Rem Maraga-Tshivhase Portofolio

Page 1


Curriculum Vitae of Rembuluwani Maraga-Tshivhase

I'm Rem Maraga-Tshivhase I have recently worked Paragon Interface https://www.paragon.co.za/ and Boogertman and Parnters https:// boogertmanandpartners.com/ along with having worked at Studio Sixteen www.s16.co.za.

Working on varied projects for corporate and hospitality clients the projects often differed in scale and program

Prior to which I worked at ARRCC formerly known as Antoni Associates www.arrcc.com for over five years.

Working on a variety of projects of varying scale and program both internationally and local.

I'm looking purse new ideas and dynamics in order to inspire my personal and professional growth by looking at companies such as yours.

Who would present a different and renewed approach with varying challenges in the fields of architecture interior architecture and interior design.

I'm a high energy, highly motivated, open minded and team oriented individual.

Skills include an ability to work autonomously, without the need for being micro managed, showing confidence in ones abilities and the individual thinking and decision making as this allows “directors/partners” to focus on other pressing matters with the reassurance that work is being done.

The above is further expanded on through the ability to fill in the "gaps" and foresee any future or probable problems, this allows for problems to be dealt with before they occur.

Further one has a willingness to assist where required in order to ensure deadlines are met, showing that one is able to contribute and is driven toward team goals.

Other abilities include being able to introduce new systems to inspire growth, in order to improve the workforce and hence raise the overall standard of work and the efficiency raising the overall office standard.

Portfolio_Rem Maraga-Tshivhase_2019 (High Quality version:

https://www.dropbox.com/s/0bf93866orp1ibx/3.%20Portfolio_Rem%2 0Maraga-Tshivhase_2020.pdf?dl=0)

https://www.dropbox.com/s/0bf93866orp1ibx/3.% 20Portfolio_Rem%20Maraga-Tshivhase_2020.pdf?dl=0

REMBULUWANI MARAGA-TSHIVHASE PORTFOLIO OF F"R□ FESSl □ NAL W□RK

Rem Design Studio

DETAILED DESIGN DOCUMENTATION. SELECTED PROJECTS

-RH_311 (Maboneng, Johannesburg)

Studio Sixteen

DETAILED DESIGN DOCUMENTATION. SELECTED PROJECTS

-Traxys (JHB, RSA - office)

ARRCC formerly Antoni Associates –SOATA Group (Stefan Antoni Olmesdahl Truen Architects)

DETAILED DESIGN DOCUMENTATION. SELECTED PROJECTS

-Star27 (USA Miami)

-Villa DeGarmo (UsaMiami)

-RW_LRDev(Kigali, Rwanda)

-SG_GroveApt(Singapore)

-CG_DCS3 (Pointe Noire, Congo)

-Pearl Valley 268 (Paarl Cape Town)

PROJECT SCOPE AND INVOLVEMENT

Stage 1:APPRAISAL & DEFINITION OF THE PROJECT

Stage 2a:INITIAL DESIGN CONCEPT

Stage 2b:FINAL DESIGN CONCEPT

Stage 3a:INITIAL DESIGN DEVELOPMENT

Stage 4: TECHNICAL DOCUMENTATION

Stage 5: CONTRACT ADMIN AND INSPECTION

Started on the project from the stage 1and is currently on hold

Stages involved in:

Stage 1 (Currently at stage 1 on but will progress to stage 5)

-Detailing and designing of varies interior components

-Detailing of open plan office space

-detailing of shared office areas and circulation spaces

-Detailing select Joinery Items

-Provide wall and floor finishing schedules

-Providing detailed construction drawings

-Weekly site meetings and site inspections to co-ordinate with other consultants contracted to the job and overseeing progress

Project Team:

Rem Maraga-Tshivhase (Creative director, Lead Designer and project manager)

RH_311 (JHB, RSA) Residental

PROJECT SCOPE AND INVOLVEMENT

Stage 1:APPRAISAL & DEFINITION OF THE PROJECT

Stage 2a:INITIAL DESIGN CONCEPT

Stage 2b:FINAL DESIGN CONCEPT

Stage 3a:INITIAL DESIGN DEVELOPMENT

Stage 4: TECHNICAL DOCUMENTATION

Stage 5: CONTRACT ADMIN AND INSPECTION

Started on the project from the stage 1completed September 2020

Stages involved in:

Stage 1 – Stage 5

-Detailing and designing of varies interior components

-Detailing of open plan office space

-detailing of shared office areas and circulation spaces

-Detailing select Joinery Items

-Provide wall and floor finishing schedules

-Providing detailed construction drawings

-Weekly site meetings and site inspections to co-ordinate with other consultants contracted to the job and overseeing progress

Project Team:

Sioux Meneghin (Creative director)

Rembuluwani Maraga-Tshivhase (Lead designer and project manager)

Len Gordan (assistant project manager)

Sameera Kahn (Furniture and decor)

Mulanga Madima (Junior Designer)

PROJECT SCOPE AND INVOLVEMENT

Stage 1:APPRAISAL & DEFINITION OF THE PROJECT

Stage 2a:INITIAL DESIGN CONCEPT

Stage 2b:FINAL DESIGN CONCEPT

Stage 3a:INITIAL DESIGN DEVELOPMENT

Stage 4: TECHNICAL DOCUMENTATION

Stage 5: CONTRACT ADMIN AND INSPECTION

Started on the project from the stage 1and is currently on site

Stages involved in:

Stage 2a –Stage 5

-Detailing and designing of varies interior components

-Detailing of bathrooms

-Detailing of Bedrooms

-detailing of shared living areas and circulation spaces

-Detailing select Joinery Items

-Provide wall and floor finishing schedules

-Providing detailed construction drawings for American architects to work from

Traveling to Miami to document site with project leader Jon Case in to co-ordinate with other consultants contracted to the job

Project leader: Jon Case

Project Junior: Rembuluwani Maraga-Tshivhase (myself)

PROJECT SCOPE AND INVOLVEMENT

Stage 1:APPRAISAL & DEFINITION OF THE PROJECT

Stage 2a:INITIAL DESIGN CONCEPT

Stage 2b:FINAL DESIGN CONCEPT

Stage 3a:INITIAL DESIGN DEVELOPMENT

Stage 3b:FINAL DESIGN DEVELOPMENT

Stage 4:TECHNICAL DOCUMENTATION

Started on the project from the stage 1and is currently on site

Stages involved in:

Stage 2a –Stage 4

-Detailing and designing of varies interior components

-Detailing of bathrooms

-Detailing of Bedrooms

-detailing of shared living areas and circulation spaces

-Detailing select Joinery Items

-Provide wall and floor finishing schedules

-Providing detailed construction drawings for American architects to work from

Travelling to Congo to document site with project leader Jon Case in to co-ordinate with other consultants contracted to the job

Project leader: Jon Case

Project Junior: Rembuluwani Maraga-Tshivhase (myself)

PROJECT SCOPE AND INVOLVEMENT

Stage 1:APPRAISAL & DEFINITION OF THE PROJECT

Stage 2a:INITIAL DESIGN CONCEPT

Stage 2b:FINAL DESIGN CONCEPT

Stage 3a:INITIAL DESIGN DEVELOPMENT

Stage 3b:FINAL DESIGN DEVELOPMENT

PROJECT DESCRIPTION

Started on the project Stage 1 and is currently at stage 2bbut will run through to stage 3b

Stages Involved in:

Stage 1-2

-Developing the interior architecture of the building along with the project leader, the client and engineer. For the purposes of construction

-Developing design plans for client approval and aor implementation

- Developing plans for submission to local authority

-Detailing of varies interior and exterior components

-Rendering architectural and interior spaces using Lumion for the client approval and to provide aorand further to serve as a aid for consultants and sub-contractors

Project leader: Jon Case

Project Junior:

Rembuluwani Maraga-Tshivhase (myself)

RW Large Residential Development (Kigali, Rwanda)

private residential

PROJECT SCOPE AND INVOLVEMENT

Stage 1:APPRAISAL & DEFINITION OF THE PROJECT

Stage 2a:INITIAL DESIGN CONCEPT

Stage 2b:FINAL DESIGN CONCEPT

Stage 3a:INITIAL DESIGN DEVELOPMENT

Stage 3b:FINAL DESIGN DEVELOPMENT

PROJECT DESCRIPTION

Started on the project Stage 1 and is currently at stage 3b but will run through to stage 3

Stages Involved in:

Stage 1-3

-Developing the interior architecture of the building along with the project leader, the client and engineer. For the purposes of construction

-Developing design plans for client approval and aor implementation

- Developing plans for submission to local authority

-Detailing of varies interior and exterior components

-Rendering architectural and interior spaces using Lumion for the client approval and to provide aorand further to serve as a aid for consultants and sub-contractors

- Detailing and designing of varies interior components

-Detailing of bathrooms

-Detailing of Bedrooms

-Detailing select Joinery Items

-Provide wall and floor finishing schedules

Project leader:

Jon Case

Project Junior:

Rembuluwani Maraga-Tshivhase (myself)

Aimee De Villiers

ADDITIONAL 3D RENDERING INFORMATION – LUMION RENDERINGS BY AUTHOR AND OTHER

PROJECT SCOPE AND INVOLVEMENT

Stage 1:APPRAISAL & DEFINITION OF THE PROJECT

Stage 2a:INITIAL DESIGN CONCEPT

Stage 2b:FINAL DESIGN CONCEPT

Stage 3a:INITIAL DESIGN DEVELOPMENT

Stage 3b:FINAL DESIGN DEVELOPMENT

Stage 4: TECHNICAL DOCUMENTATION

Stage 5: CONTRACT ADMIN AND INSPECTION

Started on the project Stage 1 and is currently at stage 3b but will run through to stage 5

Stages Involved in:

Stage 1-3

-Developing the architecture of the building along with the project leader, the client and engineer. For the purposes of construction

-Developing plans for submission to the home owners association

-Developing plans for submission to local authority

-Detailing of varies interior and exterior components

-Rendering architectural and interior spaces using Lumion

Project leader: Jon Case

Project Junior:

Rembuluwani Maraga-Tshivhase (myself)

Pearl Valley 268 (Paarl, Cape Town)

private residential

PROJECT SCOPE AND

INVOLVEMENT

Stage 1:ADP

Stage 2a:INITIAL DESIGN CONCEPT

Stage 2b:FINAL DESIGN CONCEPT

Stage 3a:INITIAL DESIGN DEVELOPMENT

Stage 3b:FINAL DESIGN DEVELOPMENT

Stage 4: TECHNICAL DOCUMENTATION

Started on the project Stage 1 and is currently at stage 3b but will run through to stage 4

Stages Involved in and role on the project:

Stage 2a –4:

-Detailing and designing of varies interior components

-Detailing of bathrooms

-Detailing of Bedrooms

-Detailing select Joinery Items

-Provide wall and floor finishing schedules

-Providing detailed construction drawings of various feature elements

-Travelling to Congo to document site with project leader Jon Case in to co-ordinate with other consultants contracted to the job

-Travelling to franceto review joinery construction by ateliers EMG and atelier paulchamps contracted to the job

Project leader:

Jon Case

Project Junior:

Rembuluwani Maraga-Tshivhase (myself)

private residential

Exterior views

DETAILED TECHNICAL DOCUMENTATION.

Selected PROJECTS:

Pearl

Valley 268 –

ARCHITECTURAL DRAWINGS FOR PEARL VALLEY HOME OWNERS SUBMISSION

Author: Rembuluwani Maraga-Tshivhase (myself)

CAD drawings BY author (Professional drawings while at arrcc)

CONCEPTUAL FURNITURE DESIGNS

FURNITURE DESIGNS

Lounge chair –“ock”
GENERAL PLANS Lounge sofa with shelving on either side –“fie”
Server unit –“geo-trip”
Lounge chair –“mond”
Lounge sofa –“yogi”

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.