Architectural Works - Portfolio(2018-2022)

Page 1

Muhammad Syazwan Afiffuddin Bin Mohd Kamaldin COVAERIS STUDIO (2018-2022) Bachelor of Science(Hons) Architecture Universiti Teknologi Mara Puncak Alam works.afiff@gmail.com 014-710

Architectural Works

Portfolio (2018-2022)
1593

All of the design throughout this portfolio are subjected to copyright of the owner or any other name that were stated in this portfolio.

The Architect in the making...

CONTENT

FYP 1 - P.O.Residence | Future Proof Housing

FYP 2 - Ketemu | Kuala Selangor Fishermen’s Community Centre

SEMESTER 05 - Meow Wolf Innovative Center - Meow Wolf Urban Intenvention F[AV]ENUE

RENDERING WORKS - Enscape - Lumion - V-ray

29208

P.O.RESIDENCE

Given our environment, a flood could erupt suddenly when it rains heavily. The homes were built to withstand flooding.

Future Proof Housing

ISSUE CHRONOLOGY

PAST- Flash flood happened regularly in Shah Alam. Although, the site, Seksyen 23 was not affected, but the nearby district, Taman Sri Muda was affected. The site was located beside Klang river, was one of the reason flooding issues should be tackled in an earliar phases.

PRESENT- Mid-December 2021, Shah Alam affected badly due to the typhoon in Phillipines. The site was also flooded. It raises up to 2 meters height.

FUTURE- The flooding occured regularly and water level getting higher.

SITE

SITE PLAN

Drawing -

3D -

Render -

Revit, AutoCad
Revit, Sketchup
Revit, Enscape, Photoshop
TYPE C TYPE C TYPE C TYPE C TYPE C TYPE C TYPE C TYPE C TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE B TYPE BOFFICELIBRARYHANGINGGARDENCAFE/CORELIFT CORELIFTCORELIFT CORELIFTTOILET TYPE B TYPE B TYPE B TYPE B TYPE A TYPE A TYPE A TYPE A TYPE A TYPE A TYPE A TYPE A FRIST FLOOR PLAN SECOND FLOOR PLAN TYPE A TYPE A TYPE A TYPE A TYPE A TYPE ATYPE A TYPE A FRONT ELEVATION EAST ELEVATION

The residence were designed to survived during flood. Flood may occurs unexpected when heavy rains happens; in reference to our climate. In order to reduce any damages and obstruction during the construction phase, the application of IBS system were implimented in the design.

The construction method use in this design was modular construction. Modular construction were prefrabricated at the factory and were then bring to the site to assembled. This would speed up the time of the building to finish and give shelter and safety before the next flood comes.

Detail A - Column to connection

Detail A

Detail B

1.Internal Vertical

Detail B - Column to column connection using vertical Base (Weldedplateto top column)

The units were made of prefabricated modular of hybrid material; lightweight concrete panel and steel. The units were the stacked up horizontally. Additional external steel columns were added to add support and structure towards cantilevered spaces there.

Base plate + shear key to bottom column)

Nut (secure rebar to shear key)

rod
column 2.Shear block 3.Plugin bar hole 4.External column Plugin strandPre-stressedbars Rod
(Welded
column
using prestressed strands
Reference: J.Y.R. Liew, Y.S. Chua, Z. Dai, Steel concrete composite systems for modular construction of high-rise buildings, Structures, Volume 21, 2019, Pages 135-149, ISSN 2352-0124, https://doi.org/10.1016/j.istruc.2019.02.010.

Eventhough the most of the building faces sun orientation, by adding louvers element could reduce excessive natural sunlight penetration into the unit.

The addition of louver folding door, enhances the wind to enter the unit. This balance and cool down the building from the heat from the sun.

HarvestingRainwater

StackedHouseGreeneffect

Long and opened

The difference pressure from short and covered, and, long and opened, increases the wind velocity for cross ventilation from one side to the other side.

The big open in the middle also creates stacked effect. This shows the building have good natural air ventilation

Solar Panel
Shortcoveredand Shortcoveredand
UNIT TYPE A-120 SQM | FAMILY UNIT 40% - 32 UNITS 3 BEDROOM 2 BATHROOM 3-5 PAX

UNIT TYPE B-100 SQM | FAMILY UNIT

40% -

2

UNIT TYPE C-88 SQM | SINGLE/COUPLE UNIT - 16 BEDROOM

32 UNITS
BEDROOM 2 BATHROOM 3-4PAX
20%
UNITS 1
2 BATHROOM 1-2 PAX
Ketemu Andai kau tau, Aku di sini selalu merindumu, Aku rindu pada sosok dirimu yang begitu ceria Entah gimana keadaanmu sekarang....
Kuala Selangor Fishermen’s Community Centre

[ke.te.mu]

Definisi : Jk bertemu, berjumpa, terdapat (source: Dewan Bahasa dan Pustaka)

The design aimed to revitalise the town and build a more cohesive community by establishing places and activities that offered advantages to all members of the community, including children, adults, and fishermen.

Ketemu with the concept of ‘Reshaping the Knot’ wishes to establish new relationships inside the existing community so as to create a new kind of community. Ketemu gives the image of a community getting together to celebrate what makes it special. The practise of Ketemu has the effect of reuniting the community.

MPH CAFE LOBBY OUTDOOR TNBSUCTIONMUSOLLACAFEKITCHENTOILETTANKLOAD BAY CONTROLGRBGE ROOM GROUND FLOOR PLAN Drawing - AutoCad 3D - Sketchup Render - Enscape, Photoshop SECTION

MEETINGVOIDDECKING

of creating a centralised-planning was to enhance the community engagement. Since age gap had been an one of the issue of site, with these planning helps the community from every age group could engage and communicate with each other. PrivateArea PrivateArea

KETEMU conceptual planning was to create a centralised planning to create focus which gathers most of the community in the middle. With that public area spaces were placed in the middle, while the semi-public and private area were pushed to the Theside.idea

PublicArea Semi-Public/
Semi-Public/
MPH
ROOM TOILETOFFICESTORE ARCADE/GAMING ROOM LIVINGAREA GALLERYOPEN BOAT/NETMAKING WORKSHOP DECK/PRIVATEOBSERVATIONEVENTSPACE WATERTANK LIBRARY PANTRY FIRST FLOOR PLAN SECOND FLOOR PLAN MEZZANINE FLOOR PLAN

Short-lengthopening

Short length opening allows cross ventilation through the building. The louvers above allows stack ventilation.

The long overhang reduces direct sunlight into the building.

Louvered window allow to control air and sunlight entering

Photovoltaic

Louvers
Long overhang Long overhang
glass panels is a technology that allows light to be converted into power. Used as both passive and active sustanable. Collects electricity and allow sunlight into the building as natural lighting.
spaces.the 1,4 21 2 3 4 3 DETAIL A
B DETAIL C DETAIL A DETAIL B DETAIL C

SEMESTER 05URBAN-THEMED APPROACH

Creating design with understanding of the urban lifestyle and surrounding

ENSCAPE

2.

1. P.O.Residence High-Rise Housing|Final Year Project
Nishorgo Oirabot Nature Interpretation Centre Precedent Study 3. Interior Design Works Current Works
1.
2.
3.

LUMION

1. Conceptual Housing|Software Workshop Training 2. One and Half-Storey Bungalow|Digital Drawing Subject
1.
2.

V-RAY

1. One and Half-Storey Bungalow|Digital Drawing Subject 2. Meow Wolf Innovative Centre|Semester 05
1.
2.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.