RISHABH JUNEJA
portfolio
“Less is only more where more is no good” -Frank Lloyd Wright
2
RISHABH JUNEJA PORTFOLIO
CV
R I S H A B H Surat, Gujarat 26th November 1997
ABOUT ME
Architecture has taught me the importance of process while designing and my goal is to expand my design skills and knowledge in the field of architecture at a professional level seeking a reputable job at an architectural firm to gain new skills and experience in the field.
EDUCATIONAL BACKGROUND College Raman Bhakta School Of Architecture, Bardoli. 2015-2020
S.S.C./H.S.C. Metas Adventist Seventhday School, Surat. 2011-2015
+91 - 7878199000 rjuneja9@gmail.com
SOFTWARES
CO-CURRICULAR ACTIVITIES Student Body Treasurer
Photoshop
2017
Indesign
Path Design and Execution, A.N.D.C. Trophy, N.A.S.A.
2017
Illustrator
Zonal N.A.S.A. Convention Treasurer Zone-2, N.A.S.A.
2018
Microsoft Office
Shortlisted Entry in Pandemic Dwelling Competition
Autocad
2020
Lumion
WORK EXPERIENCE
Revit
Architectural Internship 100 days
Sarjan Architects And Project Consultants
Sketchup
SKILLS
J U N E J A
3rd December 2018 - 15TH April 2019
Vray
DOCUMENTATION Jodhpur, Rajasthan
2015
HOBBIES
LANGUAGES Hindi English Gujarati
Nadiad, Gujarat
2016
Dholka, Gujarat
2017
Piplia, Madhya Pradesh 2019
architectural design studio -1 exploration model
INDEX Project Name
Page
1. Urban Foodscape (Institutional Project) 2. School Re-development with Community Centre (Urban Insert) 3. Reimagining “Architecture” in Mixed-Use Vertical Development (Thesis Project) 4. Professional Training 5. Miscellaneous
06 12 18 38 48
urban foodscape
institution
The site is located in Surat, Gujarat with an area of 9690 m2. Urban foodscape is the introduction of urban farming for the local individuals so that they can de-carbonise the environment, creation of green space, and focusing on utilizing organic products and this institute not only are centers for teaching individuals but moreover makes beyond any doubt that there are open spaces for people to socialise and with it the introduction of modern techniques like Aquaponics, Aeroponics, and Hydroponics.
Social
Educational
Multipurpose hall Food plaza Auditorium Courtyard
Glass house Research center Training and information centre
Different spaces, styles and pockets were created using different type of approaches for the same concern and was further developed according to program. Idea of axis was generated, Courtyard acting as an overlapping space between the spaces, Non-programmatic spaces were developed with bifercation, and spaces were bifercated but a connection was mantained.
URBAN FOODSCAPE
7
urban farming Ground floor plan
movement
built-unbuilt
axis
circulation
service
hierarchy of space
Lvl +6.00 floor plan
section aa’
section bb’
structural layout
10
zoning layout RISHABH JUNEJA PORTFOLIO
top view
section cc’
section dd’
birds eye view
view from entrance
model photographs
internal view URBAN FOODSCAPE
11
school redevelopment
urban insert
photograph of rath-yatra One of the important festival of Ahmedabad is rathyatra and the site falls on the route of this yatra so the project will also be focusing on spaces for rathyatra. route of rathyatra
photograph of nodes adjoining the street
Aim - To design a building in a way that it can be used in multiple ways. building use plan
built-unbuilt plan
Most of the area in the whole site consists of residential and commercial Saraspur consists majorly of big open chunk lands or a congested areas and lack of liveable recreational spaces and so the main concern built up area without any open land so to create intervention in design will be primarily focusing on public recreational activities. in a way that gives equal importance to built and un-built.
- Providing open plaza for people of saraspur and rathyatra as the site exists.
public space school space
The above site is kept as an urban plaza so that it can be utilized for rath yatra and the built program is placed on the lower site.
Public spaces are kept on the front side and school on rear side.
Concerns - Most of the areas in Saraspur are either residential or commercial and there are no public and recreational spaces. - Many industrial lands have been either abandoned or encroached. - Most of the schools are in need of redevelopment because of lack of infrastructure facilities and no open grounds for them.
Massing is placed in a way forming open spaces for school and public plus an transition space beneath the public library with few cantilevered spaces at above levels.
14
Massing is placed in a way forming open spaces for school and public and an transition space beneath the public building and mass was placed in a pattern forming small open spaces between few blocks.
RISHABH JUNEJA PORTFOLIO
Massing is placed in a way forming open spaces for school and public plus an transition space beneath the public library with few cantilevered spaces at above levels with play in levels and there is a play in heights of mass to break the monotony.
Orientation of the built up in such a way that open spaces be given efficiently for public on part connected to main road and for school connected to secondary road.
school space
urban plaza
circulation
built - unbuilt
services
levels
hierarchy of spaces
ground floor layout
first floor layout
second floor layout
section aa’
section bb’
16
RISHABH JUNEJA PORTFOLIO
section cc’
third floor layout
3d visual
3d visual from top SCHOOL REDEVELOPMENT WITH COMMUNITY CENTRE
17
reimagining ‘architecture’ in mixed use vertical development
thesis project
HYPOTHESIS Looking towards the future of Indian metropolitan cities which will be having tall vertical skylines, and in this urban era, everything is getting closer and compact. The cities which were developing horizontally before, have now started to develop vertically due to rapid urban influx of population. Due to urbanisation taking place at a higher rate in India, population have been migrating to metro cities leading to higher density in those areas. According to a survey by world bank India would be one of the countries to face urban population surge by 2050. So, to address its shortcomings an approach must be taken in order to create better living environments in high density areas meeting the need of the future by bringing essential requirements of humans into single environment with consideration of parameters like sustainability, more green areas with urban farming in the project. Looking forward to essential needs of future by creating a mixed use development which includes this three types of spaces to live fulfilled, connected lives: their “first place” (home) for private relief: their “second place” (work) for economic engagement; andOFFICE their “third place”, a more SPACE formless arena used for reaffirming social bonds and community identities which could be achieved by creating a development which is in vertical layers one above the other creating multi-layered and multi-dimensioned organism so that essential requirements are in the reach of the people living there. Imagining the vertical city, is a concept aiming to develop a system which is not just a high end housing infrastructure but is a vessel that houses a justified complex network of functions present SOCIAL AND RESIDENTIAL in a horizontal city hoisted vertically so as to create a similar ambience with a CULTURAL balance of comfort and elegance in the user’s lifestyle and aims at being a modulated prototype solution for the future of Indian cities which can be multiplied to face the upcoming future urban challenges more efficiently. RECREATIONAL RESIDENTIAL SERVICES OFFICE ADMINISTRATION COMMERCIAL Image depicting the congestion caused in everyday life in Mumbai while commuting.
Overlapping spaces in a vertical manner.
Illustration of vertical and horizontal development in a city.
AIM An approach to architectural innovation for vertical development in denser cities of India.
WHY VERTICAL? They serve to fit a lot of floor space in comparatively small amount of ground surface because of their immense height.
Article about population in Mumbai.
Mumbai crowding article.
WHY MUMBAI?
• The densest city, crowdiest and one of the populous city in India with facing issues like rapid urbanisation, population explosion and urban sprawl. • Mill lands which are still vacant are considered for the development as the lands are still abandoned and kept unused. • Opportunity in Mumbai to develop vertical structure is due to higher F.S.I. availability, vertical skyline.
WHY MILL PLOT?
15 K.M.
SEA-LINK
20
800 M.
900 M.
1.5 K.M.
1.4 K.M.
DISTANCE FROM MADHUSUDAN MILLS
RISHABH JUNEJA PORTFOLIO
MADHUSUDAN MILL
WORLD ONE
WESTERN EXPRESS HIGHWAY
LOWER PAREL (CENTRAL LINE)
Many mill plots have been used for re-development and many structures have been developed so far and few of them are in abandoned condition which can be considered for redevelopment.
SITE LAYOUT WITH IMMEDIATE CONTEXT - The site is adjoining to a busy street with a lot of commercial activities taking place. - Heavy pedestrian movement is seen on the streets around the site.
Section through North-South axis.
Section through East-West axis.
SITE DESCRIPTION The site is a flat land with wild vegetation and the abandoned mill structures. The structures have been partly demolished by N.T.C. There are several high rises in the Lower Parel area close to site such as World One 117 storey high, Omkar 1973, Raheja Imperia, Lodha Trump, and many more.
Present condition of site
Present condition of site
S.W.O.C. ANALYSIS
Summer Solstice
STRENGTH
WEAKNESS
- Worli metro station is proposed 900 metre walk from site. - Far from the Lower Parel Railway station - Considerably large site area for development. (Central Line). - Easy approach to Bandra-Worli Sea link. - Limited approach to site from Main road. - Aerial view of sea above 75 feet. (as per World One). - Majorly surrounded by residential and commercial spaces. - F.S.I Availability.
S OPPORTUNITY - Site located in the vicinity of tall structures like World One. - Work space requirement.
O
Winter Solstice
SHADOW ANALYSIS
W C
CHALLENGES
Shadows are casted for the same time in the whole year and overlapped to see the affect of shadow on site.
- Highly congested area. - Lack of open green spaces. - Strong wind force. - Rainfall amount in Mumbai. - High summer temperature.
Around morning time 10:00 there is a shadow casted on the site area in the months of november - february and the rest of the day the site remains shadow free.
STAIRWAY
ELECTRICAL DUCT
WATER SUPPLY
ESCALATOR
2 BHK APARTMENT
4 BHK APARTMENT
SECURITY
BANQUET HALLS AND BALLROOM
3 BHK APARTMENT JANITOR
STUDIO APARTMENT
5 BHK APARTMENT
FIRE HYDRANT DUCT
RAIN WATER HARVESTING
AUDITORIUM
HOUSEKEEPING
RESIDENTIAL SOCIAL AND CULTURAL ELEVATOR
TELECOM
SERVICES
10:00
ADMINISTRATION
13:00
OFFICE SPACE
MISCELLANEOUS
TOILET
CO-WORKING SPACE
REIMAGINING “ARCHITECTURE” IN MIXED-USE VERTICAL DEVELOPMENT
MEDICAL CARE FACILITY
CONFERENCE ROOM
CHILD CARE FACILITY OFFICE
RECREATIONAL
COMMERCIAL
16:00
BAR AND LOUNGE
CAFE
CHILDREN PLAY AREA
PARK
FITNESS CENTRE
TOILET
RESTAURANT
EDIBLE FARMS
THEATRE
JOGGING
PLAYGROUND
SWIMMING POOL
TURF
SHOPS/RETAIL OUTLET
MISCELLANEOUS
INSTITUTIONAL ADMINISTRATION
WORKSHOP
CLASSROOM
CANTEEN
LIBRARY
Program Assemblages
Photograph of conceptual model.
1. Linear mass
1. Site
2. Roads and approach to site
3. Dividing plot in three zones with main road approach for the vertical structure and public park and space.
4. Placing building in a way that the site is always casted with building’s shadow.
2. Courtyards for creating connection on both 3. Developing massing in a way around sides of site. courtyards.
4. Creating multiple heights of roof to break monotonous surface.
1. Site
2. Building placement
3. Highlighting core
4. Removing block
5. Removing block from ground
6. Adding horizontal elements around core with sky gardens.
7. Adding vertical elements around core with sky gardens.
8. Combination of horizontal and vertical elements with sky gardens
DEVELOPMENT PROCESS OF THE VERTICAL STRUCTURE
1. Development of conceptual massing as per the spaces in program.
26
RISHABH JUNEJA PORTFOLIO
2. Adding one more core to the building to have separate cores for offices and residential spaces.
3. Skewing building to get better view towards sea.
4. Creating concave surfaces for better views as well as for reducing wind loads on building.
1
2
1. Entry to site 2. Public plaza 3. Pedestrian pathway 4. Internal vehicular road 5. Elevated road 6. Basketball court 7. Open food plaza 8. Waterbody 9. Parking 10. Retail space 11. Semi open space (Amphitheatre) 12. Exit 13. Urban edge
3
4 5
6 9
7 12
8 11
13
10
12
Lower level podium layout (lvl +0.00)
1. Private office space 2. Co-working space
1. Library 2. Vertical farming 3. Restaurant 4. Medical care 5. Child care
5
1 4 2
2 1
3
Typical co-working office space layout (lvl +40.50)
Recreational floor layout (lvl +148.50) 8
1. Badminton court 2. Meditation 3. Gym 4. Yoga room 5.Volleyball 6.Indoor games 7. Basketall 8.Squash
7
1
2
3 4
Typical office space layout (lvl +54.50)
Recreational floor layout (lvl +167.50) (9 mtr. ht.)
1. Pool area 2. Gaming zone (arcade games)
1
2
Pedestrian movement
Vehicular Movement
Recreational floor layout (lvl +176.50) (10 mtr. ht.)
Figure Ground
Typical residential layout (lvl +204.50)
Courtyards
Wind movement
Core
HELIPAD (TOP FLOOR) LVL +314.50
TERRACE FLOOR LVL +297.00
SKYGARDENS
LUXURY APARTMENTS FITNESS CENTRE
LVL +186.00
EDIBLE FARMS
SWIMMING POOL
SKYGARDENS
RECREATIONAL ZONE LVL +145.00
CHILDREN PLAY AREA
LIBRARY
2 AND 3 B.H.K. APARTMENT LVL +107.00
CONFERENCE ROOM
CO-WORKING SPACE SKYGARDENS
RESTAURANT
BAR AND LOUNGE
SHOPS/RETAIL OUTLET
UPPER LEVEL PODIUM LVL +9.00
STUDIO APARTMENT AND OFFICE LVL +30.50
GROUND FLOOR (PUBLIC ZONE) LVL +0.00
Section aa’
LVL +82.50
LVL +72.00
SKYGARDENS
SKYGARDENS
CONFERENCE ROOM
CO-WORKING SPACE
LVL +51.00
RESTAURANT
BAR AND LOUNGE
SHOPS/RETAIL OUTLET
STUDIO APARTMENT + OFFICE LVL +30.50 UPPER LEVEL PODIUM LVL +9.00 GROUND FLOOR (PUBLIC ZONE) LVL +0.00
Section bb’
LVL +82.50
PARK
SKYGARDEN LVL +72.00
SKYGARDENS
SKYGARDEN LVL +54.00 LVL +51.00
CO-WORKING SPACE
STUDIO APARTMENT AND OFFICE LVL +30.50
Section cc’
32
RISHABH JUNEJA PORTFOLIO
SKYGARDEN
SKYGARDEN
Section dd’ REIMAGINING “ARCHITECTURE” IN MIXED USE VERTICAL DEVELEOPMENT
33
COMMUNICATION TOWER
TERRACE FLOOR LVL +297.00
HELIPAD CARBON NANOTUBE
CONCRETE FILLED TUBE COLUMNS
WIND LOAD
G R A V I T Y
SERVICE CORE
L O A D S
WATER SUPPLY FIRE SAFETY WATER SUPPLY HVAC LINE
LUXURY APARTMENTS
Carbon nanotube
Central core with horizontal cantilevers at roof level, to which vertical hangers and floor slabs are suspended.
MECHANICAL FLOOR LVL +186.00
RECREATIONAL SPACES
MECHANICAL FLOOR LVL +145.00
2 AND 3 BHK APARTMENTS
MECHANICAL FLOOR
MECHANICAL FLOOR LVL +107.00
WIND LOAD
OUTRIGGER TRUSS STUDIO APARMENTS CO-WORKING SPACE OFFICE SPACE
POST TENSION SLAB
MECHANICAL FLOOR LVL +30.50
Wind load and structural diagram
Illustration of algae facade and its components.
Suspended Structure
Facade with combination of algae facade system and wind turbines
Building services section.
Illustration of post-tension slabs.
Pedestrian Pathway with public park
Elevation view of the building.
View from the Entrance.
Urban -edge
REIMAGINING “ARCHITECTURE” IN MIXED USE VERTICAL DEVELEOPMENT
35
Sky-garden overlooking Bandra-Worli sea link.
Night view of the site.
professional training
D. R. KHANNA RESIDENCE 10.20 [33'-6"]
UTILITY 3.85X1.46 (12'7" X 4'9")
TOILET 1.53X1.20 (5'1" X 3'11") GUEST ROOM 3.50X3.33 (11'6" X 11'0")
SERVANT ROOM 3.73X3.33 (12'3" X 11'0")
DRESSING 2.00X1.94 (6'6" X 6'3")
TOILET + DRESSING 2.00X1.45 (6'6" X 4'9")
DUCT
LIFT 1.47X1.45
DINNING + KITCHEN 3.73 X 5.18 (12'3" X 17')
15.84 [52']
TOILET 2.00X1.45 (6'6" X 4'9")
BEDROOM 3.50X3.33 (11'6" X 11'0")
STORE 2.00X1.45
C.TOILET 2.05X1.29 (6'9" X 4'3")
O.T.S.
DUCT
DUCT
ground floor layout
TOILET + DRESSING 3.73X1.47 (12'3" X 4'9")
MASTER BEDROOM 4.00X3.73 (13'0" X 12'3")
PUJA AREA 1.54X1.44 (5'-0" X 4'-9")
ENTRANCE
GROUND FLOOR
LIFT 1.47X1.45
LIVING ROOM 5.90X4.12 (13'6" X 19'3")
UP
UP PARKING
MASTER BEDROOM 5.90X3.33 (19'3" X 11'0")
STORE
LIFT 1.47X1.45
ENTRANCE
TOILET + DRESSING 3.33X1.45 (11'0" X 4'9")
first floor layout
FIRST FLOOR
BALCONY 12'-6" X 5'-9"
second floor layout
SECOND FLOOR PROFESSIONAL TRAINING
39
C'
2.28
±0.00m LVL.
0.38 0.22 0.49
0.15
2.60
4.53
3.31 0.23
0.73
0.23
0.91
1.14
0.83
0.45
0.08
0.600.22
1.28
0.45 0.82
1.27
(230x450)
1.00
0.45
0.30
C2 (230x450)
0.60
0.30
4.50
2.00
2.94
3.20
0.15 0.41
0.45
W3
2.60 D5
B
C4 (230x530)
0.53
BALCONY 2.83 sq.mt 3.59
C'
A
W6
C 3.66
0.08 C3 (230x530)
0.23
C'
0.83
1.28
0.22 W4
0.73
0.15 C7
BED ROOM-2 3.66X4.50
2.05
CUT OUT
10 1.00
0.50
0.22
2.03
+6.50m LVL.
9
1.00
2.55
0.15
0.38 1.00
8
0.41
0.22 0.28
2.55
2.70 0.15 1.70 0.30
7
0.22 0.60
0.75 0.39
6
1.81 D4
0.75
1.71
C1 (230x450)
3.66
4 5
0.53
second level plan
1.80
+14.35 MACHINE ROOM LVL.
+9.55 TERRACE FLOOR LVL. 0.30
0.95
0.45
0.78
0.45
1.67
0.13
3.00
+12.55 STAIR CABIN LVL.
0.45
0.45
+7.40 SECOND FLOOR SILL LVL.
+6.50 SECOND FLOOR LVL.
0.95
0.90
1.20
+8.60 SECOND FLOOR LINTEL LVL.
1.20
+5.55 FIRST FLOOR LINTEL LVL.
0.45
0.45 0.30
+3.45 FIRST FLOOR LVL.
0.95
0.30
0.90
+4.35 FIRST FLOOR SILL LVL.
1.20
+2.50 GROUND FLOOR LINTEL LVL.
0.30
0.40
0.10 0.90
+1.30 GROUND FLOOR SILL LVL.
section aa’
section cc’
section dd’
section ee’
E
0.15
1.24
12
1.43
C6 (230x450)
0.30
2.80
13
C10 (230x450)
V1
ATT.TOILET 1.60X2.55
E'
0.15
1.12
BALCONY 3.66X0.90
15
1 3
0.60
V1
1.60
0.15
2.35
2.25 0.53
first level plan
25'0" WIDE ROAD
17
0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
2.00 0.94 0.30
2.60 D5
3.81
A
D5
0.22
0.22
D2
0.66
C2 (230x450)
0.45 1.09 0.15
0.88
2
1.00
0.41
W3
UP
1.00
1.00
2.52
2.35 0.60
1.98 4.04
18
DRESSING AREA 1.91 X 2.55
1.03
0.80
0.73
0.41
0.15
0.15
4.50
0.50
0.50
0.15
4.06 3.39 1.70
1.27
1.70
+6.50m LVL.
11
0.23
1.00 W4
0.73
0.45
0.22
0.22 0.28
2.55 0.15
ENTRANCE 2.0 X 1.70
14
C4 (230x530)
0.63
0.28
0.45
C1 (230x450)
(230x530)
1.38
0.15
1.43
0.90
19
0.08 C3
1.91
1.50
LIFT 1.45X1.35
DN
B'
1.00
1.45
C5 (230x450)
B
3.36
DUCT
0.30
W6
0.15
0.84 V1
1.80
0.28
0.15
C
0.15
1.06
0.43
1.45
C7 (230x450)
C9 (230x530) D2
1.05
0.60
1.00 20
+3.45m LVL.
PUJA 1.51 X 1.05
D'
3.93 5.65
3.93
V1
0.53 0.30
0.53 1.05
13.46
E
1.65
0.83
V1
0.43 0.60 0.15
C8 (230x530)
0.45
0.22
8 10 1.00
1.00
1.00
0.45
+6.50m LVL.
D4
1.35
1.21 2.31
5.23
9
0.23 0.60
3.53
BED ROOM-3 5.86X4.53
0.60
C10 (230x450)
0.45
0.15
1.20 0.22 0.60 0.30 0.38
1.20
0.60 0.75
G.TOILET 2.0X1.20
0.22 0.60
1.20
1.35
1.60 E' 2.00
0.08
0.15
0.53
0.53
0.15 0.15
W5
16
6 7
0.45
DRESSING AREA 1.45 X 2.76
4 5
C13 (230x450)
2.87
0.08
1.45
LIVING ROOM 5.23X4.50
C6 (230x450)
0.30 0.75
12
3
D
C12 (230x450) 0.81
1.80
0.95 3.84
3.46
1.60
4.15
STORE 1.60 X 1.20
0.15
D4
0.80
D1
0.45
2.25
15 13
0.53
C4 (230x530)
UP
1.00 1 2
0.30
0.30 0.67
0.44 0.45
0.45
0.52 0.45
0.23
1.20
0.52 0.23 0.45 0.23
0.67
4.53 0.15 0.60 0.15
1.05
1.05 2.55
17
11
0.64
3.89
ground level plan
2.71
0.50
18
0.30
W1
5.86
0.90
C2 (230x450)
C3 (230x530)
0.41
0.40
3.71
+3.45m LVL.
0.45
0.45
19
2.80
0.45 0.60 1.01 W3
0.23
3.58
B'
0.53
0.30 0.41
0.22 0.58
0.80
0.40
1.05
0.73
B
0.23
0.50
1.43 C9 (230x530)
0.23
DINNING AREA 3.71 x 2.55
1.50
1.35
1.65
0.15
ENTRANCE 2.0 X 1.70
14
0.23
8 0.23
1.00
0.55
0.63
0.28
DN
3.22
C
9
0.75
1.80
0.53 0.30
0.53 1.05
13.46
0.60 0.15
0.81 0.45
1.70
1.70
2.00
0.97
0.38
0.23
0.22 1.20
1.20
0.90
1.00 20
0.23
0.22
0.45
7
3.59
A
0.28
1.35
W4
0.73 0.15
LIFT 1.45X1.35
C5 (230x450)
1.35
1.00
1.45 1.45
0.15
+3.45m LVL.
0.08
1.06
DUCT
0.43
0.48
3.66
V1
0.60
KITCHEN 3.66X3.84
0.15
D2
0.43
16
6
10 1.00 TRADE=0.25 RISER=0.16
0.22 0.28
1.66
1.45 0.60
4 5
0.22
0.23
1.00
1.00
C7 (230x450)
1.66
C6 (230x450)
0.45
2.80
11
0.43
V1
0.98
12
3
E
0.15
1.70
0.43
+3.45m LVL.
2.35
14 13
2
1.80
2.25
15
0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
17
0.23
1.00 1
C8 (230x530)
D4
ATT.TOILET 1.45X1.80
+0.30m LVL.
0.53
1.70
0.45
18 16
1.05
PARKING 3.66X8.93 D1
0.38
0.22
0.23
8.85
0.15 3.20
UP
1.00 20 19
0.38
2.15
1.35
1.43
0.15
C10 (230x450)
E'
SHOE RACK
0.63
0.28
0.23
D3
ENTRANCE 3.66 X 1.70
C5 (230x450)
C1 (230x450)
C9 (230x530)
2.06
0.15
+0.40m LVL.
B'
0.22
2.29
1.45
0.90
W2
0.41 0.41 0.41 0.41 0.41
DUCT
0.15
1.35
1.65
0.07 0.90 0.90
V1
LIFT 1.45X1.35
0.15
2.81 3.93
1.60
C11 (230x450)
W7
0.45
3.66
0.43
W1
1.20
1.80
0.45
0.43
0.23
1.70
+0.40m LVL.
1.80
1.05
2.55
SERVANT ROOM 1.05X2.06
1.45
0.28
2.06
0.15 0.53
0.75
1.80
0.97
0.53 0.30
0.53 1.05
13.46
1.45 0.60
0.43 0.60 0.15
C8 (230x530)
0.15
0.67
0.67
0.44 0.45
0.45
0.10 3.03
3.42
0.35
C13 (230x450)
8.52
A'0.90 1.91
D'
+3.45m LVL.
D2
ATT.TOILET 1.45X1.80
0.18
BED ROOM-1 3.66X4.53
1.80
1.00
WASH AREA 3.68X1.20
D3
0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
0.45
0.45
2.29
3.66 D4
1.80
0.23
0.23
3.68
0.15
2.50 1.83 0.75
3.93
D'
+0.40m LVL.
D4
D
0.90 0.13
GUEST ROOM 5.86X3.03
0.15
C11 (230x450)
C12 0.15 (230x450)
W1
5.86
ATT.TOILET 1.45X3.70
1.45
0.93
1.45 WARDROBE
0.15
C12 (230x450)
0.08
1.80
0.45
0.80
2.81
2.81
0.45
7.92
1.91
C13 (230x450)
0.23
W1
0.22
W1
1.80 1.45
0.30
0.67
0.30 0.67
0.44
0.43
0.45
0.45
0.60 0.43
0.30
A'
rain water pipe- 3"Ø
D
V1
3.70
C11 (230x450)
7.92
A'0.90 1.91
+0.40 PLINTH LVL. +0.30 PARKING PLAN LVL. ±0.00 GROUND LVL.
+14.35 MACHINE ROOM LVL.
A'
1.80
0.53
0.67
D
+12.55 STAIR CABIN LVL. 3.68
0.13
2.10
2.38
1.28
0.45
0.95
0.45 0.23 0.23
1.21
0.45
0.45
0.28
1.96 1.50
0.45 1.04
3.15 0.60
0.10
0.60
0.30 0.45 0.45 0.30
0.30
0.45
4.80
0.50
+2.50 GROUND FLOOR LINTEL LVL.
3.72
0.33
+0.40 PLINTH LVL. +0.30 PARKING PLAN LVL. ±0.00 GROUND LVL.
0.30
0.60
0.30
0.10 0.90
0.35
0.50
+1.30 GROUND FLOOR SILL LVL. 0.30
9
0.22
1.00
+4.35 FIRST FLOOR SILL LVL.
1.84
W6
8
5.23 1.00
0.75
0.60 1.20 0.90 0.95
4.50
B
10 1.00
0.22 0.28
0.45
0.90 0.95
1.35 0.95
C
7
+5.55 FIRST FLOOR LINTEL LVL. W5
0.40
11
6
0.60
12 1.00
4 5
+6.50 SECOND FLOOR LVL.
+3.45 FIRST FLOOR LVL.
0.60
13
+7.40 SECOND FLOOR SILL LVL.
V
0.30
14
1.20
15
2
V
1.23
W6
D5
1 3
1.80
2.25
16
B'
D5
1.04
0.15 0.45
1.00 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
17
W6
0.30
DN
18
2.93
0.15
1.70
ENTRANCE 2.0 X 1.70
19
E
0.75
D4
+9.55m LVL.
1.00 20
W6 0.92
1.05
0.60
0.15 0.28
V
1
0.90
0.28
E'
2.70
0.30
0.15
2.70
1.20
D5
0.38
0.63
LIFT 1.45X1.35
V
1.9
1.45 1.35
W6
+8.60 SECOND FLOOR LINTEL LVL.
4.69
3
+9.55m LVL.
2.70
0.45
0.95
2.1
OPEN TERRACE 1.60
+9.55 TERRACE FLOOR LVL.
3
0.9
0.60
4.45
5.65
2.10
D'
1.51
3.00
0.27
0.10
2.33
0.10
1.45
W4
C'
A
east elevation
north elevation
+14.35 MACHINE ROOM LVL.
1.80
terrace level plan
DOOR SCHEDULE
2
D5
2.60 X 2.10
2.10 M
1
2
7 3
2.1M
1.5M
2.1M
from landing
1
2.1M 2.1M
1
1
1 1
1
1
3
4 1 2
1 2
1 4
0
0.15
+7.40 SECOND FLOOR SILL LVL.
+6.50 SECOND FLOOR LVL.
9
+5.55 FIRST FLOOR LINTEL LVL.
W6
D5
+4.35 FIRST FLOOR SILL LVL.
+3.45 FIRST FLOOR LVL. 0.15
1.0M
0.60 X 0.60
0.6M
D5
0.45
1.70 X 1.10
V1
1.0M
W6
W1
D3
0.45
W7
from landing
W7
0.15
1.60 X 1.10 2.00 X 1.50
3
1
+2.50 GROUND FLOOR LINTEL LVL. V W1
W1
D5
0.15
1.00 X 1.7
W5 W6
1 1
0.10
W4
0.95
1
1.20
1
2.6M 2.6M
0.90
2.1M
0.9M 0.9M
0.95
0.9M
0.60 X 1.70
W3
1st f. 2nd f. terrace Total 1 1 5
1.20
g.f. 3
0.10 0.90
LINTEL 2.1M
0.30
SILL 0.9M
V W1
2.34
1.75
WINDOW SCHEDULE NAME SIZE W1 1.80 X 1.20 W2 0.90 X 1.20
0.87
0.58 2.70
1
0.60
2
0.96 1.05
0.15
2
1.83 1.61
0.60
2.10 M
2
0.10
0.75 X 2.10
1.28
4
1.70
D4
2
+1.30 GROUND FLOOR SILL LVL. +0.40 PLINTH LVL.
1.30
1
+9.55 TERRACE FLOOR LVL.
+8.60 SECOND FLOOR LINTEL LVL.
0.35 0.45
1
1.15 0.64
1
2.10 M
1.04
1
0.90 X 2.10
1.51
2.10 M
D3
D2
1.50
1.00 X 2.10
G.F. 1st f. 2nd f. terrace Total 1 1 2
0.95
LINTEL 2.10 M
1.20
SIZE 1.20 X 2.10
0.90
NAME D1
1.85
1.05
0.23
2.10
0.13
1.19
3.00
0.10
+12.55 STAIR CABIN LVL.
+0.30 PARKING PLAN LVL. ±0.00 GROUND LVL.
west elevation
section bb’
PROFESSIONAL TRAINING
41
CIRCUIT HOUSE, SURAT. 5
3 4
2
landscape layout for Circuit House, Surat
42
RISHABH JUNEJA PORTFOLIO
3. view from the entrance podium of building
1. top view of landscape
2. 3d visual of landscape
4. pergola pathway
2. birds eye view of landscape
5. rear cantilever
Open storage
WP
sb WP
Coffee Table
S sb
Dressing unit
Sofa
BP Bell Point
WP
sb
Fan Point A.C. POINT KP
sb
Dining Table
WP
Foot Light HT - 0'-9" Intercom
T.V. Unit
Wall Point HT - 8'-0"
WP
Bed
WI-FI WP
sb
Spot Light
WP
B
S
DINING 8'9"x15'9"
Centre Table
Exhaust Fan
Geyser Point
sb sb
C
A
WP
C
BED ROOM 13'-6"x20'-0"
sb
Side Table
Service Table
sb
B
A
Wardrobe Point
COB Light Hanging Light
D
sb
Side Table
D
LEGENDS
Puffy
S
WP
S LIVING AREA 13'6"x15'9"
WP
sb
sb
Coffee Table
KEY POINT
S
Writing Table
KP
sb
BP
sb
Side Table
Dining Shelf
sb
Fridge Unit
sb
Sofa Side Table
sb
sb
BP
vip room electric layout - 3
vip room floor layout S.B-18 HT.3'-3" (8M) - PLUG POINT (1- 5AMP) - CEILING POINT
S.B-16 HT.4'-3" (12M) - PLUG POINT (1- 5AMP) - CEILING POINT - FAN POINT-2
S.B-17 HT.4'-3" (2M) - WALL POINT - CEILING POINT
S.B-15 HT.4'-3" (8M) S.B-14 HT.1'-6" (8M) - CEILING POINT - PLUG POINT - WALL POINT (1- 5AMP) - CEILING POINT - TELEPHONE POINT - WALL POINT - AC POINT
S.B-13 HT.4'-3" (6M) - PLUG POINT (1- 5AMP) - WALL POINT - CEILING POINT
WP WP
WP
sb
sb
sb WP
sb
sb
WP
S.B-12 HT.3'-3" (4M) - PLUG POINT (1- 5AMP) - WALL POINT
BED ROOM 13'-6"x20'-0"
S.B-11 HT.4'-3" (8M) - CEILING POINT - EXHAUST POINT - FAN POINT - WALL POINT S.B-10 HT.4'-3"(6M) - PLUG POINT (1- 5AMP) - CEILING POINT - WALL POINT
WP
sb
12 mm granite
sb
12 mm granite top
sb
vip room electric layout - 1
profile handle
Unit fridge
sb WP
550
eq eq
535
x 335
x eq sb
eq
550 eq
1215
eq
100
100
sb
eq WP
sb sb
3 equal parts
1000
1595
1845
1010
995
1200
200 925
sb
vip room electric layout - 2
100
480 480
sb
BP
sb
100
eq
sb
sb
KP
eq
eq
450
remaining
remaining
500
sb
600
965 eq eq
eq
eq
eq
WP
450
WP
480
480
1240
eq
sb
1100 400 remaining
remaining
sb
Switch Board Height 1'-6"
sb
Switch Board Height 1'-9"
sb
Switch Board Height 2'-3"
sb
Switch Board Height 3'-3"
sb
Switch Board Height 4'-3"
sb
Switch Board Height 8'-0"
C 156
A
profile handle 12 mm plywood with 4 mm veneer finish
23
Photo Frame
18 + 8 mm plywood with 4 mm veneer finish
18 + 8 mm plywood with 4 mm veneer
12 mm plywood
WP
750
100
x
1450
WP
sb
590
18+ 12 mm plywood with 4 mm veneer finish
18 + 8 mm plywood with 4 mm veneer
detail a
section bb’
12 mm granite top
12 mm granite
profile handle
150 WP
950
1310
sb
2 equal parts
WP
455
12 mm granite top
18 + 12 mm plywood with 4 mm veneer sb
2x
detail c
B
18+ 12 mm plywood with 4 mm veneer finish 12 mm plywood with 4 mm veneer finish profile handle 6 mm plywood louvers 18 + 8 mm plywood with 4 mm veneer finish
914
plan
eq
WP
2x
685
remaining
sb
2700
eq
sb
x 4 equal parts
685
eq eq
12 mm plywood with 4 mm veneer
18 + 8 mm plywood with 4 mm veneer
detail b APS
4 equal parts
23
18 + 12 mm plywood with 4 mm veneer
S.B-6 HT.2'-3" (8M) S.B-7 HT.1'-9" (6M) S.B-8 HT.4'-3" (8M) S.B-9 HT.8'-0" (4M) - PLUG POINT - PLUG POINT - PLUG POINT - PLUG POINT (1- 15AMP) (1- 5AMP) (1- 5AMP) (1- 5AMP) - GEYSER POINT - PLUG POINT - PLUG POINT - WALL POINT (1-15AMP) (1-15AMP) - LAN POINT - CEILING POINT -FOOT LIGHT -WALL POINT
Drawer
Drawer
eq
eq
A
18 mm plywood with 4 mm veneer
section aa’ B
12 mm Granite Finished top
Drawer
eq
Veneer Finished Drawer
Fridge
Fridge 914
A'
B'
750
S.B-4 HT.4'-3" (6M) S.B-5 HT.1'-6" (8M) - PLUG POINT - PLUG POINT (1- 5AMP) (1- 5AMP) - HANGING LIGHT - CEILING POINT - AC POINT - FOOT LIGHT - FAN POINT
416
S.B-3 HT.2'-3" (4M) - FRIDGE POINT
1560
S.B-2 HT.4'-3" (6M) - PLUG POINT (1- 5AMP) - CEILING POINT - AC POINT - FAN POINT
S.B-1 HT.3'-3" (6M) - PLUG POINT (1- 5AMP) - CEILING POINT - TELEPHONE POINT
18 + 8 mm plywood with 4 mm veneer
1560
sb
sb BP
75
sb
KP
vip room electric schedule
WP
WP
sb
DINING 8'9"x15'9"
TOILET
WP
sb sb
sb
sb
sb
sb
LIVING AREA 13'6"x15'9"
150
sb
plan @ lvl 650 mm
elevation
Gypsum ceiling
Gypsum ceiling
Gypsum ceiling
Wooden strips 50mmx50mm
Ash wood with polish
paint
wooden strip partition Paint
Photo Frame 70 mm niche Paint
12 mm plywood with 4 mm veneer
4 mm veneer
4 mm veneer
dinning table platform
Sliding doors
A
D
LIVING AREA 13'6"x15'9"
Side Table
A'
C
B
Service Table
DINING 8'9"x15'9"
Centre Table
Dining Table
Sofa
75 mm skirting
75 mm skirting
75 mm skirting
Sofa Fridge Unit
Side Table
Dining Shelf
BP
elevation a
elevation b
elevation c
Gypsum ceiling
elevation d
Gypsum ceiling
Gypsum ceiling
Ash wood with polish Paint
19mm Ply with 4mm Veneer PU polish and Finish with 1mm Laminate all Inside and matching edge beading
4 mm groove Paint
19 +19 mm ply with 4 mm veneer on all sides
4 mm veneer
Open storage
150 mm mattress 12 mm plywood with 4 mm veneer finish on all sides
elevation a
elevation d
S
BED ROOM 13'-6"x20'-0"
Cement sheet Ceiling @ beam bottom
S
Cement sheet Ceiling @ 24 in. dn
50
e 1:
Toilet 8'3"x3'9"
B
B
1115
Shower 8'-3"x5'-3"
S
350
150
50
e 1:
Slop
1595
C
100
toilet layout
285 600
80
toilet plumbing and slope layout
flooring layout
ceiling layout
LED Light
Overhead rain shower Glass Partition
LEGEND
Diverter 3020 1200 450
450
615 450 230 900
S S Jali
DESIRE DARK/ DESIRE LIGHT (SOMANY) 600 mm x 300 mm dado tile
Flush Plate Hand Shower Tissue Paper Holder Shelf B W.C. Seat Cover Health Faucet Spout BIB Cock W.C. Angle Valve
700
1200
elevation a
WASTE WATER OUTLET - 75MM DIA
Toilet waste line waste water line
OHWT WATER INLET - 25MM DIA
FLOORING 600 M.M. X 600 M.M.
Inlet line(Wasing,washbasin)
elevation a
elevation b
SOLID WASTE OUTLET - 110MM DIA
ETHOS BEIZE (SOMANY) 600 mm x 600 mm floor tile
elevation d 100
19+19 mm ply finish with 8mm corian & 4mm veneer @bottom
LED Light Shelf A
100
Glass Partition Napkin Ring
15 mm ms rod
850 1200 230
230
150
100
elevation c
DADO TILES 600 M.M. X 300 M.M. DADO TILES 600 M.M. X 300 M.M.
95
elevation shelf a
1045
15 mm ms rod
385
19+19 mm ply finish with 8mm corian & 4mm veneer 40 @bottom
Bottle Trap Angle cock 1300 850
450
1500
Double arm wall mounted Mirror Hand Dryer Faucet Basin
1320
Soap Dispenser Mirror 900 mm dia
elevation c
Side Table
key plan
150 Slop
A D
Writing Table
Bed
elevation c
A'
Dressing
A
Coffee Table
Side Table
150
600
150 A
D
C
930 625
535 240
415
elevation b
T.V. Unit
Sliding Doors with 1 shutter mosquito net
19 mm ply with 4 mm veneer 19 mm ply with 4 mm veneer
ashwood with PU polish 19mm Ply with 8mm BPG
Veneer Finished Palmet
4 mm groove Paint
8 mm BPG with 19mm teakwood frame
handle
A'
Ash wood with polish
key plan
100
elevation shelf b
Cement sheet Ceiling@ beam bottom
KUBERJI CROWN, SURAT. FIRE FIGHTING DEAD STORAGE UNDER GROUND WATER TANK 45 m³ (45,000 LTRS) 3,840 x 3,370 x 3,500 (D) (TOTAL DEPTH - 3700 mm)
DOMESTIC RAW WATER UNDER GROUND WATER TANK 45 m³ (45,000 LTRS) 3,840 x 3,370 x 3,500 (D) (TOTAL DEPTH - 3700 mm)
4.06
A'
128.44
4.17
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
6 KG
CO2 4.5KG
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
1.54
FIRE LIFT 1.52 X 2.40
ABC
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
3.00
G.I. PIPE "C" CLASS 25 MM I.S.I.
6.00
4.23
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
LIFT 1.52 X 2.40
35.66
M.C.P
HOOTER
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
UP
1.54
1.50
CO2 4.5KG
6 KG
G.I. PIPE "C" CLASS 25 MM I.S.I.
LIFT 2.36 X 2.74
1.54
3.08
1.50
G.I. PIPE "C" CLASS 50 MM I.S.I.
3.00
3.00
RISER 0.16 TREAD 0.30 UP
1.50
3.08
1.50 3.00
HOOTER
M.C.P
HOOTER
3.50
1.54 1.52
1.54
ABC
G.I. PIPE "C" CLASS 50 MM I.S.I.
3.60
4.17
G.I. PIPE "C" CLASS 25 MM I.S.I.
B'
ABC 6 KG
1.54
3.08
CO2 4.5KG
1.50
6.22
G.I. PIPE "C" CLASS 25 MM I.S.I.
6.00
LVL +30.45 M FLOOR LEVEL
GO TO O.H.W.T
3.00
WATER TANK
1.50 7.69
SLAB TOP LVL +27.90
23.62
2.35
HB
CO2
103
104 102
105 101
106
100
99
2.33
4.5KG
87
88 86
85
90
84
RS
RS
SHOP 7.26 X 3.96
49
FIRE
43
SHOP 7.26 X 3.96 32
2.51
W1
V1
D1
TOI. D1 BLK
42
SHOP 7.26 X 3.96
RS
RS
RS
SHOP 7.26 X 3.96
RS
SHOP 7.26 X 3.96
W
27
SHOP 7.26 X 3.96 16
2.51
W1
LIFT 2.36 X 2.74
26
RS
RS
SHOP 7.26 X 3.96
W
RS
RS
RS
SHOP 7.26 X 3.96
RS
SHOP 7.26 X 3.96
SHOP 13.54 X 3.96 03
W
W
11
W
3.43 FIRE LIFT 1.52 X 2.40
10
W
FOYER 12.52 X 7.01
SHOP 6.99 X 3.96
41
1.54
SHOP 7.26 X 3.96 24
W
2.52
W
RS
RS
SHOP 7.26 X 3.96 09
17.35
RS
RS
SHOP 7.26 X 3.96 54
W
W
W
W
SHOP 7.26 X 3.96 52
SHOP 7.26 X 3.96 53
17.35
I.C.
40
RS
RS
RS
RS
SHOP 7.26 X 3.96 39
SHOP 7.26 X 3.96 38
W
CO2
6 KG
4.5KG
W
W
W
W
SHOP 6.99 X 3.96 35 SHOP 7.26 X 3.96 36
1.54
I.C.
RS
RS
RS
SHOP 7.26 X 3.96 23
W
W
W
W
SHOP 7.26 X 3.96 19 SHOP 7.26 X 3.96 20
RS
ABC 6 KG
RS
SHOP 7.26 X 3.96 08
3.08
W
SHOP 12.98 X 3.96 05
RS
B'
RS
RS
SHOP 7.26 X 4.67 07
W
W
C.O.P. 301.83SQ.MT.
RS
CO2
SHOP 7.26 X 3.96 37
RS
RS
SHOP 7.26 X 3.96 22
W
W
SHOP 7.26 X 3.96 21
17.35
17.35 0.60MT WIDE CHAJJA
I.C.
RS
0.60MT WIDE CHAJJA
I.C.
RAMP DN FROM GROUND FLOOR 13.69FLOOR TO BASEMENT
23.47
ABC TYPE FIRE EXTINGUISHER 4.00 CAPACITY 6 KG. I.S.I SAFETY KING CO2 TYPE FIRE EXTINGUISHER CAPACITY 4.5 KG. I.S.I SAFETY KING
ENTRY / EXIT
BASEMENT LINE I.C. MUNICIPAL LINE
ground floor fire layout
1.35
39
4.5KG
40 38
41 37
23
24 22
25
IH CO2
59
21
4.5KG
7
6
9 5
92
82
76
66
60
51
50
44
2.55 4.98
4.83 4.98
112 111 110
97 93
4.98
HOOTER
PASSAGEM.C.P SLAB TOP LVL +10.41
96 95 94
81 77
65 61
49 45
LVL +10.41 M SECOND FLOOR LEVEL
TREAD :0.30 RISER :0.156 SPRINKLE SYSTEM
80 79 78
HOOTER
PASSAGEM.C.P SLAB TOP LVL +5.43
64 63 62
48 47 46
LVL +5.43 M FIRST FLOOR LEVEL
SPRINKLE SYSTEM
42
HOOTER
36
35
26
20
27
19
HYDRANT POINT OUT LET
8
113
109
2.33
52
98
LVL +15.39 M THIRD FLOOR LEVEL
SPRINKLE SYSTEM
2.35
2.33
58
10
4
11
34
28
33 29
32 31 30
18
12
17 13
16 14
M.C.P
PASSAGE SLAB TOP LVL +0.45
LVL 0.4 PLINTH LEV LVL 0.00 M GROUND LEVEL
SPRINKLE SYSTEM
15
0.23
HOOTER
3
section aa’
HOSE BOX WITH HOSE PIPE LENGTH 15 MTR. I.S.I ABC 6 KG
SHOP 13.54 X 4.67 06
53
7.00 MT WIDE INTERNAL ROAD
1.54
CO2 4.5KG
3.08
W
57
HB
6 KG
4.5KG
W
17.35 0.60MT WIDE CHAJJA
RS
3.50
ABC
3.08
2.79
SHOP 7.26 X 3.96 51
4.88
RS
W
13.16
RS
SHOP 7.26 X 3.96 55
W
SHOP 12.98 X 3.96 04
67
HYDRANT POINT OUT LET 43
CO2
6 KG
ABC
4.01
IH
ABC
HOSE REEL 19 MM LENGTH 30 MTR. I.S.I SAFETY KING
3.35
SHOP 7.26 X 3.96 69
SHOP 7.26 X 3.96 56
13.16
SHOP 7.26 X 3.96 68
RS
RS
RS
56 54
HB
FIRE EXIT DOOR
SLUCIE VALVE C.I. 150 MM I.S.I
1.52
1.52
RS
SHOP 7.26 X 3.96 18
11.02
8.23
8.23
W
SHOP 6.99 X 3.96 67
4.07
W
W
A
SHOP 7.26 X 3.96 25
34
1.54
3.08
4.01
RS
UP
2.13
RS
RS
DN
2.13
RS
50
3.08
2.79
4.5KG
SHOP 6.99 X 3.96
2.13
SHOP 6.99 X 3.96
2.13
RS
8.23
CO2
3.08
VISITORS PARKING
4.07
RS
2.79
2.79
6 KG
0.43
S.T.P.
57
SHOP 7.26 X 3.96
8.23
ABC
3.00
W
RISER 0.16 TREAD 0.30
LIFT 2.36 X 2.74
RS
PERCOLATING WELL
4.00
HYDRANT VALVE 63 MM I.S.I
1.52
66
1.54
SHOP 7.26 X 3.96
UP
3.50
1.54
RS
RISER 0.16 TREAD 0.30 DN
FOUR WAY IN LET N.R.V VALVE
C.O.P. 301.83SQ.MT.
W
LIFT 1.52 X 2.40
1.52
W
RS
LIFT 1.52X 2.15 1.83
16.13
70
SHOP 6.99 X 3.96
UP
4.01
RS
0.15
W
SHOP 13.54 X 3.96 02
2.03
4.06
W
68
75
2.35
W
1.00
SHOP 7.26 X 3.96 12
17
FIRE
SHOP 7.16 X 3.96 13
1.25
RS
15
W
W1
RS
69
74
2.36
W
SHOP 7.26 X 3.96
12.29
W
SHOP 7.16 X 3.96 14
14.07
W
28
33
D1
W
13.16
31
W
W1
RS
SHOP 7.26 X 3.96
13.16
13.21
W
RS
SHOP 7.16 X 3.96 29
0.81
RS
RS
73
M.C.P
2
1
TREAD :0.30 RISER :0.16
M.C.P
SLAB TOP LVL -5.10
PASSAGE 1.66
58
SHOP 7.26 X 3.96
RS
SHOP 7.26 X 3.96
RS
72 70
PASSAGE HOOTER SLAB TOP LVL +15.39
128 127 126
2.24
W1
44
W
SHOP 7.26 X 3.96
1.11
48
2.51 LIFT 2.36 X 2.74
W
SHOP 7.16 X 3.96 30
55
0.60
0.30
59
W
MUNICIPAL LINE
1.00
SHOP 7.26 X 3.96
W
13.21
13.16
13.16
47
W
W1
RS
SHOP 7.26 X 3.96
CONTROL ROOM
ENTRY / EXIT
SHOP 7.26 X 3.96
RS
SHOP 7.16 X 3.96 45
SUBSTATION
MAIN ENTRY 35.66
RS
RS
1.78
RS
W
RS
M.C.P
RS
14.07
RS
DN
16.92
I.C.
RS
SHOP 7.26 X 3.96
65
2.13
RS
SHOP 7.26 X 3.96
2.13
SHOP 7.26 X 3.96 79
PERCOLATING WELL
60
W
SHOP 7.26 X 3.96
SHOP 13.54 X 3.96 01
TOILET BLOCK 7.16 X 2.95
RISER 0.16 TREAD 0.30
W
W
SHOP 7.16 X 3.96 46
HOOTER
D1
SHOP 7.26 X 3.96
W
1.52
150Ø SPRINKLER PIPE
D1
W1
LIFT 2.36 X 2.74
71 D1
SHOP 7.26 X 3.96 64
2.51
W1
2.79
B
150Ø HYDRANT PIPE
V2
W
HOOTER
35.66
43.80
I.C.
D1
W
72
78 D1
63
W
3.50
SHOP 7.26 X 3.96
RS
SHOP 7.26 X 3.96
M.C.P
RS
RS
SHOP 7.16 X 3.96 61
HOOTER
RS
RS
3.50
23.47
77
RS
BASEMENT LINE ELECTRICAL
13.69
17.35
17.35
3.50
SHOP 7.26 X 3.96
RS
SHOP 7.26 X 3.96
3.50
W
RS
SHOP 7.26 X 3.96
W
SHOP 7.16 X 3.96 62
M.C.P
W
SHOP 7.26 X 3.96
D1
W
73
3.50
76
W
HOOTER
RS
W
13.16
RS
SHOP 7.26 X 3.96
13.16
SHOP 7.16 X 3.96 74
RS
M.C.P
4.01
RS
SHOP 7.26 X 3.96
17.35
I.C.
71
4.5KG
125
2.35
W
SHOP 7.16 X 3.96 75
I.C.
0.60MT WIDE CHAJJA
83
HYDRANT POINT OUT LET
CO2
6 KG
I.C.
17.35
1.52
W
ABC
113.00
M.C.P
4.06
I.C.
0.60MT WIDE CHAJJA
HOOTER
I.C.
A' 17.35
3.00
IH
137.44
91
2.41
3.00
2.35
HB
89
129
114
108 107
HYDRANT POINT OUT LET
1.60
144 143 142
2.35
IH
130
124 123
116 115
141
5.10
121 120 119 118 117
146 145 140
4.98
2.33
132 131
122
ABC 6 KG
139
LVL +20.37 M FOURTH FLOOR LEVEL
SPRINKLE SYSTEM
4.98
138
HOOTER
PASSAGEM.C.P SLAB TOP LVL +20.37
160 159 158
2.35
137 136 135 134 133
157
LIFT SHAFT
HYDRANT POINT OUT LET
CO2 4.5KG
161
2.33
IH ABC 6 KG
162
156 155
148 147
176 175 174
4.83 4.98
154
2.35
149
173
4.83 4.98
153
177
4.83 4.98
152 150
172
4.79 4.94
151
171
164 163
4.83 4.98
170
2.35
165
SPRINKLE SYSTEM
2.33
169
178
LVL +25.35 M TERRACE FLOOR LEVEL
CO2 4.5KG
2.33
180 179
2.33
168 166
189
2.33
167
4.5KG
HB
150Ø HYDRANT PIPE 150Ø SPRINKLER PIPE
188 187
HYDRANT POINT OUT LET
CO2
6 KG
186
0.70
2.35 IH ABC
80Ø DRAIN PIPE
191 190
6 KG
HB
basement floor fire layout
SLAB TOP LVL +25.35 ABC
185 184 183 182 181
1.00
29.65 32.88
2.39
1
2.40 2.55
1.69
RAMP DN FROM GROUND FLOOR TO BASEMENT FLOOR
4.7
3.64
1.10
BUSTER PUMP
1.00
4.07
4.07
3.28
81.13
A
LVL +27.90 M MACHINE ROOM FLOOR LEVEL
BUTTERFLY VALVE C.I 100 MM
RAMP UP FROM BASEMENT FLOOR TO GROUND FLOOR
3.34
3.00
3.00
1.50
3.00
3.00
1.50
1 4.7
1.50
MACHINE ROOM
2.55
G.I. PIPE "C" CLASS 25 MM I.S.I.
LIFT 1.52X 2.15
G.I. PIPE "C" CLASS 25 MM I.S.I.
4.17
G.I. PIPE "C" CLASS 25 MM I.S.I.
FIRE
M.C.P
HOOTER
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
1.83
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
4.31
G.I. PIPE "C" CLASS 50 MM I.S.I.
1.52
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
3.00
G.I. PIPE "C" CLASS 50 MM I.S.I.
FIRE
G.I. PIPE "C" CLASS 25 MM I.S.I.
1.52
G.I. PIPE "C" CLASS 25 MM I.S.I.
RISER 0.16 TREAD 0.30 UP
1.50
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
2.13
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
4.17
G.I. PIPE "C" CLASS 50 MM I.S.I.
4.17
LIFT 2.36 X 2.74
1.83
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
4.15
1.50
G.I. PIPE "C" CLASS 25 MM I.S.I.
LIFT 2.36 X 2.74
M.C.P
HOOTER
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
4.17
3.00 2.51
2.13
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
3.00
G.I. PIPE "C" CLASS 50 MM I.S.I.
4.98
4.17
1.50 G.I. PIPE "C" CLASS 25 MM I.S.I.
M.C.P
G.I. PIPE "C" CLASS 25 MM I.S.I.
LIFT 2.36 X 2.74
4.17
1.83
B
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
35.66
150Ø HYDRANT PIPE 150Ø SPRINKLER PIPE
4.17
G.I. PIPE "C" CLASS 25 MM I.S.I.
1.50
3.00
G.I. PIPE "C" CLASS 25 MM I.S.I.
1.52
4.18
4.17
1.50
3.00 G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
4.17
G.I. PIPE "C" CLASS 50 MM I.S.I.
4.18
1.50
G.I. PIPE "C" CLASS 25 MM I.S.I.
4.17
4.15
1.50 G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
1.52
4.18
4.17
G.I. PIPE "C" CLASS 25 MM I.S.I.
2.13
4.15
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
3.00
4.17
1.50 G.I. PIPE "C" CLASS 25 MM I.S.I.
1.14
4.17
4.17
G.I. PIPE "C" CLASS 25 MM I.S.I.
1.52
4.17
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 50 MM I.S.I.
G.I. PIPE "C" CLASS 25 MM I.S.I.
3.00
1.50
G.I. PIPE "C" CLASS 25 MM I.S.I.
3.00
G.I. PIPE "C" CLASS 50 MM I.S.I.
3.00
1.50
SPACE FOR PLUMBING + FIRE PUMP ROOM
3.00
3.00
3.37
4.06
3.84
LIFT PIT
LVL -5.10 M BASEMENT LEVEL
0.60MT WIDE CHAJJA 113.00
161
SHOP 7.26 X 3.96
RS
RS
RS
152
FIRE
W1
SHOP 7.26 X 3.96
W1
V1 D1
TOI. D1 BLK
145
SHOP 7.26 X 3.96
RS
RS
RS
RS
136
D1
W
W
W
2.51
W1
SHOP 7.26 X 3.96
W1
LIFT 2.36 X 2.74
129
RS
RS
SHOP 7.26 X 3.96
118
115
SHOP 7.26 X 3.96 119
SHOP 7.26 X 3.96 114
SHOP 7.26 X 3.96
RS
RS
RS
RS
120
FIRE
SHOP 10.93 X 3.96 101
W
W
W
SHOP 10.93 X 3.96
W
12.29
W
SHOP 7.16 X 3.96 116
102
14.07
131 SHOP 7.26 X 3.96 130
13.16
RS
RS
W
SHOP 7.26 X 3.96
SHOP 10.93 X 3.96 103
W
W
3.43
W
LIFT 1.52 X 2.40
FIRE LIFT 1.52 X 2.40
113
SHOP 10.01 X 3.96 104
RS
RS
RS
RS
SHOP 7.26 X 3.96
W
W
SHOP 7.26 X 3.96
RS
RS
DN
SHOP 6.99 X 3.96 144
UP
1.54
3.08
W
2.79
W
W
2.52
SHOP 7.26 X 3.96 121
RS
RS
DN
SHOP 7.26 X 3.96 112
UP
1.54
SHOP 6.99 X 3.96 170
RS
SHOP 7.26 X 3.96 171
RS
RS
RS
RS
SHOP 7.26 X 3.96 159
W
W
SHOP 7.26 X 3.96 154
RS
RS
SHOP 6.99 X 3.96
CO2 4.5KG
3.08
W
143
W
SHOP 6.99 X 3.96
RS
RS
RS
RS
RS
RS
138
SHOP 7.26 X 3.96 127
W
W
SHOP 7.26 X 3.96 122
ABC 6 KG
SHOP 10.37 X 3.96 105
RS
SHOP 10.37 X 3.96 106
RS
1.54
RS
RS
SHOP 7.26 X 3.96 111
RS
RS
SHOP 7.26 X 3.96
RS
RS
SHOP 7.26 X 3.96
3.08
CO2 4.5KG
3.08
W
W
W
first and second floor fire layout
0.60MT WIDE CHAJJA
B'
1.52 2.13 5.23
1.52
D 1.25
72 70
73 69
74
68
57 53
58
52
40 38
41 37
24 22
25 21
7
6
9 5
1.11
92
83
75
82
76
67
59
51
66
60
50
44
35
97 93
81 77
65 61
49 45
26
20
27
10
4
33 29
19
11
18
12
17 13
2.55 2.55 2.25
1.53
48 47 46
TOILET
4.98
LVL +5.43 M FIRST FLOOR LEVEL
SPRINKLE SYSTEM
HOOTER M.C.P
PASSAGE SLAB TOP LVL +0.45
32 31 30
4.98
0.60 1.53
LVL +10.41 M SECOND FLOOR LEVEL
HOOTER
PASSAGEM.C.P SLAB TOP LVL +5.43
64 63 62
4.98
0.60
1.00
2.45
1.95 2.45
1.95 2.45
TOILET
SPRINKLE SYSTEM
80 79 78
14
2.75
2.13
4.83 4.98
96 95 94
16
0.60
HOOTER
PASSAGEM.C.P SLAB TOP LVL +10.41
TREAD :0.30 RISER :0.156 34
28
0.30 1.00
4.83 4.98
112 111 110
4.98
91
98
LVL +15.39 M THIRD FLOOR LEVEL
SPRINKLE SYSTEM
113
109
TOILET
1.53
99
HYDRANT POINT OUT LET
8
114
108
42
36
M.C.P
SLAB TOP LVL +15.39
128 127 126
0.60
90
84
HOOTER PASSAGE
2.75
2.35 IH CO2
1.15
2.55 2.40 2.33
107
2.41
0.30
1.00
5.33
M.C.P
HOOTER
2.13
10.57
TOILET
LVL 0.45 M PLINTH LEVEL LVL 0.00 M GROUND LEVEL
SPRINKLE SYSTEM
15
0.23 HOOTER
3
2
1
TREAD :0.30 RISER :0.16
M.C.P
PASSAGE
SLAB TOP LVL -5.10
LVL -5.10 M BASEMENT LEVEL
section bb’
pe
O.H.W.T.
Slo
pe Slo
pe Slo
pe Slo
100
125
R.W.P.
pe
R.W.P.
115
2.36
1.25
39
23
4.5KG
144 143 142
Slo
R.W.P.
pe
R.W.P.
Slo
R.W.P.
RISER 0.16 TREAD 0.30 DN
1.54 1.54 3.08 3.38
O.H.W.T.
pe
R.W.P.
D
LIFT 2.36 X 2.74 3.72
Slo
pe
Slo
R.W.P.
4.5KG CO2
LIFT 1.52 X 2.40
ABC 6 KG
9.35
9.35 1.52
1.52 2.13
5.33 2.13 6 KG ABC
A
M.C.P
HOOTER
M.C.P
2.06
1.54 1.54 3.08 3.38
D
CO2
6.38
8.75
D
D
RISER 0.16 TREAD 0.30 DN
4.5KG
HOOTER
D LIFT 1.52X 2.15 2.88
6 KG
LOWER TERRACE LEVEL +19.91MT
FIRE
ABC
FIRE
4.63 FIRE LIFT 1.52 X 2.40
106
124
129
LVL +20.37 M FOURTH FLOOR LEVEL
SPRINKLE SYSTEM
4.65
B
LOWER TERRACE LEVEL +19.91MT
3.72 LIFT 2.36 X 2.74
116
2.35
85
HB
3.72 LIFT 2.36 X 2.74
130
123
HYDRANT POINT OUT LET 43
4.5KG
0.81
OPEN TERRACE LEVEL +24.89MT
141
TOILET
4.98
pe
pe
IH CO2
6 KG
OPEN TERRACE LEVEL +24.89MT
89
HB
ABC
OPEN TERRACE LEVEL +24.89MT
71
56 55 54
FIRE EXIT DOOR
HOOTER
PASSAGEM.C.P SLAB TOP LVL +20.37
160 159 158
5.10
R.W.P.
Slo
Slo
pe
pe
Slo
R.W.P.
157
146 145
140 139
132 131
HYDRANT POINT OUT LET
CO2 4.5KG
0.60
45 M VEL
OPEN TERRACE LEVEL +24.89MT
138
2.33
R.W.P.
ABC 6 KG
161
4.95
R.W.P.
pe
R.W.P.
Slo
Slo
Slo
2.79
third floor fire layout Slo
R.W.P.
pe
R.W.P.
pe
R.W.P.
13.69
IH
A'
88 86
HB
W2 17.35
156
1.53
V3
0.60MT WIDE CHAJJA
105 104 103 102 101
87
W
176 175 174
0.60
V3
0.60MT WIDE CHAJJA
137 136 134 133
W
W
173
1.53
W2 17.35
0.60MT WIDE CHAJJA
4.5KG
PANTRY 1.83X1.52
TOILET 1.83X1.52
177
LVL +25.35 M TERRACE FLOOR LEVEL
1.95
1.52 2.13
2.13
V3
11.02
V3
SPRINKLE SYSTEM
2.45
W2 17.35
TOILET 1.83X1.52
CO2 4.5KG
1.95
PANTRY 1.83X1.52
W
191 190
2.45
17.35
A
W
W
148 147
2.35
TOILET 1.83X1.52
W
149
HYDRANT POINT OUT LET
CO2
6 KG
W
162
155
2.33
V3
PANTRY 1.83X1.52
IH
1.60 ABC
2.03
V3
V3
W
W
8.23
W
HB
W
154
121 120 119 118 117
3.08
3.08
W
SHOP CA= 276.76 SQ.MT. 311
164 163
122
1.35
V3
W
0.15
W2
TOILET 1.83X1.52
135
1.54
CO2 4.5KG
178
172 171
2.35
PANTRY 1.83X1.52
W
SHOP CA= 274.46 SQ.MT. 310
13.16
W
W
W W 13.16
W
6 KG
3.08
8.23
W
W SHOP CA= 274.46 SQ.MT. 309
2.79
W
8.23
SHOP CA= 274.46 SQ.MT. 308
ABC
165
189
HYDRANT POINT OUT LET
CO2 4.5KG
1.00
V3
1.54
IH ABC
B'
UP
pe
17.35
V3
W
W
W 8.23
W2
TOILET 1.83X1.52
W
2.52
CO2 4.5KG
6 KG
8.23
3.08
W
PANTRY 1.83X1.52
W
ABC
3.08
16.13
2.79 SHOP CA= 273.77 SQ.MT. 307
3.08
2.79
W
W
1.54
RISER 0.16 TREAD 0.30 DN
152 151 150
HB
6 KG
Slo
1.54
RS
LIFT 2.36 X 2.74
UP
1.52
1.54
CO2 4.5KG
14.07
6 KG
2.79
ABC
RS
1.52
RISER 0.16 TREAD 0.30 DN
1.52
1.54
RS
170
153
150Ø HYDRANT PIPE 150Ø SPRINKLER PIPE
W
188
2.13
W
M.C.P
HOOTER
M.C.P
W
LIFT 1.52 X 2.40
180 179
169
2.33
3.43 FIRE LIFT 1.52 X 2.40
80Ø DRAIN PIPE 35.66
W
168 167 166
W
SHOP CA= 463.41 SQ.MT. 301
187
HYDRANT POINT OUT LET
CO2 4.5KG
1.52
2.13
W
2.13
LIFT 1.52X 2.15 1.83 W
RS
UP
2.13
RISER 0.16 TREAD 0.30 DN
1.52
RS
2.35
12.29
14.07
W
1.78
13.16
W
IH
W
RS
FIRE
W
ABC 6 KG
W1
LIFT 2.36 X 2.74
RS
D1
W SHOP CA= 276.76 SQ.MT. 302
RS
W
W
13.16
13.21
13.21
13.16
RS
FIRE
M.C.P
V1
2.51
W1
TOI. D1 BLK
W
W
HOOTER
RS
W
W1
M.C.P
D1
W1
HOOTER
D1
W
D1
LIFT 2.36 X 2.74 HOOTER
D1
HOOTER
D1
W1
W SHOP CA= 276.76 SQ.MT. 303
TOILET BLOCK 7.16 X 2.95
2.13
B
D1
2.51
W1
W
W
186
2.35
35.66
RS D1
13.16
13.16
LIFT 2.36 X 2.74
W
V2
W1
W
M.C.P
3.50
23.47
2.51
W1
W
W SHOP CA= 276.76 SQ.MT. 304
CO2
W
W
4.5KG
W
W SHOP CA= 276.76 SQ.MT. 305
6 KG
W
W
ABC
W SHOP CA= 276.05 SQ.MT. 306
13.16
HB
W
SLAB TOP LVL +25.35 ABC 6 KG
185 184 183 182 181
0.30
W
1.00
TOILET 1.83X1.52 PANTRY 1.83X1.52
4.83 4.98
V3
2.75
V3
V3
2.13
V3
0.30
PANTRY 1.83X1.52
1.00
TOILET 1.83X1.52
4.83 4.98
W
2.75
W
2.13
TOILET 1.83X1.52 PANTRY 1.83X1.52
LVL +27.90 M MACHINE ROOM FLOOR LEVEL
0.30
V3
13.69
1.00
V3
V3
BUSTER PUMP
4.83 4.98
V3
17.35 W2
17.35 W2
SLAB TOP LVL +27.90 BUTTERFLY VALVE C.I 100 MM
2.75
PANTRY 1.83X1.52
WATER TANK
2.13
TOILET 1.83X1.52
LVL +30.45 M FLOOR LEVEL
GO TO O.H.W.T
13.69
0.30
W
RS
4.94
W
RS
SHOP 10.93 X 4.67 108
2.55 2.40
0.60MT WIDE CHAJJA
113.00
W
109 17.35
0.60MT WIDE CHAJJA
PANTRY 1.83X1.52
W
2.33
TOILET 1.83X1.52
SHOP 7.26 X 3.96 124
2.35
V3
W
2.33
V3
V3
W
2.33
V3
SHOP 7.26 X 3.96 125
2.35
PANTRY 1.83X1.52
W
110
SHOP 10.93 X 4.67 107
2.33
TOILET 1.83X1.52
SHOP 7.26 X 3.96 140
17.35
0.60MT WIDE CHAJJA 17.35 W2
SHOP 7.26 X 3.96 123
2.35
W
17.35
17.35 W2
W
2.33
W
0.60MT WIDE CHAJJA
A'
W
0.70
A
SHOP 7.26 X 3.96 141
SHOP 7.26 X 3.96 126
1.00
SHOP 7.26 X 3.96 156
SHOP 7.26 X 3.96 139
2.39
RS
W
2.24
SHOP 7.26 X 3.96 157
17.35
W
RS
SHOP 7.26 X 3.96 142
1.69
SHOP 7.26 X 3.96 172
W
W
17.35
17.35 W2
RS
3.64
W
RS
3.34
W
SHOP 7.26 X 3.96 155
1.10
8.23
188
W
1.00
SHOP 7.26 X 3.96 173
W
11.02
RS
SHOP 7.26 X 3.96 158
8.23
RS
187
W
W
13.16
SHOP 7.26 X 3.96 174
13.16
SHOP 7.26 X 3.96
RS
8.23
W
RS
8.23
SHOP 7.26 X 3.96
8.23
W
14.07
16.13
RS
ABC 6 KG
B'
1.52
RISER 0.16 TREAD 0.30
LIFT 2.36 X 2.74
SHOP 7.26 X 3.96 128
3.50
3.08
175
RS
2.79
SHOP 6.99 X 3.96
RS
3.08
2.79
RS
186
4.5KG
RS
137
2.79
SHOP 7.26 X 3.96
CO2
2.79
ABC 6 KG
SHOP 6.99 X 3.96
1.54
1.52
153
1.52
RISER 0.16 TREAD 0.30
1.83
160
2.13
RS
2.13
RS
169
1.52
LIFT 1.52X 2.15
1.52
SHOP 6.99 X 3.96
UP
1.54
3.50
DN
176 1.54
W
RS
134 SHOP 7.26 X 3.96 135
13.16
13.21
W
SHOP 7.26 X 3.96
RS
3.50
RS
W
W
SHOP 7.16 X 3.96 117
35.66
W1
2.51
LIFT 2.36 X 2.74
W
SHOP 7.26 X 3.96
W
1.78
W1
147 SHOP 7.26 X 3.96 146
2.13
SHOP 6.99 X 3.96
RS
RS
185
2.13
SHOP 7.26 X 3.96
2.13
W
168
SHOP 7.26 X 3.96
RS
W
TOILET BLOCK 7.16 X 2.95
RISER 0.16 TREAD 0.30
B
RS
RS
150 SHOP 7.26 X 3.96 151
SHOP 7.16 X 3.96 132
M.C.P
D1
RS
RS
3.50
D1
RS
W
13.69
17.35
RS
HOOTER
177 D1
HOOTER
D1
SHOP 7.26 X 3.96
W
W
2.13
V2
D1
W1
LIFT 2.36 X 2.74
W
SHOP 7.26 X 3.96
RS
1.52
35.66
184 D1
2.51
W1
163 SHOP 7.26 X 3.96 162
SHOP 7.26 X 3.96
W
M.C.P
SHOP 7.26 X 3.96
RS
RS
W
3.50
RS
RS
166 SHOP 7.26 X 3.96 167
RS
SHOP 7.16 X 3.96 133
HOOTER
RS
W
SHOP 7.26 X 3.96
RS
17.35
SHOP 7.16 X 3.96 148
3.50
RS
W
W
W
13.16
SHOP 7.26 X 3.96
W
SHOP 7.26 X 3.96
W
13.16
W
3.50
SHOP 7.26 X 3.96 178
23.47
179
SHOP 7.26 X 3.96 183
SHOP 7.26 X 3.96
RS
SHOP 7.16 X 3.96 149
M.C.P
RS
182
W
RS
HOOTER
RS
SHOP 7.26 X 3.96
W
13.16
SHOP 7.26 X 3.96
RS
13.16
W
RS
17.35
SHOP 7.16 X 3.96 164
M.C.P
W
17.35
13.21
W
SHOP 7.16 X 3.96 165
M.C.P
0.60MT WIDE CHAJJA
SHOP 7.16 X 3.96 180
HOOTER
A' 17.35
SHOP 7.16 X 3.96 181
R.W.P.
terrace floor fire layout
PROFESSIONAL TRAINING
47
miscellaneous
COMPETITION PROJECT SHORTLISTED
MODELS
beam column construction
the k.o. leen aberdeen library
architectural space making model structural model
millenium dome
chaitya architectural thesis model
chaitya
architectural space making model
lotus temple model
architectural design studio - 1
section detail in column
Langkawi Sky Bridge, Langkawi.
Piplia Rao ji, Piplia.
Jama Masjid, Khambhat.
Singapore Flyer, Singapore.
Lotus Temple, New Delhi. Universal studio, Singapore.
K.L. tower, Kuala Lumpur
PHOTOGRAPHY
Dubai, U.A.E.
- MIES VAN DER ROHE
less is more
+91 - 7878199000 rjuneja9@gmail.com