Gravitee One-Step All System

Page 1

© 2019

Modified RE-9084 w/ RE-1227 & RE-1207

20’

Plan View

20’


© 2019

Grid View

= 1 sq foot


Š 2019

General Information

General Setup Instructions 7A

- Read entire setup instruction manual prior to unpacking parts and pieces. - The setup instructions are created specifically for this configuration. - Setup instructions are laid out sequentially in steps, including exploded views with detailed explanation for assembly.

Hex Tool - Essential for Assembly

WARNING

Part Identification - Numbering

Cleaning & Packing

DO NOT USE POWER TOOLS

- For Cleaning Metal, Plex, & Laminate Parts: Use a MILD NON-ABRASIVE cleanser and soft cloth/paper towel to clean all surfaces. - Keep exhibit components away from heat and prolonged sun exposure. Heat and UV exposure will warp and fade components.

LADDERS OR LIFTS MAY BE REQUIRED Spline Connection

Base Plate & Extrusion Connection

- Retain all provided Packing Materials. All provided packing materials are for ease of repacking & component protection.

ALL CONNECTIONS MUST BE TIGHTLY SECURED

Disassembly - For loss prevention, tighten all set screws and locks during disassembly.

Extrusion & Lock Connection

Engaged Lock


Š 2019

Gravitee Assembly

Assembly

Assembly Cont’d Push pin lock into hole of connecting frame. Note: Block of pin lock will secure in groove.

Side-by-Side Assembly

Corner Connector

1) Frames: Place frames side-by-side with one higher than the other, then slide panel down to lock panels securely together.

SEG Grooves

2) Corner Connectors: Repeat Step 1 for installing corner connectors to frames.

Side-by-Side Disassembly

Pin Lock

1) Pull pin lock outwards to disengage. 2) Pull frames upward and apart at the same time to detatch.

Stacking

Stacking Assembly 1) Place one horizontal frame on top of the other, lining up the center grooves.

Unstacking

Push stacking lock into the slot of the upper frame, then spin the cap to tighten the lock.

2) Turn stacking lock clockwise to tighten into place. Repeat for each lock.

Stacking Disassembly 1) Turn the stacking lock counter-clockwise to loosen. 2) The whole spring on the stacking lock should be in view to release each frame. The disengaged spring should release the stacking lock. If not, keep turning the stacking lock until it disengages.

Top View

Note: Orientation of Corner Connector may change.

Stacking Lock

Cap

Disengage the stacking lock by spinning the cap counter clockwise and pulling down.


Š 2019

CEI152 Frame Assembly

Corner Bracket Installation 1) Slide TWO-PIECE TS RV 2 L-bracket into Interior Center Slot of extrusion so that two set screws are inside groove. Tighten two set screws to secure. 2) Slide two A1 L-Brackets into outer interior grooves of upper and lower horizontals. Tighten set screws to secure. 3) Slide vertical extrusion over exposed ends of brackets in lower horizontal. Tighten set screws to secure. 4) Slide exposed ends of installed brackets of upper horizontal into open ends of verticals. Tighten set screws to secure.

Corner Connection Upper Horizontal

A1

Upper Horizontal

A1

Slide verticals over brackets of lower horizontal, then slide upper horizontal & brackets into grooves & center slots of verticals.

TS RV 2 Insert L-Brackets into the Interior Center Slot & outer interior grooves of extrusion.

Lower Horizontal

TS RV 2

Disassembly

Completed Assembly

A1

Straight Connection

Straight Bracket Installation 1) Slide TWO-PIECE TS RV 4 straight bracket into Interior Center Slot of extrusion, so that two of the set screws are inside groove. Tighten two set screws to secure. 2) Slide two V4 Connectors into outer interior grooves of extrusion, so that one set screw is inside groove. Tighten set screw.

Lower Horizontal

A1

1) Loosen set screws on brackets and slide extrusions off of brackets.

12 Brackets Total: (4) - TS RV 2 (8) - A1 L-Brackets

Insert two-piece bracket into the interior center slot of extrusion.

TS RV 4 Bracket

CEI-152 Profile

V4

3) Slide connecting extrusion over exposed ends of bracket & connectors. Tighten all remaining set screws to secure extrusions. Set Screws

Slide connecting extrusion over exposed ends of bracket & connectors.

V4

Slide V4 Connectors into front & back interior grooves.

Secure inserted half of bracket & connectors using set screws.

Completed Assembly Secure extrusion, using remaining set screws.


Š 2019

SEG Installation

Corner A

Corner B

Corner D

Corner C

It is important to first insert graphic into each alternate corner then to the sides of the frame. If this is not done, graphic will not fit into the frame correctly.

Graphic Removal

Step 1 Insert corner A. Turn edge of graphic so silicon welt is perpendicular to face of graphic. Insert narrow side of welt with fabric to outside into the channel. Repeat for other side of this corner.

Step 2 Repeat Step 1 for opposite corner C, then insert corner B, followed by corner D, to complete the installation of the corners.

Step 3 Once all corners are inserted, press one silicon edge into channel from corners and work toward the center. Make sure welt is fully inserted into channel. Continue until all sides are done. Smooth out edges of graphic.

To remove the graphic from the frame, locate the fabric pull tab. Gently pull up on the tab to remove the fabric.


© 2019

Closet Assembly

Item 1 2 3 4 5 6 7 8 9 10 6/6A

Qty. 1 1 1 1 1 1 1 1 1 1 1/1

Description 94.5”h Gravitee Corner Post w/ caps 46”w x 95”h Gravitee Panel 46”w x 95”h Gravitee Panel 94.5”h Gravitee Corner Post w/ caps 38”w x 95”h Gravitee Panel 94.5”h Gravitee Corner Post w/ caps 46”w x 95”h Gravitee Panel 46”w x 95”h Gravitee Panel 94.5”h Gravitee Corner Post w/ caps 38”w x 95”h Gravitee Panel w/ Door 91.904”h S44 Vertical Extrusion

Steps: 1) Attach vertical [6] to Gravitee Panel [2], and connect veritcal [6A] to Gravitee Panel [3]. 2) Assemble Gravitee Panels & Connectors together in numerical order. Refer to Gravitee Side-By-Side Assembly instructions in the General Information pages.

Profile View SEG grooves

6 5 4

Profile View

7

8

3

2

6A

SEG grooves

9 1

When assembled

10

6

SEG grooves

Profile View SEG grooves

Profile View

Keep internal extrusions attached to Gravitee panels. DO NOT REMOVE.

5.46”

5.46”

Step 1 of 7


© 2019

Closet Assembly (cont’d)

Item 1 2 3 4

Qty. 1 1 1 1

Description 47”h Gravitee Corner Post w/ caps 46”w x 47.5”h Gravitee Panel 46”w x 47.5”h Gravitee Panel 47”h Gravitee Corner Post w/ caps

Steps: 1) Assemble upper Gravitee Panels & Connectors [1-2-3-4] to lower panels & to eachother. See Gravitee Stacking Connection detail.

4

3

2

1

When assembled

*

4

*

3

Gravitee Stacking Connection

Push stacking lock into the slot of the upper frame, then spin the cap to tighten the lock.

*

*

2

*

1

Stacking Lock

Cap

Step 2 of 7


Š 2019

Closet Attachments

Steps: 1) Apply SEG graphics to closet assembly, as shown. 2) Attach Sintra Graphic to Door panel [10]. 3) Affix Sintra panel to Panel [5], using Velcro 3) Install Monitor Mount to verticals [6,6A] of panels [7,8]. See Monitor Mount Attachment detail. 4) Attach Lights to closet assembly. See Light Attachment detail.

*

Light Attachment

Lock Clip into Groove of Horizontal Extrusion then slide Light onto Clip.

Light

Clip

Light

Clip

Extrusion

SEG Graphic Installation Corner A

Corner B

*

*

SEG Graphic

* SEG Graphic

* *

Monitor Mount Attachment V4 Connectors Stand-Off Barrel

*

SE

G

Gr

ap

hic

Caps

*

Monitor Mount

10 tra Sinphic a Gr

or Doill Inf

Slide V4 Connections into vertical channel of extrusions. Tighten set screw to secure.

Profile View

Attach Stand-off Barrels to V4 Connectors then install Monitor Mount to stand-off barrels. Note: Monitor mounts install over SEG graphic.

Profile View

Graphic

Wrap back graphic around corner of post.

SEG Graphic

Graphic

Wrap back graphic around corner of post.

Corner D

Corner C

It is important to first insert graphic into each alternate corner then to the sides of the frame. If this is not done, graphic will not fit into the frame correctly.

Step 1 Insert corner A. Turn edge of graphic so silicon welt is perpendicular to face of graphic. Insert narrow side of welt with fabric to outside into the channel. Repeat for other side of this corner.

Step 3 Once all corners are inserted, press one silicon edge into channel from corners and work toward the center. Make sure welt is fully inserted into channel. Continue until all sides are done. Smooth out edges of graphic.

Step 2 Repeat Step 1 for opposite corner C, then insert corner B, followed by corner D, to complete the installation of the corners.

5

SEG Graphic

tra Sinnel Pa

Graphic Removal

To remove the graphic from the frame, locate the fabric pull tab. Gently pull up on the tab to remove the fabric.

BACK VIEW

Step 3 of 7


© 2019

Lightbox Assembly

Item 1 2/2A 3/3A 4/4A 5 --

Qty. 6 3/3 3/3 3/3 3 3

Description Base Plate 36”w CEI152 Horizontal Extrusion 90”h CEI152 Vertical Extrusion 90”h CEI152 Vertical Extrusion 32.338”w Z45 Horizontal Extrusion U-Channels

*

2A

*

*

Corner Base Plate Attachment

wing nut

Steps: 1) Install U-Channel to horizontal [2]. See U-Channel Attachment detail. 2) Attach verticals [3-3A], [4-4A] together. See CEI-152 Straight Connection detail. 3) Connect horizontals [2,2A] between verticals. See CEI-152 Corner Connection detail. 4) Attach horizontal [5] between verticals as shown. 5) Install Base Plates to extrusions [2,3] & [2,4]. See Base Plate Attachment detail. 6) Connect power cords to Supernova lights as shown. Place transformers into U-Channel.

key hole

3A

*

bolts

Use bolts to connect U-Channel to V4 horizontal. connector

Lights

*

5

+ -

Male

*

set screws

-

TSRV2 Bracket

- Female 96W / 4 amp Transformer

1

* *

U-Channel

2

* * *

Hole for wire management

When assembled

QTY 3

4) Use Set screws to secure extrusions.

CEI-152 Straight Connection

Transformer

Light to Tranformer Attachment

Power

CEI-152 Corner Connection

1) Insert TSRV2 and A1 Brackets into milled groove of extrusion. 2) Slide connecting extrusion over exposed end of brackets. 3) Use Set screws to secure extrusions.

4

3

+ +

*

A1

U-Channel Attachment

Light to Light Attachment

bolt

Screws

*

4A bolt

Repeat steps 1 through 6 for other two lightbox assemblies.

Slide V4 connectors into top groove of horizontal extrusion. Tighten setscrews to secure.

bolt

Place key hole over bolt on vertical extrusion and slide down; secure with bolts & wing nuts.

TSRV4 Bracket

1) Insert TSRV4 Bracket into milled groove of Extrusion. 2) Slide connecting extrusion over exposed end of bracket.

Set Screws

3) Use Set screws to secure extrusions.

1

Step 4 of 7


© 2019

Modified RE-1227 Counter Assembly

WHEN DISASSEMBLING ALUMINUM EXTRUSION, TIGHTEN ALL SETSCREWS AND LOCKS TO PREVENT LOSS DURING SHIPPING COUNTERTOP (RE-1227)

Steps: 1) Assemble Counter Unit as shown. 2) Affix Sintra panels to front, sides & back, using Velcro.

COUNTER SIDE (RE-1227)

COUNTER FRONT (RE-1227) (SHIPS ASSEMBLED)

COUNTER BACK (RE-1227) (SHIPS ASSEMBLED)

Sintra panels Counter Back includes GS300 vertical extrusion for attachment to Lightbox. COUNTER SIDE (RE-1227)

Step 5 of 7


Š 2019

Lightbox Attachments

Steps: 1) Connect assembled Counter to side of lightbox frame, using Z45 horizontal extrusions, as shown in illustration. 2) Apply SEG Graphic to front & back of lightbox. Repeat steps 1 & 2 for other two lightbox assemblies. 3) Attach medium Monitor Mount to the front lightbox, above the attached Counter, as shown.. See Monitor Mount Attachment detail.

SEG Gr

SEG Graphic

aphic

*

Monitor Mount Attachment

Slide V4 connectors into vertical channel of extrusions. Tighten set screws to secure.

set screw

V4 Connector V4

* Monitor Mount Bolts

Monitor Mount

Attach Monitor Mount to V4 connectors using bolts.

Front Lightbox

SEG Graphic Installation Corner A

Corner B

Corner D

Corner C

It is important to first insert graphic into each alternate corner then to the sides of the frame. If this is not done, graphic will not fit into the frame correctly.

Z45

Z45

RE-1227 Counter

Step 1 Insert corner A. Turn edge of graphic so silicon welt is perpendicular to face of graphic. Insert narrow side of welt with fabric to outside into the channel. Repeat for other side of this corner.

Step 3 Once all corners are inserted, press one silicon edge into channel from corners and work toward the center. Make sure welt is fully inserted into channel. Continue until all sides are done. Smooth out edges of graphic.

Step 2 Repeat Step 1 for opposite corner C, then insert corner B, followed by corner D, to complete the installation of the corners.

Graphic Removal

To remove the graphic from the frame, locate the fabric pull tab. Gently pull up on the tab to remove the fabric.

Step 6 of 7


© 2019

Modified RE-1207 Counter Assembly Steps: 1) Assemble Counter Unit as shown. 2) Affix Sintra panels to front, sides & back, using Velcro.

RE-1207 Counter Top RE-1207 Side When assembled

RE-1207 Door

RE-1207 Center

Sintra panels

RE-1207 Front

WHEN DISASSEMBLING ALUMINUM EXTRUSION, TIGHTEN ALL SETSCREWS AND LOCKS TO PREVENT LOSS DURING SHIPPING

RE-1207 Counter Top Supports

RE-1207 Side Step 7 of 7