Qihan Lei | PORTFOLIO Master of Architecture Washington University in St. Louis Email: leiqihan@wustl.edu Tel: 314-229-0018
CONTENTS
01. TANGIBLE AND INTANGIBLE WORKING SPACE Criticism on City Sociology | (R)evolution of Office and Spaces Jan. 2015 - May. 2015
02. FLOWING TOWARD THE FUTURE Design of Women heritage museum with sunlight study Jan. 2018 - May 2018
03. DRAW OUT THE HORIZON Daycare center and Culinary school Jan. 2019 - May 2019
04. TENSILE STRUCTURE VILLAGE HOTEL Natural construction | Design of Youth Hotel in Rural Village Nov. 2015 - Jan. 2016
05. GYMASIUM IN VILLA 31 Urban link in Buenos Aires Sept. 2018 - Dec. 2018
06. RUNNING BRIDGE Practical Construction | Pavilion Design and Build 15 Sept. 2016 - 30 Sept. 2016
P1-4. Internship Practice
TA N G I B L E A N D I N TA N G I B L E WORKING SPACE Criticism on City Sociology (R)evolution of Office and Spaces Academic | Teamwork Collaborator |Yang Jiebei, Hou Junqing Instructor |Ruan Hao Location |Fengqi Road, Hangzhou, China
Could the connections be “the larger, the simpler�? We are asking this because companies have changed revolutionary as result of rapid development of technology -- more employees, more serving fields and more complex connections in business yet the proficiency in the office have suffered from it.
01 Virtual space of the Internet gives us a good answer as Collaboration Software. How could an architecture do the same thing in a tangible space? We found a delicate designed three-dimensional spatial logic in this kind of software that could translate into an architectural approach applying to an advertising agency, in which a "simpler" connection is urgently needed.
Adverting Agency Needs (Tangible)
App
Market analysis
Accessory Product
Graphic design Web design
Web design
Brand planning
Brand planning
Graphic design
App
Advertising companies have engaged in much more areas nowadays, and it leads to a change in their organization structure. With the hierarchy in the organization grows deeper and the process of infor mation delivery becomes more complicated, the cost of resources collecting gets higher.
Fields involved of Advertising Agency
With a distinct layering between superior and subordinate, it needs greater efforts to passing information, and sometimes it may cause message losses.
Traditional Working Pattern
Layers gradually fade away from the company structure, communication becomes more and efficient and easy.
Expected Working Pattern
Analysis of |
Collaboration Software
|
Solutions (Intangible)
Settings
ORGANIZATIONS
Members
Dashboards
HOMEPAGE
Reachable Link (Bi-directional)
Favorites
Reports
Meetings
Projects
ME
Notes
Group Chat Agenda
Tasks
Review
INDEX
Meetings
Files
Labels
PROJECTS
TAskboards
Posts
One-way Link
Visible Link (Bi-directional)
After analyzing the hyperlinks between all the buttons and pages, a three-dimensional structure came out from the "intangible working space".
Translation from "Intangible" to "Tangible"
LINK STRUCTURE
Reachable Link Visible Link
PROJECT
REVIEW
POSTS
ME
• "LINK STRUCTURE" of the software mainly consist with "Project" and "Task", is where places all the information, documents, and related group
members. We Transfer it into a form of continuous ramp structure which interspersed with each other, thus every individual using this ramp could working on the project of himself and communicate with others at the same time.
• "Project"
homepage is an overview of the project and where a good place to show it to the public -- in the office building,vvv it is the entrance, for both members and a busy path for the citizens.
• "REVIEW" help users switch among programs and departments -- just like the central axis of every ramp, is a short cut to everywhere. • "POSTS" and "meetings" is like an information bank, we use screen boards to serve the function of discussion places and information display area.
• "ME" is the center of the structure, both in the software and the office setting, with space provide both private and publicity.
Experience in the office: Every individual knows their position and tasks
Groups to groups connections
Creative department
Process department
Customer service
Core Meeting space
Entrance and Hall Marketing department
Let the crowd of the city be part of member in the process of a project
Second&Third Floor Plan
Fourth&Fifth Floor Plan
Sixth&Seventh Floor Plan
01
5
10
20
FLOW TOWARD FUTURE Women Heritage Museum Design
Academic | Individual Instructor |Kathryn Dean Location | Central Park, NY
The heritage museum is trying to show the history of the women character that they can warmly accept everything but strong enough to fight against the world.
02 The project begins with a RULED and UNRULY exercise using unruly instinct and to create apertures that direct light. Models tested the performance in actual daylight over the course of a full day and project the performance through the seasons.
We st D r
Central Park West
AMERICAN MUSEUM OF NATURAL H I S T O R Y
79th St. Transverse
CENTRAL P A R K
W 77th St.
The heritage museum is standing on a big hard rock at the top of a grassy slope with trees on both sides. Located right in front of the American Museum of Natural History, it poses the gesture of a tough woman facing the ruled history that was written by males -- yet it still has arms warmly open to life.
In the interior, sunlight is introduced from a vertical slot. Two curving walls record sunlight over the course of a day. From morning to the noon the light will gradually move and fade along the first curvy wall; around noon time there is a contrasting point that the light move from weakest to the brightest; then it will gradually fade again. The movement of light represents the constant movement of feminism throughout history, and then, the future.
THE WOMEN H E R I TA G E M U S E U M
Insert the sunlight model on the site. With the exact height of the sun in NY, it will be able to trace the sunlight spot and then generate the height of the orientation of the two pieces of the main wall.
Occupy the space by two-volume: one is facing downhill and stretches the arms along with the trees; the other is a bridge that will be able to connect two sides of the park.
The flow of the form starts along with sunlight trance on the “sun-dale� wall, then goes up and looks back upon where it began and the Natural History Museum.
Adjust the interior experience with the exterior curves to a harmonious result.
5 4
1. Sunlight slot 2. Future wall 3. History wall 4. Temporary exhibition 5. Lookout point
2 4
1 Third Floor Plan
3
2
4
1
2 1 Ground Floor Plan
Second Floor Plan
Diagram of direct sunlight filtered by the aperture throughout a year, and distance that the maximum distance between visitor and the displaying walls.
1850
1848 Inspired by Le Corbusier’s relief on concrete walls, the history wall tells the story of women history in the relief that using different concrete techniques. In addition to the historical events, the relief also includes the sunlight track from sunrise to sunset of each day and from summer to winter of each year. So visitors in the museum will see and feel the flow of time and also the history course, a year, and a day condensed in the air. The future wall is left blank, for people to imagine, modify and make effort to lead to a better future.
A summer afternoon sunlight on the future wall
Section A-A
Section B-B
DRAW OUT THE HORIZON Daycare center and Culinary school
Academic | Individual Instructor |Adrian Luchini Location | Earth City, St. Louis, MO
The project is a combination of a daycare center and culinary school. It relieves the childcare need of workers in Earth City and provides quality food for residents and workers in the area. Covering with a curvy, climbable roof, the project shows a welcoming gesture by softly connecting the space above the empty roofs of two warehouses to the linear green area on the ground that exists between them. This space, originally conceived as mere utilitarian for the circulation of trucks, is now transformed into a landscaped boulevard of sorts, becoming de facto an important open space at one of the access points of the area.
03 The fluid surfaces that weave together , bridge two programs, as well as the landscape and the expansive warehouses. By breaking the boundary of sky and earth and joining the wall and floor, this timeless loop of space and its double program contributes to the lacking needs of Earth City. . The extra roof surface of the warehouses will be covered with solar panels taken advantage of the uninterrupted exposure to the south, thus able to generate enough energy to become self-sufficient. Last but not least, this project in its deliberate extended spread proposes to capitalize and celebrate the horizontal prevalent condition of the business park, where the timid monumentality inherent in the place is seldom celebrated.
Earth City in St. Louis is a business park full of big single-story warehouses and wide truck lanes and empty parking lots. However, the servicing facilities are insufficient in the entire neighborhood.
Instead of making space by stacking on vertical, we can use the surfaces that are existing, the ones that absorbing sunlight and exposed to the rainwater but did not utilize them well. Also, make diagonal connections to transfer the sky to the earth will add layers to the tedious and generic big boxes in Earth City. Embrace the space other than making space. And make the warehouses more than storage and make the landscape more than a park.
Exsiting Facilities
Flow of People
business park
truck
drivers
2 restaurants
office
workers
gas
w e e k e n d - parents and kids
station
p a r k i n g field
h o t e l s
New Energy
college
f ad
a faith church
people after work -weekdays and weekend
ul ts
s o
ln es
Se
rio
a
bars and cafe good restaurants o u t d o o r b a r b e c u e playground Stress relivers s u n b a t h water view g y m recreation
us kid s
soccer
Needs
ne in ss
A d u l t s Eat and relax Culinary School Daycare center Study and play K i d s Since Earth City has no fulltime residents, the office workers and truck drivers come and go for work every day, they have a need for daycare center. The establish of a such space would also serve for the adults for overlayed needs. Advance with the idea that use the diagonal to bridge and expand the definition of the space, and it is also necessary to search the dialectical quality hiding inside the program. So offer the adults that spend all the time in a cubic office at work a relaxing fluid space, and provide a serious food quality cafeteria, at the same time delicately divided height of space is what needs to explore.
pla y fu
Daycare center
Space in between: Kitchen and dinning
Option 1 Pinch the sky and the earth to one vanishing point to create an infinitive horizon.
Oprtion 2 Bring the earth up toward the sky.
Option 3 Blend the definition of inside with outside to design a negative space.
y
How to occupy the space, to reinforce the neglected value of the horizontal world?
xp City E Earth
There is a strip of the curb right in the middle of the two warehouses, which create a boulevard image and creates a natural entrance for the new program.
nt
kefro
Dr. La
Earth
Culinary School
Expy City
The site locates ON top of two most generic warehouses in the Earth City.
Polycarbonate skylight: Pyramid shape and flowing with the curvy roof surface allow the rainwater to drain and collect effortlessly. Waffle structure roof: 10’ X 10’ crossing grid structure supported by 2’6” X 4’6” columns that go through the new program and the original warehouse. Start from a serious arrangement of on the children’s part and a loose and relaxing method on the adults’ section.
Culinary school
+
= Daycare center
Double the layer to create space and twist the surface to divide subtly.
Diagram: Basing on the goal to offer the adults a fluid experience, the adult’s side started with several circles that hold the need for cooking art classes and semi-enclosed space that guides people’s view. Then wrap them with two punctuated bands that allow the activities not only fluid inside but the same outside. The bands extend and rotate towards the day-care side and become floors instead of walls. They cross each other on the section, to create smaller, hide-able, playful space for children. Roof of the original warehouse: The columns of the original warehouse will be maintained as it was, and reinforced with the concrete structure to support the new part of the roof which will build the new project on. The rest part of the warehouse will maintain the same, except there will be implant solar panels to get a self-sufficient electric supply.
C
B
A
C
B
A
N
Section A-A
Section B-B
Section C-C
It presses people’s vision through a horizontal frame and makes the viewer realize the value of the horizontal landscape.
The complicated section on the children’s part of the project offers a closeness between kids and adults.
NEW SUSPENSION Natural construction Design of Youth Hotel in Rural Area Academic | Teamwork Collaborator |Luo Jingwen Instructor |Adam Brillhart, Jiang Weihua Location |Huantan, Zhejiang, China
Based on the wooden structure of the Prototype House Project, the “New Suspension� project is an upgrade of the traditional suspension and it creates a brand new atmosphere. The supporting components visualize the flexibility and strength of log as the construction material. Besides, the supporting components, roofs and enclosures are interlaced while maintaining respective features.
Structure of PROTOTYPE HOUSE designed by ABK and Frei Otto
Simplified structure unit
Units combinations
Unit Typology
The sequence of units provides a Rhythm of FUNCTION
The sequence of units creates a Rhythm of LIGHT AND SHADE
Various combinations of meta units are displayed here and the second floor, with its distinctions, is the extension of the first floor. Each joint of the structure has its unique feature and it attracts our attention. The strength of log is presented through the supporting components propping the whole structure while the tilt of the components shows the flexibility. The flexible connection of the wooden roofs and supporting components, to some extent, allows replacement of fragments. Located at a depression, the building sits on the southern bank of a river which flows westward. The height difference of the building and surroundings leads to seclusion. As we walk down the stairs enclosed by thick bamboo forests, the sound of flowing water attests that we are entering a secluded space.
Second Floor plan
04
03
01
First Floor plan 04 03
01 | Tea house 02 | Bridge 03 | Reciption 04 | Rooms
02
In traditional Chinese architecture, no matter bold or slender, old or new, logs as the fundamental construction material can be used anywhere. In modern architecture, however, the development of woodprocessing Industry and geometric trends of design result in the popularity of regular-shaped wood. The industrial processing makes wooden components easier to joint and yet some natural merits (e.g. flexibility) are gone. However, adoption of logs can simplify the processing, reduce the demands of resources and thus is more environment-friendly.
Inspired by different scales of traditional Chinese residences, we try to create various atmospheres like seclusion, openness and silence. The building looks quaint thanks to the wide use of logs and, nevertheless, the way that the logs are jointed shows modernism.
01 03
Polycarbonate panel B o l t e d j o i n t Thin log frame Hanging curtain
02
04
05
L o g c o l u m n Interior wood panel Stuctural polywood (Insert insulation) P T F E F u r r i n g s t r i p Outer wall wood panel
09
Wood board Floor brace Beaverboard Load strip Wood beam 09
06 08
Interior wood panel Stuctural polywood (Insert insulation) P T F E F u r r i n g s t r i p Outer wall wood panel L o g c o l u m n
07 09
09
Section A
Structure & Material
Structure Model Details Structure Model Details
01 02 03 04 05 06 07 08 09
Polycarbonate panels Polycarbonate drips Thin log frame Steel cable system Pendant curtain F l o o r s u r f a c e Floor structure Log column structure Wood Panel Enclosures
Section B
GYMNASIUM IN VILLA 31 Buenos Aires Studio Academic | Individual Instructor |Gustavo Cardon, Gerrado Caballero Location | Villa 31, Buenos Aires, Argentina
At the edge of a well-known and studied shanty town – Villa 31 (future Barrio 31) and in the proximities of the business district of a big metropolis, the site could not contain more explicit third world conditions and a more intense urban experience. We were trying to propose a Gymnasium that acts as a Community activity center and link between different urban fabrics at the edge of an informal settlement.
Two sides of the city is showing a contracting separation by the railways in between.
I chose the site by the highway where there are several big trees which is very rear in the villa. The big trees are naturally creating a plaza that could allow people playing sports under the shade. Additionally, a new ministry of education is being built near this site, which will have 1500 people from both parts of the city working and study here. And new residential buildings are under construction, the site will be a good link among people from the city, villa, and new residents. The Ctiy
Site
New residential
Surrounding
Ministry of Education
Villa 31
The project has 3 circles that flowing around the trees. They create an alternate shade other than the trees for people to jog on the upper “Highway” or doing sports at the ground level. The upper floor also creates a balcony for inside -- gym and outside -- city. The small boxes under the “Highway “contains other programs, using as similar pattern of the housing in villa. Axonometric
Section
Cement floor
1 6
3 2 4
1 Roof Partition wall Shear wall Foundation Floor Window and door
Concrete Tile Pavement
Axonometric Detail section
7
1 Multipurpose rooms 2 Changing rooms 3 Rest rooms 4 Baths 5 Reception 6 Bleacher 7 Teacher’s room 8 Emergency
5 8
432
Ground Floor Plan
Main entrance
N Constraction details
Upper Floor Plan
RUNNING BRIDGE Practical Construction Pavilion Design And Build Academic | Teamwork Lei Qihan, Tang Ziyu, Luo Jingwen, Lou Hua Instructor| Mara Partida & Hector Mendoza
A form of space is not the only story the structure tells. Continuously twisting surface provide people various experiences on both structure itself and its surroundings. Materials and structure finally have a chance to have a conversation with people’s body, when they linger around or climb inside. Like skyline the tunnel framed, and the mottled light and shadows dropped from bamboos’ gaps, gesture and expression showed in this pavilion, make themselves even more vivid during contacting with people.
The Meet by chance of UK Pavilion and the artwork of Barbara Hepworth has been a great inspiration to us. The interior of UK pavilion is lit by the sunlight that comes in along the length of each rod, and by the same time, the outline of the building is so indefinite that you cannot draw a line between construction and sky for they already merge into each other. Barbara Hepworth is keen on changing from simplified naturalistic forms to purely abstract shapes. Forms like holes and wires that she uses contribute to a continuous space.
Process of Construction Raw material Rrocessing and Accessories Producing
Site Preparation Time use_2h People use_5
Time use_ 12h People use_4
Main Axis Operation Time use_4h People use_2(shift)
Basic Construction Time use_4.5h People use _7
Fixed and Reinforce Time use_27h People use_2+2
PRODUCED BY AN AUTODESK STUDENT VERSION
PROYECTO BÁSICO EDIFICIO DE OFICINAS Office design Assisted in facade design and design documents
Internship 19 Summer Supervisor |Gines Garrido, Oscar(BURGOS & GARRIDO ARQUITECTOS, S.L.P.) Location | Madrid, Spain
PRODUCED BY AN AUTODESK STUDENT VERSION
5
PROYECTO BÁSICO EDIFICIO DE
PROYECTO:
PARCELA 15A DEL SECTOR SURT-2 VALDELA
PLANO:
PERSPECTIVA 1
ARQUITECTOS:
FRANCISCO BURGOS RUIZ GINÉS GARRIDO COLMENERO
BURGOS & GARRIDO ARQUITECTOS, S.L.P.
NORFOREST S.L.
PROPIEDAD: 1
6
-
ESCALA: 2
5
3
4
1
7
+24.66 +723.66
+723.66 +722.32
Leyenda
+22.96 +721.96 4,50
+721.96
8,10
8,10
8,10
v.i.00 e.00 g.p.f c.t.c c.c c.c.e c.t.a c.g.b.t a.p.c.i g.p.p.c.i c.t.a.p g.p.f. a.p. c.l. acs c.r p.f p.m.r
8,10
2,50
8,10
+20.16 +719.16
1,20
2,85
2,96
8,10
7,76
3,71
1,20
+15.84 +714.84
Vestíbulo de independencia Escalera de evacuación Cuarto grupo presión fontanería Centro transformación compañía Centralización de contadores Cuarto de contadores eléctricos Centro transformación abonado Cuarto general de baja tensión Aljibe protección contra incendios Grupo presión protección contra incendios Cuarto técnico aguas pluviales Grupo presión fontanería Aljibe pluviales Cuarto de limpieza Cuarto de calderas y acuuladores Cuarto residuos Pozo fecales Persona movilidad reducida
8,95 2,80
2,00
6,90
2,96
8,10
2,00
1,20
2,00
13,31
v.i 08 6,90
8,10
aseos
p.m.r
aseos
1,95
2,45
24.9m
3,80
+7.92 +706.92
1,20
24.9m
2,96
1,00 0,80
e. 03
20,16
32,92
2,00
+11.88 +710.88
7,76
8,10
2,96
2,45
+3.96 +702.96 HIPÓTESIS DOS OFICINAS
PLANTA TIPO
2,96
10,00 3,71
1,20
6,90
1,20
6,90
1,20
6,90
1,20
6,90
1,20
3,71
1,10
16.6m
41,02
+0.00 +699.00
16.5m
0,90
16.5m
-3.60 +695.40 0,90
HIPÓTESIS CUATRO OFICINAS
0,90
-5.22 +693.78
-6.84 +692.16 0,90
-8.46 +690.54
-10.08 +688.92
SECCIÓN 2 ACCESO
+723.66
RAMPA 9.90%
RODADO
8,10
+22.96 +721.96
8,10
RODADO
8,10
8,10
+695.22
8,10
+722.32
Leyenda
v.i.00 e.00 g.p.f c.t.c c.c c.c.e c.t.a c.g.b.t a.p.c.i g.p.p.c.i c.t.a.p g.p.f. a.p. c.l. acs c.r p.f p.m.r
ACCESO APARCAMIENTO
Plaza mediana 5.00x2.50m
Plaza mediana 5.00x2.50m
2,50
3,00
Plaza mediana 5.00x2.50m
2,50
5,00
2,50
4,92
10
09
05
c.t.a
5,00
5,00
5,00
19
Plaza pequeña 5.00x2.25m
+695.22
c.g.b.t.
Plaza mediana 5.00x2.50m
2,25
2,50
+695.40
a.p.c.i.
+695.50
22
21
g.p. p.c.i.
Capacidad de Plazas de Aparcamiento
3,23
5,00
5,00
5,00
5,00
36
Plaza mediana 5.00x2.50m
2,50
45
48
53
52
Plaza mediana 5.00x2.50m
54
1,10
Plaza mediana 5.00x2.50m
56
55
+693.78
+693.78
Plaza mediana 5.00x2.50m
2,50
2,50
5,00
2,50 5,00
2,50
1,10
+695.40
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
aseos
Plaza mediana 5.00x2.50m
2,50
5,00
p.m.r
51
6,98
Plaza mediana 5.00x2.50m
v.i 08
2,50
5,00
aseos
50
49
Plaza mediana 5.00x2.50m
2,50
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
5,00
47
Plaza mediana 5.00x2.50m
2,50
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
46
+695.40 v.i 07
e. 03
Plaza mediana 5.00x2.50m
2,50
5,00
5,00
5,00
Plaza mediana 5.00x2.50m
2,50
57
e. 02
58
+695.50
1,10
+695.50
-3.60 +695.40 10,48
-6.84 +692.16
1,10
-10.08 +688.92
1,10
8,10
8,10
8,10
+696.00
+696.50
+697.00
44,83
+700.50
8,10
+699.00
+699.00
PLANTA SÓTANO 1
+701.00
SECCIÓN 1 +695.50
+698.50
+698.00
+697.00
+696.50
+697.00
+696.50 +696.00
+696.00
+696.00
+696.50
+697.00
+697.50
+699.00
+701.50
+702.00
PRODUCED BY AN AUTODESK STUDENT VERSION
Divided into 2 (by AXIS and WINDOW)
+702.00
PRODUCED BY AN AUTODESK STUDENT VERSION
+701.50
+701.00
+700.50
+698.50
+700.00
+699.50
+698.00
+697.50
+699.00
Divided into 2 (by AXIS and WINDOW) Plaza mediana 5.00x2.50m
2,50
Plaza mediana 5.00x2.50m
2,50
62
Plaza pequeña 5.00x2.25m
2,50
61
2,25 5,00
Plaza mediana 5.00x2.50m
2,50
63
5,00
Plaza mediana 5.00x2.50m
2,50
64
5,00
Plaza mediana 5.00x2.50m
2,50
65
5,00
Plaza mediana 5.00x2.50m
2,50
66
5,00
Plaza mediana 5.00x2.50m
2,50
67
5,00
Plaza mediana 5.00x2.50m
2,50
68
5,00
Plaza mediana 5.00x2.50m
2,50
69
5,00
Plaza mediana 5.00x2.50m
2,50
70
5,00
Plaza mediana 5.00x2.50m
2,50
71
5,00
Plaza mediana 5.00x2.50m
2,50
72
5,00
5,00
Plaza mediana 5.00x2.50m
2,50
73
5,00
Plaza mediana 5.00x2.50m
2,50
74
5,00
Plaza mediana 5.00x2.50m
3,70
75
5,00
Plaza minusválidos 5.00x3.70m
5,00
Ventilation opening INSIDE the frame
5,00
Ventilation opening OUTSIDE the frame
59
60
+692.16
+692.16 34.8m
0,3 1,95 0,3
0,3 1,95 0,3
4,05
4,05
4,05
4,05
4,05
0,3
2,6
2,50
RODADO
Plaza mediana 5.00x2.50m
Plaza mediana 5.00x2.50m
2,50
5,00
e. 02
c.t.a.p
129
+695.50 +695.5
+693.78
2,50
+695.40
g.p.f
RAMPA 16.2%
Plaza mediana 5.00x2.50m
2,50
39
128
5,00
5,00
5,00
2,50
36
Plaza mediana 5.00x2.50m
2,50
40
41
42
Plaza mediana 5.00x2.50m
2,50
35
Plaza mediana 5.00x2.50m
2,50
127
126
Plaza mediana 5.00x2.50m
2,50
34
Plaza mediana 5.00x2.50m
2,50
125
Plaza mediana 5.00x2.50m
2,50
33
Plaza mediana 5.00x2.50m
5,00
5,00
43
Plaza mediana 5.00x2.50m
2,50
2,50
a.p.
+693.78
37
38
+693.78
+693.78
2,50
5,00
Plaza mediana 5.00x2.50m
2,50
124
123
Plaza mediana 5.00x2.50m
5,00
Plaza mediana 5.00x2.50m
122
32
RAMPA 16.2%
5,00
31
Plaza mediana 5.00x2.50m
2,50
5,00
2,50
+695.40
121
120
5,00
119
5,00
5,00
2,50
30
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
118
117
Plaza mediana 5.00x2.50m
2,50
5,00
116
Plaza mediana 5.00x2.50m
29
5,00
5,00
5,00 5,00 5,00
g.p. p.c.i.
Plaza mediana 5.00x2.50m
2,50
5,00
5,00
22.3m
21
Plaza mediana 5.00x2.50m
2,50
+695.40
115
5,00
5,00
5,00 5,00
5,00
5,00
5,00
22
Plaza mediana 5.00x2.50m
17.7m 2,50
5,00
5,00
5,00
5,00
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
5,00
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
5,00
23
e. 01
Plaza mediana 5.00x2.50m
2,50
v.i 03
5,00
Plaza mediana 5.00x2.50m
a.p.c.i.
+690.54
5,00
24
Plaza mediana
2,50
108
c.r
c.g.b.t.
Plaza mediana 5.00x2.50m
2,25
109
c.t.a
+690.54
20
Plaza pequeña 5.00x2.25m
2,25
110
107
RAMPA 16.2%
2,50
5,00
111
+692.16
2,50
106 Plaza mediana 5.00x2.50m
19
18
5,00
5,00 5,00
5,00
25
5,00
5,00
5,00 5,00
5,00
5,00
5,00
33.2m
5,00
112
Plaza minusválidos
5.00x3.70m v.i 06 3,70
2,50
Plaza mediana 5.00x2.50m
2,25
105
2,50
+690.54
88
c.c
Plaza mediana 5.00x2.50m
2,50
Plaza pequeña 5.00x2.25m
2,25 Plaza mediana 5.00x2.50m
v.i 2,50 04
c.t.c
v.i 05
+695.40
Plaza mediana 5.00x2.50m
2,50
104 Plaza mediana 5.00x2.50m
2,50
Plaza pequeña 5.00x2.25m
2,50
5.00x2.50m 15.8m 2,50
2,50
89
90
31.3m
01
Plaza mediana 5.00x2.50m
19.6m 2,50
103 Plaza mediana 5.00x2.50m
Plaza mediana 5.00x2.50m
2,50
Plaza mediana 5.00x2.50m
2,50
5,00
16
Plaza mediana 5.00x2.50m
26
Plaza mediana 5.00x2.50m
2,50
Plaza mediana 5.00x2.50m
102
2,25
2,50
02
Plaza pequeña 5.00x2.25m
17
Plaza mediana 5.00x2.50m
Plaza pequeña 5.00x2.25m
2,50
5,00
5,00
81
+695.22
87
Plaza mediana 5.00x2.50m
2,50
+693.78
33.2m
v.i 07
22.3m
+693.78
44
45
46
47
48
50
49
51
53
52
Plaza mediana 5.00x2.50m
2,50
54
Plaza mediana 5.00x2.50m
2,50
56
55
Plaza mediana 5.00x2.50m
2,50
2,50
+695.40
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
2,50
5,00
2,50
Plaza mediana 5.00x2.50m
5,00
2,50
Plaza mediana 5.00x2.50m
5,00
2,50
Plaza mediana 5.00x2.50m
5,00
2,50
Plaza mediana 5.00x2.50m
5,00
Plaza mediana 5.00x2.50m
5,00
2,50
5,00
2,50
Plaza mediana 5.00x2.50m
5,00
Plaza mediana 5.00x2.50m
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
2,50
5,00
2,50
Plaza mediana 5.00x2.50m
5,00
Plaza mediana 5.00x2.50m
5,00
Plaza mediana 5.00x2.50m
57
e. 02
58 +695.50
+696.00
+696.50
0,3
+697.00
1,2 3
3
3
3
3
3
3
3
2,6
1,2 0,3 2,6 0,3
3
3
0,3
0,3
3
3
0,3
0,3
3
3
0,3
0,3
3
3
0,3 0,3
0,3
2,6
142
Plaza mediana 5.00x2.50m
2,50
Plaza pequeña 5.00x2.25m
Plaza mediana 5.00x2.50m
2,50
133
2,50
132
2,25 5,00
Plaza mediana 5.00x2.50m
2,50
134
5,00
Plaza mediana 5.00x2.50m
2,50
135
5,00
Plaza mediana 5.00x2.50m
2,50
136
5,00
5,00
Plaza mediana 5.00x2.50m
2,50
137
5,00
Plaza mediana 5.00x2.50m
2,50
138
5,00
Plaza mediana 5.00x2.50m
2,50
139
5,00
Plaza mediana 5.00x2.50m
2,50
140
5,00
Plaza mediana 5.00x2.50m
2,50
141
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
5,00
5,00
Plaza mediana 5.00x2.50m
2,50
143
5,00
Plaza mediana 5.00x2.50m
2,50
144
5,00
Plaza mediana 5.00x2.50m
2,50
145
5,00
Plaza mediana 5.00x2.50m
3,70
146
131
130 +688.92
+688.92 34.8m
17.9m
p.f Plaza mediana 5.00x2.50m
5,00
2,50
Plaza mediana 5.00x2.50m
2,50
Plaza mediana 5.00x2.50m
2,50
2,50 5,00
Plaza mediana 5.00x2.50m
2,50
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
Plaza mediana 5.00x2.50m
2,25
5,00
Plaza pequeña 5.00x2.25m
2,25
150
5,00
5,00
5,00
Plaza pequeña 5.00x2.25m
2,50
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
Plaza mediana 5.00x2.50m
v.i 01
163
162
Plaza mediana 5.00x2.50m
2,50
Plaza mediana 5.00x2.50m
2,50
63
160
159
Plaza mediana 5.00x2.50m
2,50
62
5,00
5,00
5,00
161
Plaza mediana 5.00x2.50m
2,50
31.3m
64
2,25
60
2,25
+688.92
173
79
174
175
176
2,25
2,25
2,50
Plaza mediana 5.00x2.50m
2,50
178
Plaza mediana 5.00x2.50m
2,50
Plaza mediana 5.00x2.50m
2,50
179
Plaza mediana 5.00x2.50m
2,50
Plaza mediana 5.00x2.50m
2,50
180
2,50 5,00
2,50
Plaza mediana 5.00x2.50m
Plaza mediana 5.00x2.50m
5,00
2,50
Plaza pequeña 5.00x2.25m
177
Plaza mediana 5.00x2.50m
Plaza mediana 5.00x2.50m
2,50
181
Plaza mediana 5.00x2.50m
2,50
2,50
182
5,00
RAMPA 16.2%
34.8m
5,00
2,50
Plaza pequeña 5.00x2.25m
2,50
Plaza mediana 5.00x2.50m
5,00
2,50
Plaza mediana 5.00x2.50m
5,00
2,50
Plaza mediana 5.00x2.50m
5,00
2,50
Plaza mediana 5.00x2.50m
5,00
Plaza mediana 5.00x2.50m
5,00
17.9m
5,00
5,00
2,50
172
5,00
77
78
59
+692.16 Plaza mediana 5.00x2.50m
v.i 02
76
Plaza pequeña 5.00x2.25m
2,50
61
5,00
Plaza mediana 5.00x2.50m
2,50
65
5,00
5,00
5,00
164
Plaza mediana 5.00x2.50m
2,50
66
Plaza pequeña 5.00x2.25m
2,50
5,00
165
Plaza mediana 5.00x2.50m
2,50
67
158
Plaza mediana 5.00x2.50m
2,50
5,00
166
Plaza mediana 5.00x2.50m
e 01
2,50
68
Plaza mediana 5.00x2.50m
2,50
171
5,00
Plaza mediana 5.00x2.50m
2,50
Plaza mediana 5.00x2.50m
2,50
69
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
2,50
Plaza mediana 5.00x2.50m
Plaza mediana 5.00x2.50m
2,50
70
5,00
Plaza mediana 5.00x2.50m
170
Plaza mediana 5.00x2.50m
2,50
71
Plaza mediana 5.00x2.50m
2,50
+688.92
+692.16 Plaza mediana 5.00x2.50m
Plaza mediana 5.00x2.50m
2,50
72
Plaza mediana 5.00x2.50m
157
5,00
5,00
5,00
Plaza mediana 5.00x2.50m
2,50
15.8m
73
5,00
5,00
Plaza mediana 5.00x2.50m
2,50
156
5,00
167
Plaza mediana 5.00x2.50m
74
155
2,50
5,00
168
3,70
75
Plaza mediana 5.00x2.50m
5,00
Plaza minusválidos 5.00x3.70m
5,00
169
+688.92
5,00
4,05
5,00
4,05
5,00
4,05
154
2,50
5,00
4,05
Plaza mediana 5.00x2.50m
2,25
5,00
4,05
Plaza pequeña 5.00x2.25m
2,25
5,00
4,05
Plaza pequeña 5.00x2.25m
2,50
5,00
4,05
Plaza mediana 5.00x2.50m
2,50
5,00
4,05
Plaza mediana 5.00x2.50m
2,50
5,00
Plaza mediana 5.00x2.50m
5,00
4,05
5,00
4,05
5,00
4,05
5,00
4,05
153
5,00
4,05
152
5,00
4,05
151
5,00
4,05
149
5,00
4,05
148
5,00
147
PRODUCED BY AN AUTODESK STUDENT VERSION
2,6
Plaza minusválidos 5.00x3.70m
5,00
4,05 3
4,05
3 3
3
3 3
3
4,05 3
0,65
3
4,05
3
4,05
4,05
4,05
3
4,05
3
4,05
0,3
+697.00
4,05
ACCESO
RAMPA 2.53%
5,00
5,00
5,00
5,00
5,00
Plaza mediana 5.00x2.50m
2,50
86
Plaza mediana 5.00x2.50m
5,00
5,00
5,00
92
93
Plaza mediana 5.00x2.50m
2,50
5,00
5,00
5,00
5,00
5,00
5,00
5,00
5,00
0,3 1,95 0,3
Plaza mediana 5.00x2.50m
2,50
85
Plaza mediana 5.00x2.50m
2,50 2,50 ACCESO APARCAMIENTO
+692.16
5,00
5,00
5,00
0,3 1,95 0,3
5,00
5,00
5,00
0,3 1,95 0,3
27
Plaza mediana 5.00x2.50m
+695.40
15
2,50
113
5,00
3
4,05
0,3
3 3
4,05
3 4,05
0,3 1,95 0,3
4,05
3
4,05
0,3 1,95 0,3
4,05
4,05
4,05
0,3 2,6 0,3 1,95 0,3 1,2
4,05
3
4,05
2,6
4,05
3
4,05
1,95
1,95
4,05
3
4,05
1,2
1,95
4,05
4,05
1,95
4,05
3
1,95
4,05
3
1,95
4,05
3
1,95
-6.290
4,05
3
1,95
PRODUCED BY AN AUTODESK STUDENT VERSION
4,05
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
4,05
PRODUCED BY AN AUTODESK STUDENT VERSION
4,05
PRODUCED BY AN AUTODESK STUDENT VERSION
2,6
4,05
94
Plaza mediana 5.00x2.50m
03
2,50
2,50 RAMPA 16.2%
2,50
Plaza mediana 5.00x2.50m
2,50
114
-3.145
95
Plaza mediana 5.00x2.50m
e. 01 2,50
2,50
04
Plaza mediana 5.00x2.50m
2,50
14
Plaza mediana 5.00x2.50m
2,50
+690.54
Plaza mediana 5.00x2.50m
2,50
05
2,50
13
Plaza mediana 5.00x2.50m
28
Plaza mediana 5.00x2.50m
2,50
06
Plaza mediana 5.00x2.50m
Plaza mediana 5.00x2.50m
2,50
101 Plaza mediana 5.00x2.50m
5,00
12
Plaza mediana 5.00x2.50m
2,50
07
17.9m 2,50
Plaza mediana 5.00x2.50m
2,50
100 2,50
5,00
+8.14
4,05
Plaza mediana 5.00x2.50m
2,50
08
Plaza mediana 5.00x2.50m
2,50
Plaza mediana 5.00x2.50m
2,50 Plaza mediana 5.00x2.50m
-6.290
Plaza mediana 5.00x2.50m
2,50
16.1m
09
Plaza mediana 5.00x2.50m
2,50
+0.00
Plaza mediana 5.00x2.50m
2,50
84
Plaza mediana 5.00x2.50m
2,50
+692.16
Plaza mediana 5.00x2.50m
Plaza mediana 5.00x2.50m
99
-3.145
Plaza mediana 5.00x2.50m
2,50
Plaza mediana 5.00x2.50m
2,25
5,00
5,00
96
Plaza mediana 5.00x2.50m
10
+695.40
+12.21
+0.00
Plaza mediana 5.00x2.50m
2,50
83
82
Plaza pequeña 5.00x2.25m
2,25
5,00
97
3,70
+692.16
+4.07
Plaza mediana 5.00x2.50m
2,50
81
Plaza pequeña 5.00x2.25m
2,50
5,00
5,00 Plaza minusválidos 5.00x3.70m
80
Plaza mediana 5.00x2.50m
2,50
11
+4.07
Plaza mediana 5.00x2.50m
2,25
5,00
78
Plaza mediana 5.00x2.50m
98
+16.28
+8.14
Plaza pequeña 5.00x2.25m
2,25
79
RAMPA 9.90%
5,00
5,00
5,00
77 2,50
+12.21
Plaza pequeña 5.00x2.25m
2,50
v.i 02
76 Plaza mediana 5.00x2.50m
+16.28
Plaza mediana 5.00x2.50m
2,50
5,00
Plaza mediana 5.00x2.50m
2,50
RODADO
+20.35
5,00
17.9m
Plaza mediana 5.00x2.50m
ACCESO
+20.35
6
5,30
6,75
Plaza mediana 5.00x2.50m
2,50
80
81
82
83
84
85
86
87
+696.50
+696.00
4 6
16
+693.78
+693.78
e. 01 22.3m
5,30
8,10
Plaza mediana 5.00x2.50m
2,50
a.p.
Plaza pequeña (5.00x2.25m)
46 162
37
38
63
Total +695.40
g.p.f
RAMPA 16.2%
+693.78
Plaza mediana 5.00x2.50m
2,50
39
53
Planta Sótano 3
5,00
2,50
5,00
5,00
5,00
5,00
16.28m
1,10
35
Plaza mediana 5.00x2.50m
2,50
40
+695.50 +695.5
2,50
33.2m
Plaza mediana 5.00x2.50m
44
2,50
34
Plaza mediana 5.00x2.50m
2,50
+693.78
+700.00
Plaza mediana 5.00x2.50m
41
Planta Sótano 2
c.t.a.p
Plaza mediana 5.00x2.50m
5,00
1,40
2,50
33
32
RAMPA 16.2%
2,50
42
Plaza mediana 5.00x2.50m
5,00
31 Plaza mediana 5.00x2.50m
43
Plaza mediana 5.00x2.50m
2,50
5,00
5,00
30 Plaza mediana 5.00x2.50m
10,04
Plaza mediana 5.00x2.50m
2,50
5,00
29
2,50
5,00
5,00
2,50
Plaza mediana 5.00x2.50m
Plaza mediana (5.00x2.50m)
Planta Sótano 1
+695.40
Plaza mediana 5.00x2.50m
Piso
48,85
5,08
3,00
+695.40 Plaza mediana 5.00x2.50m
+699.00
2,34 17.7m
3,00
0,50 Plaza mediana 5.00x2.50m
1,10
23
e. 01
2,52
6,60
6,60
8,10
PEATONAL
1,10
0,25
1,30
0,33
24
15.8m
3,00
ACCESO RODADO
20
Plaza pequeña 5.00x2.25m
RAMPA 2.53%
+695.40
1,30
5,00
8,77 5,00
5,00
7,35
5,00
1,60
5,00
5,00
5,00
5,00
5,00
2,50
v.i 04
18
+695.00 +695.00
+695.50
Vestíbulo de independencia Escalera de evacuación Cuarto grupo presión fontanería Centro transformación compañía Centralización de contadores Cuarto de contadores eléctricos Centro transformación abonado Cuarto general de baja tensión Aljibe protección contra incendios Grupo presión protección contra incendios Cuarto técnico aguas pluviales Grupo presión fontanería Aljibe pluviales Cuarto de limpieza Cuarto de calderas y acuuladores Cuarto residuos Pozo fecales Persona movilidad reducida
Plaza mediana 5.00x2.50m
2,25
+699.00
8,10
2,96
Plaza pequeña 5.00x2.25m
+695.40
2,25
+693.78
2,96
c.c v.i 06
0,25
2,06 48,80
1,10
2,96
20,16
3,96 3,96
17
2,50
25
26
+699.00
+699.50
3,96
+695.40
+696.00
0,80 1,00
Plaza mediana 5.00x2.50m
2,50
5,00
27
28
+695.40
2,50
+0.00 +699.00
3,23
01
2,25
0,25 RAMPA 9.90%
16
Plaza mediana 5.00x2.50m
2,50
5,00
5,00 0,42
ACCESO
+699.00
10,17
02
Plaza pequeña 5.00x2.25m
2,50
15
Plaza mediana 5.00x2.50m
2,50
2,50
+3.96 +702.96
03
+696.50
Plaza mediana 5.00x2.50m
2,50
14
Plaza mediana 5.00x2.50m
2,50
Plaza mediana 5.00x2.50m
2,50
13
Plaza mediana 5.00x2.50m
+698.26
11,00
+698.50
+7.92 +706.92
04
19.6m
Plaza mediana 5.00x2.50m
2,50
12
8,10
1,10
2,96
3,96
06
+697.00
5,00
8,10
2,96
4,32
1,10
Plaza mediana 5.00x2.50m
2,50
+698.00
RODADO
+11.88 +710.88
07
17.9m
+697.50
Plaza mediana 5.00x2.50m
ACCESO
08
5,20
+695.40
5,20
11
+698.00
c.t.c
v.i 05
10,00
0,25
+15.84 +714.84
3,23
2,50 5,00
Plaza mediana 5.00x2.50m
2,50
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
5,00
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
Plaza mediana 5.00x2.50m
2,50
5,00
Plaza mediana 5.00x2.50m
2,50 5,00
3,70 5,00
+20.16 +719.16
Plaza mediana 5.00x2.50m
Plaza minusválidos 5.00x3.70m
10,00
1,10
2,50
2,50
4,50
+721.96
ACCESO
RAMPA 2.53% 48,61
10,00
+24.66 +723.66
Plaz (
CASO UNO AND COLIVING SPACE IN THE FUTURE
The prototype coliving space in Mexco, and a mock examination of future coliving Assisted in schematic design and design development and funiture design Internship 18 Summer Supervisor |Alfonso, Joseph (T38 Studio) Location | New York, NY
CASA DOS
A DOS
ANIMATION OF MODEL CONFIGURATIONS
ANIMATION OF MODEL CONFIGERATIONS
Public space
Transportation
Living
Manufacturing
Education
MATION OF MODEL FIGERATIONS
ANIMATION OF MODE CONFIGURATION
P3
CHENGDU LU LAKE OFFICE COMPLEX Assisted in Schematic Design
Internship 16 Summer Supervisor |Gong Dong, Yi-Chi, Han Zhang(Vector Architects) Location | Chengdu, China
Option 1: Three court yard
Option 2: One big court yard
Option 3: Street image
PAGEONE BOOK STORE
Assisted in Design Development And Drawing Construction Documents Internship 16 Summer Supervisor |Gong Dong, Yang Zhou(Vector Architects) Location | Beijing, China