Landscape Architecture Portfolio QIAN ZHANG 2020

Page 1

Portfolio . QIAN ZHANG .


QIAN ZHANG 2020 PORTFOLIO

2014-2020

2


QIAN ZHANG 2020 PORTFOLIO

Contents CV Stratford Mill

professional work 2020

Xiangmihu Park City professional work 2019

Mix C Central Park

professional work 2018

St Chads

professional work 2017

Shenzhen Flower Show professional work 2019

Masterplaning Strategy professional work 2016

London Eye

hand drawing 2015

3


QIAN ZHANG 2020 PORTFOLIO

QIAN ZHANG Landscape Architect

WORK EXPERIENCE

........................................................................................................

RECOGNITIONS

........................................................................................................

EDUCATION

........................................................................................................

G

January 2020- November 2020 Project Landscape Architect Fabrik, UK

Postgraduate September 2013 - September 2015 Landscape and Architecture University of Sheffield United Kingdom

April 2018- April 2019 Landscape Architect McGregor Coxall, China

M

March 2016 - February 2018 Graduate Landscape Architect Anna French Associates, UK

Undergraduate September 2009 - July 2013 Industrial Design ShanDong University of Architecture China (PRC)

2

October 2016- 2018 Volunteer Gardener English Heritage Wrest Park, Bedfordshire, UK

Golden Prize 2019 Shenzhen Flower Show China (PRC) Merit Degree Postgraduate. 2015 The University of Sheffield United Kingdom 2nd Prize. Undergraduate. 2013 Graduation Project. ShanDong University of Architecture China (PRC)

WORK DUTIES

........................................................................................................

SOFTWARE SKILLS

........................................................................................................

HOBBIE & INTERESTS

........................................................................................................

FABRIK 2019-2020 Taking an active role in schematic and detailed design. Assisting in produce design packages. Produce 3D modelling and rendering

photoshop

illustrator

indesign

autocad

microsoft office sketchup package

vectorworks

lumion

LANGUAGE SKILLS

rhino

mac system

........................................................................................................

MCGC 2018-2019 Taking an active role in schematic and detailed design. Conducting and produce design packages. Assisting in project management Assisting in contract administration Participating in tender document preparation Attending project and site meetings Translating both in written and verbal Assisting in everyday administrative work AFA 2016-2018 Taking an active role in schematic and detailed design. Assisting in produce design packages. Assisting with site survey Attending project and site meetings

Music

Museum

Magic Trick

Travel

Piano

Contemporary Art

Basketball

Collecting

Record Dreams

Painting

Hiking

LANDSCAPE INSTITUTE

........................................................................................................ July 2016 - July 2017 Member of Landscape Institute

CHINESE

Film

Show

Cycling

Garden

Technology

ENGLISH July 2016 - July 2017 Pre-CMLI

Contact

4

QIAN ZHANG 2019.

E: QIANZ1128@GMAIL.COM T: 07923216968


QIAN ZHANG 2020 PORTFOLIO

PROJECT LIST

........................................................................................................ RESIDENTIAL

PUBLIC SPACE

CAMPUSES

PLANNING

Marshgate Industrial Estate Whitechapel Central Barking Riverside St Albans Road, Watford St Martins Place Redevelopment Stoke Wharf Rotherhithe Gas Works Hazel Court Brentford Lock West Great Scotland Yard Hotel Battersea Place Retirement Community Beacon Lodge Haringey Park Hartsbourne Avenue High Cross Merrick Road, Southall Cadogan Place Eaton Square Cote Road, Aston, Oxfordshire Witney Road, Oxfordshire Isfield Place Manor House Farm St Chads Connaught Gardens Redington Gardens Crazy Horse and Burnt Stump 177 Farnham Road 25 Thirlmere Road 42 Kimbolton Road 60 Highstreet Sandridge Haddonfield Estate Coombs Farm Buildings Heathfield Lodge, Harrow Goschen Estate Pierson House Church Road Middlefield Lane, Henlow

Zhuhai MixC Park Dashahe Park Qiangjiang Waterfront Park Jiangsu Expo Longgang Park Laoweicun Park Xiangmihu Park City

Royal Holloway Student Village St John Fisher Catholic School Surrey Downs Court SEN Free School Southwark Regeneration - Albion School Joseph Lancaster Nursery Lark Rise Academy Angel Oak Academy Spratton School LVIA

London Barking & Dagenham OSS(Open Space Strategy) Shenshan Coop Zone Planning Dameisha Seashore Dapeng Seashore

COMMERCIAL SPACE Jagger House Walkway Canary Gateway, Westferry Cosway Street Southwark Regeneration

SHOW GARDEN Skyline Garden,Shenzhen Butterfly Garden, Shenzhen Boundless Garden City, Hongkong

5


QIAN ZHANG 2020 PORTFOLIO

INDUSTRIAL HERITAGE

The site previously held a glass works in the 1940s. The landscape design takes design cues from glass and the fractured radial pattern from shattered glass. This radial form follows the curve of the waterway and orientates the landscape south towards Bow Back River. The glass shards define the forms within the landscape.

CHARACTER AREA PLAN GATEWAY SQUARE

N

1

Key transport route Gateway into the development Commercial and streetscene value RESIDENTIAL STREET

2

4

THE WINDING TOWPATH

3 2

1

Key route east-west through the site. Provide disabled parking, servicing and a drop-off point

Runs along the Bow Back River. Provides a pedestrian and cyclist friendly route connecting Stratford Mill with the wider landscape. THE COURTYARD MEWS

4

5 6

Primarily an amenity space for residents Providing play opportunities, recreational space, and cycle parking. THE PODIUM

5 3

Private communal space Providing amenity, play and biodiversity opportunities. Brings nature into the development ROOF GARDENS

6

Stratford Mill

MARSHGATE LANE, LONDON, UK

6

A series of roof gardens are located on Blocks A1, A2, A3 and B1 providing amenity space for

The design approach aims to create a permeable and accessible public realm which responds to the existing conditions and surrounding townscape and heritage. The built form of the development has been driven by the desire to create a public realm that not only responds to people’s needs, but is both integral to the spirit of Marshgates Industrial heritage, with reference to the Queen Elizabeth Olympic Park and the Canal Park.


QIAN ZHANG 2020 PORTFOLIO

1

2

MASTERPLAN

2

3

4

5

6 1 4 5

6

3

7


QIAN ZHANG 2020 PORTFOLIO Note for Contractors This drawing should be considered along with the risk information contained in the CDM Pre-construction Information. This information will include details of the SIGNIFICANT risks which fabrik has identified which may arise from constructing their designs shown on this drawing. A Competent Contractor should be aware of the typical risks associated with doing this work.

GENERAL ARRANGEMENT PLAN - GROUND FLOOR

PODIUM

Note for Workers

Notes 1. 2.

This drawing is the property of fabrik ltd. It must not be copied or reproduced without written consent. Only figured dimensions are to be taken from this drawing. All contractors must visit site and be responsible for taking and checking all dimensions related to the works shown on the drawing.

3.

This drawing uses coloured lines. Please do not rely on a monochrome copy.

DO NOT START YOUR WORK unless you know the Risks and Controls relating to the work on this drawing (including SAFE SEQUENCES OF WORK and EQUIPMENT).

STOP

Do not issue copies of parts of this drawing without the above Note for Workers (unless you are sure that the Workers can

Legend General

Furniture Type 2 - Linear benching

Application boundary

undertake the work safely).

FT2

CITY MILL RIVER

Hard Landscape Paving Type 1 - Feature Paving Product: Myriad block paving Colours: morning light/ twilight/ midnight/ sunlight Size: 600X200X80mm 400x200x80mm 200x200x80mm

PT1

PT2

FT3

Furniture Type 3 - Tree grille Recessed cover to allow paving to continue over Size: 1800x1800mm Trees in hard paving will also require structural soil cells to maintain root soil volume and prevent compaction. Furniture Type 4 - Raised planter Colour / finish: Corten Steel

Paving Type 2 - Footpath paving Product: Myriad block paving Colours: twilight/sunlight Size: 400x200x80mm

FT4

Paving Type 3 - Canal towpath surfacing Product: Resin bonded gravel Colour / Finish: golden gravel

FT5

Furniture Type 5 - Cycle Stands PT3 2

PT3 LT5

LT5

LT5

PT5

Paving Type 4 - Block paving to vehicular circulation routes and car parking Product: Myriad block paving Colour / Finish: twilight/ midnight Size: 200x100x80mm

PT5

Paving Type 5 - Private terrace paving Product: Myriad block paving Colour: Sunlight Size: 400x400x80mm

Proposed Multi-stemmed Planting Refer to indicative plant schedule for details

Paving Type 6 - Vehicular Tarmac

Proposed Rain garden

Paving Type 7 - Stepping stones Product: Myriad block paving Colours: morning light Size: 600x200x80mm

Proposed Shrub / Herbaceous Planting Refer to indicative plant schedule for details

Paving Type 8 - Buff resin bound gravel to match adjacent works

Proposed Hedge Refer to indicative plant schedule for details

2

LT5

PT5

LT5

PT5

LT5

LT5 BT2

BT2 LT5

PT5

LT5

BT2

LT3

PT7

PT5

BT2

PT2 3

FT2 LT4

LT3

LT5

LT5

BT2 BT2

LT5

PT5

2

PT3

LT5

BT2

3

PT8 PT6

BT2

3

PT5

BT2

BULMAN SITE

PT5 LT5

PT5

LT3

GT1

FT4

BT2

PT2

2

Edge Type 2 - Pin kerbs Colour / finish: Size: 50mm width laid flush

3

Edge Type 3 - Metal Edge Colour / finish: Stainless Steel

LT5

PT3

PT2

PT4

LT2

BT1

3

LT2

PT5

LT2

2

BT2 PT5

3

1

1

BT2 PT5

2

1

BT2

PT3

2

PT6

LT2

AR

M

PT5

SH

LT2

1

BT2 2

GA

PT4

PT4

PT6

1

LT1

1 1

PT2

TE

PT4

LT1

FT5

PT2

LA

2

FT5

NE

PT5 FT5

FT5

BT2

1

PT2

2

PT5

1

LT1

PT2

3

1

PT4

PT2

DESIGN SUBJECT TO APPROVAL OF STAGE 3 DETAILS ELEMENTS OUTSIDE OF PHASE 1 SITE BOUNDARY ARE INDICATIVE ONLY

PT4

1

1

PT4

2

BT2

PT3

PT6

PT4

CITY MILL LOCK

FT5

PT4

PT5

FT3

FT5

1

PT6

1

2

FT1

PT3

1

1

Lighting Type 5 - Pathlighters

LT 5

Furniture Type 1 - Individual seats

PT2

PT4

Boundary Type 3 - Amenity boundary railings Product: Corten steel vertical bar railings with glass panels Height: 1500mm high

Lighting Type 4 - LED Strip Lighting

LT 4

Gate To match adjacent boundary treatment

3

LT1

BT2

Lighting Type 3 - Tree Uplighters

LT 3

PT2

PT4

PT5

LT2

BT1

3

1

PT4

PT2

BT3

LOCK KEEPER'S HOUSE

1

PT5 LT2

FT1 LT4

FT2 LT4

3

PT2

PT8

LT4 FT1

LT1

1

PT2

PT5

BT2

Boundary Type 2 - Residential boundary railings Product: Rimini vertical bar railings Height: 1100mm high Colour: TBC

PT3

PT6

2

PT2

3

BT1 PT4

PT5

LT3

3

Lighting Type 2 - Lighting from Buildings

LT 2

Boundary Type 1 - Security railings Product: Rimini vertical bar railings Height: 1800mm high Colour: TBC

1

PT2 LT1

PT4

BT2 PT5 LT3

Lighting Type 1 - 6m high Column Lights Size: 6m high

LT 1

2

FT5

3

LT1

Lighting

3

PT5 LT2

3

Grass Type 1 - Amenity Lawn Refer to indicative plant schedule for details

GT1

LT5

3

LT3

Edge Type 1 - Granite Kerbs Colour / finish: Size: 255x12mm laid flush or with upstand

2

PT5

PT5

LT3

1 LT5

3

BT2 FT4

3

PT5

LT5

PT2

3

LT1

3

LT5

BT2

LT2

BT2

LT3

3

FT2 LT4

PT6

BLAKER ROAD

PT5

PT5 PT7

Proposed Tree Planting Refer to indicative plant schedule for details

2

PT5

LT1

Soft Landscape

PT4

BT2 BT2

Product: Sheffield Stand Material: Stainless Steel

PT2

PT11

LT1

PT11

1

PT4

PT4 FT3

1

LT1 PT6

1

1

PT4

LT1 PT3

PT2

1 1

3

PT8

Issued for planning Architects base amended. Issued for comment Visitor cycle parking added. Issued for Planning Issued for Planning Issued for Co-ordination Issued for Planning Draft Issue for Comment

BT10

FT3 PT2

1

PT2

PT3

1

1

FT3

3

PT11

LT2

FT3

PT2

PT6

FT3

FT5 FT5

LT1 1

PT2

T: E: W:

FT5 FT5 PT2

FT3

PT3

PT11

NE

1

LA E AT

PT3 3

HG

FT5

AR S M

PT4

1

PT11

3

PT2

1 3

PT6

FT3

PT7

1

FT5

PT2

FT5

FT5 FT5 FT5

FT3 PT6

0

1

2.5

5

7.5

10

1:200 This drawing may contain: Ordnance Survey material by permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office © Crown Copyright 2017. All rights reserved. Reference number xxxxxxx. OS Open data © Crown copyright and database right 2017 | Aerial Photography © XXXXXX

8

15

20m

north

3

FT11

FT10

PT11 FT4

PT7 FT4

GT1

FT4

3

GT1

FT11

FT11

FT4

GT1

FT4

PT11

FT10

3

FT4

BT10 FT4 PT11

BT2

Date

Checked

1:200 @ A1

Nov '18

jb

Drawn

trb

Drawing No.

Revision

D2698-FAB-XX-00-DR-L-200

P07

Preliminary

Issued for Design/Information

Issued for Planning Approval

Issued for Tender As Built

c

PT11

PT10 BT10 FT4 PT11

BT2

Copyright Reserved

FT4

3

FT10

Scale

Drawing sheet size - A1

FT4

FT4

0207 620 1453 london@fabrikuk.com www.fabrikuk.com

Issued for Construction

FT11

FT4 GT1

FT4

FT10

PT3

PT3

PT2

BT10 BT2

PT10

FT4

PT12

FT4

3

FT4 BT10

Detailed Hard Landscape General Arrangement Plan Ground Floor Sheet 1 of 2

LT1

FT4 3

3

FT4

PT10

Drawing

PT2 PT4

PT11

FT4

GT1

PT7

FT4

PT12

1

Temporary planter required in this location for interim wind mitigation during phased construction

BT10

FT4

PT12

Marshgate Industrial Estate, Stratford, London for Anthology

LT2 3

FT3

1

PT11

FT10

Name

BT10 FT4

Project PT4

BT10 FT4

FT4

Reason

First Floor 4-8 Emerson Street London SE1 9DU

BOW BACK RIVER

FT4

FT4

fabrik

3

LT1 PT2

DN DN JB GT1 JB DN FT10 LS JB

BT2

External References: · · -

FT3

PT6

06.02.20 05.02.20 28.11.19 26.11.19 04.10.19 31.05.19 24.05.19

No. Date Revisions

PT2

1

FT4

3

P07 P06 P05 P04 P03 P02 P01

1

PT8

BT2


QIAN ZHANG 2020 PORTFOLIO

CONSTRUCTION DETAIL DRAWING PLAY AREA WITH PLANTING BED

FROM VARIOUS OF PROJECTS

SPECIALIZED TREE PIT DETAIL

Parking Bay 4800

ET6 Raised Granite Kerb 125mm upstand

Richter Jumping Disc

Tree Pit Irrigation and Ventilation

Note: top edge of the pre-fabricated foundation must be at least 50 mm below the level of the playing surface.

Tree Anchor

14.747 Root Protection Barrier

960

ET4 Metal Edge Flush Kerb

Subsoil Suspended Pavement Structure (RootSpace by Green Blue Urban or similar approved)

1:40

1:40

Top Soil, approx. 200mm

14.439

350

1690

15.570

15.550

160

200

15.640

Top Soil

Top soil

ET4 Metal Edge Flush Kerb

PT0 To E

Irrigation/Aeration Pipe

Top Soil

Drainage Layer

rriageway rete

Strapped Anchor

Proposed Planting Refer to planting plan for detail Bark Mulch

Proposed Planting Refer to planting plan for detail Bark Mulch

Proposed Multi-stem Tree

Proposed Tree

Root Protection Barrier

PT02 Yard Paving - Buff macadam To Engineer's specification and detail

PT01 In situ exposed aggregate concrete

50

320

315

Anchoring bolts M10x approx. 250mm Concrete foundation, To Engineers Specification

Waterproofing membrane To engineers' detail

150 Reinforcing Steel

MOT Type1 Sub-base

Drainage Layer - 150mm depth of clean angular stone around sides and base of suspended pavement structure

Concrete Footing To Engineers Specification

Permeable geotextile to engineers' detail Underground tree anchoring system

02 4502

Drainage pipe refer to engineers' information

Section 2-2 Through Western Yard SCALE 1: 20

approx. 3000

eighbourhood street

SWALE DETAIL

ROOF TERRACE DETAIL 1

ROOF TERRACE DETAIL 2

Notes

This drawing may contain: Ordnance Survey material by permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office © Crown Copyright 2017. All rights reserved. Reference number xxxxxxx. OS Open data © Crown copyright and database right 2017 | Aerial Photography © XXXXXX

1. 2.

Location Plan

3.

Location Plan

0 100of 250 1000 1500 written consent. 2000mm This drawing is the property fabrik ltd. 500 It must not750 be copied or reproduced without Only figured dimensions are to be taken from this drawing. All contractors must visit site and be responsible for taking and checking1:20 all dimensions related to the works shown on the drawing.

This drawing uses coloured lines. Please do not rely on a monochrome copy.

landscape architects P02 P01

28-09-2020 18-09-2020

Revision Date

Draft Planning Issue Draft Planning Issue

QZ QZ

PF PF

Reason

Drawn

Checked

Disclaimer: 1. This drawing is copyright of fabrik ltd. It must not be copied or reproduced without written consent from the owner. 2. Do not scale from this drawing. Only figured dimensions are to be taken from this drawing. 3. All contractors must visit site and be responsible for taking and checking all dimensions related to the works shown on the drawing prior to fabrication or setting out.

36 St Mary's Street | Edinburgh | EH1 1SX E : edinburgh@fabrikuk.com | W : www.fabrikuk.com Project

Client

Plot 209B Barking Riverside

Bellway Homes

Drawing Title

Landscape Sections - Sheet 8 of 8 Tree Multi-stem Proposed

External References:

·

Drawn By

Purpose of Issue

Checked By

plans for detail Refer to fabrik plantingQZ PF

DESIGN INFORMATION ONLY Project Number

D2948

Zone

Origin

Level

File Type

Pit Irrigation FAB Tree XX 00 and Ventilation DR NBS:Q31/512A

Drawn Scale

Date of First Issue

1:20 @ A1

Sept | 2020

Role

Number

Revision

L

4508

P01

Bark Mulch NBS:Q28/845A

Site Boundary

Gravel margin approx. 300mm

Geotextile NBS:Q31/298C

ET4 Metal Edge Flush Kerb Concrete Footing To Engineers Specification

Proposed Multi-stem Tree

13.000

FFL +28.490

TOW+28.100

1:3

TOS+28.530

FFL+28.080

ET10 Retaining Wall In coordination with Engineer's detail Brick specification to match building

FFL 13.165

Proposed swale planting

FT10 Bespoke Bench NBS:Q50/220E

Soil System NBS:Q28/165A

FFL +27.690

FFL +27.60 SSL +27.480 100mm Topsoil

100mm Sand Layer Waterproofing geotextile Permeable Geotextile

Structural slab To Engineers specification Insulation To Architects specification

800mm Depth crushed gravel Drainage pipe To engineers specification

Waterproofing To Architects specification

06 4505

Drainage ducts to run below insulation to connect to gulley To Engineers specification PT6 Porcelain Tiles NBS:Q25/316 Paving Pedestal NBS: Q55/395C

Leca To Engineers specification Leca To Engineers specification

Tree guying NBS:Q31/526

Section 6-6 Through Swale SCALE 1: 20

01 05400 0 100

250

500

750

1000

1500

1:20 Location Plan

landscape architects 36 St Mary's Street | Edinburgh | EH1 1SX E : edinburgh@fabrikuk.com | W : www.fabrikuk.com Project

Client

2000mm

Section - 01 SCALE 1:20@A1

9


XIANGMIHU PARK CITY

QIAN ZHANG 2020 PORTFOLIO

SHENZHEN, GUANGDONG

SITE ANALYSIS

Meilin – Caidian Industrial Belt

Financial Expansion The site sits east of Futian’s CBD, west of Chegongmiao business zone, south of high class residential and north of the Shatou inner city village.

Futian Central Business District

Importantly Xiangmihu’s positioning between Central Futian’s Financial District and Chegongmiao business zone supports the site’s strategic role as a key regeneration site that can strengthen Shenzhen’s east to west financial expansion.

Huaqiang North Chegongmiao

Hong Kong - Shenzhen Innovation & Technology Park

Futian Port Shenzhen – Hong Kong New Corridor

Tanglang Mountain Park

Environmental Corridors

Bijia Mountain Park

Shenzhen has limited access to water resources, and its water supply system is under increasing pressure due to the city’s rapid growth. Main waterways around the site are polluted due to the wastewater discharges and stormwater runoff. This project has the potential to environmentally connect the Tanglang Mountains and Shenzhen Bay together through green and blue infrastructure. Allowing for an increase in water supply and ecological habitation positioning the project as a global leader in health, well being and urban resilience.

Futian River

Meilin Reservoir

Xinzhou River Fentang River

Xiangmi Lake Lotus Mountain Park

Central Park Childrens Park

Shenzhen Golf Course

Mangrove Nature Reserve

Regional Connectivity The site is constrained by a trunk road system featuring four east-west roads and three north-south roads, which have evolved out of necessity but provide connections to the wider city, whilst a network of fragmented secondary roads and bypasses provides scope for enhanced connectivity, particularly for pedestrians and cyclists traversing the area, and land use efficiency. The district currently benefits from 5 metro lines and 5 stations, which are reasonably integrated with the local bus network, and connects Xiangmihu to most of the key destinations around the city.

10

Futian Xiangmihu

Chegongmiao

Luohu

The contemporary history of Shenzhen is one of enormous change. Shenzhen today is quickly evolving from a quiet market town to one of China’s major global commercial centre. Xiangmihu is located within Shenzhen’s central government, Municipal Committee and business district of Shenzhen. The site is also naturally benefit from its superior environmental and transportation advantages. Xiangmihu Park City will be revealed as a memorable, experiential and connected network of environments that position Xiangmihu as a global leader in health, happiness and harmonious living.


QIAN ZHANG 2020 PORTFOLIO MASTERPLAN Legend 1h

1g

01 Xiangmihu Waterfront Quarter 1a. 1b. 1c. 1d. 1e. 1f. 1g. 1h. 1i. 1j. 1k. 1l. 1m. 1n.

1a

1f

1a

1e

1j 1k

1i

1c

1m

1b

1l

1d

Xiangmihu Waterfront Quarter

Existing Residential Housing Shenzhen Party School Technology Research Institute Xiangmihu Waterfront Interchange Boating Pontoon Swimming and Boating Area Urban Beach Terrace All Year Swimming Pool Waterfront Walkway Water Institute Wetland Habitat & Boardwalk Wave Pier Surf Zone Surf Beach

1n

1c

02 Xiangmihu Financial Quarter

2j 2i

2a. 2b. 2c. 2d. 2e. 2f. 2g. 2h. 2i. 2j. 2k. 2l. 2m. 2n.

2k 2b

2n 2c 2h 2l 2d

2a

2m

2g 2e

2f

Xiangmihu Financial Quarter 3f

Xiangmihu Financial District [West] China Bamboo Gardens Shenzhen Botanic Gardens Xiangmihu Civic Plaza Xiangmihu Civic Plaza Station Hong Kong Gardens Hotel Exchange Centre Hong Li West Road Land Bridge Planning Building Government Gardens Macao Gardens Flower Gardens Xiangmihu Financial District [East]

3k

3b

3a

3n

3g

3a. 3b. 3c. 3d. 3e. 3f. 3g. 3h. 3i. 3j. 3k. 3l. 3m. 3n.

3l

3j 3e

Shatou Green Quarter

3m

3c

03 Shatou Green Quarter

3h

3i

3d

Xiangmihu Shopping District NEO Building Sustainable Technology Research Residential District Shatou Urban Forest Shennan Avenue Land Bridge Shatou Sports Recreation Community Gardens Biomass Research Building Waterway Habitat Commercial District Fuhua Road Residential South Xinhou River Greenway

11 0

100m 200m

500m


QIAN ZHANG 2020 PORTFOLIO

E

IR NV

NT ME N O

LO CO &E

GIES

URBA N FO RM

&S TR

UC TU

RE

IoT Network

IC OM ON

S&U TIL ITIE S

EC

CTIVITIES

RESOURCE

S&A

Environment & Ecologies

Resources & Utilities PU

AL RE

M OB ILI TY

IC BL

A

M

SS

&

&

M

Culture & Sociability

CE AC

EN IT IE S

CULT URE & SOCIABILTY

Urban Form & Structure

PLACE VITALITY CRITERIA Economics & Activities

Public Realm & Amenity

Access & Mobility

12

In response to the ever-changing environments cities have to respond to, our team has developed an urban revitalisation approach that intrinsically integrates urban design and place making together. A key aim of this approach is in implementing flexible and changeable solutions to highly specific and constantly evolving places. Central to this commitment has been our team’s international research into understanding the vital aspects that combine to form a place. Through our extensive resource network, we have been able to discern these vital systems into a workable set of criteria that can be applied to any ‘place’. Referred to as the Place Vitality Criteria, these elements form a holistic set of systems. Each system inter-relates with the other, reinforcing the complex relationships that interplay in creating vital places. Importantly these systems respond to the needs a community and inform smart governance.


QIAN ZHANG 2020 PORTFOLIO BUILDING TYPES 01: Mixed Use

02: Mixed Use

03: Mixed Use

Zone Type 01 - Residential Mixed Use

Zone Type 04 - Education

Zone Type 07 - Commercial Tower Building Type 04

04: Education

05: Commercial

06: Incubator Mixed Use Building Type 01

Building Type 07

Zone Type 02 - Commercial Mixed Use Building Type 06

07: Commercial Tower

Zone Type 05 - Residential

Building Type 02 Zone Type 06 - Incubator Mixed Use Building Type 05 Building Type 03

Legend Building Typologies Commercial Residential Mixed use: Residential / Commercial Retail / Café Education Communal Green Space Living Roofs Living walls Active Laneway Road Width Setback

Zone Type 03 - Mixed Use

URBAN TYPOLOGIES

The urban structure has been broken down into a series of typologies that ensure a varied urban grain. Each is designed with a private courtyard and a strong urban edge to maximise street definition. Each Typology’s courtyard sits on a raised solid podium base for private use by tenants. These podiums allow for continued active frontage and narrower intimate and bustling city streets. Located on the podium are a myriad of perimeter block forms and towers, ensuring height and density variation while maintaining urban structure on the ground plain.

Legend / 图例 Urban Form & Structure Podium Height: 1-2 Storeys Podium Height: 3-5 Storeys Podium Height: 5+ Storeys 7 - 15 Floors 15 - 35 Floors 35 - 50 Floors 50 + Floors Landmark Building

13


QIAN ZHANG 2020 PORTFOLIO

3

4

4

6

5

4 3

5

2

3

2

1. 2. 3. 4. 5. 6.

Two Car Lanes Bus Lane Cycle Lane Parkland Recreation Biofiltration Swale Footpath

1

1 2

3 4

Major Distributor [50m]

2

2

1

5

6

3

4

5

Major Distributor [30m]

Park Promenade [20m]

1. 2. 3. 4. 5.

1. 2. 3. 4.

Two Car Lanes Bus Lane Cycle Lane Tree Lined Corridor Footpath

3

Central Promenade Outdoor Dining Tree Lined Corridor Kiosk

3 3

3

4

4

2

1

1 2

Minor Distributor [20m] 1. 2. 3. 4.

14

Two Car Lanes Cycle Lane Tree Lined Corridor Footpath

2

4

1

4

Access Roads [16m] 1. 2. 3. 4.

Two Car Lanes Pedestrian Footpath Extension Tree Lined Corridor Footpath

Laneways [8m] 1. 2. 3.

Pedestrian Lane Outdoor Seating Catenary Art and Lighting

2


QIAN ZHANG 2020 PORTFOLIO The most effective measures to control micro-climate by reducing surface temperatures are those which shade or reflect heat, especially those which involve evaporation. Here are the combination of different measures. Strategies for heat mitigation:

Stormwater Run-off Plan Site Boundary Indicative Catchment Boundary Bio-filtration Wetlands Water Bodies Surface Run-off Major Drainage Lines Existing Levels Retained

WATER MANAGEMENT & CLIMATE CONTROL Urban Heat Mitigation Measures

– Providing shade: Through deploying shade structures and planting trees surface temperatures can be reduced by up to 15 degrees through minimsing heat absorption. – Evaporative Cooling: By proposing water features such as misters, water play, urban stream, Irrigated vegetation can be reduced by up to 15 degrees through removing heat from the system. – Cool surfaces: Cool roofs and paving can reduce surface temperatures by up to 20-30 degrees through reflecting/ emitting heat

Green and Blue Roofs Reflection

Bird Habitat Grove 鸟类栖息丛林 Outdoor/Active Recreation Space

Urban Agriculture and Bee-keeping Plots Biodiverse Planting of Local Provenance

Green Facade Cooling Water Feature

Irrigated Grass Evaporation

Water Plaza

Shade and Foliage Reflection

Water Feature Evaporation

Central Ecological Corridor Site Boundary Ecological Corridor Urban Forest Water Treatment & Re-use Bio-filtration Wetlands Enriched Seed-bank

Outdoor Dining

Water Misters Evaporation

Shade and Foliage Reflection

Raingarden Evaporation Bio-filtration Raingarden

Porous Pavement Vegetation Evaporation Blue Strip

Green Streets and Roofscape Site Boundary Green Corridor Living Roofs Canal Naturalisation Reserve

Green Strip General traffic Shared Transport Priority Lane

Dedicated Cycleway

15


MIX C CENTRAL PARK HENGQIN, ZHUHAI, GUANGDONG

HISTORICAL BACKGROUND

1887-1975 Portuguese Colonial Period

1975-1992 Economic Reform Period

1992-2009 Hengqin Island Period

2009-2019 Hengqin New District Period

POTENTIAL USER

ENVIRONMENTAL VALUE

Young Individual

Green Space Resources

Sunlight & Temperature

Climate

Rich in Landforms and Green Space Resources

Marine climate

Couples

Local

Family

Air Quality

Sufficient Sunlight Excellent Air quality Pleasant Temperature

Macau Visitors

Tourists

LAND USE VALUE

R&D

Commercial MIX

Tourism

Residential

Education& Culture

Professionals

Class Groups

In the past 10 years, the government and developers have invested and completed 40% proposed projects in this land. The goal for the next 5-10 years is to accomplish at least 70-80% of the whole development. TRANSPORTATION ASSET

25-50 The Hengqin Mixc Central Park project is located in the core area of Hengqin, ​​ Zhuhai. With over 2 million square meters of floor space, it will provide commercial, restaurants, office, hotel and entertainment facilities. After the completion of the project, it will further promote economic growth in this area. The design team takes advantage of the natural environment and creates a landscape adventure sports park between the mountains. This green center hub will be transformed into an active heart of the overall master plan, running through the neighborhood community and becoming a great shopping and entertainment landmark.

30

MINS

MINS

35-60

5

MINS

MINS

China’s urbanization has undergone dramatic changes in the past 10 years. People live in a chessboard-style city, moving passively following the speed of the city. The project is inspired by the theme of “Wild” and is practiced in four core blocks. Expectation to arouse people’s desire for nature while satisfying the experience.


QIAN ZHANG 2020 PORTFOLIO SITE ANALYSIS Grading Analysis

COMMERCIAL

Public Transportation Analysis

Road Grading Site Grading Park Grading

PARK

Tram and Tram Stops 5.5

Metro and Stops

5.65

Bus Stop

5.5 6.0

5.5 5.5

6.3

6.0

OVER

NT

6.0 5.5

AD

ET

VE

RK ING

IMMER

4.2

Pedestrian Circulation Analysis

HOP

Major Pedestrian Entrance Major Pedestrian Route

NG

2nd Pedestrian Route

OR

BI

ES GAM RT

MA

NC

E

ITION

EXHIB

COU

Entrance of Underground Parking Entrance of Underground Road Urban Express Road Urban Secondary Road Urban Branch Road Internal Road

2nd Pedestrian Spot

WORKS

RF

IM

Accessibility Analysis

Major Pedestrian Spot

PE

CL

4.2

UR

E

5.5

SION

CENTRAL WILD PARK

RUNN

6.3

5.5 6.0

DISC

RETAIL

MA CAFE

4.2

5.5

5.65

开新

五道

ART

SPORT

Existing Roads

Park Streets

Fitness Paths

Program

Bridges

Landform - Water System

Wild Path

MUSIC RELAX

ART

WET FOREST

WILD FLOWER

Planting Experience

LABS

TROPICAL SPORT

OPEN GREEN SPACE

COMMERCIAL/ ACTIVITY

GRASSLAND RELAX

WETLAND

17


QIAN ZHANG 2020 PORTFOLIO

Low Density Commercial/Office buildings

16

16

14 14 15

13

17

11

Enclosed Commercial Space /High Rise Office Buildings

12

17

10

9

8

17 7 21 6

17

5

1

Blooming Island

2

Eco Pond

3

Misty Green Cliff

4

Green Wild Valley

5

Rocky Plaza

6

Sunny Grass Lawn

7

Xgame Jungle Base

8

Highland

9

Green Slope Sport Base

10 Wild Lab Base

18

11 Kid Adventure Forest

17

12 Wild Lab Flower Forest

4

13 Arty Grassland 3 3

20

14 Water Plaza 19

15 Wet forest Theater 16 City Boardwalk

2

17 Street Parking Lot (87) 1

18 National Pavillion 19 MIXC 20 Exhibition Center 21 Underground Entrance

18

Enclosed Commercial Space /High Rise Office Buildings


QIAN ZHANG 2020 PORTFOLIO

Curved Green Buffer

7M Curved Drive Way

Activate Outdoor Space

Architecture

Activate Park Landscape

7M Curved Drive Way

Outdoor Space/ Curved Green Buffer

Architecture

Curved Green Buffer

7M Festival Blvd

Outdoor Space/ Curved Green Buffer

Architecture

The other side of the canyon is the main stage of the sunken commercial plaza. The weekday stage and art cave can be opened for tourists, also can be used for rental.

Art Use rocks with tropical plants to create a dramatic canyon style lane

Fun rock slopes, escalators and stairs for visitors choose to access

B1 Floor commercial entrance

Sport

8.0 5.6

5.2 1.2

1.0

Relax Activity Main Path

Tropical Zone

Park Street

Cave Stage

Sunken Plaza

Sport Flag Store

Basketball court: In order to add visual effects to the venue, part of the terrain is raised, the ground part is designed as outdoor basketball court, and the raised mezzanine can also be used as an indoor basketball court.

Commercial

Creativity

Rocky Slope Feature

Green Plaza

Sports landmarks: The exterior is a climbing rock and the interior can be an indoor climbing and retraining gym.

10.5 7.5 5.7

5.7

Outdoor living

Office

Tropical Cafe

Park Street Park Entry Tropical Zone

Path

Basketball Court

Football Field

Tropical Zone Park Street

Cafe

Office

19



QIAN ZHANG 2020 PORTFOLIO

21


QIAN ZHANG 2019 PORTFOLIO

ST. CHAD’S RESIDENTIAL DEVELOPMENTS TILBURY, THURROCK, ESSEX

EXISTING CONTEXT RECREATION & CLINICAL FACILITIES

FERRIES & RAIL LINKS

1

2 3

LOCAL SCHOOLS

6

8

Public Amenity Space 1 Football Pitch 2 Playing Fields

5

7

4

3 Allotments 6 Sea Scouts 4 Public Open Space 7 Sheltered Housing 5 School Playspace 8 Go-kart Stadium

ROAD NETWORK

Primary Roads Secondary Roads Tertiary Roads

PRIBATE AMENITY

Academy School

Primary School

Nursery School

Junior School

BUS ROUTES

PEDESTRIAN ROUTES

Bus Stop (north/south)

URBAN GRAIN

BUILDING HEIGHT

1 storey 2 storeys 3 storeys 5+ storeys

The site is located on the northern edge of town. It is located on the site of a previous school, with fields (drained marshland) directly abutting the western boundary of the site. Surrounding the site are mainly residential developments interspersed with recreational and green areas.

22

The site benefits from a range of local schools, as well as nearby sports facilities. With walkable distance to the town centre, which provides all sorts of facilities, also very convenient connection to surrounding transportation network.

The existing semi detached houses have large front, side and rear gardens.

The density of the houses surroundings is around 25 DPH.

The overwhelming building height in the area comprises two storey houses with pitched roofs.


QIAN ZHANG 2020 PORTFOLIO SITE STRATEGIES SECTIO

N LINE

11

STREET TYPES

PUBLIC AMENITY

B-B’

12

8 21

3

1

14

13

6

VEHICULAR CIRCULATION

5

PRIVATE AMENITY

PRIMARY ACCESS

10

2

SECONDARY ACCESS

A’ A

4

SUDS

20 19

LINEAR PARK

18 16

7

9

SUNLIGHT

17

DIAGONAL AVENUE

15

F2

1. Proposed Tree 2. Proposed Specimen Tree 3. Proposed Ornamental Tree 4. Large shrub planting 5. Amenity Lawn

6. Low Level Planting F1 7. Swale 8. Proposed Native Hedge 9. Timber Bridge 10. Garden Furniture

Tree over hanging garden wall Willow Leafed Pear (Pyrus salicifolia ‘Pendula’)

Rear garden tree 1/2 Standard Fruit Trees (Mixed Varieties)

F2

MASTERPLAN

11. Play Equipment on Bark Chipping 12. Play EquipmentF1 on Gravel 13. Picnic Bench 14. Private Amenity Space 15. Stepping Logs

16. Tarmac Vehicle Road 17. Closeboard Fence Panels 18. Parking Bays 19. Timber Terrace 20. Ornemental Planting Bed 21. Garden Gate

Town House

Central triangular park

This section analyses the aspects of the existing site in order to maximise it’s potential. The evolution of the masterplan is based upon a series of strategic moves, which makes best use of the site and creates a dynamic, interesting sense of place which relates to its surroundings.

Large focus lime tree Tilia x europaea

These set out the framework of routes and spaces that connect locally and more widely, the way the development connects to the surrounding developments, and how route and open spaces relate to one another.

+10.000

+3.000 0.000

ELEVATION B-B’

23


QIAN ZHANG 2020 PORTFOLIO

DETAILED DESIGN AREA - A BIO-SWALE PLANTING

1 2

4

5

6

8

7

9

10

ION ECT

S

NE N LI

TIO

SEC

Cornus sanguinea FT: June red stem remains in winter

A-A’

HARD MATERIAL & PLAY FEATURE

FT - Flowering Time* EG - Evergreen

3

LINE

A-A’

Helleborus foetidus FT: January-April winter flower

Bergenia ‘Silberlicht’ FT: March-April low mainten,EG

Vinca minor FT: April-September EG,long flowering

Ajuga reptans FT: April-June evergreen

Resin Bound Gravel

Permeable tarmac

Wooden Bridge

AA--AA’ LLIINNEE N N O I O I T SSEECCT Juncus effusus FT: June-August perfect for pond margins

Rudbeckia hirta FT: July-October long standing & low maintenance

Iris pseudacorus Allium schoenoprasum Miscanthus sinensis FT: July-August FT: July-Aug FT: October-November ideal for pond margins edible leaves endure through the winter

SPRING

Stepping Logs

SUMMER

Balancing Beams

AUTUMN

WINTER

11

1 Large focus tree 6 Bioswale ditch Tilia x europaea 2 Betula pendula, m/s 7 Bioswale planting 3 Stepping logs (play) 4 Timber bridge 5 Balancing beams (play)

8 Betula pendula ‘Tristis’ 9 Seasonal planting bed 10 Gravel walkway

2

11

Undisturbed native subgrade

16 Mulch layer

12 Self-binding gravel

17 Geotextile

13 75-150mm sub-base

18 Bioretention soil

14 Undisturbed

19 Gravel bed

Membrane

35-50mm

native subgrade 15 Steel edging

12 13

14

3

17 18 19

20

3

4

BOTTOM OF SWALE AT +0650

1

1

2

16

connecting to the tank

BOTTOM OF SWALE AT +0650

1

15

20 Perforated pipe

FOUNDATION 300MM OR 200MM MIN. IF CLOSE TO DRAINAGE PIPES

1

2

3

4

5

3

2

1

1

2

NOTE: FFL OF LOGS NOT TO EXCEED 600MM ABOVE LOWEST POINT OF SWALE

5

FOUNDATION 300MM OR 200MM MIN. IF CLOSE TO DRAINAGE PIPES

2

F2

F2

LANDSCAPE DETAIL THROUGH BALANCE BEAM PLAY FEATURE (EAST SWALE) 1. 150mm dia play grade radiata pine support post with chamfered edges & top set flush to adjacent horizontal beam in concrete foundation. 2. 150mm dia play grade radiata pine support post with chamfered edges & top set 1500mm above adjacent horizontal beam in concrete foundation. Items designed to provide visual interest with colour & finish. 3. 150mm dia x 4500mm play grade radiata pine horizontal balance beam with chamfered edges attached to vertical support beam.

24

4. 150mm dia x 4500mm play grade radiata pine horizontal balance beam with chamfered edges attached to vertical support beam. one end to be located under and one end to be located over horicontal beams 5. Intermediate support posts to be located as close to the centre of horizontal beams as possible without interfering with swale surface & sub-base

LANDSCAPE DETAIL THROUGH STEPPING LOGS FEATURE (WEST SWALE) 1. 300mm dia. treated softwood timber posts with pencil-edged corners. (max height not to exceed 600mm F2 above lowest point of swale)

F1

F2 to conflict with underground 2. concrete foundation. (foundation not pipes) F1

F1

F1

F2

F2

House plot and garden in this area are east-west facing, avoided northerly aspect. It will comprise a mixture of hard and soft landscaping with someF1swales for surface water retention, and couple of play features. but F1 it is intended that these will be designed to be attractive amenity to add significantly to the character of the area.


QIAN ZHANG 2020 PORTFOLIO

DETAILED DESIGN PLAN B HARD MATERIAL

TREE & GARDEN PLANTING

6

5

7

4 3

2

SECTIO

N LINE

Gravel planting bed

Permeable tarmac

Garden Edging

gravel topping on soil

vehicle track

planting bed edging

Lavender Hedge Lavandula angustifolia ‘Hidcote’

Hebe rakaiensis

Agapanthus ‘White Heaven’

shrubby veronica -full sun/partial shade - h:0.5-1, w:1-1.5m - white flowers in summer - evergreen shrub -fully hardy

African lily -full sun - h:1.2, w:0.5m - pure white, trumpet-shaped flowers in summer - semi-evergreen -frost hardy

Malus ‘Evereste’

Prunus ‘Accolade’

Pyrus salicifolia ‘Pendula’

crab apple tree - medium-sized h:4-8m, s:4-8m - white/pink flowers in spring - ornamental/edible fruit in autumn - deciduous

cherry ‘Accolade’ - medium-sized h:4-8m, s:4-8m - pink flowers in spring - edible fruit, orange/red flowers in autumn - deciduous - low maintenance

weeping silver pear - medium-sized h:8-12m, s:>8m - scented white flowers in spring - edible fruit in autumn - deciduous - pest free

Lavandula angustifolia ‘Rosea’ Salvia nemorosa ‘Caradonna’

Stipa tenacissima

SECTIO

N LINE

1

B-B’

B-B’

Knautia macedonica 13

-full sun - h:0.6, w:0.75m - deep violet flowers in summer - highly scented - flowers attractive to bees -very ideal for edging paths and borders

-full sun - h:0.75, w:0.75m - rose-pink flowers in summer - highly scented - flowers attractive to bees - ideal for edging paths and borders - fully hardy

Balkan clary - full sun/partial shade - h:0.5, w:0.3m - grey-green foliage, purple-black stems - violet-blue flowers in summer/autumn - long-flowering - fully hardy

Mexican feathergrass Macedonian scabious - full sun -full sun - h:0.6, w:0.3m - h:0.8, w:0.45m - pale yellow-green leaves - deep crimson, pincushion-like flowers - silver-green flowers in summer in summer/autumn - deciduous grass - attractive to bees and butterflies - fast-growing - long-lasting - fully hardy - fully hardy

9

20

8

10

Concrete kerb Concrete bed & haunch Growing medium soil 19

21 22 23 24

12

14

15

16

17 11

Gravel course

18

Compacted subgrade

1

Shade tolerant planting

7

Prunus ‘Accolade’

Pyrus salicifolia ‘Pendula’ 8 Rear garden Garden terrace 3 9 Gated parking bay (timber decking) 4 Balcony 10 Sunny planting bed 2

1

2

13

Undisturbed native ubgrade 19 Concrete curb/edge restraint

14

Surface course 20mm

20

Undisturbed native subgrade

15

Binder course 50mm

21

Concrete slab 50mm

16

Base course 70mm

22

Bedding sand 25mm

5

Malus ‘Evereste’

11

Public parking bays

17

Sub-base 100mm

23

Concrete base 125mm

6

Concrete sidewalk

12

Vehicle track

18

Compacted subgrade

24

Compacted subgrade

Perforated Pipe

11

3

4

12 13

5

6

7

8

F2

10

9

F1

14

15

F2

F1

16

17 18

19

PLANTING BED SECTION DETAIL 1. Root barrier on four sides, 650mm deep 2. Green tree amenity tree soil 3. Sub-base 100mm 4. Base course 70mm 5. Binder course 50mm 6. Surface course 20mm 7. Concrete Kerb, 255x145x915mm HxWxL 8. Concrete bed with haunching to support kerb 9. 75 mm loose gravel layer 10. Green-tree top soil layer 500mm

11. Concrete slab 50mm 12. Bedding sand 25mm 13. Concrete base 125mm 14. Compacted subgrade 15. Green-tech - Green-tree amenity tree soil 16. Compacted subgrade 17. Green-tech - Mona Relief Grande Tree Irrigation MRG3 - 3mx60mm 18. 600mm diameter rootball 19. Plati-Mat tree anchor system - RF1P

The mews is a deliberately narrow road, giving it a distinct identity in relation to the other streets. It is defined on each side by two storey courtyard houses which include single storey elements, ensuring that the mews receives good daylighting and open aspect despite its narrow width. There will be gates accessing the car port to each house and otherwise additional on-street parking will be in a chevron arrangement in groups, interspersed with trees. This arrangement acts as a chicane to reduce traffic speeds, The whole street width will be a shared surface.

25


QIAN ZHANG 2019 2020 PORTFOLIO

GARDEN CITY SKYLINE FUTIAN, SHENZHEN, CHINA

GARDEN PLAN

This is the first international public flower show held by the Shenzhen Municipal Government. Our design team was commissioned to design two gardens, one of which was the “Skyline Garden”. It was a pre-formal flower show display, last for a month, and it plays significant role as advertising for the upcoming show before it officially launched to the public.

26

The site is located in central plaza of the Shenzhen Civic Center. The idea is to place a delicate and exotic small soft garden into the center of the city which dominated by hardscape. Lighting structures has also been designed and brings special effects in the nighttime. It also designed to coordinate with the city’s breathtaking light show on the background, and attract the public’s attention, eventually encourage them to participate in the official garden exhibition held in the Botanical Garden one month later.

The design concept is to arrange the main landmarks in the three districts of Shenzhen according to the geographical location. Plants are follow the overall ‘tempo’ , matches the height of the building shape, to creating the feeling of a ​​flower city. The plant distribution rule is starting with relatively calm colors on the edge, then reaches the more vivid visual effect on the central island. At night, the garden will have a three-hour lighting display, lighting tubes which embedded in the steel pipe is a perfect way showing the shape of the skyline and light up the planting underneath. Worth mentioning that all materials on the site are recycled materials.


QIAN ZHANG 2020 PORTFOLIO

FL 0.00

10

7

34 0.4 0

0.2 0

0.40

0.30

ANCHOR POINT B

PL 0.40

8

0

6

0.50

0.60

60 0.

8

40

2 25

20

14

0

43

30 22

PL 0.40

18 18

8

2

24

16 46 8

21 0.70 0.60 0.50

0 0.5

19

7

10

0

20 22

25 0.50 0.70

12

7 0.30

FL 0.00

5

0 0.4

0.30

0.40

0.70

0.60

0.50

0.70

37

34

8

19

9

29

30

17

28 24 10

18

21

25

11 43

20

47 18

37 13

32

38 25

27

39

38 44

10

31

31 19

0.60

22

23

37

19

8

22

17 0.60

50 0.

展市民中心周边宣传 hen Flower Show

3

0.60

3

2

12

15%SLOP

9

34

9

0.50

38

20

6

ANCHOR POINT G PL 0.40

16

13

45

0.6

ANCHOR POINT E

10

10

18 20

8

15

3

PL 0.40

0.50 0.60 0.70

16

7

5 18 9 14 19

33

0.70

FL 0.45

3

13 8

PL 0.40

4 23 16

11 2

16

0.50

9

ANCHOR POINT F

1

13 16

13

31

4

0.60

2

8

25 7

19

15

11

FL 0.00

ANCHOR POINT H

36

13

7

8 16

10

ANCHOR POINT D

44

5

8

44

10

12

FL 0.00

FL 0.45

9

7

0.5

0.8 0 0.7 0 0.6 0

FL 0.45

4

5

27

19

PL 0.40

14

18

46

39

25

19

11

PL 0.40

19

35

2

11

24

20

12

23

12 18

9

2

11 47

14

20

1

0

8

13

19 PL 0.40

25

27

41

12

43

10

ANCHOR POINT C

25

19

17

0.5

20

8

2

0

6 0.

FL 0.45

10

9

14 14

7 0.

9

3

5

6

0

15%SLOP

2 17

60

0.50

0.70

1

0.60

1

8

2

22

0.5

0.

ANCHOR POINT A

0.3 0

FL 0.00

18 6

13 2

9

27

34

12

17 18 46

6

19 16

43 14

7

17

7

25

33

24 8

14

FL 0.00

ANCHOR POINTS PLAN j ?/>/'4- 9:;*/5 :NK [YK UL ZNOY JXG]OTM GTJ YVKIOLOIGZOUTY YNGRR HK XKYZXOIZKJ ZU ZNK OTZKTJKJ YOZK 8KVXUJ[IZOUT OT ]NURK UX VGXZ ]OZNU[Z ZNK K^VXKYYKJ IUTYKTZ UL ?/>/'49:;*/5 OY YZXOIZR_ VXUNOHOZKJ *+9/-4 /4:+4: :NOY JXG]OTM OY YURKR_ LUX *KYOMT /TZKTZ UTR_ :NK )UTZXGIZUX YNGRR HK XKYVUTYOHRK LUX GRR IUTYZX[IZOUT JKZGORY GTJ UX YNUV JXG]OTMY OT GIIUXJGTIK ZU RUIGR YZGTJGXJY YZGZ[ZUX_ M[OJKROTKY GTJ IUSVROGTIK Y[HPKIZ ZU XK\OK] UL ?/>/'4- 9:;*/5 VXOUX ZU ZNK )USSKTIKSKTZ UL =UXQY

CONTOUR PLAN 6850+):

3(,

,583':

'

9)'2+

'9 *8'=/4-

PLANTING PLAN

MBF001-DD-03b More than 50 species of plant has been selected. Gravel and grass paver to coordinate as paving materials. Micro-topography has been made on the site to enhance the layering visual effect, while the aluminum thin wall at the boundary is adapted to following the changes of terrain. we have been involved in every construction stage, including select planting, hard materials, lightings and others. We also cooperated with the workers to take charge of the planting work on site from day one, to ensure that the quality of its projects is up to the standard.

27


QIAN ZHANG 2020 PORTFOLIO

CONSTRUCTION DETAIL

RESERVEΦ55 ROUND HOLE

RESERVEΦ55 ROUND HOLE PRE-EMBEDDED Φ10 STEEL

GROUND LEVEL

8MM THICK STEEL PIPE LED DIMMABLE TUBE (PROGRAMMED) PRE-EMBEDDED Φ10 STEEL

BOUNDING SCREW TWO SECTIONS EVERY 1M

CONCRETE: C20 REINFORCEMENT STEEL: HPB300

CONCRETE FOUNDATION PLAN

LIGHTING FIXTURES TOP VIEW CONCRETE: C20 REINFORCEMENT STEEL: HPB300

5MM THICK STAINLESS STEEL BRUSHED SURFACE,LIGHT GREY

150MM THICK LIGHT GREY PEBBLE FILL STAINLESS STEEL TRENCH 100MM DIAMETER DARK BROWN ROUND STAKE (HOOKING HEMP ROPE ON THE SIDE)

3MM THICK DARK GREY GALVANIZED STEEL BASE

2019 深圳花展市民中心周边宣传 2019 ShenZhen Flower Show

j ?/>/'4- 9:;*/5 :NK [YK UL ZNOY JXG]OTM GTJ YVKIOLOIGZOUTY YNGRR HK XKYZXOIZKJ ZU ZNK OTZKTJKJ YOZK 8KVXUJ[IZOUT OT ]NURK UX VGXZ ]OZNU[Z ZNK K^VXKYYKJ IUTYKTZ UL ?/>/'49:;*/5 OY YZXOIZR_ VXUNOHOZKJ *+9/-4 /4:+4: :NOY JXG]OTM OY YURKR_ LUX *KYOMT /TZKTZ UTR_ :NK )UTZXGIZUX YNGRR HK XKYVUTYOHRK LUX GRR IUTYZX[IZOUT JKZGORY GTJ UX YNUV JXG]OTMY OT GIIUXJGTIK ZU RUIGR YZGTJGXJY YZGZ[ZUX_ M[OJKROTKY GTJ IUSVROGTIK Y[HPKIZ ZU XK\OK] UL ?/>/'4- 9:;*/5 VXOUX ZU ZNK )USSKTIKSKTZ UL =UXQY

3(,

,583':

'

9)'2+

'9 *8'=/4-

ANCHOR POINT A 5MM THICK STAINLESS STEEL TRENCH FILLED WITH PEBBLE

GROUND LEVEL

MBF001-DD-05b

ANCHOR POINT B

TIMBER FENCE SUPPORTING STRUCTURE

GROUND LEVEL

SECTION 1-1

CENTER PLACING

,583':

'

9)'2+

'9 *8'=/4-

2019 深圳花展市民中心周边宣传 MBF001-DD-05b 2019 ShenZhen Flower Show

j ?/>/'4- 9:;*/5 :NK [YK UL ZNOY JXG]OTM GTJ YVKIOLOIGZOUTY YNGRR HK XKYZXOIZKJ ZU ZNK OTZKTJKJ YOZK 8KVXUJ[IZOUT OT ]NURK UX VGXZ ]OZNU[Z ZNK K^VXKYYKJ IUTYKTZ UL ?/>/'49:;*/5 OY YZXOIZR_ VXUNOHOZKJ *+9/-4 /4:+4: :NOY JXG]OTM OY YURKR_ LUX *KYOMT /TZKTZ UTR_ :NK )UTZXGIZUX YNGRR HK XKYVUTYOHRK LUX GRR IUTYZX[IZOUT JKZGORY GTJ UX YNUV JXG]OTMY OT GIIUXJGTIK ZU RUIGR YZGTJGXJY YZGZ[ZUX_ M[OJKROTKY GTJ IUSVROGTIK Y[HPKIZ ZU XK\OK] UL ?/>/'4- 9:;*/5 VXOUX ZU ZNK )USSKTIKSKTZ UL =UXQY ANCHOR LENGTH 300

3(,

ANCHOR LENGTH 300

6850+):

ANCHOR LENGTH 300

j ?/>/'4- 9:;*/5 :NK [YK UL ZNOY JXG]OTM GTJ YVKIOLOIGZOUTY YNGRR HK XKYZXOIZKJ ZU ZNK OTZKTJKJ YOZK 8KVXUJ[IZOUT OT ]NURK UX VGXZ ]OZNU[Z ZNK K^VXKYYKJ IUTYKTZ UL ?/>/'49:;*/5 OY YZXOIZR_ VXUNOHOZKJ *+9/-4 /4:+4: :NOY JXG]OTM OY YURKR_ LUX *KYOMT /TZKTZ UTR_ :NK )UTZXGIZUX YNGRR HK XKYVUTYOHRK LUX GRR IUTYZX[IZOUT JKZGORY GTJ UX YNUV JXG]OTMY OT GIIUXJGTIK ZU RUIGR YZGTJGXJY YZGZ[ZUX_ M[OJKROTKY GTJ IUSVROGTIK Y[HPKIZ ZU XK\OK] UL ?/>/'4- 9:;*/5 VXOUX ZU ZNK )USSKTIKSKTZ UL =UXQY

ANCHOR LENGTH 300

2019 深圳花展市民中心周边宣传 2019 ShenZhen Flower Show

GROUND LEVEL 3(, 6850+):

,583':

'

9)'2+

'9 *8'

ANCHOR POINT D

2019 深圳花展市民中心周边宣传 2019 深圳花展市民中心周边宣传 ELEVATION 2-2 2019 ShenZhen Flower Show 2019 深圳花展市民中心周边宣传 2019 ShenZhen Flower Show 2019 ShenZhen Flower Show 28

IZKJ ZU ZNK '4-

CENTER PLACING

6850+):

j ?/>/'4- 9:;*/5 :NK [YK UL ZNOY JXG]OTM GTJ YVKIOLOIGZOUTY YNGRR HK XKYZXOIZKJ ZU ZNK ANCHOR OTZKTJKJ YOZK 8KVXUJ[IZOUT OT ]NURK UX VGXZ ]OZNU[Z ZNK K^VXKYYKJ IUTYKTZ UL ?/>/'4POINT E j ?/>/'4- 9:;*/5 :NK [YK UL ZNOY JXG]OTM GTJ YVKIOLOIGZOUTY YNGRR HK XKYZXOIZKJ ZU ZNK ANCHOR 6850+): 3(, 9:;*/5 OY YZXOIZR_ VXUNOHOZKJ *+9/-4 /4:+4: :NOY JXG]OTM OY YURKR_ LUX *KYOMT /TZKTZ UTR_ ANCHOR OTZKTJKJ YOZK 8KVXUJ[IZOUT OT ]NURK UX VGXZ ]OZNU[Z ZNK K^VXKYYKJ IUTYKTZ UL ?/>/'4POINT G :NK )UTZXGIZUX YNGRR HK XKYVUTYOHRK LUX GRR IUTYZX[IZOUT JKZGORY GTJ UX YNUV JXG]OTMY OT 9:;*/5 OY YZXOIZR_ VXUNOHOZKJ *+9/-4 /4:+4: :NOY JXG]OTM OY YURKR_ LUX *KYOMT /TZKTZ UTR_ POINT F j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

MBF001-DD-04b

GIIUXJGTIK ZU RUIGR YZGTJGXJY YZGZ[ZUX_ M[OJKROTKY GTJ IUSVROGTIK Y[HPKIZ ZU XK\OK] UL ?/>/'4- 9:;*/5 VXOUX ZU ZNK )USSKTIKSKTZ UL =UXQY

6850+):

3(, 深圳花展市民中心周边宣传 2019

j ?/>/'4- 9:;*/5 :NK [YK UL ZNOY JXG]OTM GTJ YVKIOLOIGZOUTY YNGRR HK XKYZXOIZKJ ZU ZNK OTZKTJKJ YOZK 8KVXUJ[IZOUT OT ]NURK UX VGXZ ]OZNU[Z ZNK K^VXKYYKJ IUTYKTZ UL ?/>/'49:;*/5 OY YZXOIZR_ VXUNOHOZKJ *+9/-4 /4:+4: :NOY JXG]OTM OY YURKR_ LUX *KYOMT /TZKTZ UTR_ :NK )UTZXGIZUX YNGRR HK XKYVUTYOHRK LUX GRR IUTYZX[IZOUT JKZGORY GTJ UX YNUV JXG]OTMY OT

6850+):

3(,

,583':

'

9)'2+

'9 *8'=/4-

6850+):

3(

,583':

'

9)'2+

'9

MBF001-DD-04b


QIAN ZHANG 2020 PORTFOLIO

29


QIAN ZHANG 2019 2020 PORTFOLIO

LH BUTTERFLY GARDEN

FAIRY LAKE BOTANICAL GARDEN SHENZHEN, CHINA

This garden is from the official garden show which we were in charged designing. The site is sit inside the city botanical garden. The whole flower show includes five international gardens. 10 parterres built by well-known domestic garden companies; and 11 boutique gardens which representing all districts of Shenzhen.

30

We took the butterfly as the main design concept, representing the image of a butterfly’s transformation. More than 50 species of plant were selected and most of them are easy to attract butterflies. Colored acrylic plates and nylon ropes has also been selected to create the symbolic figure of butterflies. All materials on the site are recyclable, to avoid any unnecessary burden for the environment. This design has won the gold prize at the boutique garden section.


QIAN ZHANG 2020 PORTFOLIO INSTALLATION DETAIL

WOODEN POLE WRAPPED WITH 8MM THICK L SHAPE DARK GREY GALVANIZED STEEL

MIDDLE POLE

SCREW FIXING, NAIL ON POLE WITH WIRE WINDING

LEFT POLE

RIGHT POLE

WEATHERING STEEL BOX SECTION BASEPLATE WELDING/ TRIANGULAR REINFORCEMENT

DARK GRAY GALVANIZED STEEL CLIP FIXING

COLOURED ACRYLIC SHEET

PASTE BONDING TRANSPARENT ACRYLIC SHEET

8MM U SHAPE WEATHERING STEEL SLOT BURIED DEPTH 400MM

WEATHERING STEEL BOX SECTION BASEPLATE WELDING/ TRIANGULAR REINFORCEMENT

DESIGN CONCEPT A

DESIGN CONCEPT B

DARK GRAY GALVANIZED STEEL CLIP FIXING

CUSTOMISED ACRYLIC SHEET WITH NYLON THREAD INSIDE

8MM U SHAPE WEATHERING STEEL SLOT BURIED DEPTH 400MM

WEATHERING STEEL BOX SECTION BASEPLATE WELDING/ TRIANGULAR REINFORCEMENT

The design concept consists of two preliminary design solutions. Mainly used acrylic sheets, nylon rope s and weathering steel plate to represents the butterfly idea. Visitors can see through all these structures, so there are barely any viewing blocking. We have selected red, purple, blue and yellow as the colors of acrylic plates and transparent illusion PVC which is matching with flower colors, it not just enhance the dynamics of the garden, and it will also cast a dazzling effect on the pavement under the illumination of the sun. The installations on site are cleverly arranged, very solid as a temporary garden exhibition, easy to assemble and disassemble, which also greatly reduces labor costs..

31


QIAN ZHANG 2020 PORTFOLIO

32


QIAN ZHANG 2020 PORTFOLIO CENTRAL PARK

OLD DAGENGHAM PARK

GREATFIELD PARK ST CHADS PARK BARKING PARK

VALENCE PARK

BARKING AND DAGENHAM - OPEN SPACES STRATEGY BARKING & DAGENHAM, EAST LONDON

MAYESBROOK PARK 33


QIAN ZHANG 2020 PORTFOLIO

34


QIAN ZHANG 2020 PORTFOLIO

“LONDON EYE” - 2015

35


Thank you. . .

QIANZ1128@GMAIL.COM

07923 216968

. .


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.