GORDON BERMAN RESIDENCE INTRODUCTION TO THE GST WALL PANEL SYSTEM
ARCHITECT
NIANTIC HARBOR, CT
© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022 NIANTIC RIVER NIANTIC BAY
RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 04664

GORDON BERMAN

DESIGN

Site

Floor

Elevations

Exploded Axon

CONSTRUCTION

Prefabrication

Foundation & Under Slab

Steel Work

Interior Framing

Gst Installation

WINDOWS

Triple Gazing

High Performance Windows And Doors

Air Tight Enclosure

ENGINEERING

Gst Wall Panel Breakdown

Exploded Wall Assembly Diagram

Steel Frame Shop Drawings

Gst Thermal Evaluation

SPECIFICATION

EPS Evaluation

Insulation Comparison

Gst Specifications

Phius Certification

© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022
08
&
Plans
22
Work
32
36
52

“Maximize Your Gains, Minimize Your Losses”

These are the basic tenants of the Passive House approach. A Passive House project maximizes the energy efficiency of the basic components inherent in all buildings: the roof, walls, windows, floors and utility systems. By minimizing a building’s energy losses with smart insulation, the heating and cooling system is not called on nearly as frequently, saving resources and operating costs, while reducing the homes impact on the environment. Unlike any other structures, Passive House buildings maintain occupant comfort for more hours of the year without relying on active heating and airconditioning equipment.

RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 04666
© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022

DESIGN

Project Type

Single Family Dwelling Location East Lyme, CT Area 4580 Sq/ft

Climate Zone 5A

Credits

Owner Anne Gordon & Phil Berman Contractor Bruce Bogart Construction Co. Inc.

Structural Engineer Kevin Place, Place Structural Design. Site Engineer Indigo Land Design, Llc

“We were both deeply moved by the beauty of the house and its siting. It is one thing to see the images of the progress and another to be able to stand in the rooms.

It is remarkable. I was in tears and we both had our jaws hanging open for most of the two hours we spent there.

The sense of pride Bruce and the building team have in this home is palatable as well and part of the joy. Thank you for making this journey with us.”

- Anne Gordon, Owner on on-site visit

RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 04668
© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022
10 BUILDING SITE NIANTIC RIVER RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 0466

Early diagraming of the views, orientation, and approach to the house.

© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022

Gordon Berman Residence Site Planning

Situated on a granite cliff just off of a dead end road, the Gordon Berman residence is the perfect escape for owners Anne and Phil. Sitting 25 feet above the road the residence is surrounded by oak, hickory, evergreens while also providing an elevated view of the Niantic River. Large floor to ceiling windows allow for uninterrupted views of the lake and forests that surround their quaint home.

RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046612
© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022 SITE PLAN NIANTICRIVER
RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046614 FIRST FLOOR PLAN 01 ENTRY 02 KITCHEN / DINING / LIVING 03 PANTRY 04 MUDROOM 05 STUDIO 06 MEDIA ROOM 07 UTILITY 08 POWDER ROOM 09 BEDROOM 2 10 BATH 2 11 CLOSET 2 12 OFFICE 13 GARAGE 14 SCREEN PORCH 15 FRONT PORCH 16 BACK PATIO
© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022 01 MASTER BEDROOM 02 MASTER CLOSET 03 MATER BATHROOM 04 BATHROOM 4 05 LAUNDRY / SITTING ROOM 06 STAIR HALL A 07 ROOF DECK 08 BEDROOM 3 09 HALL 10 CLOSET A 11 BATHROOM 3 SECOND FLOOR PLAN

ELEVATION

WEST ELEVATION

RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046616 EAST

NORTH ELEVATION SOUTH ELEVATION

© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022
RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046618 RESIDENCE

The Gordon Berman residence is nestled into the cliffside to provide an unobstructed view of the river below.

A private dock within walking distance of the residence provides the Gordon Berman’s the opportunity to enjoy the privacy of their cliffside home or the adventure of a day on the water.

QUARRY DOCK ROAD

© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022
NIANTIC RIVER
RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046620

GST Roof Panel W/ Roof Finish

Cable Railing

Second Floor Roof Deck

GST Insulated Roof Panels

Wood Frame Floor System

Insulated 4” Concrete Slab

Mavrik Triple Pane Windows

GST Insulated Wall Panel System

Foundation Wall

Structural Steel Framing

Stepped Concrete Footing

4” Vertical Foundation Insulation

© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022

CONSTRUCTION

Construction Type

Panelized Light Gauge Steel Construction

Guardian Structural Technologies Panel System

Foundation R-33.6

Walls R-50.6

Roof R-67.5

Amount of Steel NEED METRIC

“Guardian Structural Technology is committed to helping owners meet their high-performance building needs with a structural envelope system that provides superior technical, environmental, and financial benefits for the building’s life.

SHIELD™ Panels buildings deliver not only short-term construction cost savings but long-term environmental and financial benefits as well.”

- GTS

RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046622
----------------------
© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022

PREFABRICATION

Prefabricated or “Prefab” is a construction method in which both standardized and non-standardized building components are fabricated in a controlled factory environment then shipped to and assembled on site. Combine the prefab construction method with the Passive House standard and you have the most energy efficient building technology available today delivered in a fraction of the time required by traditional site-built construction.

OFF SITE CONSTRUCTION

Prefabricated or Off-site Construction refers to the planning, design, fabrication, and assembly of building elements at a location other than their final installed location to support the rapid and efficient construction of a permanent structure. Such building elements may be prefabricated in a different location and transported to the site or prefabricated on the construction site and then transported to their final location. Offsite construction is characterized by an integrated planning and supply chain optimization strategy. Offsite manufacturing (OSM), offsite production (OSP) and offsite fabrication (OSF) are used when referring primarily to the factory work proper.

RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046624
© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022
RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046626 FOUNDATION & UNDER SLAB WORK UNDER SLAB DUCTWORK

BLUEDUCT

An underground HDPE air duct system designed specifically for underground or below slab forced air systems.

© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022
RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046628 STRUCTURAL STEEL
© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022 GST ROOF PANELS STRUCTURAL STEEL
RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046630 GST ROOF PANELS
STRUCTURAL
STEEL FRAME SECOND FLOOR MASTER BEDROOM
© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022

WINDOWS

Manufacturer Mavrik Windows

European Windows Imported From Poland

Type Yawal - Moreview Triple Pane Tilt Turn Window

“EFFICIENCY ISN’T A NICHE”

“With European windows you get increased comfort and quality while actually saving you money on comparable US windows. Add to that the energy savings and lower utility bills... well, you get the picture. Our mission is to make the entire process of specifying, ordering and installing these windows seamless and cost-effective.”

- Mavrik, INC.

RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046632

HIGH PERFORMANCE WINDOWS

Historically, windows and doors are weak links in a building’s thermal defense system. We can all relate to the drafts they can create in an average home. Passive House design places significant emphasis on specifying high performance windows and exterior doors. To meet the high performance needs of various climate zones, windows must meet strict standards regarding: insulation, air tightness, and solar heat gain values. Well detailed window design and flawlessly executed window installation are critical to the performance of Passive House buildings.

© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022

OUTDOOR

INDOOR

TRIPLE PANE WINDOWS

More efficient than dual pane windows, triple pane windows provide an additional layer of insulation in one of the most common locations of unwanted heat loss/gain.

THE BENEFITS OF TRIPLE PANE WINDOWS

Acoustic insulation and lower air permeability,

The possibility of heating costs reduction, The possibility of creating large-surface constructions with modern arrangement of facades and interiors, The possibility of achieving heat transfer factor as good as Uf= 0,8 ÷ 1,5 W/m K (Source: Yawal.com)

RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046634

AIR TIGHT ENCLOSURE

Passive House takes great care in designing, constructing and testing the building enclosure for industry leading leakage control. Blower door testing is a mandatory technique in assuring high building performance through a virtually leak free enclosure. Walls are carefully designed to be virtually air tight, while allowing water vapor to escape maintaining a comfortable and healthy environment.

If you combine all the small leaks in a typical home, it would be equivalent to cutting a hole in the exterior wall the size of a garbage can lid A Passive House has total air leakage about the size of a baseball or smaller.

© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022
RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046636
© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022

ENGINEERING

Structure Light Gauge Steel Frame Construction

Slab Floor 4” Concrete Slab W/ 8” Eps Insulation

Foundation 10” Stem Wall W/ 2” Rigid Insulation

Wall 11 1/4” Guardian Structural Technologies Assembly Wall Panels

Roof 15” Guardian Structural Technologies Roof Panels

Windows Yawal - Moreview Triple Pane Tilt Turn Window

RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046638
© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022 EXTERIOR (7°F) INTERIOR (68°F) INTERIOR (68°F) INTERIOR (68°F) INTERIOR (68°F) EXTERIOR (7°F) EXTERIOR (7°F) EXTERIOR (7°F)

GLAZING

NORTH ELEVATION OF GST WALL PANELS

ELEVATION

RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046640 NORTH
NORTH
NORTH ELEVATION

EAST GLAZING

EAST

EAST ELEVATION OF GST WALL PANELS

EAST ELEVATION

© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022
ELEVATION

SOUTH GLAZING

SOUTH ELEVATION OF GST WALL PANELS

SOUTH ELEVATION

RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046642 SOUTH ELEVATION

WEST

WEST GLAZING WEST ELEVATION OF GST WALL PANELS

WEST ELEVATION

© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022
ELEVATION

EXTRUDED

RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046644 1X2” TUBULAR GALVANIZED STEEL 2” EXTRUDED GALVANIZED EDGE CAP 2”
GALVANIZED EDGE CAP 11 1/4” GUARDIAN EPS FOAM INSULATION INTERIOR EXTERIOR PRE-CUT SERVICE CA VITY

EXTERIOR

© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022 PRE-CUT SERVICE CA VITY 1X2” TUBULAR GALVANIZED STEEL VAPOR & WATER BARRIER 2” EXTRUDED GALVANIZED EDGE CAP 2” EXTRUDED GALVANIZED EDGE CAP 11 1/4” GUARDIAN EPS FOAM INSULATION
INTERIOR
RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046646
© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022
RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046648
© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022
Guardian Gable End Connection to Steel Guardian Roof To Wall Panel Guardian Roof To Wall Panel
RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046650 SCALE: 1"=1'-0" Guardian Gable End Connection to Steel
© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022
Guardian Roof To Wall Panel

GUARDIAN

STEEL COLUMN

GUARDIAN

1/4” WALL

STEEL COLUMN

EXTERIOR

Thermal analysis structural wall syst

The placement of wa structure of the residenc efficiency of the building illustrate the differences to steel placement.

GUARDIAN 11 1/4” WALL W/ STEEL COLUMN

EXTERIOR

RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046652 GUARDIAN 11 1/4” WALL NO STEEL COLUMN
11 1/4” WALL W/
5 3/8” FROM CENTER
11
W/
3 1/4” FROM
2” FROM

ems

alls around the steel ce heavily influences the g system. These studies s in efficiency according

© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022 EXTERIOR (7°F) INTERIOR (68°F) INTERIOR (68°F) INTERIOR (68°F) INTERIOR (68°F) EXTERIOR (7°F) EXTERIOR (7°F) EXTERIOR (7°F) of the guardian

SPECIFICATIONS

Expanded Polystyrene

Insulation comparisons

Guardian Structural technologies panel system specifications

GST Phius certification and specifications

Credits and Resources

RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046654
© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022

EXPANDED POLYSTYRENE

Expanded Polystyrene insulation or EPS is a thermoplastic based foam that has been expanded and molded into panels. It is composed of 98% trapped air and 2% plastic making it efficient and recyclable. It is very water resistant and lightweight. It is easy to cut and install. It can be installed both in the interior and exterior of walls and holds up well in any climate.

RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046656 Foam
SheetsClose Up of Cells

INSULATION R-Value PER INCHCOSTACCESSIBILITYLONGEVITYTOXICITY FLAMMABILITY

Fiberglass

Mineral Wool

WATER RETENTION EMBODIED ENERGY EASE OF INSTALL TYPICAL QUALITY OF INSTALLATION OVERALL PERFORMANCE

Batts 2.6 - 4.4 Dense pack 3.6 - 4.4 Rigid board 4.0 - 4.4 CheapHigh80 - 100 Yrs. NeutralAirborn irritants Low NeutralRetains water over time LowEasy LowTypical to have thermal gaps

Batts 3.0 - 3.6

Loose fill 2.6 - 3.4 Rigid board 4.0 - 4.4 ExpensiveLow100+ Yrs. NeutralAirborn irritants LowNoncombustible

Cellulose Loose fill 3.2 - 3.6 Dense pack 3.0 - 3.4 Spray on 4.0 - 4.4 CheapNeutral30 - 100 Yrs.LowHigh

AverageDecreases over time

LowVery LowEasyHighHigh

High Very LowModerate ModerateRequires correct density Moderate

Wood Fiber Rigid board 3.6 - 3.8 Middle Range Neutral50 - 100 Yrs.Low NeutralNeutralMediumEasyHighHigh

Straw Bale Bale 0.9 - 2.4CheapHigh50 - 100 Yrs.Low HighHighVery Low ModerateModerateModerate

Hemp Hemp Wool - 3.5 Middle Range Low50 - 100 Yrs.Low HighHighVery LowModerateModerateModerate

Perlite Loose fill 3.0 - 4.0CheapHigh100+ Yrs. NeutralAirborn irritants LowNoncombustible

Polyiso Rigid board 5.6 - 7.6ExpensiveNeutral100+ Yrs. HighHazardous Chemicals

Polyurethane Spray Closed Cell 6.0 - 7.0 Open Cell 3.5 - 3.8 ExpensiveHigh30 - 100 Yrs. HighHazardous chemicals

LowLowEasy Neutral High

HighLowVery HighEasyModerate ModerateDecreases in the Cold

NeutralTrapped gasses may be flammable

NeutralVery High

DifficultMust be proportioned correctly Low - ModerateLow

Demilec Closed Cell 5.7 - 7.4 Open Cell 3.8 ExpensiveNeutral50 - 100 Yrs.LowNeutralNeutralMediumDifficultModerateModerate

XPS Rigid board 5.0 Middle Range High80 - 100 Yrs.Neutral HighCombust in high temperatures

NeutralHighEasyHighHigh

EPS Rigid board 3.6 - 4.2CheapHigh100+ Yrs.Low Neutral LowMediumEasy HighPrefabrication High

© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022

Guardian Structural Technologies SHIELD™ PANELS BUILDING SYSTEM and the Environment

SHIELD™ PANELS BUILDING SYSTEM – LIFETIME OF BENEFITS FOR OWNERS & OCCUPANTS SHIELD™ PANELS BUILDING SYSTEM

Sustainable - components made from 100% recyclable material.

Healthy – panels do not let off toxic gases and do not mold or attract pests.

Insulated – provide R Values of up to R-50.

Energy-Efficient - reduces heating and cooling costs for life of structure.

Load-Bearing – engineered-stamped to ensure true structural integrity.

Durable – panels never break down.

It is important to keep in mind that all insulations and buildi ng materials have an environmental footprint. The fact is pretty much all modern building and insulation materials are quite carbon-intensive to produce. Cement, for example, produces huge amounts of CO2 in production, as do insulating materials like rockwool and fiberglass. However, Expanded Polystyrene (EPS) insulation is 98% AIR and can return up to 200 times the amount of energy required to produce it and reduce emissions by up to 100 times the volume produced during the manufacturing process. EPS is non-toxic and totally inert. It contains no Chlorofluorocarbons (CFCs) or Hydrofluorocarbons (HCFCs), and never has at any time during its life cycle. It is also totally absent of any nutritional value, so no fungi, mold, or micro-organisms can grow within EPS. Cold Formed Steel (CFS) meets the highest sustainability requirements set in all major green building standards and rating programs, including Leadership in Energy and Environmental Design (LEED) and National Green Building Standard (ICC-700) for residential buildings. CF S framing has infinite recyclability. Every year, more than 65 million tons of steel are recycled, according to the American Iron and Steel Institute. CFS framing contains a minimum of 25 percent recycled steel and is continually and completely recyclable. Using recycled steel takes the pressure off renewable resources: if built with wood, a 2000-square-foot home would require about 40 to 50 trees. With steel, only the equivalent of about six scrapped automobiles is needed for the same size home.

SHIELD™ PANELS being made of Expanded Polystyrene and Cold formed steel are much lighter than alternative building techniques, thereby saving significant transportation emissions. The Expanded Polystyrene and Cold Formed Steel that Guardian Structural Technologies uses in the SHIELD™ Panels building system contains recycled content EPS and CFS. All the scrap of EPS and CFS from our manufacturing is completely recycled. The Guardian Structural Technologies SHIELD™ Panels building system virtually eliminated job site waist.

Guardian Structural Technologies is committed to helping owners meet their high- performance building needs with a structural envelope system that provides superior technical, environmental and financial benefits for the life of the building. SHIELD™ Panels building system delivers not only short-term construction cost savings, but long-term environmental and financial benefits as well.

© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022 www.guardianstructural.com 4640 Manufacturing Ave. Cleveland, Ohio 44135 216-898-5600
RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046660 GUARDIAN STRUCTURAL TECHNOLOGIES SHIELDTM Panels Critter Control Mold/Rot Resistance Indoor Air Quality Water Resistance Sustainability Air-Tightness Not Included Improvement Needed Partial / Pending Pass Grading Key Multifamily Non-Residential Single Family Building Type Application Thermal Performance Climate Recommendations Marine Subarctic8 7 5 & 6 3A & 4A above warm-humid line “C” Moisture Regime 1B, 2B, 3B & 4B 1A, 2A & 3A below warm-humid line Very Cold Cold Mixed-Humid Hot-Dry / Mixed - Dry Hot-Humid IECC ZonesBuilding America Zones Manufacturer Name: Product Name:
© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022

RESOURCES

BOOKS -

RESIDENTIAL ENERGY - Pg. 102-121, 296, 297

INTERNATIONAL ENERGY CONSERVATION CODE - ZONING MAP

PHIUS - PRESCRIPTIVE SPECIFICATIONS

MATERIALS -

GUARDIAN WALL PANEL - GUARDIAN STRUCTURAL TECHNOLOGY https://www.guardianstructural.com/

MAVRIK https://www.mavrik.build/materials-1

NEUFFER https://www.neuffer-windows.com/

YAWAL https://yawalusa.com/

WEBSITES

GORDON BERMAN RESIDENCE

https://richardpedranti.com/projects/gordon-bermanresidence-2/

RPA REFERENCES -

GORDON BERMAN RESIDENCE

https://richardpedranti.com/projects/gordon-bermanresidence-2/

RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046662

CREDITS

OWNERS

STRUCTURAL ENGINEER

Kevin Place, Place Structural Design.

SITE ENGINEER

Indigo Land Design, Llc

© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022
RICHARD PEDRANTI ARCHITECT WWW.RICHARDPEDRANTI.COM 129 SAWKILL AVENUE, MILFORD, PA 18337 (570) 296 - 046664
© COPYRIGHT RICHARD PEDRANTI ARCHITECT 2022
© COPYRIGHT 2022 RICHARD PEDRANTI ARCHITECT ALL RIGHTS RESERVED The Science of Design ™ GORDON BERMAN RESIDENCE INTRODUCTION TO THE GST WALL PANEL SYSTEM

Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.