 0" 1' - 6"
6' - 0"
1' - 9" 2' - 9"
0' - 1"
4a
SHELF FOR MICROWAVE
3' - 0"
2' - 6" 1' - 9"
2' - 6"
2' - 6"
AS REQ'D.
3
PROVIDE BLOCKING FOR FUTURE FOLD-UP GRAB BAR BTW. 30" AND 44" HOOD A.F.F. TO 6" BEYOND WIDEST POINT OF TOILET
11/26/2014 CONSTRUCTION DOCUMENTS ELEVATIONS TYPE 4_BATHROOM - IE1KITCHEN B2Level B2 Level B2 4aLevel 1/2" 1'-0"- 8" 12' - 8"= 12' 12' - 8"
AS REQ'D. 1' - 2' 0" - 6" 2' - 0"
18" TOWEL BAR
3' - 0"
2' - 6"
2' - 0"2' - 3"
1' - 6"
2
FILLER PANEL TO FILLER PANELCABINET TO MATCH MATCH CABINET FACE FACE
1' - 6"
3' - 6"
1' - 3"
0' - 1"
1/2" = 1'-0" 1/2" = 1'-0"
GWB SOFFIT AND GWB SOFFIT AND ASFASCIA, REQ'D. TYP. FASCIA, TYP.
6' - 0"
1' - 6"
RECESSED RECESSED MEDICINE MEDICINE CABINET CABINET PROVIDE BLOCKING FOR
FUTURE GRAB BARS TO 48" KITCHEN FAUCET24" TOWEL BAR FOR TYPE 24" TOWEL 24" TOWEL BARBAR FORFOR ABOVE TUB BOTTOM AT ALL 2C ONLY TYPE TYPE 2C ONLY 2C ONLY 24" TOWEL 24" TOWEL RODROD TUB WALLS
2a
ROBE HOOK
SHOWER SHOWER RODROD
LIGHT LIGHT FIXTURE FIXTURE
RECESSED MEDICINE CABINET SHOWER SHOWER ROD ROD ROBE ROBE HOOK HOOK
1/2" = 1'-0"
GWB SOFFIT AND AND GWB SOFFIT FASCIA, TYP. TYP. FASCIA,
REQ'D. ASAS REQ'D.
3' - 0"
3' - 6"
1' - 6"
AS REQ'D.
1/2" = 1'-0"
DISHWASHER
TYPE 4_BATHROOM BATHROOM - IE2TYPE 4, 4B, 4C, 4D - PLAN Level 1Level 4 B2 Level-B28" 1/2" = 0' 1'-0" - 0" 12' - 8"1/2"12'= 1'-0"
4b
2' - 6"2' - 8 3/4" 0' - 1"
0'2'- 1" - 8 3/4"
2' -2'0"- 9"
1' - 6"
2' - 6"
2'2' -- 0" 6"
SCHEMATIC DESIGN SCALE FILLER PANEL TO DESIGN DEVELOPMENT MATCH CABINET As indicated PERMIT SET FACE PRICING SET BLDG A STRUCTURAL STEEL SET REFRIGERATOR BLDG B STEEL PLANS
2'2'- 6" - 3 1/16"
BATHROOM FAUCET
STAMP ISSUE
FINISHED FULL DEPTH 03/21/2014 END PANEL, TYPICAL 04/18/2014 FILLER PANEL TO BOTH SIDES OF ISLAND MATCH CABINET06/27/2014 FACE 08/29/2014 10/24/2014 12" LINEN CABINET FOR TYPE 4B ONLYSLIDE IN RANGE 11/03/2014
Level B4 34' - 0"
2' - 6"
MIRROR
GLAZED WALL TILE UP TO UNDERSIDE OF UPPER CABINETS, TYP.
PROVIDE BLOCKING FOR FUTURE SEAT + GRABFAUCET BARS KITCHEN GLAZED TO 48" ABOVE FLOOR ATWALL ALL TILE SHOWER WALLSUP TO UNDERSIDE OF UPPER KITCHEN SINK CABINETS, TYP.DATE
TOILET
FILLER PANEL TO MATCH CABINET FACE
DISHWASHER REFRIGERATORREFRIGERATOR
1' - 3"
2' - 6"
BATHROOM BATHROOM TYPE 3, 3, 3B,3B, 3C, 3D3D - PLAN - PLAN1_KITCHEN TYPE 2_KITCHEN - IE1 - IE3 TYPETYPE 1_KITCHEN - 3C, IE2 TYPE 3 3 1/2"1/2" = 1'-0" 4 2= 1'-0" 3
1/2" = 1'-0"
LIGHT FIXTURE
24" TOWEL ROD
DOOR DOOR LOCATION LOCATION VARIES VARIES SEESEE ENLARGED ENLARGED UNITUNIT PLANS PLANS
TYPE 3_KITCHEN
7
1' - 6"
1' - 6"2' - 6"
2' - 0"
AS REQ'D.
0' - 1"
2' - 8 3/4"
AS REQ'D.
TYPE 2_KITCHEN - IE1
4
SHOWER ROD
15" MIN.
6
6' - 0"
1' - 6"
AS REQ'D. AS REQ'D.
TYPE TYPE 3_BATHROOM 3_BATHROOM - IE1 - IE12_KITCHEN TYPE - IE2 - IE3 TYPE 1_KITCHEN 3a3a1/2"1/2" = 1'-0" = 1'-0" 5 1/2" =31'-0" 1/2" = 1'-0"
3' - 0"
ROBE HOOK
AS REQ
AS REQ'D.
1/2" = 1'-0"
6' - 0"
1' - 3"
KITCHEN SINK FINISHED FULL DEPTH END PANEL, TYPICAL BOTH SIDES OF ISLAND
2' - 0"
FILLER PANEL TO MATCH CABINET FACE
11/25/2014 4:25:29 PM
2' - 6" 2' - 6"
PRESSURE BALANCE HOOD
SHELF FOR MICROWAVE
GLAZED WALL TILE UP A630 4d TO UNDERSIDE 4b OF UPPER CABINETS, TYP. 4c
36X48 NOMINAL SHOWER
KITCHEN FAUCET
LevelLevel B4 B4 34' -34' 0" - 0"
SLIDE IN RANGE
- IE3 TYPE4_BATHROOM 4_BATHROOM - IE1 Level B24c4aTYPE Level 1 Level 1 1/2" = 1'-0" 0' - 0" 1/2" = 1'-0" 12' - 8" 0' - 0"
Level Level B2 B2 12' 12' - 8"- 8"
4a
PROVIDE BLOCKING FOR FUTURE GRAB BAR BTW. 30" AND 38" A.F.F
TO 48" ABOVE FLOOR AT ALL SHOWER WALLS REMOVABLE VANITY 30X60 30X60 FINISH WALLS AND NOMINAL NOMINAL BAT/BAT/ SHOWER SHOWER BASEBOARD BEHIND VANITY BEFORE INSTALLATION
REFRIGERATOR
TUBTUB
2' - 0" 2' - 0"
CABINETS, TYP.
FILLER PANEL TO 3c 3c MATCH CABINET FACE
SHOWER ROD LIGHT FIXTURE
2' - 3"
AS REQ'D.
TYPE 3_KITCHEN - IE1
1' - 5"
GWB SOFFIT AND FASCIA, TYP. 1' - 0"
AS REQ'D.
FILLER PANEL TO MATCH CABINET FACE
3' - 0"
DISHWASHER DISHWASHER
1' 1'- 0"- 3"
GLAZED WALL TILE UP TO UNDERSIDE 3a 3a OF UPPER
PROVIDE BLOCKING FOR FUTURE FOLD-UP GRAB HOODBAR BTW. 30" AND 44" A.F.F. TO 6" BEYOND PROVIDE BLOCKING FOR TOILET FUTUREWIDEST SEAT +POINT GRAB OF BARS
2' - 9"
1' - 6"
SLIDE IN RANGE
TYPE TYPE 4_BATHROOM 4_BATHROOM - IE4 Level Level- 1IE2 4b14d = 1'-0" = 1'-0" 0' - 0" 1/2"1/2" 0' - 0" 2' - 6"
1' - 3"
AS REQ'D.
AS REQ'D.
TYPE TYPE 3_BATHROOM 3_BATHROOM - IE2 - IE2 TYPE TYPE2_KITCHEN 2_KITCHEN--IE1 IE2 3b3b1/2"1/2" = 1'-0" = 1'-0" 45 1/2" 1/2"==1'-0" 1'-0"
1' - 5"
2' - 6"
2' - 3"
6
15" MIN.
2' - 6"
FILLER PANEL TO MATCH CABINET FACE
1' - 6"
2' - 8 3/4" 2' - 6" 0' - 1"
1' - 6"
1' - 6"
0' - 1"
B NORTH KEY PLAN
LIGHT FIXTURE GWB SOFFIT AND FASCIA, TYP. 2' - 6" AS REQ'D. SHOWER HEAD
2' - 0"2' - 0"
FILLER PANEL TO MATCH CABINET FACE
3' - 0"
1' - 6" 2' - 0"
18" TOWEL BAR
3d 3d A630A630 3b 3b
1' - 0"
2' - 3 1/16" ROBE HOOK
FILLER PANEL TO MATCH CABINET FILLER PANEL TO FACE MATCH CABINET FACE
3' - 0"
1' - 0"
GLAZED WALL TILE UP TO UNDERSIDE OF UPPER CABINETS, TYP.
FILLER PANEL TO MATCH CABINET FACE
GWB SOFFIT AND FASCIA, TYP.
AS REQ'D.
3' - 0"
2' - 6"
FILLER PANEL TO MATCH CABINET FACE
AS REQ'D. 2' - 9"
1' - 6"
Level Level B2 B2 12' 12' - 8"- 8"
1/2"0'=- 1'-0" 0"
3' - 0"
3' - 0"
1' - 6"
TOILET TOILET DISHWASHER REFRIGERATOR
SLIDE IN RANGE
TYPE Level 14_BATHROOM - IE3
AS REQ'D.
AS REQ'D.
TYPE TYPE 3_BATHROOM 3_BATHROOM - IE3 - IE3 TYPE BATHROOM 3, 3B, 3C, 3D - PLAN TYPE 2_KITCHEN - IE2 3c3c1/2"1/2" = 1'-0" = 1'-0" 5 3 1/2" = 1'-0" 1/2" = 1'-0"
GLAZED WALL TILE UP TO UNDERSIDE OF UPPER CABINETS, TYP.
2' - 9"
2' - 6"
3' - 0"
4c
1' - 3"
24" TOWEL BAR
PROVIDE BLOCKING PROVIDE BLOCKING FORFOR PRESSURE BALANCE FUTURE FOLD-UP GRAB FUTURE FOLD-UP GRAB BTW. 30" AND BARBAR BTW. 30" AND 44" 44" SHELF FOR BATHROOM FAUCET A.F.F. TOBEYOND 6" BEYOND A.F.F. TO 6" MICROWAVE CENTER BETWEEN LINEN GLAZEDWIDEST WALL TILE WIDEST POINT OF TOILET POINT OF TOILET PROVIDE CABINET ANDBLOCKING WALL FORFOR UP TO UNDERSIDE FUTURE SEAT + GRAB BARS TYPE 4BFAUCET KITCHEN OF UPPER KITCHEN FAUCET TO 48" ABOVE FLOOR AT ALL RECESSEDTYP. ROLL CABINETS, GLAZED WALL TILE SHOWER WALLS PRESSURE BALANCE PRESSURE BALANCE HOLDER KITCHEN SINK CENTERSINK BETWEEN UP TO UNDERSIDE KITCHEN SHOWER AND WALL FOR OF UPPER TOILET PROVIDE PROVIDE BLOCKING BLOCKING FORFOR TYPE 4, 4C, 4D CABINETS, TYP. FINISHED FULL DEPTH 12" LINEN 12" LINEN CABINET CABINET FORFOR FUTURE GRAB GRAB BARS BARS TO 48" TO 48" FILLER FUTURE PANEL TO TYPE 3B ONLY 3BFILLER ONLY PANEL TO ABOVE TUBTUB BOTTOM BOTTOM AT ALL AT ALLEND PANEL, TYPICALTYPE MATCH ABOVE CABINET Level B4 Level B4 BOTH SIDES OF ISLAND WALLS WALLS FACE TUBTUB MATCH CABINET 34' -34' 0" - 0" 18" LINEN 18" LINEN CABINET CABINET FORFOR FACE TYPE TYPE 3D ONLY 3D ONLY TUBTUB SPOUT SPOUT
HOOD
2' - 6" AS REQ'D. 2' - 6" MIRROR
BATHROOM FAUCET
FILLER PANEL TO MATCH CABINET FACE
3' - 0"
2' - 6"
PROVIDE BLOCKING FOR SHGRAB ELF FOBAR R BTW. 30" FUTURE PROVIDE BLOCKING FOR MICROWAVE A.F.F BLOCKING FOR MIRRORAND 38"PROVIDE FUTURE SEAT + GRAB BARS MIRROR FUTURE SEAT + GRAB BARS TO 48" ABOVE FLOOR AT ALL TO 48" ABOVE FLOOR AT ALL SHOWER WALLS KITCHEN FAUCET 18" TOWEL 18" TOWEL RODROD SHOWER WALLS KITCHEN SINK BATHROOM FAUCET BATHROOM FAUCET PROVIDE PROVIDE BLOCKING BLOCKING FORFOR FUTURE FUTURE GRAB GRAB BARS BARS TO 48" TO 48" REMOVABLE VANITY - REMOVABLE VANITY ABOVE ABOVE TUBTUB BOTTOM BOTTOM AT ALL AT ALL FINISH WALLS ANDAND FINISH WALLS TUBTUB WALLS WALLS Level B4 BASEBOARD BEHIND VANITY BASEBOARD BEHIND VANITY 34' - 0" BEFORE INSTALLATION BEFORE INSTALLATION
FILLER PANEL TO MATCH CABINET FILLER PANEL TO FACE MATCH CABINET FACE
FILLER PANEL TO MATCH CABINET FACE
15" MIN.
1' - AND 6"1' - 6" 1' - 5"GWB 1' - 5" SOFFIT FASCIA, TYP. 15" MIN. 15" MIN. 1' - 0" 2' - 0"
GWB SOFFIT AND FASCIA, 2' - 9"TYP. AS REQ'D.
1' - 6"
Level Level B2 B2 12' 12' - 8"- 8" 2' - 0"
2' - 8 3/4"
- IE2
14 A642
B SOUTH
1' - 6"
3' - 0"
DISHWASHER
1' - 0"
0' - 1"
AS REQ'D.
115 KINGSTON STREET BOSTON, MA 02111 TYPE 3_KITCHEN 7 423.1414 = 1'-0" P 617 423.7200 F 6171/2" utiledesign.com ARCHITECT
TYPETYPE TYPE 3_KITCHEN 3_KITCHEN 3_KITCHEN - IE3 - -IE2 IE1 76
8
11/03/2014 11/03/2014 11/26/2014 11/26/2014
1' - 6"
2' - 6"
FILLER PANEL TO MATCH CABINET FACE
FILLER PANEL TO RECESSED SHOWER HEAD SHOWER HEAD MATCH CABINET MEDICINE CABINET FACE
1' - 6"
1/2" = 1'-0"
12" LINEN CABINET FOR LIGHT FIXTURE TYPE 4B ONLY 2' - AS 3" REQ'D.AS REQ'D. 2' - 6" SHOWER HEAD
SHOWER SHOWER RODROD ROBE HOOK
6' - 0"
TYPE 4_BATHROOM - IE4
WEL ROD
B3 3 4" 4"
2' - 6" 0' - 1" DATE DATE GRAB ISSUE BARISSUE COAT HOOK AND COMMON BATHROOM AS REQ'D. GROUP 2 ROBE TOILET PAPER SCHEMATIC SCHEMATIC DESIGN DESIGN HOOK DISPENSER DESIGN DESIGN DEVELOPMENT DEVELOPMENT PERMIT PERMIT SETSET PRICING PRICING SETSET 1/2" = 1'-0" 1/2"==1'-0" 1'-0" 1/2" BLDG BLDG A STRUCTURAL A STRUCTURAL STEEL STEEL SETSET
03/21/2014 03/21/2014 AS REQ'D. 04/18/2014 04/18/2014 06/27/2014 06/27/2014 08/29/2014 08/29/2014 10/24/2014 10/24/2014
6' - 0"
SLIDE IN RANGE
4d
FILLER PANEL TO MATCH CABINET FACE
FILLER PANEL TO MATCH CABINET FACE
GWB SOFFIT AND LIGHT FIXTURE FASCIA, TYP. 2' - 6"
3' - 0"
FILLER PANEL TO MATCH CABINET FACE
3' - 0"
18" LINEN CABINET FOR TYPE 3D ONLY
GLAZED WALL TILE UP TO UNDERSIDE OF UPPER CABINETS, TYP.
GLAZED WALL TILE PROVIDE BLOCKING FOR PROVIDE BLOCKING FOR CENTER BETWEEN UP TO BAR UNDERSIDE FUTURE GRAB BAR BTW. 30" 30" FUTURE GRAB BTW. SHOWER ANDOF WALL FOR UPPER ANDAND 38" A.F.F. 38"4D A.F.F. TYPE 4, 4C, CABINETS, TYP.
Level B4 34' - 0"
GWB SOFFIT AND FASCIA, TYP. 2' - 6"
AS REQ'D.
1' - 6"
KITCHEN SINK 3b
3c
2' - 3"
1' - 6"
A630
CENTER BETWEEN LINEN CABINET AND WALL FOR TYPE 4B
12" LINEN 12" LINEN CABINET CABINET FORFOR TYPE TYPE 3B ONLY 3B ONLY RECESSED ROLL 30X60 HOLDER NOMINAL 18" LINEN 18" LINEN CABINET CABINET FORFOR BAT/ SHOWER TYPE TYPE 3D ONLY 3D ONLY
3a KITCHEN FAUCET 3d
2' - 6" AS REQ'D.
6' - 0"
PROVIDE BLOCKING FOR FUTURE SEAT + GRAB BARS TO 48" ABOVE FLOOR AT ALL SHOWER WALLS PROVIDE PROVIDE BLOCKING BLOCKING FORFOR FUTURE FUTURE GRAB GRAB BARS BARS TO 48" TO 48" ABOVE ABOVE TUBTUB BOTTOM BOTTOM AT ALL AT ALL TUBTUB WALLS WALLS12" LINEN CABINET FOR TYPE 3B ONLY
2' - 9"
LIGHT FIXTURE LIGHT FIXTURE
HOOD
1' - 6"
SHELF FOR BATHROOM FAUCET MICROWAVE
3' - 0"
HO D1' - 6" 1' O - 6"
1' - 6"
24" TOWEL 24" TOWEL RODROD
2' - 6" 3' - 0"
3' - 0"
3' - 0"
SHOWER SHOWER RODROD
FILLER PANEL TO MATCH CABINET FACE
3' - 0"
2' - 6" AS REQ'D.
SHOWER RODROD SHOWER
FILLER PANEL TO MATCH CABINET 24" TOWEL BAR FACE
3' - 0"
SHOWER ROD
GWB SOFFIT AND FASCIA, TYP.
12" LINEN CABINET FOR GWB SOFFIT AND TYPE 4B ONLY FASCIA, TYP.
AS REQ'D.
1' - 6"
2' - 3"
RECESSED MEDICINE CABINET
3' - 0"
LIGHT FIXTURE
3' - 0"
2' - 6"
3' - 0"
1' - 6"
15" MIN. 3' - 0"
2' - 6"
B3 - 4"
R
1' - 3"
12" LINEN 12" LINEN CABINET CABINET FORFOR TYPE TYPE 4B ONLY 4B ONLY
REVISIONS REVISIONS ON SHEET ON SHEET
3' - 0"
1' - 5"
SHOWER ROD
AUCET BLOCKING DE BLOCKING FORFOR RAB E GRAB BARBAR BTW. BTW. 30" 30" F.F. " A.F.F. ANITY AND EHIND VANITY ALLATION
FIXTURE RE
2'2'--0"3" AS REQ'D. COMMON BATHROOM MIRROR
1' - 5"
E
DE BLOCKING FOR E GRAB BAR BTW. UCET FAUCET D 38" A.F.F. TO 6" D WIDEST POINT OF
- 3" 2' - 82'3/4" 2'2'2' - -0"-6"6" COMMON BATHROOM SINK 0' - 1"
2' - 8 3/4" 0' - 1" ROBE HOOK 0' - 1"
BATHROOM BATHROOM TYPE TYPE 4, 4, 4B,4B, 4C, 4C, 4D4D - PLAN - PLAN 4 4 1/2"1/2" = 1'-0" = 1'-0" 14 A642
B2 8"
R
0' - 1" RECESSED ROLL HOLDER
TYPE 3_KITCHEN - IE2TYPE 4_KITCHEN TYPE 3_KITCHEN - IE1 - IE3 9 1/2" = 1'-0" 8 1/2" = 1'-0" 1/2" = 1'-0"
7
REVISIONS ON SHEET
3' - 0"
BALANCE
FAUCET CET LOCKING FOR AB BARS TO 48" BOTTOM AT ALL OLL D ROLL
2' - 0" 1' - 3" 2'BEHIND - 8 3/4" 2' - 0" AS REQ'D. BEHIND VANITY VANITY COMMON PAPER TOWEL TOWEL BBATHROOM AR 18" AND 2BASEBOARD 4" BASEBOARD SHOWER ROD, SHOWER HEAD, BEFORE INSTALLATION INSTALLATION TOILET PAPER 0' - 1" BEFORE DISPENSER AND WASTE 0' - 1" PRESSURE BALANCE, TUB DISPENSER RECEPTACLE SPOUT
Level Level B4 B4 TYPE TYPE 3_KITCHEN 4_KITCHEN - IE3 - IE2 TYPE 4_KITCHEN - IE1 - 0"- 0" 8 101/2" 1/2" 9 1/2" = 1'-0" 34' 34' = 1'-0" = 1'-0"
N
LOCKING FOR LD-UP GRAB 0" AND 44" D BEYOND BINET CABINET NT OF TOILET
2' - 6" COAT HOOK AND AS REQ'D. GROUP 2 ROBE HOOK
MIRROR & VANITY
TYPE TYPE 4_BATHROOM 4_BATHROOM - IE1 - IE1 4a4a1/2"1/2" = 1'-0" = 1'-0"
OD
RE TURE EAD
GRAB BAR
COMMON BATHROOM TOILET TOILET MIRROR
BLDG B STEEL PLANS
CONSTRUCTION DOCUMENTS TYPE TYPE 4_BATHROOM 4_BATHROOM - IE2 - IE2 4b4b1/2"1/2" = 1'-0" = 1'-0" 11/26/2014
1' - 6"
11/03/2014
2' - 0" AS REQ'D. COMMON BATHROOM AS REQ'D. SINK 0' - 1"
Level Level B4 B4 TYPE 4_KITCHEN TYPE- IE1 4_KITCHEN - IE2 - 0"- 0" 10 1/2" = 1'-0"34' 34'
9
12" LINEN CABINET FOR TYPE 4B ONLY
1' - 6"
Level Level B4 B4 34' 34' - 0"- 0"
1/2" = 1'-0"
2' - 8 3/4" ROBE HOOK
SHOWER RODDATE , SHOWER HEADISSUE , RECESSED ROLL PRESSURE03/21/2014 BALANCE, TUB SCHEMATIC DESIGN HOLDER 0' - 1" SPOUT 04/18/2014 DESIGN DEVELOPMENT 06/27/2014 PERMIT SET 08/29/2014 PRICING SET 1/2" = 1'-0" 10/24/2014 BLDG A STRUCTURAL STEEL SET
TOWEL BAR 18" AND 24"
TYPE 4_KITCHEN - IE2
6' - 0"
10
TYPE TYPE 4_BATHROOM 4_BATHROOM - IE3 - IE3 TYPE 4, 4B, 4C, 4D - PLAN BATHROOM 4c4c1/2"1/2" 4 1/2" = 1'-0" = 1'-0" = 1'-0"
3' - 0"
MIRROR &ASVAREQ'D. NITY
B4 "- 0"
3' - 0"
SHOWER ANDAND WALL WALL FORFOR OARD BEHIND VANITY SHOWER TYPE TYPE 4, 4C, 4, 4D 4C, 4D E INSTALLATION
A301-A MATCHLINE SEE A103.1-B
CO AK
5
A301-A
TYPE 1_KITCHEN TYPE 1_KITCHEN - IE2 - IE2 2 1/2" = 1'-0" 1/2" = 1'-0"
8
URBAN NODE ACADEMIC PROJECT
South Boston, MA An adaptive reuse project located in South Boston directly adjacent to the South End. Designed as a team of two as part of a Comprehensive Design studio. The design and massing of the building acts as a destination point, interlocking with the Harborwalk which connects the area with Boston’s Downtown and Fort Point neighborhoods. The program transitions from a community center and co-working space to an artist collective consisting of studios and gallery spaces. The elevated structure allows for the building to be used in situations of extreme flooding.
9
16
10
16.5
16
.5
5
. 16
.5
16
N
SITE PLAN 1/64” = 1’
pedestrian walkways
-CELLULAR + ORGANIC-
11
PROGRAM DIAGRAM -CELLULAR + ORGANIC-
PROGRAM DIAGRAM -CELLULAR + ORGANIC-
cellular + organic program
12
CURRENT PROGRAM COMMUNITY CENTER + CO-WORKING SPACE
ground
02.
FUTURE PROGRAM ARTIST STUDIOS + GALLERY SPACE
ground
02.
13
LEVEL 4
ROOF
17
17
18
03.
04.
roof
17 OPEN OFFICE/LOUNGE 18 MECHANICAL ROOM
LEVEL 4
ROOF
1/32” = 1
12
12
13
03.
04. 12 GALLERY SPACE 13 MECHANICAL ROOM
roof
14 rain fall average (in.) 3.5
JAN
4.3
3.9
3.3
FEB
MAR
APR
4.2
MAY
5.0 3.9
JUN
3.7
2.8
JUL
AUG
9
10
3.5
SEP
OCT
3.7
3.9
NOV
DEC
8 10 11
12
10
11
11 12
12
13
number of wet days
pipe system leading to water storage tank on-site water collection
1 2
3
13
5 12
4
8
11
7
6 9
10
15
14
16
systems integration
sectional construction details
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16.
folded roof plate rebar radiant tubing ventilation ducts drop ceiling structure insulation stripping waterproof membrane concrete truss joint connection to slab rebar reinforcements 4-way panel clips metal clad panels metal panel frame insitu concrete storefront curtain wall concrete pilings
15
FUTURE USE STRATEGY FUTURE USE STRATEGY -INFILL PANELS-
adaptability of infill panels -INFILL PANELS-
SOUTH ELEVATION 1/32” = 1’ - 0”
3
1
3
CURRENT
current positioning clustered light CURRENT
3 0
COMMUNITY/OFFICE CLUSTERED LIGHT
1
1 0
3
3 1
3 2
0
1 2
1
1 0
3
3 2
3
1 2
3
1 2
1
1 0
3
2 3
COMMUNITY/OFFICE CLUSTERED LIGHT
facade strategy north
3
1
3
3 3
1 1
3 3 1 1 1
west
south
3 0 0 0
3 3 3 3 3
1 0 0 0
1 1 0 0 0
3 1 1 1
3 3
3 2 2 2
3 3 1 1 1
1 2 2 2
1 1 3 3 3
1 0 0 0
1 1 3 3 3
3 2 2 2
3 3 3 3 3
1 2 2 2
east PANEL ROTATION
ability of panels to be repositioned
PANEL ROTATION
open ground floor for adaptability porous
solid
porous
solid
ALTERNATE ARRANGEMENT ALTERNATE ARRANGEMENT
porous
solid
future positioning dispersed light
FUTURE Gallery - Indirect Light
FUTURE Gallery - Indirect Light
10:18 AM
10:18 AM
S
glass
W
anti-reflective sheet
6:14 PM 10:18 PM
cells 120° 150°
E
5:18 AM
manipulated roof geometry for solar energy
N
frame
1 1 1 1 1
1 2 2 2
1 1 3 3 3
1 0 0 0
1 1 3 3 3
2 2 2
16
ASSEMBLY ASSEMBLYPROCESS PROCESS ASSEMBLY PROCESS
11
22
1
onsite
Excavate and pour basement. Drive pilings and cap.
OFFSITE OFFSITE Transport Transportofofmaterials materialsfor forrentention rententionpond pond Cast Castfacade facadepanels panels
offsite
33
2
ONSITE ONSITE Excavate Excavateand andpour pourbasement basement Drive Drivepilings pilingsand andcap cap
Transport materials for retention pond. Cast facade panels.
44
3
ONSITE ONSITE Construct Constructretention retentionwall wallaround aroundexcavated excavatedsite site Pour Pourslab slabonongrade gradefor forground groundfloor floor Excavate Excavateretention retentionpond pond Pour Pourfirst firstlayer layerofofcores cores
Construct retention wall around excavated site. Pour slab on grade for ground floor. Excavate OFFSITE OFFSITEretention pond. Production Productionofoffacade facadepanels panels Ship glass glasslayer for forcurtain curtain wall wallcores. PourShip first of Production of facade panels. Ship glass for curtain wall.
4
ONSITEONSITE Pour ground Pour floor ground structure floor structure - columns - columns and panels and panels Build bench Buildaround bench rentention around rentention pond pond
Pour ground floor structure - columns and panels. Build bench around retention pond.
OFFSITE OFFSITE Production Production of facade ofpanels facade panels Begin construction Begin construction of precast of precast folded plate folded roof plate roof
Production of facade panels. Begin construction of precast folded plate roof.
5
6
5
ONSITEONSITE Pour second Pour floor second slab floor slab Pour cores Pour tocores Level to Three Level Three Excavated Excavated materialmaterial is distributed is distributed in landscaping in landscaping
ONSITE Third level floor and panels are poured Expansion joint placed at edge Third floor slab poured on site
Transport Transport folded plate folded roof plate roof Transport Transport structural structural concreteconcrete truss truss
OFFSITE Transport folded place and concrete truss Shipment of facade panels
Pour second floor slab. Pour cores to level three. Excavated OFFSITE OFFSITE material is distributed in landscaping. Transport folded plate roof. Transport structural concrete truss.
Third level floor and panels are poured. Expansion joint placed at edge. Third floor slab poured on site. Transport folded plate and concrete truss. Shipment of facade panels.
17
6
6
77
88
7
ONSITE Attach secondary structure at expansion joint Support with building jacks until structural roof is added Pour next level of cores
Attach secondary structure at expansion joint. Support with building jacks until structural roof is added. OFFSITE Bring concrete truss and folded roof to site landscapeof elements Pour Assemble next level cores. Bring concrete truss and folded roof to site. Assemble landscape elements.
99
8 ONSITE ONSITE Secondary Secondary expansion expansion joint at joint roof at roof Concrete Concrete truss truss connected connected to slab to slab
Attach secondary structure at expansion joint. Support with building jacks until structural roof is OFFSITE added. OFFSITE Transport Transport facade facade panels panels Transport Transport folded folded roof roof Pour next level of cores. Bring concrete truss and folded roof to site. Assemble landscape elements.
10 10
9
ONSITE ONSITE Pour Pour fourthfourth floor slab floor slab Support Support with building with building jacksjacks Attach Attach to concrete to concrete truss truss Pour Pour next level next level of cores of cores
Pour fourth floor slab. Support with building jacks. Attach to concrete truss. OFFSITE OFFSITE Folded Folded plate plate roof and rooffacade and facade panels panels arrivenext arrive on site on site Pour level of cores. Folded plate roof and facade panels arrive on site.
10
ONSITE ONSITE Folded Folded plate plate roofroof placed placed on top on top Roof Roof attached attached to concrete to concrete truss truss Facade Facade panel panel clipsclips adhered adhered to truss to truss Remove Remove building building jacks jacks
Folded plate roof placed on top. Roof attached to concrete truss. Facade panel clips adhered to truss. OFFSITE OFFSITE Transport Transport mechanical mechanical equipment equipment Remove building jacks. Transport mechanical equipment.
ONSITE ONSITE
Place Place afacde afacde panels panels between between clipsclips Place facade panels between clips. Install Install glass glass panels panels on North on North faceface and and at ground at ground level level Install Install mechanical mechanical equipment equipment Install glass panels. Landscaping Landscaping elements elements ompleted ompleted Install mechanical equipment. OFFSITE OFFSITE Landscaping elements completed.
18
RIBBON HOUSING ACADEMIC PROJECT
Roxbury + South End, Boston, MA A housing project located on the border of Roxbury and the South End. The design utilizes a ribbon extrusion that organizes public and amenity spaces throughout; carving out balconies and shared program. The relationship of solid and void on the ground level creates an outdoor plaza comprised of shops, restaurants, and rentable office space. The complex is the combination of townhouse style apartments and high density units to fit the different types of occupants.
19
20
townhouse evolution
21
massing transformation
22
ground
02.
05.
03.
06.
04.
07.
23
1
studio
Short Section 1/8" = 1'-0"
one bed + balcony
two bed duplex
one bed
two bed + balcony
three bed triplex
two bed
24
BIKE BIKE SHOP SHOP
SPIN SPIN STUDIO STUDIO
BOUTIQUE BOUTIQUE
amenity spaces
building circulation
retail + office space
unit outdoor space
25
26
assembly square ACADEMIC PROJECT
Somerville, MA An urban design project located in an overgrown industrial area. The design uses a multi-modal transportation network to connect buildings, parks, boardwalks, and T stations. The network itself shapes the architecture to create urban plaza pockets throughout. A boardwalk system acts as a container for storm water and the flooding of the Mystic River.
27
28
ST RTH ATION NO
REGIONAL
ROADS ORANGE LINE PEDESTRIAN BIKE MARINE
8 MIN. 18 MIN. 50 MIN. 20 MIN. 22 MIN.
N airpo GA rt LO
pedestrian ROADS 11 MIN. BLUE LINE 47 MIN. PEDESTRIAN 1 H 56 MIN. AIR N/A MARINE 25 MIN.
ROADS 12 MIN. ORANGE LINE 28 MIN. PEDESTRIAN 1 H 22 MIN. BIKE 31 MIN.
ROADS 12 MIN. ORANGE LINE 30 MIN. PEDESTRIAN 1 H 11 MIN. BIKE 29 MIN. MARINE 30 MIN.
O
CK
N
S
B
A
I B AY STAT
O
UT
H STAT I O
ROADS
MARINE WALK TO T: 3 MIN. T TO DOWNTOWN: 20 MIN. TOTAL: 23 MIN.
NTOWN BO S OW
TO
D
RAILS
N
N TO
RVILLE LIB ME R O S
Y AR
TO
VICINITY
bike
vehicular
PEDESTRIAN WALK TO LIBRARY TOTAL: 26 MIN.
SOMERVILLE PUBLIC LIRARY
existing
PROPOSED T STOP RAILS
RAILS MARINE
TO
WALK TO T: 6 MIN. T TO MALDEN: 17 MIN. TOTAL: 23 MIN.
TO
MALDEN
LO
RT
PEDESTRIAN WALK TO T: 40 MIN. T TO AIRPORT: 2 MIN. TOTAL: 42 MIN.
PEDESTRIAN
G A N AIRP O
overall
29
residential
office
residential/commercial
parking/commercial
cultural
30
pavilion
district entry
commercial pocket
vegetation buffer
existing development
pedestrian and bike boardwalk network. acts as a container for flooding of the mystic river.
vegetation buffer sunken park
31
destination points where the network starts and ends. pocket plazas created by transportation network.
the architecture is shaped by the movement of the transportation network.
32
BERLIN BLOCKS ACADEMIC PROJECT
Friedrichshain, Berlin, DE An apartment complex located in a Berlin neighborhood with a young professional demographic. The neglected area is in need of an architectural identity. This design utilizes five apartment blocks to personalize the living experience for its inhabitants. A sense of community is restored while creating private individualized spaces.
33
34
05.
04.
03.
02.
00.
01.
35
broken grid
height shift
variation
blocks
small private spaces large public spaces
square grid
36
mismatched views
2.
two windows per floor
1.
residents general public 1.
3.
2.
site division
iteration process
three windows per floor
37
38
SPLIT IDENTITIES ACADEMIC PROJECT
South End, Boston, MA A performing arts school located on a city block shared with residential and commercial functions. Two programmatic bars converge at the corner and split to house private and public program. The interstitial space between the two bars creates an outdoor courtyard for the students. Additional kinks in each bar create public spaces for the neighborhood.
39
40
circulation zipper
residential bar kink
widening and shortening
02.
kink
compression
program bars
ground
41
open space off street
42
43
44
CORNER WEBBING ACADEMIC PROJECT
South End, Boston, MA A culinary arts center located on a corner lot of a lively Boston neighborhood. Heavy private program is placed at the top while light public program is placed at the bottom. The division is meant to activate the streetfront, inviting the public inside the center or into the sunken cafĂŠ. The webbed mullion system acts as a connection and as an anchor between the heavy and light program.
45
46
program shift
anchoring
web
light and heavy
47
03.
ground
02.
48
BOOK BILLBOARD ACADEMIC PROJECT
South Boston, MA A library located above an existing T station on a triangular site. The design separates lounges, classrooms, and administration from the physical stacks. In between this division is an open void occupied by twisting staircases connecting the various levels. An outdoor public space is created adjacent to this void. The stacks are located along a highly populated streetfront and are strategically placed to serve as a “book billboard� for the library.
49
50
books. voided spaces within stacks
book billboard
51
form
extrusion
stacks bar
connection void
book billboard
52
ground
02.
53
03.
04.
54
55
COMMON STUDY ACADEMIC PROJECT
Boston, MA An analysis of the landscape, buildings, people, and history of both the Boston Common and Public Garden. The architectural boundary was the main interest of the study, and how it changes from one side to the next. The four topics include: a perimeter analysis of the Common, observed uses of the freedom trail, a history of fires, and a mapping of crimes.
alternate use of the freedom trail
BPw
56
crime study vehicle theft assault theft program: residential
4.0% 70.1%
25.9%
02|18|1967 department store fire
a history of fires and building technologies
traditional glass
fire proof glass 11|28|1942 cocoanut grove fire
lenient egress restrictions
strict egress restrictions
01|04|1914 early skyscraper fire
fire/smoke resistant egress fire/smoke able to enter egress 11|09|1872 great boston fire wood frame construction
masonry construction
05|30|1905 beacon hill garage fire
steel and concrete construction
timber construction
program: clubs and bars 10.9%
49.5%
39.6%
program: retail 3.3% 73.1%
23.6%
57
RETEP SIVART e r u tce t i hc r a oiloftrop