1 minute read
Culinary Water Fund
2021-2022 2022-2023 2023-2024 2023-2024
• Abandon Garamandi Well & prep site for surplus
• Chlorine sampling stations
• 1830 S Waterlline (50-60 year old lline) - rollover from FY 23 (using transfer from REDIIF)
• 11800 S Waterline (3600 W - 2700 W) - rollover from FY 23 (using transfer from REDIIF)
• Add Meter Stations with South Jordan - Charterpoint & Reeves - rollover from FY 23 (using transfer from REDIIF)
Mayor:
• Move SJ meter station to after Green Well project is done, to determine if this project is needed.
• Use General fund to cover the cost to abandon Garamandi Well and prep site for surplus