3 minute read

Concerns about Dunwoody school

Mayor Lynn Deutsch shares safety concerns for new elementary school

BY SAMMIE PURCELL

The mayor of Dunwoody shared safety concerns about a new elementary school planned for Chamblee Dunwoody Road during a Nov. 15 DeKalb County School Board meeting.

During the meeting, the school district approved a $31,050,000 contract with Evergreen Construction for the construction of the new Chamblee Dunwoody Elementary School at 4680 Chamblee Dunwoody Road. In the public comment section of the meeting, Mayor Lynn Deutsch raised concerns regarding size, roadway alignment, and overcrowding issues for the new school.

“If this was a private project, the developer would not be able to secure building permits from Dunwoody and would be told not to come back until the plans were modified to address safety issues,” the mayor said later in a Facebook post.

The property used to be the site of Shallowford Elementary, which was constructed in 1968. The school later became Chamblee Middle School, but by 2011 the building had “deteriorated beyond economical repair,” according to the district. The building was demolished in 2014.

In her public comment, Deutsch said she believes the property area for the future school is a “small, unforgiving site,” and not large enough to accommodate the 950 students it would serve. She also said the site only has one driveway, which does not line up with the road across the street.

“Keep in mind that this school will only have one driveway for entering and exiting,” Deutsch said. “It’s located on a very busy street and emergency vehicles could struggle to enter the property, depending on how busy things are in the parking lot.”

Deutsch offered some solutions to the safety problems she identified, including shrinking the enrollment of the school so that a smaller building would be suitable, or adding a floor to the school so the enrollment could stay the same.

The school district said construction on the school is expected to begin in January of 2022, and the school should open in August of 2023. The district did not respond to questions about Deutch’s comments.

BEAT THE TRAFFIC AND HIT THE TRAIL ON AN E BIKE

LARGEST IN-STOCK INVENTORY IN GREATER ATLANTA

E-Bike and Accessories Sales and Service in Brookhaven ElectroBike Georgia

2484 Briarcliff Road, NE Atlanta, GA 30329 www.electrobikega.com

Bicycle and E-Bike Rentals, Sales and Repairs on the Beltline Atlanta Bicycle Barn

151 Sampson Street, NE Atlanta, GA 30312 www.atlbikebarn.com

Pictured left to right: MaryJane LeCroy, CFP®, Bill Kring, CFP®, and Phillip Hamman, CFA, CFP®

LINSCOMB & WILLIAMS IMAGINE FINALLY FEELING CONFIDENT ABOUT YOUR FINANCIAL FUTURE

Let Linscomb & Williams’ financial planning and investment management help you build, protect and manage your wealth, no matter what life brings your way.

•Real advice. We’re a fee-only, fiduciary advisor. We don’t sell any products or get paid on commission. Instead, we simply give you advice that’s in your best interest, always. • Unparalleled experience. When your future is at stake, experience matters.

Our senior staff members have an average of 22 years of experience. • Full service. With a team from multiple professional backgrounds, we work together with you and your other professionals to maximize and protect your wealth. • Expertise that helps you do better. Insightful tax and estate planning strategies can enhance your financial outcome without additional risk. Our advisors are finance and investment professionals, but many also hold advanced degrees or certifications in accounting or law. • C Cost-effective, transparent fees. We provide our complete service for one simple, transparent fee so you can keep more of your money working for you.

This article is from: