architecture x senses x experience MASTER OF ARCHITECTURE PORTFOLIO by Rita Wei
/EDUCATION Master of Architecture at University of Melbourne 2015-2016 Master of Architecture Exchange at TUDelft 2016 Bachelor of Architecture at University of Melbourne 2010-2012 /EXPERIENCE Graduate Architect at Jesseant Architects 2013-2015 SONA super studio 2015 SHELTER International Student competition 2016
CONTENT
LOVE REACTOR
the FALCON
BUILDING TECHNOLOGY
keywords_phenomenology, atmosphere, experiential, line drawing, acrylic
keywords_phenomenology, atmosphere, experiential, line drawing, acrylic
keywords_light weight, climate control, facade
page 1-4
page 5-8
page 9-10
An INFRASTRUCTURE design that discussed architecture as a system and being highly interrelated with anthropology.
Design of a FOYER that dedicated to a hypothesized concert of David Bowie in the 1973 London.
Nakagin Capsule TOWER conversion project with a focus on passive heating and cooling system and light weight facade.
The Master’s study has further uncovered my fascination with design and strengths in critical thinking, communication, team works and developing a unique graphic style. Specifically, in contrast with my bachelor’s projects which took a more conventional path in tackling designs, recent projects are grounded on in-depth research and a more critical understanding of what architecture is/ means to me. note* This portfolio (1.0) presents the final outcome of each studios that undertaken during my 2 years Master’s study; And ended with snapshots of my bachelor’s projects. Full version of projects is available at: https://issuu. com/ritawei. which contains detailed research and progress for each semester.
REJUVENATE AZCA
A LANDMARK designed for Madrid, completed in TUDelft. keywords_research, urban planning, landmark, high-rise, building technology
page 11-16
THESIS PROJECT: iLife
A MANIFESTATION of a new Modernism that belongs to architecture of the outer space. Zero Gravity is exploited, experiences fostered by such architectural type are infinite and liberated. keywords_zero gravity, liberation, outer space, spatial experience, behaviour page 17-22
UNDERGRAD PROJECTS
page 23
PROJECTS FROM WORK
page 24-25
MASTER STUDIO C: A HUMAN INFRASTRUCTURE
LOVE REACTOR Underpressure Lab Lead by Alessia Pegoli and Vass VanSteel Program used: Rhino, Photoshop, Illustrator, AutoCAD 1
/PROJECT BRIEF & DESIGN PROCESS The projects will instigate the co-creation of architectural performance through the copulation of architecture and user. The process will provoke design to the dimensions of a spatial and bodily spectacle, a receptive system comprising the user body, the program apparatus and the resultant event as the site. We will challenge notions of the engagement of the eye and the body through mediums of storytelling and scene evocation to propel a discourse on the pertinence of cross- disciplinary methodology in creating a holistic design system.
RESEARCH & DESIGN THINKING: body+apparatus+place=event
systematic multi-d isciplin ary cross -func tiona l auto mat ed prim ary (ex sec trac ond tive ary ) in tra dus ns (m trie a p nuf ort po s act ati we on urin co rp s IND g lan ys m ) in US tem m dus s TRY un t r ies ica tio n IN sy FR st AS em TR UC TU RE
a. our obsession with technology further disconnect one with another
dynamic
Its performance is filmed and evaluated (film clip link: ).
efficient
The project starts off with the design of a body apparatus based on inspirations drawn from our favourite movie. With the apparatus - an installation that interacts with the human body, we are asked to investigate its social meanings by placing it at a site of our interest within Melbourne CBD.
TRAITS
/body+apparatus+place=events
em st
&
c. et
RE DU E OC PR
sy
n io at c u rce ed ou s re ce du pro bly em ass ss proce
FACTORY SYSTEM
packaging logistic
b. the defunct phone booth at Flinder st Station is re purposed as a communication medium.
MY SYSTEM / INFRASTRUCTURE
ALTE R ENER NATIVE GY
storage space
efficiency
safety
ts gh ou les th on oti / ru e em les p i ssu nc al i pri ion rat ope le cyc y life antit u q lity & qua ity inabil susta ity human
kineti c hor mo ne bo dy he so at un d sp iri ts
S RN
E NC CO
b. the medium evolved into a paying system for the metro which requires injection of loving messages. 2
SYSTEM OPERATION DIAGRAM
TRANSMISSION PIPELINES - Weaving within the structure - Harvesting energy from human - Harvesting love
PLUGGING IN - Human injected into the system
RECEIVING LOVE The LOVE REACTOR is a human infrastructure that harnesses love and humanity in the dystopia future. It is critiquing the dominance of technology which gradually builds up a wall in between ‘us’.
PRODUCING LOVE THE CARRIAGE - Receiving love messages - Glass, transparent, pure
3
SCAFFOLDING - Chaotic, overwhelmed, overdeveloped, filthy dystopia world
ILLUSTRATIONS ELECTRIC RAIL
OVERHEAD RACK
TOTE
THE SPIN PLATFORM - WAITING AREA SYSTEM ENTRANCE GETTING ON/OFF TRAIN SYSTEM EXIT
CONVEYOR BELT
/PROCESS Delivering message while in transit to the platform. While passengers reach the doorway of the carriage, the Head Steamer lifted and detached from the person. Start receiving message while seated
4
MASTER STUDIO D: A FOYER DEDICATED TO BOWIE’S LAST CONCERT
Collage section of the Foyer: Symbolizing Bowie has brought life back to the industrialized city. He frees people’s mind. The foyer has become a focal point of the city.
/PROJECT BRIEF ‘Loving the Alien’ studio suggests that the experience of inhabitation, simultaneously engaging all our senses in the acts and rituals of life, is the most appropriate basis for the development and evaluation of architectural propositions. The studio will stand in defence of small, idiosyncratic works of architecture truly revealing the human dimensions of contemporary life.
the FALCON Loving the Alien Lead by Rennie Liffen & Virginia Mannering Program used: Rhino, Photoshop, AutoCAD 5
/DESIGN PROCESS The studio engages us with the experiential potential of the architecture of ‘Performance’ inspired by the extraordinary and enigmatic British musician, David Bowie. We use the work of Bowie as a metaphor to consider the phenomenological implications of the architectural ‘alien’. Narratives are developed in conjunction with our writer-collaborator to form the functional and emotional brief for the architecture of a new ‘Foyer’ (spatial sequence for audience from street to seat) at a detailed hypothetical music venue in central London.
Acrylic model of the Falcon in Exhibition
STORY BOARD & MOMENT DRAWING
3rd July, 1973
5:30PM
5:40PM
5:50PM
6:00PM
6:30PM
7:00PM
7:30PM
3rd July, 1973, London “It’s Silver!” 5:30 PM; At the arrival The floating silver mass strikes my sight It flares; it reflects As if it is rebelling against its context Just as a gigantic spacecraft It is waiting for us to board
“It is alive!” 5:40PM The underbelly of the space craft is lighten up by the glowing cells Beer pipes, as veins, are weaving through those Illuminated spaces In one of the cells, she waves at me “Come on up!” she says.
5:50PM It is vast, it is spacious Beneath the glossy skin There are the bones Robust, metallic, cold
The artificial landscape 6:00PM I turned around I stood there, staring at the space As if there’s a landscape of stairs As if it is a stage that showcases all sorts of dramas and stories I set my foot on the steps Walk towards the greenish glows
The greenish glows 6:30PM Beer flows within the ‘venations’ As if it is the fuel for the space craft; the blood for this living organism Fascinating! I repeated After a few more sips The green seems to glow brighter, brighter
Excitement 7:00PM Half an hour till the show starts Excitement has already piled up within the linear gallery At the end of the tunnel I see the flare of the venue door It is teasing us
Scream Scream 7:30PM Nicotine has levelled up my excitement. I’m immersing in the taste of cigarette. Screams at the back of the door has now become a symphony A poetic expression of our passions indeed “let’s go” she says, With a sound of the glam room door closing.
6
PLANS & SECTION
GF plan
7
Level1 plan
Level2 plan
Section (of Foyer and Music Venue)
DETAIL DRAWINGS AT PORTAL
8
MASTER BUILDING TECHNOLOGY (completed in TUDelft): NAKAGIN 2.0
NAKAGIN 2.0
9
MASTER, BUILDING TECHNOLOGY (completed in TUDelft)
10
MASTER STUDIO E (completed in TUDelft): REJUVENATE AZCA, MADRID
REJUVENATE AZCA, MADRID Complex Project: Anatomy of a Landmark Project team: Rita Wei & Zac Chapman Lead by Aldo Trim, Albert Takashi Richert Program used: Revit, Rhino, Illustrator, InDesign, Photoshop, AutoCAD
11
/PROJECT BRIEF We are required to perform a thorough urban research in order to understand Madrid’s history and context (specifically AZCA - a suburban commercial district), and to identify the Landmarks that could become catalyst for intervention. The research zooms in from the large scale of the city itself, to the medium scale the site, to the small scale of the building. Researches upon infrastructure, morphology, building typology, politics, economy and cultural facts will serve as basis for forming a narrative which is leading for the individual redesigns of the Landmark.
SITE ANALYSIS & MASTER PLANNING project site: AZCA Madrid city centre
/PROJECT BACKGROUND
proposed design public transportation stops retails & eateries office towers
In 1966, AZCA was imagined to be a lively shopping and residential district, with cultural venues that would reinvigorate Madrid and effectively become the new centre of the city. Decades of compromises, altered planning and redevelopments have seen the complex become highly heterogeneous and vastly confusing. In the last two decades of the 20th Century, towers arose and brought an influx of globalized institutions which ultimately re branded the site. It became the capitalist complex that can be seen today, the public arena that was originally conceptualized has been forced to the south and the centre lacks a dynamic urban arena. Stemming from the post war period, the complex’s infrastructure and planning is highly charged with ideals of post modernism and often, references to antiquity can be seen throughout the site. note: detail of research please refer to Portfolio 2.0
/MASTER PLANNING
0
500
nels that tunnels are highly that tunnels are potenhighly thatpotenare highly potenl due to tial itsdue unique to its tial spatial unique due tospatial its unique spatial ity and quality lighting andcondition. lighting quality and condition. lighting condition. have They a special have a atmospheric special They have atmospheric a special atmospheric quality. quality. quality.
15000m
Activating defunct corridors and tunnels around the central park, by proposing an architectural language that distinguishes with the site. In particular, metallic materials are exploit and thin columns are to replace masonry structural supports in activated areas.
DIVERGENT vs CONVERGENT
400sqm each 400sqm each 400sqm each 293sqm
293sqm 1413.3sqm 1413.3sqm 293sqm
466.4sqm
1232.7sqm 1232.7sqm
433.2sqm
466.4sqm
466.4sqm
1232.7sqm
668.3sqm
6339.5sqm 6339.5sqm
1413.3sqm
668.3sqm
668.3sqm
6339.5sqm 433.2sqm
entrances entrances
433.2sqm
entrances
tunnels highlighted tunnels highlighted in tunnels doted in highlighted doted in dotedtotall area totall of selected area of totall tunnels selected area tunnels of selected tunnels existing axis existing & focal point axis existing & focal point axis & focal point lines willlines remain will itsremain current lines its willcurrent remain its current is approx is 12406.4 approx sqm 12406.4 is approx sqm 12406.4 sqm function -function major site - major access function site -access major site access for officefor people. office people. for office people. while Mahou while tower’s Mahou net tower’s while lettaMahou net lettatower’s net lettable area and blesanitary area andarea ble sanitary area is and area sanitary is area is 17838.8sqm17838.8sqm 17838.8sqm
re establish new re establish focal point new re & establish focal point new & focal point & identify existing identify gridgrid existing & toaccording grid & according to grid existing &grid identify rotate rotate according rotate grid to main entrances. main newentrances. axis main newentrances. axis new axis related angle related related to Torre angle Picasso to angle Torrerelated Picassoangle to Torreangle Picasso related angle related proposed. proposed. proposed.
fill in gaps fill - in complete the gaps fill the in complete the gaps the- complete the loop of formalloop event of formal spacesloop event of formal spaces event level floorlevel slab floor slab & extended &connecting tunnel connecting tunnel connecting to the tunnel to- the level 2 floor slab2 extended & 2extended to the journey journey fieldgenerated of column field generated of column generated service journey towerservice tower field of column service tower
spaces
12
loop of informal loopevent of informal & loop event of infor & exhibition spaces exhibition spaces exhibition
SEQUENCE & MOMENT
Sequence drawing: moving through the site (more drawings in portfolio 2.0)
13
left: Transformed undercroft - Venue space; Right Top: Corridor connecting Service Tower and Tunnel spaces; Right Bottom: Undercroft, approaching the Tower
SITE PLANS 0 10 30
80m
DIVERGENT vs CONVERGENT
/LEVEL 0 SITE PLAN
/LEVEL 1 SITE PLAN
/LEVEL 2 SITE PLAN
THE SERVICE TOWER /CONCEPTUAL SITE PLAN
/SERVICE TOWER DESIGN PROCESS
The design is built upon the Mahou plan. The exhaust is retained and treated as a highlight.
the two disjointed tunnels are now linked by a metallic bridge. The linkage is uplifted as to let circulation through. The openings synchronize the geometry of the landmark - Torre Picasso’s gateway.
DIVERGENT vs CONVERGENT
continuity of the journey here is achieved by extending the architectural element - columns. It is a way finder.
potential s t o r a g ev e r t i c a l exhaust space transition
a second skin is added for the exhaust.
the starting point of the tunnel is lead by a series of portals. Acting as the metallic arms of the service tower.
the Venue is enclosed by perforated metallic panels. Its opening has similar language with the existing landmark and also the ‘bridge’.
relocate the stair core and centralize it in the habitable space.
intersecting two geometries.
forming a new volume that accommodates services and act as a solar chimney.
the ‘service tower’ cancels out a portion of the ‘storage tower’.
area enlarged in order to provide sufficient storage space and circulation &matching the architectural language of the storage tower with he exhaust.
elevator is allocated in the ‘service tower’.
column grid. ‘service tower’ would be single glazed. the ‘storage tower’ are double layered. inner layer is glass and the outer skin is perforations.
14
MASTER THESIS STUDIO: iLife - MANIFESTATION OF A NEW MODERNISM
/EARTH on the earth terrain, gravity is the orientation the ground is our guidance telling us what is up, down, left and right our perception of architecture is fixated. Wall is wall …
17
/ZERO GRAVITY Disorientation the wall, the floor, the ceiling are merged architectural section becomes an elevation plan becomes a section a section …
we sit without a seat sleep without a bed wash without flowing water our perception is to be reformed lifestyle is to be reformed architecture is to be reformed …
SITE PLAN & FORM FINDING Collage of genes Architecture of the outer space
5
Earthly architecture Gene extraction
/ARCHITECTURE OF THE OUTER SPACE
2
b
Zero gravity has overthrown our perception of space and distorted our sense of orientation. Earthly architecture’s plan becomes section, section becomes plan. The whole building envelope merged into one terrain that imposes infinite possibilities.
1 3
4
j
g
i
f
This thesis project - iLife, is to challenge and overturn such ‘disorientation’ by utilizing the zero gravity effect. Earthly architecture is the source of genes, for composing a series of apparatus that not only shelters us, guides and assists our movements, but also fosters diverse events and experiences.
m 1.3
i 1.2
1.9
2.4
1.7
1.5
c
2.1
1. Dock-in compartment 2. Grid 3. iLife apparatus 4. Vending pipes 5. PV shell
0.9
a
2.4
m
4.2
7.6
c
c
c
1.9
1.8
k
3.5
1.3
1.0
2.0
e,f
0.9
1.65
3.8
3.3
d
Proposal: iLife
m,l
k International space station (375km)
/RESEARCH note: please refer to Thesis book at https://issuu.com/ritawei
g
1.8
a 3.1
a 1.65
1.9
4.5 0.9
Sputnik-1 (215km)
d
1.5
1.6
1.9
f
iLife
h
j
1.7
2.7
Altitude 375km Orbital inclination 51.6 deg Time 91 minutes Frequency 15 times/day Orbiting speed 27619km/h
1.5
1.8
Thesis Studio: Flirting With Space Lead by Christina Bozsan
1.0
1.9
l
3.7
Zero gravity has overthrown our perception of space and distorted our sense of orientation. Earthly architecture’s plan becomes section, section becomes plan. The whole building envelope merged into one terrain that imposes infinite possibilities.
1.0
1.88
1.0
0.8
5.3
2.1
1.75
3.2
2.55
m e
1.2
Earth radius 6378km
h
b
1.95
This thesis project - iLife, is to challenge and overturn such ‘disorientation’ by utilizing the zero gravity effect. Earthly architecture is the source of genes, for composing a series of apparatus that not only shelters us, guides and assists our movements, but also fosters diverse events and experiences.
2.1
Program used: Rhino, Illustrator, Photoshop, AutoCAD
1.5
/iLife
(siteplan @ 1:1000 & assemblage)
/FORMATION
(anatomy and reinterpretation @ 1:100, dimension unit: meter)
18
e
Lf
i i
S H E L L . . . . .
G R O O V E . . . . .
. . . . . S K E L E T O N
Categorizing form... /GROOVE Groove , as the fold of the building skin, function as a way finding device. The undulating surface becomes the ‘handrail’ element that assists movements. Best suited for mixed used, dynamic, public space. A complex surface geometry fosters diverse events and interaction with the human body. /SHELL Shell is an enclosure. It forms static, intimate or private spaces that accommodate the human body. Its scale determines its programs - whether it is for private or communal usage.
ABPL90169 Design Thesis Flirting With Space Studio Lead by Christina Bozsan Qiuxu (Rita) Wei 335181
19
/SKELETON Skeleton magnifies possibilities. It defines a territory and maintains a sense of openese. It is best seen as a space for gathering. The replication of elements creates the ‘Groove’ effect which enables vibrant activities and movements.
FORM EVALUATION (5 CONFIGURATION)
20
FORM EVALUATION
67
87
21
73
70
66
72
75
74
91
79
78
89
90
81
82
69
71
84
68
77
88
76
83
80
85
86
MOMENT DRAWINGS
/A GLIMPSE OF THE ARTIST’S OFFICE
/THE INTIMACY, BATHHOUSE
/OUTER SPACE Zero gravity fosters infinity Infinite experience infinite possibilities architecture of the outer space is the ground is a pathway that directs our movements is an apparatus experience is liberated ...
/THE SPACE RESIDENCE
/A MOMENT IN THE LIBRARY
22
SNAPSHOTS OF PROJECTS FROM WORK
Development Summary: Total Site Area: 1164.2m² Shared Common Driveway:
249.5m²
Total Site Coverage: 552.6m² (47.5%) Total Permeable Area : 362.1m² (31.1%)
Unit 1: Site Area: Site Coverage: Lower Ground: Ground Floor: First Floor: POS: SPOS: No. of Bed: No. of Car Space: Storage:
269.5m² 149.9m² 85.2m² 80.9m² 85m² 55.8m² 39.4m² 3 2
Unit 2: Site Area: Site Coverage: Lower Ground: Ground Floor: First Floor: POS: SPOS: No. of Bed: No. of Car Space: Storage:
200.25m² 123.9m² 90.8m² 76.1m² 93.7m² 37m² 25.9m² 3
Unit 3: Site Area: Site Coverage: Lower Ground: Ground Floor: First Floor: POS: SPOS: No. of Bed: No. of Car Space: Storage: Unit 4: Site Area: Site Coverage: Lower Ground: Ground Floor: First Floor: POS: SPOS: No. of Bed: No. of Car Space: Storage:
245.8m² 151.9m² 45.3m² 147.5m² 58.9m² 75.5m² 56.2m² 3
173m² 98.5m² 51.6m² 79.8m² 59.6m² 75.6m² 49.4m² 3
formal living
floorboard
6.1 x 5.0
formal dining dining
floorboard
5.2 x 4.0
paving
g enin scre high dary 2.4m boun osed front prop 900mm t offse
floorboard
kitchen
4.3 x 4.6
butler's kit floorboard floorboard
floorboard FFL=AHD:68.40
alfresco
FFL=AHD:67.68
timber decking
atrium
4 steps up
floorboard
FFL=AHD:67.68
entry
FFL=AHD:68.40
UP to 1st FL
floorboard
porch
1 step up
2 steps up
paving
1 step up
yard
DN to basement
floorboard
master bedroom 1
wc tile
floorboard
4.2 x 5.0
living
5.2 x 6.8
ens
paving
tile
l'dry floorboard
1.2m high pool fence
wir
paving
FFL=AHD:68.40
balcony
pool
proposed 2.4m high screening offset 900mm front boundary
paving
new crossover proposed in accordance with relevant authorities requirement.
LOWER GROUND FLOOR PLAN SCALE 1:100 @ A1
GROUND FLOOR PLAN SCALE 1:100 @ A1
Amendments
No.
Date
Project
Notes
Description
ANY ERRORS, DISCREPANCIES OR OMMISSIONS IN THE DRAWINGS, NOTATIONS OR DIMENSIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION PRIOR TO WORKS COMMENCING. DO NOT SCALE FROM DRAWINGS
JESSE ANT ARCHITECTS
4 MILLER CRESCENT, MOUNT WAVERLEY
Date Drawn Project No.
Title
ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, MECHANICAL, ELECTRICAL, HYDRAULIC, LANDSCAPE ARCHITECTURAL DRAWINGS
LOWER GROUND FLOOR PLAN
LOCATION OF ALL HARDWARE, FIXTURES AND FITTINGS TO BE CONFIRMED WITH ARCHITECT PRIOR TO WORKS COMMENCING.
Amendments
712/8 Marmion Place Docklands Victoria Australia 3008 31-03-2014 Scale AL/JW Checked
Drawing No.
1:100
JW
AL
Date
Description
Amendment
TP06
13040
No.
Notes
Project
ANY ERRORS, DISCREPANCIES OR OMMISSIONS IN THE DRAWINGS, NOTATIONS OR DIMENSIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION PRIOR TO WORKS COMMENCING.
DO NOT SCALE FROM DRAWINGS
-
JESSE ANT ARCHITECTS 712/8 Marmion Place Docklands Victoria Australia 3008 Date Drawn Project No.
Title
ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, MECHANICAL, ELECTRICAL, HYDRAULIC, LANDSCAPE ARCHITECTURAL DRAWINGS
GROUND FLOOR
LOCATION OF ALL HARDWARE, FIXTURES AND FITTINGS TO BE CONFIRMED WITH ARCHITECT PRIOR TO WORKS COMMENCING.
1:100 15-06-2014 Scale AL/JW Checked
Drawing No. JW
AL
Amendment
A101
13025
LEGEND:
SUBJECT SITE
A-A
B-B
Existing trees to be removed (shown in red)
C-C A-A
4 MILLER CR SINGLE STOREY DEWLLING FACED BRICK TILE ROOF
B-B
C-C
Existing trees to be retained (shown in black)
Existing structures to be removed (shown in red)
EXISTING STREESCAPE SCALE 1:200 @ A1
01
NORTH ELEVATION
01
SCALE 1:100 @ A1
NORTH ELEVATION (FRONT FENCE ELEVATION) SCALE 1:100 @ A1
SUBJECT SITE 4 MILLER CR PROPOSED 3 STOREY DWELLING
SITE ANALYSIS
D-D
PROPOSED STREESCAPE
SCALE 1:300 @ A1
SCALE 1:200 @ A1
01 Amendments
No.
E-E
Date
Description
Notes ANY ERRORS, DISCREPANCIES OR OMMISSIONS IN THE DRAWINGS, NOTATIONS OR DIMENSIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION PRIOR TO WORKS COMMENCING. DO NOT SCALE FROM DRAWINGS ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, MECHANICAL, ELECTRICAL, HYDRAULIC, LANDSCAPE ARCHITECTURAL DRAWINGS LOCATION OF ALL HARDWARE, FIXTURES AND FITTINGS TO BE CONFIRMED WITH ARCHITECT PRIOR TO WORKS COMMENCING.
Project
4 MILLER CRESCENT, MOUNT WAVERLEY
JESSE ANT ARCHITECTS
SITE ANALYSIS
Amendments
No.
Date
Description
712/8 Marmion Place Docklands Victoria Australia 3008 Date Drawn Project No.
Title
31-03-2014 Scale AL/JW Checked
Drawing No.
1:300
JW
AL
TP02
13040
Project
Notes ANY ERRORS, DISCREPANCIES OR OMMISSIONS IN THE DRAWINGS, NOTATIONS OR DIMENSIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION PRIOR TO WORKS COMMENCING. DO NOT SCALE FROM DRAWINGS
Amendment
ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, MECHANICAL, ELECTRICAL, HYDRAULIC, LANDSCAPE ARCHITECTURAL DRAWINGS
-
LOCATION OF ALL HARDWARE, FIXTURES AND FITTINGS TO BE CONFIRMED WITH ARCHITECT PRIOR TO WORKS COMMENCING.
4 MILLER CRESCENT, MOUNT WAVERLEY Title
STREETSCAPE
EAST ELEVATION
DEMOLITION PLAN
SCALE 1:100 @ A1
SCALE 1:100 @ A1
JESSE ANT ARCHITECTS 712/8 Marmion Place Docklands Victoria Australia 3008 Date Drawn Project No.
31-03-2014 Scale AL/JW Checked
Drawing No.
1:200
JW
AL
Amendment
TP05
13040
Amendments
No.
Description
Date
-
Notes
Project
ANY ERRORS, DISCREPANCIES OR OMMISSIONS IN THE DRAWINGS, NOTATIONS OR DIMENSIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION PRIOR TO WORKS COMMENCING.
DO NOT SCALE FROM DRAWINGS ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, MECHANICAL, ELECTRICAL, HYDRAULIC, LANDSCAPE ARCHITECTURAL DRAWINGS LOCATION OF ALL HARDWARE, FIXTURES AND FITTINGS TO BE CONFIRMED WITH ARCHITECT PRIOR TO WORKS COMMENCING.
JESSE ANT ARCHITECTS
Amendments
No.
Date
Description
712/8 Marmion Place Docklands Victoria Australia 3008 Date Drawn Project No.
Title
ELEVATIONS
1:100 15-06-2014 Scale AL/JW Checked
Drawing No. JW
AL
Notes
Project
ANY ERRORS, DISCREPANCIES OR OMMISSIONS IN THE DRAWINGS, NOTATIONS OR DIMENSIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION PRIOR TO WORKS COMMENCING.
DO NOT SCALE FROM DRAWINGS
Amendment
ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, MECHANICAL, ELECTRICAL, HYDRAULIC, LANDSCAPE ARCHITECTURAL DRAWINGS
A300
13025
LOCATION OF ALL HARDWARE, FIXTURES AND FITTINGS TO BE CONFIRMED WITH ARCHITECT PRIOR TO WORKS COMMENCING.
PROPOSAL FOR 4 TRIPLE STOREY TOWNHOUSES AT 4 MILLER CRESCENT, MOUNT WAVERLEY
JESSE ANT ARCHITECTS 712/8 Marmion Place Docklands Victoria Australia 3008 Date Drawn Project No.
Title
DEMOLITION PLAN
1:100 15-06-2014 Scale AL/JW Checked
Drawing No. JW
AL
Amendment
A002
13025
TOWN PLANNING DRAWING LIST: TP00 - PERSPECTIVES
TP08 - FIRST FLOOR PLAN
TP01 - SITE LOCATION PLAN
TP09 - ROOF PLAN
TP02 - NEIGHBORHOOD CHARACTER & SITE ANALYSIS
TP10 - ELEVATIONS
TP03 - DESIGN RESPONSE
TP11 - ELEVATIONS
TP04 - DEMOLITION PLAN
TP12 - SECTIONS
D-D
TP05 - EXISTING & PROPOSED STREETSCAPES
TP13 - SECTIONS
TP06 - LOWER GROUND FLOOR PLAN & AREA SCHEDULE
TP14 - SHADOW DIAGRAMS
TP07 - GROUND FLOOR PLAN
TP15 - SHADOW DIAGRAMS
ens
bed 3
E-E
bath
bed 4
01
PERSPECTIVE 1
formal living
formal dining
butler's kit
kitchen
dining
KITCHEN SCALE 1:50 @ A1
alfresco
LIME AVENUE
01
A-A
SECTION CC SCALE 1:100 @ A1
B-B
A-A
C-C
B-B
C-C
01
PERSPECTIVE 2
KITCHEN SCALE 1:50 @ A1
PERSPECTIVE 4
02 ens
ens
bed 6
bed 3
atrium
retreat
living
formal dining
KITCHEN SCALE 1:50 @ A1
bed 4
kitchen
cellar
PERSPECTIVE 5
PERSPECTIVE 3 Amendments
No.
Date
Description
Notes ANY ERRORS, DISCREPANCIES OR OMMISSIONS IN THE DRAWINGS, NOTATIONS OR DIMENSIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION PRIOR TO WORKS COMMENCING. DO NOT SCALE FROM DRAWINGS ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, MECHANICAL, ELECTRICAL, HYDRAULIC, LANDSCAPE ARCHITECTURAL DRAWINGS LOCATION OF ALL HARDWARE, FIXTURES AND FITTINGS TO BE CONFIRMED WITH ARCHITECT PRIOR TO WORKS COMMENCING.
Project
4 MILLER CRESCENT, MOUNT WAVERLEY Title
PERSPECTIVES
SHADOW DIAGRAM @9AM
SHADOW DIAGRAM @10AM
SHADOW DIAGRAM @12PM
SCALE 1:200 @ A1
SCALE 1:200 @ A1
SCALE 1:200 @ A1
01
SECTION DD
01
SCALE 1:100 @ A1
Date Drawn Project No.
31-03-2014 Scale AL/JW Checked
Amendments
Drawing No. JW
AL
13040
Amendment
TP00
-
No.
Date
Description
Notes ANY ERRORS, DISCREPANCIES OR OMMISSIONS IN THE DRAWINGS, NOTATIONS OR DIMENSIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION PRIOR TO WORKS COMMENCING. DO NOT SCALE FROM DRAWINGS ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, MECHANICAL, ELECTRICAL, HYDRAULIC, LANDSCAPE ARCHITECTURAL DRAWINGS LOCATION OF ALL HARDWARE, FIXTURES AND FITTINGS TO BE CONFIRMED WITH ARCHITECT PRIOR TO WORKS COMMENCING.
Project
4 MILLER CRESCENT, MOUNT WAVERLEY Title
SHADOW DIAGRAM
SCALE 1:100 @ A1
KITCHEN
02
SCALE 1:50 @ A1
KITCHEN SCALE 1:50 @ A1
JESSE ANT ARCHITECTS 712/8 Marmion Place Docklands Victoria Australia 3008 Date Drawn Project No.
31-03-2014 Scale AL/JW Checked
Drawing No.
1:200
JW
AL
13040
Amendment
TP14
-
Amendments
No.
Date
Description
Notes
Project
ANY ERRORS, DISCREPANCIES OR OMMISSIONS IN THE DRAWINGS, NOTATIONS OR DIMENSIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION PRIOR TO WORKS COMMENCING.
DO NOT SCALE FROM DRAWINGS ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, MECHANICAL, ELECTRICAL, HYDRAULIC, LANDSCAPE ARCHITECTURAL DRAWINGS LOCATION OF ALL HARDWARE, FIXTURES AND FITTINGS TO BE CONFIRMED WITH ARCHITECT PRIOR TO WORKS COMMENCING.
TOWN PLANNING
SECTION EE
01
JESSE ANT ARCHITECTS 712/8 Marmion Place Docklands Victoria Australia 3008
Title
SECTIONS
JESSE ANT ARCHITECTS
Amendments
712/8 Marmion Place Docklands Victoria Australia 3008 Date Drawn Project No.
1:100 15-06-2014 Scale AL/JW Checked
Drawing No. JW
AL
13025
Amendment
A303
No.
Date
Description
Notes
Project
ANY ERRORS, DISCREPANCIES OR OMMISSIONS IN THE DRAWINGS, NOTATIONS OR DIMENSIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION PRIOR TO WORKS COMMENCING.
DO NOT SCALE FROM DRAWINGS ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, MECHANICAL, ELECTRICAL, HYDRAULIC, LANDSCAPE ARCHITECTURAL DRAWINGS LOCATION OF ALL HARDWARE, FIXTURES AND FITTINGS TO BE CONFIRMED WITH ARCHITECT PRIOR TO WORKS COMMENCING.
Title
INTERNAL ELEVATION 1
JESSE ANT ARCHITECTS 712/8 Marmion Place Docklands Victoria Australia 3008 Date Drawn Project No.
15-06-2014 Scale AL/JW Checked
Drawing No.
1:50
JW
AL
13025
Amendment
A500
DOCUMENTATION - HOUSE
24
SNAPSHOTS OF PROJECTS FROM WORK
Energy Rating requirements 103 terrace
104 terrace
105 terrace
105 privacy screen
Draught Control methods C-C
B-B
W44
103 terrace
W45
103 bed1
103 ens
W46
103 bed2
W48
104 bed1
W49
104 terrace
W50
104 bed2
W51
105 bed
-
W54
W52
105 terrace
106 bed1
106 bed2
‘
103
103 ens
104
104 bed2
105
105 wc
106 bed2
’
ALL Windows/glazed doors
103 living&kit
103 study
104 wc
104 kit&dining
104 ens
105 wc
105 kit&dining
corridor
wall adjoining 102&103
106
corridor
106
M2 SINGLE SPLIT LEVEL BRICK HOUSE ADDITION TILE ROOF
NO.998 TILE ROOF SINGLE STOREY BRICK HOUSE
A
B
C
D
‘
E
186°55' 45.72
M3
M11
M4
M3
LIVING
ENS
M2
M5
M5
M12
105 terrace
106 bed1
W55
104 bed2
106 ens 105
105 study 104 ens
107 ens
107
G08 BAL
M3
F
UP
DN
2
BED1
8 7
LIVING
6
3
5
BED2
6
3
7
2
8
1
void
4
5
VOID
107 terrace
4
LIVING
BED1
BED1
106 kit
105 wc corridor
DP
KITCHEN
BED2
101 WC
fire stair
ENS
LIFT
KITCHEN & DINING
DP
G02 BAL
3
WC
DINING
KITCHEN
102
BED2
4
M3
4
ENS
natural ground line at boundary
107 107 terrace privacy screen
F
WC
F
3 lift
M9
corridor
F
LIVING
fire stair landing
101 bed2
106
service
DINING
DINING
fire stair landing
101 bed1
M12
M3
W56
STUDY
KITCHEN
corridor
WC
F
97°00' 25m
corridor
corridor 101 wc 101 ens
vent
W40
corridor
W39
102 kit W38
102 terrace
102
101
102 bed2 W37
M6
W57
WC
KITCHEN & DINING
ENS
107 wc
KITCHEN
107
WC
107 bed2
STUDY
1
102 bed1
102 ens
M4
106 wc
2 105
STUDY
KITCHEN
277°00' 25m
104
104
104 study W41
103
104 wc
103 kit
ENS
STUDY
103
DINING
101 terrace
Draught Control methods
M5
106 terrace
BED2
105 bed
BED
ENS
DINING
LIVING
G03 BAL
106 bed2
BED1
104
2
DP
Energy Rating requirements
BALCONY WITH SCREENING
M8
107 bed1
BED2
BED2
102 wc
RL. 57.130
M11
106
BED1
WC
LIVING
M5
TILE ROOF
107 terrace
104 terrace
104 terrace
103 wc
W43
103 bed1
104 bed1
103 terrace
BED1
LIVING
A-A
M9
’
NO.1 SINGLE STOREY
1 W'BOARD HOUSE DP
SCALE 1:100 @ A1
’
F
1
EAST ELEVATION
‘
existing 1.5m paling fence
natural ground line at bulding
natural ground line at boundary
proposed ground line
natural ground line at building
-
-
‘
-
’
A
-
B
C
6°55' 45.72
D
E
NORTH ELEVATION
F
ALL Windows/glazed doors
HILLSIDE PARADE
WEST ELEVATION
SCALE 1:100 @ A1 102 terrace
‘
‘
’
102
101 kit
101 wc
101 ens
vent
corridor
service
service
107 dining
107 l'dry
107 wc
SCALE 1:100 @ A1
106 living
’ 102 terrace
102 living
102 bed2
SOUTH ELEVATION
MATERIAL SCHEDULE
102 l'dry
102 ens
W36
102 wc
102 bed1
101
101 living
W35
W34
101 bed2
lift
101 bed1
W33
101 bed2
W32
corridor
107 ens
void
fire stair
W31
107
107 bed1
107 bed2
W63
W62
W61
106 terrace
107 terrace
W60
W59
W58
1700mm lovers to restrict overlooking (angle of inclination of lovers to be determined on site)
SCALE 1:100 @ A1
ISSUE FOR CONSTRUCTION 04.01.2015 Amendments
No.
Date
Project
Notes
Description
ANY ERRORS, DISCREPANCIES OR OMMISSIONS IN THE DRAWINGS, NOTATIONS OR DIMENSIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION PRIOR TO WORKS COMMENCING.
JESSE ANT ARCHITECTS
994 TOORAK ROAD CAMBERWELL
DO NOT SCALE FROM DRAWINGS
Drawing No.
1:100 26-07-2014 Scale AL/JW Checked
Date Drawn Project No.
EAST & SOUTH ELEVATION
LOCATION OF ALL HARDWARE, FIXTURES AND FITTINGS TO BE CONFIRMED WITH ARCHITECT PRIOR TO WORKS COMMENCING.
101 terrace
FIRST FLOOR PLAN
JW
AL
No.
Date
106 terrace
ISSUE FOR CONSTRUCTION 04.01.2015 Project
Notes
Description
ANY ERRORS, DISCREPANCIES OR OMMISSIONS IN THE DRAWINGS, NOTATIONS OR DIMENSIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION PRIOR TO WORKS COMMENCING. DO NOT SCALE FROM DRAWINGS
Amendment
A301
13040
107 terrace
SCALE 1:100 @ A1
Amendments
712/8 Marmion Place Docklands Victoria Australia 3008
Title
ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, MECHANICAL, ELECTRICAL, HYDRAULIC, LANDSCAPE ARCHITECTURAL DRAWINGS
M5
M3
M11
M1
M2
M11
M3
M2
M12
M1
M5
M6
712/8 Marmion Place Docklands Victoria Australia 3008 1:100 26-07-2014 Scale AL/JW Checked
Date Drawn Project No.
FIRST FLOOR PLAN
LOCATION OF ALL HARDWARE, FIXTURES AND FITTINGS TO BE CONFIRMED WITH ARCHITECT PRIOR TO WORKS COMMENCING.
M5
JESSE ANT ARCHITECTS
994 TOORAK ROAD CAMBERWELL Title
ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, MECHANICAL, ELECTRICAL, HYDRAULIC, LANDSCAPE ARCHITECTURAL DRAWINGS
-
Drawing No. JW
AL
Amendment
A103
13040
C
Energy Rating requirements
Draught Control methods -
M3 ‘
-
M3
’
ALL Windows/glazed doors 202
203
206
CORRIDOR
205 WC
103
BED 2
CORRIDOR
G03
106
CORRIDOR
G08
‘
‘
’
’
RL. 49.680 +
BED
RL. 49.098 +
GBB5
existing 1.8m brick fence
C1
C1
C1
C1
existing natural ground line at boundary proposed ground line
SECTION A-A
SOUTH ELEVATION
SCALE 1:100 @ A1
SCALE 1:100 @ A1
ROOF: WALLS:
SCALE 1:50 @ A1
204 LIVING
RL. 53.650
CORRIDOR
LIFT CORE
AIR VENT
CORRIDOR
Energy Rating requirements
104 KITCHEN
AWNING:
Draught Control methods -
CORRIDOR
WC
G05 STUDY
‘
-
BED
(5) SELECT CEMENT RENDER SMOOTH FINISH, inc. INTEGRAL COLOUR, DULUX COLOUR SPECIFIER, “DEEP GARNET” OR SIMILAR (6) FRAMELESS CLEAR GLASS DOWNPIPES: (7) SELECT SHEET STEEL, COLORBOND “WOODLAND GREY” OR SIMILAR GUTTERS/FASCIAS: (7) SELECT SHEET STEEL, COLORBOND “WOODLAND GREY” WINDOWS: (8) ALUMINIUM FRAME .SELECT COLOURBOND COLOUR, “WOODLAND GREY” GARAGE DOORS: (9) SELECT SHEET STEEL, COLORBOND FINISH “SURFMIST” DRIVEWAY: (10) EXPOSED AGGREGATE; (11) clear glass (12) fixed obscure glazing to 1700mm height
ALL Windows/glazed doors
CAR PARK
‘
‘
’
’
SECTION B-B
Notes
SCALE 1:100 @ A1
No.
Date
Project
Notes
Description
ANY ERRORS, DISCREPANCIES OR OMMISSIONS IN THE DRAWINGS, NOTATIONS OR DIMENSIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION PRIOR TO WORKS COMMENCING. DO NOT SCALE FROM DRAWINGS ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, MECHANICAL, ELECTRICAL, HYDRAULIC, LANDSCAPE ARCHITECTURAL DRAWINGS LOCATION OF ALL HARDWARE, FIXTURES AND FITTINGS TO BE CONFIRMED WITH ARCHITECT PRIOR TO WORKS COMMENCING.
JESSE ANT ARCHITECTS
994 TOORAK ROAD CAMBERWELL
Date Drawn Project No.
SECTION A-A & B-B
1:100 26-07-2014 Scale AL/JW Checked
Drawing No. JW
AL
13040
No.
Date
Project
Notes
Description
ANY ERRORS, DISCREPANCIES OR OMMISSIONS IN THE DRAWINGS, NOTATIONS OR DIMENSIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION PRIOR TO WORKS COMMENCING.
Amendment
A400
SCALE 1:5 @ A1
SCALE 1:20 @ A1
Amendments
712/8 Marmion Place Docklands Victoria Australia 3008
Title
ENTRANCE STAIR DETAIL
PERFORATED SCREEN & PFC FRAME DETAIL
ISSUE FOR CONSTRUCTION 04.01.2015 Amendments
(1) SHEET STEEL ROOFING, COLORBOND, “MANOR RED” OR SIMILAR FINISH (2) FACE BRICKWORK, BORAL, “BLUE RIO” OR SIMILAR (3) SELECT CEMENT RENDER, SMOOTH FINISH, INCL. INTEGRAL COLOUR, DULUX COLOUR SPECIFIER “NATURAL WHITE” OR SIMILAR (4) SELECT ALUCOBOND FEATURE CLADDING “SMOKE SILVER” OR SIMILAR (5) SELECT CEMENT RENDER SMOOTH FINISH, inc. INTEGRAL COLOUR, DULUX COLOUR SPECIFIER. “DEEPGARNET” OR SIMILAR
BALUSTRADE:
’
DISABLE LIFT
SCALE 1:100 @ A1
Materials and Finishes Schedule
ENTRANCE STAIR DETAIL CORRIDOR
natural ground line at boundary
existing 1.9m paling fence
EAST ELEVATION
DO NOT SCALE FROM DRAWINGS
-
ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, MECHANICAL, ELECTRICAL, HYDRAULIC, LANDSCAPE ARCHITECTURAL DRAWINGS LOCATION OF ALL HARDWARE, FIXTURES AND FITTINGS TO BE CONFIRMED WITH ARCHITECT PRIOR TO WORKS COMMENCING.
ISSUE FOR CONSTRUCTION 04.01.2015
JESSE ANT ARCHITECTS
994 TOORAK ROAD CAMBERWELL
712/8 Marmion Place Docklands Victoria Australia 3008 26-07-2014 Scale AL/JW Checked
Date Drawn Project No.
Title
DETAILS
Drawing No.
1:100 & 1:50
JW
AL
13040
Amendment
A603
ANY ERRORS, DISCREPANCIES OR OMMISSIONS IN THE DRAWINGS, NOTATIONS OR DIMENSIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION PRIOR TO WORKS COMMENCING. DO NOT SCALE FROM DRAWINGS ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, MECHANICAL, ELECTRICAL, HYDRAULIC, LANDSCAPE ARCHITECTURAL DRAWINGS LOCATION OF ALL HARDWARE, FIXTURES AND FITTINGS TO BE CONFIRMED WITH ARCHITECT PRIOR TO WORKS COMMENCING.
Jesse Ant Architects
(1)
Suite 801, Level 8, 492 St Kilda Road, Melbourne VIC 3004 Ph: (03) 9820 5211 Email: info@jesseantarchitects.com.au; www.jesseantarchitects.com.au ABN: 97 704 554 379
(2)
(3)
(4)
(5)
(10)
Project
Drawing Number
Project Number
A400
15029
85 Thames Street, Box Hill Drawing
Date
ELEVATIONS
Drawn
02-12-2015
1:100
Scale Checked
Amendment
AL /JW
-
Energy Rating requirements tactile indicator as per AS 1428.4 2002
tactile indicator as per AS 1428.4 2002
tactile indicator as per AS 1428.4 2002
tactile indicator as per AS 1428.4 2002
SET OUT POINT
Draught Control methods
DN
-
DN
’
Unit 6
Garage L'dry tile
Pwd tile
Pwd tile
L'dry
L'dry
tile
tile
Pwd tile
Pwd tile
L'dry
Pwd tile
Unit 7 floorboard
concrete
tile
Ens tile
STAIRS
STAIRS
STAIRS
STAIRS
180 SET DOWN
STAIRS
Porch
ALL Windows/glazed doors balustrade as per manufacture specification
Unit 5
concrete
Unit 1
-
balustrade as per manufacture specification
SET OUT POINT
Unit 4
Unit 3 Garage
‘
-
180 SET DOWN
180 SET DOWN
STAIRS
180 SET DOWN
180 SET DOWN
180 SET DOWN
Unit 8
balustrade as per manufacture specification
balustrade as per manufacture specification
STAIRS
WC tile
Garage
Garage
Garage
concrete
concrete
concrete
Unit 2
‘
’
Ens tile
STAIRS 180 SET DOWN
Porch
‘
180 SET DOWN
’
Garage concrete
SET OUT POINT
BASEMENT
GROUND FLOOR
FIRST FLOOR
SECOND FLOOR
SCALE 1:50 @ A1
SCALE 1:50 @ A1
SCALE 1:50 @ A1
SCALE 1:50 @ A1 UNIT 1
UNIT 2
UNIT 3
UNIT 4
UNIT 5
UNIT 6
UNIT 7
SETOUT PLAN SCALE 1:100 @ A1
Notes ANY ERRORS, DISCREPANCIES OR OMMISSIONS IN THE DRAWINGS, NOTATIONS OR DIMENSIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION PRIOR TO WORKS COMMENCING. DO NOT SCALE FROM DRAWINGS ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, MECHANICAL, ELECTRICAL, HYDRAULIC, LANDSCAPE ARCHITECTURAL DRAWINGS LOCATION OF ALL HARDWARE, FIXTURES AND FITTINGS TO BE CONFIRMED WITH ARCHITECT PRIOR TO WORKS COMMENCING.
LIFT CORE
E T
STAIR CORE SECTION1
STAIR CORE SECTION2
SCALE 1:50 @ A1
Amendments
No.
SCALE 1:50 @ A1
Date
Description
Notes ANY ERRORS, DISCREPANCIES OR OMMISSIONS IN THE DRAWINGS, NOTATIONS OR DIMENSIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR CLARIFICATION PRIOR TO WORKS COMMENCING. DO NOT SCALE FROM DRAWINGS ARCHITECTURAL DRAWINGS TO BE READ IN CONJUNCTION WITH SPECIFICATIONS, MECHANICAL, ELECTRICAL, HYDRAULIC, LANDSCAPE ARCHITECTURAL DRAWINGS LOCATION OF ALL HARDWARE, FIXTURES AND FITTINGS TO BE CONFIRMED WITH ARCHITECT PRIOR TO WORKS COMMENCING.
Project
994 TOORAK ROAD CAMBERWELL Title
DETAILS
DOCUMENTATION - LOW RISE APARTMENT
25
STAIR DETAIL SCALE 1:5 @ A1
ISSUE FOR CONSTRUCTION 04.01.2015
JESSE ANT ARCHITECTS 712/8 Marmion Place Docklands Victoria Australia 3008 Date Drawn Project No.
26-07-2014 Scale AL/JW Checked
Drawing No.
1:100 & 1:50
JW
AL
13040
Amendment
A600
-
BUILT PROJECT
Jesse Ant Architects
Suite 801, Level 8, 492 St Kilda Road, Melbourne VIC 3004 Ph: (03) 9820 5211 Email: info@jesseantarchitects.com.au; www.jesseantarchitects.com.au ABN: 97 704 554 379
Project
85 Thames Street, Box Hill
Project Number
Drawing Number
A100
15029
Drawing
Date
SETOUT PLAN
Drawn
02-12-2015
Scale Checked
1:100 AL /JW
Amendment
to make x to draw x to explore BACHELOR OF ARCHITECTURE PORTFOLIO by Rita Wei