1 minute read

Preview

IRIS IP

ARCHITECTURE PORTFOLIO selected works 2018

Advertisement

1 Arietes Park

STUDIO DESIGN| ARCH 293 SUPERVISOR: JANE HUTTON AUGUST 2018

Main Entrance

Bridge

Cave

First Intersection

Once visioned for wildife rehabilitation after the industrial use of the aggragate quarry, it is assumed that the riparian edge and the man-made interference will coexist. A leftover of the City of Brantford, it is forgotten and tucked away at the borders. The site became a part of the city’s hiking trail network with its connection of the Grand Valley Trail, embracing along side the river. However the assumption of regrowth and revitalization of the wildlife has been interrupted by the impatient need of crossing through the meadow grounds directly, reaching the marvelous in a path lesser than the Trans Canada Trail.

This article is from: