Portfolio_2020

Page 1

RAFAELA SIMONATO CITRON

62A Leslie Park Road - CRO 6TP citron.rafaela@gmail.com 07388699520


HERITAGE

RESIDENTIAL

O3

O4

URBAN

O1

O2

O5

O6

O7

Coventry Charterhouse

Coventry Draper’s Hall

Chelsea Manor Street

Oceans Estate

Bromley Rd

Coventry Riverside

Urban 21

PCPT Architects 2013

PCPT Architects 2012

Madigan Browne 2014

JKSW and Partners 2015

JKSW and Partners 2016

PCPT Architects 2013

IMED 2018

Main tasks:

Main tasks:

Main tasks:

Main tasks:

Main tasks:

Main tasks:

Main tasks:

Historical research; Building survey; Pre app drawings and reports; Feasibility studies;

3D modeling; Planning drawings; Photography; Presentation boards;

Layout designing; Planning drawings; Drawings for publicity.

Construction drawings; Comply with planning conditions.

Feasibility studies; Design; Planning drawings.

Site survey; Production of drawings;

Design; Project supervision; Boards design; Photoshop drawings.

Softwares: AutoCad, Photoshop, SketchUp

Softwares: AutoCad, Photoshop, SketchUp, V-ray

Softwares: AutoCad, Photoshop

Softwares: AutoCad

Softwares: AutoCad, Photoshop, SketchUp

Softwares: AutoCad, Photoshop,

Softwares: AutoCad, Photoshop, Lumion, InDesign


Project overview

O1

East elevation view | Photo by Rafa Citron

THE CHARTERHOUSE PCPT Architects 2013

West elevation view | Photo by Rafa Citron

The Charterhouse is a Grade I listed building, the only remaining building of a monastic monastery, in the city of Coventry, UK. PCPT has been appointed to do a feasibility study for the reuse of the Chaterhouse, opening the building and the grounds to the community. Before proposing any intervention to a listed building, it is essential that we know it’s history. My main task o this project wasto conduct a research to find out how the building was in its original configuration, on medieval times. Through a literature reseach on other Carthusian monasteries, cathograohic research and an extensive survey on the building, I was able to create a 3D model showing how the monastic complex was. This was the starting point to a proposal for the use of the grounds and buildings.

Drawing by: David Mahony Colouring by: Rafa Citron

Crucification medieval wall painting on first floor | Photo by Rafa Citron


Monastic complex reconstruction To help telling this story, the medieval monastery was reconstructed in a three-dimensional model, based on the research. From the archaeological excavations, we knew with certainty the location of the church and the monks’ cells and these, together with the standing building, were the starting point for the three-dimensional model. Although only five cells have been excavated, it is known from historical research that there were in total eleven, six to the east of the cloister, four to the south and two to the west of the cloister. No excavation has been done in the supposed location of the Chapter house, but it is known, from the research on other monasteries throughout Europe, this would usually be by the east side of the cloister. To the north of the church, the excavations found part of what is believed to be the cloister of the lay brothers, who certainly were outside the cloister of monks. To the west of the survival building, based in the usual configuration of the Carthusian monasteries and also on drawings made in the 19th century, were located the service homes, the kitchen, the bakery, etc. Near the bridge of access to the monastery, there was probably the home of the prosecutor.

Monastic period

After dissolution

Victorian period

The monk’s cells

The remaining building (charterhouse)

The church

The cloister

The chapter house


C15 window

C15 window

C15 - Lavatorium

C16 - Extension C18 - Probably rebuilt

C15 - Priors House

Building analysis, east elevation C16 - Extension C18 - Probably rebuilt

C15 - Priors House CHRONOLOGY

EAST ELEVATION

Coventry Charterhouse Scale 1:100 @ A3

C15 window

The information that we had prior to the survey was that the medieval painting of the crucifixion had been divided in two by the insertion of the second floor in the 16th century and the top part of the painting had been removed or covered, although no traces of the painting in the second floor has ever been found. The survey showed that it would never have been possible to find the top of the painting, because the ancient masonry was destroyed and a new wall was built almost in the same place.

1970’s - Verandah extension

Building analysis, west elevation

1850’s - Verandah

C19 - Victorian House

CHRONOLOGY

Phase I - 15 century / Monastic Period

Phase I - 15 century / Monastic Period

Phase II - 15th century / After Dissolution, House Period

Phase II - 15th century / After Dissolution, House Period

Phase III - 18th century / House Period

Phase III - 18th century / House Period

Phase IV - 19th century / House Period

Phase IV - 19th century / House Period

Phase V - 20th century

Phase V - 20th century

Building analysis, ground floor

Building analysis, first floor CHRONOLOGY - GROUND FLOOR Coventry Charterhouse Scale 1:100 @ A3

CHRONOLOGY - FIRST FLOOR Coventry Charterhouse Scale 1:100 ò A3

Building survey


Feasibility studies

Hand sketch of overall proposal

Hand sketch ground floor proposal

Photoshop sketch overall proposal

The process of knowledge has been critical to the assessment of the possibilities for the reuse of the Carthusian Priory of Santa Ana, and will also be important to tell the story of The Charterhouse to the community of Coventry. The union of all the data collected between historical research and the direct analysis of the building gave us the conditions for planning the reuse of the building, respecting its history and original configuration. Once the building and the monastic complex was understood, the first step was to determine that the garden - that used to be the cloister - should remain a space of silence, since it has been that way in the monastic period. It will be there that the story will be told to visitors of the monastery and the children of the local schools. The gardens outside the walls will be developed for sports and other activities in general, because it was the secular space in the monastery. The result of this research and all processed materials will be exhibited in the museum of The Charterhouse with the intuition that the entire Coventry community can learn the history and participate on it from now on. The future use of the house is still to be confirmed by the trust that owns the house, but the most important decision is that, although it is now known that the building has suffered some important modifications through the years, no work will be done in the attempt to convert the building into its original configuration. All phases are important and it tells the history of The Chapter house. The only exception will be the reconstruction of one of the cells, where visitor will have the chance to see how the Carthusian monks used to live.


Project overview PCPT had been appointed by the Higgs Trust to do a proposal for the Grade II* listed building, the Draper Hall, in Coventry, to become a music centre for the Coventry University and Coventry’s Music Services, with additional funding from Arts Council England. When I joined PCPT, the team had already worked on the design and I was asked to:

After completing this initial task, I joined the team on designing new options for the extension, following the advices from the planning officers. I have also produced materials such as the Design and Access Statement and boards for client’s meetings.

O2

DRAPERS HALL

Photograph the building Create a 3D model of the proposal Create a photo-montage with the photos and the 3D model

Photo showing the site of the proposed extension

PCPT Architects 2013

Photo by: Rafa Citron

Proposed extension

Photo showing the existing Grade II Listed building


The proposal

Large Practice Area 1

Bang It Performance Area

Medium Practice Aerea

Foyer

Large Practice Area 2

Male WC Large Meeting Room

Female WC

Sheet Music

Sheet Music Entrance Hall and exibition area

Listed Building

Listed Building Archeology

Listed Building

Ground floor plan

East elevation

First floor plan

Second floor plan


Project overview The site, situated on 232 Kings Road and 18 – 20 Chelsea Manor Street, consists of two connected buldings that once formed the Royal Mail Chelsea Sorting Office. Madigan Browne Architects had already gained permision for the demolition of the existing building on Chelsea Manor Street, retaining the historic façade of n18 Chelsea Manor Street and the construction of 17 flats + 4 affordable units on Kings Road.

O3

CHELSEA MANOR STREET Madigan Browne Architects 2014/2015 Internal layout design Planning application Amendments on existing drawings AutoCad Photoshop

When I joined the team, they were working on the redevelopment of the consented scheme to provide 22 apartaments + 4 affordable units and retail on the ground floor of Kings Road. My task was to redesign the floor plans of the Chelsea Manor Street side of the project, in order to accomodate 5 more apartments, which I have managed to do without changing the envelope of the previous proposal.


Layout redesign

Existing n18 Chelasea Manor Street Entrance to 4 affordable units

New building on n20 Chelsea Manor Street Entrance to 22 market appartments


O4

OCEANS ESTATE JKSW and Partners 2015

Construction drawings

Ocean Estate, at 85 Harford St, London, is a building conversion into 11 apartments. JKSW took over this project during the construction phase, to produce all technical drawings and details required for its construction. My task on this project was to produce the details and manage a team of 3 architectural assistants to make sure the drawings were being delivered on time.


DO NOT SCA DD

EW02

DG7 WG7

Dimensions to dimensions on drawings.

437

WG8

437

WG9

This drawing i

AA

BB

387

414 PW02

WG15

NEW CONTINUOUS UC COLUMN LOCATED FROM THE BUILDING`S FOOTING RIGHT THROUGH UP TO THE ROOF STRUCTURE. REFER TO STRUCTURAL ENGINEER`S DRAWINGS No.1008/12/2322 FOR SECTIONS AND No.1008/12/2317 FOR COLUMN DETAILS.

WG17

EW02

600 2041

1993

2621

G/17 03/05

1135

Store 1 m²

EW02

Cup

C

Wa

D

Doo

E

Sec

1840 97

4733

439

IW08

561 DG5 WG18

B

Bedroom 13 m²

G/17 04/04

348

439

WG19

561

2613

459

Uns

FF

G/17 06/07

Entrance 4 m²

De

A

IW03

108

108 360

Revision

1135

PW02

G/CA 06/08

W 2 m²

4239

3398

108

942 1086

258

365

835

4

W/C 3 m²

G/17 01/02

348

2613

G/17 05/18

561

1280

4314

3360 4200 PW02 3

2

4 x 17.7/26

1

12 11 10

PLOT 16 (TYPE 11 - 2B3P) 56.1m2

713 108

157

G/17 02/04

G/CA 05/01

2982

IW02

IW02

PLOT 17 (TYPE 12 - 1B2P) 51.6m2

Hall 14 m²

PW02

108

3375

1105

Kitchen 10 m²

7 5

485 G/16 01/02

Bedroom 1 8 m²

1322

Hallway 4 m²

6

585

108

9 8

10 x 17.7/26

942 108

1260

3475

Living Room 14 m²

13

0 -1 -3

-2

PW02

1512

394

EW02

WG20

AA

DD

KK

HH

85

Bedroom 2 10 m²

WG16

JJ

348

BB

3519

WG14

G/15 01/02

481

806

G/16 02/04

CC

EW02

1318

160 G/16 03/04

3375

481 WG NEW2

780

926

Bedroom 1 11 m²

108

6010

373

3000

EW02

EE

108 108

97 585

372 DG4 WG13

G/16 07/08

IW0 3

IW02

W 1 m²

409

WING4

3932

IW03

G/15 08/17

108

939

W/C 4 m²

458

WING3

2089

108

108 761

589 2005

865

Store 1 m²

IW03

Hallway 9 m²

108

W 1 m²

348

3440 108 936

2100

247

108

2959

IW03

443

320

108

PW02

315 1865

PW01

550

108

Bedroom 2 11 m²

1959

2539

PW02

2092 108 1084

51

GG

159

3519

IW03

Entrance 4 m²

7567

G/15 07/05

G/15 06/04

3000

IW02

113

G/16 05/05

PW02

Kitchen 12 m²

351

3256

443

3933

1678

2348

G/16 06/04

2000

724

FF

108 1859

.

PW01

3499

1677

3390

108

108 108

108

1116

2092

1920

108 897

448

173

G/CA 02/08

467

3592

22

G/15 09/04

458

WG1

1623 97

1436 1035

IW02

1791

97

PW02

2861

Living Room 17 m²

409

Ensuite 3 m²

97 985

907

IW03

665

5144

1326

874

3256

21

1561

G/15 03/12

2613

G/15 01/02 1187

107 411

IW02

97

1050

Hallway 7 m²

320

IW01

IW03

4141

Kitchen 9 m² 6505

108

20

G/CA 01/01 WING NEW1

3613 97

19

G/15 02/12 G/15 01/02 443

1806

108

1289

750

1341

W 1 m²

514

1690

G/15 05/05

Utility 1 m²

Living Room 13 m²

W/C 4 m²

1521

PLOT 15 (TYPE 10 - 1B4P) 72.7m2

5 x 16.5/25

2213

G/15 04/04

LL

108

GW01

3 2

Entrance 24 m²

5984 470

221

365

PW02

2116

EW02

2111

4

PLOT 14 (TYPE 9 - 1B2P) 50.9m2

2460

97

1158

1

7 x 16.5/25

0.00

18

EW02

2983

EW02 DG1

360

Kitchen 8 m²

520

4809

97

G/14 01/02

1923

IW03

600

1404

4 x 16.5/25

11 12 14

1500

15

353

6218

IW 02

1077

WG4 EW01

5

1250

EW02

WG5

DG2

1301

6

PW01

16

700

1456

Hall 4 m²

G/14 02/04 108

2763

7

DG6 WG6

Living Room 22 m²

5475

685

959 108

17

1115

IW03

97 1389

DG8

GG

108

97

IW03

984

1528

W 1 m²

1386

108

1624

2939

EW02

G/14 03/04

8

328

G/14 06/12

G/14 04/17

9

1030

13

108

IW02

120

472 DG3

6 x 16.5/25

482

108

LL

6698

398

986 1164

1841

3663

3663

WING2

Bedroom 9 m²

PW02

108

2716

Store 1 m²

2149

10

W/C 4 m²

4440

WG10 EW01

784

430

430

EW02

WG NEW1

CC

1990 3004

KK

HH

JJ

EE

Copyright is re issued on the retained or dis without the pri Ltd.

NOTES: Refurbishment Building Block A requirements Minimum 'U' Values to be achieved are as follows: Floor 'U' Value Wall 'U' Value Roof 'U' Value Window/Door 'U' Value

- 0.22 - 0.28 - 0.16 / 0.18 (refer to plans) - 1.6 / 1.8 (refer to plans)

The required air permeability rating for the project is 5m3/h/m2@50pa. To achieve this target the construction will require the highest quality workmanship. A selection of dwellings will be tested when completed. Failure to achieve the target air permeability rating will require very expensive remedial work, which may involve opening-up much of the completed finishes for inspection and corrective action. It is recommended a strict quality control process is implemented by the builder, including checklists for each room at various stages, together with a detailed photographic record which will help to identify defects should they arise. Ensure that all foamed thermal & acoustic insulation has a Global Warming Potential (GWP) of less than 5 in either manufacture or composition. Ensure that moisture resistant board is applied to ALL wet areas including Kitchens and Bathrooms.

1

Ground Floor Setting Out 1 : 50

EXTERNAL WALL TYPE 1 (EW01): 102.5mm Facing Brickwork, 125mm cavity fully filled with 'Isover' Cavity Wall Slab (CWS), 100mm 'Plasmor Stranlite' Lightweight Aggregate Blockwork with1 layers of 12.5mm Plasterboard on 10mm dabs to room face. Wall ties should be spaced at a max. 600mm centres horizontally and 450mm centres vertically, and to Building Regulations, Part A, or as required by Structural Engineer.

EXTERNAL WALL TYPE 2 (EW02): Existing solid external brick walls (varying in dimension) fit internally with 25mm Metal lining system for cavity (to be fit in line with manufacturer's instructions as chosen by the contractor) with 65mm Celotex PL4000 Insulation Joints tapered to VCL (vapour control layer) or similar approved and 12.5mm Tapered edge Plasterboard.

EXTERNAL WALL TYPE 3 (EW03): 84mm Shaft Wall consisting of 60mm Gypframe Tabbed 'I' Stud framework with Gyproc 19mm CoreBoard between studs, secured by Gypframe Retaining Channel, 25mm 'Isover' APR 1200 in cavity. 2 x 12.5mm Lining boards on non-shaft side only.

PARTY WALL TYPE 1 (PW01): 300mm Cavity Party Wall consisting 2No. leaves of 100mm 'Plasmor Stranlite' Lightweight Aggregate Blockwork (1350-1600 Kg/m³ with 225mm coursing) with 100mm cavity infilled with minimum 100mm 'Isover' RD Partywall Roll, drylined with dot and dabbed 12.5mm Gyproc Soundbloc (9.8Kg/m³). Ensure mortar completely fills each joint. Connect the leaves only where necessary by butterfly pattern ties to BS. 1243 and spaced as required by Structural Engineer to BS 5628-3:2001. PARTY WALL TYPE 2 (PW02): Existing solid brick wall (dimension varies) with 15mm Soundbloc each side and Gypframe GL1 Lining Channel framework fixed to both sides to give 35mm cavities. Cavities filled with 25mm 'Isover' APR 1200. (Please note: The drylining build up is the recommendation of the Architect, yet due to varying wall thicknesses, the build up on the existing solid brick party walls will need to be confirmed on site and in every case, the wall to have Fire Resistance of 60 minutes and to achieve a Sound Rating of 44dB to meet the requirements of the Code for Sustainable Homes and to comply with Building Regulations Part E - Resistance to the Passage of Sound). PARTY WALL TYPE 3 (PW03): Two layers of 15mm Soundbloc fixed to the outside faces of two Gypframe 'I' Stud frameworks with studs at 600mm centres. 100mm 'Isover' APR 1200 in the cavity (Cavity width 190mm). The wall to have Fire Resistance of 90 minutes and to achieve a Sound Rating of 44dB to meet the requirements of the Code for Sustainable Homes and to comply with Building Regulations Part E - Resistance to the Passage of Sound).

INTERNAL WALL TYPE 1 (IW01): Gypwall Classic - one layer of 12.5mm Mositure Resistant Soundbloc each side of 70mm Gypframe 'C' Studs at 600mm centres with 19mm WBP plywood between Studs to both sides for kitchen units, grab rails and heat interface units etc. (FR - 30mins; SR - 40dB) INTERNAL WALL TYPE 2 (IW02): Gypwall Classic - one layer of 12.5mm Soundbloc each side (Mositure Resistant to Bathroom Side) of 70mm Gypframe 'C' Studs at 600mm centres with 19mm WBP plywood between Studs to bathroom side for grab rails etc. (FR - 30mins; SR - 40dB). INTERNAL WALL TYPE 3 (IW03): Gypwall Classic - one layer of 12.5mm Soundbloc each side of 70mm Gypframe 'C' Studs at 600mm centres. (FR - 30mins; SR - 40dB).

Key Plan

Client

Project

Drawing Title

Project Stag

Scale

As ind

13/1 10:5

Date Drawn R.K.


O5

BROMLEY ROAD JKSW and Partners 2016


06

RIVERSIDE PCPT Architects 2013

Drawing by: David Mahony Colouring by: Rafa Citron


07

URBAN 21 IMED 2019



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.