WHOLE HOME DESIGN
Collaboration with Red Heart Construction
Project: Whole Home Design for Apartment To Be Built 2023 (Work in Progress)
Scope:
• Manage client survey and assessment of wants & needs
• Design for entire 1 bedroom apartment over garage of existing home: floorplan / systems / exterior / interior
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/d76bf569adb845fca878b0aeefe74dd5.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/6d54e2d883c19078bdc76223ea91bacb.jpeg)
• Analyze site and recommend apartment orientation, fit to existing house structure
• Develop framing plans to submit for planning board approval
• Produce CAD drawings to support all construction & trades
Floorplan for new 2nd floor apartment
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/43754b91e11053e827c359cafb4e3046.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/6fa676f6906e36aa5db821c3f9a50871.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/2115362a1ab3c6930defa6eb8fac7cae.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/2cefba7ad876f69eb3fa58138af933e7.jpeg)
DWN REV ApanABae
BY BY SCALESEEVIEW DESIGNEDFOR SHEET# 1 DATE REDHEART CONSTRUCTION CONCEPT DRAWINGS ClientK 1BEDROOMAPARTMENT OVERGARAGE BEFORE AFTER DRS WESTWALLVIEW EASTWALLVIEW CONTRACTORTOVERIFY 06-12-22 DRS
DATE
6 4 3 0 F X 4 3 6 8 N E 1 6 7 7 7 1 0 6 1 F T 3 4 6 3 2 1 1 FT 1 1 8 1 4 9 8 5 F T 2 2 F T 6FT 6FT 7 7 3 4 7 7 3 4 7 7 3 / 4 7 7 3 4 15 1 3 1 5 / 1 6 0 1 0 1 6 7 8 7 1 1 BETTYANNS EXSTNG KTCHEN DOOR BETTYANNS EXSTNG FRONTENTRY EXSTNG BACKDOOR/WNDOWS D NORTHWALLELEVATON B SOUTHWALLELEVATON A WESTWALLELEVATON C EASTWALLELEVATON DWN REV ApanABae DATE BY BY SCALESEEVIEW DESIGNEDFOR SHEET# 2 DATE REDHEART CONSTRUCTION ClientK 1BEDROOMAPARTMENT OVERGARAGE DRS GROUNDFLOOR FOOTPRINT 3/16"=1'-0" CONTRACTORTOVERIFY 06-12-22 DRS
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/518f8d3ad1324c8ae8c9cb2808d44c8a.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/233cb31ddfeb9445c96bcd2fb5144a46.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/5663e545ce737507a5a52aad6f2ab925.jpeg)
24FT-8916N 4FT-458N 6978" 29FT-11/4N 27FT-8716N 5FT-978N 21FT-10916N 2 3 F T1 0 5 / 8 I N 1 0 F T6 1 4 N 1 3 F T4 3 / 8 I N 2 3 F T1 0 5 / 8 I N A WESTWALLELEVATON DWN REV ApanABae DATE BY BY SCALESEEVIEW DESIGNEDFOR SHEET# 3 DATE REDHEART CONSTRUCTION EXTERIOR ELEVATIONS 1/4"=1'-0" ClientK 1BEDROOMAPARTMENT OVERGARAGE DRS CONTRACTORTOVERIFY 06-12-22 DRS
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/4d72db3a83de3ce28f0dcf8099c55c4e.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/f61637354feb51112a017edb3740100a.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/79a43bf2545664a5a69f65c65eb7e356.jpeg)
40FT-0316N 35FT-858N 14FT-21/16N 7FT-2116N 7FT 25FT-1018N 14FT-21/16N 2 3 F T1 0 5 / 8 N 2 3 F T1 0 5 / 8 N 1 0 F T6 1 / 4 I N 1 3 F T4 3 8 N 5FT-81316N 41FT-5716N B SOUTHWALLELEVATON DWN REV ApanABae DATE BY BY SCALESEEVIEW DESIGNEDFOR SHEET# 4 DATE REDHEART CONSTRUCTION ClientK 1BEDROOMAPARTMENT OVERGARAGE EXTERIOR ELEVATIONS DRS 1/4"=1'-0" CONTRACTORTOVERIFY 06-12-22 DRS
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/38ff9ed76962f30294e4d0c9f1e8a43e.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/f141b043d44f5421a0db1bd29ab25076.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/b4a11927bc0385d36cab1e0562a38649.jpeg)
29FT-114N 4FT-458IN 24FT-858IN 27FT-87/16N 21FT-10916N 5FT-978N 2 3 F T1 0 5 / 8 I N 1 0 F T6 1 / 4 I N 1 3 F T4 3 8 N 2 3 F T1 0 5 / 8 I N C EASTWALLELEVATION DWN REV ApanABae DATE BY BY SCALESEEVIEW DESIGNEDFOR SHEET# 5 DATE REDHEART CONSTRUCTION ClientK 1BEDROOMAPARTMENT OVERGARAGE EXTERIOR ELEVATIONS DRS 1/4"=1'-0" CONTRACTORTOVERIFY 06-12-22 DRS
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/27ba246de44d2d136750119be23abddb.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/1386dd1f8875c21d82d47072494321bf.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/1a372d0dba140d9ef4fddf913ef8d52b.jpeg)
2 3 F T1 0 5 8 N 1 0 F T6 1 / 4 I N 1 3 F T4 3 / 8 I N 2 3 F T1 0 5 8 N 497716 5FT-81316N 35FT-858IN 40FT-0316N 25FT-1018N 14FT-2116N 14FT-2116N 7FT-2116N 7FT D NORTHWALLELEVATON DWN REV ApanABae DATE BY BY SCALESEEVIEW DESIGNEDFOR SHEET# 6 DATE REDHEART CONSTRUCTION ClientK 1BEDROOMAPARTMENT OVERGARAGE EXTERIOR ELEVATIONS DRS 1/4"=1'-0" CONTRACTORTOVERIFY 06-12-22 DRS
M I C R O W A V E 3DB15 3 0 W B A S E F O R 2 7 A P R O N S I N K 3 D B 1 8 B F 1 3 5 3 D B 1 2 B 2 4 F O R M I C R O & D R A W E R 3 D B 2 7 3DB1835 3DB1835 BF3 B F 3 3DB1835 BF2 3DB15 3DB15 6 T R A Y P U L L O U T U303084 3 0 R A N G E 36HOOD T A L L P A N E L R S 3 2 A 7 2 J 1 W1530L W1530R W1530R W3130 W 2 7 4 8 36X36 W2HORZ LFTDOORS WF336 W 1 5 1 5 2 4 R W 1 5 1 5 2 4 L W 1 2 3 6 L W 1 2 3 6 R W F 1 2 0 2 4 W F 2 3 6 3 1 4 0 F X 3 1 4 0 F X 5 0 4 0 F X 2440DH 2440DH 21068 6421FX 2 1 0 6 8 2 4 4 0 D H 2 4 4 0 D H 2514FX 2668 5214FX 2524PT 2 6 6 8 2 6 6 8 D N N E 2 E 4 E 6 E 7 E 5 6 2 5 2 6 6" 384" 6 33FT 396 6 2 5 2 6 6 384" 6" 33FT 396" 44" 10FT-3316N 123316 60 221516 2312" 4 7 1 3 / 1 6 8518" 7FT-118N 7 F T1 0 7 / 1 6 I N 9 4 7 / 1 6 36 39 3 / 16" 3 6 4 1 1 4 4058 38" 5 F T6 9 / 1 6 I N 6 6 9 1 6 4211/16" 45 12FT-101516N 1541516 8 F T1 0 N 1 0 6 4634 3 9 3 / 8 3 0 1 / 2 8FT-10716N 106716" 1 0 F T8 5 / 1 6 I N 1 2 8 5 / 1 6 1 0 F T7 7 / 1 6 I N 1 2 7 7 / 1 6 1 1 F T4 9 1 6 I N 1 3 6 9 / 1 6 CL CL 5 6 5 / 1 6 CL 7 9 1 1 / 1 6 CL 4 7 3 4 3 9 3 / 8 4 0 7 / 8 2 2 F T 2 6 4 CL 5278 CL 12014 108316 9FT-61116N 1141116 10FT-01/4N 12014 13FT-5116N 161116" 2 2 F T 2 6 4 " CL CL 4 7 9 / 1 6 CL 4 6 1 1 / 1 6 3 3 1 3 / 1 6 CL 5 6 3 8 7 9 9 1 6 CL 7212 581516 214 CL 6234" CL CL 803/16 3678 CL CL 2812" 5614" 19FT-8116N 236116 13FT-31516N 1591516 CL 1141116 6 9 7 1 6 1 5 3 8 " 8 3 3 5 7 / 8 3 0 36 4334" 5 4 3 2 1 / 8 15 3858 5 4 8FT-10716N 106716 4 F T3 1 1 6 I N 5 1 1 1 6 3 6 " MASTER WTH QUEENBED60"X80" LAUNDRY KITCHEN LVINGROOM BATH ENTRANCE DECK A WESTWALLELEVATON C EASTWALLELEVATON 358FOR 3233REF OPENSHELVES 30RANGE 2 4 D W 2 D B 1 5 W T R A S H P U L L O U T 4ECAAC 9 F T1 1 3 / 1 6 I N 1 1 9 3 / 1 6 " TV DEN DWN REV ApanABae DATE BY BY SCALESEEVIEW DESIGNEDFOR SHEET# 7 DATE REDHEART CONSTRUCTION ClientK 1BEDROOMAPARTMENT OVERGARAGE DRS 2ndFLOOR FLOORPLAN CONTRACTORTOVERIFY 06-12-22 DRS 1/4"=1'-0"
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/f3682580801d73f4207a0dde4d4b3130.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/be952c97035cfddc04f45b3382475cd9.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/574281f822dfb8d529721722da8b055a.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/b5a11379f1f08f26df7969470597d0bc.jpeg)
DWN REV ApanABae DATE BY BY SCALESEEVIEW DESIGNEDFOR SHEET# 8 DATE REDHEART CONSTRUCTION ClientK 1BEDROOMAPARTMENT OVERGARAGE DRS INTERIOR PERSPECTIVESLIVINGROOM 06-12-22 DRS
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/89108b46b7aae9c4aaf588417bd08e8d.jpeg)
DWN REV ApanABae DATE BY BY SCALESEEVIEW DESIGNEDFOR SHEET# 9 DATE REDHEART CONSTRUCTION ClientK 1BEDROOMAPARTMENT OVERGARAGE DRS 06-12-22 DRS INTERIOR PERSPECTIVESKITCHEN
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/cea9bd230c29299c99abdefbe98bbc5b.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/3d1863b4d0a03dff1f40ef6e8b2f809f.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/7131dccc3100a2a6b731b3865582bbb4.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/376ec890ebc8de361ead230e436f4e0a.jpeg)
DWN REV ApanABae DATE BY BY SCALESEEVIEW DESIGNEDFOR SHEET# 10 DATE REDHEART CONSTRUCTION ClientK 1BEDROOMAPARTMENT OVERGARAGE DRS 06-12-22 DRS INTERIOR PERSPECTIVESKITCHEN
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/ba43cfcc8c4665efb875f22410d65db4.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/f64561c278bda6972bd63c27df063f81.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/8e9e0aa099f500dd4b9c695541ca90f8.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/5826ffac36d13913d0acc363f55531e9.jpeg)
DWN REV ApanABae DATE BY BY SCALESEEVIEW DESIGNEDFOR SHEET# 11 DATE REDHEART CONSTRUCTION ClientK 1BEDROOMAPARTMENT OVERGARAGE DRS 06-12-22 DRS INTERIOR PERSPECTIVESLAUNDRY&BATH
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/275a7964720d9d70a61ad6cb15693142.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/90787a40df0f5cf5098f6ed4b9781565.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/63c97cf9214a8bc8ba2fbc7480e77baf.jpeg)
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/d20fa65a4b1d78408e705b6ab6248371.jpeg)
DWN REV ApanABae DATE BY BY SCALESEEVIEW DESIGNEDFOR SHEET# 12 DATE REDHEART CONSTRUCTION ClientK 1BEDROOMAPARTMENT OVERGARAGE DRS 06-12-22 DRS INTERIOR PERSPECTIVESBEDROOM&TVDEN
![](https://assets.isu.pub/document-structure/230320224218-23a994832ca273c6e4fdea6e3c5aee40/v1/0bb6cd47af46b08f7601ae1cc66e6b7c.jpeg)
DWN REV ApanABae DATE BY BY SCALESEEVIEW DESIGNEDFOR SHEET# 13 DATE REDHEART CONSTRUCTION ClientK 1BEDROOMAPARTMENT OVERGARAGE DRS 06-12-22 DRS INTERIOR PERSPECTIVES
OVERVIEW
-