PUTRI NAWANG WULAN 165060501111032 DA-V KELAS F ꟾ DOSEN KOORDINATOR : WULAN ASTRINI, ST ., MDS ꟾ DOSEN PJK : DR. TECH. YUSFAN ADEPUTRA YUSRAN, ST., MT., ARS
Modul 4
Skematik Desain
Keramik Art Museum
Meil 2019
JURUSAN ARSITEKTUR FAKULTAS TEKNIK UNIVERSITAS BRAWIJAYA
11
10
7
9
6
2
3
1 5
Legenda 1. 2. 3. 4. 5. 6.
Entrance Museum Amphitheater Hoste; Parkitan mobil Parkiran motor
4
9
6. Service area 7. Taman 8. Rumah warga 9. Jurang 10. Sunngai Brantas
8
Site plan Keramik Art Museum
Skala 1:400
B
A 15
16 17 18
19
20 26 14
8
7
11
12
21
6
9
5
3
10
2 13
1
4
B’
22
23 25
Legenda 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13.
Entrance Lobby Locker area Permanent exhibtion Gallery Hallway gallery Hallway gallery Temporary Exhibition Ceramic studio Kid’s hands on workshop Ruang pengeringan&pembakaran Kantori pengelola Gift shop
24
14.Lecture hall 15. Service area 16. Tempat wudhu 17. Musholla 18. Toilet 19. Dapur kedai keramik 20. Kedai keramik 21. Amphitheater 22. Private bed room 23. Comunal area 24. Lobby hostel 25. Parkiran mobil 26. Parkiran motor
Keramik Art Museum
A’
Layout plan Skala 1:400
PDAM Ground water tank Pompa
Roof tank
Rencana Infrastruktur Rencana air bersih
Keramik Art Museum
Skala 1:400
Septitank
PDAM Air kotor dialirkan ke drainase
Filter Sumur resapan Pembuangan akhir
Ground water tank Pompa
Roof tank
Keramik Art Museum
Rencana Infrastruktur Rencana air bersih
Skala 1:400
meteran Power house
MEE Panel listrik
Hydrant Kotak Hydrant Titik kumpul evakuasi
Rencana Infrastruktur Rencana arus listrik & kebakaran
Keramik Art Museum
Skala 1:400
Entrance tapak
Exit tapak
Sirkulasi kendaraan roda dua Sirkulasi loading dock Sirkulasi kendaraan roda empat
Keramik Art Museum
Rencana Sirkulasi Skala 1:400
+15.20
+12.40 +09.55 +06.00 +03.50 +00.50 ± 00.00 -02.50 Lecture hall
Temporary exhibition
Ruang jeda
Hallway gallery
Keramik gallery
Rumah keramik hostel
Potongan tapak B-B’ Skala 1:400
+13.00 +07.00 ±00.00
Potongan tapak A-A’ Skala 1:400
Keramik Art Museum
Tampak tapak barat daya Skala 1:400
Tampak tapak tenggara Skala 1:400
Keramik Art Museum
B
A’
Toilet Pria T.Wudhu
A
+00.44
Musholla
+00.10
+00.10
Dapur kedai Toilet Wanita
Kedai Keramik
+00.10
+00.10
+00.10
R.Servis +00.44
Keramik gallery
-00.38 Ruang jeda +00.00
Temporary Exhibition
Hallway gallery
+00.00
-00.38 Keramik gallery
-00.38 Private bedroom
-02.50
R.Pembakaran & pengeringan
Lecture hall +00.44
Comunal area1
Locker
+00.38
-02.50
-00.54
Kids studio +00.00
Lobby
Workshop 2 backstage
+00.00
+00.44
R.Utilitas hall
-00.54
-02.50
+00.00
Gift shop
R.Rapat pengelola +01.37
Studio 1
R.Kepala museumR.Wakil kepala museum +01.37
Ruang staff pengelola +01.37
Lobby k.pengelola
+00.12
+00.38
+01.37
B’ Keramik Art Museum
Lobby hostel
Workshop1
+00.44
+01.37
-00.54
Permanent Exhibition
Denah lt.1 Skala1:250
A
A’
Kamar mandi wanita +01.00
Bunk bed room +01.00
Kamar mandi pria +01.00
Bunk bed room +01.00
Bunk bed room +01.00
Bunk bed room +01.00
Bunk bed room +01.00
Twin bed room Twin bed room
+01.00
+01.00
Twin bed room +01.00
Twin bed room +01.00 Open kitchen +01.00
Comunal area2 +01.00
Denah lt.2 Keramik Art Museum
Skala 1:250
Tampak barat daya Museum Skala 1:250
Tampak barat laut Museum Skala 1:250
Keramik Art Museum
Potongan bangunan A-A’ Skala 1:400
Potongan bangunan B-B’ Skala 1:400
Keramik Art Museum
Keramik Art Museum
Ground water tank
pompa
Roof water tank
Dari PDAM
PDAM Ground water tank Pompa
Roof tank
Distribusi air bersih Skala 1:250
Keramik Art Museum
Pembuangan akhir
Septitank
Filter
Sumur resapan Pembuangan akhir
Distribusi air kotor Keramik Art Museum
Skala 1:250
MEE
Power house
Dari pln
Titik lampu
Distribusi arus listrik (lampu) Keramik Art Museum
Skala 1:250
Permanent exhibition 2: development of ceramic in Dinoyo
Partisi pada temporary exhibition :
Tampak
Tampak
Perspektif
Perspektif
Denah
Potongan
Denah
Detail Arsitektural Potongan
Keramik Art Museum
Skala 1:50
(komponen bangunan)
Ceramic gallery
Kids hands-0n workshop
Temporary Exhibition
Hallway gallery
Private bed-room hostel
Perspektif Interior Keramik Art Museum
Perspektif Interior Permanent exhibition 2: development of ceramic in Dinoyo
Keramik Art Museum
Perspektif interior dalam kedai Pintu masuk kedai
Perspektif interior luar kedai Detail lantai kedai outdoor
concreate
Batu kerikil
Perspektif Interior & detail bangunan utama Keramik Art Museum
Kedai keramik
Seat box
back stage
venue stage
Mini exhibition
Potongan
Lampu sorot
Tampak venue dari stage Mini exhibition under seat box Tampak stage dari seat box
Perspektif Interior & detail bangunan utama Keramik Art Museum
Lecture hall
Amphitheater
Kolam ikan hostel
Plywood
Rumput gajah mini
Plywood
concreate
concreate
Detail Arsitektural Keramik Art Museum
(Ruang luar)
Keramik Art Museum
Perspektif Eksterior