Network Rail
Leading the £2.2 billion transformation of the railways in Anglia Network Rail’s Ellie Burrows on the major work involving over 2,600 workers and • 87% weight saving vs. traditional build 1,700 miles of track due to lightweight superstructure and
2020 Queen’s Award Winners in Innovation for Dura Platform
Robroyston Station
Unlocking the Power of Composites for the Rail Industry
GRP End of Platform Gates and Fencing Solutions
Unlocking the Power of Composites for the Rail Industry
Dura Slab Composite Stair Treads & Landings with Built-in Riser for Rapid Install Unlocking the Power of Composites for the Rail Industry
railbusinessdaily.com
GRP panels
M
• Allows for changes rapid adjustment future ajor are wellforunderway PTI requirements
to provide a safe and high-performing • Low maintenance surface tested to railway for passengers in Cambridge, Norfolk, +1 million footfalls Suffolk, Essex and East London. • Modular panels can be rapidly installed Theconvex £2.2 billion transformation, which runs until on or concave platforms is focused onsystem renewing maintaining •2024, Hybrid GRP steel hasand design life of up infrastructure, to 120 years leading to fewer delays and existing improved reliability for passengers. the project is Ellie Burrows, who this Tel:Leading +44 (0)1255 440291 info@duracomposites.com month has marked her first anniversary since www.duracomposites.com being appointed as Network Rail’s Route Director for Anglia. “It certainly wasn’t the normal first year in the content published in good faith. job,” said Ellie.is“It has been challenging but also a great opportunity to quickly understand how the organisation works under pressure and get a of our strengths and areasfencing for improvement. •grasp Lightweight, high strength and “We solutions have delivered a lot over the last year gate all and of thisnon delivered a high level •and Nonthroughout conductive corrosive reliabilitydesign to our passengers and users. That’s •ofModular can be rapidly installed to theStructural amazing teams Anglia, who •down Bespoke Designacross and CAD Services never fail toavailable impress.” In theday lastdispatch 12 months, Network Rail has • Same on standard stock holdings completed many large-scale projects as part of the Anglia transformation. This has included replacing the overhead wires on the Southend Victoria line, replacing 57 pairs of wheel timbers across bridges near Manea and capacity has Tel: +44four (0)1255 440291 info@duracomposites.com been doubled on the Fen Line. www.duracomposites.com This has been alongside maintenance work such as track renewals on the Wherry Lines
• Low maintenance surface tested to +1 million footfalls • Built-in risers and fall eliminate water pooling on surface • Single unit construction and lightweight nature means rapid installation • Produced to BS 476 Part 20/21 Fire Rating • Can span up to 2.1m achieving a 5kn loading at L/300
Tel: +44 (0)1255 440291 info@duracomposites.com www.duracomposites.com
January 2021 | 5