1 minute read
Appendix F – Additional results by State
from The Australian Electricity Workforce for the 2022 Integrated System Plan: Projections to 2050
by racefor2030
Figure 40State by state technology summary by scenario
Note: Hydrogen Superpower Scenario the maximum is 120,000 FTE while the other three scenarios have a maximum of 35,000 FTE.