QUESTION: 147 DRAG DROP Click the Task button. Match the appropriate availability level with its correct description.

Answer:

QUESTION: 148 What is the main purpose of the ECC memory controller?

55


A. to detect single-bit errors B. to detect and correct single-bit errors C. to detect multi-bit errors D. to detect and correct multi-bit errors within a single DRAM chip

Answer: B

QUESTION: 149

Which statements correctly describe the HP Server Console Switch G2 with Virtual Media?

(Select two.)

A. Up to two local keyboards, mice, and monitors can be connected to the switch simultaneously. B. The switch requires management software to be installed on target servers. C. Standard rack mounting of the switch occupies 2U (3.50") of front panel rack space. D. A USB drive can be mapped to an attached server for server upgrades. E. The switch features four front USB ports for attaching USB storage devices.

Answer: A, D

QUESTION: 150 Which HP ProLiant server family features these design characteristics Shared hardware components Optimized for dynamic, space-constrained, scaled-out environments Designed to adapt easily to changing workloads Used for industry-standard, fabric-based computing Centralized infrastructure with redundant power

A. ML server line B. DL server line C. BL server line D. SL server line

Answer: C

QUESTION: 151 Your customer is looking for rack-mounted servers that will enable them to run their memoryintensive HPC applications. They are also looking for ways to save money by sharing

56


components such as power supplies and fans. Which HP ProLiant server solution should you recommend?

A. BL685c G7 server blade B. SL6000 Scalable System C. DL980 G7 server D. WS460c G6 Workstation Blade

Answer: B

QUESTION: 152 DRAG DROP Click the Task button. Match the term with its correct description.

Answer:

57


QUESTION: 153 An HP BladeSystem c7000 Enclosure is populated with two full-height server blades installed in device bays 1 and 2. Which device bays should receive the next two half-height server blades?

A. 3 and 11 B. 9 and 10 C. 5 and 6 D. 11 and 12

Answer: A

QUESTION: 154 Six power supplies are installed in a BladeSystem c7000 Enclosure. The Onboard Administrator indicates 6750W is available. Which redundant power mode is being used in this enclosure?

A. N+N AC B. N+N DC C. N+2 D. N+1

58


Answer: A

QUESTION: 155

Which statements correctly describe the HP Lights-Out power management functionality?

(Select two.)

A. Power Regulator enables the server processors to operate at lower frequency and voltage during reduced activity. B. When the system is operating in the Power Supply High-Efficiency mode, power is drawn equally from all available power supplies. C. The Virtual Power button is only available with the BladeSystem versions of iLO 2 and iLO 3. D. When support for the Power Supply High-Efficiency mode is detected, this option is enabled automatically. E. The Lights-Out management processor is always available as long as the server is plugged into a power source.

Answer: A, E

QUESTION: 156 Depending on the redundancy level required and the number of devices installed in an HP BladeSystem c3000 Enclosure, what is the maximum number of power supplies supported in the enclosure?

A. 2 B. 4 C. 6 D. 8

Answer: C

59


For More exams visit https://killexams.com/vendors-exam-list

Kill your exam at First Attempt....Guaranteed!


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.