ACADEMIC PORTFOLIO SELECTED WORKS: 2014-2019 RITA GANDRA
CURRICULUM VITAE Professional experience:
- September 2014- September 2015: Marketing department manager in Cores do Açucar de Olinda Gandra, Valongo (Portugal)- costumer service; cashier; stock control/shelf life; promotions, livening up parties and themed events; criation of parties play materials - November 2017- January 2018 : Merchandising – AMLIVE – costumer service; Sellin show merchandising; ticket sales support; promotion and streamline event. - November 2018- - Cenography Project for AMLIVE- Foyer
Academic experience:
- 2011-2014 - Ermesinde High School- Visual Arts - 2014-2016 - Architecture School, Minho University - 2016-/ ... - Architecture School, Porto University -2018/2019 - Politecnico di Milano, Leonardo- Erasmus Program
Formation:
- 2014/2015, Annual exhibition- Architecture School, Minho University - 2015/2016, Annual exhibition- Architecture School, Minho University - 2016/2017, Annual exhibition- Architecture School, Porto University - October 12 to december 14, 2016- Training in rhino 3D e Vray- Final grade of 14 - February 2017 - Photography: exhibition Architecture and the Body Within - October 2017 - Worshop in stopmotion- Animation House of Porto - November 5th 2017- Contest FAUP Instalation, FAUP Students Association - November 6, 2017 - Workshop methods and character development Cinanima Festival - November 8, 2017 - Workshop animation techniques 2D digital, Cinanima Festival - November 9, 2017 - Workshop introdution to 2D digital animation, Cinanima Festival - November 10, 2017 - Workshop character animation in after effects in flat design, Cinanima Festival - April 05, 2018 - Workshop lighting in Architecture at Faup - May and June 2018- Italian classes , A1 level- Oporto Italian Consulate- Final grade 17 - November 2018 - Project book- compilation of the third year best papers in the 2017/2018 school year
Personal skills:
Main language: Portugueses Other languages: Understanding Oral understanding Reading English C1 C2 Spanish B1 B1 French B1 B1 Italian B1 B1
Software:
Autocad Photoshop Indesign Rhinoceros Revit
Speakin Oral interaction Oral prodution C1 C1 B1 B1 A1 A1 A1 A1 Archicad Illustrator Lumion Sketchup Microsoft Office
MOTIVATION LETTER I´m a Portuguese architecture student, that has decided to embrace a new challenge by finding a new opportunity outside my comfort zone. I´m looking for a new experience, in a new environment with a different culture and language. I’m aiming to challenge my perspective and my experience in the architectural field, so i´m searching for an internship during the summer of 2019, that would help me to develop more skills and introduced me to the real world in which the exercise of architecture is no longer abstract but real, with new barriers and frontiers. In this sense, I found out that your company fits the profile that I’m looking for because, in one hand, I relate to the style that you express through architecture, as well as the interest that I have for the process of making it. In the other hand, the opportunity that your company could give me to learn new things and comprehend different concepts and aspects of the architecture made there.
Personal information: Age: 22
PT Address: Rua Lameira Ferreira, nº46, 4440-671, Valongo, Portugal UK Address: 23 york way Hampton road west feltham, Tw13 6bq Contact: +351913533342 E-mail: ritasgandra@hotmail.com Find me : - https://www.linkedin.com/in/rita-gandra-a77295105/ - https://www.instagram.com/ritaagandra/?hl=pt
RITA GANDRA
1
2
INDEX
PROJECTS . COMPETITIONS . WORK
COLLECTIVE HOUSING, LIMA- PORTO AT FAUP - 3 TH EYEAR
3
SCALO LAMBRATE- ERASMUS PROJECT, MILAN- 5TH EYEAR
6
CAMPANHÃ CINEMA CLUB, PORTO AT FAUP - 4TH EYEAR
10
“DELIRIOUS GUIMARÃES”, AT UNIVERSITY OF MINHO - 2 TH EYEAR
14
. ACADEMIC DRAWINGS - 1TH AND 2 TH EYEAR
16
ILLUMINATION INSTALATION AT FAUP - 4 TH EYEAR
17
.
COLLECTIVE HOUSING, LIMA
MODEL OF THE PROJECT
PHOTOS
IMPLANTAION PLAN 1:1000
IMPLANT
PORTO - FAUP . September 2016 - June 2017 . This project appears in a wasteland, with a vast area, located next to one of the most iconic constructions of collective housing in the Porto city.
143.84
144.09
S.S.
C.R.
DE A SANT RINA
CATA
CASA DE E SAUD
My proposal arises, in this context, from the design of a volumetric set of shapes that are enhanced by altimetry and implantation. A set of scales, governed by the new linear axis created in the middle of the lot, from which, the built develops a growing scale as we enter the lot. Thus, a first skin appears which draws the front of the street and encloses the block itself, introducing in its core a contrasting element that appears as a rupture and dynamic before the surrounding.
R
143.61
145
DA
GIO
COLE
ORA
SENH
145.28
142.63
PAZ
141.27
148.54 139.51
A
155.22 139.51
O
EIS
ITUT
DOS
TEXT
INST
A volume in height, marked by its horizontal extension in the ground, apparently connected with the idea of a wall but thought like a tripartite piece that rises from the floor with pilotis. In this way, it is marked by the strong presence of accessibility, as well as the theme of common space that can be used by all. Materiality, the game of lights and the presence of red color in contrast to the vast existence of concrete and glass create the uniqueness of the building.
152.19
145.48 157.70
158.34
C.C.
144.06
158.26
161.32
B
C.C.
R
Isidro
Santo
de
Travessa
D RR
PAIVA O
DE
CAMP
DO TRAVESSA
CHOSEN BUILDING TO DEVELOP THE PROJECT 1:100
E
139.13
139.13
146.27
143.90
S OF THE FIELD
3
PROJECT DRAWINGS - FRONT VIEW AND BACK VIEW
G 147.31
146.86
146.29
TAION PLAN 1:500
149.08
150.54
147.07
153.43
143.13
147.15
154.89 153.32
151.22
158.27
155.11
148.91 156.65 151.28
148.69 146.25
150.68
145.65
149.64 150.55
150.35
145.24
147.11
159.70
149.01
145.80
147.18
147.06
147.78
145.93
146.40
145.95 145.77
146.93
5.19
158.23
153.35
151.72 146.85
155.64
156.76
149.88
148.69
154.62
149.40 148.52
147.31
145.01
154.71
150.25
146.85
147.09
143.10
145.95 145.80
8
142.08 142
143
A'
142.65 152.59
152.59
LIM A
142.5
152.59
152.59 157.79 160.39
144,33 156.30
RU A
159.50 151.20 151.20
140.5
141
141
141.5
142.5
142
143
143
142
143.5 144
143.80
144
B'
151.20 149.94
152.04
145.61
DO
143.55
152.18
144
146.44
143.3
142.39
143.30
143.5
147.04
147.04
142.52
0
147.01
147.01
158.00
D'
A
LIM
143
158.37
150.01
149.65
159.38
160.22
152.19
155.43
RUA
139.21
DA
ALEGRIA
140.72
141.58
141.12
141.84
142.22
142.00
141.06 140.21
174.97 178.70
157.75
143.37
141.12
140.08
152.41
139.79
144.01
142.14
175.75
144.34 179.13
143.44
144.61
140.38
139.24
142.74
156.38
170.94
170.92
171.04
139.27
G'
PLANTA DE COBERTURAS
E'
COLLECTIVE HOUSING, LIMA
CHOSEN BUILDING TO DEVELOP THE PROJECT 1:100 - LEVEL 0, 1 AND 2
PLANTA PISO RÉS DO CHÃO PLANTA PISO 1
PROJETO III - 2016 / 2017 - FAUP
C'
A
B
C
A'
B'
C'
A
B
C
ALÇADO LATERAL CORTE PELA LAVANDARIA / C C'
PAINEL 2 ESCALA 1/100
CORTE PELA COZINHA / A A'
CORTE PELAS ESCADAS / B B'
C' B' A'
PLANTA PISO 2 PLANTA PISO 3 PLANTA PISO 4
B'
PLANTA PISO 1 PLANTA PISO 2 PLANTA PISO 3
A'
PLANTA PISO RÉS DO CHÃO PLANTA PISO 1 PLANTA PISO 2
"EDIFÍCIO HABITACIONAL PLURIFAMILIAR: DESENHO E CONSTRUÇÃO" EXERCÍCIO Nº2 - 3º FASE - ENTREGA FINAL - 16.06.2017 RITA GANDRA
SECTIONS AA´ 1:100 SECTIONS BB´ 1:100
C B A
4
CHOSEN BUILDING TO DEVELOP THE PROJECT 1:100 - LEVEL 3, 4 AND 5
A
B
C
A'
B'
C'
A
B
C
A'
B'
C'
B
B
6
CORTE BB´
1
4
6 4
2
6
A
A´
A
A´
3
1- HALL; 2- COZINHA; 3- SALA;
CORTE AA´
"EDIFÍCIO HABITACIONAL PLURIFAMILIAR: DESENHO E CONSTRUÇÃO"
B´
B´
ALÇADO LATERAL
CORTE PELA LAVANDARIA / C C'
SIDE FACADE SECTIONS CC´ 1:100
5
C'
4
B'
PLANTA PISO 7 PLANTA PISO 8 PLANTA DE COBERTIRA
A'
PLANTA PISO 5 PLANTA PISO 7 PLANTA PISO 8
C
PLANTA PISO 3 PLANTA PISO 4 PLANTA PISO 5
B
PROJETO III - 2016 / 2017 - FAUP
A
COLLECTIVE HOUSING, LIMA PLAN APARTMENT T3- LEVEL 1- 1:50
A´
PLAN APARTMENT T3- LEVEL 2- 1:50 A
C'
C
C'
A
6
3 6
B
B
B´
B´
6
4
4
5 1 4
2 A´
A´
PLAN APARTMENT T3- LEVEL 1- 1:50
B'
C'
B
B'
A
6 6
CORTE BB´
B´
CORTE AA´
CORTE AA´
6
4
CORTE BB´
B
4
5
CONSTRUCTIVE DETAILS 1:10
2
1 1
4
6
41
8
8
4
6
10
4
17
10 7 5 3 11 12 13 14 15
12
16
13
11
18
2 1 12 28
27
22
17
19
20
21
12
31
3
3
12
21
12
15
16
22
23
17
19
20
17
19
20
13 30
1- Ventilated facade - concrete reinforced with glass fiber - air box- 1.5 cm 2- Fixation System 3- Concrete slab- 20 cm 4- Concrete fasteners- 60 cm / 40 cm/ 5 cm 5- Layer shape 6- Thermal insulation 7- Elastic Joint 8- Waterproof Screens 9- Metal Parts 10- Geotextile screen 11- Pre-rim 13
11
12
28
29 27
12
22
17
19
20
21
12
12-Thermal Insulation - 8 cm 13- Aluminum sliding frame 14- Sliding door 15- False ceiling in plasterboard 16- Pivot 17- Drain box - 10 cm 18- Solid Wood Piece 19- Micro concrete - 3 cm 20- Waterproof screen 21- Straightening layer - 10 cm 22- Cobogรณ 23- Wood Floating floor 18
27
3
3 24
12
21
25
26
22
SCALO LAMBRATE, MILAN
PHOTOS OF THE FIELD
ERASMUS PROJECT, MILAN CITY PLAN AND RESIDENCE BUILDING This is a project for an area in the outskirts of Milan characterized by its implementation, strongly linked to the railroad wall. An emptiness created by this megastructure, which is characteristic and recurrent in the city of Milan. The project appears conscious of this physical barrier and tries to solve it taking into account the vast scale of the field. In this sense, tries to bring into it the element of the green, as a barrier to the noise as well as the wall scale. On the other hand, we tried to bring the accessibility theme and free circulation as one of the main characteristics of this plan. The scale here is assumed in different ways because of the square sequence along the pedestrian passage, that is marked by different types of buildings and their variation in height. The moment of exception appears in the center as a big open space for the main services that are related to the larger and higher building on the field. In this case, this is a building with a geometry that tries to connect the different built parts of the field and assumes itself as a structure facing all the sides of the city. This is a building characterized by the presence of the typologies, co-housing, social housing, and residence housing and therefore, it follows the idea of the common space maximization, transversal to all, creating towards the interior the galleries and for the exterior the dwelling. EAST FACADE 1:200
IMPLANTAION PLAN 1:2000
RENDERS OF
THE CHOSEN BUILDING AND PUBLIC SPACE
6
SCALO LAMBRATE, MILAN RENDERS OF THE CHOSEN BUILDING AND PUBLIC SPACE - INSIDE AND OUTSIDE
GARAGE, FIRST FLOOR AND SECOND FLOOR PLAN 1:200
SECOND FLOOR PLAN 1:200
THIRD FLOOR PLAN 1:200
WEST FACADE 1:200
7
FOURTH FLOOR PLAN 1:200
ROOF PLAN 1:200
SCALO LAMBRATE, MILAN RENDERS OF APARTMENTS INTERIOR 1
SECTION AA´1:50
SECTION BB´1:50
SECTION AA´1:200
APARTMENT 2
APARTMENT 3
8 APARTMENT 4
APARTMENT 5
1
2
3
4
5
6
SECTION BB´1:200
APARTMENT 6
2
SCALO LAMBRATE, MILAN
CONSTRUCTIVE DETAILS AND NORTH FACE 1:10
1- Concrete Fasteners
1
1
2
2
3 4
3 4
3- Waterproofing Screens
5 6
5 6
4- Structure for the Fasteners
7
7
8
8
2- Thermal Insulation
5- Rubber Band 6- Layer Shape 7- Concrete 8- Outdoor Lighting 9- Interior Blind 10- Running Frame 11- False Ceiling - Pladur 12- Sliding Door 13- Handrail 14- Floating Wooden Floor 15- Structure of the Floating Wooden Floor 16- Marble 17- Micro Concrete
13 14 7 18 7 19 11 22 21 18
13 14 7 18 7 19 11 22 21 18
18- Thermal Insulation 19- Pivot 20- Air Box 21- Brick 22- Plaster 23- Wooden Footer 24- Earth
6 7
6 7
9
9 10
10
9
1
1
2
2
3 4
3 4
5 6
5 6
7
7
8
8
9 10
9 10
11
11
12
12
13
6 14 15 16 17 6 18 7 8
10
13
6 14 15 16 17 6 18 7 8
10
17
17
6
6
7 18
7 18 7
7 8
8 19
19
CAMPANHĂƒ CINECLUB
PHOTOS OF THE FIELD
PORTO - FAUP PROJECT FOR A SCHOOL AND CINEMA This project appears on a field near to the Porto city center train station, in an area of easy accessibility, strongly related to a residential building area. The existence of buildings related to the culture exposition is not present here. That’s why this project and idea appears in this area.
2
79.4
5
74.3
75
0
73.6 5
74.3
My idea for the intervention, in this sense, is to create a building in which the seventh art is celebrated, presenting it to the whole community as accessible. This is a building marked by a strong and compact form, associated with the existence of two volumes connected together in their center by an exterior auditorium, to me the heart of the project. A geometry that tries to regularize the field borders, working the program in the interior as compact and closed, almost the time to the exterior. The program is distributed in the building according to these two volumes by separating the private parts to the longest and narrowest volume and the public part to the other one.
9
77.4
72.4
4
73.5
PLAN 1:500 4
77.3
6
74.1
1
76.8
7
82.7
7
74.2
3
2
76.7
81.3
3
76.8
5
75.9 3 76.3
5
74.4
3
74.1 9
74.6 8
77.3
2
78.4 0
74.9
1
2
75.6
75.7
8
80.1
7
79.2
1
83.8
SOUTH FACADE 1:100
9
81.9
5
85,2
1
79.4 9
1
83.0
83.6
8
84.3
4
84.3
4 85.6
3
85.3
6
87.5
5
86.9 2
90.9
2
86.9
3
8
82.1
84.9
1
80.5
8
86.5
0
90.2
6
79.1
6 86.4
0
81.5 3
89.4
.84
83 2
87.8
81.
10 DRAWINGS OF THE BUILDING
8
73.9
6
74,4
5
72.1
3
5
72.7
9
67.0 4
68.6
5
67.4
1
72.4
2
7
67.6
6
72.0
67.3
7
67.0 4
72.5
9
5
71.4
68.6
3
68.7
5
69.2
46
5
69.6
4
69.7
6
70.8
7
69.8
7
69.5
1
69.2
8
69.6
4
69.9 7
71.3
4
2
67.6
69.3
5
5
67.4
68.9 2
8
5
69.9
1
70.4
67.3
68.7
4
68.3
5
67.0
5
68.9 3
69.0 6
69.3
9
67.2
3
67.2
7
70.0
6
66.6
8
67.4 5
66.7
2 72.2 7
9
68.2
67.6
6
68.3
9
67.5 8
66.7
7
72.4
2
67.6
6
66.4
6
68.1
2
66.1
5
67.8
2
68.1
1
66.5
6
66.4
RUA DE
1
71.3
4
71.8
8
65.7
6
67.6
JUSTINO IRA TEIXE
5
68.2
73.16
2
5
79.7
1
4
72.7
68.0
68.2 9
5
77.1
68.3
7
74.9
6
71.0
RUA DE PINTO BESSA
11 1
68.9 2
7
78.5
RUA DE MIRAFLOR
RUA DO PADRE ANTÓNIO VIEIRA
69.4
3
72.2
5
68.2
8
71.0
2
69.4
2
3
72.1
68.0
8
.
70.0
4
72,5
8
73.9
8
73.0
4
78.4
7
69.5
7
71.6
8
73.6
1
72.4
8
70.6
8
68.2
2
74,4
.
4
80.4
0
74.7
6
67.6
0
73.3
5
77.9
8
71.1
1
74.5
8
75.0
0
.74
68.5
5
70,9
4
72.5
9
74.5
0.29
8
.33
77
6
80.5
2
2
71.9
75.4
71
71
ALÇADO FRONTAL
CAMPANHÃ CINECLUB GROUND FLOOR PLAN 1:200 A A
B
C D
B
E
C D
FIRST FLOOR PLAN 1: A
E
A
B
sala de trabalho de grupo - 50
68 F
68
68
sala de trabalho de grupo - 50
F´
F
F F´
68 F sala de trabalho de grupo - 50
sala de trabalho de grupo - 50
sala de reuniões - 40
sala de reuniões - 40
biblioteca
sala de reuniões - 30
UTA auditório sala de reuniões - 30
Sala dos conferencistas
Regie
Arrumos
UTA Polivalente sala do pessoal
gabinete bibiotecário
arquivo
UTA Biblioteca
Instalações sanitárias gerais
Cisterna de água
Instalações sanitárias gerais Instalações sanitárias gerais
Instalações sanitárias gerais
UTA Cafetaria
Cisterna de água
Grupo Gerador de emergência
Central Térmica
Grupo Gerador de emergência
G
G
G´
Arrumos da sala polivalente
G G´
Arrumos da sala polivalen
Balneários
G
Arrumos da sala polivalente
Chiller
Área Técnica
Balneários
Espaço de projecção do cinema exterior
Auditório
Cargas e descargas 71
Arrumos cinema exterior Cargas e descargas 71
Sala Polivalente 67,18
Sala Polivalente 67,18
H
H
H´
H
A´
A´
SECTION B/B’ 1:100
B´
B´
C´ D´
C´ D´
E´
PLANTA PISO -1 COTA 67,18 PLANTA PISO 1 COTA 74,82
H H´ A´ B´
SECTION C/C’ 1:100
74,82
74,82
74,82
74,82
E´ A´
71
71
67,18
67,18
67,18
67,18
CORTE CC'
CINECLUBE EM CAMPANHÃ FACULDADE DE ARQUICTETURA DA UNIVERSIDADE DO PORTO
- PROJETO 4 - CONSTRUÇÃO III - SISTEMAS ESTRUTURAIS - 2017/2018 - TURMA B
CINECLUBE EM CAMPANHÃ
CORTE GG'
11
:200
C D
B
A C D
AXONOMETRI 1:500
E
B
C D
E
E
sala de trabalho de grupo - 50
F´
68
sala de trabalho de grupo - 50
Cafetaria
F
F´ F´ Cafetaria
Despensa
Copa
sala de trabalho de grupo - 50
Despensa
Copa
Sala da direcção
sala de trabalho de grupo - 50 Sala da direcção
Sala de reuniões
sala de reuniões - 40
Sala de reuniões
Gabinete do director
sala de reuniões - 40
Gabinete do director
Secretaria
sala de reuniões - 30
Arquivo Secretaria
Instalações sanitárias Arquivo
sala de reuniões - 30
Loja
Instalações sanitárias
compartimento técnico
sala do pessoal Loja compartimento técnico
Instalações sanitárias gerais Instalações sanitárias gerais Instalações sanitárias gerais Instalações sanitárias gerais
Instalações sanitárias gerais Instalações sanitárias gerais
67,18
67,18
Balcão de atendimento Compartimento técnico
Balcão de atendimento Compartimento técnico
G´ G
nte
G´
G´ de cinema ao ar livre - 71 ArrumosProjecção da sala polivalente
Balneários
Projecção de cinema ao ar livre - 71
Átrio
Átrio
Balneários
Paravento 71 Paravento 71
Sala Polivalente 67,18 Sala Polivalente 67,18
H´
H
B´
C´ D´
E´
A´
H´ C´ D´ PLANTA PISO 0 COTA 71
E´
B´
PLANTA PISO 0 COTA 71
H´ C´ D´
SECTION G/G’ 1:100
E´
PLANTA PISO -1 COTA 67,18
71
71
CORTE BB'
CINECLUBE EM CAMPANHÃ FACULDADE DE ARQUICTETURA DA UNIVERSIDADE DO PORTO
- PROJETO 4 - CONSTRUÇÃO III - SISTEMAS ESTRUTURAIS - 2017/2018 - TURMA B
CORTE BB'
CORTE GG'
CAMPANHÃ CINECLUB SECOND FLOOR PLAN 1:200
ROOF PLAN 1:200 B
A
E
C D
A
68 F
F´
F
biblioteca
UTA auditório
Sala dos conferencistas
Regie
Arrumos
UTA Polivalente
gabinete bibiotecário
arquivo
UTA Biblioteca
Instalações sanitárias gerais Instalações sanitárias gerais
UTA Cafetaria
Central Térmica
B´
C´ D´
E´
SECTION E/E’ 1:100
74,82
- PROJETO 4 - CONSTRUÇÃO III - SISTEMAS ESTRUTURAIS - 2017/2018 - TURMA B
A´
- FICHA 6 - 25.06.2018
H
ENTREGA FINAL
Espaço de projecção do cinema exterior
Auditório Arrumos cinema exterior
CINECLUBE EM CAMPANHÃ
Área Técnica
PAINEL 5 / 10 - ESCALA 1/100
Chiller
FACULDADE DE ARQUICTETURA DA UNIVERSIDADE DO PORTO
RITA GANDRA
G
G´
G
H´
H
PLANTA PISO 1 COTA 74,82
A´
74,82
74,82
71
71
71
67,18
67,18
67,18
CORTE CC'
CORTE EE'
FACULDADE DE ARQUICTETURA DA UNIVERSIDADE DO PORTO ENTREGA FINAL
- FICHA 6 - 25.06.2018
'
CINECLUBE EM CAMPANHÃ CINECLUBE EM CAMPANHÃ
- PROJETO 4
12
PHOTOS OF THE MODEL 1:200 B
C D
E
F´
G´
74,82
71
H´ 67,18
B´
C´ D´
E´
PLANTA DE COBERTURAS
SECTION F/F’ 1:100
CORTE EE'
71
71
CORTE HH'
ALÇADO LATERAL
CORTE D
- CONSTRUÇÃO III - SISTEMAS ESTRUTURAIS - 2017/2018 - TURMA B
CAMPANHÃ CINECLUB PLAN OF THE INTERIOR AUDITORIUM 1:50
SECTION OF THE INTERIOR AUDITORIUM A/A’ 1:50
74,82
13 Betão armado
1
Lajeta betão
2
CONSTRUCTIVE DETAILS 1:10
1- Reinforced concrete 2- Concrete fasteners 3- Finishing in zinc
Camada de forma
3 4 5 6 7 8
Laje nervurada
9
Acabamento em zinco Isolamento térmico xps 8cm Calha em madeira Tela pitonada
membrana asfaltica de impermeabilização 4- Thermal2xinsulation xps
5- Wood rails 6- Python screen
7- Asphalt Waterproofing Membrane 8- Layer Shape 9- Ribbed slab 10- Suspended ceiling support structure 11- Rock Wool 12- Pladur 13- Cork 14- Wooden floor 15-Wood profile
Estrutura suporte teto falso
10
Lã de rocha Pladur
11 12
Cortiça 15 cm
13
Pavimento em madeira
14
Perfil em madeira
15
16- Layer of settlement
Camada de acentamento
16 2x membrana asfaltica de impermeabilização
Caixilho aluminio
“DELIRIOUS GUIMARÃES”
PHOTOS OF THE MODEL
GUIMARÃES -UNIVERSITY OF MINHO CITY PLAN AND RESIDENCE BUILDING As its name indicates, this is a utopian and delusional project in relation to the land where the project will be inserted, but the exercise that produces it doesn´t annul its surroundings and works under the reality, taking into account its historical value and its implantation in the city of Guimarães. The idea of this project arises from several influences that I obtained from images and frames of films, always r elated to the movement of pieces and with the maximum possible utopian idea of housing. The plan presents the construction of two structures, in two distinct locations of Guimarães, as two new monumental and megalithic elements of the city. However, only one is developed keenly, but it assumes itself as identical in its genesis. The building, in this way, is a structure in height that contemplates diverse typologies that are being added in a variety of ways. The gallery is thus the result of these combinations, a common space with different altimetry and even relation between floors.The monotony of the building present in the elevation and the plant is broken by a moment of rotation in the middle of the building, where the plant changes its position creating a new dynamic. An exception created to contrast between the design of the floor, marked by the loose distribution of the stores, in the form of boxes, in relation to the manner in which the building is finished, taking to the extreme the utopian idea of inhabited cover, controlled by high walls, small buildings and of a wide green area. SECTION - MASTER PLAN 1:1000
PLAN 1:1000
PHOTO OF
THE CITY- AREAS
DRAW OF THE BUILDING
14
FILM REFERENCE- “HIGHRISE”
158
163 162 161
160 159 158
159
164 165
166
167
169
168
170 171
172 158
173
174
163
158
162 161
160 159 158
159
164
166
165
169
168
167
170 171
172
173
174
158
UNIVERSIDAD ARQUITETURA
PROJECTO IV "DELIRIOUS G
ENTREGA FIN RITA GANDRA
ESCALA 1:100 PAINEL 8
CAMPANHÃ CINECLUB PLANTAS PISO TIPO 1:200 FLOORS PLAN
GROUND FLOOR PLAN 1:500
4
4
3
5
1
1
2
2
5
4
3
4
2
PLANTA PISO 1
4
4
3
4
4
3
5
4
5
C
PLANTA PISO 2
4
4
3
5
1
2
1
2
5
4
3
4
PLANTA PISO 3
ALÇADO OESTE
169
A
168 2
4
167
1
3
166
2
1
5
5
165 4
3
4
164
B´
162
PLANTA PISO 4
163
161 160 159
3
4
4
5
4
5
3
4
4
158
PLANTA PISO 5 159
B
158
2
4
4
3
4
1 5
3
1
2
1
2
158
5
4
3
4
ALÇADO ESTE
SECTION AA´ 1:500
PLANTA CONTACTO COM O SOLO -COTA 169
TRANSVERSAL AA´
C´
A´
SECTION BB´ 1:500
PLANTA PISO 6
SOU
PERFIL LONGITUDINAL BB´ PERFIL LONGITUDINAL BB´
ALÇADO
15 FLOORS PLAN 1:200 4
4
3
4
5
3
4
4
4
3
4
5
5
3
4
5
2 1
2
2
1
1
2
1
2
4
4
4
3
4
4
3
4
3
4
1 5
2
3
1
1
2
5 2
3
1
1
1
3
2
5
5
5
2
1
2
5 1
1
3
4
4
4
3
4
3
4
4
4
4
2
1
5
2
1
2
5
3
4
4
4
3
5
4
3
4
4
PLANTA PISO + HOTEL 1
PLANTA PISO + HOTEL 7
4
4
4
3
4
4
3
4
3
5
5
5
4
4
4
4
4
5
5
5
4 4
4
4
3
4
3
3 1 4
2
5 4 3 1
1
2
4
2
PLANTA PISO + HOTEL 2 5
4 4
5 3
3
5
4
4
3
5 1 2
1
2
4
1
4
3 4
2
PLANTA PISO - 1º PISO - VOLUME 2 4
4
4
3
3
4
3
4
4
5
5
1
2
2
3
3
5
5
1
1 4
3
4
5
5
1
4
3
4
4
3
4
4
4
3 4
5
4
2
2
4
4
4
PLANTA PISO + HOTEL 3
3
5
5
4
4
4
3
5
4
4
4
3
4
3
4
4
4
4
3
4
3
4 5
1
2
2
2
1
1
3
2
1
5
5
4
4
4
1
2
2
1
5
4
4
3
5
5
PLANTA PISO - 1º PISO - VOLUME 2
5
3
3
4
4
4
4
3
4 3 1
4
2
5
4
PLANTA PISO + HOTEL 4
3 1
1
2
4
2
5
4 3
5
3 4
4
4
5
3 3
4
4
4
4
4
3
4
4
4
4
4
3
3
3
5
4 5
5 5
5
4
5
PLANTA PISO - 1º PISO - VOLUME 2
3
4
1
4
4
4
5 5
2
2 3
4
3
4
4
4
4
UNIVERSIDADE DO MINHO- E ARQUITETURA
1
PLANTA PISO + HOTEL 5
3
4
PROJECTO IV "DELIRIOUS GUIMARÃES"
3
1 4
2
1 2
5
2
2
4
2
5
ENTREGA FINAL- 23 DE JUNH RITA GANDRA A76535
3 4
4
4
4
4
4
3
4
4
3
3
5
5
4
4
4
1
1
4
3
1
2
4
5
5
5
2
1
1
3 1
3
3
2
1
1
2
2
3
4
5
4
PLANTA PISO - 1º PISO - VOLUME 2
4
3
1
3
2
3
5
5
5 1
1 4
4
3
4
3
4 4
4
3
4
4
2
2
OUTH FACADE 1:500 PERFIL TRANSVERSAL AA´
SUL
1- COZINHA 2- SALA 3- CASA DE BANHO 4- QUARTO 5-ZONA AMBÍGUA
PLANTA PISO + HOTEL 6
NORTH FACADE 1:500 PERFIL LONGITUDINAL BB´
ALÇADO NORTE
ESCALA 1:200 PAINEL 4
ACADEMIC DRAWINGS FRIST, SECOND AND THIRD EYEAR This is a selection of drawings made in Portugal during my first three years of the course in the Minho University and some at Faup. In Portugal, the exercise of drawing is considered one of the fundamental parts of architectural thinking. Not as a final observation but as a mechanics to verify and quickly check if the idea could or not be done. In this selection, I present drawings related mostly to the abstract reality but some of them are observation drawings from places. The use of different materials is also a frequent exploration in my architectural drawings because I like to add a quick element of color to correct or to create something new on top of it.
16
Corte AA´
ILLUMINATION INSTALATION AT FAUP 0,05 cm
10 cm
2,3 cm
4,7 cm
ROOF FLOOR
STRUCTURAL PLAN 1:50
Corte BB´
PLANTA DE COBERTURAS
B´
This was a competition that I participated in my third year as a collaboration with another student at my University. This competition was a collaboration between the Faup and a Lighting Company called Modular. The idea was to develop a structure combined with a lamp of the company, in the University Exposition area, as an element of interaction with the people who visited it. 1 cm
1,6 cm
4,7 cm
PLANTA DE ESTRUTURAS
RENDER OF THE PROJECT
A´
The combination of these elements created a certain idea of closed space, where the reflection of the light in the water and on the glass is the effect created to amplify the quality and potential of it.
B
B
The visitor plays an important part in this installation, because of its interaction with it, which is conditioned by the disposition of the different parts.
SECTION BB´ Corte AA´ Corte AA´ 2,3 cm
10 cm
4,7 cm
2,3 cm
10 cm
0,05 cm
4,7 cm
PLANTA DE ESTRUTURAS
0,05 cm
DRAWING OF THE PROJECT 1 cm 1,6 cm
4,7 cm 1 cm 1,6 cm
4,7 cm
1,6 cm
4,7 cm 1 cm
SECTION AA´ 1:50
B
A
Espelho
Tela de isolamento em alumínio
Peça de remate em madeira
Poliestireno
Madeira
Água
Cola Pattex
Placa aglomerado, CRU
Ripa sem aplainar
Parafuso
Esquadro Metálico
Ripa sem aplainar Ripa sem aplainar - com encaixe de suporte Mármore Lage de betão
The project that we proposed follows the ideia of light and the way it reflects among different materials and spaces. In this sense, we created a structure in the middle of the room that follows the design present there for the floor as the line guides for this intervention. There emerges two different walls, one in wood and other in glass, as two visible barriers, a tank of water in the middle and a lamp on the opposite side of the glass.
Espelho 0,05 cm
Espelho
Tela de isolamento em alumínio Madeira Cola Pattex Placa aglomerado, CRU Água Ripa sem aplainar
2,3 cm
Espelho
Poliestireno
Peça de remate em Peça de remate em madeira madeira
Madeira
Água
Cola Pattex
Tela de isolamento Tela de isolamento em alumínio em alumínio
Poliestireno
Madeira
Cola Pattex
Parafuso
Placa aglomerado,Placa aglomerado, CRU CRU
Água
Parafuso
Ripa sem aplainarRipa sem aplainar
Esquadro MetálicoEsquadro Metálico
Ripa sem aplainarRipa sem aplainar Ripa sem aplainarRipa sem aplainar - com encaixe de - com encaixe de suporte suporte Mármore Mármore Lage de betão Lage de betão
Corte AA´
Peça de remate em madeira
Poliestireno 10 cm
4,7 cm
Esquadro Metálico Parafuso Ripa sem aplainar Ripa sem aplainar - com encaixe de suporte Mármore Lage de betão
PLANTA DE ESTRUTURAS
PLANTA DE ESTRUTURAS
R PLAN 1:50
17
A
A
B´
B´
A´
A´
PLANTA DE COBERTURAS
PLANTA DE COBERTURAS
´ 1:50
Corte BB´
Corte BB´
THANK YOU OBRIGADA GRAZIE GRACIAS ritasgandra@hotmail.com