The Snake

Page 1

SPAIN | UNIVERSIDADE DA CORUÑA

Adrián Capelo Cruz | Rebeca Juncal Rosales | Óscar Rodríguez Álvarez

MANNHEIM | GERMANY what is all this snake thing about?

Starting with a typical Mannheim block, which encloses space inside We broke this block alowing to run away the bounded space, but it’s not already possible to make it useful mixing public space with semi-public through lineality

Our project twists delimiting spaces without closing, giving them unique and individual character through lineality

Breaking orthogonality to connect with preexisting planning and neighbourhood

Pavement mixtures A zone with B zone and is useful for gradating space with surroundings

Inserting green zones with wood-staying zones to humanize our ways and squares

Let’s crack the snake to allow relationship between this delimited spaces

Breaking this bridge to conect the surrounding area and generate living spaces in the middle

By extruding the final point from our project we get a counterpoint for Turmtower

We throw a bridge to the other side of the planning, over the railtrain, giving it enough wide to forget about a simple gateway

and what about the historical buildings?

Using the planned cut in one of the factories due to the new avenue between A and B zones, we insert a new piece to allow us to construct a concert room. This piece can be closed or open as we need. In this factory we place too a couple of music rehersal rooms

In the other factory, in best terms of maintaince, we just place a market using such a big space and flexibility.

housing!

Azone buildings in detail. 5 floors and unique residential use, with parking half-buried in basement

how does it feel to live in Mannheim?

Living-types. 1,2,3 bedrooms in each case. Every corridor conects two flats per floor

Corridors slice our building section

Detailing interior distribution, around wet areas, handing facade space in day and night areas (north-east and south-west orientation)

Multi-Comfort House Overview

how does the facade work?

A.Data input

8,0 0,8 16,0 16,0

Grass-planted soil Double layer roof and sealing sheeting, bonded ISOVER Exporit EPS 200/035 FD ISOVER Exporit EPS 200/035 FD ISOVER Metac DSB, Vapour retardant sheeting for flat roofs 4,0 Fire-resistant panelling on load-bearing structure at inclination

5,0 3,0 4,0 1,9 16,0 1,5 8,0 2,7 2,7 2,5

Floor covering Screed ISOVER Akustic EP 3 040 ISOVER Exporit EPS 100/035 as compensation for height of tube OSB board or chipboard ISOVER Integra ZKF 1-032 (solid wood beams 10/16, e=80cm, 11% wp) OSB board or chipboard Installation level with ISOVER Akustik TP 1 (glass wool, WLG 040) Rigips Ceiling profile CD 60/27 as basic profile Rigips Ceiling profile CD 60/27 as supporting profile Rigips Rigidur H double layer, each layer 12.5 mm

1.General project data: Name of building proj.: The Snake Name of developer: Adrián Rebeca Óscar Street of proj., house no.: John Deere Street ZIP/Post code, Town/City: Climatic region DE-Mannheim Planning phase: Project Serial No.: 00 2.Areas: Energy reference areas: 5160.00 m2 Thermal envelope area: 6000.00 m2 3. Constructional U-values: Exterior wall to air: 0.100 W/m2K Exterior wall to ground: 0.00 W/m2K Roofs/top floor ceiling: 0.100 W/m2K Cellar ceiling/floor: 0.100 W/m2K 4.Glazing U-values: Mean U-value 0.49 W/m2K 5.Window U-value: Mean U-value: 0.65 W/m2K

2,5 6,0

During summer isolation is avoided thanks to this double enclosure at midday, and opening the outer glazing the overheating is lost. With vertical slats we can stop later sunrays and control lighting

In winter isolation stays in our home radiating to the inside from the closed-balcony. With slats we can control lighting without losing the heating direct income Air renovation changing temperatures between inside-outside to keep comfort athmosphere As in other buildings in Mannheim we decided to use geothermical superficial foundations losing the heating direct income

1,5 16,0 1,5 12,0 3,0 1,0

Rigips Rigidur H double layer, each layer 12.5mm ISOVER Integra UKF 1-032 (wood 6/6 e=40cm, 13% wp) ISOVER VARIO KM Duplex UV OSB board or chipboard ISOVER Integra ZKF 1-032 (wood 6/16 e=62.5cm, 14%wp) OSB board or chipboard Kontur FSP 1-032 Easy Fix 120 (wood 6/12 e=60cm, 12%wp) Rear ventilation Exterior cladding (e.g. wood, metal, plastic, stone)

7. Forced ventilation: Present: 33% B. Calculation: 1.Transmission Heat Losses: 18.76kWh/(m2a) 2.Ventilation Heat Losses: 5.97 kWh/(m2a) 3.Total Heat Losses: 24.73 kWh/(m2a) 4.Internal Heat Gains: 11.34 kWh/(m2a) 5.Available Solar Heat Gains: 15.51 kWh/(m2a) 6.Heat Gains: 21.41 kWh/(m2a) 7.Annual Heat Demand: 17135.57 kWh/a

how does it feel to live in Mannheim? PRECIPITATION There is no dry season, it rains all over the year. The most rainy days are in summer and winter

light rain

moderate rain

4% 43% drizzle

26%

light snow thunderstorms

TEMPERATURES: high and low average temperatures

WINDS March and December windiest October the less

25

1-5m/s, maximum 8m/s. High average is in March 4m/s

10%

5%

4%

5%

14%

9%

7%

5%

N

NE

E

SE

S

SO

W

NW

20

Floor covering 5,0 Screed Vapour retarder and separating layer 4,0 ISOVER Exporit EPS 100/035 3,0 ISOVER Akustic EP 1 16,0 Reinforced concrete ceiling 12,0 ISOVER Topdec DP 1 032 ULTIMATE

6% 5% 15% moderate snow

15 10 5

FRACTION SPENTS IN DIFERENT TEMPERATURE BANDS ON A YEAR

1,5 24,5 0,1 0,5 20,0 0,6

0 -5 Freezing

Cold

Cool

Comfortable

Warm

-10 J

F

M

A

M

J

X

A

S

O

N

D

6. Thermal bridge-free Guaranteed: YES

Interior plaster Wall HLZ 24.5cm (upper layer of porous concrete blocks) Bitumen preliminary coating Sealing against moisture ISOVER Exporit EPS PDP 1 (up to 3m installation depth) or PDP 2 (up to 6 m installation depth) Thin plaster coat

Spec. Heat demand: 3.32 kWh/(m2a) regarding OIB


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.