3 minute read

CONTENTS

Next Article
IX. STUDIO FIRE

IX. STUDIO FIRE

Decent architecture is always more than a sets of good drawings of it, yet precisely knitting though logic and theories.

Design may start from a moment of sudden inspiration but is based on the daily accumulation of progress in curiosity.

Advertisement

414 STUDIO

Ucla Material Research Institute

How to generate architectural imaginary merges with existing buildings? This paradigm of engaging the existing material site in a constructive creative manner brings a set of interesting challenges, potentials, and questions.

CITY ARBORETUM & BOTANIC GARDEN

The central theme explores the fundamental structural concets related to issues of enclosure and environmental condition of interiors. Each disposed to combine with the other to form larger , more complex , compound ideas and forms . The architectrue is dedicated to plants and allow human to embrace nature.

Construction Design

Detail axo drawing of a section of a commercial building 291 ARCHI

INSTITUTE generate an imaginary that buildings? engaging on a constructive and brings along challenges, questions.

COMMUNAL CENTRE University High School

RB2 - 600 x150 section Glue Laminated18 exposed beams. Span 12000 (Supported between PC1s). Spacing 3000 Bolted on PC1 and RB1at each ends through10 plate bracket with seat

With the objectives to enrich school experience, to create interactive social communication among students and public through archi-language.

RA1 - Roof Battens to be screwed on packer over PU1, and form a 1.5 degrees slope Batten - 45 x 90 timber battens @900 cts screwed fixing on RA1 RS1 - Corrugated roof metal Sheet lapped using screw fixing with roof membrane on Battens Sitting on steel angle support plate which fixed to RA1

MC1 Metal Cladding Wall

MC1 cladding on continuous 8mm R1.1 Thermal Breaker

Structure frame:

FC1 - 150PFC @3000.

Parametric Design

WG.29 Window Glazing

1700H x 5038W for 7 pieces of doubled glaze with Sub-sill sitting on BW2 PFC header with welded plate lintel support for window head

Folded colorbond window capping over 20mm R0.2 Thermal Breaker

BW2 Concrete Block cavity Wall

Block type:

390 x190 x 190 (L x W x H) core filled Block work inside

390 x 90 x 190 core filled Block work for veneer 70mm cavity with 20mm R2.4 Foilboard

The nature of the material expresses the concept of hiding without isolating, the nature of the acoustic pond is that it both defines the distinction and connection of the spaces.

There should have metal sheets as wall tie for stability of block wall Weephole at wall bottom Wall flashing at the wall base

First Floor Slab

80mm screen slab with SL82 reinforcement & Heating cores

Fabric design for 4.0 KPa live load

11060 x 1200 x 300. 1332-HC01 Hollowcore Plank

Supported by 1332-1CB1 Precast Concrete Beam

1CB1 - Precast Concrete Beam

5710 Length x 700 width x 600&220 Height - L shape section, with 12 x 12 Chamfers.

9-N24 Bars, btm&top going straight through Beam, With 39 cover to surface fixed by:

(40) N12-U 600 x 175 Bars, @150

6-N12 Bars, with 30 cover to surface, fixed by:

(20) N12-L 150 x 500 x 400 Bars, @300

5-N12-U 900 x 510 Bars, @100. At each end of beam

Coming out of beam to connect and be reinforcement for Screen Slab Tied with (20)N12 540 x 570 square closed LIGS, @300

Connectionn Between 1CB1 and PC1

Each 1CB1 sits on the table of PC1

2 Location Dowels penetrating though 2-RB20-100 Reidbar for PC1 table top to 50Ø grout tubes for beam

Urban Smart Context

As the over accelerated city growth is considered, the time of smart urban environment is coming.

PC1 - Precast Concrete Column

12 x12 Chamfers

Detail axo drawing of a section of a commercial building commercial

8-N24 Bars going through PC1 straightly, tied with R10 LIGS @250

Btm&Top have 50-(1) set R10 LIGS, respectively.

12-N20-U Bars closed form & 4-N20- Bars table shape, tied with

(3)N20 600 x 640LIGS

(4)N20 200 x 590LIGS

Connection Between PF1 and PC1

PC1 sits on the top of PF1

8-N20 Dowels

Casting into Footing with 400 cogs at ends

Projecting 1000 into 50Ø PVC grout ducts at the bottom of PC1

50Ø PVC Ducts fully grout with flowable grout

Note: N20 Dowels covered with 50Ø ducts and N24 Bars for PC1 are tied within 2-R10-250 LIGS together.

150 Slab On Ground Hydronic Heating run across mesh bars, 20 MIN cover to face of slab & 75 MIN to adjacent cores or bar mesh SL72 top. Sl92 btm. 30 cover, Lap 1 grid + 25mm on 0.2 Polythne Memberane. Slab to be formed over 100 MIN. Layer of compressible cardboard Void

This article is from: