Redeemer Master Plan - Conceptual Design

Page 1

Evangelical Lutheran Church of the Redeemer

Master Plan – SAG Presentation

August 6, 2023

01 02 03 04 05 06 07ection 4 Agenda Schedule Process Drivers Massing Schemes Option A Option B Discussion

Master Plan Timeline

ESTABLISH BASELINE

Information gathering

Campus visits

Building scan

Build BIM model

Informational meetings

STAGE 1

VISIONING & PROGRAMMING

Meet with Subject Area Groups

Develop program

Verify findings

STAGE 2

MASTER PLANNING & CONCEPTUAL DESIGN

Develop alternatives

Develop preferred options

Cost Estimate

STAGE 3

FINALIZE PLAN

Choose & Refine preferred option

Implementation Plan

Cost Estimate

STAGE 4

FINAL DELIVERABLE Master Plan document

STAGE 5

Process

Process Leading to Conceptual Design Options

• Subject Area Group Visioning Sessions Fall 2022

• Visioning Report Winter 2022-2023 (including all ideas collected in the Visioning Sessions)

• 2023 Council Retreat, Council included a focus on the congregational responses during Visioning Sessions. Specifically, to set priorities and identify which areas needed further discussion/research to facilitate the process of completing the master plan and to gauge impact on current ministries and budget.

• Preschool Expansion – expanding the program to full day, expanding the ages to include primary and beyond

• Affordable Housing – to look at the cost implications of the various types of affordable housing and the relationship to Lutheran Towers.

• Adult Day Programs – part day or full day programs, definitions of the population served and the demand in our area.

• Food Ministry – whether the nature of the food ministry will continue to change over time and how to best respond.

• The Master Planning Management Team has worked with Lord Aeck Sargent and Ennead to develop master plan options. Two conceptual plans resulted from that process.

Status Of Master Plan Today

No vote for approval has been taken. A final Master Plan report will be presented to Council once completed.

• No transactions are on the table today. No development partners have been identified at this time.

• The plan is still being developed. Primarily, a financial review of the two options produced needs to be completed and may impact the final form of the Master Plan.

• Additional Listening Posts will be conducted in September.

Drivers

BRING WORSHIP, MUSIC, AND SERVICE TO PEACHTREE STEET

PLACE VITAL AND DYNAMIC PROGRAMMING ON PEACHTREE STREET

COMMUNITY AND SERVICE ARE VISIBLE TO OUR NEIGHBORS

SO OUR

FACILITATE THE FLOW BETWEEN WORSHIP, SERVICE,

AND OTHER

PROGRAM

SPACES FOR ALL, INCLUSIVE OF THOSE WITH ACCESSIBILITY NEEDS

CREATE GREEN SPACE ON PEACHTREE STREET AND ON BOTH SIDES OF 4TH STREET

WORK
THE
OF ATLANTA TO CLAIM 4TH STREET FOR OUTDOOR COMMUNITY
WITH
CITY
EVENTS

CREATE A HIERARCHY OF OUTDOOR SPACES THAT OFFER PUBLIC AND PRIVATE ACTIVITY SPACES, MERGE INDOOR AND OUTDOOR SPACES AND SURROUND

THE CHURCH IN GREEN

CAPTURE NATURAL LIGHT IN ALL AREAS

BREAKING BREAD TOGETHER BINDS US AS A COMMUNITY

US ALL
LET
EAT TOGETHER

HONOR LUTHERAN TOWERS BY IMPROVING THE SKYWALK LINK AND CONNECTIVITY TO PROGRAMS AND SERVICES

MAXIMIZE THE VALUE OF OUR RESOURCES TO SUSTAIN AND GROW OUR

MISSION

Massing Schemes

Massing Schemes

Option A

Option A

Option A – Juniper Level

TYPICAL PARKING LEVEL - 160 SPACES

BASE DEVELOPMENT – 2-1/2 LEVELS; 392 SPACES

ADDED COMMERCIAL DEVELOPMENT - 4-1/2 LEVELS; 712 SPACES

Option A – Peachtree Level

Option A – Sanctuary Level

Option A – Upper Level

Option A – Bird’s Eye View LEGEND

ATRIUM WORSHIP

DINING

PRE-SCHOOL

GYM CLASSROOMS

OFFICE

LAWN/GREEN ROOF

COMMERCIAL DEVELOPMENT

Option A

LEGEND ATRIUM WORSHIP
CLASSROOMS OFFICE
DEVELOPMENT
DINING PRE-SCHOOL GYM
LAWN/GREEN ROOF COMMERCIAL

LAWN/GREEN ROOF

COMMERCIAL DEVELOPMENT

WORSHIP
Option A LEGEND ATRIUM
DINING PRE-SCHOOL GYM CLASSROOMS OFFICE

Option A

LEGEND ATRIUM WORSHIP DINING
GYM CLASSROOMS OFFICE
ROOF
DEVELOPMENT
PRE-SCHOOL
LAWN/GREEN
COMMERCIAL

Option B

Option B

Option B – Juniper Level

TYPICAL PARKING LEVEL - 150 SPACES

BASE DEVELOPMENT – 2-1/2 LEVELS; 344 SPACES

ADDED COMMERCIAL DEVELOPMENT - 4-1/2 LEVELS; 644 SPACES

Option B – Peachtree Level

Option B – Sanctuary Level

– Upper
Option B
Level

Option B – Bird’s Eye View

LEGEND

ATRIUM

WORSHIP

DINING

PRE-SCHOOL

GYM

CLASSROOMS

OFFICE

LAWN

GREEN ROOF

COMMERCIAL DEVELOPMENT

ROOF
DEVELOPMENT
Option B LEGEND ATRIUM WORSHIP DINING PRE-SCHOOL GYM CLASSROOMS OFFICE LAWN GREEN
COMMERCIAL
DEVELOPMENT
Option B LEGEND ATRIUM WORSHIP DINING PRE-SCHOOL GYM CLASSROOMS OFFICE LAWN GREEN ROOF COMMERCIAL
ROOF
DEVELOPMENT
Option B LEGEND ATRIUM WORSHIP DINING PRE-SCHOOL GYM CLASSROOMS OFFICE LAWN GREEN
COMMERCIAL

Evangelical Lutheran Church of the Redeemer

Master Plan - SAG Presentation

Q&A

Development Options –

north side of 4th Street

Option A – Typical Parking Level
Option B – Typical Parking Level