QUESTION: 47 Which list best describes the redundant items needed to support a GDPS/XRC Continuous Availability solution?
A. FICON channels FICON switches Network circuits System Data Movers B. FICON channels FICON switches Capacity for peak read activity System Data Movers C. FICON channels FICON switches Network circuits Capacity for peak read activity D. FICON channels Network circuits Capacity for peak read activity System Data Movers
Answer: A
QUESTION: 48 A customer is implementing a GDPS/PPRC solution and is concerned about building skills for their staff. Which of the following is an appropriate response?
A. IBM Tivoli System Automation Manual B. IBM Lab Services provides transition staffing C. System zTechnical events offer customized instruction D. Transition education is included in a typical services solution
Answer: D
QUESTION: 49 When reviewing a customer’s data center electrical infrastructure, what is most important for Business Resiliency?
A. Confirm that all equipment is connected to two power distribution units. B. Confirm the electrical utility has two lines from the grid to the data center. C. Confirm there is uninterruptible power in the data center to the equipment. D. Confirm backup power can be switched on before severe weather approaches.
17
Answer: C
QUESTION: 50
Which of the following need to be considered in Disaster Recovery planning?
A. Employee work location Infrastructure utilities Datacenter locations Audit and regulatory issues B. Employee work location Infrastructure Utilities Public emergency response Audit and regulatory issues C. Hardware redundancy Employee work location Infrastructure Utilities Public emergency response D. Infrastructure Utilities Datacenter locations Audit and regulatory issues Public emergency response