Rithu portfolio

Page 1

portfolio

architecture + design Selected works 2013 | 2016

rithu roy M.Arch | AADRL

1


| Aerial Sand Printing 02 | Encoding Matter 03 | Spanning Skeletons 01

04

2

| Hyperthreads 2013

Architecture + Design | Selected Works 2013-2016

professional

research

contents

|V 06 | I 07 | S 08 | B 05

09

|E


academic

Vaishnavi Apartments | Bangalore Indian Business School | Mohali Site Office | Khardi Bungalow Scheme | Lonavala

10

| A city on the hill

Elizabeth House | Dadar

3


cv

Rithu Mathew Roy

M.Arch | Architecture and Urbanism (AADRL) Helen Graham House 57 Great Russell Street London WC1B 3BA

Address |

Although architecture started for me with a passion to develop space and a creative environment, it eventually evolved into the creation of innovative design processes which involves space, form, materiality and structure. My interest lies in the detailed material organisation, exploration of new design tools and systems towards a research-based design methodologies and the conception of comprehensive design proposals. During my professional environment, I handled two projects simultaneously, coordinating detailed BIM Models with structural and MEP and further giving a detailed and informed dialogue between the construction on site and the consultants. After my post graduation in AADRL, I developed a profound interest in robotics and communcation and thus comprehending the opportunities in architecture and design through machine coding and scripting. Also, the group projects made me quite efficient and innovative in terms of ideas and interactions and an adaptive nature in any kind of group work. With multiple computational skills evolved over time, I’m eager to implement these skills in a comprehensive area of reference.

4

Architecture + Design | Selected Works 2013-2016

e-mail | rithu_roy@hotmail.com mobile |

+44 7448442745

date of birth | 22 Nov 1990 nationality | Indian


education 2016 | M.Arch | Architectural Association School of Architecture, London | Architecture and Urbansim [AADRL]

Post Graduate

2013 | B.Arch | National Institute of Technology Patna, India | CGPA - 8.22

Undergraduate

2008 | AISSCE | CBSE | Indian School Al Ghubra, Oman | 78.8%

12th grade

2006 | AISSE | CBSE | Indian School Al Ghubra, Oman | 91.2%

10th grade

professional summer internship

July 2015 | Robert Stuart-Smith Design, London

junior architect

October 2013 - May 2014 | InFORM Architects, Bangalore, India Working Drawings | Executive Housing, Bachelors Housing-2, Indian School of Business, Mohali Design | Vaishnavi Apartments, Bangalore Design | Marigold Apartments, Bangalore

academic internship

June 2012 - October 2012 | Sanjay Puri Architects, Mumbai, India Working Drawings + Design | Elizabeth House, Suraj Developers, Dadar Design | Kavya Buildcon Bungalow Scheme, Lonavala Design | Luxury Hotel, Kolkata Design | Site Office,Commercial Complex, Suite extension, Khardi Township

summer internship

June 2011 - July 2011 | Ninan Philip & Associates, Cochin, India Working Drawings | MMAR School, Chengannur Design | CSI Church, Thiruvalla Design | Car Showroom, Karunagapally

languages english malayalam hindi

skills

Drafting

AutoCAD 2D

Graphics + Visualisation

Modelling

Adobe Photoshop Adobe Indesign Adobe Illustrator Adobe After Effects Adobe Premiere Mental Ray (Rendering) MS Office

Revit Architecture Google Sketchup 3ds Max Autodesk Maya Rhinoceros Grasshopper AutoCAD 3D

December 2013 | Hyperthreads Bangalore October 2014 - November 2014 | Material Computation November 2014 - December 2014 | Encoding Matter

Theodore Spyropoulos Director | AADRL London Director | Minimaforms AA School of Architecture 36 Bedford Square London WC1B 3ES e-mail: theo@minimaforms.com

Code

Processing Python ROS Arduino Other Skills

Linux Operating System CNC Machine Laser Cutting

research AA Visiting School

AADRL Material Workshop AADRL Computational Workshop

reference

Robert Stuart Smith Studio Course Master | AADRL London Founding partner | Kokkugia Director | Robert Stuart Smith Design AA School of Architecture 36 Bedford Square London WC1B 3ES e-mail: rss@robertstuart-smith.com 5


01 research

research | thesis

Plín[θ]os Aerial Sand Printing

6

Architecture + Design | Selected Works 2013-2016


Brief AADRL Architectural Association School of Architecture, London

Plín[θ]os explores the use of autonomous distributed robots to fabricate temporal structures in a closed loop ecology where local material and energy harvesting ensure rapid, adaptable and environmentally sensitive design solutions are intrinsic to a algorithmic construction process.

Team

| Marialena Bali, Raissa Fonseca, Assad Khan, Rithu Mathew Roy

The research employs a swarm of autonomous multicopters (UAVs) in combination with autonomous rovers (UGVs) to 3D print structures utilising locally available resources as a deposition material and as a 3D printing sub-strate (support structure) to simplify construction while reducing waste and logistical complexities.

| Robert Stuart Smith

The project employs this technology for the constant monitoring of desert regions where desert-greening initiatives can be autonomously identified and executed with frequency and urgency in the hope of reducing the increasingly serious adverse affects of climate change. Desert regions where water sources are identified are suggested as opportunistic locations for the autonomous construction of oasis irrigation, plantations and temporary accommodation shelters. The locally available sand is utilised as a construction material, mixed only with a binder and water. Sand dunes are appropriated as a scaffolding for the 3D printing process. Architectural spaces are created to replace the volume of sand dunes through a iterative process of 3D printing on the surface of dunes, adding additional sand and 3D printing additional layers of structural surface on top of one another. The sand substrate is then excavated by UVGs to create architectural shelters. These temporal shelters are to eventually erode and re-integrate into their monolithic material environment with minimal environmental impact.

M.Arch |

Tutor

The research employs multi- agent stigmergic processes in both camera-vision autonomous UAV flight and in design simulations to enable previous building activity to inform subsequent building operations. In this way construction is able to emerge from the complex real-time interactions of an autonomous swarm of building robots that are capable of adapting a suitable design to varied, situated on-site environments. A comprehensive development of bespoke material mixtures, material deposition hardware suitable for UAV 3d printing and both on-board and off-board flight control programs have demonstrated the viability of the design proposition and clarify the necessary parallel development of these elements in relation to algorithmically controlled construction sequences.

7


8

Architecture + Design | Selected Works 2013-2016


mix 01

mix 02 • • •

200g sand 600ml water 20 g binder

Sand:Water:Binder= 1:3:0.1

Physical model

mix 04

mix 03 • • •

200g sand 200ml water 15g binder

Sand:Water:Binder= 1:1:0.08

• • •

200g sand 100ml water 200 g binder

Sand:Water:Binder= 2:1:2

• • •

200g sand 400ml water 20 g binder

Sand:Water:Binder= 1:2:0.1

Deposition Maneuver

Linear deposition Deposition style 1

Slow deposition Deposition style 2

Multiple layers deposition Deposition style 3

Fluid deposition Deposition style 4

9


Printing prototypes development based on constrains Center of Gravity

Untethered Flight

Tethered Flight

Broken Line

Continuous Line

Nozzle under ground effect

Nozzle on airshadow area

Air Shadow

Flow

Light Weight

Distribution of Weight

Center of Gravity

Comparative study of aerial printed prototypes

Printing with Mix 02

Printing with Mix 03

Printing with Mix 04

Printing with Mix 05

Viscosity

Viscosity

Viscosity

Viscosity

Flow Rate

Flow Rate

Flow Rate

Flow Rate

Strength

Strength

Strength

Strength

Drying Time

Drying Time

Surface Absorption

Surface Absorption

Output : Line like Behaviour

10

Output : Line like Behaviour

Architecture + Design | Selected Works 2013-2016

Drying Time Surface Absorption

Output : Discontinuous broken lines

Drying Time Surface Absorption

Output : Continuous Lines Behaviour


Printing prototype in landed mode

Printing Prototype v2.3 Specifications Arduino harware 21g Battery 9V 46g Linear Actuator 38g Steel frame 20g Syringe 100ml 27g Total Weight = 152g

Components

11.1 V power supply Rotating steel frame Tightening screws Iron-zinc coated tower bolt assembly for rigid frame 100 ml silicon-coated plastic syringe Firgelli micro linear actuator 50mm stroke Plunger tip Cathetic tip Orifice reducer for increase in flow rate Qw

Microcontroller 433 MHz four Channel Radio receiver Linked to transmitter Solderless Micro-breadboard Arduino UNO with 5v power supply

Printing prototype during material deposition

Way Points from a simulated environment The IR cameras were used in order to execute a series of way points. The points were given as inputs P(x,y,z) from a simulated environment.

11


Autonomous flights through a centralized communication system Basic Maneuvers using Vicon IR cameras : 3 WayPoints

Responsive Prinitng: Material Refilling

Multiple UAV’s Choreography using offboard Vicon IR cameras: Separation and Cohesion

Multiple UAV’s Choreography using Onboard camera vision: Separation and Cohesion

Leader UAV

Leader UAV Follower UAV

V Follower UA

Follower UAV’s Onboard Camera View

Follower UAV’s Onboard Camera View

This sequence shows the movement of drone detecting its target and following the quad ahead of it.

12

Architecture + Design | Selected Works 2013-2016


C2

C1

C3 y

B

e St

er

(x V1

1 1,z

1 ,y

Intended position Actual position

Steer V2(x2,y2,z2)

(x1,y1,z1)

)

10cm A

C(x2,y2,z2)

,z3) (x3,y3 Steer V3

Starting Point

Accuracy Stability

D (x3,y3,z3)

Vicon Camera Positions C5

C4

C5

y

x x

C1

C2

C3

Responsive printing

P1

Material deposition Linear actuator ON Amount of material emitted

Ptemp

Material tracking

t)

Quad 1- quad 2 t,z

Swarm printing based on separation cohesion alignment to what is already deposited.

t,y t(x rV ee St

Quad 1

r ee

St

1)

1,z

1,y

(x

V1

er

Ste

Quad 2

)

,zs

,ys

(xs

Vs

)

2,y2,z2

r V2(x

Stee

Position stored after deposition

P2 Construction area

Material refillment point Linear actuator ON C4 C

IR CAMERA SETTING SYSTEM Semi-autonomous System

IR Vicon Camera

C5

Position Ptemp, is a potential position where a canister of material will be emptied and from where the Uav needs to return to the material refillment point. The coordinates of Ptemp(xt,yt,zt), are stored locally in the system, so the Uav can steer towards this way point to continue the printing.

Responsive Prinitng: Stigmergy

Printing UAV

Following UAV : Alignment

Following UAV : Separation

Object tracking programs are able to establish swarm based rules of separation and cohesion. And by using these visual tracking programs, the stigmergic rules for aerial 3D printing was created which is able to form a closed loop system for construction.

Following UAV : Cohesion

Printed Matter Following UAV path

13


Autonomous flight based on local positioning using Computer Vision One of the ways of using Local Positioning of a UAV is by using the onboard computer vision through SLAM. The main disadvantage of using the onboard vision is that it is only aware of what is seen immediately in front of it [even though ideally a 360 degree camera can be used on board, the openCV based colour/ object detection is not reliable].

The camera detects stationary points as slam points for the computer vision

The movement of the UAV in Plan Continuous flow of material achieved

14

Architecture + Design | Selected Works 2013-2016


Material refilling and battery charging in a simulated environment Simulation mapped on a rounded dune based on log equation patterns and branching

15


Construction sequence Columns model Step 01: Print columns

Step 02: Add sand dunes

Step 03: Print first layer

Step 04: Add sand dunes on top of columns

Step 05: Print second layer

Step 06: Remove loose sand

Deposition pattern - continuous loop

step 01.

step 03.

step 02.

steps 04 & 05.

step 06.

16

Architecture + Design | Selected Works 2013-2016

Simulated construction sequence of a basic pavilion: The columns are the first to be constructed, then material is deposited on top of the above dunes and then the ground level is built


17


Multilayered deposition strategy

Top View

Perspective View

Elevation Displacement analysis

Stress Analysis

Stress Distribution

Multi layers of the deposition strategy

WIND DIRECTION TENTACLES

18

Architecture + Design | Selected Works 2013-2016

Structural analysis of the proposed shell


Allignment to the topographic contours of the dune and wind as a parameter affects the UAVs direction

field 003 wind=15m/s

indicative double layer section

Exterior Top Level 6.0m

Interior Top Level

3.6m

Ground Level Upper Ground Level Lower Ground Level

19


20

Architecture + Design | Selected Works 2013-2016


21


Processing > Real Time(Arduino/Proximity Sensor) > CNC

The main aim of this workshop was to create a real- time environment providing live- data feeds and location based services. This workshop also focused on ways to establish more inter- related physical and computational simulations. Potentially,there was investigation of the agent behaviours and trying to establish simple rules to create complex outcomes in physical fabrication.

3000mm z max

proximity IR sensor - Z axis

-3000mm z min

In our project, we aimed to design a digital system with the kinect camera and the proximity sensor which would develop behaviors of sensing, acting and feedback of live feeds to the CNC and thus resulting in physical milled pieces. The main challenge of this workshop was to develop skills in algorithmic designing (scripting), Arduino electronics, Kinect, Proximity Sensors, CNC milling and analyze their behaviors critically to design a real time environment.

02 research

research | computational workshop

Encoding Matter AADRL London

Single agent processing output milled real-time with a 6 mm End Mill bit

M.Arch | AADRL Architectural Association School of Architecture, London Team | Marialena Bali,

Rithu Mathew Roy, Qiao Zhang

Grid detection = TorusSpace void created the need for a rule which would lift the drill up each time the agent crosses the borders

22

Architecture + Design | Selected Works 2013-2016

Tutor | Robert Stuart Smith


Multiple agents based adaptive simulations- Swarm behaviors

23


Autonomous System : The final design outcome as part of a real-time, feedbacked simulation process

The real-time feedback loop process STEP 1 : Coding to move with an acceleration from white to black. Result : The agent tends to stay in the black area. STEP 2 : Coding for the agent to move avoiding the black and the white

area at the same time.

Result : The agent stays near the border line between black and white. STEP 3 : Coding for the agent with a set of local rules to move avoiding the black and white area and stays in a specific range of grey. Result : The agent detects the grey area but the agent tends to follow the same path and the image contrast has to be altered so that it seeks and moves in different grey area. STEP 4 : Coding for the kinect detected image to change its image brightness and contrast manually to improve accuracy. STEP 5 : Coding for the z depth to vary everytime the agent goes back to its origin.

V bit is considered as the most effective drill on milling large area surfaces. In our case the V bit was also elected asยง it can carve hollow path trails.

24

Architecture + Design | Selected Works 2013-2016


Seting up the workspace for the real-time experiment. The pc is running the processing agent based file, which is conected to the two sensors (inputs) and the cnc machine (output).The kinect camera detects the drills movent and sent data back to the screen. The agents behavior is controlled and therefore dependent to the machine’s movent and the distance measured by the proximity sensor.

Proxmity IR sensor position to detect the Cnc’s bed movemt in its axis. This distance is then mapped to adjust the brightness of the image sent back from the kinect camera, which results in the agent movement behavior.

Snapshots of the real time simulation process on screen mode, using Processing Software

Real time based final feedback loop -Fluvial Landforms simulation

25


Simulating fluvial landforms

Final 1:1 real time model, milled into a high density yellow foam, using a v-bit drill. The final product was milled 75% smaller than the actual 50x40 cm CNC bed dimensions. This was because we needed to map the kinect’s capture frame such that it focused on the yellow foam. In the picture above, the effective result of using the V-bit and its movement according to the processing agent file which was running in real time. An interesting effect is the “aggressive�way the foam piece was milled, as a result of the angle the kinect camera was placed into theCNC, and the use of the V-bit. The real time feedback loop was almost succesfully produced.

26

Architecture + Design | Selected Works 2013-2016


By a series of iterations of various digital explorations achieved based on different strategies, a further in-depth understanding of the computational simulations, the emergent complex behaviour that arises from the relations of numerous physical and digital systems was demonstrated.

27


03 research

The objective of the workshop deals with the exploration of material behavior and complexities of Sodium Acetate in forming a spanning structure. The challenge lies in dealing with a material of low compression, lower tensile capacities and brittle material composition. The potential and advantage of the material results from its behavior of instant state changing ability from fluid to solid giving an opportunity of spontaneous explorations of spanning structural forms constructed without scaffolding systems. The Initial exploration of the material probes the system of support connections in achieving maximum stability. The series of explorations are carried out in parallel with basic tests conducted in gathering material data in relation to parameters such as height-length-thickness-span. The resultant data informs the eventual design strategies in achieving an optimal maximum spanning structure.

research | material workshop

Spanning Skeletons AADRL London

M.Arch | AADRL Architectural Association School of Architecture, London Team | Yeonsuk Kim,

Rithu Mathew Roy, Anju Veerappa Satish, Tutor | Shajay Bhooshan

28

Architecture + Design | Selected Works 2013-2016


in order to obtain the overall system of surface arches the process of construction began with the raising of the peripheral members and consequently connecting them with the intermediate members.

The Surface strategy was iterated to producing several prototyes permutating and combining the start and middle support components to achieve stable formations. The exploration dealt with trying to achieve a form consisting of lower number of support members and higher spanning capabilities of the surface structure. The arch members of the middle component were gradually decreased in numbers testing the support and strength of the overall form.z

MODEL 1: Surface spanned structure

Start/End Module

Touch Down Module

Height

8 cm

9 cm

Span

14 cm

27 cm

No. of base members

6

4

Height

24 cm

24 cm

Span

12 cm

18 cm

No. of base memebers

6

2

MODEL 1

MODEL 2

MODEL 2: Surface spanned structure

29


The model was further iterated to consist of increased vaulted surface components resulting from an increased number of smaller base structures strategically located to distribute the overall loading of the upper surface onto the lower portion. This result provided higher stability due to an increase of support base components.

MODEL 3: Increased base structures

30

Architecture + Design | Selected Works 2013-2016


A stable base formation was constructed influenced by regular branching pattern and the concept of tree algorithm. The lower structure consisted of a 3 X 3-membered tetrahedral connection branching out further into a connection of 3-2-2 upper branching formation. The regularity in the branching stabilized and unified the overall form. This prototype was later combined with surface formations to result in hybrid spanning structures.

MODEL 4: 3-2-2 upper branching structure 3D modelled structure

31


Patterns | Research

TOPOLOGY | INTELLIGENCE Inspire | Optimal topology according to designer’s input and constrains.

Typology 01

The Forces applied

Resultant structure

Typology 02

The Forces applied

Resultant structure

32

Architecture + Design | Selected Works 2013-2016


04

visiting school | workshop

Hyperthreads 2013

AA Visiting School, Bangalore

research

Team

|

Raoul Parekh Rithu Mathew Roy Mayur Jain

40

60

80

40

20

20 40

40

40

40

60

80

80

60

20

20 60

dia a

60

60

dia b

60

dia a > dia b

The spacing between the curves defines the horizontal curvature [diameter]

The height of the curves defines the vertical curvature 33


Vaishnavi Apartments was a 41 floored high rise residential tower proposed for the Vaishnavi group, Bangalore. The project was a design proosal where different possibilities were presented to the client. The design shown here is one of the proposals with packets of greenery at various levels of the tower. The idea incorporated Vaastu, the traditional indian system of architecture and the parameters for LEED certification.

05 professional

professional | junior architect

Vaishnavi Apartmets High Rise, Bangalore

Office | InForm Architects, Bangalore Team | Padmashree

Bhargav V Kavinaya S Rithu Mathew Roy

Architect | Kiran Venkatesh

34

Architecture + Design | Selected Works 2013-2016


Typical Floor Plan - Tower 1

Typical Floor Plan - Tower 2

Typical Floor Plan - Tower 3

35


1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

19.1 20

19.2 21 22

23

24

25

26

27

28

29

30

31

32

35

36

37

38 39

40

41

A1

A2

100

3200

100

W10

A

130

DEPTH OF THE LINTEL / BEAM TO BE DECIDED ON FINALISATION OF THE CORRIDOR DETAILS [TO STRUCTURAL DETAILS]

3400

3400 CHAJJA 3200

100

130 100

W10

UP

A

3200

3200 LINTEL

A3

STAIRCASE-1 3400 x 7125

STAIRCASE-2 3400X7125

320

B

1050 CHAJJA

1475

1050 CHAJJA

W6

685

750

1900 CHAJJA

1

W6

380

1320 CHAJJA

W1

380

1320 CHAJJA

W6

3

DD4

1900 CHAJJA

W6

1730

1900 CHAJJA

W1

380

270

W1

1050 CHAJJA

380

1050 270 CHAJJA

W6

4

DD4

1900 CHAJJA

W6

750

750

1900 CHAJJA

W1

380

270

1050 CHAJJA

W1

380

1050 270 CHAJJA

W7

6

DD4

1900 CHAJJA

W7

750

750

1900 CHAJJA

W1

380

270

1050 CHAJJA

W1

1900 CHAJJA

8

W6

271

380

1049 CHAJJA

1900 CHAJJA

W6

W6

W1

510

1050 150 CHAJJA

370

B

W1

C

C DD4 230 780 230 500 1240 LINTEL

335

DISHWASH

AHU ROOM

2590 x 5300

3400 X 5300

230 1290

1900

520

230

2360 LINTEL

270

150

1660 LINTEL 1200

230

1900

150

1210 LINTEL DD4 200

1050

230

2360 LINTEL

230 1270

1900

230

2360 LINTEL

270

1050

230

1550 LINTEL W6

150

270 1320

1520 LINTEL W6

230

1050 270

1730

CW3

520

230

GD3

1900

520

230

2360 LINTEL

270 1050 230

150

2080

LOBBY/ RECEPTION

5

10745 X 5650 GP4

D3

1760 230 780

TOILET (FEMALE)

3400 x 5300

4590 x 3630

DD1

DD1

D1

1900

150

1520 LINTEL W7

230

2360 LINTEL

230 520

1900

520

230

2360 LINTEL

270

150

1050 1520 LINTEL W6

1320

1200

230

1900

520

1050

230

2360 LINTEL

150

FACULTY OFFICE-1 3400 x 5300

UP 1770 LINTEL 1200 570

1800 x 2700

231

230

DD4 1400 230 780 200 LINTEL W6

270 1551 LINTEL W6

1210 LINTEL DD4

1900

530

1759

2180

980 LINTEL DD4

D3

TOILET FOR DISABLED

D2

200 DD4 780 200 780

300

1310 LINTEL DD4

IT-HUB ROOM

GD1

2

D7

230

1550 LINTEL W7

370

2500 LINTEL

1200

D

FACULTY OFFICE-2

PANTRY

FACULTY OFFICE-4

DISCUSSION ROOM-1

FACULTY OFFICE

3400 x 5300

2180 x 5300

3400 x 5300

4590 x 5300

3400 X 5300

E

1430

F

D8

D4

D1

7

DD1

D1

D1

GP5

D1

GD2

G

D1

230

D6

230

1210 LINTEL DD4

1770

D4

G

1900 2360 LINTEL

GD1

AR-400B 1430 LINTEL 1200 230

230 150

1550 LINTEL W6

200 780 230

UP 230

D7

F

230 780 200 750

1660

230

230

LINTEL SECTION 1

1890 x 3500 460

E

1050 1550 LINTEL

230

TRASH RECYCLING ROOM

1050 230 1510 LINTEL

240

230 745

1200

D

230

LINTEL

1050

1600 LINTEL 40

4930 LINTEL

320 DD2

520 230

2360 LINTEL 1900

150 230

270

1520 LINTEL W6 1050 200

200

150

2360 LINTEL 1900

230

1800 LINTEL

1000 570

230

230

1230 LINTEL 1230 LINTEL 1000 230

2170

21

1630

DD3

520

2360 LINTEL 1900

230

150

TOILET (MALE)

FACULTY OFFICE-8

ELECTRICAL ROOM

4590 x 5300

3400 x 5300

3400 x 6370

1010 LINTEL DD4

28

W1

1050 270 CHAJJA

380

1900 CHAJJA

1230 LINTEL 1000 230

D3

200

270

1000 230 1230 LINTEL

950 950

19

18

750

CW2

CW1

3000 LINTEL

16

W1

3095

750

3100

130

2360 LINTEL 1900

230

520 230

2170

1000 1230 LINTEL

H

1230 LINTEL 230 1000

4590 LINTEL

GP5

D1

380

270

W7

1050 CHAJJA

AHU ROOM 2180 X 5300

13

1200

520

14

2360 LINTEL 1900

230

J K

D1

GD2

W1 380

1050 270 CHAJJA

1900 CHAJJA

520 230

W1

750

750

FACULTY OFFICE

4590 x 5300

3400 x 5530

2180

520

2360 LINTEL 1900

230

150

1210 LINTEL DD4

M N

S-7-2 AR-206

1200

P

230 780 200 1760 1400 LINTEL W6 200 1050

1550 LINTEL W6 1050 230

230

DD4

270

1900 CHAJJA

11

W6

1900 CHAJJA

W1 550

130

DISCUSSION ROOM-2

3400 x 5300

2500 370

S-1-2

AR-200

520

1900 LINTEL

280

230

Q

2360 LINTEL 1900

230

FACULTY OFFICE-6

980 LINTEL DD4

200 780 1520 780 LINTEL W6 1050 200 DD4 270

150 230

DD5

100

3300 CHAJJA

LINTEL SECTION 3

2170

1.8M WIDE CORRIDOR

2170

L

270

15

W7

1900 CHAJJA

W9 100

CW7

CW7

230

4590 LINTEL

2170

1230 LINTEL 1000 230

D1

3400 x 5300 DD3

150

1520 LINTEL W7 1050

DD4

320

3100 LINTEL

D1

FACULTY OFFICE-7

1400

230 780 200 1790

1520 LINTEL W7 1050 200

230

GD3

850

W6

1050 CHAJJA

3095 LINTEL

270

25

LINTEL

W6 380

1000 230 1230 LINTEL

1230 LINTEL 230 1000

1830 D3

2180

LIFT-1 CAPACITY-13

3030 LINTEL

2245

W1

1000 1230 LINTEL

12

DD1

450

D3

3100X6830

1900 CHAJJA

2170

D5

D1

3400 x 5300 LINTEL HEIGHT TO BE SPECIFIED BY THE VENDOR LD1

SERVICE LIFT

230

D2

FACULTY OFFICE-9

PEBBLE COURT

Q 750

230 2170

3200 LINTEL

230 DD3

STAIRCASE 3

R

1200 1430 LINTEL

2170

CAPACITY-13

GP2

MULTI-PURPOSE HALL 21150 x 24075

520

230

3000 x 5650

LD2

20

1520 LINTEL W6 1050 270

LIFT-2

LD1

LIFT LOBBY

2180

1790

1000 1460 LINTEL

2800

P

D1

UP

D1

3400 x 5300

1210 LINTEL DD4 200 780 230

230 1180

LINTEL

GENERAL STORE

8340 x 5300 1200

1210

PANTRY PRE-HEAT

N

19

DD1

230

LINTEL HEIGHT TO BE SPECIFIED BY THE VENDOR

1000

1230 LINTEL 1230 LINTEL 230 1000

2170

LINTEL 200 1200

D7

1360

D6

L

2170

GP3 GD5

300

K

M

230

1130 LINTEL

D6

1430 LINTEL

4095 LINTEL

1800 LINTEL

1200

1430 LINTEL 1430 LINTEL 230 1200

1970

4930 LINTEL

230

D12

J

230 1970

1800 LINTEL

1800 2030 LINTEL 2030 LINTEL 1800

835

230 670 2560

LINTEL 900 230

H

380

270

W1

1050 CHAJJA

10

W6

1900 CHAJJA

270

380

W6

1050 CHAJJA

W1 370

1050 280 CHAJJA

1900 CHAJJA

R

750

750

UP

3165 LINTEL

SLOPE 1:8

AR-400B

3165 LINTEL

CW10

S

S RAMP UP

CW4

GD4

UP

895

CW9

7570 LINTEL

1

1

2

3

4

5

6

7

8

9

10

11

12

3085 LINTEL

200

LINTEL DD2

AR-400B

125 570

0

LINTEL 570 895 200 LINTEL DD2

3085

T

LINTEL SECTION 2

CW8

125

DD2

UP

CW4

GD4

27

26 DD2

T

11040 LINTEL

13

14

15

16

17

18

19

19.1

20

19.2 21 22

23

24

25

26

27

28

29

30

31

32

35

36

37

38 39

LINTEL PLAN-GROUND FLOOR 1 : 100

40

41

KEY PLAN

MASTER PLAN

O

S

S T A F F IC E

E A G R T O

E T T O IL

IC P U B L IN G I T A W

O

S T A F F IC E

S

E T T O IL

T O A G R E

T O IL E T

W

NOTES

FIRST FLOOR

STAIRCASE-1

FHR-1

CORRIDOR

2150 2150

NOTES: ARCHITECTURAL DRAWINGS SHOULD BE REFERRED FOR LINTEL LAYOUTS AND GP1 RCC DETAILS ARE TO BE FOLLOWED AS PER STRUCTURAL DETAILS

1300 2667

D6

DD1

CW10

CW4

GD4

600

3500

900

WALL THK

LINTEL WITHOUT PROFILE [HEIGHT AS PER SCHEDULE]

GP4

GP3

GD1

3500 3500

51/2 SECOND FLOOR, PROMENADE ROAD FRASER TOWN BANGALORE- 560 005

HYDERABAD OFFICE SSL +316.45 M FLAT # 503 , 5TH FLOOR , SRIVATSASA APARTMENTS, METHODIST COLONY , BEGUMPET, HYDERABAD - 500016 PH:(0091) 040-33574812

CEILING PHFALSE : +91 (80) TO SEPARATE DETAIL

18

3500

41252683

MEP CONSULTANTS

LINTEL WITHOUT PROFILE ABOVE LIFT DOOR [HEIGHT TO BE SPECIFIED BY VENDOR]

GP2

CW10

CW4

12.04.2014

CONSERVE CONSULTANTS PVT LTD

CW9

DRAWING NO :

NO.12, FIRST CROSS STREET,KARPAGAM GARDENS, ADYAR, CHENNAI –600 020 PH: 91-44-4550 4313 / 2445 0655 FIRST FLOOR SSL +309.45 M EMAIL: info@conserveconsultants.com WEBSITE: www.conserveconsultants.com

TEL/FAX: 080 - 26507360 / 26507370 / 26610598 / 26610498

CW7

DATE :

SECOND FLOOR

GREEN BUILDING CONSULTANTS SSL +312.95 M

MECA PROJECT ENGINEERS PVT. LTD. 84/3, 4th Main Road, [Opp. Karnataka Mahila Hindhi Seva Samithi] Chamrajpet, Bangalore -560018.

CHAJJA PROFILE [HEIGHT AS PER SCHEDULE]

GOOD FOR CONSTRUCTIO

TECHNICAL PROJECTS THIRD CONSULTANTS FLOOR

HUNTER DOUGLAS LOUVERS TO SEPERATE DETAILS

200

ENTRY | LINTEL WITH TOILET WARDROBE

CORRIDOR

GD1

STRUCTURAL CONSULTANTS

ISB/EH1/WD/ A

DD2

MULTI-PURPOSE HALL

GROUND FLOOR FFL

GD4

+304.50 M GROUND FLOOR SSL +304.45 M

1600

SSL +304.45 M

SECTION S-2

14

16

18

19

20

21

ROOF

ROOF SSL +323.45 M

W5

3500

SSL +323.45 M

W1

TERRACE FLOOR

TERRACE FLOOR W9

D10

W12

W11

W2

W1

W2

W2

W1

W1

W2

SSL +319.95 M

D11

W8

W5

D11

W8

W2

W1

W5

W1

W2

W2

W1

W1

W1

W2

W8

W1

W2

W2

D11

W8

W2

W1

W1

W2

W2

W1

3500

SSL +319.95 M

THIRD FLOOR

THIRD FLOOR W9

W2

W1

W2

W2

W1

W1

W2

W2

SSL +316.45 M

W1

W1

W1

3500

W3

19000

SSL +316.45 M

SECOND FLOOR

SECOND FLOOR W9

W3

W2

W1

W2

W2

W1

W1

W2

W2

SSL +312.95 M

W1

W1

W2

W1

W7

W2

W1

W1

W1

W1

W1

W2

W2

W1

W1

W1

W1

W2

W2

3500

SSL +312.95 M

W1

950

1550

GD3

FIRST FLOOR

FIRST FLOOR SSL +309.45 M

MULTI-PURPOSE HALL

W6

GD3

CW2

W6

CW1

W7

W1

W6

W6

W6

W6

W1

3575

W6

5000

5000

SSL +309.45 M

5000

Indian School Business, Mohali

W4

GP1

ISSUED AS

AT SECTOR NO. 81, S.A.S NAGAR,SSL MOHALI, +319.95 M CHANDIGARH- PUNJAB

GROUND FLOOR

SSL +304.45 M

12

Executive Housing + Bachelors Housing 2

GP1

TOILET

D8

+304.50 M

GROUND FLOOR

SECTION S-1

professional | junior architect

D8

ENTRY | WARDROBE

D1

INDIAN SCHOOL OF BUSINESS TERRACE FLOOR

CORRIDOR

LIFT PIT

professional

D1

CORRIDOR

D1

GROUND FLOOR FFL

GROUND FLOOR FFL

CLIENT

GLEEDS HOOLOOMANN CONSULTING (INDIA) PVT . LTD .

LIVING / DINING

LINTEL LAY GROUND F

ROOF AT SECTOR NO. 81, S.A.S NAGAR, MOHALI, SSL +323.45 M CHANDIGARH- PUNJAB

PROJECT MANAGEMENT CONSULTANTS

LINTEL WITHOUT PROFILE ABOVE LIFT DOOR [HEIGHT TO BE SPECIFIED BY VENDOR]

DRAWING NAME

PROPOSED EXECUTIVE HOUSING - 2 FOR ISB CAMPUS N AT MOHALI

N

DUCT COVER TO STRUCTURAL DETAIL

3500

750

LD2

T

KITCHEN W4

CORRIDOR

SSL +309.45 M

+304.50 M FHR-1

S

NO 422, 2ND FLOOR, 9TH MAIN ROAD, BANASHANKARI II STAGE, BANGALORE- 560070 PH/FAX: +91 80 26713360/61/62 E-mail:projects@informarchitects.com

5000

950 5000

CW7

D4

STAIRCASE-1

InFORM ARCHITECTS

R

LINTEL WITH CHAJJA PROFILE [HEIGHT AS PER SCHEDULE]

ENTRY | WARDROBE

FIRST FLOOR

SSL +309.45 M

+304.50 M GROUND FLOOR SSL +304.45 M

D8

TOILET

W10

Q

LINTEL WITHOUT PROFILE [HEIGHT AS PER SCHEDULE]

19000

Sill 50 150 50 50 150 150 150 150 50 50 50 50

FIRST FLOOR

SSL +309.45 M

GROUND FLOOR FFL

Lintel 3050 3050 3050 3050 3150 3050 3050 3150 3050 3050 3050 3050

M

450

N

D4 ARE TO BE DD1 07. ALL FINISHES FINALISED

1317

N

600

3500

950

06. THIS DRAWING IS TO BE READ IN CONJUCTION WITH THE STRUCTURAL AND SERVICES DRAWINGS.

Count 1 1 1 2 2 1 1 2 1 1 1 2

K

3500

1300

W10

Area 9.00 8.79 17.61 6.57 6.74 21.95 32.02 9.50 14.79 5.40 14.79 13.77

J

200

STAIRCASE-1

SECOND FLOOR SSL +312.95 M

Height Description 3000 Curtain Wall 2900 Curtain Wall 3000 Curtain Wall 3000 Curtain Wall 3000 Curtain Wall FALSE CEILING 2900 Curtain WallDETAIL TO SEPARATE 2900 Curtain Wall 3000 Curtain Wall 3000LOUVERS [MAKE: GlassHUNTER Partition DOUGLAS] TO SEPARATE DETAILS 3000 Glass Partition 3000 Glass Partition 3000 Glass Partition

H

LINTEL LEGEND

1550

1300 950

3500

19000

650 600

LMR : LIFT MACHINE ROOM

05. ANY DISCREPANCY IN THIS OR ANY OTHER DRAWINGS RELATED TO THIS DRAWING SHALL BE BROUGHT TO THE NOTICED4OF THE ARCHITECTS DD1 IMMEDIATELY. FHR-1 CORRIDOR

Curtain Wall Schedule - Ground Floor

LD2

Type Length CW1 3000 CW2 3030 CW3 5870 CW4 2190 CW7 2245 CW8 7570 SERVICE LIFT WELL11040 CW9 CW10 3165 GP2 4930 GP3 1800 GP4 4930 GP5 4590

G

Description Count ROOF SSLShutter +323.45 M Single Flush Door 13 Single Shutter Flush Door 2 Single Shutter Flush Door 5 DUCT COVER TO STRUCTURAL DETAIL Metal Fire Rated - Single Shutter 2 Metal Fire Rated - Double Shutter 1 TERRACE FLOOR Double Shutter Flush Door 3 SSL +319.95 M Single Shutter Flush Door 4 Single Shutter Door 1 Metal - Double shutter - with fixed glass above 1 Metal Fire Rated - Single Shutter 5 Metal Fire Rated - Single Shutter 3 KITCHEN LIVING / DINING MetalTHIRD FireFLOOR Rated - Single Shutter 3 SSL +316.45 M Metal Fire Rated - Single Shutter 10 Metal Fire Rated - Double Shutter 1 Fully Glazed Double Door 2 D8 D1 GP1 Fully Glazed Single Door 2 TOILET ENTRY | 4 Fully Glazed Double Door 2 WARDROBE SECOND FLOOR Fully SSL Glazed Double Door 2 +312.95 M Fully Glazed Double Door 1

3500

950

3500

425 600

DD1

04. WRITTEN DIMENSIONS TO BE FHR-1 CORRIDOR FOLLOWED.

Lintel 2250 2250 2150 2250 2250 2250 2250 2250 3050 2250 2250 2250 2250 2250

225

03. ALL DIMENSIONS AT THE SITE TO BE COUNTER CHECKED PRIOR TO CONSTRUCTION. D4

04.CONSTRUCTION MANAGER / PROJECT MANAGER TO REVERT BACK WITHIN 7 WORKING DAYS OF RECEIVING THE DRAWING ON CONSTRUCTION ISSUES . STAIRCASE-1 OTHERWISE IT WOULD BE DEEMED THAT W10 THEY HAVE UNDERSTOOD AND ACCEPTED SSL +316.45 M THE DRAWING/DESIGN AND OWN FULL RESPONSIBILITY FOR THE WORK THE WORK CARRIED OUT ACCORDINGLY.

THIRD FLOOR

Sill 50 50 -50 50 50 50 50 50 50 150 150 150 950 150

150 75

SSL +319.95 MEXISTING

A/C : AIR CONDITIONING RW : RAIN WATER T.O.S : TOP OF SLAB ELE : ELECTRICAL

Height 2200 2200 2200 2200 2200 2200 2200 2200 3000 2100 2100 2100 1300 2100 2150 2150

SSL +323.45 D1 2900 M

2550

TO ENSURE THAT W10 FACILITIES ARE NOT DISTURBED. 1300

03.CONTRACTOR TERRACE FLOOR

LVL : LEVEL STRL : STRUCTURAL PHE : PLUMBING

4250

LEVEL INDICATOR

ABBREVIATIONS

DD1

Type MarkCount Width ROOF Lintel 17 1000 D2 2900 14 1200 D3 2900 800 4 D4 4775 1200 1 D5 4775 1770 2 TERRACE D6 FLOOR 1800 SSL +319.95 M D7 1200 D8 1000 D12 1800 DD1 900 DD2 570 THIRD FLOOR DD3 750 SSL +316.45 M DD4 780 DD5 1200 GD1 1800 GD2 1000 GD3 2400 SECOND FLOOR GD4 2090 SSL +312.95 M GD5 1700

Sill 950 950 950 3475 3475

2435

D4

02. ALLFHR-1 DIMENSIONS ARE IN CORRIDOR MILLIMETRES UNLESS OTHERWISE SPECIFIED.

STAIRCASE-1

E

Door Schedule - Ground Floor

Description Aluminium Sliding Window Aluminium Sliding Window Aluminium Top Hung Openable Window Sliding Window Aluminium Sliding Window

950

2326

3500

OL T I T E

Height 1950 1950 1950 1300 1300

3500

OL T I T E

B

Window Schedule - Ground Floor Width 1900 1050 1050 3100 3200

2425

600

T A S R G O E

P IC U L B W IT A G N

R

Type W1 W6 W7 W9 W10

450

06 T C S O IA E F

PROJECT

DESIGN CONSULTANTS

01. WHILE EVERY ATTEMPT HAS BEEN H J N MADEF IN PREPARATION OF THIS DRAWING TO AVOID MISTAKES, THE ARCHITECT CANNOT GUARANTEE AGAINST HUMAN ERROR. THE CONTRACTOR ON THE JOB MUST CHECK ALL THE DIMENSIONS AND OTHER DETAILS AND BE RESPONSIBLE FOR THE SAME.

150 MM THICK HOLLOW BLOCK MASONRY WALLS

E T O IL T

2600

01.THIS DRAWING IS THE PROPERTY OF A InFORM ARCHITECTS AND IS NOT TO BE COPIED, ISSUED OR LOANED TO ANY THIRD PARTY FOR ANY PURPOSE OTHER THAN FOR WHICH IT HAS BEEN ISSUED. 230 MM THICK FLY ASHROOF SSL +323.45 M02.EH-2 HAS BEEN PLANNED FOR LEED BRICK MASONRY WALLS GOLD CERTIFICATION . CONTRACTOR TO R.C.C ENSURE THAT ALL PRE CONSTRUCTION RELATED PRACTICES ARE ADHERED TO LEED REQUIREMENTS. WET FIELD STONE MASONRY

350 MM THICK HOLLOW BLOCK MASONRY WALLS

E T O IL T

T O IL E T

5000

IMPORTANT NOTE

LEGENDS

E R G O T A S

L B P IC U T G A W IN

3500

MASTER PLAN

A T F S I E F OC

200

KEY PLAN

P U B L IC I T A IN G

GROUND FLOOR FFL

GROUND FLOOR FFL +304.50 M

+304.50 M

GROUND FLOOR 450

450

GROUND FLOOR SSL +304.45 M

SSL +304.45 M

SECTION S-3 SCHEDULE OF OPENINGS

03. ALL DIMENSIONS AT THE SITE TO BE COUNTER CHECKED PRIOR TO CONSTRUCTION.

LEVEL INDICATOR

ABBREVIATIONS

04. WRITTEN DIMENSIONS TO BE FOLLOWED.

LVL : LEVEL STRL : STRUCTURAL PHE : PLUMBING A/C : AIR CONDITIONING RW : RAIN WATER T.O.S : TOP OF SLAB ELE : ELECTRICAL LMR : LIFT MACHINE ROOM

05. ANY DISCREPANCY IN THIS OR ANY OTHER DRAWINGS RELATED TO THIS DRAWING SHALL BE BROUGHT TO THE NOTICE OF THE ARCHITECTS IMMEDIATELY. 06. THIS DRAWING IS TO BE READ IN CONJUCTION WITH THE STRUCTURAL AND SERVICES DRAWINGS. 07. ALL FINISHES ARE TO BE FINALISED

IMPORTANT NOTE

N

H

J

K

THIS DRAWING IS THE PROPERTY OF InFORM ARCHITECTS AND IS NOT TO BE COPIED, ISSUED OR LOANED TO ANY THIRD PARTY FOR Q ROTHER THAN FOR WHICH IT ANY PURPOSE HAS BEEN ISSUED.

N

DESIGN CONSULTANTS Door Schedule

Type Mark D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 DD1 DD2 DD3 DD4 DD5 GD1 GD2 GD3 GD4

2400 2220

Height 2250 2200 2250 2200 2250 2200 2250 2200 2200 2250 2250 2200 2200 2250 2200 2250 2200 2250 2200 2250 2200 3350 2100 2100 2100 1300 2100 2400 2355 2200 2185 2175 2400 2225

Sill

Lintel 2250 2250 2250 2250 2250 2250 2250 2250 2250 50 2250 50 2250 50 3400 0 150 2250

Description Single Shutter Flush Door Single Shutter Flush Door Single Shutter Flush Door Metal Fire Rated - Single Shutter Metal Fire Rated - Double Shutter Double Shutter Flush Door Single Shutter Flush Door Single Shutter Door

50 50 0 50 50 50 0 50 50 0 50 0 50

150 2250 150 2250 950 2250 150 150 2250 50 2450 50 2250

Single Shutter Flush Door Aluminium Sliding Door Aluminium Sliding Door Metal - Double shutter - with fixed glass above Metal Fire Rated - Single Shutter Metal Fire Rated - Single Shutter Metal Fire Rated - Single Shutter Metal Fire Rated - Single Shutter Metal Fire Rated - Double Shutter Fully Glazed Double Door Fully Glazed Single Door

50 50

Fully Glazed Double Door Fully Glazed Double Door

2450 2250

Count 233 6 15 28 12 16 18 165 33 6 27 6 70 14 39 148 15 6 9 8 6

Length

CW1 CW2 CW3 CW4 CW5 CW6 CW7 CW8 CW9 CW10 GP1 GP2 GP3 GP4 GP5

Height

3400 3030 5870

Description

3000 2900 3000

5870 3400 2220 5870 2265 3515 7690 2265

2700 1300 1300 2900 2563 2900 2900 2900 2900 2200 3350

7690 10920 2815 1000 4680 1800 4930 4590

3000 3000 3350

9.18 7.63 22.89 22.30 9.01 31.67 22.30 31.67 31.67 16.33 118.80 15.68 5.40 14.79 15.38

FHR DUCT

Aluminium Aluminium Aluminium Aluminium Aluminium Aluminium Aluminium Aluminium Aluminium Aluminium Aluminium Aluminium

M

Q

INDIAN SCHOOL OF BUSINESS

HYDERABAD OFFICE FLAT # 503 , 5TH FLOOR , SRIVATSASA APARTMENTS, METHODIST COLONY , BEGUMPET, HYDERABAD - 500016 PH:(0091) 040-33574812

AT SECTOR NO. 81, S.A.S NAGAR, MOHALI, CHANDIGARH- PUNJAB

50

PEDESTALS TO SEPARATE DETAIL

TERRACE FLOOR

SSL +319.95 M

TERRACE FLOOR SSL +319.95 M

SECOND FLOOR

SECOND FLOOR

600 300 950

BALCONY

3500

1950

W1

W4

W1

12 CORRIDOR

STAFF TOILET

SECOND FLOOR

SSL +312.95 M

SECOND FLOOR

SSL +312.95 M

ROOM

CORRIDOR

ROOM

CORRIDOR

ROOM

SSL +312.95 M

FIRST FLOOR SSL +309.45 M

450

1950

GROUND FLOOR FFL

+304.50 M

34

33

32

31

30

28

27

26

25

24

CORRIDOR

FACULTY OFFICE-3

+304.50 M

FACULTY OFFICE-7

GROUND FLOOR

SSL +304.45 M

SSL +304.45 M

SECTION S-5

37

GROUND FLOOR FFL

+304.50 M

GROUND FLOOR

SSL +304.45 M

FALSE CEILING TO SEPARATE DETAIL

W1

950

GROUND FLOOR FFL

DISCUSSION ROOM-3

GROUND FLOOR

SSL +304.45 M

SECTION S-4

39

CORRIDOR

PANTRY

+304.50 M +304.50 M GROUND FLOOR

W1

GROUND FLOOR

450

GROUND FLOOR FFL

GD3

LIFT LOBBY

FIRST FLOOR SSL +309.45 M

225

1275 225

LD1

CORRIDOR

FALSE CEILING TO SEPARATE DETAIL

DD4

3250

LD1

LOBBY/RECEPTION

GROUND FLOOR

SSL +312.95 M

W1

ROOM

450

GD3

GP5

450

+304.50 M

D6

DD4

SECOND FLOOR

1950 W4

5000

5000

CW1

5000

300

CW3

3010

4800

W1

600

FIRST FLOOR SSL +309.45 M

950

1950

3500

DD4

STAFF TOILET

1275

CORRIDOR

SSL +309.45 M

850

200

GP1

W4

ENTRY | WARDROBE

FIRST FLOOR

950

GP1

TOILET

FIRST FLOOR

600

DD4

950 200

LD1

LIFT LOBBY

3500

3500

225

LD1

THIRD FLOOR SSL +316.45 M

1950

DD4

GP1

ENTRY | WARDROBE

3500

W4 GP1

TOILET

LIVING / DINING

300

SSL +316.45 M

8

1950

3500

SSL +316.45 M

CORRIDOR

LIVING / DINING

225

1250

R0

W4

BALCONY

SSL +316.45 M

GROUND FLOOR FFL

41

1 : 100 REVISION

Q

SSL +319.95 M

FALSE CEILING TO SEPARATE DETAIL

TOILET

SSL +316.45 M

DD4

LIFT LOBBY

W4

950

2250

1300

CW5

SSL +304.45 M

SECTION 6

23

21

20

19

18

17

16

15

14

13

12

11

10

9

7

3

2

1

ROOF

ROOF

W5

DD3

450

SOLAR BATTERY ROOM

TERRACE FLOOR

2750

SSL +323.45 M

D7 W1

3200

SSL +323.45 M

3500

TERRACE FLOOR 4250

SSL +319.95 M

SSL +319.95 M

1800

BIM MODELLING

WARDROBE UTILITY

CORRIDOR

THIRD FLOOR

SSL +309.45 M

GROUND FLOOR FFL

Chief Architect | Kiran Venkatesh

12.10.2013 DRAWING NO :

ISB/EH2/WD/AR-200

P

950

CORRIDOR

DD4

GP1

THIRD FLOOR

SSL +312.95 M

SSL +304.45 M

J

600

CORRIDOR

LOBBY

D1

THIRD FLOOR

FALSE CEILING TO SEPARATE DETAIL

LD1

125

Rithu Mathew Roy

H

1250

LD1

LOBBY

3500

W5

W4

SSL +312.95 M

Team | Sreenivas

CONSERVE CONSULTANTS PVT LTD NO.12, FIRST CROSS STREET, KARPAGAM GARDENS, ADYAR, CHENNAI –600 020 PH: 91-44-4550 4313 / 2445 0655 EMAIL: info@conserveconsultants.com WEBSITE: www.conserveconsultants.com

G

1550

SECOND FLOOR

WARDROBE UTILITY

D9

W4

THIRD FLOOR

19000

225 225

3500

1300

CW5

D9

3500

950

TOILET

LIFT LOBBY

SSL +316.45 M

950

Office | InForm Architects, Bangalore

SCALE :

TERRACE FLOOR

SSL +319.95 M

D1

GP1

LD1

CORRIDOR

TRIPLE HEIGHT CUT-OUT

DD4

19000

W5

N

DATE :

DUCT COVER TO STRUCTURAL DETAIL

TERRACE FLOOR

3500

W4

CW5

LD1

THIRD FLOOR

GREEN BUILDING CONSULTANTS

D

225 3500

1300 225

FALSE CEILING TO SEPARATE DETAIL

GOOD FOR CONSTRUCTION

TECHNICAL PROJECTS CONSULTANTS

BUILDING SERVICES CONSULTANTS SLJ TOWERS, # 297, 2ND FLOOR, (ABOVE ALAHABAD BANK)100FT RING ROAD, BSK 3RD STAGE, 4TH PHASE, NEAR DEVEGOUDA PETROL BUNK, BANGALORE – 560 085

600 X 600MM / 800 X 800MM 600 X 600MM

600

DUCT COVER TO STRUCTURAL DETAIL

SSL +319.95 M

ORIENTATION

ISSUED AS

ROOF

STORE

TERRACE FLOOR

CLIENT

MECA PROJECT ENGINEERS Pvt. Ltd.

600 X 600MM

3500

W5

SECTIONS 1, 2 & 3

AT SECTOR NO. 81, S.A.S NAGAR, MOHALI, CHANDIGARHPUNJAB

STRUCTURAL CONSULTANTS

SSL +323.45 M

50 600

1500

3500

D7

SSL +319.95 M

2900 2900 2900 2900

E-mail:projects@informarchitects.com

R

SSL +323.45 M

2000

D6

CORRIDOR

TERRACE FLOOR

950 950 950 950

DRAWING NAME

PROPOSED EXECUTIVE HOUSING - 2 FOR ISB CAMPUS AT MOHALI

NO 422, 2ND FLOOR, 9TH MAIN ROAD, BANASHANKARI II STAGE, BANGALORE- 560070 PH/FAX: +91 80 26713360/61/62

Count 237 171 15 18 7 45 13 27 9 22 6 6

600 X 600MM / 800 X 800MM

EXTERNAL TILES RAISED FLOOR

K

Lintel 2900 2600 2900 2900 2900 2900 2900 2250 2250 2600

FLOORING - 300 X 600MM DADO -300 X 300MM SIZE AS REQUIRED

ANTISKID CERAMIC LEATHER FINISHED GRANITE

A.C SHAFT J

ROOF

SSL +323.45 M

Sill 950 950 950 950 950 950 950 950

MEP CONSULTANTS

POLISHED KOTAH STONE

DATA AND COMMUNICATION SHAFT

H

Description Sliding Window Top Hung Openable Window Sliding Window Sliding Window Sliding Window Sliding Window Top Hung Openable Window Sliding Window Sliding Window Sliding Window Sliding Window Sliding Window

SIZE AS REQUIRED

VITRIFIED TILES

ELECTRICAL SHAFT

13, 20 G

Height 1950 1650 1950 1950 1950 1950 1950 1650 1300 1300 1950 1950

FLOORING LEGEND :

1, 3, 4, 5, 6, 8, 9,10,11,12, 16,17,18 DRAINAGE AND WATER SERVICES 18A,19,19A 23, 24, 25, 26, 27, 28 DUCT

E

Width 1900 1050 3000 1800 3400 1050 1050 1050 3100 3400 1400 1050

POLISHED GRANITE

15, 22

ROOF

SSL +323.45 M

Type Mark W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12

Count 5022 3 3 3 6 8 2 6 3 3 8 138 3 3 3 9

10.20 8.79 17.61

LEGEND : 2,7

14, 21

B

ROOF

Area

Curtain Wall Curtain Wall Curtain Wall Curtain Wall Curtain Wall Curtain Wall Curtain Wall Curtain Wall Curtain Wall Curtain wall Curtain Wall Glass Partition Glass Partition Glass Partition Glass Partition

PROJECT

InFORM ARCHITECTS

Window Schedule

Curtain Wall Schedule Type

Width 1000 1200 800 1200 1800 1800 1200 1000 980 2800 3400 1800 900 570 750 780 1200 1800 1740 1000 970

1000 225 900

WET FIELD STONE MASONRY

02. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE SPECIFIED.

3500

R.C.C

3500

230 MM THICK FLY ASH BRICK MASONARY WALLS

3500

150 MM THICK HOLLOW BLOCK MASONRY WALLS

15500

01. WHILE EVERY ATTEMPT HAS BEEN MADE IN PREPARATION OF THIS DRAWING TO AVOID MISTAKES, THE ARCHITECT CANNOT GUARANTEE AGAINST HUMAN ERROR. THE CONTRACTOR ON THE JOB MUST CHECK ALL THE DIMENSIONS AND OTHER DETAILS AND BE RESPONSIBLE FOR THE SAME.

350 MM THICK HOLLOW BLOCK MASONRY WALLS

E T T O IL IC P U B L IN G I T A

T O IL E T P A B G IC L IU T IN

5000

NOTES

LEGENDS

E R A G O

E T T O IL

W

R A G O E

T O IL E T

W

450

MASTER PLAN

S T

S T A F F IC E O

S T

S T A F F IC E O

1500

KEY PLAN

LIVING / DINING

KITCHEN

W2

TOILET

DD3

W1

BEDROOM

W1

W1

IT HUB ROOM

BEDROOM

GP1

W2

D11

W8

TOILET

KITCHEN

LD1

LIVING / DINING

W5

4250

GP1

W8

LIVING / DINING

3800

D11

W8

KITCHEN

2000

GP1

W2

TOILET

7000

3500

LIFT WELL W1

BEDROOM

D11

D1

W8

LIVING / DINING

LIFT LOBBY

D8

W1

WARDROBE

W1

D8

DD4

W2

BEDROOM

W1

SERVICES

D1

D8

LD2

DB

WARDROBE

W11

D1

D10

W12

BEDROOM

W1

LIVING / DINING

THIRD FLOOR

THIRD FLOOR

W2

W1

W2

W1

W2

W2

W1

W1

W2

W1

W2

W1

W1

TOILET

ROOM

ROOM

TOILET

STAFF TOILET

SERVICES/ ADDITIONAL ROOM

14

TOILET ELECTRICAL ROOM

LIFT LOBBY

ROOM

TOILET

ROOM

W2

DD4 D8

LD1

TOILET

W1

W5

DD3

ROOM

SECOND FLOOR

ROOM

D8

ENTRY | WARDROBE

ENTRY | WARDROBE

ENTRY | WARDROBE

ENTRY | WARDROBE

W1

W3

D8

ROOM

W1

D8

LD2

ENTRY | WARDROBE

ROOM

3500

W1

3500

3500

SSL +316.45 M

19000

SSL +316.45 M

ENTRY | WARDROBE

HOUSE KEEPING

ROOM

SECOND FLOOR SSL +312.95 M

1500

SSL +312.95 M

GP1

GP1

W2

W1

W1

W2

GP1

GP1

W2

DD3

W1

W1

W1

GP1

W2

GP1

W2

TOILET

ROOM

ROOM

STAFF TOILET

TOILET

SERVICES/ ADDITIONAL ROOM

ELECTRICAL ROOM

ROOM

TOILET

TOILET

ROOM

LIFT WELL

2550

CW6

LD1

W1

2000

W2

TOILET

GD3

D8

W1

LIFT LOBBY

ROOM

D8

W1

W1

ROOM

D8

ROOM

DD4

W2

ENTRY | WARDROBE

W1

D1

D8

LD2

W3

ENTRY | WARDROBE

HOUSE KEEPING

FALSE CEILING TO SEPARATE DETAIL

W1

ROOM

950

3500

TOILET W1

ROOM

FIRST FLOOR

FIRST FLOOR SSL +309.45 M

3000

1875

SSL +309.45 M

3125

CW1

+304.50 M

LOUNGE

W6

W6

DD4

DISCUSSION ROOM-2

W1

FACULTY OFFICE-6

W1

FACULTY OFFICE-7

W6

DD4

W6

DISCUSSION ROOM-3

DD3

W1

AHU ROOM

W1

ELECTRICAL ROOM

W1

W7

FACULTY OFFICE-8

D3

DD4

W1

TOILET (MALE)

LD1

FACULTY OFFICE-9

GD3

CW2

GP2

CW9

CW8

D1

LD2

W6

DD4

D7

GROUND FLOOR FFL LIFT LOBBY

AHU ROOM

DISHWASH

+304.50 M

CORRIDOR

GROUND FLOOR

450

GROUND FLOOR

SSL +304.45 M 1600

SSL +304.45 M

2000

W1

GROUND FLOOR FFL

LIFT PIT

SECTION S-7

KEY PLAN

MASTER PLAN

NOTES

LEGENDS 350 MM THICK HOLLOW BLOCK MASONRY WALLS

S T

S T A F F IC E O

150 MM THICK HOLLOW BLOCK MASONRY WALLS

E R A G O

E T T O IL

E T T O IL

W

36

IC P U B L IN G I T A

230 MM THICK FLY ASH BRICK MASONARY WALLS

Architecture + Design | Selected Works 2013-2016 S T

S T A F F IC E O

R.C.C

R A G O E

T O IL E T

T O IL E T

W

P A B G IC L IU T IN

WET FIELD STONE MASONRY LEVEL INDICATOR

ABBREVIATIONS LVL : LEVEL STRL : STRUCTURAL PHE : PLUMBING A/C : AIR CONDITIONING RW : RAIN WATER T.O.S : TOP OF SLAB ELE : ELECTRICAL LMR : LIFT MACHINE ROOM

01. WHILE EVERY ATTEMPT HAS BEEN MADE IN PREPARATION OF THIS DRAWING TO AVOID MISTAKES, THE ARCHITECT CANNOT GUARANTEE AGAINST HUMAN ERROR. THE CONTRACTOR ON THE JOB MUST CHECK ALL THE DIMENSIONS AND OTHER DETAILS AND BE RESPONSIBLE FOR THE SAME. 02. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE SPECIFIED. 03. ALL DIMENSIONS AT THE SITE TO BE COUNTER CHECKED PRIOR TO CONSTRUCTION. 04. WRITTEN DIMENSIONS TO BE FOLLOWED. 05. ANY DISCREPANCY IN THIS OR ANY OTHER DRAWINGS RELATED TO THIS DRAWING SHALL BE BROUGHT TO THE NOTICE OF THE ARCHITECTS IMMEDIATELY. 06. THIS DRAWING IS TO BE READ IN CONJUCTION WITH THE STRUCTURAL AND SERVICES DRAWINGS. 07. ALL FINISHES ARE TO BE FINALISED

IMPORTANT NOTE

N

N

THIS DRAWING IS THE PROPERTY OF InFORM ARCHITECTS AND IS NOT TO BE COPIED, ISSUED OR LOANED TO ANY THIRD PARTY FOR ANY PURPOSE OTHER THAN FOR WHICH IT HAS BEEN ISSUED.

SCHEDULE OF OPENINGS

DESIGN CONSULTANTS Door Schedule

Type Mark D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 DD1 DD2 DD3 DD4 DD5 GD1 GD2 GD3 GD4

2400 2220

Height 2250 2200 2250 2200 2250 2200 2250 2200 2200 2250 2250 2200 2200 2250 2200 2250 2200 2250 2200 2250 2200 3350 2100 2100 2100 1300 2100 2400 2355 2200 2185 2175 2400 2225

Sill

Lintel 2250 2250 2250 2250 2250 2250 2250 2250 2250 50 2250 50 2250 50 3400 0 150 2250

50 50 0 50 50 50 0 50 50 0 50 0 50

Description Single Shutter Flush Door Single Shutter Flush Door Single Shutter Flush Door Metal Fire Rated - Single Shutter Metal Fire Rated - Double Shutter Double Shutter Flush Door Single Shutter Flush Door Single Shutter Door

150 2250 150 2250 950 2250 150 150 2250 50 2450 50 2250

Single Shutter Flush Door Aluminium Sliding Door Aluminium Sliding Door Metal - Double shutter - with fixed glass above Metal Fire Rated - Single Shutter Metal Fire Rated - Single Shutter Metal Fire Rated - Single Shutter Metal Fire Rated - Single Shutter Metal Fire Rated - Double Shutter Fully Glazed Double Door Fully Glazed Single Door

50 50

Fully Glazed Double Door Fully Glazed Double Door

2450 2250

Count 233 6 15 28 12 16 18 165 33 6 27 6 70 14 39 148 15 6 9 8 6

CW1 CW2 CW3 CW4 CW5 CW6 CW7 CW8 CW9 CW10 GP1 GP2 GP3 GP4 GP5

Length 3400 3030 5870 3400 2220 5870 2265 3515 7690 2265 7690 10920 2815 1000 4680 1800 4930 4590

Height 3000 2900 3000 2700 1300 1300 2900 2563 2900 2900 2900 2900 2200 3350 3000 3000 3350

Description Curtain Wall Curtain Wall Curtain Wall Curtain Wall Curtain Wall Curtain Wall Curtain Wall Curtain Wall Curtain Wall Curtain wall Curtain Wall Glass Partition Glass Partition Glass Partition Glass Partition

Area 10.20 8.79 17.61 9.18 7.63 22.89 22.30 9.01 31.67 22.30 31.67 31.67 16.33 118.80 15.68 5.40 14.79 15.38

Count 5022 3 3 3 6 8 2 6 3 3 8 138 3 3 3 9

LEGEND : 2,7

Type Mark W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12

Width 1900 1050 3000 1800 3400 1050 1050 1050 3100 3400 1400 1050

Height 1950 1650 1950 1950 1950 1950 1950 1650 1300 1300 1950 1950

Aluminium Aluminium Aluminium Aluminium Aluminium Aluminium Aluminium Aluminium Aluminium Aluminium Aluminium Aluminium

ELECTRICAL SHAFT

14, 21

DATA AND COMMUNICATION SHAFT

13, 20

A.C SHAFT

Description Sliding Window Top Hung Openable Window Sliding Window Sliding Window Sliding Window Sliding Window Top Hung Openable Window Sliding Window Sliding Window Sliding Window Sliding Window Sliding Window

POLISHED KOTAH STONE

Sill 950 950 950 950

Lintel 2900 2600 2900 2900

950 950 950 950

2900 2900 2900 2250 2250 2600

950 950 950 950

2900 2900 2900 2900

Count 237 171 15 18 7 45 13 27 9 22 6 6

NO 422, 2ND FLOOR, 9TH MAIN ROAD, BANASHANKARI II STAGE, BANGALORE- 560070 PH/FAX: +91 80 26713360/61/62 E-mail:projects@informarchitects.com

STRUCTURAL CONSULTANTS

PROJECT

PROPOSED EXECUTIVE HOUSING - 2 FOR ISB CAMPUS AT MOHALI

DRAWING NAME

SECTIONS 4,5,6 & 7

AT SECTOR NO. 81, S.A.S NAGAR, MOHALI, CHANDIGARHPUNJAB

CLIENT

TECHNICAL PROJECTS CONSULTANTS

INDIAN SCHOOL OF BUSINESS

HYDERABAD OFFICE FLAT # 503 , 5TH FLOOR , SRIVATSASA APARTMENTS, METHODIST COLONY , BEGUMPET, HYDERABAD - 500016 PH:(0091) 040-33574812

AT SECTOR NO. 81, S.A.S NAGAR, MOHALI, CHANDIGARH- PUNJAB

MEP CONSULTANTS

FLOORING LEGEND :

POLISHED GRANITE FHR DUCT

1, 3, 4, 5, 6, 8, 9,10,11,12, 16,17,18 DRAINAGE AND WATER SERVICES 18A,19,19A 23, 24, 25, 26, 27, 28 DUCT 15, 22

InFORM ARCHITECTS

Window Schedule

Curtain Wall Schedule Type

Width 1000 1200 800 1200 1800 1800 1200 1000 980 2800 3400 1800 900 570 750 780 1200 1800 1740 1000 970

GREEN BUILDING CONSULTANTS

ISSUED AS

ORIENTATION

GOOD FOR CONSTRUCTION

DATE :

N

SCALE :

SIZE AS REQUIRED 600 X 600MM

VITRIFIED TILES

600 X 600MM / 800 X 800MM

ANTISKID CERAMIC LEATHER FINISHED GRANITE

FLOORING - 300 X 600MM DADO -300 X 300MM SIZE AS REQUIRED

EXTERNAL TILES

600 X 600MM / 800 X 800MM

RAISED FLOOR

600 X 600MM

MECA PROJECT ENGINEERS Pvt. Ltd.

CONSERVE CONSULTANTS PVT LTD

BUILDING SERVICES CONSULTANTS SLJ TOWERS, # 297, 2ND FLOOR, (ABOVE ALAHABAD BANK)100FT RING ROAD, BSK 3RD STAGE, 4TH PHASE, NEAR DEVEGOUDA PETROL BUNK, BANGALORE – 560 085

NO.12, FIRST CROSS STREET, KARPAGAM GARDENS, ADYAR, CHENNAI –600 020 PH: 91-44-4550 4313 / 2445 0655 EMAIL: info@conserveconsultants.com WEBSITE: www.conserveconsultants.com

12.10.2013

1 : 100

DRAWING NO :

REVISION

ISB/EH2/WD/AR-201

R0


S-5

S-4

AR-202

24

22

21

S-3

S-2

AR-203

23

S-6

AR-201

AR-201

19

20

18

AR-202

17

16

14

15

12

13

11

9

10

7

8

6

5

2 1

3

18380

3960 750

2410

800

W2

W2

W2

3660 2060

800

W2

A 1500

200

890

600

1730

TOILET-1

150

D3

BEDROOM-1

BEDROOM-2

2900 X 4400 VITRIFIED TILES

2900 X 4400 VITRIFIED TILES

1900

D3

D3

1000

1000

D3

1000

1000

1900

1900

1900

ENTRANCE CANOPY

D2

BEDROOM-2

2900 X 4400 VITRIFIED TILES

2900 X 4400 VITRIFIED TILES

BEDROOM-4

2900 X 4400 VITRIFIED TILES

2900 X 4400 VITRIFIED TILES

2900 1400

450

450

2900 1400

750 1050

2900 1400

750 1050

DD1

450

450

2900 1400

D3

1000

2750

450

1400

3900

2900

DD1

1050

450

450

890 UP

600

1730

600

1730

CLOTH DRYING 1400 X 2030

WASH 1500 X 1800 100 MM SUNK

D4

D5

1501

GP1

W4

ENTRANCE CANOPY

W3

D3

1000

1000

L

750

2550

750

1650

M

TOILET-2 1650 X 2550

WASH

2030

1400 X 2030

W3

1500MM X 1800 100 SUNK

D5 1400

S-1-1

S-7-1

AR-200

AR-203

D4

1500

N GP1

150

D2

PASSAGE

D2

6030 X 1050 D3

CLOTH DRYING

W5

D1

250

PASSAGE

W3

1500

CUTOUT

W5

2F TO 3F TREAD=275 RISER= 20 EQ(175) WIDTH=1200

DD1

1180

600

CUTOUT

600

2550 1650 X 2550

DD1

4430

W9

1200

2800 290 600 DN890

4430

2550

K 150 1200

2550

600 600

STAIRCASE 3

600 290 DD1

1180

W4

6030 X 1050

1900

1900

2900

1400

W3

D3

D3

1000

1000

P

1900

FALSE CEILING ABOVE

1400

1050

BEDROOM-1

BEDROOM-2

2900 X 4400 VITRIFIED TILES

2900 X 4400 VITRIFIED TILES

COMMON ROOM

4400

W2

4660

1650

DD2

2550

2340

2.55 M WIDE CORRIDOR

1500

1200

4660

600 290

750

600 890

890

DD1

1500

1650 W6

1900

750

DD1

1050

W2

3200

2970

600

1650 X 2550

750

1620 3010

600

2550

1730

350

D4

1500 TOILET-2

DD1

POLISHED KOTA

2500

J WASH

1500 X 1800 100 MM SUNK

1400 X 2030

W5

1180

600

W4 D5

CLOTH DRYING

CUTOUT

DD1

W2

5400 X 4870 VITRIFIED TILES

4400

450

4400

4400

1500

2550

750

750

600

2030

750

750

230 2550

4400

4400

800

750

2900

1400

4430

D1

1180

DD1

2030

2030

2550

1500

4400

5430 2475

4400

4400

1000 2550

1000

5740 800

2500

1050

6030 X 1050 GP1

BEDROOM-3

BEDROOM-4

2900 X 4400 VITRIFIED TILES

2900 X 4400 VITRIFIED TILES

Q R

18380

1050

W1

750

2900

1400

450

450

1400

3900

750

DD1

1050

2900

DD1

1050

2900

1400

450

450

1400

S

1050

W1

T

TOILET-2

S-7-2

S-1-2

AR-206

AR-200A

T 1395

3900

1395

W2

W2

W2

ENTRANCE CANOPY

D4

n

SLOPE 1:200

PE SLO 1:200

W2

18380

CHAJJA PROJECTION ABOVE

W4 W3

D3

1730

360

H

PASSAGE

D4

1900

2900 X 4400 VITRIFIED TILES

F

1900

1500

TOILET-1

BEDROOM-4

D3

W3

CUTOUT W5

1650

W8

4000

4430

1400 X 2030

1500

E SLOP00 1:2

2900 X 4400 VITRIFIED TILES

D3 D2

PARAPET 950 MM

BEDROOM-3

1000

250 150

TOILET-2

W4

1000

D2 W3

CLOTH DRYING

WASH 1500 X 1800 100 MM SUNK

TOILET-1

D3

1000

D3

2900

GP1

1000

2550

1200 3010 800 5690

800

2500 2500 2000

1900

COMMON ROOM 5400 X 4870 VITRIFIED TILES

2900 X 4400 VITRIFIED TILES

1000

p

6690

1900

BEDROOM-3

BEDROOM-4 2900 X 4400 VITRIFIED TILES

q

750

2900

1400

450

450

1400

3900

750

DD1

1050

2900

DD1

1050

2900

1400

450

450

1400

s

1050

W1

4400

3900

DD1

2900 X 4400 VITRIFIED TILES

BEDROOM-4

2900 X 4400 VITRIFIED TILES 1900

r 1050

t

4400

1050

1900

BEDROOM-2

2900 X 4400 VITRIFIED TILES

D3

GP1 6030 X 1050

1650 X 2550

S

1650 X 2550

1500

2900 X 4400 VITRIFIED TILES

W2

W2

W2

W2

18380

u

1000

BEDROOM-1 4000 X 8980

BEDROOM-3

FALSE CEILING ABOVE

1900

PASSAGE

W3

D3

2900

E

5400 X 4870 VITRIFIED TILES

2900 X 4400 VITRIFIED TILES 1000

1650 X 2550

1500

6030 X 1050

4400

4400

COMMON ROOM 5400 X 4870 VITRIFIED TILES

1900

BEDROOM-3

1000

1500

1500MM X 1800 100 SUNK

D5 1400

D

W3

D4

GP1

PASSAGE

D2

2900

1050

750

COMMON ROOM

BEDROOM-2

1000

W3

W1

m

1650

6030 X 1050

1900

W7

CORRIDOR

1650

WASH

1400 X 2030

150

D3

2900

1500MM X 1800 100 SUNK

D5 1400

PASSAGE

D2

1900

BEDROOM-1

2900

COMMON ROOM 5400 X 4870 VITRIFIED TILES

4400

D3

1000

250

1400

FALSE CEILING ABOVE

W4

FALSE CEILING ABOVE

4400

PASSAGE

D3

1000

1730

450

1200

W4

FALSE CEILING ABOVE

LOBBY

CAPACITY 13

1730

WASH

1400 X 2030

150

1730

600

3900

450

4400

r

600

1500

CLOTH DRYING

W5

W3

D1

2000

R

DD1

1180

6030 X 1050

SLOPE 1:20 0

D4

W3

t

W3

250

W3

TOILET-2

1500

6030 X 1050

W3

s

GP1

W4

W6

1650 X 2550

1500 X 1800 100 MM SUNK

D5 1400

GP1

PASSAGE

D2

890

CUTOUT

W5

4400

250

WASH

1400 X 2030

W3

D1

D2

D5

1501

4400

CLOTH DRYING

W5

2030

W3

GP1 PASSAGE 6030 X 1050

CUTOUT CLOTH DRYING 1400 X 2030

WASH

D4

350

1650

600

2550

W5

1000

D5

1501

LIFT 2

Q

1730

DD1

1500

CUTOUT 2550

CLOTH DRYING 1400 X 2030

WASH 1500 X 1800 100 MM SUNK

D4

W4

h k

600

DD1

4424

1650

600

1400

DD1

750

DD1

CLOTH DRYING

W5

W3

D1

D2

W2

290 600

1180

1500 X 1800 100 MM SUNK

2550

DD1

4430

CUTOUT

600

TOILET-1 1650 X 2550

q

600 290

2030

290 600

1180

2030

2550

p

890

100 MM WIDE EXPANSION JOINT

DD1

1500

2550

1730

750

4430

890

890

1180

W3

6030 X 1050

PARAPET 950 MM

1650

600

750

DD1

600

600 600

1650 X 2550

230

DD2

1650

DD1

600

890

1050 DD1

2900

1900

PARAPET 950 MM

DD1

1050

2880

DD1

890

1500

4660

2550

2550

1730

CORRIDOR

2500 1650

2340

LD

2880

1650

POLISHED KOTA

n

1500

DD1

600 290

2.55 M WIDE CORRIDOR

PARAPET 950 MM

UP

1180

DD1

890

P

2550

1500

600

4660

2.55 M WIDE CORRIDOR

1180

600

g TOILET-2 1650 X 2550

750

2030

600

750

750

2550

1730

2900

2900 X 4400 VITRIFIED TILES

435

DD1

600

290 600

1400

D6

1650 X 2550

CUTOUT

W5

PASSAGE

D3

1900

N

D4

1500

POLISHED KOTA

DD1

2340

STAIRCASE 5

1500 DD1

1200

DD1

230 4660

1650

D7

600

1650 X 2550

600

2550

2550

600 890 600 290 DN

50 49 48 47 46 45 44 43 42 41

W9

0A

1180

DD1

600

51 52 53 54 55 56 57 58 59 60

1730

1770 X 1470

D4

1500 TOILET-2

1180

DD1

ELEC. ROOM

W4

WASH 1500 X 1800 100 MM SUNK

1400 X 2030

W5

2550

2550

1500

W7

D5

CLOTH DRYING

CUTOUT

4660

CUTOUT

GP1 W3

CAPACITY 13 LD

AR-200

f WASH

1500 X 1800 100 MM SUNK

1400 X 2030

W5

1180 CLOTH DRYING D5

1501

W4

LIFT 1

M

S-1-1

AR-203

W4 D5

CLOTH DRYING

CUTOUT

2340

4430

450

4400

1650

6030 X 1050 GP1

W3

D1

CUTOUT W5

m 2F TO 3F TREAD=275 RISER= 20 EQ(175) WIDTH=1200

250 150

4430

1400 X 2030

1500

PASSAGE

D2

D2 W3

CLOTH DRYING

1500 X 1800 100 MM SUNK

1470

W3

PASSAGE GP1 6030 X 1050

D5 WASH

D4

TOILET-1 1650 X 2550

6030 X 1050 GP1

W3

D1

CUTOUT W5

S-7-1

e

PASSAGE

D2

250 150

4430

1400 X 2030

750

1500 X 1800 100 MM SUNK

1500

2550

W3 W4

k

1000

h

D2 W3

CLOTH DRYING

WASH

D4

TOILET-1 1650 X 2550

750

DD3 900

4400

4400

PASSAGE GP1 6030 X 1050

W4 D5

435

D6

1900

750

D3

600

1000

D3

D3

DD3 900

1500

DD1

4660

600 290

600 290

1400 X 2030

WASH 1500 X 1800 100 MM SUNK

2000

450

D5

DD1

1500

TOILET-1 1650 X 2550

D4

L

d

W3

3200

2900 X 4400 VITRIFIED TILES

1000

D3

890

890

DD1

1400

BEDROOM-1

1500

W2

DN

STAIRCASE 2

D4 TOILET-2

1180

2.55 M WIDE CORRIDOR 1730

1900

2030

BEDROOM-4

2900 X 4400 VITRIFIED TILES 1900

1500

4400

BEDROOM-3

5400 X 4870 VITRIFIED TILES

FALSE CEILING ABOVE

1900

1000

2030

D3

D3

2900 X 4400 VITRIFIED TILES

1000

W5

DD1

600

600

W4

WASH 1500 X 1800 100 MM SUNK

W2

C

D5

CLOTH DRYING 1400 X 2030

1180

1650

510

c

BEDROOM-4

2900 X 4400 VITRIFIED TILES 1900

FALSE CEILING ABOVE

2550

1000

D3

D3

W3

BEDROOM-3

5400 X 4870 VITRIFIED TILES

1900

2550

2900 X 4400 VITRIFIED TILES 1000

DN

1000

UP

6030 X 1050 GP1

4400

1900

COMMON ROOM

BEDROOM-2

2900 X 4400 VITRIFIED TILES

2900 X 4400 VITRIFIED TILES 1000

1900

D3

PASSAGE

18380

W2

W1

1050

D8

1200

W9

2900 X 4400 VITRIFIED TILES 1900

STAIRCASE 4

700

BEDROOM-1

f

4400

4400

4400

UP

g

3900

COMMON ROOM

BEDROOM-2

BEDROOM-1

1500

K

1050

2550

51 52 53 54 55 56 57 58 59 60

1650

2550

1825

1550

1050

e

2

2000 X 2550

1000

D3

CUTOUT

W5

1730

IT ROOM

1000

W3

D1

B

CHAJJA PROJECTION ABOVE W2

POLISHED KOTA

1400

750

2550

1400

450

4400

450

1000

450

450

3200 50 49 48 47 46 45 44 43 42 41

W2

1400

DD1 750

3900

2550

1050 DD1 750

1400

DD1 750

2550

1050

1050

1000

1400

1050

4400

W2

2750

450

2475

450

1400

DD1 750

1500

1400

450

2F TO 3F TREAD=275 RISER= 20 EQ(175) WIDTH=1500

51 52 53 54 55 56 57 58 59 60

W2

W1

1050

450

1500

51 52 53 54 55 56 57 58 59 60

50 49 48 47 46 45 44 43 42 41

W2

c d

1400

1900

D2

4430

CUTOUT

DD1

W2

a 1050

1200

2400 W2

2550

W2

W1

1500

2900 X 4400 VITRIFIED TILES

250 150

W3

CLOTH DRYING 1400 X 2030

TOILET-1 1650 X 2550

2000

W2

200

1500 X 1800 100 MM SUNK

1500

CORRIDOR

BEDROOM-4

2900 X 4400 VITRIFIED TILES

W3

D5 WASH

D4

D2

GP1 6030 X 1050

W4

J

18380

1500 2F TO 3F TREAD=275 RISER= 20 EQ(175) WIDTH=1500

FALSE CEILING ABOVE

1900

BEDROOM-3

D3

PASSAGE W6

2730

D7

1000

D3

W3

1200 1200 D6

2000 X 2400

CHAJJA PROJECTION ABOVE 3660

a 18380

4400

2300

H

1000

DN

STAIRCASE 1

2000

ELEC W10 ROOM

2550

F

b

1900

UP

25

26

5400 X 4870 VITRIFIED TILES

600

27

28

COMMON ROOM

230

29

2030

30

31

2550

32

33

600

34

BEDROOM-2 2900 X 4400 VITRIFIED TILES

2550

35

36

BEDROOM-1 2900 X 4400 VITRIFIED TILES

900

37

38

900

39

1500

40

41

850

42

43

2750

5180

AR-205

E 45 44

1500

AR-205

AR-206

D

2630

S-9

2475

C S-8

50 49 48 47 46 45 44 43 42 41

4400

1050

2550

1400

2550

450

4400

450

1000

1400

DD1 750

3900

2550

1050 DD1 750

230

1050

2550

1400

3200

51 52 53 54 55 56 57 58 59 60

1000

450

3500 50 49 48 47 46 45 44 43 42 41

2030

450

1550

1400

1550

1050

1825

2F TO 3F TREAD=275 RISER= 20 EQ(175) WIDTH=1500

1825

B

4400

W1

S-10

800

300

A

CHAJJA PROJECTION ABOVE

1050

u

24

23

22

21

19

20

18

17

16

14

15

12

13

11

9

10

7

8

6

5

3

2 1

W1

v

v S-4

S-2

S-3

S-6

AR-203

AR-201

AR-201

AR-202

W2

KEY PLAN

MASTER PLAN

LEGENDS

NOTES 350 MM THICK HOLLOW BLOCK MASONRY WALLS

O

S

S T A F F IC E

E T T O IL

230 MM THICK FLY ASH BRICK MASONARY WALLS

35

36

34

32

33

30

31

29

27

28

W

25

26

R.C.C

02. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE SPECIFIED.

LEVEL INDICATOR

150 MM THICK HOLLOW BLOCK MASONRY WALLS 230 MM THICK FLY ASH BRICK MASONARY WALLS R.C.C LEVEL INDICATOR

9

8

: LEVEL : STRUCTURAL : PLUMBING : AIR CONDITIONING : RAIN WATER : TOP OF SLAB : ELECTRICAL : LIFT MACHINE ROOM

01. WHILE EVERY ATTEMPT HAS BEEN MADE IN PREPARATION OF THIS DRAWING TO AVOID MISTAKES, THE ARCHITECT CANNOT GUARANTEE AGAINST HUMAN ERROR. THE CONTRACTOR ON THE JOB MUST CHECK ALL THE DIMENSIONS AND OTHER DETAILS AND BE RESPONSIBLE FOR THE SAME.

Type W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13

02. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE SPECIFIED.

04. WRITTEN DIMENSIONS TO BE FOLLOWED.

: FINISHED FLOOR LEVEL : FORMED GROUND LELVEL : STRUCTURAL SLAB LEVEL : NATURAL GROUND LEVEL

THK

: THICKNESS

Door Schedule - Phase II

Window Schedule - Phase II

05. ANY DISCREPANCY IN THIS OR ANY OTHER DRAWINGS RELATED TO THIS DRAWING SHALL BE BROUGHT TO THE NOTICE OF THE ARCHITECTS IMMEDIATELY.

FFL FGL SSL NGL

Width Height Sill 3900 1950 950 1400 1950 950 1050 1650 950 1050 1650 950 1800 1950 300 2500 1650 950 1470 1650 950 2500 1950 950 2550 1950 950 2400 450 2450 450 2450 5180 2550 450 2450 2550 1950 950

Lintel Description Location Aluminium Sliding Window Common Room 2900 Aluminium Sliding Window Bedroom 2900 2600 Aluminium Sliding Window Passage 2600 Top Hung Openable Window Toilet 2250 Aluminium Louvered Window Cloth Drying Aluminium Sliding Window Lobby 2600 2600 Aluminium Sliding Window Corridor 2900 Aluminium Sliding Window Lobby Aluminium Sliding Window 2900 Staircase 2900 Aluminium Louvres and Fixed Glazing Electrical Room 2900 Aluminium Louvres and Fixed Glazing Electrical Room 2900 Lovered window Battery Room 2900 Aluminium Sliding Window Staircase

Type D1 D2 D3 D3a D4 D5 D6 D7 D8 DD1 DD3 DD2

Count 22 88 88 44 44 05 06 -06 ---06

B

RCC COLUMN LEGEND : [TO STRUCTURAL DETAILS]

06. THIS DRAWING IS TO BE READ IN CONJUCTION WITH THE STRUCTURAL AND SERVICES DRAWINGS.

FGL 304.000 m

47

FHR DUCT DRAINAGE AND WATER SERVICES DUCT

HYDERABAD OFFICE FLAT NO 503, 5TH FLOOR, SRIVATSASA APARTMENTS; METHODIST COLONY, BEGUMPET; HYDERABAD - 500016 Tel: (0091) 040-33574812

MECA PROJECT ENGINEERS Pvt. Ltd.

CONSERVE CONSULTANTS 200MM THK HOLLOW BLOCK PVT LTD MASONRY WALL

BUILDING SERVICES CONSULTANTS SLJ TOWERS, # 297, 2ND FLOOR, (ABOVE ALAHABAD BANK)100FT RING ROAD, BSK 3RD STAGE, 4TH PHASE, NEAR DEVEGOUDA PETROL BUNK, BANGALORE – 560 085

NO.12, FIRST CROSS STREET, KARPAGAM GARDENS, ADYAR,ALUMINIUM CHENNAI –600 020 SLIDING PH: 91-44-4550 4313 / 2445 0655 EMAIL: info@conserveconsultants.com WEBSITE: www.conserveconsultants.com

450

450

1050

12

PE SL O

1400

450

450

600 FFL +304.485M SSL +304.350M

2470

4400

2900 X 4400

VITRIFIED TILES

3820

FFL +304.500M SSL +304.450M

1900

1300

1300

1000

1000

1050

CUTOUT ABOVE

CUTOUT ABOVE

ENTRANCE FROM CORRIDOR

ALUMINIUM LOUVERED WINDOW MAKE : SCHUECO

600

1180

DD1

1900

WINDOW SILL COPING [20MM THK POLISHED BLACK GRANITE] [TO FURTHER DETAILS]

PASSAGE 6030 X 1050

VITRIFIED TILES

1560

RCC LINTEL WITH CHAJJA ABOVE [TO STRUCTURAL DETAILS] DADO ON TOILET WALL [300 X 300MM GLAZED CERAMIC TILES - VANILLA] [TO FURTHER DETAIL] SINGLE SHUTTER FLUSH DOOR [TO FURTHER DETAIL]

W4

2900

D5 ALUMINIUM SLIDING WINDOW MAKE : SCHUECO

CLOTH DRYING

SINGLE SHUTTER FULL GLAZED DOOR [TO FURTHER DETAIL]

1250 X 1800 VITRIFIED TILES

WASH

D4

TOILET

1500 X 1800 VITRIFIED TILES

FFL +304.485M SSL +304.350M

ALUMINIUM 2 TRACK SLIDING DOOR + FIXED GLASS W5 AT FFL +304.50M [MAKE : SCHUECO]

1300

FFL +304.490M SSL +304.350M

DD1

14

DD1

Width 1600 980 1000 900 1430 600 600

J

EWC [TO PHE DETAILS]

FFL +304.480M SSL +304.350M

DADO ABOVE WASH COUNTER [POLISHED GRANITE]

Type

GP1 GP2

18-20MM THK POLISHED GRANITE COUNTER TOP

1500

1180

Type D1 D2 D3 D4 D5 DD1 DD2

LEDGE WALL [150MM THK HOLLOW BLOCK MASONRY WITH LEDGE TOP FINISHED WITH POLISHED GRANITE

1650 X 2550 ANTISKID CERAMIC TILES

GP2

ALUMINIUM LOUVERED WINDOW MAKE : SCHUECO

H

W3

RCC BEAM ABOVE

W3 D1

ALUMINIUM 2 TRACK SLIDING DOOR + FIXED GLASS AT FFL +304.50M [MAKE : SCHUECO]

11

600

10 1500

SHOWER PARTITION [10MM THK TOUGHENED FRAMELESS GLASS WITH DORMA / OZONE PATCH FITTINGS]

TOP HUNG OPENABLE ALUMINIUM WINDOW [MAKE : SCHUECO]

D3

FFL +304.50M SSL +304.45M

D2

F

FALSE CEILING ABOVE [GYPSUM BOARD] [TO FURTHER DETAILS]

D3

2000

ALUMINIUM SLIDING WINDOW [MAKE : SCHUECO]

.

SINGLE SHUTTER FLUSH DOOR [TO FURTHER DETAIL]

RCC BEAM ABOVE

Type W1 W2 W3 W4 W5

600MM WIDE, 75MM THK PRECAST CONCRETE AS FLAGGING CONCRETE [AS PER TENDER SPECS] SLOPE

FFL +304.500M SSL +304.450M

FALSE CEILING ABOVE [GYPSUM BOARD] [TO FURTHER DETAILS]

SINGLE SHUTTER FULL GLAZED DOOR W5 [TO FURTHER DETAIL]

1250

1000

DADO ON WALL [SHOWER AREA] [300 X 300MM GLAZED CERAMIC TILES - CHOCOLATE]

FFL 304.025 m

GP1

650

FFL +304.490M SSL +304.350M

1500

GP2

C

600

BEDROOM 4

2900 X 4400

VITRIFIED TILES

W3

ALUMINIUM SLIDING WINDOW MAKE : SCHUECO

1800

FFL +304.480M SSL +304.350M

DADO ABOVE WASH COUNTER [POLISHED GRANITE] 18-20MM THK POLISHED GRANITE COUNTER TOP

520

E

SINGLE SHUTTER FLUSH DOOR + FIXED GLASS [TO FURTHER DETAIL]

70 980

D2

1050

1250 X 1800 VITRIFIED TILES

530

2900

SINGLE SHUTTER FLUSH DOOR [TO FURTHER DETAIL]

1900

4460

1500 X 1800 VITRIFIED TILES

1400

BEDROOM 3

FFL +304.50M SSL +304.45M

GYPSUM BOARD FALSE CEILING ABOVE [TO FURTHER DETAILS]

D3

WASH 1800

1650 X 2550 ANTISKID CERAMIC TILES

NO.12, FIRST CROSS STREET, KARPAGAM GARDENS, ADYAR, CHENNAI –600 020 PH: 91-44-4550 4313 / 2445 0655 EMAIL: info@conserveconsultants.com WEBSITE: www.conserveconsultants.com

D

750

1000

CLOTH DRYING

CONSERVE CONSULTANTS PVT LTD

BUILDING SERVICES CONSULTANTS SLJ TOWERS, # 297, 2ND FLOOR, (ABOVE ALAHABAD BANK)100FT RING ROAD, BSK 3RD STAGE, 4TH PHASE, NEAR DEVEGOUDA PETROL BUNK, BANGALORE – 560 085

FGL 304.000 m

5400 X 4870

4400

4400 1050

530

GP1

D5

A.C. SHAFT

GREEN BUILDING CONSULTANTS

MECA PROJECT ENGINEERS Pvt. Ltd.

W2

750

VITRIFIED TILES

FFL +304.50M SSL +304.45M

6030 X 1050

4, 7, 11, 14, 16, 20, 23, 26

MEP CONSULTANTS

FIRE RATED METAL DOOR SHAKTIMET DOR

RCC BEAM ABOVE

VITRIFIED TILES

D4

TOILET

EWC [TO PHE DETAILS]

K

1000

PASSAGE

W4

SINGLE SHUTTER FLUSH DOOR [TO FURTHER DETAIL] LEDGE WALL [150MM THK HOLLOW BLOCK MASONRY WITH LEDGE TOP FINISHED WITH POLISHED GRANITE

DATA AND COMMUNICATION SHAFT

DD1

FALSE CEILING ABOVE [GYPSUM BOARD] [TO FURTHER DETAILS]

D3

DADO ON TOILET WALL [300 X 300MM GLAZED CERAMIC TILES - VANILLA] [TO FURTHER DETAIL]

J

520

13

SINGLE SHUTTER FLUSH DOOR [TO FURTHER DETAIL]

RCC BEAM ABOVE W3

ELECTRICAL SHAFT

1

7240

W1

FFL +304.500M SSL +304.450M

1900

RCC LINTEL WITH CHAJJA ABOVE [TO STRUCTURAL DETAILS]

DRAINAGE AND WATER SERVICES DUCT

2

B

COMMON ROOM

2900 X 4400

FALSE CEILING ABOVE [GYPSUM BOARD] [TO FURTHER DETAILS]

WINDOW SILL COPING [20MM THK POLISHED BLACK GRANITE] [TO FURTHER DETAILS]

H

FHR DUCT

3, 5, 6, 8, 10, 12, 13, 15, 17, 18, 19, 21, 22, 24, 25, 27

RCC LINTEL WITH CHAJJA ABOVE [TO STRUCTURAL DETAILS]

2900

VITRIFIED TILES

SINGLE SHUTTER FLUSH DOOR [TO FURTHER DETAIL]

TOP HUNG OPENABLE ALUMINIUM WINDOW [MAKE : SCHUECO]

9

WINDOW SILL 20MM THK POLISHED BLACK GRANITE

18380

3900

BEDROOM 2

2900 X 4400

VITRIFIED TILES

FFL +304.500M SSL +304.450M

ALUMINIUM SLIDING WINDOW [MAKE : SCHUECO]

F

1

KITCHEN COUNTER TOP [POLISHED BIEGE/BROWN GRANITE]

3650

BEDROOM 1

2

A

W2

750

230MM THK FLY ASH BRICK MASONRY WALL

HYDERABAD OFFICE FLAT NO 503, 5TH FLOOR, SRIVATSASA APARTMENTS; METHODIST COLONY, BEGUMPET; HYDERABAD - 500016 Tel: (0091) 040-33574812

350MM THK HOLLOW BLOCK MASONRY WALL

R0

ISB/BH2-P2/AR-102A

DD1

E

INDIAN SCHOOL OF BUSINESS

TECHNICAL PROJECTS CONSULTANTS

ALUMINIUM SLIDING WINDOW MAKE : SCHUECO

2900

REVISION

AT SECTOR NO. 81, S.A.S NAGAR, MOHALI, CHANDIGARH- PUNJAB

CLIENT

STRUCTURAL CONSULTANTS

600

AR-400A R0

PROPOSED BACHELOR HOUSING FOR ISB CAMPUS AT MOHALI

NO 422, 2ND FLOOR, 9TH MAIN ROAD, BANASHANKARI II STAGE, BANGALORE- 560070 PH/FAX: +91 80 26713360/61/62 E-mail: projects@informarchitects.com

RCC COLUMN [TO STRUCTURAL DETAIL]

1 : 100

SLOPE

1400

Count 24 44 94 02 46 44 13 07 07 138 05 06

REVISION

.

.

1400 2900

D

PROJECT

InFORM ARCHITECTS Location Entrance - Common Room Passage Bedroom, Store, Housekeeping Bedroom, Store, Housekeeping Toilet Cloth Drying Staircases Electrical Rooms I.T Room, Store FHR Ducts FHR Ducts Service Ducts

LEGEND :

3

THIS DRAWING IS THE PROPERTY OF InFORM ARCHITECTS AND IS NOT TO BE COPIED, ISSUED OR LOANED TO ANY THIRD PARTY FOR ANY PURPOSE OTHER THAN FOR WHICH IT HAS BEEN ISSUED.

3900 W2

SLOPE

600

PE

12-10-2013

MAKE : SCHUECO

Width Height Description 1600 2250 Single Shutter Flush Door + Fixed glass 980 2250 Single Shutter Full Glazed 1000 2250 Single Shutter Flush Door 1050 2250 Single Shutter Flush Door 900 2250 Single Shutter Flush Door 1430 2250 Aluminium 2 Track Sliding Door 1200 2250 Fire Rated Metal Door 1200 2250 Fire Rated Metal Door 1200 2250 Fire Rated Metal Door 600 Fire Rated Metal Door 2100 900 2100 Fire Rated Metal Door 600 1200 Fire Rated Metal Door

N

DRAWING NO :

WINDOW

4

Type D1 D2 D3 D3a D4 D5 D6 D7 D8 DD1 DD3 DD2

Count 31 96 96 49 44 12 06 06 07 02 05 01 06

Lintel Description Location Aluminium Sliding Window Common Room 2900 2900 Aluminium Sliding Window Bedroom 2600 Aluminium Sliding Window Passage 2600 Top Hung Openable Window Toilet 2250 Aluminium Louvered Window Cloth Drying Aluminium Sliding Window Lobby 2600 2600 Aluminium Sliding Window Corridor 2900 Aluminium Sliding Window Lobby Aluminium Sliding Window 2900 Staircase 2900 Aluminium Louvres and Fixed Glazing Electrical Room 2900 Aluminium Louvres and Fixed Glazing Electrical Room 2900 Lovered window Battery Room 2900 Aluminium Sliding Window Staircase

IMPORTANT NOTES

SCALE :

RCC LINTEL WITH CHAJJA ABOVE [TO STRUCTURAL DETAILS]

SL O

1050

1570

06. THIS DRAWING IS TO BE READ IN CONJUCTION WITH THE STRUCTURAL AND SERVICES DRAWINGS.

Width Height Sill 3900 1950 950 1400 1950 950 1050 1650 950 1050 1650 950 1800 1950 300 2500 1650 950 1470 1650 950 2500 1950 950 2550 1950 950 2400 450 2450 450 2450 5180 2550 450 2450 2550 1950 950

ORIENTATION

600

SCALE :

05. ANY DISCREPANCY IN THIS OR ANY OTHER DRAWINGS RELATED TO THIS DRAWING SHALL BE BROUGHT TO THE NOTICE OF THE ARCHITECTS IMMEDIATELY.

5

DATE :

WINDOW SILL 20MM THK POLISHED BLACK GRANITE

C

04. WRITTEN DIMENSIONS TO BE FOLLOWED.

RCC COLUMN

RCC LINTEL WITH CHAJJA ABOVE [TO STRUCTURAL DETAILS]

W2

: FINISHED FLOOR LEVEL : FORMED GROUND LELVEL : STRUCTURAL SLAB LEVEL : NATURAL GROUND LEVEL

GOOD FOR CONSTRUCTION

[TO STRUCTURAL GREEN BUILDING CONSULTANTSDETAIL]

7240 FFL 304.025 m

FFL FGL SSL NGL

ISSUED AS

INDIAN SCHOOL OF BUSINESS

TECHNICAL PROJECTS CONSULTANTS

ELECTRICAL SHAFT

: LEVEL : STRUCTURAL : PLUMBING : AIR CONDITIONING : RAIN WATER : TOP OF SLAB : ELECTRICAL : LIFT MACHINE ROOM

THK PLAN : THICKNESS TYPICAL FLOOR (2ND TO 4TH) N - PHASE II

WINDOW SILL 20MM THK POLISHED BLACK GRANITE

N

Wid

1300 750

DADO ON WALL [SHOWER AREA] [300 X 300MM GLAZED CERAMIC TILES - CHOCOLATE]

15 1650

1500

SHOWER PARTITION [10MM THK TOUGHENED FRAMELESS GLASS WITH DORMA / OZONE PATCH FITTINGS]

DD2

K

SCHEDULE 9

FIRE RATED METAL DOOR SHAKTIMET DOR

10, 12

FIRE RATED METAL DOOR SHAKTIMET DOR

11, 14

NOTE: ALL LI

REVISION DES

11

10

9

8

7

6

5

4

3

2

R0

GFC

R1

GFC

1

CORRIDOR SECTION 1

QUAD PLAN - MOCK UP UNIT

CORRIDOR SECTION 1

25MM WIDE EXPANSION JOINT FILLED WITH CAPCELL BOARD

FFL +304.490 SSL +304.450

750

1900

1200

B

: FINISHED FLOOR LEVEL : FORMED GROUND LELVEL : STRUCTURAL SLAB LEVEL

C

: THICKNESS

750

C

220

550

330 200

100MM THICK RCC SLAB [TO STRUCTURAL DETAIL] 100MM THICK PCC SLAB [TO STRUCTURAL DETAIL]

50MM THICK FLOOR FINISH

03

GROUND FLOOR_PHASE I

CORRIDOR SECTION 2 1 : 25

06

SLOPE 1:200

SLOPE 1:200

75 50 775

RAMP [SLOPE: 1:10] 20MM THICK BLACK LEATHER FINISHED GRANITE COPING

200

EQ

EQ

200

GREE

CON

NO.12 GARD CHEN PH: 91 EMAIL WEBS

174

50

EH2 GROUND FLOOR LOBBY FFL +304.500 SSL +304.450

7

AR-502B

GRO UN D FLO OR F FL +304 .50 M

SLOPE 1:250 [TOWARDS THE DRAIN]

GROU ND FLO OR SSL +304 .45 M FGL +304 .00 M

4

AR-502B

150MM RCC BAND BEAM [TO STRUCTURAL DETAIL] 450 MM RCC WALL [TO STRUCTURAL DETAIL]

100MM THK PCC SLAB [TO SEPARATE DETAIL] RCC SLAB [TO SEPARATE DETAIL]

RCC PLINTH BEAM [TO STRUCTURAL DETAIL]

05

50MM FLOOR FINISH

CORRIDOR SECTION 1 1 : 25

IMPORTANT NOTE

LEGENDS 35 0 MM TH IC K H OL LO W BL O CK MA S ON R Y W AL L S 15 0 MM TH IC K H OL LO W BL O CK MA S ON R Y W AL L S

T A S F S T O E G A R OF IC E OL T I T E O IL T E T U B P IC L WA N G IT

23 0 MM T HI C K FL Y AS H BR IC K M A SO NR Y W A LL S R.C .C

01 .T HI S DR AW IN G IS TH E PR OP ER TY O F In FO R M AR C HI T EC TS AN D I S N OT T O B E CO PI ED , IS SU ED O R LO AN ED T O AN Y TH IR D PA R T Y F O R A N Y P U R PO S E OT H E R T H A N F O R WHIC H I T H AS BEE N I SSU ED. 02 .E H- 2 HA S BE EN P LA NN ED F OR L EE D GO L D C ER T I FI C AT I O N . C O NT R A CT O R T O EN SU R E T HA T A L L P RE CO N ST R UC T IO N RE L AT E D P RA C TI C ES A RE AD H ER E D T O

NOTES 01. W HI LE E VE RY AT TE MP T HA S BE EN MA DE I N PR EP AR AT IO N OF T HI S DRA WI NG TO A VO ID MI ST AKE S, T HE AR C HI T E CT C AN N OT G UA R A NT E E AG AI NS T H UM A N ER RO R . TH E CO N T R AC T O R O N T HE J O B M U S T CH EC K AL L TH E D IM EN SI ON S AN D OT HE R DE T AI LS A ND BE R ES P ON SI BL E FO R TH E SA ME .

DESIGN CONSULTANTS

InFORM ARCHITECTS NO 422 , 2 ND FL OOR , 9 TH MA IN ROA D, BAN ASH ANK ARI II ST AGE , BAN GAL ORE - 5 600 70 PH/ FAX : + 91 80 267 133 60/ 61/ 62 E-mail: projec ts@inf ormarc hitect s.com

PROJECT

PROPOSED EXECUTIVE HOUSING - 2 FOR ISB CAMPUS AT MOHALI AT SEC TOR NO . 8 1, S.A .S NAG AR, MO HAL I, CHA ND IG AR H- P UN JA B

CLIENT

DRAWING NAME

CONNECTING CORRIDOR AND CANOPY DETAIL I

HYDE FLAT # APAR METHO HYDE PH:(00

84/3, 4TH MAIN ROAD, [OPP. KARNATAKA MAHILA HINDHI SEVA SAMITHI] CHAMRAJPET, BANGALORE -560018 TEL / FAX : 080 - 26507360 / 26507370 / 26610598 / 26610498

150MM THICK WET FIELD STONE CLADDING [TO STRUCTURAL DETAIL]

CONSOLIDATED EARTH [TO STRUCTURAL DETAIL]

CORRIDOR SECTION 3 1 : 25 MASTER PLAN

MEP CONSULTANTS

STRUC

MECA PROJECT ENGINEERS PVT. LTD.

50MM THICK FLOOR FINISH

RCC DRAIN [TO STRUCTURAL DETAIL]

SIZE STONE MASONRY [TO STEPS PROFILE]

EQ

STAIRCASE TREAD=1460MM HEIGHT OF THE RISER= 2EQ(128MM) WIDTH=1500MM RAMP [SLOPE 1:10]

MS GRATING [TO SEPARATE DETAIL]

GROU ND FLO OR SSL

I T L B U C P E T O IL W IN T G A

PH : +91 (80) 41252683

ENTRANCE FLOOR CARPET 50

EXISTING EH1 CORRIDOR FFL +304.21M 110MM DIA PVC PIPE TO BE CONNECTED TO THE NEAREST STORM WATER CHAMBER [AS PER SITE SONDITION] [TO SEPARATE DETAIL]

+304 .45 M

F S A T T O S E G A R I T E T L E I O F OC

AT SEC CHAN

BRICK BAT COBA TO SLOPE [TO STRUCTURAL DETAIL] RCC SLAB [TO STRUCTURAL DETAIL]

CW3

100MM WIDE EXPANSION JOINT [TO STRUCTURAL DETAIL]

+304 .50 M

KEY PLAN

IND BUS

RCC COLUMN CLADDED WITH 5MM MS STEEL [TO EXISTING EH1 COLUMN DETAIL]

EXISTING EH1 CORRIDOR COLUMN

25x75MM SS RHS

1500

85

RCC BEAM WITH PROFILE 1 : 10

ALIGN THE BOTTOM OF THE BEAM WITH THE EXISTING EH1 CANOPY BEAM BOTTOM

ALIGN THE TOP OF THE COLUMN CLADDING WITH THE EXISTING EH1 COLUMN CLADDING

150MM THICK WET FIELD STONE CLADDING [TO SEPARATE DETAIL]

12MM DIA SS BARS

1500

275

CLIEN

GLEEDS HOOLOOMANN CONSULTING (INDIA) PVT . LTD .

SAUCER DRAIN [TO SEPARATE DETAIL] RCC BEAM WITH PROFILE [TO EXISTING EH1 DETAIL] SLOPE 1:200

ALIGN THE TOP OF THE BEAM WITH THE EXISTING EH1 CANOPY BEAM TOP

RCC UPTURN BEAM [TO STRUCTURAL DETAIL]

50MM DIA SS RAILING

GRO UN D FLO OR F FL

180

CONSOLIDATED EARTH

20MM THICK BLACK LEATHER FINISHED GRANITE COPING [TO SEPARATE DETAIL]

STAIRCASE TREA D=1 460 MM HEIGHT OF THE RISER= 2EQ (1 28M M) WIDTH =150 0MM

55 116

+304 .00 M

EXISTING EH1 CORRIDOR CANOPY BEAM

150MM THICK WET FIELD STONE CLADDING

GRO UND FLO OR

220

150MM THICK HOLLOW BLOCK MASONRY [TO STRUCTURAL DETAIL]

FGL

06

25MM WIDE EXPANSION JOINT FILLED WITH CAPCELL BOARD [TO STRUCTURAL DETAIL]

RCC COLUMN WITH MS STEEL [PIPE] CLADDING [AS PER EXISTING EH1 CORRIDOR DETAIL]

+304 .72 M

151025

CORRIDOR ROOF PLAN 1 : 50

RCC SLAB OF THE EXISTING EH1 CANOPY TO BE EXTENDED [TO STRUCTURAL DETAIL] WATER PROOFING PLASTER [AS PER SPECIFICATION] RCC BEAM WITH PROFILE AS PER EXISTING EH1 CANOPY BEAM PROFILE [TO STRUCTURAL DETAIL]

ALIGN THE TOP OF THE COLUMN CLADDING WITH THE EXISTING EH1 COLUMN CLADDING

50

AT SEC CHAN

PROJECT MANAGEMENT CONSULTANTS

350

02

19.1

ALIGN THE BOTTOM OF THE BEAM WITH THE EXISTING EH1 CANOPY BEAM BOTTOM

GROU ND FLO OR SSL +304 .45 M

150

RCC SLAB TO BE EXTENDED TILL THE EDGE OF EH1 CORRIDOR SLAB. PROPER BOND SHOULD BE ENSUREDBETWEEN OLD AND NEW CONCRETE

19.2

150MM THICK WET FIELD STONE CLADDING [TO STRUCTURAL DETAIL]

+304 .50 M

A 04.CONSTRUCTION MANAGER / 05. ANY DISCREPANCY IN THIS OR PROJECT MANAGER TO REVERT A3 ANY OTHER DRAWINGS RELATED BACK WITHIN 7 WORKING DAYS TO THIS DRAWING SHALL BE OF RECEIVING THE DRAWING BROUGHT TO THE NOTICE OF THE ON CONSTRUCTION ISSUES . ARCHITECTS IMMEDIATELY. OTHERWISE IT WOULD BE DEEMED THAT THEY HAVE B 06. THIS DRAWING IS TO BE READ UNDERSTOOD AND ACCEPTED SSL +307.58 IN CONJUCTION WITH THE THE DRAWING/DESIGN AND STRUCTURAL AND SERVICES OWN FULL RESPONSIBILITY FOR C DRAWINGS. THE WORK THE WORK CARRIED OUT ACCORDINGLY.

455

20MM THICK BLACK LEATHER FINISHED GRANITE COPING [TO STRUCTURAL DETAIL]

GRO UN D FLO OR F FL

PRO FOR

51/2 SECOND FLOOR, PROMENADE ROAD FRASER TOWN BANGALORE- 560 005

50MM THICK FLOORING [TO STRUCTURAL DETAIL]

2088

100

: NATURAL GROUND LEVEL

3400

ALIGN THE TOP OF THE BEAM WITH THE EXISTING EH1 CANOPY BEAM TOP

900

B

W7

THK

CORRIDOR PLAN 1 : 50

04

A A3

: ELECTRICAL : LIFT MACHINE ROOM

FFL FGL SSL

RCC COLUMN WITH MS STEEL [PIPE] CLADDING [AS PER EXISTING EH1 CORRIDOR DETAIL]

205

A

ELE LMR

04. WRITTEN DIMENSIONS TO BE FOLLOWED.

PROJ

InFORM ARCHITECTS

E-mail: projects@informarchitects.com

330

: PLUMBING : AIR CONDITIONING : RAIN WATER : TOP OF SLAB

03.CONTRACTOR TO ENSURE THAT EXISTING FACILITIES ARE NOT DISTURBED.

50MM DIA RAINWATER SPOUTS [TO STRUCTURAL DETAIL]

150MM THICK WET FIELD STONE CLADDING [TO STRUCTURAL DETAIL]

03. ALL DIMENSIONS AT THE SITE TO RCCPRIOR BEAMTO TO PROFILE BE COUNTER CHECKED CONSTRUCTION. [TO EXISTING EH1 DETAIL]

DESIGN CONSULTANTS

NO 422, 2ND FLOOR, 9TH MAIN ROAD, BANASHANKARI II STAGE, BANGALORE- 560070 PH/FAX: +91 80 26713360/61/62

300

01

PHE

NGL

N

5870

AR-502A

A/C RW T.O.S

W1

FFL +304.500 SSL +304.450

CORRIDOR SECTION 3

RCC BEAM WITH PROFILE AS PER EXISTING EH1 CANOPY BEAM PROFILE [TO STRUCTURAL DETAIL]

450

3000

GD3

LOBBY/ RECEPTION

: LEVEL : STRUCTURAL

WATER PROOFING PLASTER [AS PER SPECIFICATION] 455

3000

800

1325

1880

A3

02.BH-2 HAS BEEN PLANNED FOR LEED GOLD CERTIFICATION . CONTRACTOR TO ENSURE THAT ALL PRE CONSTRUCTION RELATED PRACTICES ARE ADHERED TO LEED REQUIREMENTS.

19.2

3164 450

2808

1460

LVL STRL

CORRIDOR SECTION 3

1950

CARPET @ THE ENTRANCE

N

ABBREVIATIONS

555

STAIRCASE TR E AD = 1 46 0 M M HE IG HT O F TH E RIS ER = 2 EQ (12 8M M) WID TH =1 50 0M M

1460

SLOPE 1:10

50

200 EQ

2920 B

LEVEL INDICATOR

SIZE STONE MASONRY [TO STEPS PROFILE]

FFL +304.490 SSL +304.450

1950

N

R.C.C

AR-502A

LEATHER FINISH GRANITE

450

A3

4870

A

150MM DIA RCC CIRCULAR COLUMN CLADDED WITH 150MM THK WET FIELD STONE CLADDING [TO FOLLOW EH1 CORRIDOR COLUMN DETAILS]

3660

UP

4215

1500

A2

A2

SLO PE

4215

SLOPE 1:250 TO DRAIN WATER

SLOPE 1:250 TO DRAIN WATER

EQ 200 50 450

1500 RAMP UP

EQ

A2

240

200 MM THICK HOLLOW BLOCK MASONRY WALL

20

455

20

LEATHER FINISH GRANITE O IL T E T

19.1

CANOPY LEVEL TO BE ALIGNED WITH THE EXISTING EH1 CANOPY LEVEL

50MM DIA RAINWATER SPOUT 01. WHILE EVERY ATTEMPT HAS [TO STRUCTURAL DETAIL] BEEN MADE IN PREPARATION OF THIS DRAWING TO AVOID 50MM DIA SLEEVE TP BE MISTAKES, THE MAKER CANNOTIN THE BEAM PROVIDED GUARANTEE AGAINST [TOHUMAN STRUCTURAL DETAIL] ERROR. THE CONTRACTOR ON 110MM DIA SLEEVE IN THE SLAB THE JOB MUST CHECK ALL THE [TO STRUCTURAL DETAIL] 240 DIMENSIONS AND OTHER DETAILS AND BE RESPONSIBLE FOR THE A2 SAME. 110MM DIA RAINWATER SPOUTS STRUCTURAL DETAIL] 02. ALL DIMENSIONS[TO ARE IN MILLIMETRES UNLESS OTHERWISE SPECIFIED. 100

FFL +304.208 SSL +304.158

OL T I T E

4340

SLOPE 1:200

O IL T E T

T O S A G R E

U C P L IB WA N G IT

NOTES

SAUCER DRAIN

01.THIS DRAWING IS THE PROPERTY OF InFORM ARCHITECTS AND IS NOT TO BE 150 MM THICK HOLLOW CORRIDOR SECTION 2 COPIED, ISSUED OR LOANED TO AR-502A BLOCK MASONRY WALL ANY THIRD PARTY FOR ANY 230 MM THICK FLY ASH PURPOSE OTHER THAN FOR BRICK MASONRY WALL WHICH IT HAS BEEN ISSUED.

4780

IMPORTANT NOTES 350 MM THICK HOLLOW BLOCK MASONRY WALL

12080

LEGENDS EXISTING STORM WATER LINE [AS PER THE SITE CONDITIONS] TOP RL +302.818 AR-502A

S F T A OF IC E

A1 SSL +306.89

CORRIDOR SECTION 2 O IL T E T

RCC UPTURN BEAM [TO STRUCTURAL DETAIL]

SLOPE 1:200

A1

EXISTING SEWER LINE [AS PER SITE CONDITIONS] TOP RL +302.558

SLOPE 1:200

A1

T O S A G R E

U IB P L C W IN T G A

295

EXISTING EH1 CANOPY 110MM DIA PVC PIPE TO BE CONNECTED TO THE NEAREST STORM WATER CHAMBER [AS PER SITE CONDITIONS] EXISTING EH1 FOOTING [AS PER SITE CONDITIONS] TOP RL +302.708

MASTER PLAN

T F S A OF IC E

21

24

4340

KEY PLAN

330

AR-502A

1050

150 150 150 1500

450 450

225 450 225

A1

23

19.2

EXISTING EH1 FFL +304.208

450

1950

3000

20

500

19.2

1525 SCALE 1:50 2525

450

19.1

SLOPE 1:200

19.1

EXISTING EH1 FFL +304.208

EXTENT OF EXISTING PLANTER BOX [TO BE DEMOLISHED AND REBUILT]

3400

AR-502A

7300

As indicated

CLIENT

STRUCTURAL CONSULTANTS

DATA AND ALUMINIUM SLIDING WINDOW COMMUNICATION SHAFT MAKE : SCHUECO A.C. SHAFT

LVL STRL PHE A/C RW T.O.S ELE LMR

AT SECTOR NO. 81, S.A.S NAGAR, MOHALI, CHANDIGARH- PUNJAB

E-mail: projects@informarchitects.com

MEP CONSULTANTS

28, 30, 31, 33, 34, 36, 37, 39, 40, 42, 43, 45, 350MM THK HOLLOW BLOCK 48, 50, 51, 53 MASONRY WALL 46

IMPORTANT NOTES

6 DRAWING NAME

PROPOSED BACHELOR HOUSING - 2 FOR ISB CAMPUS AT MOHALI

NO 422, 2ND FLOOR, 9TH MAIN ROAD, N BANASHANKARI II STAGE, BANGALORE560070 PH/FAX: +91 80 26713360/61/62

[AS PER TENDER SPECS]

ORIENTATION

ON

InFORM ARCHITECTS N

Width Height Description Location Count 1600 2250 Single Shutter Flush Door + Fixed glass Entrance - Common Room 22 980 2250 Single Shutter Full Glazed Passage 44 1000 2250 Single Shutter Flush Door Bedroom, Store, Housekeeping 88 1050 2250 Single Shutter Flush Door Bedroom, Store, Housekeeping -900 2250 Single Shutter Flush Door Toilet 44 1430 2250 Aluminium 2 Track Sliding Door Cloth Drying 44 1200 2250 Fire Rated Metal Door Staircases 07 600MM THK PRECAST CONCRETE 1200 2250 Fire Rated Metal Door WIDE, 75MM Electrical Rooms 06 1200 2250 Fire Rated Metal Door I.T Room, Store 01 AS FLAGGING CONCRETE 600 Fire Rated Metal Door 2100 FHR Ducts 127 900 2100 Fire Rated Metal Door FHR Ducts 06 600 1200 Fire Rated Metal Door Service Ducts 05

THIS DRAWING IS THE PROPERTY OF InFORM ARCHITECTS AND IS NOT TO BE COPIED, ISSUED OR LOANED TO ANY THIRD PARTY FOR ANY PURPOSE OTHER THAN FOR WHICH IT HAS BEEN ISSUED.

N

7 PROJECT

650

YOUT FLOOR - I

10

03. ALL DIMENSIONS AT THE SITE TO BE COUNTER CHECKED PRIOR TO CONSTRUCTION.

ABBREVIATIONS

DESIGN CONSULTANTS

03. ALL DIMENSIONS AT THE SITE TO BE COUNTER CHECKED PRIOR TO CONSTRUCTION.

ABBREVIATIONS

A

S-9 AR-205

NOTES 350 MM THICK HOLLOW BLOCK MASONRY WALLS

LVL STRL PHE A/C RW T.O.S ELE LMR

S-8 AR-205

70 980

11 LEGENDS

S-10 AR-206

Door Schedule - Phase I

Window Schedule - Phase I Type W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13

4400

37

38

T O IL E T

1050

39

T O IL E T

1780

40

41

T O A G R E

600

42

43

S

P U B L IC I T A IN G

1800

45 44

S T A F F IC E

DESIGN CONSULTANTS

01. WHILE EVERY ATTEMPT HAS BEEN MADE IN PREPARATION OF THIS DRAWING TO AVOID MISTAKES, THE ARCHITECT CANNOT GUARANTEE AGAINST HUMAN ERROR. THE CONTRACTOR ON THE JOB MUST CHECK ALL THE DIMENSIONS AND OTHER DETAILS AND BE RESPONSIBLE FOR THE SAME.

150 MM THICK HOLLOW BLOCK MASONRY WALLS

E A G R T O

E T T O IL

IC P U B L T G I IN A W

O

3650

W2

18380

900

W2

600

W2

37


07 professional

Professional | Internship

Kavya Buildcon Site Office, Khardi

Office | Sanjay Puri Architects, Mumbai Team | Toral Jayawant,

Rithu Mathew Roy

Chief Architect | Sanjay Puri

38

Architecture + Design | Selected Works 2013-2016


The site office of the Kavya Buildcon’s township was essentially designed to house the administrative staff during the construction and sale phase of their township in Khardi, Maharashtra, India.

roof plan

concept:

The main concept of the design is to evolve the building from the contours of the site which varies from 1-2 metres within one metre in plan. Following the contours, the building had undulating roofs, which were followed down by a green patch of landscape. As a result, the building looks as a part of the site, rising from the contours.

This office building echoes the sand dunes of the surrounding landscape in angular planes covered with grass simultaneously contrasting with its surroundings. Office spaces are laid out in a single level. The entire site is covered with grass with angular planes rising gradually over the built up spaces & shields them from high temperatures.The planning of this building itself ensures cool naturally ventilated & naturally lit spaces within it. The sculpted feel of the spaces within the building create a unique work environment underneath the angular planes of that reduce the heat gain into the building substantially.

floor plan

The north facing side of the building is fully glazed so as to let in the maximum amount of the northern indirect light while the southern side has maximum landscaped area along with the coinciding undulating site. Even though RCC was used, the structure majorly was designed in steel. I- sections and box sections of various sizes were used on site as per the suggestions of the structural engineer. 39


CONCEPT: The Bungalow is a part of Ateria, a bungalow scheme by Kavya Buildcon in Lonavala, Maharashtra. It houses the clubhouse in the basement and the owner’s houses on the upper floors. Angled spaces projected towards different directions encapsulated in an organically folded concrete skin create a two level building. The entire frontage of the site along the main road overlooks large trees and a riverbed and hills. The axis of the building changes constantly from one side to the other allowing each space within to look out towards different views of the surrounding landscapes.

08 professional

Professional | Internship

Kavya Buildcon

Bungalow Scheme, Lonavala Office | Sanjay Puri Architects, Mumbai Team | Toral Jayawant,

Rithu Mathew Roy

Chief Architect | Sanjay Puri

40

Architecture + Design | Selected Works 2013-2016


basement floor

lower basement floor

ground floor

Another completed bungalow of the same project first floor

41


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

09 professional

professional | internship

Elizabeth House High Rise, Dadar

Office | Sanjay Puri Architects,

Mumbai

Team | Toral Jayawant,

Rithu Mathew Roy

Chief Architect | Sanjay Puri

42

Architecture + Design | Selected Works 2013-2016


PRODUCED BY AN AUTODESK

DOOR SCHEDULE

1

1'

2 3

6 7

4

3'

8

9 10

WIDTH 600 1100 800 1000 1100

LOCATION ELECTRICAL DUCT ROOM STAIRCASE TOILET BEDROOM MAIN ENTRANCE

NO.

3 4 6 7 8

HEIGHT 2100 2450 2450 2450 2450

1.

2.

3.

4.

WINDOW SCHEDULE NO.

5 6 9 17 18 12 13 14 15 16

A BEDROOM 02

A' TOILET

TOILET

B

D1

BEDROOM 03 [APT 5] LIFT LOBBY KITCHEN [APT 4] LIVING ROOM [APT 4] BEDROOM 02 [APT 4] BEDROOM 01 [APT 4]

D7

NO.

STUDY

KITCHEN

WIDTH 750 600

LOCATION TOILET [SILL = 1200] TOILET [SILL = 1200]

1 2

BALCONY

D

SUNK AREA DUCT

HEIGHT 1250 1250

D6

5

E F

F.F.

BEDROOM 03

G

D2

G'

D3

s.s.

LIFT LOBBY

4

TOILET

ELEC duct D5

D1 D5

GOKHALE

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

C

5. 6.

VENTILATOR SCHEDULE

LIVING ROOM BALCONY

HEIGHT 1500 2450 2450 2450 2450 2450 2450 2450 2450 2450

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

BEDROOM 01

WIDTH 2426 3450 2133 4863 2529 1374 2145 4393 1910 2943

LOCATION STAIRCASE BEDROOM 01 [APT 5] BEDROOM 02 [APT 5] LIVING ROOM[APT 5]

UNLESS OTHERWISE INDICATED ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN METERS. ALL DRAWINGS SHALL READ INCONJUNCTION WITH RELEVANT SECUCTURAL AND MEP DRAWINGS. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT BEFORE COMMENCEMENT OF WORK ON SITE. ALL SHADES, DESIGN AND COLORS SHOULD BE FINALLY APPROVED ON SITE ACCORDING TO THE SUBMITTED AND /OR APPLIED SAMPLES TO THE ARCHITECTS APPROVAL. DO NOT SCALE THE DRAWING. THIS DRAWING IS A COPYRIGHT OF "SANJAY PURI ARCHITECTS". DO NOT DUPLICATE/COPY OR MODIFY WITHOUT PRIOR WRITTEN PERMISSION OR CONSENT.

ROAD[SOUTH]

BEDROOM 01

H

D2

D4

H'

s.s.

TOILET

LIVING ROOM

H'

TRANSFER

D2

D4

TOILET s.s. KITCHEN

D3

D3

D6

D4

D7

J BEDROOM 02

K

SURAJ DEVELOPERS SANJAY PURI ARCHITECTS ELIZABETH HOUSE (FP-398)

1'

8'

B+G+11 FLOORS

9'

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

5TH FLOOR PLAN

5TH FLOOR PLAN PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

K EDUCATIONAL PRODUCT

ADVANCE COPY

DOOR SCHEDULE

1'

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

1

2 3

3'

6 7

4

8

9 10

WIDTH 600 1100 1260 800 1000 1100

LOCATION ELECTRICAL DUCT ROOM STAIRCASE BALCONY TOILET BEDROOM MAIN ENTRANCE

NO.

3 4 5 6 7 8

HEIGHT 2100 2450 2450 2450 2450 2450

1.

1.

2.

WINDOW SCHEDULE NO.

5 6 7 8 9

A TO SLOPE

BEDROOM 01

BEDROOM 01

A' TOILET

TOILET

B LIVING ROOM

LIVING ROOM KITCHEN

G

3

2

E F

LIFT

TO SLOPE

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

D

HEIGHT 2450 2450 2450 2450

10

LIVING ROOM [APT 2] SILL = 1200

915

1250

11 12 13 14 15 16

LOBBY LIFT LOBBY KITCHEN [APT 1] LIVING ROOM [APT 1] BEDROOM 02 [APT 1] BEDROOM 01 [APT 1]

1499 1374 2145 4393 1910 2943

2450 2450 2450 2450 2450 2450

3.

4.

5. 6.

VENTILATOR SCHEDULE NO.

LIFT

WIDTH 750 600

LOCATION TOILET [SILL = 1200] TOILET [SILL = 1200]

1 2

HEIGHT 1250 1250

F.F. GOKHALE

ROAD[SOUTH]

LIFT LOBBY

TOILET

s.s.

ELEC duct

G' H

3.

4.

5. 6.

BALCONY

KITCHEN

BALCONY

LIVING ROOM [APT 3] BEDROOM 01 [APT 3]

WIDTH 2426 3450 2804 1829 2133

U A M A A IN S D A D T A C S A C A T A A D T O D M P

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

C

LOCATION STAIRCASE BEDROOM 01 [APT 2] LIVING ROOM [APT 2]

2.

UNLESS OTHERWISE INDICATED ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN METERS. ALL DRAWINGS SHALL READ INCONJUNCTION WITH RELEVANT SECUCTURAL AND MEP DRAWINGS. ANY INCONSISTENCY OR DISCREPANCY IS TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT BEFORE COMMENCEMENT OF WORK ON SITE. ALL SHADES, DESIGN AND COLORS SHOULD BE FINALLY APPROVED ON SITE ACCORDING TO THE SUBMITTED AND /OR APPLIED SAMPLES TO THE ARCHITECTS APPROVAL. DO NOT SCALE THE DRAWING. THIS DRAWING IS A COPYRIGHT OF "SANJAY PURI ARCHITECTS". DO NOT DUPLICATE/COPY OR MODIFY WITHOUT PRIOR WRITTEN PERMISSION OR CONSENT.

BEDROOM 01 LIVING ROOM

H'

s.s. duct

SERVANT TOILET

H'

TRANSFER SLAB s.s.

TOILET KITCHEN

J BEDROOM 02 TO SLOPE

SURA

SANJ

K

SURAJ DEVELOPERS

ELIZA

SANJAY PURI ARCHITECTS ELIZABETH HOUSE (FP-398)

1'

8'

B+G+

B+G+11 FLOORS

9'

4TH FLOOR PLAN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

ADV

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

VALID FOR CONSTRUCTION

Elizabeth House a project under Suraj Estate Developers, Mumbai, is a residential tower similar to any normal residential building in Mumbai, has limitation in carpet area and therefore rises to higher no of floors with basement + ground floor + 11 floors. The tower was designed to house MTNL office on the basement & ground floors. These floors have a separate lift and staircase too. Of the 11 floors of the tower, first, second and third floors are designed as podiums for car parking. The building is designed with a car lift due to the lack of space for ramps. Structurally, the first four floors (GF to third podium) of the tower are designed according to the requirement of the podium parking. There is a transfer slab after third podium which has girders of 1.5m depth. The transfer slab is to change the position of the columns after the third floor according to the residential apartments on the upper floors.

1.

2.

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

3.

4.

GOKHALE

300 600

600

467 618 872

3256 230

230

2575 265 TOILET

785

1880

900

842

LIVING ROOM

520 564

1494

797

985

4910

115

114

LIVING ROOM

KITCHEN

750

592

1865

983

2530

905

2

1999

1334

640

725

1853

1520

3329

TOILET

770

195

LIFT LOBBY

731 3058

BEDROOM 01

615

298

SERVANT TOILET

2385

TOILET

s.s. duct

1165 1395

SURAJ DEVELOPERS

520

KITCHEN

827

1877

1795 4393

SANJAY PURI ARCHITE

1185

398

1880

1240

520

115 298

1085 115

2223

1196

1785 LIVING ROOM

600

350 2971

ELEC duct

1104

2163

ELIZABETH HOUSE (FP

520

BEDROOM 02

2943

s.s. duct

F.F. duct

350 350

350 230

1330

3987

s.s. duct

600

LIFT

LIFT

115

TO SLOPE

600

797

3

2459

125

148

2230 338

265 640

600

801

983

750

1615

ELE 003

BALCONY

KITCHEN

BALCONY

385

ELE 004

1480

370

BEDROOM 01

230

520

1736

2621

TO SLOPE

230

89

785

300

957 150 370

70 2656

520

3450

BEDROOM 01

2460

ROAD[SOU

300

3830

TOILET

797

488

600

300 418

3615

830

300

TO SLOPE

695

B+G+11 FLOORS

43

DETAIL 00

VALID FOR CONSTRUCTION

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

5. 6.

UNLESS OTHERWIS ALL DIMENSIONS AR MILLIMETERS AND A ARE IN METERS. ALL DRAWINGS SHA INCONJUNCTION W SECUCTURAL AND DRAWINGS. ANY INCONSISTENC DISCREPANCY IS TO TO THE ATTENTION ARCHITECT BEFOR COMMENCEMENT O SITE. ALL SHADES, DESIG COLORS SHOULD B APPROVED ON SITE TO THE SUBMITTED APPLIED SAMPLES ARCHITECTS APPR DO NOT SCALE THE THIS DRAWING IS A OF "SANJAY PURI A DO NOT DUPLICATE MODIFY WITHOUT P PERMISSION OR CO


10 academic

academic | thesis

A city on the hill,

Christian Worship Centre B.Arch | NIT Patna, India Tutor | Ajay Kumar

44

Architecture + Design | Selected Works 2013-2016


Sanctuary later moved to the lower contours to minimise cutting. Youth centre placed for easy access from both road and the sanctuary

45


Sanctuary was placed at the lowest contour so as to minimise cuttting on the site Roof top of the sanctuary is made garden so as the people may interact well with the nature The Chapel placed above the roof top garden maintains the topography and no cutting is done Connexion is the connecting stairway to the sanctuary aligned above the topography for minimal cutting The Youth Centre also maintains its contour level and first floor matches with the upper contours Suites, similarly is placed maintaing the contours all well connected through stairs and landscaping

•

The main aim of the sanctuary was to accommodate 10,000 people while giving each a complete backdrop of the scenic background.

•

The congregation seated in semicircular/ circular in form- could face each other to allow greater focus

46

Architecture + Design | Selected Works 2013-2016

The entrance is welcomed by the view looking onto the hills and the valleys The chapel placed above the roof top garden also provides the serene view integrateing the worshipper with the nature Sanctuary has glazed backdrop which gives a clear view to worshippers inside


47


48

Architecture + Design | Selected Works 2013-2016


49


rithu roy

Helen Graham House 57, Great Russell Street London, WC1B 3BA rithu_roy@hotmail.com +44 7448442745

50

Architecture + Design | Selected Works 2013-2016


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.