Q-TEE II C SST
Montage af Fedtsten Montage von Speckstein Mounting the soapstone Montage de stéatite Montering av kleberstein Montering av tvålsten Vuolukivin asennus Montage van speksteen
INSTALLATION MANUAL
CONTENTS
16.06.2020
4 5 7
EN
Dimensional drawings Mounting the soapstone Installation of firewood hopper cover
3
Dimensional drawing 1038
EN
335
696
70 n1
850
60
B
B-B
n
n
5 12
686
110
60
B
vja
Project manager: Approved:
29-01-2020
D M Y
Designer:
RAIS\ksj
0 17
Established: Format: Revision: Drawing no.: _ 05-10-2018 A3 8336550
Q-TEE C SST
INDUSTRIVEJ 20, 9900 FREDERIKSHAVN, DENMARK Corrections: Phone +45 98 47 90 33 - Fax +45 98 47 92 91 E-mail: info@rais.dk - Homepage: www.rais.dk
Drawing name:
Q-Tee II C SST
Project:
4
205 332,9
60 507
Front side
2 B
A A 1. Attach the fastener brackets (1) to the side stones using the four M5 x 10 bolts (2). 25 25
1
EN
97,4
68 68
4
2. Position the fasteners in relation to A 3 the top of the side stones as shown here.
Right side
B
Mounting of Soapstone
3. Remove the back panel by loosening the screws (3) and lifting it off. 4. Pull the two fasteners (4) all the Front side way to the rear. 2 A
A
1
25
4
3
A
5
EN
5. Place the side stones on the baseplate and carefully push them in against the guide pins on the base4 plate. A
6. Hold the side stone against the stove and push the fastener bracket all the way to the front until it clicks into place. The stones are now locked in place.
7. Reattach the back panel and insert the four enclosed guide pins, two on each side. Place the top stone on top of the stove, making sure the guide pins in the side stone mesh with the guide holes in the top plate.
6
4
3
A
Attaching the firewood bin cover
EN
Attach the firewood bin cover by resting the cover’s rubber feet (1) on the stove baseplate. Then tilt it in against the stove until the magnets (2) hold the cover in place.
A
B
B
A
A
B
1
B
A
A
B
A
B
B B
2
7