Peter Travis Architecture Portfolio

Page 1

PETER TRAVIS a r c h i t e ct u r e portfolio


TA B L E O F C O N T E N TS


4

PROFESSIONAL WORK

8

URBAN NODE

18

RIBBON HOUSING

26

ASSEMBLY SQUARE

32

BERLIN BLOCKS

38

SPLIT IDENTITIES

44

CORNER WEBBING

48

BOOK BILLBOARD

54

COMMON STUDY


4

HANDEL ARCHITECTS Journal Squared | Jersey City, NJ

New York, NY During my time at Handel Architects I worked on the project team from DDs through CDs for Journal Squared, a 54 story residential high rise in Jersey City, New Jersey. I worked on a range of drawings from podium sections to different building codes drawings such as light and air easements. In addition to Journal Squared, I also worked on Millennium Hollywood during schematic design, a mixed use development in Los Angeles, creating different presentation diagrams and materials for client and city reviews.

* Rendering created by HWKN, for reference

2 A-320

PROPERTY LINE EXTENT OF PATH LIGHT & AIR EASEMENT

4

WEST SHEARWALL

A-319

30'-0"

30'-0" MECH PLENUM

1&2 A-310

EXTENT OF PATH LIGHT & AIR EASEMENT

3 A-310

SW5

1 A-311

SW5

LEVEL 9 T.O.S. EL. +97'-8"

T.O. SHEAR WALL EL. 95'-2"

T.O. PARAPET EL. +78'-6"

LEVEL 8/CLUB T.O.S. EL. +77'-8"

LEVEL 8/CLUB T.O.S. EL. +77'-8"

LEVEL 8/CLUB TERRACE T.O.S. EL. +76'-9"

LEVEL 8/CLUB TERRACE T.O.S. EL. +76'-9"

LEVEL 7/PARKING T.O.S. EL. +65'-0"

LEVEL 7/PARKING T.O.S. EL. +65'-0" EDGE OF CORE BOX

EDGE OF CORE BOX

CHANGE IN SLAB THICKNESS

LEVEL 6/PARKING T.O.S. EL. +56'-3"

BASE OF PATH LIGHT & AIR EASEMENT CHANGE IN SLAB THICKNESS

LEVEL 6/PARKING T.O.S. EL. +56'-3" EDGE OF CORE BOX

El. +53'-6"

LEVEL 5/PARKING T.O.S. EL. +47'-6"

BASE OF PATH LIGHT & AIR EASEMENT EL. 53'-6"

EDGE OF CORE BOX

LEVEL 5/PARKING T.O.S. EL. +47'-6" CHANGE IN SLAB THICKNESS

LEVEL 4/PARKING T.O.S. EL. +38'-9"

LEVEL 4/PARKING T.O.S. EL. +38'-9" EDGE OF CORE BOX

EDGE OF CORE BOX

CONC. VEHICLE BARRIER (TYP)

LEVEL 3/PARKING T.O.S. EL. +30'-0"

SW5

SW5

LEVEL 3/PARKING T.O.S. EL. +30'-0" CHANGE IN SLAB THICKNESS

BASEMENT INTAKE VENT LI-1 IN 2HR ENCLOSURE

LEVEL 2/PARKING T.O.S. EL. 20'-0"

CONC. VEHICLE BARRIER EL. 12'-5" TYP (VB2)

8'4" MIN HOLD

8'4" MIN HOLD

SEE M-102

ROLL DOWN DOORS HOUSING ON STEEL POSTS BELOW BASEMENT INTAKE

BASMENT INTAKE VENT SEE M-102

LEVEL 2/PARKING T.O.S. EL. +15'-11"

RAMP LANDING T.O.S. EL. 9'-8"

15'-0" CHANGE IN RAMP THICKNESS

LEVEL 1/LOBBY T.O.S. EL. 0'-0"/GLOBAL ELEV 88'-6"

CONC VEHICLE BARRIER (TYP) ROLL-DOWN SECURITY SCREEN (NIC)

RAMP MEZZANINE EL. 9'-8"

PARKING RAMP

EDGE OF CORE BOX

TRENCH DRAIN

LEVEL 1/LOBBY T.O.S. EL. 0'-0"/GLOBAL ELEV. 88'-6"

6

EDGE OF CORE BOX

A-340

TOPPING SLAB

LOWER PATH SURFACE LOT EL. -5'-3"

TRENCH DRAIN

LOADING T.O.S. EL. -5'-3" SW5

SW5

4" CURB

BASEMENT LEVEL T.O.S. EL. -15'-6"

HYDRAULIC PATH SECURITY BOLLARDS (NIC)

9'-1"

LEVEL 2/PARKING T.O.S. EL. +15'-11"

BASEMENT LEVEL T.O.S. EL. -15'-6" 14'-117 8"

PROPERTY LINE

BUILDING SETBACK LINE

PROPERTY LINE

110'-0"

BUILDING SETBACK LINE

PROPERTY LINE

PROPERTY LINE

T.O. PARAPET EL. +294'-9 3/4"

PODIUM PARKING SECTION

PODIUM PARKING SECTION 5

6

1

A-427

A-427

1 3 12" 2 2" 4"

30"

3

7

A-427

A-427

30"

UNDERSIDE OF STRUCT. SLAB TYP.

2"

27"

30"

18"

A-427 21 4"

18"

ALIGN FRONT OF CABINET WITH FRONT OF END PANEL

K-4

ST-5

30" CAB-1

30" K-3B

SP

7 A-427

1 3 12" 2 2" 4"

TILE-12

T-7B

2'-0"

FILLER PANEL TO MATCH CABINETS (@ ALL SIDES)

3/4" END PANEL TO MATCH CABINETS; ALIGN WITH FRONT OF COUNTER TOP

ST-5 SP 3 T-21

CABINET INSERT TO MATCH CABINETS 2"

3'-0"

5 A-427

6'-0"

2'-0"

6 A-427 42" TYP.

3'-0" P-36

CAB-1

TILE-12

CABINET INSERT TO MATCH CABINETS UNDERSIDE OF STRUCT. SLAB TYP.

F-28

27" K-1B

1

A-427

30" CAB-1

18"

A-427

18" K-2B

42" TYP.

CAB-1

FILLER PANEL TO MATCH CABINETS (@ ALL SIDES) 14'-117 8"

2'-0"

CAB-1

3'-0"

3'-0"

F-28

10'-0"

P-8

1'-6"

P-8

6"

6"

FIN. SOFFIT @8'-0" A.F.F. TYP.

21 4"

WD-2

T.O. FIN. FLOOR FIN. SOFFIT @8'-0" A.F.F. TYP.

ST-5

SP

3'-0"

CORRIDOR

STORAGE P-36

LEVEL 5/PARKING T.O.S. EL. +47'-6"

LEVEL 4/PARKING T.O.S. EL. +38'-9"

LEVEL 3/PARKING T.O.S. EL. +30'-0"

LEVEL 2/PARKING T.O.S. EL. +20'-0" B.O. PEDESTRIAN WALKWAY CEILING EL. +17'-6"

ELEV. LOBBY

LEVEL 6 PARKING

ELEV. LOBBY

LEVEL 5 PARKING

ELEV. LOBBY

LEVEL 4 PARKING

ELEV. LOBBY

LEVEL 3 PARKING

ELEV. LOBBY

LEVEL 2 PARKING

CAB-1

6" TILE-12

T-7B

ST-5 SP T-21

K-1B

CAB-1

K-2B

WD-2 REMOVABLE BASE CABINET

REMOVABLE BASE CABINET

BATHROOM ELEVATION 5

6

A-427

7

A-427

2

A-427

3

A-427

A-427

THICKENED SLAB 2" UNDERSIDE OF STRUCT. SLAB TYP.

30"

12"

2"

30"

UNDERSIDE OF STRUCT. LINK BEAM @7'-9" A.F.F.

1 4"1 2"

30"

24"

13 4"

6"

P-8

36" TALL CABINETS ON LVL 18, 39 AND 53/PH

FILLER PANEL TO MATCH CABINETS (@ ALL SIDES)

CAB-1

ALIGN FRONT OF CABINET WITH FRONT OF END PANEL

T-7B 2'-0"

TILE-12

2'-0" P-36

2"

12"

30"

P-36

SP

2

3

A-427

3

1 4"1 2"

K-2A24"

A-427 T-21

30"

2'-0" T-21

3/4" END PANEL TO MATCH CABINETS; ALIGN W/ EDGE OF COUNTER TOP P-36

K-1B

K-2A

42" TYP.

42" TYP.

CABINET INSERT TO MATCH CABINETS

SP

WD-2

T.O. FIN. FLOOR REMOVABLE BASE CABINET

T-7B

TILE-12

2'-0" 3'-0"

SP

WD-2

F-28

36" TALL CABINETS ON LVL 18, 39 AND 53/PH

ST-5

BATHROOM ELEVATION

FILLER PANEL TO MATCH CABINETS (@ ALL SIDES)

P-8 CAB-1

ALIGN FRONT OF CABINET WITH FRONT OF END PANEL

TILE-12

ST-5

P-36

13 4"

REMOVABLE BASE CABINET

1'-6"

2'-6"

36" TALL CABINETS ON LVL 18, 39 AND 53/PH

FILLER PANEL TO MATCH CABINETS (@ ALL SIDES)

PODIUM PARKING SECTION

K-1B 27"

WD-2

6"

1'-0"

P-8 F-28

7 A-427

3/4" END PANEL TO MATCH CABINETS; ALIGN W/ EDGE OF COUNTER TOP

SOFFIT PAINTED WITH P-8 ON LVL 18, 39 AND 53/PH

REMOVABLE BASE CABINET

BUILDING SETBACK LINE

CABINET INSERT TO MATCH CABINETS 2"

30"

WD-2

2'-6"

UNDERSIDE OF STRUCT. SLAB TYP. UNDERSIDE OF STRUCT. LINK BEAM @7'-9" A.F.F. T.O. FIN. FLOOR FIN. SOFFIT @7'-6" A.F.F. TYP.

REMOVABLE BASE CABINET

3'-0"

PROPERTY LINE

42" TYP.

A-427

VERIZON ROOM

6'-0"

TEL. SERVICE

42" TYP.

A-427 EJECTOR ROOM

3'-0"

STORAGE

6'-0"

SP 6

5 ELEVATOR CONTROL ROOM

SW6

NONOCCUPIABLE SPACE

3'-0"

ST-5

6"

PE5 T.O. PIT SLAB EL. -5'-7"

F-28

36" TALL CABINETS ON LVL 18, 39 AND 53/PH

ST-5

TILE-12

2'-6"

2'-6"

1'-6"

1'-0"

P-8 F-28

6"

FIN. SOFFIT @7'-6" A.F.F. TYP.

LEVEL 1/WALKWAY T.O.S. EL. -0'-11"

3

27"

SOFFIT PAINTED WITH P-8 ON LVL 18, 39 AND 53/PH

OPEN AIR

LEVEL 1/LOBBY T.O.S. EL. 0'-0"/GLOBAL ELEV. 88'-6"

SUMP PIT, REFER STRUCTURAL DRAWINGS

FILLER PANEL TO MATCH CABINETS (@ ALL SIDES)

3/4" END PANEL TO MATCH CABINETS; ALIGN WITH FRONT OF COUNTER TOP

CABINET INSERT TO MATCH CABINETS K-3B

T.O. FIN. FLOOR

SW6 LEVEL 6/PARKING T.O.S. EL. +56'-3"

BASEMENT LEVEL T.O.S. EL. -15'-6"

2'-0"

2'-0"

TILE-12

CABINET INSERT TO MATCH CABINETS

LEVEL 7/PARKING T.O.S. EL. +65'-0" FUTURE SIGNAGE BY OWNER (N.I.C.)

3'-0"

3'-0"

4

42" TYP.

3

2'-0"

2

LEVEL 8/CLUB TERRACE T.O.S. EL. +76'-9" HOIST BEAM (HOOK) 9000# CAPACITY BY OTHERS

CAB-1

3'-0"

4

K-4

FILLER PANEL TO MATCH CABINETS (@ ALL SIDES)

SIM

LEVEL 8/CLUB TERRACE T.F.F. EL. +77'-8"

F-28 ALIGN FRONT OF CABINET WITH FRONT OF END PANEL

6'-0"

A-318

CAB-1

CAB-1

42" TYP.

T.O. PARAPET EL. +78'-6"

REMOVABLE BASE CABINET

P-8

1'-6"

F-28

1&2 A-316

3&4

6"

REMOVABLE BASE CABINET

P-8

FILLER PANEL TO MATCH CABINETS (@ ALL SIDES)

BUILDING SECTION


5 1

2

A-334-B

A-337-A

1

2

A-334-B

A-337-A SW6

7

12'-9"

10'-3"

12'-9" SW6

25'-8"

SIM

T.O.S. ROOF EL.+572'-7" T.O. OUTRIGGER WALL EL.+570'-2" T.O.S. ROOF EL.+572'-7" T.O. OUTRIGGER WALL EL.+570'-2"

A-360

20'-0"

SIM

LEVEL 9 T.O.S. EL. +97'-8"

12'-9"

2'-8" 10'-3"

12'-9"

CLADDING

CLADDING

21'-10"

BEAM

2 LEVEL 5/PARKING T.O.S. EL. +47'-6"

LEVEL 5/PARKING T.O.S. EL. +47'-6"

LEVEL 4/PARKING T.O.S. EL. +38'-9"

LEVEL 4/PARKING T.O.S. EL. +38'-9"

LEVEL 3/PARKING T.O.S. EL. +30'-0"

2

T.O.S. MECHANICAL LEVEL EL.+543'-10"

T.O.S. MECHANICAL LEVEL EL.+543'-10"

8'-8"

12'-10"

2'-8" 8'-8"

LEVEL 6/PARKING T.O.S. EL. +56'-3"

11'-6"

LEVEL 6/PARKINGT.O.S. EL. +56'-3"

RING BEAM

RING BEAM

FALSE BEAM

T.O.S. LEVEL 54/CLUB EL.+530'-8"

11'-0"

LEVEL 7/PARKING T.O.S. EL. +65'-0"

T.O.S. LEVEL 54/CLUB EL.+530'-8"

T.O.S. LEVEL 53/PH EL.+517'-10"

T.O.S. LEVEL 53/PH EL.+517'-10"

2'-8"

11'-0"

LEVEL 7/PARKING T.O.S. EL. +65'-0"

FALSE BEAM FRAMING FALSE BEAM FALSE BEAM FRAMING

RAISED PLANTER SEE LANDSCAPE DWGS

6'-0"

LEVEL 8/CLUB TERRACE T.O.S. EL. +76'-9"

21'-10"

6'-0"

RAISED PLANTER SEE LANDSCAPE DWGS

2'-8"

BEAM

RING BEAM

11'-6"

SW8

1&2 A-351

26'-9"

RING BEAM

3 A-681

RAISED PLANTER LEVEL 8/CLUB T.O.S. EL. +77'-8"

12'-10"

A-320

T.O. PARAPET EL. +78'-6"

26'-9"

2

SECTION 1/8"=1'-0"

SECTION

ROOFTOP SECTION

1/8"=1'-0"

LEVEL 3/PARKING T.O.S. EL. +30'-0" 02

T.O. BUILDING PARAPET EL. +23'-6"

A-336-A

THICKENED SLAB

LEVEL 2/PARKING T.O.S. EL. +20'-0"

THICKENED SLAB

GEN ROOM T.O.S. EL. +15'-11"

02 A-336-A

3

02

FAA LIGHT AT THE CORNER. SEE E-114 OUTRIGGER WALL

SIM

FAA LIGHT AT THE CORNER. SEE E-114 OUTRIGGER WALL

SIM

A-336-A

02 A-336-A

26'-4" 26'-4"

T.O.S. ROOF EL.+572'-7" T.O. OUTRIGGER WALL EL.+570'-2" T.O.S. ROOF EL.+572'-7" T.O. OUTRIGGER WALL EL.+570'-2"

12'-9"

26'-4"

LEVEL 1/LOBBY T.O.S.

LEVEL 1/LOBBY T.O.S. EL. 0'-0"/GLOBAL ELEV. 88'-6"

26'-4"

12'-9"

A-681

13'-7" 13'-2"

T.O.S. MECHANICAL LEVEL EL.+543'-10"

13'-2"

11'-10"

T.O.S. MECHANICAL LEVEL EL.+543'-10"

T.O.S. LEVEL 54/CLUB EL.+530'-8"

PODIUM PARKING SECTION

1

1

1/8"=1'-0"

SECTION 1/8"=1'-0"

ROOFTOP SECTION

8'-8"

12'-10"

8'-8"2'-8"

11'-6"

2'-8"

SECTION

T.O.S. LEVEL 54/CLUB EL.+530'-8"

12'-10"

11'-6"

11'-6"

8'-8"

11'-6"

12'-10"

8'-8"2'-8"

PROPERTY LINE

2'-8"

PROPERTY LINE

12'-10"

1'-4"

11'-10"

11'-10"

13'-2"

1'-4"

11'-10"

13'-2"

BASEMENT LEVEL T.O.S. EL. -15'-6"

1'-4"

SW8

12'-3"

1'-4"

12'-3"

13'-7"

El. 0'-0"

T.O.S. LEVEL 53/PH EL.+517'-10"

T.O.S. LEVEL 53/PH EL.+517'-10"

SECTION GENERAL NOTES 1.

REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION & ALL FOUNDATION CONDITIONS.

2. REFER TO MEPGENERAL DRAWINGS FOR ADDITIONAL SECTION NOTES 1. 3. 2. 4. 3.

4.

AIR

AIR

LIGHT

LIGHT

AIR

AIR 17

18

18

LVG/DNG U04

LVG/DNG U04

LIGHT

19

BR U07

20

LVR/BR U04

BR U07

20

20

LVG/DNG U04

K.03 U06 SIM

TX

PANTRY U14

26x16

17

CL U08

CL U08 HALLWAY U01 WIC U09

K.10 U06

B.06 U10 OPP

B.02 U10 OPP

B.03 U12

K.14 U06

LVG/DNG U04

W/D U03

HALLWAY U01

TX

32x10

B.04 U11

TX

CS

60X31

LVG U04

HALLWAY U01

SP

DNG U04

CL U02

AIR

22x20

K.11 U06

CORRIDOR 260 SF 1905

CL U02

CL U02

TXE 22x20

W/D U03

32x10

HALLWAY U01

28

CL U02

20

K.12 U06 W/D U03

TX

MBR U07

B.01 U10

HALLWAY U01

CL U02

HALLWAY U01 W/D U03

CL U08

W/D U03

CL U02

AIR

LIGHT

K.03 U06 SIM

W/D U03 BR U07

LIGHT

BR U07

CL U02

21

LIGHT

STR

ETC

HER

28 BR U07

24"

x 84"

24x50

B.08 U10 SIM

SERVICE RM 46 SF 1902

B.02 U10

BR U07

TRASH RM 29 SF 1903

WIC U09

AIR

TX

ELEC 81 SF 1904

32x10

ELEV. LOBBY 232 SF 1901

21

WIC U09 TX

GX

TX 14x22 16x26

LVG/DNG U04

12x26

SP

W/D U03

27

AIR

21X95

B.03 U12

LIGHT

CL U02

DEN U05 K.13 U06

09

CS

LVG/BR U01 TX

LIGHT

18x18 24x50

B.02 U10 OPP

CORRIDOR 218 SF 1906

BR U07

CL U02

W/D U03 TX

18x24

26

AIR

CL U02

HALLWAY U01

32x10

TX

32x10

B.02 U10

CL U08

K.10 U06 OPP

W/D U03

HALLWAY U01

CL U02

HALLWAY U01

B.06 U10

CL U08

HALLWAY U01

CL U02

TX

BR U07

AIR

LIGHT

LIGHT AND AIR CALCULATIONS

26

LVG/DNG U04

K.16 U06

W/D U03 TX 36x12

HALLWAY U01 CL U02

B.02 U10 OPP

K.10 U06 W/D U03

W/D U03

CL U08

CL U08

B.06 U10 OPP

K.03 U06 SIM

LIGHT

WIC U09

PANTRY U14

HALLWAY U01

CL U08

27

CL U08

23 BR U04

AIR

K.03 U06 SIM

25

LVG/DNG U04

25

BR U07

24

BR U07

LVG/DNG U04

24

23

LVG/DNG U04

AIR

LIGHT

LIGHT

INFORMATION. REFER TO STRUCTURAL DRAWINGS FOR MECHANICAL EQUIPMENT IS SHOWN FOR ADDITIONAL INFORMATION & ALL FOUNDATION COORDINATION PURPOSES ONLY. REFER TO CONDITIONS. MECH. DWGS. FOR DESIGN AND SPECIFICATIONS. REFER TO MEP DRAWINGS FOR ADDITIONAL REFER TO RCP'S FOR CLEARANCE INFORMATION. REQUIREMENTS. MECHANICAL EQUIPMENT IS SHOWN FOR COORDINATION PURPOSES ONLY. REFER TO MECH. DWGS. FOR DESIGN AND SPECIFICATIONS. REFER TO RCP'S FOR CLEARANCE REQUIREMENTS.


6

UTILE INC.

GENERAL NOTES:

1. WINDOW QUANTITIES AND LOCATIONS MAY 1. WINDOW VARY FROM QUANTITIES AND LO THOSE INDICATED ON ENLARGED UNIT PLANS. THOSE REFER INDICATED TO ON ENLARGED BUILDING FLOOR PLANS AND ELEVATIONS BUILDING FOR WINDOW FLOOR PLANS AND ELE QUANTITY AND LOCATIONS. QUANTITY AND LOCATIONS.

Metromark Apartments | Jamaica Plain, MA

2. REFER TO FINISH SCHEDULE ON G01 FOR 2. ADDITIONAL REFER TO FINISH SCHEDULE O INFORMATION. INFORMATION.

Boston, MA

3. ALL DIMENSIONS ARE TO FACE OF FRAMING, 3. ALLU.N.O. DIMENSIONS ARE TO FACE

4. ALL DOORS LOCATED 4" FROM WALL, U.N.O. 4. ALL DOORS LOCATED 4" FROM

5. CONFIRM SHOWER/TUB OPENING DIMENSIONS 5. CONFIRM WITHSHOWER/TUB OPENI FINAL UNIT SELECTION. FINAL UNIT SELECTION.

While at Utile Inc. I worked on the project team for Metromark Apartments, a 283-unit residential development located in Boston. I was on the project from the end of SDs through CDs where I was primarily responsible for the design and management of over 70 unique unit types as well as their corresponding bathroom and kitchen layouts. I also was involved on 26 West Broadway during CA, a mid-rise residential project in South Boston.

6. INTERIOR CLOSET SHELVING SHALL BE VINYL 6. INTERIOR COATED CLOSET SHELVING S STEEL ROD SHELVING WITH 9-11 MIL PVC COATING, STEEL ROD 1" SHELVING WITH 9-11 CROSS DECK SPACING, BY CLOSETMAID. PROVIDE CROSS DECK ONE SPACING, 18" BY CLOS WIDE SWEATER STACK IN EACH BEDROOMWIDE CLOSET. SWEATER STACK IN EACH REMAINDER OF SHELVING IN CLOSET TO BE REMAINDER DIVIDED OF SHELVING IN CLO EQUALLY BETWEEN SINGLE AND DOUBLE STACK EQUALLY SHELVES. BETWEEN SINGLE AND PROVIDE 5 - 16" SHELVES IN LINEN/PANTRYPROVIDE CLOSETS5 - 16" SHELVES IN LINE (EXCLUDING LINEN CABINETS). (EXCLUDING LINEN CABINETS).

7. MULTIPLE CEILING AND SOFFIT CONDITIONS 7. MULTIPLE MAY EXIST CEILING AND SOFFIT FOR SAME UNIT TYPE. RCP SHOWN CORRESPONDS FOR SAMETO UNIT TYPE. RCP SHOW MOST COMMON CONDITION. REFER TO OVERALL MOST COMMON BUILDINGCONDITION. REF RCPS (A200 SERIES) FOR SPECIFIC CEILINGRCPS AND (A200 SOFFIT SERIES) FOR SPECIF CONDITIONS. CONDITIONS.

* Rendering created as part of design team, Utile Inc. 4' - 1 3/4"

4' - 4 3/4"

CLOSET 2 GWB 9' - 0 1/8"A.S.F.

1

SC1

SC1

3' - 0 5/8"

8' - 10 7/8"

8' - 10 7/8"

3' - 9 1/8"

7' - 2 7/8" 6' - 4 1/4"

2' - 8"

3' - 3 9/16" W/D

2

B

2' - 2 3/8"

2' - 11 15/16" 1

BEDROOM 2 LIVING ROOM

BEDROOM 2

X3B

2' - 1 11/16"

BEDROOM 1

2A 3 1/4" = 1'-0" 3C.2 3 1/4" = 1'-0"

1/4" = 1'-0"

1 5/8" 5'12' - 6- 3/8"

GWB 7' - 6"A.S.F.

1A B

1

GWB GWBTO 7' - 6"A.S.F.MOUNTED BOTTOM OF UPPER 7' - 6"A.S.F. CABINET OVER SINK

GWB MOUNTED TO 7' - 6"A.S.F. BOTTOM OF UPPER CABINET OVER SINK2 CLOSET GWB 9' - 0 1/8"A.S.F. SW8

MECH

MECH SW8

UP

KITCHEN TYPE 16 - SIM OPP

CLOSET 2 GWB 9' - 0 1/8"A.S.F.

1

SC1 GWB 9' - 0 1/8"A.S.F.

1

GWB 9' - 0 1/8"A.S.F.

1

MECH

1

2' - 9 1/16" 5' - 3 3/4"

2' - 8 7/16"

LIVING ROOM GWB 9' - 0 1/8"A.S.F.

2' - 9 1/16" LIVING ROOM GWB 9' - 0 1/8"A.S.F.

1 BEDROOM 2

SC1

SC1 LIVING ROOM GWB 9' - 0 1/8"A.S.F.

LIVING ROOM GWB 9' - 0 1/8"A.S.F.

8

3D.2 - RCP 1/4" = 1'-0"

2

3D.2 - RCP 8 1/4" = 1'-0" 3C.1 - RCP 1/4" = 1'-0"

LIVING ROOM

1

2' - 9 3/8" 3' - 3 3/16"

LIVING ROOM

STEP UP TO DECK

1

1/4" = 1'-0"

3D.2

1/4" = 1'-0"

1

1/4" = 1'-0"

3' - 3 3/4"

1 F

4' - 1 1/4"

2

CLOSET 2 1

G

GENERAL NOTE: GENERAL NOTE: PROVIDE CRUMB RUBBER ACOUSTIC PROVIDE CRUMB RUBBER ACOUSTIC FLOOR UNDERLAYMENT IN ALL NON-TILED FLOOR UNDERLAYMENT IN ALL NON-TILED SPACES AT LEVEL B2 SPACES AT LEVEL B2

EX5

1' - 4 15/16"

1' - 4 15/16" 4' - 1 1/4" 6' - 2 5/16"

MOVABLE3' - 7 1/4" ISLAND

2' - 8 1/4"

6' - 2 5/16"

1' - 10" DN

1' - 5 1/16" SC1

SC1

1/4" = 1'-0"

1/4" = 1'-0"

2

E10

3D.2 7 7 TYPICAL DUPLEX RCP AND FLOOR PLAN3C.1(LEVEL 2) 3C.1 - RCP 3C.1 2

0' -110 13/16"

1

KITCHEN TYPE 16 - SIM OPP CLOSET 2 MECH 1 1

1

3' - 3 3/16"

1

2' - 8 7/16"

UP

G

1 MOVABLE 2' - 5 1/2" ISLAND

2' - 5 1/2"

1

F

SC5

3' - 3 3/4" 2A

6' - 2 7/8"

E10 E7 CLOSET 1 3' - 3 3/4" 1 1 CLOSET 5

1

2A

POWDER TYPE 2

1

E15 1 E10 0' - 10 13/16" E7 CLOSET 1

CLOSET 5

6A

B

1

2A 1 3' - 3 3/4" B 2A

6' - 2 7/8" 1

LINEN

1A

POWDER 5' - TYPE 10 7/16"2

KITCHEN TYPE 20

1

6A 6' - 4 3/16" BATHROOM 2 TYPE 8

7' - 3 1/2"

E15

1 3'1- 9 1/16" B

5' - 10 7/16"

KITCHEN TYPE 20 CLOSET 1

1A

1A

A

1' - 10"

2' - 1 1/2"

3' - 9 1/16"

1A

R

2' - 6 15/16" 6A

STORAGE LINENBEDROOM 3 1 1 B

BEDROOM 3 1 1

SC1

SC1

CLOSET 2 E7

A

1' - 10 5/8" 6' - 4 3/16"3' - 4 1/2" BATHROOM3'2- 0 5/8" MIN. TYPE 8

E10

DN

3' - 7 1/4"

1 2' - 8 1/4" 1' - 5 1/16"

2' - 9 3/8"

2' - 6 3/4"

SC5

2' - 6 15/16"

2' - 5" 7' - 3 1/2"

6A

STORAGE

F

GWB 7' - 2"A.S.F.

SC1

B

CLOSET 2 3' - 4 1/8" E7

SC5 CLOSET 1

CLOSET 5 GWB GWB 7' - 2"A.S.F. 9' - 0 1/8"A.S.F.

CLOSET 5 GWB 9' - 0 1/8"A.S.F.

R

SW1

11' - 11 1/4"

12' - 9 1/16" 1' - 5 3/4"

6A

BATHROOM 1 TYPE 2

1

1A

TYPICAL DUPLEX RCP AND FLOOR 3D.1 PLAN (LEVEL 1) 3D.1 - RCP 3D.1 1/4" = 1'-0"

3' - 0 1/2"

6' - 2 5/16"

6A

B

3' - 9 1/8"

1A

1A

3' - 4 1/2" 3' - 0 5/8" MIN.

SC1

SC1

SC5

1A

1

1' - 5 3/4"

POWDER TYPE 2 GWB-MR 9' - 0 1/8"A.S.F.

1' - 10 5/8"

2' - 1 1/8"

1A

BATHROOM 2 TYPE 8 GWB-MR 9' - 0 1/8"A.S.F. LINEN

BATHROOM 2 TYPE 8 F GWB-MR 9' - 0 1/8"A.S.F. SW7 GWB STORAGE LINENSW7 GWB STORAGE SW1 GWB 9' - 0 1/8"A.S.F. GWB 9' - 0 1/8"A.S.F. 9' - 0 1/8"A.S.F. 9' - 0 1/8"A.S.F. SC1 SC1 GWB-MR GWB-MR POWDER 9' - 0 1/8"A.S.F. 9' - 0 1/8"A.S.F. TYPE 2 F MOUNTED TO MOUNTED GWB-MRTO BOTTOM OF UPPER OF UPPER 9'BOTTOM - 0 1/8"A.S.F. CABINET OVER SINK CABINET OVER SINK

1' - 7 5/8"

D

6A

1

BEDROOM 1 BEDROOM 2

5

5' - 6 3/8"

3' - 0 1/2"

6A

F

1

1

D

1' - 7 11/16"

1

BEDROOM 1

3C.2

MECH G

4' - 0 1/4"

3' - 8 3/4"

2' - 4 3/4"

1

2' - 3 1/4"

3' - 3 9/16"

1' - 5 5/8"

3' - 11 1/16" 2' - 2 3/8" 2' - 1'11- 15/16" 4' - 5 1/8" 9 1/2" 1

1'

1

1

7' - 2 7/8"

2' - 5"

W/D

B

E10

11

3' - 4 1/8"

3

3' - 2 3/4"

2' - 3 1/4"

2' - 4 3/4"

2' - 1 7/8" 1' - 10 1/8" 4' - 4 3/4"

E10

1

1

3' - 1 5/8"

6' - 5 3/4" 1

CLOSET 2 2' - 3 1/4"

2' - 4 3/4"

2' - 4 3/4" 2' - 1 7/8"

3' - 8 3/4"

MOVABLE 4' - 0 1/4" 2' - 3 1/4" ISLAND

LINEN

2' - 8"

3' - 1 5/8"

1' - 10 1/8"

2

CLOSET 4

1' - 8 1/8"

2' - 2 5/8" 3' - 7 5/8"

1' - 5 5/8"

4' - 5 1/8" 4' - 1 1/4"

2' - 0 5/8"

2' - 4 1/2"

1

E10

SW1

BEDROOM 3

E3

E15BATHROOM 1 TYPE 2

1

1/4" = 1'-0"

1

2 B

6' - 2 5/16"

B

3' - 3 3/4"

CLOSET 4

1A

5' - 3 3/4"

5

1

B

E10 B

CLOSET 3 E5 1

1' - 10 5/8"

A

2A

1A KITCHEN TYPE 2

12

1 BEDROOM 3BEDROOM 2

STEP UP TO DECK

1/4" = 1'-0"

1

1 B

4' - 11 3/4" 1

EX5

6

1' - 8 1/8"

3' - 0 5/8" 5' - 5"

5' - 5"

4' - 1 1/4"

2' - 2 5/8" 2' - 0 5/8"

1' - 4 15/16"

1' - 4 15/16" 4' - 1 1/4"

3' - 7 5/8" 4' - 5 1/8"

4' - 1 1/4" 2' - 4 1/2"

2' - 8"

1' - 9 1/2"

6' - 0 3/4"

1 BEDROOM 3 LIVING ROOM

1/4" = 1'-0"

GWB 9' - 0 1/8"A.S.F.

1

2

CLOSET 1

BEDROOM 2 GWB 9' - 0 1/8"A.S.F.

SC1

4' - 5 1/8"

SC1

2' - 1 1/4"2' - 1 1/8"

1

1A

1' - 10 1/8"

1

BEDROOM 2 GWB 9' - 0 1/8"A.S.F.

1

1 W/D CLOSET 4

D

3' - 2 5/8" 3' - 0 5/8" MIN.

CLOSET 3 1

BATHROOM 2 6A TYPE 6

B

1A

1

1 6A

1

G DN

1

C1 E10

3' - 11 1/16"

13' - 4 1/2"

1 1

1

1 2' - 1 11/16"

1

MECH

4' - 3 1/4" 1

B CLOSET 1

1

1' - 7 5/8"

CLOSET 3

BEDROOM 1 GWB 9' - 0 1/8"A.S.F.

SC1

3' - 0" 5' - 10 1/4"

1 E3

1

1' - 5 3/8"

3' - 3 3/4"

CLOSET 4

1' - 10 1/8"

D

1' - 10 1/8"

B

CLOSET 2 GWB 9' - 0 1/8"A.S.F.

1

CLOSET 5

D

2' - 6 3/4"

1

CLOSET 3 1

W/D

1

1/4" = 1'-0"

SW1

GWB 9' - 0 1/8"A.S.F.

2' - 11 7/16" 1

CLOSET 1

E10

SW1

B

1A

1A

12' - 1 5/8"

1

C1

W/D

4

1/4" = 1'-0"

2' - 8"

1

2' - 9 1/4"

1

6A

1

1

B

6' - 0 3/4" 4' - 11 3/4"

SC1

1

1

SC1

UP

1' - 10 1/8"

2

E15

F SW1

1

E10

1' - 10 5/8"

B

2' - 101 3/4"

2' - 11 7/16" C1

CLOSET 3

4

6' - 0 1/4"

F

BEDROOM 2 GWB 9' - 0 1/8"A.S.F.

LINEN

B

BEDROOM 2 GWB 9' - 0 1/8"A.S.F.

1

TYPE 6

1

1

C1

2' - 10 3/4"

- 0 11/16" 0' - 11 1/4" 5' - 12'1/2" E10

SC1

BEDROOM 3

DEN

2' - 4 1/2"

SC6

BATHROOM 1 TYPE 2 GWB-MR 9' - 0 1/8"A.S.F.

1/4" = 1'-0"

1

B

2' - 8 1/4"

GWB-MR 8' - 0"A.S.F.

BATHROOM 1 TYPE 2 GWB-MR 9' - 0 1/8"A.S.F.

2' - 10 3/4"

GWB 8' - 6 1/8"A.S.F.

BEDROOM BEDROOM 3 2 GWB GWB 9' - 0 1/8"A.S.F. 9' - 0 1/8"A.S.F.

SC1

SC1

SC1

G

1' - 5 3/8"

CLOSET 4

CLOSET 1

2' - 10 1/4"

1

6'1'--653/4" 1/2"

3' - 2 3/4" BE10

A

MECH UP

1

2' - 4 1/2"

W/D GWB 9' - 0 1/8"A.S.F. GWB-MR 8' - 0"A.S.F.

CLOSET 1 GWB 9' - 0 1/8"A.S.F. SC6

BEDROOM 1 GWB 9' - 0 1/8"A.S.F.

DEN

2' - 9 1/4"

W/D GWB 9' - 0 1/8"A.S.F.

CLOSET 1 GWB 9' - 0 1/8"A.S.F.

GWB 9' - 0 1/8"A.S.F.

BEDROOM 2 GWB 9' - 0 1/8"A.S.F.

BEDROOM 3 GWB 9' - 0 1/8"A.S.F.

LIVING ROOM GWB 9' - 0 1/8"A.S.F.

2A - RCP 2A 3 TYPICAL TWO BEDROOM RCP AND FLOOR PLAN 3C.2 - RCP 3C.2 - RCP

1' - 105'5/8" - 1 11/16"

GWB 9' - 0 1/8"A.S.F.

CLOSET 4

CLOSET 4 GWB 9' - 0 1/8"A.S.F.

A

2A

1

0' - 11 1/4"

CLOSET 5

W/D

D

BEDROOM 1

4A

1

11' - 0 13/16"

11' - 0 13/16"

SC6

CLOSET 4

1

SC1

G

2' - 8 1/4"

CLOSET 3 GWB 9' - 0 1/8"A.S.F.

4' - 4 3/4"

MECH

1

GWB 8' - 6 1/8"A.S.F. GWB 3 9' -CLOSET 0 1/8"A.S.F. GWB 9' - 0 1/8"A.S.F.

BEDROOM 1 GWB 9' - 0 1/8"A.S.F.

SC1

1/4" = 1'-0"

GWB 9' - 0 1/8"A.S.F.

GWB 9' - 0 1/8"A.S.F.

2' - 5" LIVING ROOM GWB 9' - 0 1/8"A.S.F.

A

SC1

GWB 9' - 0 1/8"A.S.F.

1

3' - 0 5/8" MIN.

4' - 3 1/4" 16A

1A

KITCHEN 1A TYPE 2

0' - 11 1/4"

2' - 1 1/2"

7

GWB 8' - 6 1/8"A.S.F.

DEN GWB 9' - 0 1/8"A.S.F.SC6

SC10

SC10

6A

B

1A

1

1/4" = 1'-0"

2' - 4 1/2"

SC1

CLOSET SW15 GWB 9' - 0 1/8"A.S.F. CLOSET 2 GWB SC10 9' - 0 1/8"A.S.F. GWB SC10 9' - 0 1/8"A.S.F.

W/D GWB 9' - 0 1/8"A.S.F.

3' - 4 3/4"

2' - 0 11/16"

1 6' - 3 3/4"1' - 10 5/8" 3' - 2 5/8"

CLOSET 3 B BATHROOM 1 E5 DNBATHROOM TYPE 5 2A

1 B

BATHROOM TYPE 6

6A

BEDROOM 1 2' - 10 3/4"

2' - 0 11/16"

X3B

1/4" = 1'-0"

MECH

2' - 4 1/2"

DEN GWB 9' - 0 1/8"A.S.F.

CLOSET 5 GWB 9' - 0 1/8"A.S.F.

LINEN

SC6

3' - 4 3/4"

EX5

5' - 1 11/16"

GWB 9' - 0 1/8"A.S.F.

F

SC1 SW1 MOUNTED TO BOTTOM OF UPPER CABINET OVER SINK CLOSET 2 GWB 9' - 0 1/8"A.S.F.

GWB 9' - 0 1/8"A.S.F.

SC6

1A

B 2' - 10 1/4"

STEP UP TO DECK

EX5 EX7

7

GWB SW8 8' - 6 1/8"A.S.F.

W/D GWB 9' - 0 1/8"A.S.F.

GENERAL NOTE: GENERAL NOTE: PROVIDE CRUMB RUBBER ACOUSTIC PROVIDE CRUMB RUBBER ACOUSTIC FLOOR UNDERLAYMENT IN ALL NON-TILED FLOOR UNDERLAYMENT IN ALL NON-TILED SPACES AT UNIT B222 SPACES AT UNIT B222

1/4" = 1'-0"

MECH

RCP

DN

3' - 7 1/4"

2A - RCP 4A TYPICAL STUDIO RCP AND FLOOR PLAN 3D.2 - RCP 3D.2 3D.2

SW8

1

DN

3' - 7 1/4"

SC1

STEP UP TO DECK

8

SC10

LIVING ROOM

EX7

"

CLOSET 1 GWB 9' - 0 1/8"A.S.F.

BATHROOM 1 TYPE 5 2A

1 GWB 9' - 0 1/8"A.S.F.

1 LINEN BATHROOM 1 BEDROOM 1 TYPE 5 - SIM OPP

3' - 0 5/8" 2' - 0 11/16" B

2A

11' - 11 1/4"

LIVING ROOM GWB 9' - 0 1/8"A.S.F.

SC6

6' - 0 1/4"

SC1

BATHROOM 2 TYPE 6 F GWB-MR 9' - 0 1/8"A.S.F. BATHROOM TYPE 6 GWBGWB-MR 9' - 0 1/8"A.S.F. 9' - 0 1/8"A.S.F.

CLOSET 3 GWB 9' - 0 1/8"A.S.F.

W/D GWB 9' - 0 1/8"A.S.F.

SW8

GWB 9' - 0 1/8"A.S.F.

2' - 4 3/4"

SC1

2' - 4 1/2"

1A

6' - 6 3/4"

1

BEDROOM 1 GWB 9' - 0 1/8"A.S.F.

1' - 5 1/8"

LIVING ROOM

LIVING ROOM GWBROOM LIVING 9' - 0 1/8"A.S.F. GWB 9' - 0 1/8"A.S.F.

MOVABLE ISLAND

5' - 7 3/8"

12' - 9 1/16"

SC1

E10

CLOSET 3 GWB 9' - 0 1/8"A.S.F.

W/DSW1 GWB 9' - 0 1/8"A.S.F.

MECH F BATHROOM TYPE 6 GWB-MR 9' - 0 1/8"A.S.F.

6' - 3 3/4"

3' - 0 5/8"

F

2' - 8"

SC1

1

1

2' -111 5/8"

1' - 5 1/8"

LIVING ROOM GWB 9' - 0 1/8"A.S.F.

1 G

MOVABLE ISLAND

5' - 7 3/8"

4' - 1 3/4"

5' - 8 1/16" MOVABLE ISLAND

1 MECH E10

SW1

5' - 8 1/16"

1

ALIGN

2'2'--11 5/8" 5 1/2"

SC1

MOUNTED TO BOTTOM OF UPPER CABINET OVER SINK

2A CLOSET 2 KITCHEN TYPE 16 - SIM OPP

GWB 9' - 0 1/8"A.S.F.SC6SW1

F

1

1

SW8

LINEN BATHROOM 1 TYPE 5 - SIM OPP

2' - 1 1/4"

1 G

1

ALIGN

SC5

CLOSET 3 BATHROOM 2 GWB TYPE 69' - 0 1/8"A.S.F. GWB-MR 9' - 0 1/8"A.S.F.

MECH

GWB GWB 9' - 0 1/8"A.S.F.7' - 6"A.S.F. SC5

1

B

F

SW1

F

SC1

BEDROOM 1 GWB 9' - 0 1/8"A.S.F.

13' - 4 1/2"

1 MECH

1 2' - 5 1/2"

3' - 0"

1 CLOSET 1 1 GWB D W/D 9' - 0 1/8"A.S.F. 2A CLOSET 2 KITCHEN TYPE 16 - SIM OPP SC10

W/D

F SW1

CLOSET 3 1 BATHROOM GWB 1TYPE 5 9' - 0 GWB-MR 1/8"A.S.F. 9' - 0 1/8"A.S.F. 0' - 10 13/16"

E10 GWB 7' - 16"A.S.F.

5' - 10 1/4"

11' - 11 1/4"

1' - 6 5/8"

1' - 5 7/8"

2' - 2 1/8"

2

1 1 BATHROOM TYPE 5 E15 0' - 10 13/16" F CLOSET 5 GWB 9' - 0 1/8"A.S.F. SW1F

BEDROOM 1 GWB 9' - 0 1/8"A.S.F.

SC1

3' - 3 3/4"

5' - 4 7/16"

SC10

MECH SC1 SW8 GWB 9' - 0 1/8"A.S.F.

1 1A

GWB 9' - 0 1/8"A.S.F.

2A

2' - 4 3/4"

SC10 SW8

1' - 4 5/8"

MECH SC1

GWB 9' - 0 1/8"A.S.F.

D

E10

2' - 1 1/4"

1' - 6 5/8" 11' - 11 1/4"

SW1 SC5

W/D MOUNTED TO CLOSET 2 W/D MOUNTED TO CLOSET 2 GWBTO GWB GWB MOUNTED GWB BOTTOM OF UPPER GWB BOTTOM OF UPPER BOTTOM OF UPPER 7' - 6"A.S.F. 9' - 0 1/8"A.S.F. CABINET OVER 9' - 0 1/8"A.S.F. 9' - 0 1/8"A.S.F. 9' SINK - 0 1/8"A.S.F. CABINET OVER SINK CABINET OVER SINK

MOUNTED GWB TO 7'BOTTOM - 6"A.S.F.OF UPPER CABINET OVER SINK

1A KITCHEN TYPE 9

2

5' - 10 7/16" 1

6' - 2 5/16"

SC1

KITCHEN TYPE 9

BATHROOM 1 TYPE 5 1 GWB-MR BATHROOM 1 TYPE 9' - 50 1/8"A.S.F.

CLOSET 5

GWBBATHROOM 1 9' - 0 1/8"A.S.F. TYPE 5 - SIM OPP GWB-MR 9' - 0 1/8"A.S.F.

BATHROOM 1 TYPE 5 - SIM OPP GWB-MR 9' - 0 1/8"A.S.F.

B

2A 1 3' - 3 3/4"

2' - 5"

SW1

SC5

SC5

F

E15

CLOSET 1 3' -19 1/16" E5 1 LINEN

5' - 10 7/16" 1

LINEN

1

A

5' - 4 7/16"

SC1 SC5

SC1

GWB 9' - 0 1/8"A.S.F.

CLOSET 1 3' - 9 1/16" E5 1

3' - 10 1/16"

CLOSET 5 GWB 9' - 0 1/8"A.S.F.

TYPE 5 GWB-MR 9' - 0 1/8"A.S.F.

A

6A

BATHROOM 2 TYPE 8

1A

2' - 4 1/2"

3' - 0 1/2"

6A

3 4' - 2 3/8" 2'BEDROOM - 1" B

2' - 8 1/4"

1' - 4 5/8"

GWB 7' - 6"A.S.F.

GWB-MR 9'BATHROOM - 0 1/8"A.S.F.

4'1'- -210 3/8"5/8"

6A

BATHROOM 2 TYPE 8

1A 2' - 8 1/4" BEDROOM 2' - 1" 3

1' - 10 5/8"

1' - 4 5/8"

GWB 9' - 0 1/8"A.S.F.

SC1 GWB-MR 9' - 0BATHROOM 1/8"A.S.F. CLOSET 1 CLOSET 1 TYPE 5 GWB-MR 9' GWB - 0 1/8"A.S.F. 9' - 0 1/8"A.S.F. SC1 GWB 7' - 6"A.S.F. GWB 9' - 0 1/8"A.S.F. CLOSET 5 GWB 9' - 0 1/8"A.S.F. F

F

1' - 4 5/8"

SC1

F

BATHROOM 2 TYPE 8 GWB-MR 9' - 0 1/8"A.S.F.

1' - 5 7/8"

GWB 9' - 0 1/8"A.S.F.

BATHROOM 2 TYPE 8 GWB-MR 9' - 0 1/8"A.S.F.

14' - 2 11/16"

GWB 9' - 0 1/8"A.S.F.

5' - 6 3/8"

6A

2' - 2 1/8"

BEDROOM 3

BEDROOM 3

3' - 0 1/2"

SW1

3' - 10 1/16" 2' - 1 1/4" 14' - 2 11/16"

SW1

12' 5' --613/8" 5/8"

6' - 2 5/16"

12' - 1 5/8"

RCP

"

GENERAL NOTES:


BLDG BLDG B STEEL B STEEL PLANS PLANS CONSTRUCTION CONSTRUCTION DOCUMENTS DOCUMENTS

2'2'- -0"8 3/4" 1'0' -- 3" 1" 2' - 3" PAPER TOWEL DISPENSER AND WASTE RECEPTACLE

2' - 6"

2' - 3" ARCHITECTURE + URBAN DESIGN

14 A642 A

BEFORE INSTALLATION 2' - 6"BEFORE 1' - 6"INSTALLATION 1' -2'6"- 0" TOILET TOILET

2' - 0" 2' - 6"

2' - 8 3/4"

1' - 9"

0' - 2 1/4"

LevelLevel B2 B2 12' - 12' 8" - 8"

Level 2c A2 2c 15' - 4"

2' - 10 3/4"1' - 6"

1' - 6"2' - 6"

2' - 6" 2' - 0"

TOILET

SLIDE IN RANGE SLIDE IN RANGE

2'1'- -0"3"

1' - 3"2' - 6"

Level A2 15' - 4"

2' - 6"1' - 3"

6' - 0"

AS REQ'D.

2' - 6"

2' - 0"

AS REQ'D.

2' - 6"1' - 3"

1' - 3"2' - 8 3/4" 0' - 1"

2' - 8 3/4" 0' - 1"

Level B3WALL TYPES 23' - 4"

0" FRAMING, 1' -2'0"- 6" U.N.O.2' - 6" 2' - 0" 2 6. ALL DIMENSIONS ARE TO FACE1' - OF DIMENSIONS FOR INTERIOR DOORS ARE TO CENTERLINEASOF DOOR, U REQ'D. AS RE

0' - 1"

3 5' - 1

1/4" 8' - 10

4

1/16"

3' - 4

7/8"

4' - 11

1/2"

A302-A

3A

A308 SB - SIM OPP AFF.

3' - 10 5/8" 15/16"

A

9/16"

E8

7' - 11

B

A

3' - 4

B

D

3/16" 6' - 2

B

C6

3' - 4 7/8"

C8

7' - 3 9/16"

7' - 3 9/16"

3' - 4 7/8"

7' - 3 9/16"

1' - 6"

1' - 6" 3' - 0"

1' - 6"

6' - 0"

6' - 0"

1' - 6"

1' - 6"

6' - 0"

3' - 0"

6' - 0"

5' - 3 3/16" 5' - 1 1/4"

2' - 9" 2' - 3" 18" TOWEL ROD

2' - 3"

2' - 6"

2' - 6"

2' - 3"

36X48 1d A630 NOMINAL GWB SOFFIT AND SHOWER GWB SOFFIT AND AS REQ'D. AS REQ'D.TYP. FASCIA, TYP. FASCIA, 1c 1' - 0"

2'1'- -3"0"

0' - 1"

1' - 6"

HOOD

GWB SOFFIT AND GWB SOFF FASCIA, TYP. FASCIA, TY

FILLER PANEL TO FILLER PA MATCH CABINET MATCH CA FACE FACE

HOOD SHELF FOR SHELF FOR MICROWAVE MICROWAVE

TOILET

CM

1b

FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE 3' - 0"

1' - 6"

PROVIDE BLOCKING FOR FUTURE GRAB BAR BTW. 30" AND 38" A.F.F. TO 6" BEYOND WIDEST POINT OF TOILET

3' - 0"

10' - 4 15/16"

1' - 6"

Level B3 23' - 4"

DOOR LOCATION VAIRES, SEE ENLARGED UNIT PLANS

6' - 0"

4' - 2 3/8" 4' - 7 15/16" 3' - 5 3/4"

2' - 8 3/4" 1' - 0" 0'0'--1"1"

1a

BATHROOM FAUCET

11/26/2014 12:39:01 PM 6' - 0"

15/16 " 15/16 "

A301-A

GLAZED WALL TILE GLAZED W UP TO UNDERSIDE UP TO UND OF UPPER OF UPPER CABINETS, TYP.CABINETS

GLAZED WALL TILE GLAZED WALL TILE UP TO UNDERSIDE UP TO UNDERSIDE OF UPPER OF UPPER CABINETS, TYP.CABINETS, TYP.

FILLER PANEL TO FILLER PA

FILLER PANEL TO FILLER PANEL TO

MATCH CABINET MATCH CA CABINET BATHROOMMATCH TYPE 1,MATCH 1B,CABINET 1C, 1D - PLAN FACE FACE FACE FACE

1 REFRIGERATOR REFRIGERATOR

0' - 1"

2' - 0' 8 3/4" - 1"

2'0' - 81"3/4"

1/2" = 1'-0"

SLIDE IN RANGE SLIDE IN RANGE

2' - 3"0' - 1"

2' - 3"

2' - 6"

2' - 6"

2' - 3"

Level B2 12' - 8"

2' - 3" AS REQ'D.

Level B2 12' - 8"

AS REQ'D.

6

TYPE 3_KITCH TYPE 6 1/2" = 1 1/2" = 1'-0"

1

TYPE 1_KITCH TYPE 1 1/2" = 1 1/2" = 1'-0"

10' 4

TYPE 3_KITCHEN TYPE 3_KITCHEN - IE2 - IE2 7 1/2" = 1'-0" 1/2" = 1'-0"

1/4"

14 A642

9/16" 9' - 10

2' - 6"

HOOD

HOOD

2' - 6"

14 A642

2' - 6"

Level B2 12' - 8"

GWB SOFFIT AND GWB SOFFIT AND FASCIA, TYP. FASCIA, TYP. AS REQ'D. FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE 3' - 0"

1' - 6"

AS REQ'D. 2' - 9"

1' - 6" 6' - 0"

FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE 3' - 0"

CN

SLIDE IN RANGE SLIDE IN RANGE

2' - 6"

2' - 9"

3' - 0"

FINISHED FULLFINISHED DEPTH FULL DEPTH END PANEL, TYPICAL END PANEL, TYPICAL BOTH SIDES OFBOTH ISLAND SIDES OF ISLAND

3' - 5

15/16 "

2' - 0" 2' - 6"

1' - 6"

1' - 6"

GLAZED WALL TILE GLAZED WALL TILE UP TO UNDERSIDE UP TO UNDERSIDE OF UPPER OF UPPER CABINETS, TYP.CABINETS, TYP.

3' - 0"

3/4" 3' - 9

2'1'--0"0"

3' - 0"

3' - 0"

3/4" 3' - 5 1/4"

7/8"

6' - 6 5/16"

C9 6

BUILDING A LEVEL THREE PLAN

KITCHEN FAUCET KITCHEN FAUCET

Level B2 12' - 8"

REFRIGERATOR REFRIGERATOR

Level B2

AS REQ'D.

2

1/4"

5/8" 3' - 4

7' - 3 9/16"

C7

7/8"

X1B 7' - 3 9/16"

3' - 1

3' - 4 7/8"

3' - 0"

X1B A309 1T

E15

2

5' - 1

G

4

C5

CP

4

E7

0' - 1"

TYPE 5_KITCHEN TYPE 5_KITCHEN - IE1 - IE1 1/2" = 11 1'-0" 1/2" = 1'-0"

2' - 0" AS REQ'D.

2' - 0" 2' - 6"

2' - 6"

2' - 6"

0' - 1" 2' - 6"

0'2'--1"8 3/4"

2' - 8 0'3/4" - 1"

12' - 8" 0' - 1"

Level B2 12' - 8"

7' - 4 7/8"

A307 1C

2C

G

7/8"

2C

3' - 4

8' - 0"

G

2C A

A310 1S

7' - 3 9/16"

1/2" 6' - 2 1/16"

3' - 8 B

4D

REFRIGERATOR REFRIGERATOR

FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE

5' - 1

E10

9/16"

E10

2' - 0" 2' - 6"

AJ

2' - 7

4 E10

B

D

E5

4

3' - 5 11/16 "

3' - 0"

A306 1C

B

B

CL

3' - 0"

3' - 0"

3' - 0"

3/4"

3' - 0"

R

G

D

2' - 3

1/4" 16' 4

G

A

X1B

1' - 6"

1' - 6"

3' - 0" 1' - 6" 3' - 0"

3' - 0"

1/4"

4

1'2'- -3"0"

B

2C

MATCHLINE SEE A103.1-B

Level B3 LevelTYPE B3 BATHROOM 2, 2B, 2C - PLAN - 4" 23' - 4" 2 1' - 3"1/2"23' = 1'-0" 2' - 8 3/4"

2' - 6"1' - 3"

MIRROR

AS2' REQ'D. - 9"

1' - 0"

TYPE 1_KITCHEN TYPE 1_KITCHEN - IE3 - IE3 3 1/2" EX7= 1'-0" 1/2" = 1'-0"

4

E10

A322 CORRIDOR

2D

12' 5 1/2 " A325 STORAGE R A324 STORAGE 1

1' - 3"

E10

B

E10

7

3' - 0"

3' - 0"

1/2"

7/16"

5' - 3

0' - 1"

A305 1C

AS REQ'D.

A

1' -2'0"- 6"

11

DISHWASHER DISHWASHER

3 D

2D

3

6' - 8

A301-A

2'0' - 81"3/4"

1' - 6" 2' - 8 3/4" AS REQ'D.

Level 1 0' - 0"

A501-A

2D

E10

11/16 "

3' - 4

CK

4' - 1

AS REQ'D.

2C

Level 1 0' - 0"

TYPE 2_KITCHEN TYPE 2_KITCHEN - IE1 3 - IE1 4 1/2" = 1'-0" 1/2" = 1'-0"

4

1/8"

SHAFT

4

4

1' - 6" AS REQ'D.

7/8"

B

REFRIGERATOR REFRIGERATOR

3/4"

5' - 0

9/16"

X3B

16' 7

3A

G B

7' - 1

3E

A319 UP STAIR A1

E10

A311 2W

7/8"

6' - 0"

4' - 2 6' - 0" 1/8" 3' - 5 7/16" 4' - 7

2E B

F.E.

N

AS REQ'D.

X2B

E10

G

2C

1/4"

E10

B

3' - 5

B

AS REQ'D.

7/8" 2' 4' - 11 - 1 15/16 3/16" "

C4

3' - 5

1' - 6"

1' - 3"

Level 1 0' - 0"

7

KITCHEN SINK KITCHEN SINK

5 A713

Q

FILLER PANEL TO FILLER PANEL TO A321 MATCH CABINET MATCH CABINET FACE FACE ELEV 1&2

D A

4

1/8"

2' - 6"1' - 3"

Level 1 0' - 0"

1' - 10

3 A510

FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE

7' - 5

2' - 0" 2' - 6"

TYPE 2_KITCHEN TYPE 2_KITCHEN - IE2 - IE2 5 1/2" = 1'-0" 1/2" = 1'-0"

3' - 4

5

2'1'--0"0"

2C

A323 ELEC.

5/8"

3/4" 3' - 5 3/4"

2' -1'6"- 0" B

4

3E

FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE

A

2C

6' - 7

3' - 4

GLAZED WALL TILE GLAZED WALL TILE UP TO UNDERSIDE UP TO UNDERSIDE E13 OF UPPER OF UPPER CABINETS, TYP.CABINETS, TYP.

2C E8

0' - 10

SHAFT

1E

GLAZED WALL TILE GLAZED WALL TILE UP TO UNDERSIDE UP TO UNDERSIDE OF UPPER OF UPPER CABINETS, TYP.CABINETS, TYP. 3E

EX7

E10

B

2E

9/16"

1/16"

2' - 1 3/4"

D

B

5

D

3' - 6"

1'2'--0"0"

B

2E

3

A502-AAS REQ'D. AS REQ'D. 2' - 9"

2' - 9"

6' - 7

8' - 10

FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH B CABINET FACE

E10 FACE

B

SHELF FOR SHELF FOR MICROWAVE MICROWAVE

E10

2' - 6"

0' - 10 2'"- 6"

A

E5

B 2'AS- 6"REQ'D.

AS REQ'D.

1' - 3"

2c

UP

3' - 5

HOOD

KITCHEN SINK KITCHEN SINK

1/4"

10' - 1' - 6" 5 1/8 "

3' - 0"

FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE

KITCHEN FAUCET KITCHEN FAUCET

E10

GWB SOFFIT AND GWB SOFFIT AND FASCIA, TYP. FASCIA, TYP.

2'1'- -0"3"

E10

A320 STAIR A2

3/16" 5' - 6 1/8"

HOOD

9/16" 5' - 1

G

GWB SOFFIT AND GWB SOFFIT AND FASCIA, TYP. FASCIA, TYP.

B

A

B

D

E10

AS REQ'D.

2' - 6" 2' - 0"

Level B2 12' - 8"

A303 TYPE 3_KITCHEN TYPE 3_KITCHEN - IE3 - IE3 8 1/2" = 1'-0" 2I 1/2" = 1'-0"

8

15/16 3' - 4 " 7/8"

7' - 1

3' - 0"

3/4"

AS REQ'D. 2' - 3"

2' - 6"D

Level B2 12' - 8"

1' - 6"

2' - 3"

SLIDE IN RANGE SLIDE IN RANGE DISHWASHER DISHWASHER E10

7/8"

1/2"

1/2" = 1'-0"

2E

N

2D

2' - 2

C3

2' - 6"

E7

B

A313 2A

3/4" 3' - 4

2' - 6"

AS REQ'D.

1a

B DISHWASHER DISHWASHER

4

A304 SB

4

B 3' - 0"

AS REQ'D. 2' - 0" 0' - 1"

FINISHED FULLFINISHED DEPTH FULL DEPTH END PANEL, TYPICAL END PANEL, TYPICAL

BOTH SIDES OFBOTH ISLAND SIDES OF ISLAND - IE1 TYPE 1_BATHROOM

B

4' - 4

3' - 8

G

3' - 0"

2' - 0"

0' - 1"

Level B3 23' - 4"

A630

4

E10

2' - 9"1' - 0"

15" MIN.

ENLARGED BATHROOM PLANS

REMOVABLE VANITY FINISH WALLS AND CENTER BETWEEN BEHIND VANITY BASEBOARD DOORBEFORE TRIM AND INSTALLATION SHOWER FOR TYPE 1D

E10

G

A

7/8" 5' - 3 9/16"

3/8"

3' - 3

2' - 8 3/4"

0' - 1"

Level B3 23' - 4"

2C

KITCHEN SINK KITCHEN SINK

A

Level B3 23' - 4"

1' - 6"

2' - 6"

B

C2

A302-A

2' - 6"

G

1/16"

7' - 4

7' - 2"

E13

EX72' - 8 3/4" 0' - 1"

TYPE 4_KITCHEN TYPE 4_KITCHEN - IE1 - IE1 9 1/2" = 1'-0" 1/2" = 1'-0"

18" LINEN CABINET FOR TYPE 1B ONLY

2b

A630

1' - 5"

AS REQ'D. FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE UTILE PROJECT NUMBER FACE 1309.2

SCALE As indicated

PROVIDE BLOCKING FOR FUTURE SEAT + GRAB BARS TO 48" ABOVE FLOOR E10 AT ALL SHOWER WALLS

MATCH CABINET MATCH CABINET TYPE 1_BATHROOM BATHROOM - IE2 TYPE 2C 1, 1B, 1C, 1D - PLAN FACE 1b 1/2" =FACE 1'-0" E3 1 1/2" = 1'-0"

B

PRESSURE BALANCE

KITCHEN FAUCET KITCHEN FAUCET

2C

FILLER PANEL TO FILLER PANEL TO

2d

TYPE 5_KITCHEN TYPE 5_KITCHEN - IE2 - IE2 1/2" = 12 1'-0" 1/2" = 1'-0"

3/4" 4' - 1

5' - 1 A

E5

9

A312 2B

F.E.

D

7/8"

1/4"

B

4

3' - 4

5' - 1

G

A

2E

E15

X3E

1/4"

B 9

A701

E12

REFRIGERATOR REFRIGERATOR

X2B

SHOWER HEAD 18" LINEN CABINET FOR TYPE 1B ONLY

D

AS2' REQ'D. - 9"

2a

30X60 NOMINAL BAT/ SHOWER

AS REQ'D.

LIGHT FIXTURE

A

B

B

3/4"

C1

2' - 6"1' - 3"

1' - 3"2' - 6"

13' 0

Level B3 23' - 4"

E14

B

16' 10

2'1'- -0"3"

Level B3 1' - 3" 23' - 4"

A301 2G

1c

4

GLAZED WALL TILE GLAZED WALL TILE DOOR LOCATION SEETO UNDERSIDE UP TO VAIRES, UNDERSIDE UP ENLARGEDOF UNIT PLANS OF UPPER UPPER CABINETS, TYP.CABINETS, TYP.

E2

0' - 10

2C

A318 STAIR A3 B

D

1/4"

2' - 6" 2' - 0"

AS REQ'D.

TYPE 4_KITCHEN TYPE 4_KITCHEN - IE2 4 - IE2 1/2" = 10 1'-0" 1/2" = 1'-0"

E5

C1

5' - 1

1' - 6"2' - 6"

SLIDE IN RANGE SLIDE IN RANGE

12

B

G

B

Level Level B3 B3 23' 23' -- 4" 4"

3' - 0"

7/8"

3' -DISHWASHER DISHWASHER 8 7/1 6" 3' - 5 3/4"

EX7

3 A503-A

N

B

4' - 10

AS REQ'D.

9/16"

D

2E

A315 2J AFF.

10

B

CD

TYPE TYPE1_BATHROOM 1_BATHROOM- IE3 - IE1 1c1a1/2"1/2"= 1'-0" = 1'-0"

1' - 6"

B

5/8"

KITCHEN SINK KITCHEN SINK

E15

TOILET

AS REQ'D.

1' - 6"

1b

A630

G

E10

INNER CORNER

HOOD

Level B3 23' - 4"

B

1d

AS REQ'D.

FILLER PANEL TO PROVIDE BLOCKING FOR FILLER PANEL TO MATCH CABINET MATCH CABINET FUTURE GRAB BAR BTW. 30" D2 FACE AND 38" A.F.F. TO 42" FROMFACE

AS REQ'D. FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE

TOILET

"JULIET-STYLE" BALCONY WITH SLIDING DOOR, TYP. 1' - 3" 1'2'- -3"0"

5' - 5 1/4"

0' - 1"

E10

36X48 GWB SOFFIT AND GWB SOFFIT AND NOMINAL FASCIA, TYP. FASCIA, TYP. SHOWER

AS1'REQ'D. - 0"

1'2'--0"0"

0' - 1" 0' - 1"

15" MIN.

A302 G2 2U GROUP 2A

3' - 0"

1' - 11

1' - 6"

A314 1B

G

A

1/4"

CC

HOOD

BEFORE INSTALLATION

3' - 0"

16' 2

REMOVABLE VANITY FINISH WALLS AND HOOD BASEBOARD BEHIND VANITY

C12

1' - 5"

1' - 5"

1' - 6"

1' - 3"

DISHWASHER DISHWASHER SLIDE IN RANGE SLIDE IN RANGE

B2 Level B2 - IE1 TYPE Level 2_BATHROOM 12' - 8" 12' - 8"

E10

1a

2' - 9" 2' - 0" 18" TOWEL ROD

2a

= -1'-0" 5 3/4" 3' - 52'3/4" - 81/2" 3/4" 3'

2' - 8 3/4"

0' - 1"

TYPE 6_KITCHEN TYPE 6_KITCHEN - IE1 - IE1 1/2" = 13 1'-0" 1/2" = 1'-0"

B

PROVIDE BLOCKING FOR FUTURE GRAB BAR BTW. X2B 30" AND 38" A.F.F. TO 6" PROVIDE BLOCKING FOR BEYOND FUTURE SEATWIDEST + GRAB POINT BARS OF TOILET TO 48" ABOVE FLOOR AT ALL SHOWER WALLS

1' - 6"

2D

3' - 5

FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET A302-A FACE FACE 1

3' - 0"

7' - 2"

E15

2C

2E E10

7' - 1 11/16"

2C A

1/4"

EX7 E5

2C 4 G

5' - 1

- 9" AS2' REQ'D.

AS REQ'D.

1' - 3"

KITCHEN FAUCET KITCHEN FAUCET

Level B3 Level B3 23' - 4"23' - 4"

1/4"

FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET

FACE FACE TYPE TYPE 1_BATHROOM 1_BATHROOM - IE2 - IE4 1b 1d1/2" =1/2"1'-0"= 1'-0"

2' - 6"1' - 3"

1/16"

E15

4 B

B

13' 0

D A

RECESSED ROLL SHELF FOR HOLDER SHELF FOR MICROWAVE MICROWAVE

1' - 3"2' - 6"

5' - 1

1/2" = 1'-0"

G

4

EX7

MIRROR

2'1'- -0"3"

PRESSURE BALANCE 24" TOWEL ROD PROVIDE BLOCKING FOR FUTURE SEAT +DOOR GRAB CENTER BETWEEN TO 48" ABOVE TRIMBARS AND SHOWER FOR FLOOR TYPEAT1DALL SHOWER WALLS

AS REQ'D.

4

BATHROOM FAUCET

2' - 6" 2' - 0"

18" LINEN CABINET FOR TYPE 1B ONLY

CABINETS, TYP.CABINETS, TYP.

4

B

SHOWER HEAD ROBE HOOK

2 2' - 6"

BATHROOM FAUCET

1' - 6"

Level B3 A316 23' - 4"1B

B

TYPE 1_BATHROOM - IE3 B

RECESSED MEDICINE 2' -REQ'D. 3" 2' - 3" AS CABINET

AS REQ'D.

1' - 6"

E15

GWB SOFFIT AND GWB SOFFIT AND FASCIA, TYP. FASCIA, TYP.

PROVIDE BLOCKING FOR

FUTURE BAR BTW. PROVIDEGRAB BLOCKING FOR30" X3B FILLER PANEL TO FILLER PANEL TO AND 38" A.F.F. 42" FROM FUTURE SEATTO + GRAB BARS MATCH CABINET MATCH CABINET 1/4 INNER TO" 48"CORNER ABOVE FLOOR AT ALL FACE FACE SHOWER WALLS 6' - 5 5/16" 4' - 8 11/16 " 3' GLAZED WALL TILE GLAZED WALL TILE - 5 3/4 UP"TO UNDERSIDE UP TO UNDERSIDE OF UPPER OF UPPER

5' - 1

8' - 9 7/8"

1cD 4

5' - 1

3' - 0"

B

B

X3F

A302-A

C11 1/4"

3' - 0"

9' - 0

1/4" 5' - 10 15/16 "

3/4"

4' - 6

3' - 5

PROVIDE BLOCKING FOR FUTURE SEAT + GRAB BARS TO 48" ABOVE FLOOR AT ALL SHOWER WALLS EX7

E10

E15

13

LIGHT FIXTURE SHOWER BAR

3' - 0"

7/8"

CB

DOOR LOCATION VARIES SEE ENLARGED UNIT PLANS

A630 A630

AS REQ'D.

X2B

HOOD

REMOVABLE VANITY FINISH WALLS AND BASEBOARD BEHIND VANITY BEFORE INSTALLATION

REFRIGERATOR REFRIGERATOR

10' - 52'1/8" - 3"

14 A642

2' - 6"1' - 3"

SHELF FOR SHELF FOR MICROWAVE MICROWAVE BATHROOM FAUCET

FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE

Level B3 23' - 4"

1'2'- -0"3"

1' -2'0"- 6"

MIRROR

GLAZED WALL TILE GLAZED WALL TILE UP TO UP TO UNDERSIDE OFUNDERSIDE OF UPPER CABINETS, UPPER CABINETS, TYP. TYP.

C14

A15

TUB SPOUT

2'1'- -3"0"

18" TOWEL BAR

SHELF FOR SHELF FORPRESSURE BALANCE MICROWAVE MICROWAVE DOOR LOCATION VARIES, SEE ENLARGED UNIT PROVIDE BLOCKING FOR PLANS FUTURE GRAB BARS TO 48" ABOVE TUB BOTTOM AT ALL TUB WALLS 12" LINEN CABINET FOR TYPE 2B ONLY

1 2b

6' - 7

CA

AS REQ'D.

FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE

3' - 5

AS REQ'D.

TYPE 6_KITCHEN TYPE 6_KITCHEN - IE2 - IE2 14 1/2" = 14 1'-0" 1/2" = 1'-0" BATHROOM BATHROOM TYPE TYPE 1, 1, 1B,1B, 1C, 1C, 1D1D - PLAN - PLAN 1 1 1/2"1/2" = 1'-0" = 1'-0"

LIGHT FIXTURE

SHOWER BAR

3' - 0"

3' - 0"

AS REQ'D.

12" LINEN CABINET FOR

LIGHT FIXTURE 2' -AS 0" REQ'D. 2' - 0" 2' - 3"

TYPE 2B ONLY A301-A

11/26/2014 12:39:01 PM 11/26/2014 12:39:01 PM

AS REQ'D.

1' - 6"

1' - 6"

1' - 6"

1' - 6"

AS REQ'D.

PROVIDE BLOCKING FOR FUTURE FOLD-UP GRAB BAR BTW. 30" AND 44" 24" TOWEL BAR6"FOR TYPE A.F.F. TO BEYOND 2C ONLY WIDEST POINT OF TOILET

15" MIN.

GWB SOFFIT AND GWB SOFFIT AND FASCIA, TYP. FASCIA, TYP. AS REQ'D.

GWB SOFFIT AND GWB SOFFIT AND FASCIA, TYP. FASCIA, TYP. AS REQ'D. FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE

2' - 3" SHOWER 2' - 9" HEAD AS REQ'D. 2' - 9"

2' - 0" 2' - 3"

ENLARGED ENLARGED BATHROOM BATHROOM Level B2 Level B2 PLANS PLANS 6 1/8"2C - PLAN TYPE 2_BATHROOM BATHROOM - IE2TYPE 2,2' -2B, 12' - 8" 12' - 8" 2b 5' 1/2" = 1'-0" 3' - 523/4"1/2" = 1'-0" - 4 5/8" 3' - 5 3/4" 7' - 5 1/8" 7' - 11" 1' - 0"

CENTER CENTER BETWEEN BETWEEN DOOR DOOR TRIMTRIM ANDAND SHOWER SHOWER FORFOR TYPE TYPE 1D 1D 2' - 6"1' - 6" 1' - 6"

1' - 6"2' - 6"

3' - 0"

3' - 0"

3' - 0"

3' - 0"

1' - 6"

DOOR DOOR LOCATION LOCATION VAIRES, VAIRES, SEESEE ENLARGED ENLARGED UNITUNIT PLANS PLANS AS REQ'D.

TYPE 6_KITCHEN TYPE 6_KITCHEN - IE3 - IE3 1/2" = 15 1'-0" 1/2" = 1'-0"

SHOWER ROD

5' - 8

4

E13

CJ

1/8"

RECESSED ROLL HOLDER

3' - 5 3/4"

CI

Level Level B3 B3 23' 23' - 4"- 4"

23'23' - 4"- 4"

SLIDE IN RANGE SLIDE IN RANGE

1' - 0"

3' - 0"

CH

2' -1'6"- 0"

1' - 6"

1/2" = 1'-0"

5' - 5

E10

CENTER BETWEEN DOOR TRIM AND SHOWER FOR TYPE 1D

6' - 4 1/8"

1d

3/4"

E13

B

24" TOWEL ROD BATHROOM FAUCET

Level B3 23' - 4"

A302-A 3

2' - 0" 2' - 6"

6' - 0"

7' - 7 7/8" 7' - 2" 7' - 2" 3' - 5 3/4"

CG

C10

ROBE HOOK RECESSED MEDICINE CABINET

CF

3' - 5

A317 DOOR LOCATION VARIES SEE 2K ENLARGED UNIT PLANS

LIGHT FIXTURE

TYPE 1_BATHROOM - IE4

2"

15 TYPE TYPE 1_BATHROOM 1_BATHROOM - IE1 - IE1 1a1a1/2"1/2" = 1'-0" = 1'-0"

2'1'--0"0"

FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE

Level B2 Level- B2 TYPE IE3 TYPE2_BATHROOM 2_BATHROOM - IE1 12' - 8" 12' - 8" 2c2a1/2"1/2"= 1'-0" = 1'-0"

TOILET TOILET 1' - 0"

11' 2"

3' - 5 3/4" SHOWER ROD

TYPE TYPE 1_BATHROOM 1_BATHROOM - IE2 - IE2 1b 7' -1b1/2"1/2" = 1'-0" = 1'-0"

DISHWASHER DISHWASHER

TYPE TYPE 2_BATHROOM 2_BATHROOM - IE2 - IE4 2b 2d1/2" =1/2"1'-0"= 1'-0"

Level Level B3 B3 23' 23' - 4"- 4"

A630

1/4"

REMOVABLE REMOVABLE VANITY VANITY - FINISH FINISH WALLS WALLS ANDAND BASEBOARD BASEBOARD BEHIND BEHIND VANITY VANITY BEFORE BEFORE INSTALLATION INSTALLATION

6' - 0"

5' - 1

EX7

1/2" = 1'-0"

3' - 0"

- 2 3/1 6"

PROVIDE PROVIDE BLOCKING BLOCKING FORFOR FUTURE FUTURE SEAT SEAT + GRAB + GRAB BARS BARS TO 48" TO ABOVE 48" ABOVE FLOOR FLOOR AT ALL AT ALL SHOWER SHOWER WALLS WALLS

Level B3

23'TYPE -1B4" 1B 18" LINEN 18" LINEN CABINET CABINET FORFOR TYPE ONLY ONLY

ENLARGED BATHROOM PLANS - IE3 TYPE 2_BATHROOM

1' - 6"

Level Level B3 B3 23' 6' 23' - 4"- 4"

TYPE TYPE 1_BATHROOM 1_BATHROOM - IE3 - IE3TYPE 1, 1B, 1C, 1D - PLAN BATHROOM 1c1c1/2"1/2" = 1'-0" = 1'-0" 1 1/2" = 1'-0"

PROVIDE BLOCKING FOR FUTURE SEAT + GRAB BARS TO 48" ABOVE FLOOR AT ALL SHOWER WALLS

2c

1c 1c

5' - 5 1/4" 0' - 10 "

CENTER BETWEEN DOOR TRIM AND SHOWER FOR TYPE 1D

1/2" = 1'-0"

AS REQ'D. 2' - 0"

A16 C13

1d 1d A630A630 1b 1b

1/2"

PROVIDE PROVIDE BLOCKING BLOCKING FORFOR 23' - 4" FUTURE FUTURE SEAT SEAT + GRAB + GRAB BARS BARS TO 48" TO ABOVE 48" ABOVE FLOOR FLOOR AT ALL AT ALL SHOWER SHOWER WALLS WALLS

TYPE 2_BATHROOMCE - IE4

36X48 36X48 NOMINAL NOMINAL SHOWER SHOWER

FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE

SHOWER ROD

AS REQ'D.

FILLER PANEL FILLER PANEL FILLER PANEL TO FILLER PANEL TO TO MATCH TO MATCH MATCH CABINET MATCH CABINETCABINET FACECABINET FACE FACE FACE

24" TOWEL BAR FOR TYPE 2C ONLY

1/4"

Level B3

2d

DOOR LOCATION VAIRES, SEE ENLARGED UNIT PLANS

TUB SPOUT PROVIDE PROVIDE BLOCKING BLOCKING FORFOR FUTURE FUTURE GRAB GRAB BARBAR BTW. BTW. Level Level B3B3 30" AND 30" AND 38" A.F.F. 38" A.F.F. TO 6" TO 6" - 4" 23'23'-BEYOND 4" BEYOND WIDEST WIDEST POINT POINT OF OF TOILET TOILET

RECESSED MEDICINE CABINET

14 A642

15" MIN.

GWB SOFFIT AND GWB SOFFIT AND LIGHT FIXTURE AS REQ'D. 2' - 6" AS REQ'D. FASCIA, TYP. FASCIA, TYP.

2' - 6"

HOOD PROVIDE BLOCKING FORHOOD GLAZED WALL TILE GLAZED WALL TILE 2a FUTURE GRAB BARS TO 48" UP TO UNDERSIDE UP TO UNDERSIDE BATHROOM FAUCET BATHROOM FAUCET ABOVE TUB BOTTOM AT 18"ALL LINEN 18" LINEN CABINET CABINET FORFOR OF UPPER OF UPPER 30X60 TUB WALLS TYPE TYPE 1B ONLY 1B ONLY CABINETS, TYP.CABINETS, GLAZED WALL TILE GLAZED WALL TILE 2d TYP. A630 NOMINAL UP TO UNDERSIDE UP TO SHOWER UNDERSIDE REMOVABLE VANITY BAT/ FINISH WALLS AND OF UPPER OF UPPER RECESSED ROLL 2c CABINETS, TYP.CABINETS, TYP. BASEBOARD BEHIND VANITY HOLDER BEFORE INSTALLATION FILLER PANEL FILLER PANEL TO MATCH TUB TOILET FILLER PANEL TO SCALE SCALE FILLER PANEL TO UTILE UTILE PROJECT PROJECT NUMBER NUMBER TO MATCH FACECABINET FACE MATCH CABINET MATCH CABINETCABINET As indicated As indicated 1309.2 1309.2 Level Level B3B3 FACE FACE

1a 1a

PROVIDE BLOCKING FOR FUTURE GRAB BARS TO 48" ABOVE TUB BOTTOM AT ALL TUB WALLS

18" TOWEL 18" TOWEL RODROD

PRESSURE PRESSURE BALANCE BALANCE

TUB

UTILE PROJECT NUMBER 1309.2

3' - 0"

PROVIDE PROVIDE BLOCKING BLOCKING FORFOR FUTURE FUTURE GRAB GRAB BARSCALE BAR BTW. BTW. 30" 30" As indicated ANDAND 38" A.F.F. 38" A.F.F. TO 42" TO FROM 42" FROM INNER INNER CORNER CORNER

PRESSURE BALANCE

PROVIDE BLOCKING FOR MIRROR MIRROR KITCHEN FAUCET KITCHEN FAUCET FUTURE GRAB BAR BTW. 30" AND BATHROOM 38" A.F.F. BATHROOM FAUCET FAUCET KITCHEN SINK KITCHEN SINK

RECESSED ROLL HOLDER

CENTER CENTER BETWEEN BETWEEN DOOR DOOR TRIMTRIM ANDAND SHOWER SHOWER FORFOR TYPE TYPE 1D 1D

ROLL L

PROVIDE BLOCKING FOR PROVIDE BLOCKING FOR FUTURE GRAB BARS TO 48" FUTURE GRAB BARS TO 48" SHOWER SHOWER HEAD HEAD BATHROOM ABOVE TUBFAUCET BOTTOM AT ALL ABOVE TUB BOTTOM AT ALL TUB WALLS TUB WALLS

PROVIDE BLOCKING 18"FOR LINEN CABINET FOR FUTURE GRAB BAR BTW. TYPE 1B30" ONLY AND 38" A.F.F.

1' - 6"

1b

1c

24" TOWEL 24" TOWEL RODROD

2' - 6"

MIRROR 24" TOWEL ROD 18" TOWEL BAR

3' - 0"

A630

12" LINEN CABINET FOR TYPE 2B ONLY LIGHT LIGHT FIXTURE FIXTURE

3' - 0"

1d

24" TOWEL ROD

SHOWER SHOWER BARBAR

1a

36X48 NOMINAL SHOWER

24" TOWEL BAR FOR TYPE 2C ONLY

PROVIDE BLOCKING FOR ROBE HOOK FUTURE FOLD-UP GRAB BAR BTW. 30" AND 44" A.F.F. TO 6" BEYOND DOOR LOCATION VARIES SEE WIDEST POINT OF TOILET ENLARGED UNIT PLANS

7/8"

OOM FAUCET

DOOR LOCATION VARIES SEE ENLARGED UNIT PLANS

11/26/2014 12:39:01 PM

DOOR DOOR LOCATION LOCATION VARIES VARIES SEESEE ENLARGED ENLARGED UNITUNIT PLANS PLANS PROVIDE BLOCKING FOR FUTURE GRAB BARS TO 48" ABOVE TUB BOTTOM AT ALL ROBE ROBE HOOK HOOK TUB WALLS

BATHROOM TYPE 3, 3B, 3C, 3D - PLAN TYPE 7_KITCHEN TYPE 7_KITCHEN - IE1 - IE1 1/2"16 = 1'-0" 1/2" = 16 1'-0" 1/2" = 1'-0"

3

1' - 5"

1' - 6"

1' - 5" 1' - 5" 1' - 6" 1' - 6" 1' - 6" LIGHT FIXTURE 1' - 6"2' - 6" SHOWER ROD 15" MIN. 15" MIN.

SHOWER HEAD

RECESSED MEDICINE CABINET

6' - 5

LIGHT FIXTURE

SHOWER ROD ROBE HOOK

3' - 0"

1' - 6"

1' - 6"

SLIDE IN RANGS ELIDE IN RDAISNHGW EASHER DISHW

5. LOCATE FRAMING TO ENSURE WALL FINISH FACES ALIGN AT DIFFE

Level B3 23' - 4" 0' - 1"

1

1' - 5"

SHOWER ROD

SHOWER ROD

15" MIN.

30X60 KITCHEN SINK KITCHE

3c

BATHROOM BATHROOM TYPE TYPE 2, 2, 2B,2B, 2C2C - PLAN - PLAN 2 2 1/2"1/2" = 1'-0" = 1'-0"

A401 SHOWER ROD

2

SHELF

4. REFER TO ENLARGED UNIT PLANS FOR ROOM NAMES, DOOR TYPE KITCHEN AND BATHROOM TYPES WITHIN RESIDENTIAL UNIT

REFRIGERATOR EFRIGERATOR

TUB

2' - 0" 2' - 6" AS REQ'D.

2' - 0"

SHELF FOR

NOMINAL 3d 3b A630 3. REFER TO SHEET G02 FOR TYPICAL INTERIOR PARTITION TYPES AN BAT/ SHOWER ADDITIONAL NOTES.

12" LINEN CABINET FOR TYPE 3B ONLY

18" LINEN CABINET FOR TYPE 3D ONLY TYPICAL

Level B2 12' - 8" 1' - 6"2' - 6"

AS REQ'D. 2' - 6"

2. REFER TO SHEET A901 FOR TYPICAL3aEXTERIOR WALL TYPES KITCHEN FAUCET KITCHE

PRESSURE BALANCE PROVIDE BLOCKING FOR FUTURE GRAB BARS TO 48" ABOVE TUB BOTTOM AT ALL TUB WALLS

1' - 6"

1/2" = 1'-0"

1' -2'0"- 6"

3' - 0"

GENERAL NOTES:

A640

TYPE 1_KITCHEN

1' - 6" AS REQ'D.

15" MIN. 1' - 0"

COMPACT COMP 1. REFER TO STRUCTURAL DRAWINGS FOR INTERIOR AND EXTERIOR MICROWAVE MICRO HOOD HOOD BEARING WALL LOCATIONS AND CONSTRUCTION.

TUB SPOUT

TYPE 3_BATHROOM - IE1 3aTYPE=8_KITCHEN TYPE 8_KITCHEN - IE1 - IE1 1'-0" 17 1/2"1/2" = 17 1'-0" 1/2" = 1'-0"

AS REQ'D.

3' - 0"

GWB SOFFIT AND GWB SOFFIT AND FASCIA, TYP. FASCIA, TYP. AS REQ'D. FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE

AS REQ'D. 2' - 9"

KITCHEN FAUCET KITCHEN FAUCET KITCHEN SINK KITCHEN SINK

SLIDE IN RANGS ELIDE IN RADNIS GHEWASHER DISHWASHER

Level A2 15' - 4"

1' - 3"

TYPE 3_BATHROOM BATHROOM - IE2TYPE 3, 3B, 3C, 3D - PLAN 1/2" = 1'-0" 3 1/2" = 1'-0"

3' - 0"

1' - 6" 3' - 0"

1' - 6"

1' - 3"2' - 9"

PROVIDE BLOCKING FOR FUTURE FOLD-UP GRAB BAR BTW. 30" AND 44" A.F.F. TO 6" BEYOND WIDEST POINT OF TOILET

SHELF FOR SHELF FOR HOOD MICROWAVE MICROWAVE

HOOD

GLAZED WALL TILE GLAZED WALL TILE UP TO UNDERSIDE UP TO UNDERSIDE MIRROR OF UPPER OF UPPER

Level B2 12' - 8"

2' - 10 3/4"

3b TYPE 9_KITCHEN TYPE 9_KITCHEN - IE1 - IE1 18 1/2" = 18 1'-0" 1/2" = 1'-0"

3' - 0"

1' - 6" 1' - 6"

3' - 0" 3' - 0"

3' - 0" DISHWASHER DISHWASHER

12" LINEN 12" LINEN CABINET CABINET FORFOR TYPE TYPE 2B ONLY 2B ONLY

0' - 2 1/4"

3' - 0"

3' - 0" 3' - 0"

1' - 6"

1' - 6"

6' - 0"

6' - 0"

1' - 6"

3' - 0"

1' - 6" 2d 2d A630A630 2b 2b

Level A2 15' - 4" 0' - 1"

2'0' - 81"3/4"

3c

1 1' - 5"

2' - 6"1' - 3"

SHOWER HEAD

TYP.CABINETS, TYP. GLAZED WALL TILE GLAZED WALL CABINETS, TILE UP TO UNDERSIDE UP TO UNDERSIDE 18" TOWEL ROD 30X60 OF UPPER OF UPPER NOMINAL BATHROOM FAUCET CABINETS, TYP.CABINETS, TYP. PROVIDE BLOCKING FOR BAT/ SHOWER FUTURE GRAB BARS TO 48" FILLERVANITY PANEL TO REMOVABLE -FILLER PANEL TO ABOVE TUB BOTTOM ATFILLER ALL PANEL TO FILLER PANEL TO FINISHMATCH WALLSCABINET AND MATCH CABINET TUB WALLS FACE BEHIND FACE MATCH CABINET MATCH CABINET BASEBOARD VANITY FACE FACE BEFORE INSTALLATION

3b

A630

2' - 6"

FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET LIGHT FIXTURE FACE FACE

HOOD

3a

KITCHEN SINK KITCHEN SINK 3d

2' - 3"

TYPICAL KITCHEN ELEVATIONS

TYPE TYPE 2_BATHROOM 2_BATHROOM - IE1 - IE1 2a2a1/2"1/2" = 1'-0" = 1'-0"

TYPE TYPE 2_BATHROOM 2_BATHROOM - IE2 - IE2 2b2b1/2"1/2" = 1'-0" = 1'-0"

6' - 0"

REFR30X60 IGE30X60 RATOR EFRIGERATOR NOMINAL NOMINAL BAT/BAT/ SHOWER SHOWER

2' - 6" 1' - 9"

TYPE TYPE3_BATHROOM 3_BATHROOM- IE3 - IE1 3c3a1/2"1/2"= 1'-0" = 1'-0"

Level Level B3 B3 TYPE TYPE 3_BATHROOM 3_BATHROOM - IE2 - IE4 - 4"- 4" 3b 3d1/2" =1/2"1'-0"= 1'-0" TYPE 10_KITCHEN TYPE 10_KITCHEN - IE1 - IE1 23' 23' 19 1/2" = 19 1'-0" 1/2" = 1'-0"

SHELF FOR SHELF FOR HOOD MICROWAVE MICROWAVE KITCHEN FAUCET KITCHEN FAUCET

PRESSURE BALANCE PROVIDE BLOCKING FOR FUTURE GRAB BAR BTW. 30" 24" TOWEL BARBAR FOR FOR TYPE TYPE 18" LINEN CABINET FOR24" TOWEL AND 38" A.F.F. 2C ONLY 2C ONLY FOR TYPE 3DPROVIDE ONLY BLOCKING 12" LINEN CABINET FOR FUTURE GRAB BARS TO 48" TYPE 3B ONLY ABOVE TUB BOTTOM AT ALL TUB WALLS 18" LINEN CABINET FOR DOOR DOOR LOCATION LOCATION VARIES, VARIES, TYPE 3D ONLY SEESEE ENLARGED ENLARGED UNITUNIT TUB SPOUT PLANS PLANS REFRIGERATOR REFRIGERATOR TUB

FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE2a 2a

2' - 3"

1/2" = 1'-0"

1' - 6"

1/2" = 1'-0"

TYPICAL BATHROOM PLAN AND ELEVATIONS

TYPE TYPE 2_BATHROOM 2_BATHROOM - IE3 - IE3 TYPE 2, 2B, 2C - PLAN BATHROOM 2c2c1/2"1/2" 2 1/2" = 1'-0" = 1'-0" = 1'-0"

REMOVABLE REMOVABLE VANITY - Level Level B2B2 VANITY FINISH FINISH WALLS WALLS ANDAND 12' 12'BASEBOARD - 8"- 8" BEHIND BASEBOARD BEHIND VANITY VANITY

1' - 6"2' - 6"

GLAZED WALL TILE GLAZED WALL TILE UP TO UNDERSIDE UP TO UNDERSIDE OF UPPER OF UPPER CABINETS, TYP.CABINETS, TYP.

2' - 6"

TYPE 1_KITCHEN - IE1

3' - 0"

Level Level B3 B3 23' 23' - 4"- 4"

1' - 6"

1' - 6"2' - 6"

1

1' - 6"

TYPE 3_BATHROOM - IE3

1' - 6"

3' - 0" 1' - 6" 1' - 6"

TUBTUB SPOUT SPOUT

3c

PROVIDE BLOCKING FOR FUTURE FOLD-UP GRAB BAR BTW. 30" AND 44" A.F.F. TO 6" BEYOND WIDEST POINT OF TOILET 12" LINEN CABINET FOR TYPE 3B ONLY

15" MIN. 15" MIN.

1' - 6"

1/2" = 1'-0"

SHOWER ROD

SHOWER ROD

SHOWER HEAD

AS REQ'D.

12'12'- 8" - 8"

6' - 0"

1/2" = 1'-0"

3' - 0"

PROVIDE PROVIDE BLOCKING BLOCKING FORFOR FUTURE FUTURE GRAB GRAB BARS BARS TO 48" TO 48" ABOVE ABOVE TUBTUB BOTTOM BOTTOM AT ALL AT ALL TUBTUB WALLS WALLS

Level B2 12' - 8"

RECESSED RECESSED ROLL ROLL HOLDER HOLDER

AS 1'REQ'D. - 3"

TYPE 1_KITCHEN - IE2

3' - 0"

12" LINEN CABINET FOR TYPE 2B ONLY

Level Level B3 B3 23' 23' - 4"- 4"

2' - 6"1' - 3"

1/2" = 1'-0" 0' - 1"

AS REQ'D.

A640

UTILE PR

BATHROOM 4, 4B, 4C, 4DKITCHEN - PLAN ELEVA Level LevelTYPE B2B2

4

1' - 0" 2' - 8 3/4"

1' - 6"

Level B2 12' - 8" TUBTUB

2' - 6"

SCALE As indicated

3' - 0"

ABOVE ABOVE TUBTUB BOTTOM BOTTOM AT ALL AT ALL PLANS TUBTUB WALLS WALLS

2b

A630

TYPE 3_BATHROOM - IE4

15" MIN. 2' - 3"

1'2'- -0"3"

2' -1'6"- 0"

REFRIGERATOR

2' - 6" 2' - 3" 0' - 1"

2' - 6"

4b

4c

FILLER PANEL TO MATCH CABINET FACE

SLIDE IN RANGE

2' - 0"

AS REQ'D.

A630

4d

36X48 NOMINAL GLAZED WALL TILE SHOWER UP TO UNDERSIDE OF UPPER CABINETS, TYP.

1' - 6"

2d

2c

3d

1' - 6"2' - 6"

2

Level B4 34' - 0"

3' - 0"

30X60 NOMINAL BAT/ SHOWER

BATHROOM BATHROOM FAUCET FAUCET

2' - 9" 1' - 6"

1' - 5" 1' - 5"

1' - 6" 1' - 6"

KITCHEN FAUCET KITCHEN FAUCET 18" TOWEL ROD PROVIDE BLOCKING FOR KITCHEN SINK KITCHEN SINK FUTURE GRAB BARS TO 48" BATHROOM FAUCET KITCHEN FAUCETFOR PROVIDE BLOCKING MIRROR MIRROR ABOVE TUB BOTTOM AT ALL FUTURE GRAB BARS TO 48" TUBREMOVABLE WALLS VANITY ABOVE TUB BOTTOM AT ALL 18" TOWEL 18" TOWEL BARBAR FINISH WALLS AND TUB WALLS BASEBOARD BEHIND VANITY RECESSED ROLL BEFORE INSTALLATION HOLDER BATHROOM BATHROOM FAUCET FAUCET TOILET SLIDE IN RANGS ELIDE IN RANGE DISHWASHER DISHWASHER

PRESSURE PRESSURE BALANCE BALANCE 3' - 0"

RECESSED ROLL PROVIDE PROVIDE BLOCKING BLOCKING FOR FOR HOLDER DOOR LOCATION VARIES, FUTURE FUTURE GRAB GRAB BARS BARS TO 48" TO 48" UNIT SEE ENLARGED

1' - 6"

PROVIDE PROVIDE BLOCKING BLOCKING FORFOR FUTURE FUTURE FOLD-UP FOLD-UP GRAB GRAB PROVIDE BLOCKING FOR BARBAR BTW. BTW. 30"FUTURE AND 30" AND 44" GRAB 44" BAR BTW. 30" A.F.F. A.F.F. TO 6" TOBEYOND 6" BEYOND AND 38" A.F.F. WIDEST WIDEST POINT POINT OF TOILET OF TOILET

LIGHT FIXTURE SHOWER ROD

REVISIONS ON SHEET

AS REQ'D.

- 9" AS2' REQ'D.

AS REQ'D.

0' - 1"

GWB SOFFIT AND GWB SOFFIT AND FASCIA, TYP. FASCIA, TYP.

1' - 6"

FILLER PANEL TO FILLER PANEL TO SHOWER ROD MATCH CABINET MATCH CABINET FACE FACE

FILLER PANEL TO FILLER PANEL TO MATCH CABINET MATCH CABINET FACE FACE

2' - 8 3/4"

1_KITCHEN TYPE 1_KITCHEN TYPETYPE 1_KITCHEN - IE3 - IE1 - IE2 1 = 1'-0" 1/2" 1/2" =21'-0" 1/2" = 1'-0" 1' - 5"

REMOVABLE VANITY FINISH WALLS AND BASEBOARD BEHIND VANITY BEFORE INSTALLATION

UTILE PROJECT NUMBER 1309.2

SHE MICR

1' - 6"

AS2'REQ'D. - 9"

24" TOWEL ROD HOOD RECESSED SHELF FOR SHELF FOR LIGHT LIGHT FIXTURE FIXTURE MICROWAVE MICROWAVE MEDICINE CABINET MIRROR

HOOD

SHOWER SHOWER HEAD HEAD 12" LINEN CABINET FOR TYPE 3B ONLY 18" LINEN CABINET FOR TYPE 3D ONLY 12" LINEN 12" LINEN CABINET CABINET FORFOR TYPE TYPE 2B ONLY 2B ONLY

3' - 0"

1' - 6"

3' - 0" 1' - 6"

6' - 0"

1' - 9" 2' - 9"

0' - 1"

4a

SHELF FOR MICROWAVE

3' - 0"

2' - 6" 1' - 9"

2' - 6"

2' - 6"

AS REQ'D.

3

PROVIDE BLOCKING FOR FUTURE FOLD-UP GRAB BAR BTW. 30" AND 44" HOOD A.F.F. TO 6" BEYOND WIDEST POINT OF TOILET

11/26/2014 CONSTRUCTION DOCUMENTS ELEVATIONS TYPE 4_BATHROOM - IE1KITCHEN B2Level B2 Level B2 4aLevel 1/2" 1'-0"- 8" 12' - 8"= 12' 12' - 8"

AS REQ'D. 1' - 2' 0" - 6" 2' - 0"

18" TOWEL BAR

3' - 0"

2' - 6"

2' - 0"2' - 3"

1' - 6"

2

FILLER PANEL TO FILLER PANELCABINET TO MATCH MATCH CABINET FACE FACE

1' - 6"

3' - 6"

1' - 3"

0' - 1"

1/2" = 1'-0" 1/2" = 1'-0"

GWB SOFFIT AND GWB SOFFIT AND ASFASCIA, REQ'D. TYP. FASCIA, TYP.

6' - 0"

1' - 6"

RECESSED RECESSED MEDICINE MEDICINE CABINET CABINET PROVIDE BLOCKING FOR

FUTURE GRAB BARS TO 48" KITCHEN FAUCET24" TOWEL BAR FOR TYPE 24" TOWEL 24" TOWEL BARBAR FORFOR ABOVE TUB BOTTOM AT ALL 2C ONLY TYPE TYPE 2C ONLY 2C ONLY 24" TOWEL 24" TOWEL RODROD TUB WALLS

2a

ROBE HOOK

SHOWER SHOWER RODROD

LIGHT LIGHT FIXTURE FIXTURE

RECESSED MEDICINE CABINET SHOWER SHOWER ROD ROD ROBE ROBE HOOK HOOK

1/2" = 1'-0"

GWB SOFFIT AND AND GWB SOFFIT FASCIA, TYP. TYP. FASCIA,

REQ'D. ASAS REQ'D.

3' - 0"

3' - 6"

1' - 6"

AS REQ'D.

1/2" = 1'-0"

DISHWASHER

TYPE 4_BATHROOM BATHROOM - IE2TYPE 4, 4B, 4C, 4D - PLAN Level 1Level 4 B2 Level-B28" 1/2" = 0' 1'-0" - 0" 12' - 8"1/2"12'= 1'-0"

4b

2' - 6"2' - 8 3/4" 0' - 1"

0'2'- 1" - 8 3/4"

2' -2'0"- 9"

1' - 6"

2' - 6"

2'2' -- 0" 6"

SCHEMATIC DESIGN SCALE FILLER PANEL TO DESIGN DEVELOPMENT MATCH CABINET As indicated PERMIT SET FACE PRICING SET BLDG A STRUCTURAL STEEL SET REFRIGERATOR BLDG B STEEL PLANS

2'2'- 6" - 3 1/16"

BATHROOM FAUCET

STAMP ISSUE

FINISHED FULL DEPTH 03/21/2014 END PANEL, TYPICAL 04/18/2014 FILLER PANEL TO BOTH SIDES OF ISLAND MATCH CABINET06/27/2014 FACE 08/29/2014 10/24/2014 12" LINEN CABINET FOR TYPE 4B ONLYSLIDE IN RANGE 11/03/2014

Level B4 34' - 0"

2' - 6"

MIRROR

GLAZED WALL TILE UP TO UNDERSIDE OF UPPER CABINETS, TYP.

PROVIDE BLOCKING FOR FUTURE SEAT + GRABFAUCET BARS KITCHEN GLAZED TO 48" ABOVE FLOOR ATWALL ALL TILE SHOWER WALLSUP TO UNDERSIDE OF UPPER KITCHEN SINK CABINETS, TYP.DATE

TOILET

FILLER PANEL TO MATCH CABINET FACE

DISHWASHER REFRIGERATORREFRIGERATOR

1' - 3"

2' - 6"

BATHROOM BATHROOM TYPE 3, 3, 3B,3B, 3C, 3D3D - PLAN - PLAN1_KITCHEN TYPE 2_KITCHEN - IE1 - IE3 TYPETYPE 1_KITCHEN - 3C, IE2 TYPE 3 3 1/2"1/2" = 1'-0" 4 2= 1'-0" 3

1/2" = 1'-0"

LIGHT FIXTURE

24" TOWEL ROD

DOOR DOOR LOCATION LOCATION VARIES VARIES SEESEE ENLARGED ENLARGED UNITUNIT PLANS PLANS

TYPE 3_KITCHEN

7

1' - 6"

1' - 6"2' - 6"

2' - 0"

AS REQ'D.

0' - 1"

2' - 8 3/4"

AS REQ'D.

TYPE 2_KITCHEN - IE1

4

SHOWER ROD

15" MIN.

6

6' - 0"

1' - 6"

AS REQ'D. AS REQ'D.

TYPE TYPE 3_BATHROOM 3_BATHROOM - IE1 - IE12_KITCHEN TYPE - IE2 - IE3 TYPE 1_KITCHEN 3a3a1/2"1/2" = 1'-0" = 1'-0" 5 1/2" =31'-0" 1/2" = 1'-0"

3' - 0"

ROBE HOOK

AS REQ

AS REQ'D.

1/2" = 1'-0"

6' - 0"

1' - 3"

KITCHEN SINK FINISHED FULL DEPTH END PANEL, TYPICAL BOTH SIDES OF ISLAND

2' - 0"

FILLER PANEL TO MATCH CABINET FACE

11/25/2014 4:25:29 PM

2' - 6" 2' - 6"

PRESSURE BALANCE HOOD

SHELF FOR MICROWAVE

GLAZED WALL TILE UP A630 4d TO UNDERSIDE 4b OF UPPER CABINETS, TYP. 4c

36X48 NOMINAL SHOWER

KITCHEN FAUCET

LevelLevel B4 B4 34' -34' 0" - 0"

SLIDE IN RANGE

- IE3 TYPE4_BATHROOM 4_BATHROOM - IE1 Level B24c4aTYPE Level 1 Level 1 1/2" = 1'-0" 0' - 0" 1/2" = 1'-0" 12' - 8" 0' - 0"

Level Level B2 B2 12' 12' - 8"- 8"

4a

PROVIDE BLOCKING FOR FUTURE GRAB BAR BTW. 30" AND 38" A.F.F

TO 48" ABOVE FLOOR AT ALL SHOWER WALLS REMOVABLE VANITY 30X60 30X60 FINISH WALLS AND NOMINAL NOMINAL BAT/BAT/ SHOWER SHOWER BASEBOARD BEHIND VANITY BEFORE INSTALLATION

REFRIGERATOR

TUBTUB

2' - 0" 2' - 0"

CABINETS, TYP.

FILLER PANEL TO 3c 3c MATCH CABINET FACE

SHOWER ROD LIGHT FIXTURE

2' - 3"

AS REQ'D.

TYPE 3_KITCHEN - IE1

1' - 5"

GWB SOFFIT AND FASCIA, TYP. 1' - 0"

AS REQ'D.

FILLER PANEL TO MATCH CABINET FACE

3' - 0"

DISHWASHER DISHWASHER

1' 1'- 0"- 3"

GLAZED WALL TILE UP TO UNDERSIDE 3a 3a OF UPPER

PROVIDE BLOCKING FOR FUTURE FOLD-UP GRAB HOODBAR BTW. 30" AND 44" A.F.F. TO 6" BEYOND PROVIDE BLOCKING FOR TOILET FUTUREWIDEST SEAT +POINT GRAB OF BARS

2' - 9"

1' - 6"

SLIDE IN RANGE

TYPE TYPE 4_BATHROOM 4_BATHROOM - IE4 Level Level- 1IE2 4b14d = 1'-0" = 1'-0" 0' - 0" 1/2"1/2" 0' - 0" 2' - 6"

1' - 3"

AS REQ'D.

AS REQ'D.

TYPE TYPE 3_BATHROOM 3_BATHROOM - IE2 - IE2 TYPE TYPE2_KITCHEN 2_KITCHEN--IE1 IE2 3b3b1/2"1/2" = 1'-0" = 1'-0" 45 1/2" 1/2"==1'-0" 1'-0"

1' - 5"

2' - 6"

2' - 3"

6

15" MIN.

2' - 6"

FILLER PANEL TO MATCH CABINET FACE

1' - 6"

2' - 8 3/4" 2' - 6" 0' - 1"

1' - 6"

1' - 6"

0' - 1"

B NORTH KEY PLAN

LIGHT FIXTURE GWB SOFFIT AND FASCIA, TYP. 2' - 6" AS REQ'D. SHOWER HEAD

2' - 0"2' - 0"

FILLER PANEL TO MATCH CABINET FACE

3' - 0"

1' - 6" 2' - 0"

18" TOWEL BAR

3d 3d A630A630 3b 3b

1' - 0"

2' - 3 1/16" ROBE HOOK

FILLER PANEL TO MATCH CABINET FILLER PANEL TO FACE MATCH CABINET FACE

3' - 0"

1' - 0"

GLAZED WALL TILE UP TO UNDERSIDE OF UPPER CABINETS, TYP.

FILLER PANEL TO MATCH CABINET FACE

GWB SOFFIT AND FASCIA, TYP.

AS REQ'D.

3' - 0"

2' - 6"

FILLER PANEL TO MATCH CABINET FACE

AS REQ'D. 2' - 9"

1' - 6"

Level Level B2 B2 12' 12' - 8"- 8"

1/2"0'=- 1'-0" 0"

3' - 0"

3' - 0"

1' - 6"

TOILET TOILET DISHWASHER REFRIGERATOR

SLIDE IN RANGE

TYPE Level 14_BATHROOM - IE3

AS REQ'D.

AS REQ'D.

TYPE TYPE 3_BATHROOM 3_BATHROOM - IE3 - IE3 TYPE BATHROOM 3, 3B, 3C, 3D - PLAN TYPE 2_KITCHEN - IE2 3c3c1/2"1/2" = 1'-0" = 1'-0" 5 3 1/2" = 1'-0" 1/2" = 1'-0"

GLAZED WALL TILE UP TO UNDERSIDE OF UPPER CABINETS, TYP.

2' - 9"

2' - 6"

3' - 0"

4c

1' - 3"

24" TOWEL BAR

PROVIDE BLOCKING PROVIDE BLOCKING FORFOR PRESSURE BALANCE FUTURE FOLD-UP GRAB FUTURE FOLD-UP GRAB BTW. 30" AND BARBAR BTW. 30" AND 44" 44" SHELF FOR BATHROOM FAUCET A.F.F. TOBEYOND 6" BEYOND A.F.F. TO 6" MICROWAVE CENTER BETWEEN LINEN GLAZEDWIDEST WALL TILE WIDEST POINT OF TOILET POINT OF TOILET PROVIDE CABINET ANDBLOCKING WALL FORFOR UP TO UNDERSIDE FUTURE SEAT + GRAB BARS TYPE 4BFAUCET KITCHEN OF UPPER KITCHEN FAUCET TO 48" ABOVE FLOOR AT ALL RECESSEDTYP. ROLL CABINETS, GLAZED WALL TILE SHOWER WALLS PRESSURE BALANCE PRESSURE BALANCE HOLDER KITCHEN SINK CENTERSINK BETWEEN UP TO UNDERSIDE KITCHEN SHOWER AND WALL FOR OF UPPER TOILET PROVIDE PROVIDE BLOCKING BLOCKING FORFOR TYPE 4, 4C, 4D CABINETS, TYP. FINISHED FULL DEPTH 12" LINEN 12" LINEN CABINET CABINET FORFOR FUTURE GRAB GRAB BARS BARS TO 48" TO 48" FILLER FUTURE PANEL TO TYPE 3B ONLY 3BFILLER ONLY PANEL TO ABOVE TUBTUB BOTTOM BOTTOM AT ALL AT ALLEND PANEL, TYPICALTYPE MATCH ABOVE CABINET Level B4 Level B4 BOTH SIDES OF ISLAND WALLS WALLS FACE TUBTUB MATCH CABINET 34' -34' 0" - 0" 18" LINEN 18" LINEN CABINET CABINET FORFOR FACE TYPE TYPE 3D ONLY 3D ONLY TUBTUB SPOUT SPOUT

HOOD

2' - 6" AS REQ'D. 2' - 6" MIRROR

BATHROOM FAUCET

FILLER PANEL TO MATCH CABINET FACE

3' - 0"

2' - 6"

PROVIDE BLOCKING FOR SHGRAB ELF FOBAR R BTW. 30" FUTURE PROVIDE BLOCKING FOR MICROWAVE A.F.F BLOCKING FOR MIRRORAND 38"PROVIDE FUTURE SEAT + GRAB BARS MIRROR FUTURE SEAT + GRAB BARS TO 48" ABOVE FLOOR AT ALL TO 48" ABOVE FLOOR AT ALL SHOWER WALLS KITCHEN FAUCET 18" TOWEL 18" TOWEL RODROD SHOWER WALLS KITCHEN SINK BATHROOM FAUCET BATHROOM FAUCET PROVIDE PROVIDE BLOCKING BLOCKING FORFOR FUTURE FUTURE GRAB GRAB BARS BARS TO 48" TO 48" REMOVABLE VANITY - REMOVABLE VANITY ABOVE ABOVE TUBTUB BOTTOM BOTTOM AT ALL AT ALL FINISH WALLS ANDAND FINISH WALLS TUBTUB WALLS WALLS Level B4 BASEBOARD BEHIND VANITY BASEBOARD BEHIND VANITY 34' - 0" BEFORE INSTALLATION BEFORE INSTALLATION

FILLER PANEL TO MATCH CABINET FILLER PANEL TO FACE MATCH CABINET FACE

FILLER PANEL TO MATCH CABINET FACE

15" MIN.

1' - AND 6"1' - 6" 1' - 5"GWB 1' - 5" SOFFIT FASCIA, TYP. 15" MIN. 15" MIN. 1' - 0" 2' - 0"

GWB SOFFIT AND FASCIA, 2' - 9"TYP. AS REQ'D.

1' - 6"

Level Level B2 B2 12' 12' - 8"- 8" 2' - 0"

2' - 8 3/4"

- IE2

14 A642

B SOUTH

1' - 6"

3' - 0"

DISHWASHER

1' - 0"

0' - 1"

AS REQ'D.

115 KINGSTON STREET BOSTON, MA 02111 TYPE 3_KITCHEN 7 423.1414 = 1'-0" P 617 423.7200 F 6171/2" utiledesign.com ARCHITECT

TYPETYPE TYPE 3_KITCHEN 3_KITCHEN 3_KITCHEN - IE3 - -IE2 IE1 76

8

11/03/2014 11/03/2014 11/26/2014 11/26/2014

1' - 6"

2' - 6"

FILLER PANEL TO MATCH CABINET FACE

FILLER PANEL TO RECESSED SHOWER HEAD SHOWER HEAD MATCH CABINET MEDICINE CABINET FACE

1' - 6"

1/2" = 1'-0"

12" LINEN CABINET FOR LIGHT FIXTURE TYPE 4B ONLY 2' - AS 3" REQ'D.AS REQ'D. 2' - 6" SHOWER HEAD

SHOWER SHOWER RODROD ROBE HOOK

6' - 0"

TYPE 4_BATHROOM - IE4

WEL ROD

B3 3 4" 4"

2' - 6" 0' - 1" DATE DATE GRAB ISSUE BARISSUE COAT HOOK AND COMMON BATHROOM AS REQ'D. GROUP 2 ROBE TOILET PAPER SCHEMATIC SCHEMATIC DESIGN DESIGN HOOK DISPENSER DESIGN DESIGN DEVELOPMENT DEVELOPMENT PERMIT PERMIT SETSET PRICING PRICING SETSET 1/2" = 1'-0" 1/2"==1'-0" 1'-0" 1/2" BLDG BLDG A STRUCTURAL A STRUCTURAL STEEL STEEL SETSET

03/21/2014 03/21/2014 AS REQ'D. 04/18/2014 04/18/2014 06/27/2014 06/27/2014 08/29/2014 08/29/2014 10/24/2014 10/24/2014

6' - 0"

SLIDE IN RANGE

4d

FILLER PANEL TO MATCH CABINET FACE

FILLER PANEL TO MATCH CABINET FACE

GWB SOFFIT AND LIGHT FIXTURE FASCIA, TYP. 2' - 6"

3' - 0"

FILLER PANEL TO MATCH CABINET FACE

3' - 0"

18" LINEN CABINET FOR TYPE 3D ONLY

GLAZED WALL TILE UP TO UNDERSIDE OF UPPER CABINETS, TYP.

GLAZED WALL TILE PROVIDE BLOCKING FOR PROVIDE BLOCKING FOR CENTER BETWEEN UP TO BAR UNDERSIDE FUTURE GRAB BAR BTW. 30" 30" FUTURE GRAB BTW. SHOWER ANDOF WALL FOR UPPER ANDAND 38" A.F.F. 38"4D A.F.F. TYPE 4, 4C, CABINETS, TYP.

Level B4 34' - 0"

GWB SOFFIT AND FASCIA, TYP. 2' - 6"

AS REQ'D.

1' - 6"

KITCHEN SINK 3b

3c

2' - 3"

1' - 6"

A630

CENTER BETWEEN LINEN CABINET AND WALL FOR TYPE 4B

12" LINEN 12" LINEN CABINET CABINET FORFOR TYPE TYPE 3B ONLY 3B ONLY RECESSED ROLL 30X60 HOLDER NOMINAL 18" LINEN 18" LINEN CABINET CABINET FORFOR BAT/ SHOWER TYPE TYPE 3D ONLY 3D ONLY

3a KITCHEN FAUCET 3d

2' - 6" AS REQ'D.

6' - 0"

PROVIDE BLOCKING FOR FUTURE SEAT + GRAB BARS TO 48" ABOVE FLOOR AT ALL SHOWER WALLS PROVIDE PROVIDE BLOCKING BLOCKING FORFOR FUTURE FUTURE GRAB GRAB BARS BARS TO 48" TO 48" ABOVE ABOVE TUBTUB BOTTOM BOTTOM AT ALL AT ALL TUBTUB WALLS WALLS12" LINEN CABINET FOR TYPE 3B ONLY

2' - 9"

LIGHT FIXTURE LIGHT FIXTURE

HOOD

1' - 6"

SHELF FOR BATHROOM FAUCET MICROWAVE

3' - 0"

HO D1' - 6" 1' O - 6"

1' - 6"

24" TOWEL 24" TOWEL RODROD

2' - 6" 3' - 0"

3' - 0"

3' - 0"

SHOWER SHOWER RODROD

FILLER PANEL TO MATCH CABINET FACE

3' - 0"

2' - 6" AS REQ'D.

SHOWER RODROD SHOWER

FILLER PANEL TO MATCH CABINET 24" TOWEL BAR FACE

3' - 0"

SHOWER ROD

GWB SOFFIT AND FASCIA, TYP.

12" LINEN CABINET FOR GWB SOFFIT AND TYPE 4B ONLY FASCIA, TYP.

AS REQ'D.

1' - 6"

2' - 3"

RECESSED MEDICINE CABINET

3' - 0"

LIGHT FIXTURE

3' - 0"

2' - 6"

3' - 0"

1' - 6"

15" MIN. 3' - 0"

2' - 6"

B3 - 4"

R

1' - 3"

12" LINEN 12" LINEN CABINET CABINET FORFOR TYPE TYPE 4B ONLY 4B ONLY

REVISIONS REVISIONS ON SHEET ON SHEET

3' - 0"

1' - 5"

SHOWER ROD

AUCET BLOCKING DE BLOCKING FORFOR RAB E GRAB BARBAR BTW. BTW. 30" 30" F.F. " A.F.F. ANITY AND EHIND VANITY ALLATION

FIXTURE RE

2'2'--0"3" AS REQ'D. COMMON BATHROOM MIRROR

1' - 5"

E

DE BLOCKING FOR E GRAB BAR BTW. UCET FAUCET D 38" A.F.F. TO 6" D WIDEST POINT OF

- 3" 2' - 82'3/4" 2'2'2' - -0"-6"6" COMMON BATHROOM SINK 0' - 1"

2' - 8 3/4" 0' - 1" ROBE HOOK 0' - 1"

BATHROOM BATHROOM TYPE TYPE 4, 4, 4B,4B, 4C, 4C, 4D4D - PLAN - PLAN 4 4 1/2"1/2" = 1'-0" = 1'-0" 14 A642

B2 8"

R

0' - 1" RECESSED ROLL HOLDER

TYPE 3_KITCHEN - IE2TYPE 4_KITCHEN TYPE 3_KITCHEN - IE1 - IE3 9 1/2" = 1'-0" 8 1/2" = 1'-0" 1/2" = 1'-0"

7

REVISIONS ON SHEET

3' - 0"

BALANCE

FAUCET CET LOCKING FOR AB BARS TO 48" BOTTOM AT ALL OLL D ROLL

2' - 0" 1' - 3" 2'BEHIND - 8 3/4" 2' - 0" AS REQ'D. BEHIND VANITY VANITY COMMON PAPER TOWEL TOWEL BBATHROOM AR 18" AND 2BASEBOARD 4" BASEBOARD SHOWER ROD, SHOWER HEAD, BEFORE INSTALLATION INSTALLATION TOILET PAPER 0' - 1" BEFORE DISPENSER AND WASTE 0' - 1" PRESSURE BALANCE, TUB DISPENSER RECEPTACLE SPOUT

Level Level B4 B4 TYPE TYPE 3_KITCHEN 4_KITCHEN - IE3 - IE2 TYPE 4_KITCHEN - IE1 - 0"- 0" 8 101/2" 1/2" 9 1/2" = 1'-0" 34' 34' = 1'-0" = 1'-0"

N

LOCKING FOR LD-UP GRAB 0" AND 44" D BEYOND BINET CABINET NT OF TOILET

2' - 6" COAT HOOK AND AS REQ'D. GROUP 2 ROBE HOOK

MIRROR & VANITY

TYPE TYPE 4_BATHROOM 4_BATHROOM - IE1 - IE1 4a4a1/2"1/2" = 1'-0" = 1'-0"

OD

RE TURE EAD

GRAB BAR

COMMON BATHROOM TOILET TOILET MIRROR

BLDG B STEEL PLANS

CONSTRUCTION DOCUMENTS TYPE TYPE 4_BATHROOM 4_BATHROOM - IE2 - IE2 4b4b1/2"1/2" = 1'-0" = 1'-0" 11/26/2014

1' - 6"

11/03/2014

2' - 0" AS REQ'D. COMMON BATHROOM AS REQ'D. SINK 0' - 1"

Level Level B4 B4 TYPE 4_KITCHEN TYPE- IE1 4_KITCHEN - IE2 - 0"- 0" 10 1/2" = 1'-0"34' 34'

9

12" LINEN CABINET FOR TYPE 4B ONLY

1' - 6"

Level Level B4 B4 34' 34' - 0"- 0"

1/2" = 1'-0"

2' - 8 3/4" ROBE HOOK

SHOWER RODDATE , SHOWER HEADISSUE , RECESSED ROLL PRESSURE03/21/2014 BALANCE, TUB SCHEMATIC DESIGN HOLDER 0' - 1" SPOUT 04/18/2014 DESIGN DEVELOPMENT 06/27/2014 PERMIT SET 08/29/2014 PRICING SET 1/2" = 1'-0" 10/24/2014 BLDG A STRUCTURAL STEEL SET

TOWEL BAR 18" AND 24"

TYPE 4_KITCHEN - IE2

6' - 0"

10

TYPE TYPE 4_BATHROOM 4_BATHROOM - IE3 - IE3 TYPE 4, 4B, 4C, 4D - PLAN BATHROOM 4c4c1/2"1/2" 4 1/2" = 1'-0" = 1'-0" = 1'-0"

3' - 0"

MIRROR &ASVAREQ'D. NITY

B4 "- 0"

3' - 0"

SHOWER ANDAND WALL WALL FORFOR OARD BEHIND VANITY SHOWER TYPE TYPE 4, 4C, 4, 4D 4C, 4D E INSTALLATION

A301-A MATCHLINE SEE A103.1-B

CO AK

5

A301-A

TYPE 1_KITCHEN TYPE 1_KITCHEN - IE2 - IE2 2 1/2" = 1'-0" 1/2" = 1'-0"


8

URBAN NODE ACADEMIC PROJECT

South Boston, MA An adaptive reuse project located in South Boston directly adjacent to the South End. Designed as a team of two as part of a Comprehensive Design studio. The design and massing of the building acts as a destination point, interlocking with the Harborwalk which connects the area with Boston’s Downtown and Fort Point neighborhoods. The program transitions from a community center and co-working space to an artist collective consisting of studios and gallery spaces. The elevated structure allows for the building to be used in situations of extreme flooding.


9


16

10

16.5

16

.5

5

. 16

.5

16

N

SITE PLAN 1/64” = 1’

pedestrian walkways


-CELLULAR + ORGANIC-

11

PROGRAM DIAGRAM -CELLULAR + ORGANIC-

PROGRAM DIAGRAM -CELLULAR + ORGANIC-

cellular + organic program


12

CURRENT PROGRAM COMMUNITY CENTER + CO-WORKING SPACE

ground

02.

FUTURE PROGRAM ARTIST STUDIOS + GALLERY SPACE

ground

02.


13

LEVEL 4

ROOF

17

17

18

03.

04.

roof

17 OPEN OFFICE/LOUNGE 18 MECHANICAL ROOM

LEVEL 4

ROOF

1/32” = 1

12

12

13

03.

04. 12 GALLERY SPACE 13 MECHANICAL ROOM

roof


14 rain fall average (in.) 3.5

JAN

4.3

3.9

3.3

FEB

MAR

APR

4.2

MAY

5.0 3.9

JUN

3.7

2.8

JUL

AUG

9

10

3.5

SEP

OCT

3.7

3.9

NOV

DEC

8 10 11

12

10

11

11 12

12

13

number of wet days

pipe system leading to water storage tank on-site water collection

1 2

3

13

5 12

4

8

11

7

6 9

10

15

14

16

systems integration

sectional construction details

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16.

folded roof plate rebar radiant tubing ventilation ducts drop ceiling structure insulation stripping waterproof membrane concrete truss joint connection to slab rebar reinforcements 4-way panel clips metal clad panels metal panel frame insitu concrete storefront curtain wall concrete pilings


15

FUTURE USE STRATEGY FUTURE USE STRATEGY -INFILL PANELS-

adaptability of infill panels -INFILL PANELS-

SOUTH ELEVATION 1/32” = 1’ - 0”

3

1

3

CURRENT

current positioning clustered light CURRENT

3 0

COMMUNITY/OFFICE CLUSTERED LIGHT

1

1 0

3

3 1

3 2

0

1 2

1

1 0

3

3 2

3

1 2

3

1 2

1

1 0

3

2 3

COMMUNITY/OFFICE CLUSTERED LIGHT

facade strategy north

3

1

3

3 3

1 1

3 3 1 1 1

west

south

3 0 0 0

3 3 3 3 3

1 0 0 0

1 1 0 0 0

3 1 1 1

3 3

3 2 2 2

3 3 1 1 1

1 2 2 2

1 1 3 3 3

1 0 0 0

1 1 3 3 3

3 2 2 2

3 3 3 3 3

1 2 2 2

east PANEL ROTATION

ability of panels to be repositioned

PANEL ROTATION

open ground floor for adaptability porous

solid

porous

solid

ALTERNATE ARRANGEMENT ALTERNATE ARRANGEMENT

porous

solid

future positioning dispersed light

FUTURE Gallery - Indirect Light

FUTURE Gallery - Indirect Light

10:18 AM

10:18 AM

S

glass

W

anti-reflective sheet

6:14 PM 10:18 PM

cells 120° 150°

E

5:18 AM

manipulated roof geometry for solar energy

N

frame

1 1 1 1 1

1 2 2 2

1 1 3 3 3

1 0 0 0

1 1 3 3 3

2 2 2


16

ASSEMBLY ASSEMBLYPROCESS PROCESS ASSEMBLY PROCESS

11

22

1

onsite

Excavate and pour basement. Drive pilings and cap.

OFFSITE OFFSITE Transport Transportofofmaterials materialsfor forrentention rententionpond pond Cast Castfacade facadepanels panels

offsite

33

2

ONSITE ONSITE Excavate Excavateand andpour pourbasement basement Drive Drivepilings pilingsand andcap cap

Transport materials for retention pond. Cast facade panels.

44

3

ONSITE ONSITE Construct Constructretention retentionwall wallaround aroundexcavated excavatedsite site Pour Pourslab slabonongrade gradefor forground groundfloor floor Excavate Excavateretention retentionpond pond Pour Pourfirst firstlayer layerofofcores cores

Construct retention wall around excavated site. Pour slab on grade for ground floor. Excavate OFFSITE OFFSITEretention pond. Production Productionofoffacade facadepanels panels Ship glass glasslayer for forcurtain curtain wall wallcores. PourShip first of Production of facade panels. Ship glass for curtain wall.

4

ONSITEONSITE Pour ground Pour floor ground structure floor structure - columns - columns and panels and panels Build bench Buildaround bench rentention around rentention pond pond

Pour ground floor structure - columns and panels. Build bench around retention pond.

OFFSITE OFFSITE Production Production of facade ofpanels facade panels Begin construction Begin construction of precast of precast folded plate folded roof plate roof

Production of facade panels. Begin construction of precast folded plate roof.

5

6

5

ONSITEONSITE Pour second Pour floor second slab floor slab Pour cores Pour tocores Level to Three Level Three Excavated Excavated materialmaterial is distributed is distributed in landscaping in landscaping

ONSITE Third level floor and panels are poured Expansion joint placed at edge Third floor slab poured on site

Transport Transport folded plate folded roof plate roof Transport Transport structural structural concreteconcrete truss truss

OFFSITE Transport folded place and concrete truss Shipment of facade panels

Pour second floor slab. Pour cores to level three. Excavated OFFSITE OFFSITE material is distributed in landscaping. Transport folded plate roof. Transport structural concrete truss.

Third level floor and panels are poured. Expansion joint placed at edge. Third floor slab poured on site. Transport folded plate and concrete truss. Shipment of facade panels.


17

6

6

77

88

7

ONSITE Attach secondary structure at expansion joint Support with building jacks until structural roof is added Pour next level of cores

Attach secondary structure at expansion joint. Support with building jacks until structural roof is added. OFFSITE Bring concrete truss and folded roof to site landscapeof elements Pour Assemble next level cores. Bring concrete truss and folded roof to site. Assemble landscape elements.

99

8 ONSITE ONSITE Secondary Secondary expansion expansion joint at joint roof at roof Concrete Concrete truss truss connected connected to slab to slab

Attach secondary structure at expansion joint. Support with building jacks until structural roof is OFFSITE added. OFFSITE Transport Transport facade facade panels panels Transport Transport folded folded roof roof Pour next level of cores. Bring concrete truss and folded roof to site. Assemble landscape elements.

10 10

9

ONSITE ONSITE Pour Pour fourthfourth floor slab floor slab Support Support with building with building jacksjacks Attach Attach to concrete to concrete truss truss Pour Pour next level next level of cores of cores

Pour fourth floor slab. Support with building jacks. Attach to concrete truss. OFFSITE OFFSITE Folded Folded plate plate roof and rooffacade and facade panels panels arrivenext arrive on site on site Pour level of cores. Folded plate roof and facade panels arrive on site.

10

ONSITE ONSITE Folded Folded plate plate roofroof placed placed on top on top Roof Roof attached attached to concrete to concrete truss truss Facade Facade panel panel clipsclips adhered adhered to truss to truss Remove Remove building building jacks jacks

Folded plate roof placed on top. Roof attached to concrete truss. Facade panel clips adhered to truss. OFFSITE OFFSITE Transport Transport mechanical mechanical equipment equipment Remove building jacks. Transport mechanical equipment.

ONSITE ONSITE

Place Place afacde afacde panels panels between between clipsclips Place facade panels between clips. Install Install glass glass panels panels on North on North faceface and and at ground at ground level level Install Install mechanical mechanical equipment equipment Install glass panels. Landscaping Landscaping elements elements ompleted ompleted Install mechanical equipment. OFFSITE OFFSITE Landscaping elements completed.


18

RIBBON HOUSING ACADEMIC PROJECT

Roxbury + South End, Boston, MA A housing project located on the border of Roxbury and the South End. The design utilizes a ribbon extrusion that organizes public and amenity spaces throughout; carving out balconies and shared program. The relationship of solid and void on the ground level creates an outdoor plaza comprised of shops, restaurants, and rentable office space. The complex is the combination of townhouse style apartments and high density units to fit the different types of occupants.


19


20

townhouse evolution


21

massing transformation


22

ground

02.

05.

03.

06.

04.

07.


23

1

studio

Short Section 1/8" = 1'-0"

one bed + balcony

two bed duplex

one bed

two bed + balcony

three bed triplex

two bed


24

BIKE BIKE SHOP SHOP

SPIN SPIN STUDIO STUDIO

BOUTIQUE BOUTIQUE

amenity spaces

building circulation

retail + office space

unit outdoor space


25


26

assembly square ACADEMIC PROJECT

Somerville, MA An urban design project located in an overgrown industrial area. The design uses a multi-modal transportation network to connect buildings, parks, boardwalks, and T stations. The network itself shapes the architecture to create urban plaza pockets throughout. A boardwalk system acts as a container for storm water and the flooding of the Mystic River.


27


28

ST RTH ATION NO

REGIONAL

ROADS ORANGE LINE PEDESTRIAN BIKE MARINE

8 MIN. 18 MIN. 50 MIN. 20 MIN. 22 MIN.

N airpo GA rt LO

pedestrian ROADS 11 MIN. BLUE LINE 47 MIN. PEDESTRIAN 1 H 56 MIN. AIR N/A MARINE 25 MIN.

ROADS 12 MIN. ORANGE LINE 28 MIN. PEDESTRIAN 1 H 22 MIN. BIKE 31 MIN.

ROADS 12 MIN. ORANGE LINE 30 MIN. PEDESTRIAN 1 H 11 MIN. BIKE 29 MIN. MARINE 30 MIN.

O

CK

N

S

B

A

I B AY STAT

O

UT

H STAT I O

ROADS

MARINE WALK TO T: 3 MIN. T TO DOWNTOWN: 20 MIN. TOTAL: 23 MIN.

NTOWN BO S OW

TO

D

RAILS

N

N TO

RVILLE LIB ME R O S

Y AR

TO

VICINITY

bike

vehicular

PEDESTRIAN WALK TO LIBRARY TOTAL: 26 MIN.

SOMERVILLE PUBLIC LIRARY

existing

PROPOSED T STOP RAILS

RAILS MARINE

TO

WALK TO T: 6 MIN. T TO MALDEN: 17 MIN. TOTAL: 23 MIN.

TO

MALDEN

LO

RT

PEDESTRIAN WALK TO T: 40 MIN. T TO AIRPORT: 2 MIN. TOTAL: 42 MIN.

PEDESTRIAN

G A N AIRP O

overall


29

residential

office

residential/commercial

parking/commercial

cultural


30

pavilion

district entry

commercial pocket

vegetation buffer

existing development

pedestrian and bike boardwalk network. acts as a container for flooding of the mystic river.

vegetation buffer sunken park


31

destination points where the network starts and ends. pocket plazas created by transportation network.

the architecture is shaped by the movement of the transportation network.


32

BERLIN BLOCKS ACADEMIC PROJECT

Friedrichshain, Berlin, DE An apartment complex located in a Berlin neighborhood with a young professional demographic. The neglected area is in need of an architectural identity. This design utilizes five apartment blocks to personalize the living experience for its inhabitants. A sense of community is restored while creating private individualized spaces.


33


34

05.

04.

03.

02.

00.

01.


35

broken grid

height shift

variation

blocks

small private spaces large public spaces

square grid


36

mismatched views

2.

two windows per floor

1.

residents general public 1.

3.

2.

site division

iteration process

three windows per floor


37


38

SPLIT IDENTITIES ACADEMIC PROJECT

South End, Boston, MA A performing arts school located on a city block shared with residential and commercial functions. Two programmatic bars converge at the corner and split to house private and public program. The interstitial space between the two bars creates an outdoor courtyard for the students. Additional kinks in each bar create public spaces for the neighborhood.


39


40

circulation zipper

residential bar kink

widening and shortening

02.

kink

compression

program bars

ground


41

open space off street


42


43


44

CORNER WEBBING ACADEMIC PROJECT

South End, Boston, MA A culinary arts center located on a corner lot of a lively Boston neighborhood. Heavy private program is placed at the top while light public program is placed at the bottom. The division is meant to activate the streetfront, inviting the public inside the center or into the sunken cafĂŠ. The webbed mullion system acts as a connection and as an anchor between the heavy and light program.


45


46

program shift

anchoring

web

light and heavy


47

03.

ground

02.


48

BOOK BILLBOARD ACADEMIC PROJECT

South Boston, MA A library located above an existing T station on a triangular site. The design separates lounges, classrooms, and administration from the physical stacks. In between this division is an open void occupied by twisting staircases connecting the various levels. An outdoor public space is created adjacent to this void. The stacks are located along a highly populated streetfront and are strategically placed to serve as a “book billboard� for the library.


49


50

books. voided spaces within stacks

book billboard


51

form

extrusion

stacks bar

connection void

book billboard


52

ground

02.


53

03.

04.


54


55

COMMON STUDY ACADEMIC PROJECT

Boston, MA An analysis of the landscape, buildings, people, and history of both the Boston Common and Public Garden. The architectural boundary was the main interest of the study, and how it changes from one side to the next. The four topics include: a perimeter analysis of the Common, observed uses of the freedom trail, a history of fires, and a mapping of crimes.


alternate use of the freedom trail

BPw

56

crime study vehicle theft assault theft program: residential

4.0% 70.1%

25.9%


02|18|1967 department store fire

a history of fires and building technologies

traditional glass

fire proof glass 11|28|1942 cocoanut grove fire

lenient egress restrictions

strict egress restrictions

01|04|1914 early skyscraper fire

fire/smoke resistant egress fire/smoke able to enter egress 11|09|1872 great boston fire wood frame construction

masonry construction

05|30|1905 beacon hill garage fire

steel and concrete construction

timber construction

program: clubs and bars 10.9%

49.5%

39.6%

program: retail 3.3% 73.1%

23.6%

57


RETEP SIVART e r u tce t i hc r a oiloftrop


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.