Davison Hall Parking Deck Green Infrastructure Redesign Final Design 12/14/12 Cook Campus, Rutgers New Brunswick
Route 1
8
Geor ge St .
h
e. v ol A
Nic
e c a rf u S ot Parking L Deck
Project Area
Drawing List: Cover Sheet L-000 Notes L-001 Existing Conditions L-002 Demolition and Removals L-003 Layout Plan L-100 Materials Plan L-101 Grading Plan L-102 Planting Plan L-103 Enlargement Plans L-400, L-401 Details Sheets L-500, L-501, L-502, L-503 Schedules L-600
Cover Sheet
Passion Puddle 14
Location Map: NTS
George St.
Lipman Dr.
Nichol Ave.
Surface Lot 96’
80’
Vehicle Entrance
Parking
Pedestrian Entrance Passion Puddle
88’
Surface Lot
Deck
th
Asphalt Pa 80’
70’
Gabion
72’
Ravin
72’
e
Ravine
e
B
g rid
60’ 60’
Ravine
ne act Li r t n o C
Limit
80’ 70’ 88’
- large percent of tree canopy is invasive Norway Maples
LA
0’
DEPARTMENT OF LANDSCAPE ARCHITECTURE School of Environmental & Biological Sciences Rutgers University Construction III
PROJECT:
Parking Deck Redesign
20’
40’
80’
SHEET TITLE:
Existing Conditions DATE: 12/14/12 SCALE: 1" = 40' DRAWN BY: Matt Pugliese
SHEET NUMBER:
L-002
Nichol Ave.
George St.
Lipman Dr.
Surface Lot 96’
80’
Parking
CK P STO
Passion Puddle
ILES
Surface Lot
Deck
88’
th
Asphalt Pa 80’
70’
72’
60’
Line tract
Con
- Excavate soil to grading plan details - Remove asphalt to specified depth in asphalt detail - Grade for path
- Entry to site - Tree canopy removal - Tree protection fence
Limit
LA
0’
DEPARTMENT OF LANDSCAPE ARCHITECTURE School of Environmental & Biological Sciences Rutgers University Construction III
PROJECT:
Parking Deck Redesign
20’
40’
80’
SHEET TITLE:
Demolition & Removals DATE: 12/14/12 SCALE: 1" = 40' DRAWN BY: Matt Pugliese
SHEET NUMBER:
L-003
Surface Lot Passion Puddle
George St.
(3)
Nichol Ave. (10)
(5)
Parking
D4 L-500
(1)
Surface Lot
D3
(4)
(2) L-500
Deck
(6)
(11) L-500 (9)
D1 L-501
D1 L-500
Ravin
e
(8)
D2
D5 L-500
(13)
D1 L-502
(12)
(3)
(9)
(7)
D2
(5) L-501
Lipman Dr.
e
B
g rid
Ravine
Ravine
(1) - 6 inches of sandy soil held in place by a exterior curb with geowebs on the interior(7) - swale (8) - rain garden with water stone base planted with grasses (9) - seating/gathering area with benches and concrete pavers (2) - 6 inch curb holding in 3” gravel (10) - grass terrace with retaining walls (3) - soil stabilizing grasses (11) - concrete curb (4) - crushed stone (red) with aluminium edging on existing desire paths (12) - porous concrete (5) - porous asphalt (13) - gabion (6) - 6” to 12” stone
it
e Lim
in ract L t n o C
LA
0’
DEPARTMENT OF LANDSCAPE ARCHITECTURE School of Environmental & Biological Sciences Rutgers University Construction III
PROJECT:
Parking Deck Redesign
20’
40’
80’
SHEET TITLE:
Materials Plan DATE: 12/14/12 SCALE: 1" = 40' DRAWN BY: Matt Pugliese
SHEET NUMBER:
L-101
86’
88’ 88’
Passion Puddle
BW 88’
LP 86.5’
BM 86’ TW 86’ BM 84’ TW 84’ TW 88.5’ BM 82’
George St.
Nichol Ave.
TW 88’ 84’
82’
80’ 78’
76’
92’ 90’
74’
88’
86’
TW 78’
TW 84.5’
84’
TW 79.5’ BW 77’
LP 71’
BW 75’
BW 77.5’
2%
82’
7
6’
BW 74’ 74’ 2%
TW 74.5’
2%
74’
HPR 73.5’
72’
72’
Lipman Dr.
70’ 68’ 66’ 64’ 62’ 60’ Limit 60’ e n i L t 62’ ntrac 64’ Co 66 ’
TW 76.5’ BW 76’ 2%
72’
74’ 76’ 78’ 80’ 82’ 84’ 86 88’ ’
HPP 73’
Trench Drain
80’ 78’ 76’
1%
68’
70’
72’
LA
0’
DEPARTMENT OF LANDSCAPE ARCHITECTURE School of Environmental & Biological Sciences Rutgers University Construction III
PROJECT:
Parking Deck Redesign
20’
40’
80’
SHEET TITLE:
Grading Plan DATE: 12/14/12 SCALE: 1" = 40' DRAWN BY: Matt Pugliese
SHEET NUMBER:
L-102
18" Drain Cover 6" Curb 6" Porous Concrete
Coarse Agg.
2" Aggregate Base
Porous Asphalt 2"
5" Aggregate Coarse
Block Courses For Adjustment Gravel Backfill 1' Aggregate Backfill
Compacted Soil
Precast Concrete Unit
3' 8" Drain Pipe
Rebar #6
Concrete Base
8" x 6' Concrete Wall
Gravel Base
4" Porous Concrete Pavers 2" Aggregate Base
D1 L-500
1/2" Joint
D2 L-500
5" Aggregate Coarse
Tall Grasses Geofabric
Medium Grasses Low Grasses
Geoweb Low Grass
5" Concrete Curb
Sandy Soil
Concrete
Geofabric
10"
6"
Sandy Soil
#6 Steel Rebar
3'-8"
6" Concrete Curb
Gravel Base
2" Curb Cut Geoweb
7"
#6 Steel Rebar 11" Drain Cover Drain Basin
2'
4" Pipe 11" Pipe
Dowel
D3 L-500
4"
D4 L-500
10 1/2" Pipe
D5 L-500
LA
DEPARTMENT OF LANDSCAPE ARCHITECTURE School of Environmental & Biological Sciences Rutgers University Construction III
PROJECT:
Parking Deck Redesign
SHEET TITLE:
Details
DATE:
SHEET NUMBER:
12/14/12 SCALE: Varies DRAWN BY: Matt Pugliese
L-500
Retaining Wall 8" #6 Steel Rebar 6" Concrete Curb
Porous Asphalt 6" Aggregate Base 2" 3'
Aggregate Coarse 5"
Compacted Soil
3'
Subsoil Welded Wire Mesh
8" - 10" Gravel Geofabric
Aggregate Base
Compacted Soil
D2 L-501
LA D1 L-501
DEPARTMENT OF LANDSCAPE ARCHITECTURE School of Environmental & Biological Sciences Rutgers University Construction III
PROJECT:
Parking Deck Redesign
SHEET TITLE:
Details
DATE:
SHEET NUMBER:
12/14/12 SCALE: Varies DRAWN BY: Matt Pugliese
L-501
Compacted Soil Aggregate Base 2" depth Aggregate Coarse 6" depth
6" Concrete Curb
8" - 10" Stones
Amended Soil 1' depth
3" Stones Porous Asphalt 6" depth
Existing Subgrade
Geofabric
LA D1 L-502
DEPARTMENT OF LANDSCAPE ARCHITECTURE School of Environmental & Biological Sciences Rutgers University Construction III
PROJECT:
Parking Deck Redesign
SHEET TITLE:
Details
DATE:
SHEET NUMBER:
12/14/12 SCALE: Varies DRAWN BY: Matt Pugliese
L-502
Rubber Hose at Bark Concrete Paver
Double 12 Gauge Wire Twisted
Corner of Root System to be at Line of Original Grade
Wood Post
Aggregate Coarse 5"
Rootball Top Remove Rope and Burlap
Rootball Top Remove Rope and Burlap
Rootball Top Remove Rope and Burlap
Mulch 2-3"
Mulch 2-3"
Mulch 2-3"
Saucer Formed with Topsoil
Saucer Formed with Topsoil
Soil Fill
Soil Fill
Soil Fill
Rootball Bottom with biodegradable burlap on
Rootball Bottom with biodegradable burlap on
Prepared Subsoil to Prevent Settling
Prepared Subsoil to Prevent Settling
Prepared Subsoil to Prevent Settling
Subsoil
Subsoil
Subsoil
Rootball Bottom with biodegradable burlap on
D1 L-503
Aggregate Base 2"
D2 L-503
D3 L-503
LA
DEPARTMENT OF LANDSCAPE ARCHITECTURE School of Environmental & Biological Sciences Rutgers University Construction III
PROJECT:
Parking Deck Redesign
SHEET TITLE:
Details
DATE:
SHEET NUMBER:
12/14/12 SCALE: Varies DRAWN BY: Matt Pugliese
L-503
Planting Schedule Key BN
CF
SM
Material Schedule
Qty. Botanical Name Common Name Spacing 2
4
8
Betula Nigra
Cornus Florida
River Birch
Flowering Dogwood
Sweetbay Magnolia Magnolia Virginiana
115’
25’
25’
Commands
Key
Quantity
Commands
-plant rootballs a little high see detail D1 on detail sheet L-503 for planting on a hill
Porous Asphalt
150 cubic yards
- see D2 on sheet L-501 for accurate depths
Concrete
45.35 cubic yards
-plant rootballs a little high see details D1 and D2 on detail sheet L-503 for regular and hill planting
- concrete used for walls, footers, and curbs see D2 on sheet L-501 and D2, D3, D4, and D5 on sheet L-500 for specs
Porous Concrete
40 cubic yards
- see D1 on sheet L-500 for specs
Concrete Pavers
6,750 sq. ft. (18,750 units)
- see D5 on sheet L-500 for specs
Crushed Red Stone
13.33 cubic yards
- see materials plan for location
6 - 12 inch Stone
11 cubic yards
- see materials plan for location
- see detail D3 on detail sheet L-503 for planting in concrete pavers
PV
16
Panicum Virgatum
Switch Grass
2’
- use 1 gal. pots
PV
82
Panicum Virgatum
Switch Grass
1’
- use .30 gal. pots
Sandy Soil
15 cubic yards
- see D4 on sheet L-500 for specs
TC
261
Tiarella Cordiflolia
Foamflower
1’
- use .30 gal. pots
Aggregate Base
105 cubic yards
CB
10.5 lbs.
Calamagrostis Brachytricha
Korean Feather Reed Grass
even spread
- use seed
- see D1 and D5 on sheet L-500 and D2 on sheet L-501 depending on application
Aggregate Coarse
262 cubic yards
Ophiopogon Planiscapus
Black Mondo Grass
even spread
- use seed
- see D1 and D5 on sheet L-500 and D2 on sheet L-501 depending on application
Switch Grass
even spread
- use seed
Tables
13
Miliano outdoor round table, FSC Eucalyptus wood
Chairs
52
Miliano outdoor chairs, FSC Eucalyptus wood
OP
5.5 lbs.
PV
5 lbs. Panicum Virgatum
LA
DEPARTMENT OF LANDSCAPE ARCHITECTURE School of Environmental & Biological Sciences Rutgers University Construction III
PROJECT:
Parking Deck Redesign
SHEET TITLE:
Schedules DATE: 12/14/12 SCALE: DRAWN BY: Matt Pugliese
SHEET NUMBER:
L-600