The Printworks, Preston BUILD UPDATE August 2020

Page 1

The Printworks Build Update August 2020


‘‘We are pleased to commence on site and with the progress made stripping the existing buildings. The hoardings are to be erected following the demolition and levelling of the ground, and as we have now taken the decision to extend the hoardings around the majority of the site , this will provide maximum exposure for future lettings from the numerous prospective tenants passing on a daily basis.’’ Guy Ladson, Ladson Group



Images from The Printworks, Preston site before any works have started, taken early 2020


Images from The Printworks, Preston July 2020 during the asbestos removal stage.


Asbestos removal stage. continued ...



Images from The Printworks, Preston August 2020 as they strip the buildings ready for demolition, external walls have been removed & hoardings to be erected by the end of August 2020.


Site access viewable from Sizer Street, Preston.


Further images showing the removal of the external walls as they continue to finish stripping the existing buildings ready for demolition.



Internal stripping of the existing buildings is nearly complete, August 2020.



The full site will be demolished and flattened by the 2nd week in September.




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.