Portfolio 2019 - en

Page 1

Q Portfolio

Quentin Rabu



p.2

Resume

p.4

Final Year Project | 2018

p.28

Mineral Ribbon | Spring 2015

p.34

Floating Library | Autumn 2015

p.40

Shelters on Houses | Spring 2016

p.48

Living on the Outside | Autumn 2016

p.56

Cross the Ring Road | Spring 2017

p.64

Renovation of a Parisian flat | 2018

p.70

Manufacturing

p.72

Manhattan

p.74 Photomanipulation

p.1


QUENTIN RABU Born on 1rst May 1995

SKILLS

+++ AutoCad, InDesign, Photoshop, Sketchup

++

Artlantis, Illustrator, Lumion, Pack Office, Revit

+

Grasshopper, Rhinoceros 3D, V-Ray

COMPETITION

BACKGROUND ENSA Paris Val-de-Seine, 2013-2018

Graduated in june 2018

Final year project : « A vertical necropolis in Montmartre »

Master thesis : « The Urbaphobia in the science-fiction

cinema »

University of Kansas, 2016

Academic exchange in the School of Architecture,

Design and Planning, Kansas, USA

Beaux Arts de Rennes, 2011-2013 Re-think the city of tomorrow, 2017 Public prize : Utopian competition of urbanism in Vendée Re-think the historic center of the seaside resort.

Best final year project of Paris, 2018 Laureate : « A vertical necropolis in Montmartre » Exhibition at the Architecture Home of Paris

Evolo Skyscraper, 2019 In deliberation : Create an innovative skyscrapper Presentation of the final year project (vertical necropolis)

Competition WOOD, 2019 In deliberation : « Reach the sky »

Introduction to the drawing and painting skills

Scientific Bachelor’s Degree, 2013

«Very Good» rating, European section,

Cinama optional course

LANGUAGES French | Native language English | Cambridge Certificate in Advanced English Spanish | Basic notions

INTERESTS

Rehabilitation of two nuclear power plants to create the Atom Museum and luxury housing

Design, astronomy, street art, world culture, football referee, music, cinema, travels

p.2


ARCHITECTURE DEGREE IN PARIS

quentin.rabu@laposte.net +33 664 99 15 69

EXPERIENCE Vous Êtes Ici Architects, Paris, 2019 Junior achitect for 8 months

WAW Architects, Paris, 2016

Internship architect for 5 weeks

Competition : Rethink the Greater Paris Metropolis

Social housing in Colombes

(nursing home, hotel, medical institute, recycling depot)

- 3D Modeling - Sketchup

- Plans, coupes, élévations - Autocad

- Plans, sections, elevations - AutoCad

- 3D Rendering - Artlantis

Competetion for housing in Paris, 18th District

- Plans, sections, elevations - Autocad

Le Trionnaire & Tassot Architects, Rennes, 2012

- Hand-drawings improvement- Photoshop

Internship student for 5 weeks

- Final presentation - InDesign

Conception of 22 dwellings in Pacé

Competition for the first casino in French Guyana

- Construction site supervsion

- Plans, sections, elevations - Autocad

- Research for facades - Photoshop

Rehabilitation of the Sport Arena in Cesson-Sévigné

- Digital reproduction of existing plans - AutoCad

Social housing in Malay-le-Grand

- 3D Modeling and plans - Revit

- Development of the construction files - Revit

- 3D Rendering - Photoshop

Rehabilitation and extension of Le Fouquet’s Hotel

- Plans, sections, elevations- AutoCad

- Construction site supervision

Competition : Social Housing in Garges-lés-Gonesses

- Plans, sections, elevations- AutoCad

Glet Construction, Bruz, 2015

Internship architect for 2 weeks

Participation in various projects in Rennes conurbation

p.3


Awarded l Year Best Fina f Paris Project o in 2018

d at the Exhibite e ture Hom Architec in Paris

A VERTICAL NECROPOLIS, PARIS 18TH Just like the changes of paradigms of our societies about mourning and death, metropolitan cemeteries occupy a new place in the modern cities. Paris has always been conducting a policy to reject its necropolis out of its borders, buying enclaves in its nearby suburbs. With the emergence of Greater Paris, this system of rejection reaches its limits. In this Final Year Project, we propose a new and vertical funerary typology, that try to reconcile the city with this necessary public facility.

ON THE RIGHT

p.4

Perspective 1 | Emergence of the tower behing the cemetery canopy



p.6 - A vertical necropolis in Montmartre


1130-1780

Middle of the XIXth

From 1850 to 1929

1780 : Cemetery of Innocents and little parish cemeteries are closed due to insalubrity

1860 : Annexation of the nearby suburbs of Paris and of their vast cemeteries

Since the 1850’s, due to a lack of space, creation of the giant extramural cemeteries

206000

1963 : the Catholic Church no longer consider the cremation as a sin

170000 142000

110000 73000 43000

Practicing

Atheist

Bound to a religion

20000

Believer 1987

A society always more atheistic

1992

1997

2002

2007

2012

2017

Increase of the cremation

ON THE LEFT

Aerial view | Location of the parisian cemeteries

p.7


BAGNEUX

MONTMARTRE

PANTIN

PÈRE-LACHAISE

THIAIS

MONTPARNASSE


One of the main challenge of the project was to refind the proximity of the funeral facilities. A vertical extension of the historic cemeteries of Montmartre and Montparnasse would provide enought cemetry plots to avoid the need of extramural cemetries, often located more than one hour from the parisian boundaries.

ON THE LEFT

Isochrons | The difference of access time between extramural and intramural cemeteries

p.9


REDUCE THE FOOTPRINT

SCULPT THE LANDSCAPE

PROVIDE VIEWS

pros of the tower cons of the tower

at 8:00 and 17:00

COMPLEX CO-PROPERTY

SHADOW ON THE CITY

HOURLY CONGESTION

from 8:00 to 17:00

SINGLE OWNER

p.10 - A vertical necropolis in Montmartre

SHADOW ON THE CEMETRY

SMOOTH DAILY FLOWS


Surface of the cemetery : 113 000 m² / Surface of the project : 575 m²

FOOTPRINT OF THE TOWER : 0.5 %

ON THE LEFT

The vertical choice : a pragmatic answer to the tower scepticism ABOVE

¨Ground plan | Implantation in the very heart of Montmartre Cemetery

p.11


Existing site

1 Extension of the existing walls

2 Emergence of the structure

ABOVE

p.12 - A vertical necropolis in Montmartre

Perspective 2 | The tower seen from the cemetery


3

Laying of the double skin

4

Opalescence gradient of the windows

The facade of the project establishes a dialogue with the characteristic topography of the site (the cemetery is located on old quarries). Like a dress, the skin of the building delicately covers the ground floor level. Located away from tourist flows, it is a covered forecourt where families can meet before the ceremony.

p.13



ON THE LEFT

Plan | Ground floor in context ABOVE

Perspective-section

p.15


D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Coupe\Coupe repérage\Coupe repérage.dwg, 03/07/2018 17:53:09, AutoCAD PDF (General Documentation).pc3

3rd basement level : Memory Hall

p.16 - A vertical necropolis in Montmartre

D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Plans\Plan repérage.dwg, 03/07/2018 13:48:28, AutoCAD PDF (General Documentation).pc3


D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Coupe\Coupe repérage\Coupe repérage.dwg, 03/07/2018 17:53:09, AutoCAD PDF (General Documentation).pc3

CTA

D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Plans\Plan repérage.dwg, 03/07/2018 13:48:27, AutoCAD PDF (General Documentation).pc3

1rst basement level : Funeral home

SSI

Elec.

D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Plans\Test impression plans\3.dwg, 04/07/2018 22:01:04, AutoCAD PDF (General Documentation).pc3

D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Coupe\Coupe repérage\Coupe repérage.dwg, 03/07/2018 17:53:09, AutoCAD PDF (General Documentation).pc3

D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Plans\Plan repérage.dwg, 03/07/2018 13:48:27, AutoCAD PDF (General Documentation).pc3

2nd basement level : Morgue

Red = public circulation / Blue = private circulation

ABOVE

Perspective 3 | Receptacle for the ashes & engraving on the walls

p.17


D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Coupe\Coupe repérage\Coupe repérage.dwg, 03/07/2018 17:53:10, AutoCAD PDF (General Documentation).pc3

2nd floor : Administration

D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Plans\Plan repérage.dwg, 03/07/2018 13:48:27, AutoCAD PDF (General Documentation).pc3

D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Plans\Test impression plans\3.dwg, 04/07/2018 22:01:04, AutoCAD PDF (General Documentation).pc3

p.18 - A vertical necropolis in Montmartre


D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Coupe\Coupe repérage\Coupe repérage.dwg, 03/07/2018 17:53:10, AutoCAD PDF (General Documentation).pc3

D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Plans\Plan repérage.dwg, 03/07/2018 13:48:25, AutoCAD PDF (General Documentation).pc3

3rd floor : Civic ceremony room

D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Plans\Test impression plans\3.dwg, 04/07/2018 22:01:05, AutoCAD PDF (General Documentation).pc3

ON THE LEFT

Perspective 4 | Pathway to the forecourt of the ground floor ABOVE

Perspective 5 | Civic ceremony with the panorama of Montmartre in the background

p.19


D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Coupe\Coupe repérage\Coupe repérage.dwg, 03/07/2018 17:53:10, AutoCAD PDF (General Documentation).pc3

4th floor : Crematoriums

D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Plans\Plan repérage.dwg, 03/07/2018 13:48:24, AutoCAD PDF (General Documentation).pc3

D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Plans\Test impression plans\3.dwg, 04/07/2018 22:01:05, AutoCAD PDF (General Documentation).pc3

p.20 - A vertical necropolis in Montmartre


D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Coupe\Coupe repérage\Coupe repérage.dwg, 03/07/2018 17:53:09, AutoCAD PDF (General Documentation).pc3

D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Plans\Plan repérage.dwg, 03/07/2018 13:48:24, AutoCAD PDF (General Documentation).pc3

7th floor : Video archives

D:\Quentin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Plans\Test impression plans\3.dwg, 04/07/2018 22:01:06, AutoCAD PDF (General Documentation).pc3

ON THE LEFT

Perspective 6 | Launch area for cremation ABOVE

Perspective 7 | Video archive boxes

p.21


tin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Plans\Test impression plans\6.dwg, 04/07/2018 22:10:09, AutoCAD PDF (General Documentation).pc3

tin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Plans\Test impression plans\6.dwg, 04/07/2018 22:10:12, AutoCAD PDF (General Documentation).pc3

p.22 - A vertical necropolis in Montmartre


tin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Plans\Test impression plans\6.dwg, 04/07/2018 22:10:11, AutoCAD PDF (General Documentation).pc3

tin\Nouveau dossier\Architecture\Projet\Master 2\Phase 4\Plans\Test impression plans\6.dwg, 04/07/2018 22:10:10, AutoCAD PDF (General Documentation).pc3

ABOVE

Plans & Axonometries | Different ways of layout for the collumbarium floors

p.23


1 - Bavette de rejet 2 - Panneau extérieur en verre agrafé 3- Panneau extérieur en verre avec meneaux acier 4 - Traverse en verre 5 - Revêtement bois sur lambournes 6 - Dalle sur plots 7 - Platine de fixation 8 - Finition en aluminium plaqué 9 - Caillebotis 10 - Rail de guidage 11 - Pare pluie en deux couches 12 - Ecran d’indépendance 13 - Isolant origine 14 - Pare vapeur 15 - Chape de propreté avec pente de 1% 16 - Plancher béton solidaire des poutres de rives 17 - Trappes de ventilation 18 - Chape de propreté / béton ciré 19 - Plot en béton 20 - Fourreau électrique 21 - Chauffage au sol 22 - Dalle caisson 23 - Drain 24 - Refend périphérique 25 - Radier 26 - Bèches

ABOVE

Details | Double skin & Foundations ON THE RIGHT

p.24 - A vertical necropolis in Montmartre

Perspective 8 | Dialogue between the sky and the glazing



OBJECTIVESÂ : - Increase the cemetery capacity by 20Â % - Propose new funeral facilities - Propose a flexible disposition of the funerary urn over time - A respectfull integration of the project into the existing cemetery - Propose decent funeral conditions - Adapt the ancestral typology of the cemetry to the modern concept of the death and mourning

p.26 - A vertical necropolis in Montmartre


ABOVE

Section model | Superposition of the different programs within the tower

p.27


MINERAL RIBBON, ROME In this project of school of dance and music, the building was inspired by the movement of steps of the dancers. It is designed like a stone ribbon wrapping around itself. This process allows the creation of an patio in the heart of the project, typical of the Roman capital. On the north facade, the openings are designed to write a partition on the wall. In order the pay tribute to the Italian heritage, the building is covered with stone, highlighted by a touch of modernity with a white concrete basement.

ON THE RIGHT

p.28

Perspective 9 | View of the school from the piazza



p.30 - Mineral Ribbon


ABOVE

Plan | Groundfloor in its context

p.31


p.32 - Mineral Ribbon


ABOVE

South facade and cross section

p.33


FLOATING LIBRARY, ÉPERNON Located in Epernon, this media library project tries to blend into its exceptional landscape. It consists of a large wooden platform floating above the ground, thus respecting the biodiversity of the place. At the center of this platform, there are two technical modules that separate the different spaces. In order to ensure a visual comfort to the users, an overflowing roof completes the project. The main area can then open onto the surrounding woods to provide a pleasant and relaxing reading environment

ON THE RIGHT

p.34

Perspective 10 | The engawa between the landscape and the library




ON THE LEFT

Plan | Groundfloor and landscape ABOVE

Perspective 11 | Reading space ON THE RIGHT

Cross section

p.37


p.38 - Floating Library


ABOVE

Perspcetive 12 | Minimal impact on the surrounding swamp

p.39


SHELTERS ON HOUSES, MORTEFONTAINE Located in the outskirts of Paris, the municipality of Mortefontaine wanted to lead an urban study on a former apple production site of its downtown. In order to revitalize the town center, our urban project proposes the reunification of three essential poles for small towns, but currently scattered : the town hall, the reception hall and the church. In addition, we create intermediate housing along the new main roads, with the desire to create a strong identity for each typology of housing.

ON THE RIGHT

p.40

Perspective 13 | Maintain the cultural identity of the village



ABOVE

p.42 - Shelters on Houses

Urban plan | Redensification et requalification of the downtown


p.43


p.44 - Shelters on Houses


3RD FLOOR - HOUSE 2 :

Day space : 31 m² Night space : 21 m² Terrace : 8 m²

2ND FLOOR - HOUSE 1 :

Night space : 60 m²

GROUNDFLOOR - HOUSE 1 :

Day space : 60 m² Terrace : 30 m² Garden : 240 m²

2 SEPARATED GARAGES + BOXES :

Garages : 2 x 13 m² Dustbin : 4 m²

ABOVE

Longitudinal section ON THE LEFT

Plan | Main groundfloor ON THE RIGHT

Exploded axonometry

p.45


p.46 - Shelters on Houses


ABOVE

Perspective 14 | Use of stone to bind the new and the old

p.47


LIVING ON THE OUTSIDE, FLORIDA Because of the imminent risks of rising sea levels, the city of Fort Lauderdale wants to rethink its urban policy to protect the endangered tourist areas. This development project proposes a smooth transition to a sustainable model. Traffic flows, protected areas, building on stilts : the entire neighborhood is completely redesigned, and invites to a new outwardlooking lifestyle.

ON THE RIGHT

p.48

Perspective 15 | View from the canal



In this project, we worked on several scenarios of requalification of the city, depending on the sea level rise. This ground plan represents the final state of our reflection, which correspond at the level of the oceans for the year 2080. In response to the new urban challenges, we proposed an urbanism based on a river network, by creating a new port and a central canal in the very heart of the site. Historic constructions that can not be preserved are destroyed to permit the creation of buildings on stilts that can be elevated over the years and tides.

p.50 - Living on the Outside


BUILT ENVIRONMENT

NATURAL ENVIRONMENT

PALMETO

PEDESTRIAN

BICYCLE

BLACK MANGROVE

SALT MARSH

WILDLIFE

PEDESTRIAN BLACK MANGROVE BICYCLE SALT MARSH ABANDON BUILDING WILDLIFE RAISED BUILDING OYSTER REEF NEW BUILDING

BLACK MANGROVE PEDESTRIAN SALT MARSH BICYCLE WILDLIFE SELF DRIVING CAR OYSTER REEF BOAT MANATEE GRASS

ON THE LEFT

Site plan | Final projection for 2080 ABOVE

Axonometries | Evolution from 2020 to 2080

p.51


p.52 - Living on the Outside


ON THE LEFT

Exploded axonometry ABOVE

Plans | Groundfloor and 2nd floor

p.53


p.54 - Living on the Outside


ABOVE

Perspective 16 | Predominance of the vegetation

p.55


CROSS THE RING ROAD, PARIS 13 Located in the continuity of the Campus Paris Rive Gauche, this project is composed of four buildings on stilts that overhang an elevated public place. This large public space is connected to the ring road and entirely dedicated to the appropriation of its inhabitants. The reflection focuses on the mutability and potential use of the device in the future. The project completes the perspective of Avenue de France. The buildings are arranged in a scalar pattern, given by the triangular plot.

ON THE RIGHT

p.56

Perspective 17 | View from the Avenue de France



p.58 - Cross the Ring Road


ABOVE

Settlement pattern

p.59


ABOVE

Plan | Elevated public space ONT THE RIGHT

p.60 - Cross the Ring Road

Plans | Different ways to organize the ground floor



p.62 - Cross the Ring Road


ABOVE

Perspective 18 | The elevated public space as an incubator of use

p.63


RENOVATION OF A PARISIAN APARTMENT In this Parisian flat of 70m², ideally located near the Eiffel Tower, clients wanted us to change the layout of existing rooms and create a new dressing room. We decided to remove the existing walls between the kitchen and living room to find a generous and bright main space. We reduced the kitchen to linear wall to allow maximum space in the living room and dining room. The wardrobe has taken the place of the old bathroom, which is now having natural light in the new layout.

ON THE RIGHT

p.64

Pictures | Delivered project



Conservation persiennes existantes + application 2 couches de peinture + antirouille F01 - 2V

0.80

F&P d'une fenêtre en bois, ouvrant à la française à 2 vantaux, double vitrage, sécurité enfant F&P radiateur eau chaude Finimetal T6-PLAN type 33PM H=300 L=1120 (cf devis CEDEO), tuyauterie encastrée dans mur porteur et recouverte par la plinthe

Bureau en bois de frêne, passe-câble + étagères x2 en bois de même essence en partie supérieure

S 4.81

26 H

Seuil de cheminée en pierre existant à conserver

Chambre 1

Encadrement de porte sur mesure, bois essence de frêne

14.3m² HSP = 2.97

Penderie sur meure, voir détail 307/308

Portes coulissante de 2.70 m de haut à âme pleine, dont une en bois essence de frêne et une à peindre, guidage par rails haut encastré dans le faux plafond, poignée cuvette en bois, en attente validation architcete

PV80 - 05

PP80 - 04

2.94

Conservation du compteur existant, coffrage médium peint blanc

6.8m² HSFP = 2.68

1.50

1.39 0.22 0.80

WC suspendu GEBERIT (devis CEDEO) Bati support autoportant Duofix plus UP 320 H : 112cm Ref. 111.303.00.5 + Pack Prima Rimfree, abattant frein de chute, blanc Ref. 08398800000100 + Plaque de déclenchement WC Duofix Sigma 20 blanc chromé Ref 115.882.KJ.1 F&P de rangements en partie haute, type Ikea Colonne eau usée à coffrer, BA13

Entrée

Repose du radiateur des WC existants, vidange + F&P d'un robinet thermostatique

PP70 - 07

2.16

2.9m² HSFP = 2.90

PC140 - 03

Dressing

F&P radiateur KEVA eau chaude vertical double 1134W haut 2200 larg 297 9 éléments blancs, réf HKD 220 028 (devis CEDEO)

1.30

Penderie sur mesure, voir détails 303 à 306,

revoir le dessin avec MO

1.60

SDB

WC

5.02m² HSFP = 2.90

1.1m² HSFP = 2.90 PP60 - 02 PP130 - 01

1.70 1.01

Lave main compact TARGA ARCHITECTURA, (déjà acheté par Hugo) P=26cm L=36cm F&P d'une porte en bois essence similaire à la porte du dressing Percement d'un oeil de boeuf dans la porte d'entrée F&P d'une fenêtre en PVC, ouverture à la française, double vitrage, VMC intégrée

F06 - 1V

F&P de persiennes sur mesure, propriété isolante, 2 vantaux

M. & Mme. GRANAT 190 Rue de Grenelle, 75007 PARIS Tél: 06.62.73.93.35 / 06.88.98.99.58 Mail : hugo.granat@gmail.com / eve.pik@gmail.com

p.66 - Renovation of a Parisian apartment

Quentin RABU - Clément JENNESSEAUX Tél : 06.64.99.15.69 / 06.75.18.89.50 Mail :quentin.rabu@laposte.net / clement.jennesseaux@gmail.com

Rénovation d'un appa Plan général


Conservation persiennes existantes + application 2 couches de peinture + antirouille F&P de persiennes sur mesure, propriété isolante, 2 vantaux F02 - 2V

F&P d'une fenêtre en bois, ouverture à la française à 2 vantaux, 1 vantail oscillo-battant, ventilation dans chassis, double vitrage, sécurité enfant

F03 - 2V

F&P radiateur eau chaude Finimetal T6-PLAN type 33PM H=300 L=1120 (cf devis CEDEO), tuyauterie encastrée dans mur porteur et recouverte par la plinthe F&P d'une fenêtre en bois, ouvrant à la française à 2 vantaux double vitrage, sécurité enfant F&P radiateur eau chaude Finimetal T6-PLAN type 33PM H=300 L=1120 (cf devis CEDEO), tuyauterie encastrée dans mur porteur et recouverte par la plinthe

Salon / Salle à manger / Cuisine 4.81

6.2m² HSP = 2.98

Chauffe eau existant à coffrer, voir plans exe IKEA Aménagement cuisine, voir plans EXE Ikea 5.32 Pose de rangements sur mesure en médium peint blanc au dessus de la porte, voir détail F&P d'une fenêtre en bois, ouverture à la française à 1 vantail, double vitrage

F04 - 1V

1.30

PP80 - 06

Chambre 2

1.94

15.7m² HSP = 2.99

0.50

F&P Lave-linge Miele WTF130WPM, couvert en partie supérieure par le plan de travail dim : H=85cm L=59.6cm P=63.7cm Plan de toilette type Leroy Merlin en bambou, L=65 l=180 F&P lavabo blanc Torviken, Ikea, 45 cm + mitigeur Lundskar couleur acier chromé, Ikea, centré par rapport au miroir de gauche de l'armoire Cloison en plaques de plâtre BA13 hydrofuges doublées

1.80

F&P Sèche-serviette atoll spa eau chaude 716W Hauteur1468 largeur 500 blanc ref SL 150 050 (devis cedeo) + boîtier de résistance mixte pour remplacement blanc classe 2 300W ref 857211 (devis cedeo), prévoir sortie de câble pour alimentation

3.24

0

F&P Baignoire rectangulaire BASTIA, 170x70cm, acrylique blanc Réf 00091600000 (devis Cedeo) + F&P mitigeur Bain Douche Mural (devis AUBADE)

3.01

0.62

F&P douchette CROMA SELECT S110 VARIO + flexible 1m60 chrome + support mural à rotule design laiton chrome (devis Aubade)

F05 - 2V

Tablettes x6 en bois médium peint blanc, voir détail 314 Repose du radiateur existant, vidange + F&P d'un robinet thermostatique, tuyauterie à encastrer dans mur porteur et à recouvrir par la plinthe F&P d'une fenêtre en bois, ouvrant à la française à 2 vantaux, 1 vantail oscillo-battant, double vitrage, sécurité enfant

artement parisien

EXE

25/03/2018 1/50 IND: B

201

ABOVE

Plan for the construction

p.67


1.58

Parquet existant à poncer puis vitrification mate F&P de parquet neuf pour compléter le parquet existant, ponçage puis vitrification mate

4.81

Seuil de cheminée en pierre existant à conserver

Parquet existant à poncer puis vitrification mate

F&P de carrelage hexagonal Mosaic Del Sur, couleur unie rose pâle RL, 20x23 cm

Repose du parquet du couloir pour changer les lattes abîmées 1.03

0.52

2.16

1.37

Parquet existant à poncer puis vitrification mate

Repose du parquet du couloir dans la penderie, à poncer puis vitrification mate

3.56 Repose du parquet existant + F&P de parquet en point de Hongrie pour compléter l'existant, ponçage + vitrification mate

1.39

F&P de carrelage Leroy Merlin, bleu blanc effet ciment Dément 20x20 cm

1.70

0.80

2.30

1.20

Parquet en point de Hongrie existant, à poncer puis vitrification mate Repose du parquet existant + F& P de parquet en point de Hongrie pour compléter l'existant, ponçage + vitrification mate

0.95

F&P Marbre Calacatta Volupto, Surface, 120x60 cm, sol + tablier de baignoire + plinthes F&P Carreaux de ciment Mosaic Del Sur, 20x20 cm, couleur blanche B, prévoir trappe d visite de 20x60 pour accéder au robinet d'eau froide

Rénovation d'un appartement parisien

PC basse sur laquelle sera branché un

M. & Mme. GRANAT commandé par 2 lampadaire,

190 Rue de Grenelle, 75007 PARIS : un juste au dessus, interrupteur Tél: 06.62.73.93.35 / 06.88.98.99.58 autre à l'entrée de la pièce Mail : hugo.granat@gmail.com / eve.pik@gmail.com

un

Quentin RABU - Clément JENNESSEAUX Tél : 06.64.99.15.69 / 06.75.18.89.50 Mail :quentin.rabu@laposte.net / clement.jennesseaux@gmail.com

EXE

Plan de revêtements de sol

25/03/2018 1/50 IND: B

202

LEGENDE ELECTRIQUE HABITATION SORTIE DE CABLE INTERRUPTEUR VA ET VIENT

2 PC Haute à placer en dessous du niveau de la cheminée pour branchage télé, voir coupe chambre 1

BOUTON POUSSOIR PRISE COURANT / PC HAUTE LAVE VAISSELLE LAVE LINGE 1.47

2.16

FOUR

0.40 0.40

REFRIGIRATEUR

1.33

1.42

HOTTE

CHAUFFE EAU PLAQUES DE CUISSON

0.45

PRISE TV

0.66

TABLEAU GENERAL 0.80

PLAFONNIERS SPOT ENCASTRE

0.56

2.26

2.56

0.41

0.45

0.60

FIBRE COMPTEUR EDF

Coffrage dans la cloison, comprenant le tableau divisionnaire, le disjoncteur et une PC et une prise RJ45 pour la Box internet, à voir avec électricien

1.52

0.56 0.56

0.50

1.42

1.10

1.46

1.07

0.40 0.40

APPLIQUE Prévoir une sortie de câble pour le miroir de la SDB 1.62

- TOUS LES INTERRUPTEURS A 1.15m DE HAUTEUR (sauf à côté du lit et au dessus du plan de travail cuisine) - TOUTES LES PRISES DE COURANT EN PARTIE BASSE A 0.15m

M. & Mme. GRANAT 190 Rue de Grenelle, 75007 PARIS Tél: 06.62.73.93.35 / 06.88.98.99.58 Mail : hugo.granat@gmail.com / eve.pik@gmail.com

Quentin RABU - Clément JENNESSEAUX Tél : 06.64.99.15.69 / 06.75.18.89.50 Mail :quentin.rabu@laposte.net / clement.jennesseaux@gmail.com

Rénovation d'un appartement parisien Plan électrique

p.68 - Renovation of a Parisian apartment

EXE

25/03/2018 1/50 IND: B

204


Mural (devis AUBADE) 0.70

0.20 0.31

1.96

Miroir Storm LeroyMerlin, 1.20x0.90cm

Meuble suspendu, IKEA, à définir

2.90 0.45 0.60

1.20

0.89

Lave Linge MIELE WTF 130WPM

0.90

F&P carreaux de ciment Mosaic Del Sur, 20x20 cm, Ref 10690 Couleur BMF Lavabo TORNVIKEN, IKEA, diamètre 0.45cm, hauteur 0.14cm Plan de travail en bois essence bambou Leroy Merlin

0.47

0.20

0.70

Meuble IKEA, à définir

M. & Mme. GRANAT

Quentin RABU - Clément JENNESSEAUX Tél : 06.64.99.15.69 / 06.75.18.89.50 Mail :quentin.rabu@laposte.net / clement.jennesseaux@gmail.com

Rénovation d'un appartement parisien SDB

EXE

25/03/2018 1/20 IND: A

EXE

25/03/2018 1/20 IND: B

317

0.58

0.10

190 Rue de Grenelle, 75007 PARIS Tél: 06.62.73.93.35 / 06.88.98.99.58 Mail : hugo.granat@gmail.com / eve.pik@gmail.com

Cloison escamotable, recouvert de carreaux de ciment Mosaic Del Sur, 20x20 cm, couleur blanche B F&P Baignoire rectangulaire BASTIA, 170x70cm, acrylique blanc Réf 00091600000 (devis Cedeo) + F&P mitigeur Bain Douche Mural (devis AUBADE) Passage de l'évacuation d'eau, recouvert de marbre Calacatta Volupto, Surface

Moulures existantes à conserver

0.54

M. & Mme. GRANAT 190 Rue de Grenelle, 75007 PARIS Tél: 06.62.73.93.35 / 06.88.98.99.58 Mail : hugo.granat@gmail.com / eve.pik@gmail.com

Quentin RABU - Clément JENNESSEAUX Tél : 06.64.99.15.69 / 06.75.18.89.50 Mail :quentin.rabu@laposte.net / clement.jennesseaux@gmail.com

0.60

0.60

Rénovation d'un appartement parisien Chambre parentale

0.60

0.08

0.15

1.15

Porte de penderie en bois médium peint blanc

0.60

0.80

0.80

Encadrement de la porte sur mesure, essence bois de frêne à valider par la MO

0.60

308

ON THE LEFT

Plans | Floor covering and electricity ABOVE

Detailed sections | Bathroom and wardrobe

p.69


MANUFACTURING Whether used as a tool in the outcome of a project or as an element of representation and communication, the model accompanies my path from my first years of study to my experience as a young architect. From the urban scale to the technical detail, it is a way of understanding the complexity of our work.

p.70



MANHATTAN As part of an artistic project called Playground, we had to examine the city as if it was a playing field. Firstly inspired by urban practices like Urbex, we worked as a team to design a board game which would be at the end an allegory of an American ÂŤCentral Business DistrictÂť. In the desire to create an object with elegant design, the towers were represented by rough blocks of wood and the urban grid by a sleek black support.

p.72


GAME RULES : You play as a character who must conquer the tallest tower in the heart of Manhattan. To achieve this mission, you will have to jump from rooftop to rooftop, but beware: the heights of buildings vary. You will not be able to move from one building to another if the difference in height is too great. Two choices are available to you : - Action 1: Jump on a neighboring building, only if the difference in height does not exceed one unit. - Action 2: Adjust the playing field by swapping two adjacent buildings, anywhere on the game board. Trace your way to the highest tower or slow down your opponents’ progress. NB: Only one of these actions is possible per game turn. After an opponent makes a swap, you must wait for one turn before doing it in the opposite direction. The central tower to be reached can not be moved. The game board is flexible. Feel free to express your creativity at the beginning of the game !

p.73


PHOTOMANIPULATION In order to practice post-production software, I challenge myself to produce a photoshop montage per week over a period of three months. The photomontages opposite are a non-exhaustive list. Beyond the desire to learn new tools on this software, this process forced me to unleash my inventiveness and my imagination.

p.74


2 : Lost in Modernism

1 : Culture in Metropolis

4 : La Ballade de Jim

3 : Deep Moon

5 : Swinging in the Sky

6 : Urban Fatality

p.75


quentin.rabu@laposte.net +33 664 99 15 69




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.